Facility Condition Assessments and Asset Management with GIS John Przybyla, PE, GISP Senior Vice President Woolpert, Inc.

Upload: john-przybyla

Post on 29-Nov-2014

2.237 views

Category:

Documents


4 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Facility Condition Assessment And Asset Management With GIS

Facility Condition Assessments

and Asset Management with GIS

John Przybyla, PE, GISP

Senior Vice President

Woolpert, Inc.

Page 2: Facility Condition Assessment And Asset Management With GIS

Facility Condition Assessments (FCA)

Over 100 Million Square Feet of FCA Experience + Army and Air Force Exchange Service

+ Cincinnati State Technical & Community College

+ Cummins, Inc.

+ Department of Defense Education Activity

+ Illinois State University Facilities & Infrastructure Condition Assessment

+ Illinois State University South Residence Complex

+ Kaiser-Permanente California

+ State of Illinois Department of Human Services

+ State of Illinois Statewide Facility Condition Assessment

+ State of Missouri Office of Administration

+ The Ohio State University Infrastructure Master Plan & GIS

+ U.S. Air Force Services Agency

+ U.S. Fish and Wildlife Services

+ Walter Reed Army Medical Center

+ Washington University North Campus

+ Many more…

Page 3: Facility Condition Assessment And Asset Management With GIS

Facility Condition Assessments (FCA)

FCA Objectives:

