exhibit planning & design - state.nj.us documents/exhibit_design... · .1 exhibit plan 0.2...
TRANSCRIPT
Exhibit Planning & Design
Task 4 Submittal RFP 11-001
Production Documents, Book 1 of 3Exhibit Design Drawings
• Material and finishes• AV equipment specifications• Reference material for specialized
elements
Submitted to:NJ Pinelands CommissionNew Lisbon, NJ
Submitted by: Content•DesignCollaborativeLLCScituate, Massachusetts
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
0.0
Table of Contents
SSDrawn by:
2.15.12 Task 3
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
Table of Contents
0.1 Exhibit Plan
0.2 Exhibit Gallery Plan
0.3 Wall Location
0.4 Reflected Ceiling Plan
0.5 Overall Wall Elevation
1.0 Introduction Area
1.1 Touchable Map
1.2 Hidden Wonders Wall
1.3 Hidden Wonders Flip Up Panels
2.0 Area 2.0 Geology
2.1 Geology
2.2 Details
2.3 Aquifer Interactive
2.4 Aquifer Interactive
3.0 Area 3.0 Uplands
3.1 Uplands Elevations
3.2 Details
3.3 Flipbook
4.0 Area 4.0 Wetlands
4.1 Wetlands Elevations
5.0 Area 5.0 Surface Waters
5.1 Elevations and Details
5.2 Cedar Water Interactive
5.3 Cedar Water Interactive
6.0 Pinelands Resources
6.1 Elevations
6.2 Elevations
6.3 Object Reference Key
6.4 Graphic Rail Details
7.0 Map Graphic
7.1 Video & Frame Details
8.0 General Details
8.1 Renderings
5.31.12 Task 4NoteUse this book in conjunction with • Book 2 Graphics • Book 3 Content/Technical
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
0.1
Exhibit Plan
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
3/16" = 1'-0"Exhibit Plan1
14'-
2"
21'-8 3/4"
1.0 Introduction
6.0 Natural Resources
3.0 The Pine Uplands
4.0 Wetlands
5.0 Water
2.0 Geology
New Receptionist Area
Elevation KeySheet-Detail
1.1-2 Touchable Map
1.2-1 Flap Interactive Wall
2.0-1 Geology
3.1-1 The Pineland Uplands
4.1-1 The Wetlands
5.1-2 Surface Waters
6.0 Natural Resources
7.0-1 Graphic Panel
7.0-2 Screen
2.1
4.1
1.2
1.12
3
1
1
5.0
1
6.0
7.0 1
2
2.15.12 Task 3
7.0 Lobby
7.1 Welcome
7.3 Video
7.2 Orientation
7.4 Smartboard
13.1
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
0.2
Exhibit Gallery Plan
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
3/8" = 1'-0"Exhibit Gallery Plan1
14'-
2"
21'-9"
9'-5
"
4'-0
"
1.12 Topo Map
1.2 Hidden Wonders
2.3 Aquifer Interactive
3.5 Serotiny Video
4.3 Terrarium
5.5 Aquarium
5.3 Cedar Water Interactive
2.1 Feel the difference
1.0 Introduction
6.0 Pinelands Resources
3.0 Uplands
4.0 Wetlands
5.0 Surface Waters
2.0 Geology
3.6
3.2 Case
Aquarium access door
0.52
Note:Changes to wall; window removal and door installation are completed by the General Contractor
2.15.12 Task 3
3.3
4.5
4.6
3.4
5.4
Key1.1 Introduction graphic1.12 Topographical map1.13 Topo map base2.0 Geology graphic2.1 Feel the difference interactive2.3 Aquifer interactive3.0 Uplands graphic3.1 Area strip graphic3.2 Case3.3 Flipbook3.4 Snake model3.5 Serotiny video3.6 Case4.0 Wetlands graphic
4.1 Area strip graphic4.3 Terrarium tree frog4.42 Changeable label4.5 Flipbook4.6 Boat case5.0 Surface waters /1.2
Hidden wonders graphic5.1 Area strip graphic5.3 Cedar water interactive5.4 Flipbook5.5 Aquarium6.0 Pinelands resources6.1 Reader rail: Bog iron6.2 Reader rail: Sand
