exhaust scrubber schedule - first cascade

27

Upload: others

Post on 24-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXHAUST SCRUBBER SCHEDULE - First Cascade
Page 2: EXHAUST SCRUBBER SCHEDULE - First Cascade
Page 3: EXHAUST SCRUBBER SCHEDULE - First Cascade

SYMBOL TYPE FACE FRAME FINISH BASIS OF DESIGN NOTES

CD-1 CEILING DIFFUSER PERF 24X24 FACTORY WHITE TITUS PCS

SWS-1 SIDEWALL SUPPLY LOUVER SEE PLANS FACTORY WHITE TITUS 23RL

CTG-1 CEILING TRANSFER GRILLE PERF 24X24 FACTORY WHITE TITUS PAR

NOTES:

DIFFUSER, REGISTER AND GRILLE SCHEDULE

S-1 COOKLINE CAPTIVE AIR KB20-INLINE CENTRIFUGAL BELT 4200 500 2.25 1652 26 8 0.329 2 119 15 0.217 4 119 CARBON 0.671 4 119 460 3 5.42 7.5 9.6 Y N 28521, 2

S-2 COOKLINE CAPTIVE AIR KB-25 INLINE CENTRIFUGAL BELT 6800 500 2.25 1283 26 8 0.233 2 108 15 0.161 4 108 CARBON 0.46 4 108 460 3 7.67 10 12.2 Y N 40971, 2

NOTES:

1 UNIT TO BE LISTED TO UL-762 FOR GREASE EXHAUST

2 MINIMUM AIRFLOW TO BE ADJUSTABLE AND DETERMINED AT TIME OF CONSTRUCTION TO ENSURE NO AIRFLOW FROM THE KITCHEN ENTERS THE LOBBY SPACE.

EXHAUST SCRUBBER SCHEDULE

SYMBOL AREA SERVED

BASIS OF DESIGN

TYPE DRIVE

AIR

FLOW

(CFM)

MIN AIR

FLOW

(CFM)

ESP

(IN H20)

FAN RPM

SOUND

(SONES)

PRE-FILTER DUAL HIGH EFFICIENCY FINAL FILTER DUAL ODOR CONTROL FILTER ELECTRICAL

VFD

(Y/N)

EMERG.

POWER

(Y/N)

MAX.

WT

(LBS)

NOTES

MFR MODEL MERV

CLEAN SP

LOSS (IN

H20)

THICKNESS

(IN)

FACE

VELOCITY

(FPM)

MERV

CLEAN SP

LOSS (IN

H20)

THICKNESS

(IN)

FACE

VELOCITY

(FPM)

MEDIA

CLEAN SP

LOSS (IN

H20)

THICKNESS

(IN)

FACE

VELOCITY

(FPM)

VOLTS PH BHP MHP FLA

AIR EMERG. MAX

FLOW TSP FAN VFD POWER WT

SYMBOL AREA SERVED MFR MODEL TYPE DRIVE

(CFM) (IN H2O)

RPM VOLTS PH BHP MHP

(Y/N) (Y/N) (LBS)

NOTES

EF-6 DISHWASHER GREENHECK CUBE-101-3 CENTRIFUGAL BELT 1100 0.75 1700 120 1 0.3 0.5 N N 85

NOTES:

1

2

FAN SCHEDULE

BASIS OF DESIGN ELECTRICAL

INLET TU MIN WATER

SIZE MAX MIN SP HTG CAP FLOW EWT LWT EAT LAT WPD

SYMBOL AREA SERVED MFR MODEL

(IN)

CFM CFM

(IN H2O)

CFM

(MBH) (GPM) (°F) (°F) (°F) (°F) (FT H2O)

NOTES

TU-2-XX STAGING AREA MATCH EXISTING MATCH EXISTING 10 1080 0 0.5 1080 29.16 1.5 180 141.1 55 80 5 1

TU-3-XX 2ND FLOOR STAGING AREA MATCH EXISTING MATCH EXISTING 16 2590 0 0.5 1300 33.57 2 180 144.9 55 80 5 1

NOTES:

TERMINAL UNIT SCHEDULE - PHASE 1

BASIS OF DESIGN COOLING HOT WATER HEATING COIL

AIRFLOW

1. COORDINATE SYMBOL IDENTIFICATION WITH EXISTING IDENTIFICATION SYSTEM.

INLET TU MIN WATER

SIZE MAX MIN SP HTG CAP FLOW EWT LWT EAT LAT WPD

SYMBOL AREA SERVED MFR MODEL

(IN)