+ Obtain an accurate snapshot of current facility conditions based on

professional assessments

+ Obtain prioritized recommendations for corrective actions

+ Obtain a planned project approach to address identified facility

deficiencies

+ Obtain an updatable database of deficiencies and planned projects

Page 4: Facility Condition Assessment And Asset Management With GIS

1. Establish Assessment Team

2. Perform Preliminary Walk-Thru

3. Obtain and Review Facility Documents

4. Refine Assessment Scope

5. Define Standards

6. Define Condition Assessment Database

Project Preparation

Data

Gathering

Data Analysis

Reporting and Delivery

Program Planning

1. Prioritize Projects

2. Develop Project Schedules

3. Assist in Analysis of Funding Sources and Requirements

4. Assist Client in Project Implementation

5. Provide ongoing support for Optimization Tool

1. Interview Facility Officials and Maintenance Staff

2. Collect Facility and System Data

3. Identify and Record Facility Deficiencies

4. Populate Condition Assessment Database

1. Analyze and Apply Life Cycle Data

2. Prescribe Corrective Actions for Each Deficiency

3. Prepare Cost for Each Corrective Action

4. QA/QC Deficiencies and Corrective Action

5. Group Tasks into Projects

1. Summarize Data and Prepare Draft Report

2. Review Report with Client

3. Deliver Final Report to Client

4. Finalize Condition Assessment Database

Facility Condition Assessments (FCA) Assessment Approach

Page 5: Facility Condition Assessment And Asset Management With GIS

Pentop Computers

Digital Photographs Hand Notes

Facility Condition Assessments (FCA) Appropriate Tools

Page 6: Facility Condition Assessment And Asset Management With GIS

Facility Condition Assessments (FCA) Building System Categories

Building

Envelope

+ Roof Membrane

+ Foundations

+ Exterior Windows

+ Exterior Walls

+ Exterior Doors

+ Structure

+ Floor Deck

Building

Interior

• Interior Walls

• Interior Doors

• Floor Coverings

• Exterior Doors

• Ceilings

• Elevators

• Food Service

Equipment

• Stairs

• Interior Finishes

HVAC

• Equipment

• Ductwork

• Piping

• Controls

Electrical

• Equipment

• Power Distribution

• Interior Lighting

• Exterior Lighting

• Fire Alarm

• Security

Plumbing

• Equipment

• Fixtures and

Hardware

• Domestic Water

• Drain, Waste and

Vent Systems

• Storm Drains

Fire

Protection

• Equipment

• Sprinkler

Systems

• Stand Pipes

Site

• Landscaping

• Walkways

• Parking and

Roadways

• Lighting

• Utilities

Page 7: Facility Condition Assessment And Asset Management With GIS

Facility Condition Assessments (FCA) Deficiency Categories

• Equipment Failure

• Maintenance

• Planned

Replacement

• Exceeded Useful Life

• Poor Condition

• Code Compliance

• Hazardous

Materials

• Indoor Air Quality

• Hazardous

Condition

• Energy Consumption

• Appearance

• Security

• ADA/Accessibility

• System

Misapplication

• Equipment

Misapplication

• Consequential

Building

Integrity

Health & Life

Safety

Functionality

Page 8: Facility Condition Assessment And Asset Management With GIS

Facility Condition Assessments (FCA) Deficiency Priorities

Deficiencies that have a direct impact on the health and safety of the building

occupants or violates enforceable building, mechanical or electrical codes. Priority 1

Deficiencies that impact the building integrity and if not corrected will

cause further damage and in turn affect the health and safety of the

building occupants. Priority 2

Deficiency corrections that must be performed to maintain or restore

the building systems integrity, reliability and performance. Priority 3

Deficiency corrections performed to improve the building systems

integrity, reliability and performance. Priority 4

Deficiency corrections required to conform to codes that are currently

in effect but not required when the building was built. Priority 5

Page 9: Facility Condition Assessment And Asset Management With GIS

Facility Condition Assessments (FCA) Deliverables

+ Portfolio Summaries

+ Facility Summaries

+ Executive Summary

+ System Narratives

+ Reports

+ Photos

+ Database

Page 10: Facility Condition Assessment And Asset Management With GIS

Use the Power of GIS to Manage FCA Data + Spatial analysis and modeling

+ Overlay analysis (union, intersect)

+ Proximity analysis (buffer, near)

+ Surface analysis (hill shade, slope)

+ Linear analysis (connectivity, tracing)

+ Raster analysis

+ Geoprocessing tools

+ Database management

+ Rich API

+ Enterprise-ready

+ Integrates with

+ FCA Database

+ CMMS

+ CAFM

+ IWMS

Page 11: Facility Condition Assessment And Asset Management With GIS

GIS Supports Enterprise Applications

Analysis

Decision

Support

Executive

Dashboard

Building Automation

Systems

Space

Analysis/CAFM

Work Order

Management

FCA Data

Management

Planning

Page 12: Facility Condition Assessment And Asset Management With GIS

ESRI’s Building Interior Space Data Model

(BISDM) for GIS - A user community effort

+ Started in summer 2007

+ Built template to serve many uses

cases and compatible technologies

+ Support property, building, and asset

objects

+ Models, supporting documentation,

data loading tools, and sample

viewers at www.esri.com/datamodels

+ Can be extended to include FCA Data

Page 13: Facility Condition Assessment And Asset Management With GIS

BISDM Asset Data Feature Classes

BISDM

Mimics the

structure

of IFCs

Page 14: Facility Condition Assessment And Asset Management With GIS

2-D GIS For Facility and Space

Management

Page 15: Facility Condition Assessment And Asset Management With GIS

3-D GIS Facility Examples

Page 16: Facility Condition Assessment And Asset Management With GIS

Automated Risk-based

Asset Management with

GIS

Page 17: Facility Condition Assessment And Asset Management With GIS

Infrastructure Lifecycle

Commissioning

Update

Systems

Maintain

Prepare As-Builts

Maintenance

Master

Plan

Plan New

Systems

Plan

Select

Contractors

Perform Work

Build

Select Design

Consultants

Approve

Plans

Perform/Approve

Designs

Design

Stakeholder

Support

Operate

Manage Change

Reallocate Space

Page 18: Facility Condition Assessment And Asset Management With GIS

The Asset Life Cycle Over Time

Page 19: Facility Condition Assessment And Asset Management With GIS

Defining Asset Management

Asset management

means different things to

different people: + Asset Management is a work order

system

+ Asset Management is moving from

reactive, planned, preventative, to

reliability centered maintenance

(rcm)

+ Asset Management is regulatory

driven - required by the FRA, EPA,

GASB, etc.