3.1
4.1
5.1
6.1
6.2
6.3
6.4
6.5
1.11.13 Base
7.1 Welcome Text
4.425.51
5.31.12 Task 4
6.3 Reader rail: Charcoal6.4 Reader rail: Cedar6.5 Reader rail: Piney lingo6.6 Ceiling graphic7.1 Welcome text7.2 Map7.3 Video frame
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
0.3
Wall Location
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
14'-
2"
21'-9"
R 6'-11 1/2''
R 1
0'-6
''
R 108'-3''
R 23'-11 1/2''
R 18'-5''
R 1
8'-1
1/2
''
R 10'-4''
R 40'-9''
R 31'-7 1/2''
R 33'
R 17'-6 1/2''
L 9
'-10
''
L 3'-2''
L 8'-5''
L 4'-4''
L 4'-3''
L 6
'-5'
'
L 7'-5 1/2''
L 6'-8''
L 5'
L 1'6''
L 5'-5''
3/8" = 1'-0"Exhibit Gallery Plan1
Exhibit Wall Specifications
-Typical plywood and MDF construction
-Curves must be smooth and true from top to bottom
-Paint back of walls
BaffleSee sheet 8.0 for details
2.15.12 Task 3
Power Required
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
0.4
Reflected Ceiling Plan
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
3/16" = 1'-0"Lighting Plan1
14'-
2"
21'-8 3/4"
2'-2
3/4
"
Lighting SpecificationsLume LEX series C (600 lumen)Beam spread 10°-60°
Manufacturer and contact:Gordon [email protected] Services Inc
2.15.12 Task 35.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
0.5
Wall Elevation
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
3/16" = 1'-0"Flattened Elevation 3
R 12' R 12'2'' R 2895'5''
8'-8
"
7'-6
"
3'-3
1/2
"
1.2 Flap Interactive Wall
5.0 Surface Water4.0 Wetlands3.0 Pine Uplands2.0 The Land
3/16" = 1'-0"Entry Elevation 1
3/16" = 1'-0"Entry Section2
3/16" = 1'-0"Topographical Map Elevation 4
3/16" = 1'-0"7.3 Map Elevation 5
3/16" = 1'-0"Quote Elevation 6
3/16" = 1'-0"Video Elevation 7
3'-1"
6'-0
"
BaffleExhibit wall
2.15.12 Task 3
2.0
2.12.3
3.2
3.0
3.1
3.5 3.3 3.4
3.6 4.14.0
4.3
4.6
4.5
5.05.3 5.4
5.5 1.2
Access door
1.1
1.13
7.2
Key1.1 Introduction graphic1.12 Topographical map1.13 Topo map base2.0 Geology graphic2.1 Feel the difference interactive2.3 Aquifer interactive3.0 Uplands graphic3.1 Area strip graphic3.2 Case3.3 Flipbook3.4 Snake model3.5 Serotiny video3.6 Case4.0 Wetlands graphic
4.1 Area strip graphic4.3 Terrarium tree frog4.42 Changeable label4.5 Flipbook4.6 Boat case5.0 Surface waters /1.2
Hidden wonders graphic5.1 Area strip graphic5.3 Cedar water interactive5.4 Flipbook5.5 Aquarium5.51 Changeable label6.0 Pinelands resources6.1 Reader rail: Bog iron6.2 Reader rail: Sand
6.3 Reader rail: Charcoal6.4 Reader rail: Cedar6.5 Reader rail: Piney lingo6.6 Ceiling graphic7.1 Welcome text7.2 Map7.3 Video frame
7.1
7.31.12
5.1
5.31.12 Task 4
Speaker
4.42
5.51
6.18.12 Update
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
1.0
1.0 Introduction Area
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
Area 1 Introduction
There are two components in this area: 1.1 Introduction, a combination of graphic panel and tactile topo map, and 1.2 Hidden Wonders, a curved graphic mural wall with 16 horizontally opening flaps built into the wall. The flaps must be durable, quiet, and must return from open to close position automatically. We recommend a cord and weight type system. The topo map will be provided by a company Solid Terrain Modeling in California or equivalent.
