Explaining firm compliance in a large-scale Chinese energyefficiency program
Valerie J. Karplus, Xingyao Shen, Da Zhang
MIT Joint Program on the Science and Policy of Global ChangeInstitute of Energy, Environment and Economy, Tsinghua University
Sloan School of Management, MIT
June 21st, 2017
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Motivation
China’s Industrial Sector:
Accounts for more than 15% of world’s total energy use and CO2 emissions.
Is expected to have large potential for energy efficiency improvement.
Firm compliance in energy efficiency programs:
Have been rarely studied in the literature.
May differ in developing countries because ofa) More acute trade-offs with environmental constraints (Greenstone and Jack,2015), andb) Less deterrence against data manipulation (Duflo et al., 2013)
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 2 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Motivation
China’s Industrial Energy Conservation Program:
The flagship program in China’s comprehensive set of command-and-controlpolicies for energy saving.
Implemented as the “Top 1,000 Firms Program” in the Eleventh Five-Year Plan(FYP, 2006-2010).1,008 firms involved accounted for about 30% of China’s total energy use in 2005,and ended up with about 170 million tons of coal-equivalent energy savingreported.
Expanded to the “Top 10,000 Firms Program” during the Twelfth FYP(2011-2015), involving 14,641 industrial firms, and hundreds of transportationoperators, hotels and restaurants, commercial and trade enterprises, and schools,in total 16,078 institutions,accounting for more than 60% of China’s total energy use, targeting 250 milliontons of coal-equivalent energy saving, about 650 million tons of CO2 emissionsmitigation.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 3 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Motivation
Our primary contribution from assessing firm compliance outcomes inChina’s Industrial Energy Conservation Program:
We develop a new and unique data set that combines data on participating firmcharacteristics.
We use a statistical method to evaluate the plausibility of compliance datasubmitted by firms.We find statistical evidence that firms deliberately exaggerated performance in thefirst phase of the program.
We assess the correlation between pre-existing firm and location characteristicsand compliance outcomes after the program was expanded.We find larger firms not controlled by the state and firms in cities with slow growthshowed significantly lower likelihood of compliance.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 4 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Firms covered and non-compliant firms
Numbers of total firms and non-compliance firms for the two programs:
Top 1,000 Firms Program Top 10,000 Firms ProgramOriginallist
Evaluationin 2008
Evaluationin 2009
Evaluationin 2010
Originallist
Evaluationin 2012
Evaluationin 2013
Evaluationin 2014
Total firms 1,008 922 901 881 16078 14,542 14,119 13,328Non-compliantfirms
- 36 28 15 - 1,377 1,191 948
Non-compliantrates
- 3.9% 3.1% 1.7% - 9.5% 8.4% 7.1%
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 5 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
A closer look at the Top 10,000 Firms Program
Non-industrial firms have higher non-compliance rate, especially in 2012.
Tranportation firms and schools, most of which are shiyedanwei or large localSOEs, have fairly high non-compliance rate in 2012, but greatly improved in 2013and 2014.
Non-compliance rate of industrial firms in the Top 10,000 Firms Programs is stillsignificantly higher than that of the Top 1,000 Firms Program.
Originallist
Evaluation in 2012 Evaluation in 2013 Evaluation in 2014
Total num-ber
Non-compliancenumber
Estimatednon-compliancerate
Non-compliancenumber
Estimatednon-compliancerate
Non-compliancenumber
Estimatednon-compliancerate
Industrial firms 14,641 1,174 9.0 % 1038 8.2% 693 5.8%Transportationfirms
548 63 11.5% 37 6.8% 28 5.1%
Hotels and restau-rants
195 14 7.2% 13 6.7% 12 6.2%
Commercial andtrade firms
260 28 10.8% 29 11.2% 41 15.8%
Schools 434 88 20.3% 48 11.1% 21 4.8%
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 6 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Matching with the CIC data
We match the firm information of the Top 10,000 Firms Program with acomprehensive firm-level data set (the China Industrial Census) that includesvery detailed corporate finance information.
7,006 out of 12,000+ Top 10,000 industrial firms are matched with 2011 CIC data.