+ Asset Management a process that

directs O & M activities and CIP

planning

Page 20: Facility Condition Assessment And Asset Management With GIS

Defining Asset Management

“Asset management may be defined as managing infrastructure capital

assets to minimize the total cost of owning and operating them, while

delivering the service levels customers desire.”

Page 21: Facility Condition Assessment And Asset Management With GIS

Asset Management Impacts Sustainability

of the Community

A Sustainable “Triple Bottom Line”

Page 22: Facility Condition Assessment And Asset Management With GIS

Answering the Five Core Questions

for Sustainable AM

1. What is the current state of my assets? What do I own? Where is it? What condition is it in? What is its performance? What is its remaining useful life? What is its remaining economic value?

2. What is my required level of service (LOS)? What is the demand for my services by my stakeholders? What do regulators require? What is my actual performance?

3. Which assets are critical to sustained performance? How does it fail? How can it fail? What is the likelihood of failure? What does it cost to repair? What are the consequences of failure?

4. What are my best O&M and CIP investment strategies? What alternative management options exist? Which are the most feasible for my organization?

5. What is my best long-term funding strategy?

Page 23: Facility Condition Assessment And Asset Management With GIS

1

Overview of the Asset

Management Elements

23

45

6

Asset Inventory

Asset Criticality

Service Levels

Asset Condition

Planned Maintenance

Life Cycle Costing

Track Asset Inventory Data

Identify Critical Assets (highest consequence of failure)

Set Performance

Standards

Rate Critical Assets

Plan and Execute

PM/PdM/RCM

Apply to Repair / Rehab /

Replace Decisions

Page 24: Facility Condition Assessment And Asset Management With GIS

Criticality Determines

Importance

• Focuses on: • Managing risk and the assets that pose the most

• Data collection activities and frequency

• Condition assessment remaining useful life

• Melds maintenance and capital planning practice interdependence

• With technology enables informed decision making

• Helps “Begin with the end in mind” (Steven Covey)

Page 25: Facility Condition Assessment And Asset Management With GIS

Customer, Environmental, and Regulatory

Measures are “Service Levels”

Example Measures

• Reliability – Availability of facilities, equipment, parking, restrooms, etc.

• Quality – customer complaints

• Customer Service – On time performance, minimal wait times, facility conditions, etc.

• Regulatory – safety, Federal regulations

Page 26: Facility Condition Assessment And Asset Management With GIS

Computerized Maintenance

Management System (CMMS)

Capture time and costs associated

with work activities and assign costs

to the asset

Page 27: Facility Condition Assessment And Asset Management With GIS

Risk Management

• Risk in AM-speak is the consequence

of failure multiplied by the probability

of failure

• Often used as a measure of “criticality”

• Another term is “business risk

exposure (BRE)”

Page 28: Facility Condition Assessment And Asset Management With GIS

Combining Factors for a Simple

AM Decision Making Model Aspect Rating Factor

Estimated Life Years Years

Condition 1 to 6 125% to 5%

Performance 1 to 6 125% to 5%

Reliability 1 to 6 125% to 5%

Remaining Life

% life consumed or years

remaining (calculated)

f(min) of above

Level of Service

1 to 5

Compare to Target (Minimum)

LOS

Redundancy

0%, 50%, 90%, 98%

Reduces PoF

Probability of Failure Calculated: (% consumed x (1 – % Redun) x 10

1 to 10

Consequence of Failure 1 to 10 1 to 10

BRE (Business Risk Exposure) Calculated:

PofF x CoF x % Redundancy

1 to 100

Page 29: Facility Condition Assessment And Asset Management With GIS

Old Method

Page 30: Facility Condition Assessment And Asset Management With GIS

Asset Management Infrastructure

Optimization

• Can we build a repeatable process or tool, leveraging

our knowledge, GIS and FCA investment to answer

these questions?

• What and where is the critical infrastructure?

• What do we need to do to maximize useful life?

• How do we properly allocate R&R and CIP budget

dollars to do this?