2.15.12 Task 31/4" = 1'-0"
Area 1.0 Plan 1
1.12 Topo Map
1.2 Hidden Wonders
1.0 Introduction
1.1
1.13 Base
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
1.1
1.1 Touchable Map
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
4'-0"
4'-3
1/2
"
7'-6
"
15°
2'-8
1/2
"
3'-2
1/2
"
2"
3/4" = 1'-0"Plan 1
3/4" = 1'-0"Front Elevation 2
3/4" = 1'-0"Side Elevation 3
R 24''
Note:Exhibit contractor responsible to level exhibit and to ensure there is no gap between topo map base and wall graphic
1.1
2.15.12 Task 3
3" = 1'-0"Graphic Panel Detail4
1"
Metal rim
Woodenbase with
appliedgraphic
Metal rim
Wall
Phenolic graphic panel
6" = 1'-0"
Base Detail5
Bendable plywood base
Graphic
6" = 1'-0"Metal Rim Detail6
Inset topographical map
Painted contour surface
Existing wall
1.13
Metal rim
Topographical map
1.12
Topo Map SpecificationMedium density foam laser cut topo map with printed surface with satin clear coat, from Solid Terrain Modeling 800-548-7621 or equivalent
Topo map is screwed in from below so it can be replaced
5.31.12 Task 4
Phenolic panel
GWB building wall
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
1.2
1.2 Hidden Wonders Wall
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
1" = 1'-0"1.2 Flattened Elevation 1
Portion of wall in common area
7"5"
7"
5"6 1/2"5"5"8"7"5 1/2" 2 1/2"
6 1/
2"7"
1'-2 1/2"
2'-3
"7"
6"
8"7 1/2"
T
F D
XEAZ
K W M O J
H Q VL
Hinged Graphic Flaps
1.2
1/2" = 1'-0"1.2 Axon View 2
2.15.12 Task 35.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
1.3
1.2 Hidden Wonders Flip Up Panels
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
3" = 1'-0"Flip Panel Horizontal 1
110°
7"
5"
1/2"1"
1"2"
1/2"
110°
5"
7"
3"
1/2"
3" = 1'-0"Flip Panel Vertical 2
3" = 1'-0"Flip Panel Axon 3
2.15.12 Task 3
Phenolic graphic panel
Exhibit Wall
Handle
Inset graphic surface
Hinge
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
2.0
Area 2.0 Geology
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
Area 2 Geology
This area is made of four components: the exhibit wall, sand and gravel cases, scenic (painted) wall sections, and aquifer interactive. The sand and gravel cases are filled with actual sand and gravel from the Pinelands that has been disinfected. The aquifer interactive contains acrylic sand, polished stone and other material to simulate the action of water being absorbed by the aquifer. During the prototype phase, the use of actual materials can be investigated. It is not intended to visually duplicate the strata, but to evoke the idea. The liquid being used to simulate water will have bromide or other disinfectant added for stability.
SubmittalsThe Exhibit Contractor must create a prototype that can be used by the NJ Pinelands Commission for testing with school groups. It can be a table top version but must be similar in scale and will be used to test the interactive process.
The intention of the rubber ring at the touch hole is to remove any sand that adhered to the visitors finger tip. The entire structure is removable for filling with new sand or gravel as needed.
In addition to the submittals above, see the graphics schedule for graphics submittals and shop drawings that will be submitted.
2.15.12 Task 3
1/4" = 1'-0"Area 2.0 Plan 1
2.3 Aquifer Interactive
2.1 Feel the difference
2.0 Geology
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
2.1
Geology
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
7'-6
"
3'-3
1/2
"
4'-1
1/4
"
6"7"
7 1/
2"6"
2'-0"
6"
6"
5 1/
2"
8"
2.1 Feel thedifference interactive
2.3 Aquifer interactive
1 Translucent wall
2 Clear curved acrylic face
B
C
K
A
Bridgeton
Cohansey
Kirkwood
Alloway
Painted dimensional layers
3 Painted base layer
R 12' R 12'2'' R 2895'5''
3/4" = 1'-0"2.0 Flattened Elevation 3
3/4" = 1'-0"Plan 1
3/4" = 1'-0"2.0 Section2
2.0
Note:See sheet 0.3 for wall area details
2.15.12 Task 3
2.12
Note:Exhibit wall extends past this edge
2.31
SpecificationsTop 3 dimensional layers scenically painted to match graphic sample provided by designer
Base color:Matthews acrylic poly. MP11705 Chocolate Thunder
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
2.2
Feel the Difference Interactive
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion6" = 1'-0"
Hole Detail1
Acrylic soil containers
Acrylic back
2.15.12 Task 3
7"9
1/2"
5"5"
6 1/
2"
7"
7 1/
2"
3"
2"
1"
1-1/2" = 1'-0"Sand Case Plan2
1-1/2" = 1'-0"Sand Case Front Elevation3
1-1/2" = 1'-0"Cases Plan4
Gravel
Coarse Sand
Fine Sand
Clay
1" = 1'-0"Sand Case Exploded View5
1/6'' Rubber lip
Acrylic
Soil
Start the water cycle
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
2.3
AquiferInteractive
EPMDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
2.15.12 Task 3
Graphics prompt the visitor to start interactive by pushing button at right to start rain sequence
1
1
Pump motor is actuated and forces water from lower reservior to upper reservior where is begins to 'rain' upon the Pinelands
2
2
2
Rainfall fills the Pinelands, between 1 quart and 2 quarts of blue-tinted, bromide treated water
3
Water is slowly absorbed by the aquifer4
Start the water cycle
Start the water cycle
3
4
Once water is absorbed it is visible contained in the aquifer until button is pushed to restart the cycle.