435 out of 7,006 firms were in the Top 1,000 Firms Program. Theirnon-compliance rates are 7.8% in 2012 and 7.4% in 2013 respectively.⇒ Even for the same group of firms, compliance is more difficult under the
Top 10,000 Firms Program.
4,995 of 7,006 firms are from the sectors that are covered in the Top 1,000 FirmsProgram. Their non-compliance rates are 7.7% in 2012 and 7.6% in 2013respectively.⇒ Expanding sector coverage does not fully explain the significant increase
of non-compliance rate.
Top 1,000 Firms Program Top 10,000 Firms ProgramOriginallist
Evaluationin 2008
Evaluationin 2009
Evaluationin 2010
Original list
Industrial firms total 1,008 922 901 881 14,641Industrial firms matched 1,001 862 840 824 7,006Percentage matched 99.3% 93.5% 93.2% 93.5% 47.9%
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 7 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Data manipulation? A discontinuity test
We test whether there are possibilities that the low non-compliance rate inthe Top 1,000 Firms Program is a result of data gaming.
China’s energy and environmental data should not be taken for granted.Previous studies either found huge disparity in reported values for the sameenergy statistics (Guan et al., 2012), and discovered data gaming in air qualitydata by observing “bunching” the PM10 numbers below the “Blue Sky Day”threshold (Chen et al., 2013; Ghanem and Zhang, 2014).
We apply the statistical method of Chen et al. (2013) to check if there isevidence that firms’ energy saving data is “bunched” above the target.
Firm’s energy saving achievement in percentage term in 2010 is calculated.There must be a discontunuity around 100% if data is revised upward.This discontinuity does not necessarily mean data manipulation because firmsmay stratigically achieve the energy saving target by a small margin.Burgstahler and Dichev test (BDT) statistics (Burgstahler and Dichev, 1997):compare each bin’s observed probability density with its average neighboringprobability density:
BDT =
p̂j−1+p̂j+12 − p̂j√
1n p̂j (1− p̂j ) +
14n (p̂j−1 + p̂j+1)(1− p̂j−1 − p̂j+1) +
1n p̂j (p̂j−1 + p̂j+1)
(1)
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 8 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Data manipulation? A discontinuity test
Dash lines are the critical values with the confidence level of 99%. Significantdiscontinuity is found in the neighborhood of 100%.Results are robust for the bin size of 2.5% and 5%.
Achievement in Percentage (bin size: 2.5) (%)0 50 100 150 200 250 300
Den
sity
0
0.02
0.04
0.06
0.08
0.1
0.12(a)
Achievement in Percentage (bin size: 2.5) (%)0 50 100 150 200 250 300
BD
T S
tati
stic
s
-20
0
20
40
60(b)
Achievement in Percentage (bin size: 5) (%)0 50 100 150 200 250 300
Den
sity
0
0.02
0.04
0.06
0.08
0.1
0.12(a)
Achievement in Percentage (bin size: 5) (%)0 50 100 150 200 250 300
BD
T S
tati
stic
s
-20
0
20
40
60(b)
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 9 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Data manipulation? A discontinuity test
No evidence of “bunching" is found from the non-compliant firm data of theTop 10,000 Firms Program.
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 5) (%)
0
0.02
0.04
0.06
0.08
0.1
0.12
Den
sity
(a)
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 5) (%)
-20
0
20
40
60
BD
T S
tati
stic
s
(b)
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 2.5) (%)
0
0.02
0.04
0.06
0.08
0.1
0.12
Den
sity
(c)
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 2.5) (%)
-20
0
20
40
60
BD
T S
tati
stic
s
(d)
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 10 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Data manipulation? A discontinuity test
No evidence of “bunching" is found from the non-compliant firm data of theTop 10,000 Firms Program.
