Tucson Electric Power Company  CEC Application Irvington to Kino 138 kV Transmission Line Project April 2018  F1  EXHIBIT F:  RECREATIONAL PURPOSES AND ASPECTS State the extent, if any, the proposed site or route will be available to the public for recreational purposes, consistent with safety considerations and regulations and attach any plans the applicant may have concerning the development of the recreational aspects of the proposed site or route.  The alternative routes would be located within public road rightofway to the extent practical and will be available to the public consistent with existing use.  Alternative B is located directly adjacent to soccer fields at Kino Sports Complex and would therefore be colocated with this use.  Various recreational activities occur close to the preferred and alternative routes. There are also several municipal parks near the alternative routes that offer sports and playground facilities (see Exhibit F1). Although these facilities are located in proximity to the alternative routes, the Project would not prevent current recreation uses at these facilities. Table 6 lists the recreational facilities adjacent to the alternative routes.  Other neighborhood parks and recreation centers are located 1500 feet or more from the alternatives. Table 6. Recreation Facilities Adjacent to Alternatives Recreation Facility Location Adjacent to Alternative Quincie Douglas Recreation Center, Pool, Library, and Silver Lake Park Soccer Fields Northwest of the intersection of South Kino Parkway and East 36th Street North of Alternative A Kino Sports Complex (spring training fields) Between I10 and East Ajo Way North of Alternative B South of Alternative C Kino Veterans Memorial Stadium South of East Ajo Way South of Alternative C Kino Sports Complex (soccer fields), Kino Veterans Memorial Pool, Sam Lena Recreation Area, Mulcahy YMCA North of East Ajo Way North of Alternative C Julian Wash Greenway (trail) Runs northwest from South Rita Road to I10 Crossed by Alternative A at Irvington Road and Benson Highway.  Tucson Diversion Channel (trail) Runs northeast from Julian Wash Greenway east of Kino Parkway to Kino Environmental Crossed by Alternative B at I10 Crossed by Alternative C at East Ajo Way 

Upload: others

Post on 29-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Tucson Electric Power Company   CEC Application Irvington to Kino 138 kV Transmission Line Project  April 2018  

    F‐1  

    EXHIBIT F:   RECREATIONAL PURPOSES AND ASPECTS 

    State the extent,  if any, the proposed site or route will be available to the public for recreational  purposes,  consistent  with  safety  considerations  and  regulations  and attach  any  plans  the  applicant  may  have  concerning  the  development  of  the recreational aspects of the proposed site or route. 

     

    The alternative routes would be located within public road right‐of‐way to the extent practical and will be available to the public consistent with existing use.   Alternative B  is  located directly adjacent to soccer fields at Kino Sports Complex and would therefore be co‐located with this use.  

    Various recreational activities occur close to the preferred and alternative routes. There are also several municipal parks near the alternative routes that offer sports and playground facilities (see Exhibit F‐1). Although these facilities are located in proximity to the alternative routes, the Project would not prevent current recreation uses at these facilities. 

    Table 6 lists the recreational facilities adjacent to the alternative routes.  Other neighborhood parks and recreation centers are located 1500 feet or more from the alternatives. 

    Table 6. Recreation Facilities Adjacent to Alternatives 

    Recreation Facility  Location  Adjacent to Alternative 

    Quincie Douglas Recreation Center, Pool, Library, and Silver Lake Park Soccer Fields 

    Northwest of the intersection of South Kino Parkway and East 36th Street 

    North of Alternative A 

    Kino Sports Complex (spring training fields) 

    Between I‐10 and East Ajo Way  North of Alternative B 

    South of Alternative C 

    Kino Veterans Memorial Stadium 

    South of East Ajo Way  South of Alternative C 

    Kino Sports Complex (soccer fields), Kino Veterans Memorial Pool, Sam Lena Recreation Area, Mulcahy YMCA 

    North of East Ajo Way  North of Alternative C 

    Julian Wash Greenway (trail)  Runs northwest from South Rita Road to I‐10 

    Crossed by Alternative A at Irvington Road and Benson Highway.  