5
5
Specifications
Sand and gravel is synthetic or polished and discinfected sand and gravel.
Synthetic or natural sand and gravel color should match actual sand and gravel used in adjacent tactile exhibit as close as possible.
Back wall has graphic that is the same as the mural wall graphic.
Pump must be located in a ventilated and sound proof enclosure and must use the building power supply.
Pump is a typical aquarium pump similar to a Iwaki WMD-30RLXT Pump
Aquifer interactive enclosure is metal with a 2 part Matthews acrylic polyurethane or equal.
Acrylic is an abrasion resistant type, Exhibit Contractor must provide recommended cleaning instructions to prevent accidental surface wear due to improper cleanser use.
Water return holes
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
2.4
Water Interactive
EPMDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
4
609-
894-
7300
New
Jer
sey
Pine
land
s C
omm
issi
on
2.15.12 Task 3
2'-0" 3 1/4"
10 1
/2"
2"
2 1/
4"2"
4 3/8"
5"
Exhibit wall
Interactive structure
Building wall
Circulation pump
Assembled view
Sand and gravel chambers
Acrylic scenic elements
Lower opaque clay ayers
Upper reservior
Aquifer interactive body
Button
Acrylic face
Sand and gravel layers
Opaque layers
Scenic Pinelands cut-out
Control button
Exhibit wall
Lower reservoir
Return line
Upper reservoir
Feed line
Flex line connection to pup
1-1/2" = 1'-0"Interactive detail plan and front1
1-1/2" = 1'-0"Section2
1-1/2" = 1'-0"Interactive detail plan2
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
3.0
Area 3.0 Uplands
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
Area 3 Uplands
This area consists of an exhibit wall, two artifact cases that are partially protruding from the wall, with one of the cases containing a small embedded video, a flip book structure mounted directly to the wall, and finally a snake artifact also mounted directly to the wall. The audio is located in the suspended ceiling above. The mural exhibit wall has a large base that is a continuation of the base on Area 2, and has a baffle area that provides an environmental infill between the top of the exhibit wall and the room ceiling.
SubmittalsThere are no special submittals for this area. See the graphics specifications for information on the media component and shop drawings.
CoordinationThe exhibit contractor is responsible for the continuous loop video and ambient audio as well as confirming the correct alignment of graphics and casework.
2.15.12 Task 3
1/4" = 1'-0"
Area 3.0 Plan 1
3.5 Serotiny Video
3.0 Uplands
3.6
3.2 Case
3.3
3.4
3.1
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
3.1
Uplands Elevations
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
Line of suspended clg.