Page 31: Facility Condition Assessment And Asset Management With GIS

Infrastructure Optimization 32

CMMS Data

FCA Data

GIS Data

?

Page 32: Facility Condition Assessment And Asset Management With GIS

Decision

Analysis

Strategy

Costs

Replacement

Strategy

Costs

Risk

Creation Calibration

GIS CMMS Asset Management Support Tool

IO Overview

SCENARIOS

FCA

Page 33: Facility Condition Assessment And Asset Management With GIS

RISK

Infrastructure Optimization Toolset

INFRASTRUCTURE OPTIMIZATION

RISK REPLACEMENT DECISION

Purpose: Determine Business Risk Exposure In the context of asset management, risk can be defined as the [probability of failure multiplied by the consequence of failure] multiplied by redundancy and is often used as a measure of „criticality‟. The preferred term used for this is „Business Risk Exposure‟ (BRE).

Probability of Failure (POF)

Consequence of Failure

(COF)

Redundancy

(R)

Business RISK

Exposure

Page 34: Facility Condition Assessment And Asset Management With GIS

GIS Data

CMMS Data • Historical Analysis

• Work Activity

• Performance

• Failure History

Specialized Data

• FCA

Institutional Knowledge

Risk

Creation Calibration

Risk Workflow

Page 35: Facility Condition Assessment And Asset Management With GIS

Integration with ESRI GIS

Page 36: Facility Condition Assessment And Asset Management With GIS

Probability of failure (PoF):

+ Condition

+ Age

+ Material

+ Capacity

+ Structural integrity

+ Operational / Maintenance history

(breakage, leakage, defects)

+ Design Standards

+ Physical Location (associated soil

characteristics, climatic conditions,

proximity to construction activity)

+ Installation information (construction

techniques, installer ratings, bedding

conditions)

+ Repair costs

+ Hydraulic performance characteristics

+ Maintenance practices

+ Asset reliability and performance

information

+ Other Factors

Probability of Failure (POF)

Consequence of Failure

(COF) Redundancy

Business Risk

Exposure (BRE)

Probability or likelihood of failure / Can be determined based

on an asset’s physical characteristics:

Page 37: Facility Condition Assessment And Asset Management With GIS

PoF Factor Manager

Page 38: Facility Condition Assessment And Asset Management With GIS

Probability of Failure

Number Factor Ranking Percentage Weight Score

Required 1 Percent Consumed

Required 2 Condition

Optional 3 User Defined

Optional 4 User Defined

Optional 5 User Defined

Optional 6 User Defined

Optional 7 User Defined

Optional 8 User Defined

Optional 9 User Defined

Optional 10 User Defined

Weight Must Equal 10

Sample Factors

Passive assets

Original construction techniques

Performance

Rating Description Impact

Contractor who installed 1 Exceeds / Meets all Performance Targets125.00%

Soil Characteristics 2 Minor Performance Deficiencies 100.00%

Bedding conditions 3 Notable Performance Deficiencies 75.00%

Physical loads 4 Considerable Performance Deficiencies50.00%

Internal corrosion 5 Major Performance Deficiencies 25.00%

Temperature conditions 6 Does not meet any Performance Targets5.00%

Active Assets

Hours of use (non-linear)

Lack of PM Reliability Rating Description Impact

Climatic conditions 1 As Specified by Manufacturer 125.00%

Replacement or wear parts 2 Rare Breakdown 100.00%

Improper alignment / calibration 3 Occasional Breakdown 75.00%

Lubrication or cooling of parts 4 Periodic Breakdown 50.00%

Reliability 5 Continuous Breakdown 25.00%

Performance 6 Unserviceable 5.00%

Sample Ratings

Apply Probability of

Failure Factors

IO: Infrastructure Optimization

Asset Criticality &

Risk Mitigation

R&R Strategy and CIP

Value and Depreciation

Reporting

Page 39: Facility Condition Assessment And Asset Management With GIS

Consequence of Failure (CoF):

+ Critical Facilities Served

+ Proximity to Structures (Roads/Buildings/Lakes/Creeks)