    Tucson Diversion Channel (trail)  Runs northeast from Julian Wash Greenway east of Kino Parkway to Kino Environmental 

    Crossed by Alternative B at I‐10 

    Crossed by Alternative C at East Ajo Way 

  • Tucson Electric Power Company   CEC Application Irvington to Kino 138 kV Transmission Line Project  April 2018  

    F‐2  

    Recreation Facility  Location  Adjacent to Alternative 

    Restoration Project north of East Ajo Way 

    Kino Environmental Restoration Project (trail and passive recreation) 

    North of East Ajo Way  North of Alternative C 

     

    The Julian Wash Greenway is part of The Loop, a shared‐use trail complex throughout Pima County and City of Tucson, that has both soft and hard surface trails. Pima County is developing “The Loop” around metropolitan Tucson with  links  to Marana, Oro Valley, and South Tucson. Pima County  residents and visitors on foot, bikes, skates, and horses can enjoy the more than 120 miles of shared‐use paths that have already been completed.  

    Kino Sports Complex (south of Ajo Way, and including Veterans Memorial Stadium) covers 155 acres, and is the largest professional sports and entertainment venue of its kind in Pima County. If offers recreational arenas for youth, high school, collegiate, semi‐pro, and professional grass sports and provides a setting for social gatherings, concerts, and community events. 

    Kino Sports Complex (north of Ajo Way)  is primarily dedicated to soccer and  long field activities with a lighted 2,000‐seat North Grandstand field, four soccer fields, and a 3,000‐seat stadium (North Stadium). 

    The Kino Environmental Restoration Project was created from a 50‐acre detention basin.  It covers 141 acres, and contains 28 acres of riparian and open water including a 5.6 acre, fifty‐foot deep pond; 21 acres of grassland, mesquite bosque, marsh and upland vegetation that rises to an elevation of 2,520 feet; and another 92 acres that includes flood control structures, a basin earthen berm, and a recreational path that surrounds the basin.   Recreational opportunities  include bird‐watching, wildlife viewing, and a 2.2 mile paved trail for walking, running, and bicycling. 

    Visitors  to  these  recreational  facilities would experience  an  impact  from  the  added  structures  in  the viewshed (see visual simulations in Exhibit G‐5).  The existing structures within view of the recreational facilities  include  the  railroad,  I‐10,  the  Sundt  Generating  Station,  various  commercial  and  industrial facilities, and multiple power distribution and transmission  lines, therefore the  impact of the Project’s additional structures is indirect and negligible. 

    The proposed Project would not directly impact the facilities or any of the current recreation uses. 

       

  • Tucson Electric Power Company   CEC Application Irvington to Kino 138 kV Transmission Line Project  April 2018   

     

     

     

     

     

     

     

     

     

     

    EXHIBIT F‐1    

  • Kino Env. Restoration Project

    Silverlake Park

    Kino Veterans Memorial Sports Complex

    Mulcahy YMCA

    Julian Wash Greenway

    The Bridges

    I-10

    36th St

    Ajo Way

    Irvington Rd

    Alvern

    on Wa

    y

    Benson Highway

    Kino P

    arkway

    Aviation Parkway

    Swan R

    d

    Kino

    Irvington

    D:\2018_Consulting_GIS\Clients\TEP\Projects\Irv_Kino\CEC_figures\MXDs\F1_d3.mxd3/27/2018

    This map is for planning purposes only.TEP and UNS Energy make no warranty of its accuracy

    Exhibit F-1Irvington to Kino 138kV Transmission Line ProjectRecreation

    0 1200 2400Feet ±

    Date Sources:TEPPima County GISCity of TucsonBasemap: ESRI World TopographicProjection: NAD 1983 UTM Zone 12NScale: 1:30,000

    Revised Study AreaUnion Pacific RailroadParkstrails

    _̂ Trail Heads# Proposed Substations

    Line Siting Alternatives

    Existing TEP Transmission138kV46kV

    ABCC