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 5) (%)
0
0.02
0.04
0.06
0.08
0.1
0.12
Den
sity
(a)
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 5) (%)
-20
0
20
40
60
BD
T S
tati
stic
s
(b)
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 2.5) (%)
0
0.02
0.04
0.06
0.08
0.1
0.12
Den
sity
(c)
-200 -150 -100 -50 0 50 100Achievement in Percentage (bin size: 2.5) (%)
-20
0
20
40
60
BD
T S
tati
stic
s
(d)
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 11 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Data manipulation? A discontinuity test
No evidence of “bunching" is found from the non-compliant firm data of theTop 10,000 Firms Program.
Achievement in Percentage (bin size: 5) (%)-200 -150 -100 -50 0 50 100
Den
sity
0
0.02
0.04
0.06
0.08
0.1
0.12(a)
Achievement in Percentage (bin size: 5) (%)-200 -150 -100 -50 0 50 100
BD
T S
tati
stic
s
-20
0
20
40
60(b)
Achievement in Percentage (bin size: 2.5) (%)-200 -150 -100 -50 0 50 100
Den
sity
0
0.02
0.04
0.06
0.08
0.1
0.12(c)
Achievement in Percentage (bin size: 2.5) (%)-200 -150 -100 -50 0 50 100
BD
T S
tati
stic
s
-20
0
20
40
60(d)
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 12 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
The Anna Karenina Principle
NDRC publishes reasons why firms failed to achieve the target for the Top10,000 Firms Program.We collect all the 803 records, and are surprised to find that there are allkinds of reasons that could explain firms’ non-compliance, consistent with thefamous “Anna Karenina” principle that firms that comply are all alike, andfirms that do not comply have their own reasons.
No. Reasons Numberoffirms
Description
1 Did not cooperatewith the evaluationor not provide com-plete data
245 Firms refused or failed to completely submit the selfcheckingreport, energy data, or any other materials required by theevaluation.
2 Ceased pro-duction, merge,product portfolioschange, or newbuildings
179 Those are firms that faced bankruptcy or stopped a signifi-cant part of or entire production temporarily or permanently,merged with other firms, or added energy-intensive productsto their portfolios. Energy saving targets of schools werelinked to the number of students, therefore constructing newbuildings made targets harder to achieve if the number of stu-dents was unchanged.
3 Low or unstableproduction
161 Production level was lower than expected, therefore the en-ergy saving linked to production was limited. Lower produc-tion level could increase the unit energy consumption of theproduct as more frequent starts and stops reduce efficiencyof operation.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 13 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
The Anna Karenina Principle
No. Reasons Numberoffirms
Description
4 Uncertain energy useper unit of production
26 Some firms had production process with fluctuating energyuse, especially for some transportation firms.
5 Product price de-crease
5 Decreasing product price could bring down the output invalue term of a firm with same input use, therefore energyconsumption per unit of output in value term increased.
6 Lower heating valuefuels
5 Fuels with a lower heating value than previously used couldlead to an increase in reported energy use if firms did notmeasure the heating value change to correctly convert theenergy use to coal equivalent units.
7 Ongoing constructionproject
5 Energy use increased due to new projects under construc-tion.
8 Little room to improveenergy efficiency
34 Firms were very efficient already, with little room to im-prove.
9 Lack of capacity infirms newly includedin the program
28 Firms newly included in the evaluation might not have ac-curate historical data or an energy management system,or lack capacity to achieve energy saving or complete theevaluation.
10 Poor energy manage-ment
12 Firms had very low energy management scores.
11 Ongoing or plannedtechnology upgrading
11 Firms were implementing technology upgrades, or hadplans to enhance energy efficiency in later years duringthe Twelfth FYP.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 14 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Firm characteristics associated with non-compliance
We speculate that firm size, profitability, ownership status, and whether wasincluded in the Top 1,000 Firms Program may affect the compliance.We observe a wide range of non-compliance rate across provinces andsectors, therefore we include province and sector dummies in our regression.
