expanda stand carousel display system
DESCRIPTION
Expanda Stand Carousel Display System. India Distributor:. Les Expressions Corporate Services Pvt. Ltd. Flat No.4, 2 ND Floor, Sapathagiri Apatments, 83, T.T.K Road, Alwarpet, Chennai – 600 018. Fax: 044-4980832. [email protected] - PowerPoint PPT PresentationTRANSCRIPT
Expanda StandExpanda Stand Carousel Display SystemCarousel Display System
India Distributor:India Distributor:
Les Expressions Corporate Services Pvt. Ltd.
Flat No.4, 2ND Floor, Sapathagiri Apatments, 83, T.T.K Road, Alwarpet, Chennai – 600 018. Fax: 044-4980832. [email protected]
Call Us At : 044-24988823 / 24 / 25 Fax: 044 42088823
Proceed Proceed
for a
Step By Step
Installation
Procedure ...
Carousel Brochure Display System
PackagingPackaging
The Entire System is packed in a BoxThe Entire System is packed in a Box
Closed Box Open Box
ContentsContents
3 – Triangular spinners
2 – Metal pipes (Long& short)
1- Central connecting Hub
3 - Stoppers
1 – Branding Holder
5 - Legs
HubHub
A standard system consists of
A central connecting hub ...
LegsLegs
5 legs to support
the system ...
MetalMetal PipesPipes
Two metal pipes of
different sizes ...
StoppersStoppers
Three stoppers ...
TriangularTriangular SpinnerSpinner
Three spinners …
Branding HolderBranding Holder
And a four way
branding holder top.
Assembling Your Assembling Your Carousel StandCarousel Stand
Connecting the legs to the hub.
Hold the hub and legs
in the inverted position
and insert the leg as
shown...
Connecting the legs to the hub.
Press down to
hear the snap
lock ...
Connecting the legs to the hub.
It should appear as
shown.
Connect the rest in the
same manner ...
Connecting the legs to the hub.
In the same
method connect all
the five legs …
Connecting the legs to the hub
The hub with all 5 legs
assembled ...
Inverted View
Connecting the legs to the hub.
Normal viewThe hub with all 5 legs
assembled ...
Connecting the pipes to the base.
One pipe is shorter
than the other. On
one end of the
shorter pipe there is
a sleeve inside and
one end of the
longer pipe is
tapered
Connecting the pipes to the base.
Insert the longer pipe with
a slight twist into the
sleeve end of the Shorter
pipe … (see the next)Shorter pipe
(Sleeve End)
Longer Pipe
Connecting the pipes to the base.
Longer pipe with one
end tapered …
Insert the tapered
end into the sleeve
ringed pipe
Fixed Pipe With BaseFixed Pipe With Base
Insert the assembled pipes into
the central hub.
Fixing The StopperFixing The Stopper
Insert the stopper ring
through the pipe
Connecting the stopper to the pipe.
Tighten the screw at a
convenient height as
desired by you.
Fixing The Triangular SpinnerFixing The Triangular Spinner
Insert the triangular
spinner (Note: Position
the spinner with stubs
pointing upwards)
through the pipe to rest
on top of the stopper.
Fixing The Triangular Spinner.Fixing The Triangular Spinner.
One Triangular
spinner now rests
where the first stopper
is fixed …
Fixing The Triangular SpinnerFixing The Triangular Spinner
Fix the rest of the spinners in the same manner.
Fixing The Branding HolderFixing The Branding Holder
Fix the branding holder on top end of the pipe.
Branding Holder
this Side Up
Fixing the Brochure HoldersFixing the Brochure Holders
There are two clips in the
Brochure Holders. Press
them gently and insert the
holder in the Triangular
Spinners till you hear the
click sound
Fixing the Brochure Holders.Fixing the Brochure Holders.
Carousel Stand
with One Brochure
Holder fixed on the
top spinner
Adding More Brochure HoldersAdding More Brochure Holders
Keep adding brochure
holders as per your
required combination on
all the three triangular
spinners.
The Fully Assembled CarouselThe Fully Assembled Carousel
Now your carousel is ready for use.