CFM CFM

(IN H2O)

CFM

(MBH) (GPM) (°F) (°F) (°F) (°F) (FT H2O)

NOTES

TU-1-XX KITCHEN MATCH EXISTING MATCH EXISTING 16 2615 0 0.5 NA NA NA NA NA NA NA NA 1

NOTES:

TERMINAL UNIT SCHEDULE - PHASE 2

BASIS OF DESIGN COOLING HOT WATER HEATING COIL

AIRFLOW

1. COORDINATE SYMBOL IDENTIFICATION WITH EXISTING IDENTIFICATION SYSTEM.

1

1

1

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

CONTACT

PROJECT

100 SW Main Street

Suite 1600

Portland, OR 97204

TEL 503.382.2266

FAX 503.382.2262

www.interfaceengineering.com

Jesse Agosta

2019-0026

20

0 C

OM

ME

RC

IA

L S

TR

EE

T - S

ALE

M, O

RE

GO

N 97301

CIT

Y O

F S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R

100% CD Set

KIT

CH

EN

IM

PR

OV

EM

EN

TS

18-0927 05/21/2019

1

M0.2

SCHEDULES - MECHANICAL

20

Page 4: EXHAUST SCRUBBER SCHEDULE - First Cascade

2472

2472

RECEIVING

135

PLATING

156B

DISHWASHING

156A

ELECTRICAL ROOM

134

HALLWAY

125

LOADING DOCK

STAFF TOILET

160

STAFF LOCKERS

159

COOLER ALCOVESTORAGE

158

157

CORRIDOR

135.1

135F

155B (E)

156A (E)

156

KITCHEN

EF-4

ON ROOF

AC-3

20x60

20x34

20x34

18x16

HW

S

HW

R

3"

4"

14x10

HWS

HWR

1-1/2"

16x18

1/2"

CD-1

50

6"Ø-2

EF-7

1"

34x20

12"Ø

CW

S

CW

R

R

R

CU-9

ON ROOF

1-1/2"

TO

AC-9

14"Ø

TU-1-XX

18x14 14x14

6"Ø

20x12

ROUTE NEW EXHAUST DUCT

THROUGH EXISTING ROOF

PENETRATION - EXISTING

PENETRATION SIZE IS

UNVERIFIED. IF OPENING

SIZE MINUS THE REQUIRED

2" THICK FIRE WRAP IS LESS

THAN THE SIZE INDICATED

CONTACT ENGINEER OF

RECORD FOR DIRECTIONS.

ROUTE NEW EXHAUST DUCT

THROUGH EXISTING ROOF

PENETRATION - EXISTING

PENETRATION SIZE IS UNVERIFIED.

IF OPENING SIZE MINUS THE

REQUIRED 2" THICK FIRE WRAP IS

LESS THAN THE SIZE INDICATED

CONTACT ENGINEER OF RECORD

FOR DIRECTIONS.

28x12

32

x1

22

2x1

2

14

x1

2

28x1

2

14

x14

14"Ø

DUCT SIZE TO

MATCH HOOD

CONNECTION

SIZE TYPICAL

DUCT SIZE TO

MATCH HOOD

CONNECTION

SIZE TYPICAL

DUCT SIZE TO

MATCH HOOD

CONNECTION

SIZE TYPICAL

10"Ø

18"Ø

18"Ø

NEW CAP AT

EXISTING DUCT

TU-2-XX

3/4" HWS

3/4" HWR

UH-1

RELOCATED

104x48

60x4830x48

104x48

22x12

22x12

22x12

22x12

22x12

22x12

22x12

22x12

60x48

60x48

60x48

CTG-1

1410

22x22

TYP 8

CTG-1

1155

22x22

TYP 8

1

4

x

6

14x14

14X10 DOWN TO DISHWASH UNLOAD

SIDE-TRANSITION TO CONNECTION

SIZE IN DROP

14X6 DOWN TO DISHWASH

LOAD SIDE-TRANSITION

TO CONNECTION SIZE IN

DROP

14X6

14X10 UP TO NEW EF-6- TRANSITION

TO EXISTING ROOF PENETRATION

OPENING IN RISE.