+ Accessibility to Repair,

+ Size

+ Depth

+ Major Expense

+ Safety Concerns

+ Health / Welfare Concerns

+ Social Costs

+ Levels of services (LOS)

+ Regulatory Impacts

+ Environmental Impacts

+ Public Issues

+ Other Factors

Probability of Failure (POF)

Consequence of Failure

(COF) Redundancy

Business Risk

Exposure (BRE)

Consequence or impact of failure / Can be determined based

on related asset characteristics:

Page 40: Facility Condition Assessment And Asset Management With GIS

Consequence of Failure

Number Factor Ranking Percentage Weight Score

Optional 1 User Defined

Optional 2 User Defined

Optional 3 User Defined

Optional 4 User Defined

Optional 5 User Defined

Optional 6 User Defined

Optional 7 User Defined

Optional 8 User Defined

Optional 9 User Defined

Optional 10 User Defined

Weight Must Equal 10

Sample Factors

SizeCritical Facilities Being Served

Proximity to Structures

Accessibility to Repair

Depth

Main Looped System

Major Expense

System Failure

Safety Concerns

Contractor Installed

Social Costs

LOS

Regulatory

Environmental

Sample Ratings

Sewer Main Consequence of Failure

Consequence

Category

Negligible

=1 Low = 2

Moderate =

3

Severe =

4 SCORE

Size <8" 10"-12" 15"-24" >24"

Depth <5' 5' - 13' 14' - 20' >20'

TOTAL 0

Apply Consequence of

Failure Factors

IO: Infrastructure Optimization

Asset Criticality &

Risk Mitigation

R&R Strategy and

CIP

Value and Depreciation

Reporting

Page 41: Facility Condition Assessment And Asset Management With GIS

Redundancy (R):

Probability of Failure (POF)

Consequence of Failure

(COF) Redundancy

Business Risk

Exposure (BRE)

* Workflow provided by Asset

Management Fundamentals

Workshop 2007

Page 42: Facility Condition Assessment And Asset Management With GIS

Risk Analysis Results

Page 43: Facility Condition Assessment And Asset Management With GIS

Establish Replacement

Costs

Calculate Costs

Establish Replacement

Strategies

Replacement

Strategy Costs

Replacement Workflow

Page 44: Facility Condition Assessment And Asset Management With GIS

Replacement Costs

+ Scenario based

+ Configurable costs and activities

+ Generates present and future value costs

+ Inflation factor

+ Made for decision makers

+ Ad-hoc reporting

+ Imbedded in GIS

Page 45: Facility Condition Assessment And Asset Management With GIS

R&R Strategy and Costing

+ Tool used for What IF

maintenance strategies

Page 46: Facility Condition Assessment And Asset Management With GIS

Build R&R and Maintenance

Strategies

Calculate Costs Finalize

Decisions

Conduct Analysis

Decision

Analysis Strategy Costs

Decision Workflow

Page 47: Facility Condition Assessment And Asset Management With GIS

IO Decision Capabilities

+ R & R Reports: Cost based scenarios for rehabilitation, repair and

maintenance strategies

+ Rehabilitation and replacement (R&R) prioritization

+ Capital investment versus enhanced maintenance

+ Capital investment timing

+ Long-term fiscal alternatives

+ Short-term packaging for capital projects

+ Single location for various data sets

Page 48: Facility Condition Assessment And Asset Management With GIS

Decision Analysis

Page 49: Facility Condition Assessment And Asset Management With GIS

Replacement Report

Page 50: Facility Condition Assessment And Asset Management With GIS

Replacement Report

Page 51: Facility Condition Assessment And Asset Management With GIS

EXAMPLE

Page 52: Facility Condition Assessment And Asset Management With GIS

Probability of Failure

Lowest Probability of

Failure

Highest Probability of

Failure

Legend

Sewer Main - POF

0 - 2.50

2.51 - 5.00

5.01 - 7.50

7.51 - 10.00

Probability of Failure Percent consumed (Weight = 2) Condition (Weight = 8) Soils Ground Water Level Under Drained

