RESA Discussion Points

� Interruptible Load Program (ILP)

� ILP Preparatory Activities

� ILP Feedback from Contestable Customers Contracted

� ILP Implementation Activities

Page 3: F 20141105 012255 resa mbc 100114

INTERRUPTIBLE LOAD PROGRAM

Page 4: F 20141105 012255 resa mbc 100114

ILP Implementation

4October 3, 2014

Process being finalized is to utilize stand-by generation of

contracted Contestable Customers to relieve system demand

duringYellow and Red Alert Situations

Page 5: F 20141105 012255 resa mbc 100114

ILP Implementation

5October 3, 2014

Page 6: F 20141105 012255 resa mbc 100114

ILP Implementation

6October 3, 2014

Customer participation is voluntary and done via coordination

by the DU direct to the customers for confirmation

Page 7: F 20141105 012255 resa mbc 100114

ILP Implementation

7October 3, 2014

Page 8: F 20141105 012255 resa mbc 100114

ILP Implementation

8October 3, 2014

Contracted volumes by the RES customer will be re-declared to

MERALCO/DU and settled at the ERC approved ILP rate

Page 9: F 20141105 012255 resa mbc 100114

ILP Implementation

9October 3, 2014

Page 10: F 20141105 012255 resa mbc 100114

ILP Implementation

10October 3, 2014

Date with

ILP

De-

loading

Hour

Baseline

kW

(A)

Metered kW

during ILP

(B)

De-loaded

kW

(A – B)

April 1,

2014

2:00pm-

3:00pm

2,305 474 1,831

SAMPLE COMPUTATION:

De-Loaded kWh

De-loaded kWh=Hourly Baseline kWh-Metered kWh during ILP

Page 11: F 20141105 012255 resa mbc 100114

ILP Implementation

11October 3, 2014

₱18,365

De-loading Compensation=

(₱9.71/kWh x 1,831 kWh)

Incremental De-loading Rate x De-loaded

kWh

+₱585.92

Maintenance Cost

Where:

₱9.71/kWh

Incremental De-loading Rate=

(₱43.26/L x 0.34 L/kWh)

Generation Cost of Fuel x Fuel Consumption

Rate

Generation Cost of Fuel

Generation Cost of Fuel is the average price of

diesel from Caltex, Petron & Shell the city or

municipality where the ILP CC is located as of

the end of the previous calendar month

Fuel Consumption Rate is 0.34 L/kWh

-

₱5/kWh

Average Generation

Charge of ILP CC

1,831 kWh

De-loaded kWh=

(2,305 kW – 474 kW) x 1 hour

Baseline kW – Metered kW

₱585.92

Maintenance Cost=

1,831 kWh x ₱0.32/kWh or ₱23,548 per month,

whichever is lower

De-loading Compensation

De-loading Compensation=Incremental De-loading Rate × De-loaded kWh + Maintenance

Cost

Page 12: F 20141105 012255 resa mbc 100114

ILP Implementation

12October 3, 2014

₱27,517

ILP Amount=

1,831 kWh x ₱14.71/kWh

Redeclared BCQ x ILP Rate x

₱585.92

Maintenance Cost

Where:

₱14.71/kWh

ILP Rate =

₱43.26/L x 0.34 L/kWh

Generation Cost of Fuel x Fuel Consumption

Rate

Generation Cost of Fuel is the average price

of diesel from Caltex, Petron & Shell the city

or municipality where the ILP CC is located as

of the end of the previous calendar month

Fuel Consumption Rate is 0.34 L/kWh

1,831 kWh

Redeclared BCQs= Generator Redeclared BCQs to Meralco

₱585.92

Maintenance Cost=

1,831 kWh x ₱0.32/kWh or ₱23,548 per

month, whichever is lower

Meralco Payment to ILP RES (ILP Amount)

ILP Amount = [Redeclared BCQ x ILP Rate] + Maintenance Cost

Page 13: F 20141105 012255 resa mbc 100114

Sample ILP Participation

13October 3, 2014

0

500

1,000

1,500

2,000

2,500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

kW

h U

tili

zed

pe

r In

terv

al

Hour Interval

Complete Deloading from 10am to 1pm (Tuesday

load profile)

Normal Operations Deloaded interval: 10am-1pm

Note: Customer X has ample provision for diesel generator that could address energy needs during deloading.

Page 14: F 20141105 012255 resa mbc 100114

Sample ILP Participation

Status Quo: No ILP participation

Scenarios:

1- ILP @ Tuesdays, 10am-1pm

2- ILP @ Tuesdays, 12nn-3pm

3- ILP @ Tuesdays, 10am-3pm

4- ILP @ Tues and Thurs, 10am-3pm

5- ILP @ Tues, Thurs, and Sats, 10am-3pm

1,322,809

1,293,658 1,293,216

1,273,802

1,228,646

1,185,538

Status Quo Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5

kWh utilized from the grid of Customer X

(Feb 26-Mar 25, 2014)

October 3, 2014

Page 15: F 20141105 012255 resa mbc 100114

ACTIVITIES TO BE UNDERTAKEN

Page 16: F 20141105 012255 resa mbc 100114

ILP Preparatory Activities

16October 3, 2014

� Confirm compensation rate approved by the ERC against embedded

generation costs

� Identify preferred operating hours and sustainable operating period

� Identify personnel to be contact point upon enrolment to ILP

Page 17: F 20141105 012255 resa mbc 100114

Why Participate?

17October 3, 2014

� Shortage in 2015 will result to Automatic Load Drop (ALD) / Manual Load

Drop (MLD) Scenarios for all those connected to the grid

� Enrolment to ILP will ensure prior notification for any ALD/MLD scenario

during Yellow and Red Alert grid situations

� Operation of stand-by generation capacity will be compensated via ILP

approved rate

Page 18: F 20141105 012255 resa mbc 100114

FEEDBACK ON ILP

Page 19: F 20141105 012255 resa mbc 100114

Contestable Segment Feedback

Number of Contracted

RES

Number of Committed

Customers

Committed

Contracted Load for

ILP, MW

12 75 245

Page 20: F 20141105 012255 resa mbc 100114

IMPLEMENTATION ACTIVITIES

Page 21: F 20141105 012255 resa mbc 100114

Implementation Activities

� RESA, MERALCO and ERC discussions on-going for the implementation

of ILP on the retail supply segment via re-declaration process of RES

volume to MERALCO

� DOE support being provided to allow for re-declaration of RES volume in

the WESM

� Review of tax applications on-going to determine possible assistance to

be requested involving impact of ILP transactions to both the RES and

participating ILP

Page 22: F 20141105 012255 resa mbc 100114

Thank You