1/2" = 1'-0"3.0 Flattened Elevation 1
20'-6 3/8"
8"
2'-1"
3'-7
" 4'-4
"
1'-6 1/2"
1'-7
"
10"
2'-1
0"
2'-0
"
3.5 Serotiny Video
3.2 Case
3.6 Case
Note:Final video cut-out to be determined by EC upon procurement of equipment
3.0
2.15.12 Task 3
1/2" = 1'-0"
3.0 Section 2
3.3 Flipbook 3.4 Snake
Model
3.1
3.21
3.61
5.31.12 Task 4
3.12
SpeakerSpeaker
Artifact case
Video panel
NoteTest speaker location prior to final installation on site
6.14.12 Speaker
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
3.2
Details
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
3" = 1'-0"7
Case mounting detail
2'-1"
6 1/
2"
3"
1-1/2" = 1'-0"1
1'-6 1/2"
1'-7
"
3.6 Case Plan
2.15.12 Task 3
7"1'-1"
1'-6 3/4"
1'-1
"
7"Basketartifact
2'-1"
2'-0
"
3"6 1/2"
1-1/2" = 1'-0"2
3.6 Case Front Elevation
1-1/2" = 1'-0"3
3.6 Case Side Elevation
1-1/2" = 1'-0"4
3.2 Case Plan
1-1/2" = 1'-0"5
3.2 Case Front Elevation
1-1/2" = 1'-0"6 3.2 Case Side Elevation
7
Painted
Acrylic case
Graphic mural
3.5 Videoscreen
Video screen
Back of exhibit wall
Mountingbracket
Graphicmural
Acryliccase
Mountingbracket
Case
Graphic
Graphic surface
Graphic
3.213.61
Note:See sheet 8.0 for video details and specifications
AudioPower
5.31.12 Task 4
Power & Signal
Artifactlabel
6.18.12 Update
Barkspecimen
Pine cones
Pitch pine branch specimen
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
3.3
Flipbook
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
7 1/
2"10
1/2
"1'-7 1/2"
9"
11"
3" = 1'-0"1
Flip Book Plan
3" = 1'-0"2
Side Elevation
3" = 1'-0"3
Front Elevation
3" = 1'-0"4
Single Page Detail
Graphic mural
Wooden base
2.15.12 Task 3
Phenolic panel
Exhibit wall
Metal hinge
Double-sidedphenolic panel
Fixed outer panel
Fixed outer panel
4.3 Terrarium
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
4.0
Area 4.0 Wetlands
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
Area 4 Wetlands
In addition to the exhibit wall with base and mural graphics, there is a surface mounted case with a half model of a Barnegat Bay sneakbox with sail. In addition, there is also the typical flip book structure and a terrarium (from Showcase cages) mounted on a slide-out system. The terrarium has a bezel frame that is removable for access. A label will be provided for mounting and placement next to the terrarium.A graphic panel is also provided that covers the terrarium opening in the event that there is no species available. The terrarium and model are provided by the exhibit contractor.
SubmittalThere are no special submittals for this area. See the graphics specifications and provide shop drawings.
CoordinationThe exhibit contractor is responsible to ensure the artifact case and model are the correct size, as well as confirming the correct alignment of graphics and casework.
2.15.12 Task 3
1/4" = 1'-0"
Area 4.0 Plan 1
4.0 Wetlands
4.54.6
4.14.42
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
4.1
Wetlands Elevations
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
1/2" = 1'-0"4.0 Flattened Elevation 1
2'-0"1'
-6"
2'-1
1"
10" 8'-6 1/2"
2'-1
1 1/
2"
1'-5
1/2
"
1'-7 1/2"
Line of suspended clg.
4.3 Terrarium:Tree Frog
4.0
4"
1/2" = 1'-0"Section 2
3" = 1'-0"3
Terrarium detail
Terrarium
4.12
2.15.12 Task 3
Terrarium
Metal slider
Stand
Exhibit wallRoom wall
4.6 Boat Case
4.5 Flipbook
Terrarium slides out
4.1
4.43
4.42
Terrarium Specificiations:showcasecages.comItem#: C241816BGBlack granite
5.31.12 Task 4
Half hull model
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
5.0
Area 5.0 Surface Waters
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
Area 5 Surface Waters
In addition to the flip book, cedar water interactive, and exhibit wall graphics, embedded in the graphic mural is an aquarium, with an access door to to the right of it. This typical 'stage set' door is designed with angled inside door frame faces and a pivot hinge for minimal gap between door and mural. The door continues the graphic wall mural, and is locking. The exhibit contractor is responsible for the proper alignment of the aquarium with the face of the mural, the support for the aquarium, and the utility light. Power and water will be provided, it is not a plumbed aquarium. A lable will be provided for mounting and placement next to the aquarium.
SubmittalThere are no special submittals for this area, see the graphics specifications for information on the media component and shop drawings.
CoordinationThe exhibit contractor is responsible to coordinate the aquarium opening and access door swing with the room structure.