8"Ø

8"Ø

1

1

12"Ø

CD-1

530

12"Ø-3

CD-1

550

12"Ø-3

CD-1

285

8"Ø-2

CD-1

285

8"Ø-2

T

TU-2-XX

T

TU-1-XX

7

M4.0

8

M4.0

7

M4.0

6

M4.0

TYPICAL ALL

FSD

CD-1

285

8"Ø-2

CD-1

285

8"Ø-2

CD-1

285

8"Ø-2

CD-1

285

8"Ø-2

14x12

42x1

2

3

2

x

1

4

10x14

PHASE 1 SCOPE OF WORK

PHASE 2 SCOPE OF WORK

3

1

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

PROJECT

CONTACT

100 SW Main Street

Suite 1600

Portland, OR 97204

TEL 503.382.2266

FAX 503.382.2262

www.interfaceengineering.com

Jesse Agosta

2019-0026

20

0 C

OM

ME

RC

IA

L S

TR

EE

T - S

ALE

M, O

RE

GO

N 97301

CIT

Y O

F S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R

100% CD Set

KIT

CH

EN

IM

PR

OV

EM

EN

TS

18-0927 05/21/2019

1

M2.0

ENLARGED FIRST FLOOR

PLAN - MECHANICAL

0 4' 8'

SCALE: 1/4"=1'-0"

2'

1 ENLARGED FIRST FLOOR PLAN - MECHANICAL

GENERAL SHEET NOTES

A. DUCTWORK SERVING A SINGLE DIFFUSER OR GRILLE TO BE

THE SAME SIZE AS THE DIFFUSER OR GRILLE NECK.

B. NEW PIPING THAT IS NOT SIZED IS TO BE 3/4" MIN.

PHASE 1

GENERAL SHEET NOTES

A. ENCLOSE GREASE EXHAUST DUCT IN 2-HOUR RATED FIRE

WRAP.

B. CONTROLS REQUIRED FOR THIS PROJECT:

1. THE NEW DISHWASHER EXHAUST FAN IS TO USE

THE CONTROLS THAT CURRENTLY CONTROL THE

EXISTING DISHWASHER EXHAUST FAN.

2. THE NEW SCRUBBER IS CONTROLLED BY HOOD

CONTROL PANEL.

3. EXISTING ROOF TOP UNITS THAT SUPPLY LOBBY AND

RESTAURANT HAVE POWER EXHAUST FANS. EXISTING

ROOM PRESSURE CONTROL WILL ACTIVATE THE POWER

EXHAUST FANS AS THE KITCHEN EXHAUST AIR VOLUME

VARIES.

C. DUCTWORK SERVING A SINGLE DIFFUSER OR GRILLE TO BE

THE SAME SIZE AS THE DIFFUSER OR GRILLE NECK.

D. NEW PIPING THAT IS NOT SIZED IS TO BE 3/4" MIN.

SHEET KEYNOTES

1. CONSTRUCT DISHWASHER EXHAUST DUCT OF STAINLESS STEEL.

CONSTRUCT WITH NO LONGITUDINAL SEAMS ON THE BOTTOM. SEAL

TRANSVERSE SEAMS WATER TIGHT. SLOPE DUCT TO DRAIN BACK TO

DISHWASHER.

2. DURING PHASE 1 REBALANCE (E) MAU-1 AND (E) MAU-2. REDUCE THE

MAKEUP AIR VOLUME IN (E) MAU-1 TO 2560 CFM

3. PROVIDE 2" DUCT LINER ON TRANSFER DUCTWORK.

PHASE 2

2

1

20

Page 5: EXHAUST SCRUBBER SCHEDULE - First Cascade

GW GW GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

HT

HT

S

G

HT

HT

MPG

HT

HT

HT

HT

HT

HT

HT

HT

HT

MP

GM

PG

MPG

DD

PW PW

GW

FS-1

2

3

1

2

3

4

4

4

4

4

RECEIVING

135

PLATING

156B

DISHWASHING

156A

ELECTRICAL ROOM

134

HALLWAY

125

LOADING DOCK

STAFF TOILET

160

STAFF LOCKERS

159

COOLER ALCOVESTORAGE

158157

CORRIDOR

135.1

156

KITCHEN

FS-2

FS-1

FS-1

FS-1

FS-1

4" GW

4" GW

4" GW

4" GW

4" GW

4" GW

G

G

G2

"1

-1

/2

"