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
No
n-c
om
plia
nce
rat
e
Ningxia
Guang
xi
Beijing
Xinjian
g
Heilon
gjian
g
Gansu
Tianjin
Shang
hai
Hainan
Shanx
i
Jiang
xiTibe
t
Anhui
Shaan
xi
Liaon
ing
Hunan
Guizho
u
Chong
qing
Jilin
Henan
Inne
r Mon
golia
Shand
ong
Zhejia
ng
Yunna
n
Fujian
Qingha
i
Guang
dong
Sichua
n
Hebei
Jiang
su
Hubei
All the firmsSample firms matched with CIC
0
0.05
0.1
0.15
Non-fe
rrous
Ferro
us
Other
mini
ng
Petro
chem
ical
Electri
city
Paper
Other
man
ufac
turin
g
Non-m
etall
ic
Chem
ical
Textile
Coal m
ining
No
n-c
om
plia
nce
rat
e
Non-compliance rate of firms matched with CIC in 2012Non-compliance rate of firms matched with CIC in 2013Non-compliance rate of firms matched with CIC in 2014
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 15 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Firm characteristics associated with non-compliance
The dependent variable is the binary variable for non-compliance.Non-compliance: 1, Compliance: 0.
(1) (2) (3) (4) (5)
Log (main business revenue) 0.07* 0.08* 0.08* 0.10** 0.17***(0.03) (0.03) (0.03) (0.04) (0.04)
Profit rate -0.31 -0.33 -0.34 -0.31(0.39) (0.38) (0.39) (0.37)
Central SOE -0.05 -0.04 2.18***(0.18) (0.18) (0.59)
Local SOE -0.12 -0.11 0.82**(0.11) (0.11) (0.29)
Top 1,000 enterprise -0.20 -0.11(0.16) (0.16)
Log (main business revenue) * Central SOE -0.31***(0.08)
Log (main business revenue) * Local SOE -0.16**(0.05)
Province fixed effects YES YES YES YES YESSector fixed effects YES YES YES YES YES
Year fixed effects YES YES YES YES YESNumber of years 3 3 3 3 3
Number of observations 19974 19974 19974 19974 19974
Note: Standard errors are clustered at the province and sector level.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 16 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Firm characteristics associated with non-compliance
We further explore if the macroeconomic and institutional factors matter.We include per-capita GDP and GDP growth rate at the prefecture citylevel in 2012, 2013 and 2014 in the regression.
(1) (2) (3) (4)
Log (main business revenue) 0.10* 0.09* 0.10* 0.18***(0.04) (0.04) (0.04) (0.04)
Profit rate -0.43 -0.43 -0.43 -0.38(0.32) (0.32) (0.32) (0.31)
Central SOE -0.03 -0.01 -0.01 2.69***(0.19) (0.19) (0.19) (0.59)
Local SOE -0.10 -0.09 -0.09 1.01**(0.12) (0.12) (0.12) (0.31)
Top 1,000 enterprises -0.22 -0.23 -0.24 -0.12(0.17) (0.17) (0.17) (0.17)
Log (main business revenue) * Central SOE -0.38***(0.08)
Log (main business revenue) * Local SOE -0.19***(0.05)
Per-capita GDP -0.01 -0.01 -0.01(0.02) (0.02) (0.02)
GDP growth rate -0.03*** -0.03*** -0.03***(0.01) (0.01) (0.01)
Province fixed effects YES YES YES YESSector fixed effects YES YES YES YES
Year fixed effects YES YES YES YESNumber of years 3 3 3 3
Number of observations 17657 17657 17657 17657
Note: Standard errors are clustered at the province and sector level.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 17 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
When command-and-control meets market-based approach
As China has confirmed that a national emission trading system (ETS) will belaunched in 2017, the role of energy efficiency programs will be weakened,because these two policies with very similar focus may be incompatible.
ETS encourages flexible compliance by allowances trading, whilecommand-and-control programs require a hard target for each firm tosave energy or reduce emissions within firm’s own fence.
We find evidence that this inflexibility has caused difficulty for some firmsthat are already very energy efficient to achieve the target.