2.15.12 Task 3
9'-5
"
1/4" = 1'-0"
Area 5.0 Plan 1
5.5 Aquarium5.3 Cedar Water Interactive
5.0 Surface Waters
Aquarium access door
5.45.51
5.1
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
5.1
5.0/1.2 Elevations & Details
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
1/2" = 1'-0"5.0 Flattened Elevation 2
5.3 Cedar Water Interactive
5.5 Aquarium
21'-5 1/2"10"
3'-0"2'
-0"
2'-1
1"
2'-10 1/2"
7'-5
1/2
"
8"
3'-7
1/2
"
8"11"
1/2" = 1'-0"Section3
Aquarium access door
1-1/2" = 1'-0"4 Aquarium detail
1/2"
AquariumFinish
edge
5.02
5.0
110°
1/2" = 1'-0"Aquarium Access Door Plan 1
4
Line of suspended clg.
Graphicmural Back of wall
5.4 Flipbook
2.15.12 Task 3
Aquarium
Stand
Baffle
Light
5.1
5.51
Aquarium Specificiations:Possible source: Glasscages.com LLC, 1600 East Piney Road, Dickson TN 37055 615-446-8877
Glass must be 3/4" thick safety glass
Exhibit contractor must coordinate mounting details with supplier
Aquarium must be level and no gaps between indie of exhibit wall and aquarium case.
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
5.2
Cedar Water Interactive
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
1" = 1'-0"Cedar Water Interactive Front Elevation1
2.15.12 Task 3
Sequence
1. Position yourself in front of the viewing frame so you can see through to the gray section of the water graphic.
2. Place the correct color wands behind the frame so that the color of the gray section of the graphic now matches the rest of the water color.
8"
2'-4
"
148°
1'-7 1/2"
8"
6 1/
2"
4 1/2"
1/2" 1/2"3/8"
7"
4 1/
2"
3 1/2"
3" = 1'-0"Viewing Frame Plan3
3" = 1'-0"Viewing Frame Front5
3" = 1'-0"Viewing Frame Side4
4" 1"
1/2" 3/8" 1/2"
6" = 1'-0"Rod Side6
6" = 1'-0"Rod Front7
Painted window frame
3" = 1'-0"Axon View2
Color Wand
Rod
Viewing frame
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
5.3
Cedar Water Interactive
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
2.15.12 Task 3
6 1/
2"
5"1/
4"1/
2"7"
1/4"
3" = 1'-0"Color Wand Detail2
3" = 1'-0"Color Wand Plan1
3" = 1'-0"Color Wand Side3
1/8'' Colored acrylic
Handle with label
Hole for pivot on rod
Frame
1 2
3 4
Roscolux #88 Light Green
(Organic Matter)
Roscolux #30 Light Salmon Pink
(Iron Ore)
Roscolux #325 Henna Sky
(Soil)
Roscolux #2004 Storaro Green
(Pollution)
3" = 1'-0"Color Matching4
3" = 1'-0"Sample Color Overlays5
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
6.0
Pinelands Resources Plan
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
11.9.11
Rail 6.1 Bog Iron
Rail 6.5 Piney lingo
Rail 6.4 Cedar
Rail 6.3 Charcoal
Rail 6.2 Sand
1" = 1'Pinelands Resources Plan1
1
4
2
3 5
56
11
9
12
10
8
13
14
18
19
21
15
16
2.15.12 Task 3
Area 6 Pinelands Resources
This is a sculpture which represents all that has been produced from natural resources as well as harvested. Where possible, durable tactile elements that are actual artifacts, such as a historic mason jar reproduction will be used, as well as scenic elements such as the sand pile. The tree will have elements pinned off it and the upper level will have scenically reproduced branches and needles. The contractor will install an edge illuminated graphic in a recessed ceiling space, [graphic element 6.6].
The charcoal pile will have a glowing ember located within the pile. Power will be located by the general contractor in the ceiling for the glowing ember charcoal effect (#13).
Shop Mock Up
The exhibit contractor will create a massing model prototype for review.
5
7 12
18
18
22
23
17
19
18
20
See sheet 6.3 for further details regarding the resource details
3.12.12
6.1 1
6.1
2
6.21
6.2
2
Key
1. Bog Iron
2. Iron Pot
3. Iron Ingot or sprue
4. Tombstone
5. Cannonball (4lb & 6lb)
6. Section of Pipe
7. Fireback
8. Sand Pile
9. Mason Jar
10. Glass Paperweight
11. Slag
12. Jersey Glass
13. Charcoal
14. Charcoal (inner)
15. Cedar Tree
16. Cedar Planks
17. Wooden Shingles
18. Duck Decoys (Progressive - 3 Steps)
19. Sphagnum Moss
20. Crates
21 Cranberries
22. Cranberry Scoop
23. Jersey Devil
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
6.1
Sculpture Elevations
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
11.9.11
1" = 1'Pinelands Resources Elevation 22
17
15
7
8
13
1
4
3
2
1" = 1'Pinelands Resources Elevation 11
1
4
7 65
13
32
20
21
17
1715
16
23
225
5
8
912
12
11
23
9
1011
12
12
7
5
55
622
14
2.15.12 Task 33.12.12
Rail 6.2 SandSee sheet 6.4 for details
11
Rail 6.2 Sand
Rail 6.1 Bog Iron
Note:Glowing ember colored light effect to be located within pile.Final details to be determined during shop drawing phase and shop mock-up.