Hydraulic characteristics

Page 53: Facility Condition Assessment And Asset Management With GIS

54

Consequence of Failure

Highest Consequence of Failure

(Interceptor lines)

Legend

Sewer Main - COF

0 - 2.50

2.51 - 5.00

5.01 - 7.50

7.51 - 10.00

Consequence of Failure Pipe Size (Weight = 8) Ground Surface (Weight = 2) Critical Facilities Served Pipe Depth Road Classification Crossing Flood Plain

Page 54: Facility Condition Assessment And Asset Management With GIS

PoF CoF BRE

Probability of Failure (POF)

Consequence of Failure

(COF)

Redundancy

(R)

Business RISK

Exposure

Legend

Sewer Main - BRE

0 - 15.00

15.01 - 30.00

30.01 - 45.00

45.01 - 100.00

Legend

Sewer Main - COF

0 - 2.50

2.51 - 5.00

5.01 - 7.50

7.51 - 10.00

Legend

Sewer Main - POF

0 - 2.50

2.51 - 5.00

5.01 - 7.50

7.51 - 10.00

Comparative Analysis

Page 55: Facility Condition Assessment And Asset Management With GIS

56

Page 56: Facility Condition Assessment And Asset Management With GIS

Analysis of Sewer

District

50 Year Forecast For Replacement - Sewer Mains

Selection from 50

Year Forecast

Legend

Sewer Main - BRE

0 - 15.00

15.01 - 30.00

30.01 - 45.00

45.01 - 100.00

Page 57: Facility Condition Assessment And Asset Management With GIS

58

Page 58: Facility Condition Assessment And Asset Management With GIS

Other Key Features

+ Can use any asset:

+ Facilities

+ Parks and Recreation

+ Transportation

+ Water, Wastewater, Stormwater

+ Supports linear and non- linear assets

+ Related objects

+ Advanced reporting and charting

+ WPF Version coming soon!