Most Top 10,000 firms in the ETS pilots are allocated with both energysaving targets and emissions allowances. They have to achieve theenergy saving target, which undermines the efficiency of ETS.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 18 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
When command-and-control meets market-based approach
Two anectdotal stories:
Datang Jixi Thermal Power Company in 2013:“The company’s two 125 MW generation units are already the mostenergy efficient ones compared to other units with simialr type in China.There is no room to improve the energy efficiency, therefore the energysaving target is not achieved. In order not to add a negative impact onJixi City’s Twelfth FYP energy saving target, Datang Heilongjiang PowerCompany has negotiated with Datang Jixi No.2 Thermal PowerCompany, and signed an agreement regarding the target sharing of theenergy saving target during the Twelfth FYP. Datang Jixi No.2 ThermalPower Company will carry the 22,000 tons of coal-equivalent energysaving target for Datang Jixi Thermal Power Company. This case hasbeen reported to the Jixi Development and Reform Commission forapproval."
Some firms reported that they signed a contract with ESCOs buyingenergy from them, so this part of energy consumption can be accountedas energy saving to fulfill the target.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 19 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
When command-and-control meets market-based approach
There are firms which overfulfill their energy saving targets significantly. 25 of theprovinces have already achieved their Five-Year energy saving targets in 2014.Overfulfillment rates of central SOEs are mostly higher than the rates of all the firms.
0
50
100
150
200
250
300
Pro
gre
ss t
ow
ard
pro
vin
cial
tar
get
(%
)
Qingha
i
Guang
dong
Henan
Shaan
xi
Anhui
Guang
xi
Hebei
Heilon
gjian
g
Fujian
Hubei
Chong
qing
Liaon
ing
Sichua
n
Shanx
i
Inne
r Mon
golia
Tianjin
Jiang
su
Guizho
u
Hunan
Ningxia
Jiang
xi
Gansu Jil
in
Zhejia
ng
Shand
ong
Xinjian
g
Yunna
n
Shang
hai
Beijing
Hainan
Tibet
Progress of provincial energy saving target in 2012 (%)Pass line of provincial energy saving target progress in 2012 (40%)Progress of provincial energy saving target in 2013 (%)Pass line of provincial energy saving target progress in 2013 (60%)Progress of provincial energy saving target in 2014 (%)Pass line of provincial energy saving target progress in 2014 (80%)
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Ove
rfu
lfill
rat
e
Guang
dong
Guizho
u
Shanx
i
Beijing
Henan
Fujian
Liaon
ing
Chong
qing
Inne
r Mon
golia
Shaan
xi
Hainan
Guang
xi
Zhejia
ng
Tianjin
Ningxia
Hubei
Qingha
i
Shang
hai
Heilon
gjian
g
Yunna
n
Sichua
n
Hebei
Shand
ong
Jilin
Xinjian
g
Gansu
Anhui
Hunan
Jiang
xi
Jiang
su
Sample central SOEsAll the sample firms
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 20 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
When command-and-control meets market-based approach
Nevertheless, the Top 1,000 and 10,000 Firms Program provided a veryimportant common basis for future policy, regardless of whethercommand-and-control or market based.
Company executives are now aware of the importance of energy saving.
Financing problem is addressed to some extent by central and provincialfunds.
The energy management and online measurement system promoted bythe program are prerequisites for any effective energy saving oremissions reduction policy.
NDRC has made many relevant program documents available,increasing the transparency of the policy and offering a chance toengage the public participation in the energy saving campaign.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 21 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Concluding remarks
Summary
Non-compliance rate is increasing for many reasons:We find evidence of data manipulation in the Top 1,000 Firms Program.Larger firms not controlled by the state and firms in cities with slow growthshowed significantly lower likelihood of compliance⇒ Those are firms lesssubject to state control and related incentive structures.
The programs have built important institutions:E.g. energy data direct reporting, monitoring, verification and importantlytransparency that did not previously exist.Surfaced some related challenges for program administration such asdouble counting. structures.
Policy recommendations:Evaluate the trade off between firm-level targets and market-based policy.
a) Strengthen the measuring, reporting and verification (MRV) of energyand emissions.
b) Address potential incompatibilities to arise between the nationalemission trading system (ETS) and energy conservation programs.
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 22 / 23
Motivation Overview of firm-compliance Why firms fail to comply? Discussion Conclusion
Thank you for your attention!
Da Zhang (MIT Joint Program) China’s Energy Saving Program June 21st, 2017 23 / 23