Glowing ember effect within pile
Rail 6.3 Charcoal
Rail 6.1 Bog
Rail 6.5 Piney lingo
See sheet 6.4 for rail details
Paint base to match surrounding exhibit base
Level as required
Existing marmoleum floor
Note:Sculpture should not require bolting to floor to be secure
5.31.12 Task 4
Key
1. Bog Iron
2. Iron Pot
3. Iron Ingot or sprue
4. Tombstone
5. Cannonball (4lb & 6lb)
6. Section of Pipe
7. Fireback
8. Sand Pile
9. Mason Jar
10. Glass Paperweight
11. Slag
12. Jersey Glass
13. Charcoal
14. Charcoal (inner)
15. Cedar Tree
16. Cedar Planks
17. Wooden Shingles
18. Duck Decoys (Progressive - 3 Steps)
19. Sphagnum Moss
20. Crates
21 Cranberries
22. Cranberry Scoop
23. Jersey Devil
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
6.2
Sculpture Elevations
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
11.9.11
1" = 1'Pinelands Resources Elevation 31
2.15.12 Task 3
8'-8
"1'
-2"
4"
3/4" = 1'Recessed Ceiling Detail2
Rail 6.1 Bog Iron Rail 6.4 Cedar
Rail 6.5 Piney lingo
Circular-shaped recessed portion of ceiling. Radius to match sculpture base's larger circular dimension.
Lighting
6.6 Graphic, illuminated from above
3.12.12
VIF
Line of structural ceiling
Circular graphic strip
Note:General contractor will provide a finished opening, power for lightbox, and applied graphic
Line of suspended ceiling
Key
1. Bog Iron
2. Iron Pot
3. Iron Ingot or sprue
4. Tombstone
5. Cannonball (4lb & 6lb)
6. Section of Pipe
7. Fireback
8. Sand Pile
9. Mason Jar
10. Glass Paperweight
11. Slag
12. Jersey Glass
13. Charcoal
14. Charcoal (inner)
15. Cedar Tree
16. Cedar Planks
17. Wooden Shingles
18. Duck Decoys (Progressive - 3 Steps)
19. Sphagnum Moss
20. Crates
21 Cranberries
22. Cranberry Scoop
23. Jersey Devil
17
16
15
13
8
18
20
20
21
1214
Rail 6.2 Sand1818
23
19
Rail 6.4 Cedar
Rail 6.5 Pineylingo Rail 6.3 Charcoal
1. Bog Iron
Obtain actual bog iron from the area. Clean to remove bacteria and spray with a matte polyurethane clear-coat to reduce dust.
2. Iron pot
Use existing iron pot, clean and finish as above. Modify to allow for support that raises pot above bog iron.
3. Iron ingot or sprue
To be provided by client during shop drawing phase
4. Tombstone
Fabricate to match existing tombstone (unless actual specimen can be sourced)
5. Cannon ball (4lb and 6lb)
Fabricate from resin and mount on acrylic rod (unless actual specimen can be sourced)
6. Section of Pipe
7. Fire Back
8. Sand pile
Replicate actual sand pile matching the fine sand used in glassmaking
9. Mason Jar
Purchase and mount replica 19th century mason jars (Old Sturbridge Village)
10. Glass Paper Weight
11. Slag
12. Jersey Glass
13. Charcoal
Use act pine segments, seal with matte polyurethane spray. Construct so outer log segments are lifting away to reveal darkened charcoal within.
14. Charcoal (inner)
Use actual 'lump charcoal' available for purchase. Create glowing ember effect within pile.