2"

1-1/2"

1"

1"

1"

1-1

/2

"

1"

1-1

/2

"

1"

1"

1"

1"

WCO

5

2"

2"

2"

2"

WCO

WCO

WCO

5 1/2"

3/4"

51/2"

1

P0.0

1

P0.0

2

3

2

3

1"

MV-1

MV-1

3/4"

2 3

3" GW

3" GW

2472

2472

4

5

GW

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

GW

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

GW

3"GW

3"GW

3"GW

3"GW

4"

8

8

4"

1

1

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

CONTACT

PROJECT

100 SW Main Street

Suite 1600

Portland, OR 97204

TEL 503.382.2266

FAX 503.382.2262

www.interfaceengineering.com

Jerry Atienza

2019-0026

20

0 C

OM

ME

RC

IA

L S

TR

EE

T - S

ALE

M, O

RE

GO

N 97301

CIT

Y O

F S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R

100% CD Set

KIT

CH

EN

IM

PR

OV

EM

EN

TS

18-0927 05/21/2019

1

P2.0

ENLARGED FIRST

FLOOR PLAN - PLUMBING

0 4' 8'

SCALE: 1/4"=1'-0"

2'

1 ENLARGED FIRST FLOOR PLAN - PLUMBING

SHEET KEYNOTES

2 SEE KITCHEN CONSULTANT DRAWINGS FOR HOT WATER

CONNECTION SIZES TO KITCHEN EQUIPMENT AND

PLUMBING FIXTURES.

1 SEE KITCHEN CONSULTANT DRAWINGS FOR GAS LOAD

AND CONNECTION SIZES FOR KITCHEN EQUIPMENT.

3 SEE KITCHEN CONSULTANT DRAWINGS FOR COLD WATER

CONNECTION SIZES TO KITCHEN EQUIPMENT AND

PLUMBING FIXTURES.

4 CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF POST

TENSION CABLING IN THE FLOOR SLAB PRIOR TO CORE

DRILLING CONCRETE SLAB.

5 ROUTE PIPING BELOW FLOOR TO FIXTURE .

6 REFER TO P.01 GAS CALCULATION #1 FOR MORE

INFORMATION.

7 REFER TO P.01 GAS CALCULATION #2 FOR MORE

INFORMATION.

6

7

GENERAL SHEET NOTES

A. ALL WORK THIS SHEET TO BE DONE IN PHASE 2.

8 COORDINATE ROOF TOP PCU DRAIN LOCATION WITH

MECHANICAL SHEET M2.2. ROUTE PCU DRAIN PIPING @ 1/4"

PER FOOT SLOPE AWAY FROM UNIT. PROVIDE AN INDIRECT

CONNECTION TO GREASE WASTE SYSTEM. SEE KITCHEN

CONSULTANT SHEET K-5.15, CAPTIVEAIRE DRAWING SHEET

16 FOR MORE INFORMATION.

1

20

Page 6: EXHAUST SCRUBBER SCHEDULE - First Cascade

COVER SHEET

BARGREEN ELLINGSON

FS - CS

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

4 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

Page 7: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

270

2 N

E 11

4th

A

ve, S

uite 2

, V

ancou

ver, W

A, 98

68

4 P

HO

NE

: (3

60

) 82

8-54

18

F

AX

: (91

9) 22

7-5

98

3 E

MA

IL

: reg

90@

cap

tive

aire

.com

“ ”

ɸ

HOOD DRAWINGS

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

FS - K7

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

Page 8: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

HOOD DRAWINGS

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

FS - K7.1

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

Page 9: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.2

Page 10: EXHAUST SCRUBBER SCHEDULE - First Cascade

1500500

FLOW RATE (cfm)

1000

0.00

0

0.50

PR

ESSU

RE

DR

OP

(in

. H

20)

PRESSURE DROP VS. FLOW RATE

FR

AC

TIO

NA

L E

FF

ICIE

NC

Y (

%)

