fa cv dd 3 august 2011
TRANSCRIPT
-
8/6/2019 FA CV dd 3 August 2011
1/3
May. 2011 Page 1 of 3
CURRICULUM VITAE
NAME FAHMY ARDHIANSYAH (MR.)
NATIONALITY Indonesian
MARITAL STATUS Single
LANGUAGE English and Bahasa Indonesia
QUALIFICATIONS
S1-Degree Ocean Engineering,
Program of Study Hydrodynamics and Floating Structure,
Faculty of Ocean Technology, ITS-Surabaya.
EDUCATION/TRAINING
January INSTITUT TEKNOLOGI SEPULUH NOPEMBER (ITS)
2010
As The Final Project
Reliability Analysis of Scantling Support Structure System Gas Processing
Module Belanak FPSO Due to Extreme Load
July INDOSAFE PRATAMA2011 Basic Offshore Safety Induction and Emergency Training (BOSIET)
Consist of Basic Life Support, Basic Fire Fighting, and HUET using METS & Sea Survival
-
8/6/2019 FA CV dd 3 August 2011
2/3
Jun. 2011 Page 2 of 3
PROFESSIONAL EXPERIENCES
May 2011 PT. GLOBAL MARITIMEPresent Naval Engineer / Naval Architect
He was involved in the following major projects:
Client : PT. TRADA MARITIME Tbk. (July 2011)- Mooring Analysis of FSO Lentera Bangsa
Client : PT. MEINDO/TOTAL (July 2011)- Lifting Stability Analysis of SWIBER CHAI SISI NUBI MWS
Module
Client : PT. Pertalahan Arnebatara Natuna. (June 2011)- Mooring Analysis of MT. Cyrus
Client : Conoco Philips Indonesia. (July 2011)- Fuel Loading 220 KL HSD to FOS Universe at Pertamina Terminal,Tual
Client : Conoco Philips Indonesia. (July 2011)- Fuel Loading 220 KL HSD to FOS Universe at Pertamina Terminal,
Tual
Client : Conoco Philips Indonesia. (June 2011)- Fuel Loading 50 KL HSD to FOS Gemini at Pertamina Terminal,Merak
Client : Conoco Philips Indonesia. (June 2011)- Loading 350 KL HSD to Vessel "Era Merah Putih at PertaminaTerminal, Tual
Client : Conoco Philips Indonesia. (May 2011)- Loading 750 KL HSD to Vessel "Posh Value at Pertamina Terminal,Tual
Client : Conoco Philips Indonesia. (May 2011)- Loading 750 KL HSD to Vessel "Posh Voyager at PertaminaTerminal, Tual.
Nov 2010 PT. CITRA MASApril 2010 Asst. Naval Engineer / Naval Architect
He was involved in the following major projects:
-
8/6/2019 FA CV dd 3 August 2011
3/3
Jun. 2011 Page 3 of 3
Client : Indonesian Ministry of Transportation (Nov 2010)- Design and Engineering of PATROL BOAT 45 metres.
Client : Indonesian Police Department (Nov 2010)- Design and Engineering of PATROL BOAT 60 metres.
July 2009 TOTAL E&P INDONESIESept 2009 On the Job Training
He was involved in the following major projects:
Client : TOTAL E&P INDONESIE (July 2011)- Well Connection GTS TMX-18&21, Tambora Offshore Field.
Client : TOTAL E&P INDONESIE (July 2011)- Jacket Structure In-place analysis of SISI NUBI MWPN2 Platform.
This CV is a true statement of my qualifications and work experience.
Signed by: _______________________________ Fahmy Ardhiansyah