Page 59: Facility Condition Assessment And Asset Management With GIS

A Comprehensive AM

Solution

Page 60: Facility Condition Assessment And Asset Management With GIS

Potential Integrated CADD/BIM/GIS Asset

Management Data Workflow

GIS

Repository

836.2

836.5

840.8

836.3

836.1

836.5835.6

835.6

835.5

835.6

835.5

834.3

835.2

835.7

835.5

835.1

835.1

834.8

834.5

835.1

835.7

835.4

835.5

835.2

825.6

833.4

833.4

832.9

834.4

831.5

832.8

831.4

832.4832.8

832.7

833.8

832.4

832.2

833.2

828.8

829.2

830.2

843.5

842.5 842.1

843.3

830.2

830.3

830.4

831.6

831.5

831.3

830.2

830.3

835.7

837.4

827.7

828.4

828.4

827.6

827.5

829.4

829.6

829.4

829.3

828.3

827.6

841.4

844.6

842.2

842.3

842.8842.3

842.5

843.4

836.5

837.6

837.7 837.4

831.6

U/C

845.3

839.2

838.8

836.7

841.3842.7843.7

844.6

844.6

840.6

840.8

841.2

842.3

842.7

843.3

844.7

844.3

848.3857.6

853.1

844.6

845.5

847.2846.8

845.4

846.5

847.3

848.3

847.4

846.6

846.6

845.7

847.6

845.4

845.6

846.5

DIRT PILES

829.8

829.8

829.8

829.3

829.3

826.8

827.2

827.2828.1

828.2

828.5

828.3

828.3

828.3

828.5

828.2

829.4

827.5

827.7

829.6

829.6

830.3

830.3

830.3

835.8

835.8

833.4

834.5

829.4

829.6

828.4

832.7

831.5

832.3

833.8

833.8

833.4833.6

833.6

833.2

833.3

832.4832.5

832.6

832.7

833.7

834.7

834.4

834.7

834.7

834.7

835.5

835.5

835.4

835.1

835.4

834.7

833.8

833.6

832.4

833.5

832.7

833.5

834.7

832.3

831.2

831.2

830.6

831.3

831.7

831.7

831.3

831.7

831.7

832.4

832.4

832.4

833.7

833.7

835.6

835.4835.5

832.4

832.4

831.2

830.6

831.3

830.7

831.1

830.8

831.1

830.6

831.4

831.6

831.8

832.3

832.4

832.5

832.5

833.3

832.8

832.2

832.5

834.2

834.5834.5

835.8

832.5

832.5

832.5

832.5

833.4

832.4

83

832.3

831.2

832.2

832.4

832.6

831.4

831.6

831.9

832.3

832.3

832.2

833.4

832.8

832.6

835.4

836.7

836.5

837.1

837.1

834.2

835.4

847.8

848.3

848.8

833.5

833.5

835.7

835.4

834.8

835.8

835.3

840.4

839.8

841.3

839.3

839.7

840.4

840.4

841.9

836.7

835.6

835.4

835.3

836.4

846.7

846.7

846.5

846.6

835.5

835.9

836.3836.3

837.2

843.6

843.5

843.3

833.5

835.5

833.4

836.2

834.7

842.7

832.2

841.8

843.6

843.6

843.7

843.6

841.8

841.8

844.5

844.8

845.4

846.7

841.7

846.7

846.7

846.7

846.3846.6

844.3

838.5

837.7

837.3

N 447,500

N 447,750

N 448,000

N 448,250

N 448,500

N 448,750

E 13,089,250 E 13,089,500 E 13,089,750 E 13,090,000 E 13,090,250 E 13,090,500 E 13,090,750 E 13,091,000

REVISIONS

MICHIGAN STATE UNIVERSITY

PHYSICAL PLANT DIVISION

ENGINEERING SERVICES DEPARTMENT

DWN. BY

DATE

SCALE

DWG. NO.

FILE NO.

APPVD. BYN

50' 0' 50' 100' 150'

SCALE IN FEET

CONTOUR INTERVAL : 1 FOOT

TITLE

DIGITAL DATABASEMAPPING

8-89

1"= 50'INFORMATIONSERVICES

WOOLPERT

GEOGRAPHIC

MSU2C

84 5

855

850

85

0

84

5

840

840

845

MUNN ARENABRESLIN STUDENT

EVENTS CENTER

850

845

BIR

CH

RO

AD

TRACK

POOL

845

INTRAMURAL-RECREATIVE

SPORTS-WEST

DEMONSTRATION

HALL

ROAD

840

835

JENISON

PARKING LOT

67

KALAMAZOO

835

840

830

835

825

825

830

RED

CED

AR

RIV

ER

83

5

KELLOGG PARKING

LOT 66

HA

RR

ISO

NR

OA

D

840

151

59

508

PARKING

TOLL BOOTH

835

835

825

83 0

FOOTBRIDGE

KELLOGG CENTER

55

825

830

835

PARKING LOT

64

835

835

STREE

T

830

DEMONSTRATION HALL

57

PARADE FIELD

CHEST

NU

T

RO

AD

835

832.6

ROAD

CEDAR

RED

SPARTANSTATUE

835

825

830

8 35

830

825

825

830

INTRAMURAL PARKING

LOT 62

JENISON GYMNASIUM

AND

FIELDHOUSE

56

850

845

845

845

RED

CEDAR

RIVER

51

117

GIS Data

CADD Data

BIM Data

CMMS

CAFM/IWMS COBIE

Spatial Data

Tabular Data

Facility/Asset

Management

BIM

Repository

Page 61: Facility Condition Assessment And Asset Management With GIS

Concept - Automated Risk-Based

Asset Management System

+ Facility Condition Assessment Data in GIS

+ Integration of Data from Multiple Repositories

+ Executive Dashboard Interface

+ GIS-Based Visualization

+ Asset Criticality And Risk Analysis

+ R&R Strategy and CIP

Page 62: Facility Condition Assessment And Asset Management With GIS

Automated Risk-based Asset Management –

an Integrated Approach

Page 63: Facility Condition Assessment And Asset Management With GIS