0

0.1

20

40

1.0

PARTICLE DIAMETER (um)10.0

EFFICIENCY VS. PARTICLE DIAMETER

60

80

100

1.00

1.50

2.00

2.50

3.00

3.50

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

270

2 N

E 11

4th

A

ve, S

uite 2

, V

ancou

ver, W

A, 98

68

4 P

HO

NE

: (3

60

) 82

8-54

18

F

AX

: (91

9) 22

7-5

98

3 E

MA

IL

: reg

90@

cap

tive

aire

.com

BALANCING DAMPER DETAIL

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.3

Page 11: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.captiveaire.com

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.4

Page 12: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.5

Page 13: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

270

2 N

E 11

4th

A

ve, S

uite 2

, V

ancou

ver, W

A, 98

68

4 P

HO

NE

: (3

60

) 82

8-54

18

F

AX

: (91

9) 22

7-5

98

3 E

MA

IL

: reg

90@

cap

tive

aire

.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.6

Page 14: EXHAUST SCRUBBER SCHEDULE - First Cascade

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

6 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.7

Page 15: EXHAUST SCRUBBER SCHEDULE - First Cascade

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.8

Page 16: EXHAUST SCRUBBER SCHEDULE - First Cascade

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.9

Page 17: EXHAUST SCRUBBER SCHEDULE - First Cascade

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.10

Page 18: EXHAUST SCRUBBER SCHEDULE - First Cascade

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.11

Page 19: EXHAUST SCRUBBER SCHEDULE - First Cascade

1

2

3

4

5

6

7

8

002/08/2018

----

----

----

----

----

----

----

----

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.12

Page 20: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.captiveaire.com

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.13

Page 21: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire.com

MASTER DRAWING

Ore

gon

Off

ice

270

2 N

E 11

4th

A

ve, S

uite 2

, V

ancou

ver, W

A, 98

68

4 P

HO

NE

: (3

60

) 82

8-54

18

F

AX

: (91

9) 22

7-5

98

3 E

MA

IL

: reg

90@

cap

tive

aire

.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.14

Page 22: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.captiveaire.com

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

²²

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.15

Page 23: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.cap

tive

aire.com

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.16

Page 24: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

270

2 N

E 11

4th

A

ve, S

uite 2

, V

ancou

ver, W

A, 98

68

4 P

HO

NE

: (3

60

) 82

8-54

18

F

AX

: (91

9) 22

7-5

98

3 E

MA

IL

: reg

90@

cap

tive

aire

.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.17

Page 25: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.18

Page 26: EXHAUST SCRUBBER SCHEDULE - First Cascade

²²

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.captiveaire.com

MASTER DRAWING

Ore

gon

Off

ice

2702 N

E 114th A

ve, S

uite 2, V

ancouver, W

A, 98684 P

HO

NE

: (360) 828-5418 F

AX

: (919) 227-5983 E

MA

IL: reg90@

captiveaire.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

7 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.19

Page 27: EXHAUST SCRUBBER SCHEDULE - First Cascade

SHEET NO.

SCALE:

DWG.#:

DRAWN

DATE:

BY:

REVISIONS

ww

w.ca

ptivea

ire

.co

m

MASTER DRAWING

Ore

gon

Off

ice

270

2 N

E 11

4th

A

ve, S

uite 2

, V

ancou

ver, W

A, 98

68

4 P

HO

NE

: (3

60

) 82

8-54

18

F

AX

: (91

9) 22

7-5

98

3 E

MA

IL

: reg

90@

cap

tive

aire

.com

BARGREEN

Phone: (503) 227-1161

Fax: (503) 345-0738

3232 NW INDUSTRIAL STREET

PORTLAND, OR 97210

ELLINGSON

www.bargreen.com

2:1

8 P

M 6

/1

4/1

9 \\B

EP

DX

20

16

\P

DX

_D

ES

IG

NS

TO

RA

GE

\D

RA

WIN

GS

\S

AL

EM

C

ON

VE

NT

IO

N C

EN

TE

R\H

-4

79

S

AL

EM

C

C C

AT

ER

IN

G K

IT

CH

EN

.D

WG

© MERRYMAN BARNES ARCHITECTS, INC.

ME

RR

YM

AN

B

AR

NE

S A

RC

HIT

EC

TS

4713

N A

LBIN

A AV

E. S

UITE

304

POR

TLAN

D, O

REGO

N 97

217

p 50

3.222

.3753

H-479

M. PHAN

S. BRITT

DRAWN BY:

PROJECT MANAGER:

HOOD DRAWINGS

FS - K7.20