15. Cedar Tree
Typical scenic representation of cedar tree trunk
16. Cedar Planks
Finish actual cedar to resist staining, use rods and bolts to stand away from cut cedar trunk
17. Wooden Shingles
Finish with matte clearcoat to resist staining, mounted with pins to create dynamic effect of standing away from cedar tree
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
6.3
Object Reference Key
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
11.9.11
18. Duck Decoys (Progressive -3 Steps) Step 1: Rough blocks of cedar wood, hollowed center
Step 2: Partially carved decoy
Step 3: Finished decoy
19. Spagnum Moss
20. Crates
To be provided by client during shop drawing phase
21. Cranberries
22. Cranberry Scoop
23. Jersey Devil
2.15.12 Task 33.12.12
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
6.4
Graphic RailDetails
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
1-1/2" = 1'Graphic Rail Front Elevation2
2.15.12 Task 3
Powdercoated metal posts
1'-1"
9"
1'-9
"
1 1/2"
1-1/2" = 1'Graphic Rail Plan1
Graphic panel
Painted plywood base, 1/4'' radius
R 26''
R 29'' Edge of base
R 30''
3.12.12
Contractor is responsible for mounting and leveling
4"
1'-1"
3"
1/4"
7"
3" = 1'Graphic Rail Plan Detail3
3" = 1'Graphic Rail Front View Detail4
1/4'' thick steel panel with text
Finish edges
Note: Finish rail support tube opening with thin escutcheon plate painted to match tube
Finish SpecificationsTube & panel paintedMatthews acrylic poly. MP20090 Champagne Brut MetallicClearcoat satin finish
Text silkscreen colorMatthews acrylic poly. MP11705 Chocolate Thunder
Welded connection
1'' tube diameter
5.31.12 Task 4
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
7.0Map Graphic
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
3/4" = 1'-0"Graphic Panel Elevation 1
7'-4"
4'-0
"2'
-8"
2 1/
2"1'
-1 1
/2"
1'-0
"
1'-5"
3" = 1'-0"Detail3
2.15.12 Task 3
1 1/2"
3/4" = 1'-0"Side Elevation 2
3
Existing table
Painted edge
1/2'' Plywood
1/16'' Phenolicgraphic
Brochureholder
Typical painted GWB wall
7.2
Brochure holder
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
7.1
7.3 Video & Frame
SSDrawn by:
8.30.11 Review
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
3/4" = 1'-0"7.3 Video Front Elevation 1
3'-7
7/8
"2'
-10
5/8"
4'-2 5/8"
7 1/2"
7 1/
2"
6" = 1'-0"7.3 Frame Corner Detail 4
2 1/4"
1-1/2" = 1'-0" 7.3 Frame Plan View 3
2.15.12 Task 3
Video Panel
Note:Exhibit Contractor must fabricate frame from existing reception wall shown in photo.
Verify by Exhibit Contractor
"X" to be determined by video panel mounting
X''
Video panelVentillation slot
Decorative frame
3/4" = 1'-0"7.3 Video Side Elevation 2
Decorative frame
433
Cou
ntry
Way
Sci
tuat
e, M
A 02
066
781-
378-
1484
p
781
-849
-791
0 f
cont
entd
esig
n@m
e.co
m
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
8.0
General Details
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pine
land
s C
omm
issi
on
1" = 1'-0"Baffle Detail1
2.15.12 Task 3
11 1/2"
Exhibit wall
Visitor Control Playback Signal Process Output Device
Proximity switch Playback device
AmplifierSpeaker
Video Panel
3.5 Serotiny Video
Product List Qty Mfg. Model Description
1 Meyer Sound UP-4XP Ultra compact speaker
1 ViewSonic VFM1035-52 Video playback
2 Dakota Sound Mounting U-bracket
1 Alcorn McBride AM4/E Solid state player w/ ethernet
1 Bogen ANS501 Ambient noise sensor and microphone
1 Museum Tech. BB-150 Motion detector with power supply
5.31.12 Task 4
Varies
Paint to match ceiling color, matte finish
6.14.12 Spkr.
Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.
This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.
Title
DATES ISSUED
8.1
Renderings
SSDrawn by:
15 S
prin
gfie
ld R
oad
New
Lis
bon,
NJ
0806
460
9-89
4-73
00
New
Jer
sey
Pin
elan
ds
Com
mis
sion
Area 1.0 1 Area 2.02 Area 2.0 Detail 3
Area 3.0, 4.0, 6.0 Sculpture4 Area 4.0, 5.0/1.24
5.31.12 Task 4