Project Description Santa Clara and San Benito counties are working together to develop and deliver infrastructure improvements to the SR 152 Trade Corridor from U.S. 101 to I-5. The Santa Clara Valley Transportation Authority (VTA) in coordi- nation with the California Department of Transportation (Caltrans) is leading the development of this project. This project includes the realignment of SR 152 between U.S. 101 and SR 156, and the east bound truck climbing lanes over Pacheco Pass. The improvements would accommodate the long-term travel needs of commercial, commuter, and recreational traffic and result in an economically viable, safe, and efficient highway system that would enhance the quality of life for the local communities and economic vitality of the region. Objectives Improve mobility between the Bay Area, Salinas Valley and Central Valley Improve reliability of travel times Reduce traffic congestion Enhance travel safety Support economic vitality of southern Santa Clara and northern San Benito counties Outcomes Complete SR152 as a continuous four-lane facility between U.S.101 and SR156 Remove regional traffic from Gilroy and local roads Provide truck climbing lanes over Pacheco Pass Current Activities Advancing project definition, technical studies, and environmental documentation Continued stakeholder outreach Securing additional funding Benefits A new four-lane freeway between SR156 and U.S.101, curve corrections and access control improvements will improve safety and reliability of travel time between U.S. 101 and I-5 The eastbound Pacheco Pass climbing lanes will improve travel times and safety by separating slower moving vehicles from traffic moving at freeway speeds Separating regional traffic from local traffic by eliminating114 direct driveway access points to SR152 Project Funding VTA received $5 million of State funding from the Interregional Improvement Program (IIP), matched with $5 million of VTA’s highway funds and is seeking additional funding from the state. Project Schedule Completed Preliminary Traffic and Revenue Study February 2010 Completed Draft Trade Corridor Summary Report September 2010 Completed Project Study Report April 2015 Complete Environmental Documents Pending Funding Design and Construction Pending Funding FACT SHEET: Highways State Route (SR) 152 Trade Corridor Project Continued on reverse side

Upload: others

Post on 24-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FACT SHEET Highwaysvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/...climbing lanes over Pacheco Pass. The improvements would accommodate the long-term travel needs of commercial,

Project DescriptionSanta Clara and San Benito counties are working together to develop and deliver infrastructure improvements to the SR 152 Trade Corridor from U.S. 101 to I-5. The Santa Clara Valley Transportation Authority (VTA) in coordi-nation with the California Department of Transportation (Caltrans) is leading the development of this project.

This project includes the realignment of SR 152 between U.S. 101 and SR 156, and the east bound truck climbing lanes over Pacheco Pass. The improvements would accommodate the long-term travel needs of commercial, commuter, and recreational traffic and result in an economically viable, safe, and efficient highway system that would enhance the quality of life for the local communities and economic vitality of the region.

Objectives

• ImprovemobilitybetweentheBayArea,SalinasValleyandCentralValley• Improvereliabilityoftraveltimes• Reducetrafficcongestion• Enhancetravelsafety• SupporteconomicvitalityofsouthernSantaClaraandnorthernSanBenitocounties

Outcomes

• CompleteSR152asacontinuousfour-lanefacilitybetweenU.S.101andSR156• RemoveregionaltrafficfromGilroyandlocalroads• ProvidetruckclimbinglanesoverPachecoPass

Current Activities

• Advancingprojectdefinition,technicalstudies,andenvironmentaldocumentation• Continuedstakeholderoutreach• Securingadditionalfunding

Benefits

• Anewfour-lanefreewaybetweenSR156andU.S.101,curvecorrectionsandaccesscontrolimprovements will improve safety and reliability of travel time between U.S. 101 and I-5

• TheeastboundPachecoPassclimbinglaneswillimprovetraveltimesandsafetybyseparatingslowermoving vehicles from traffic moving at freeway speeds

• Separatingregionaltrafficfromlocaltrafficbyeliminating114directdrivewayaccesspointstoSR152

Project FundingVTA received $5 million of State funding from the Interregional Improvement Program (IIP), matched with $5 million of VTA’s highway funds and is seeking additional funding from the state.

Project ScheduleCompleted Preliminary Traffic and Revenue Study February 2010Completed Draft Trade Corridor Summary Report September 2010Completed Project Study Report April 2015CompleteEnvironmentalDocuments PendingFundingDesign and Construction Pending Funding

FACT SHEET: HighwaysState Route (SR) 152 Trade Corridor Project

Continued on reverse side

Page 2: FACT SHEET Highwaysvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/...climbing lanes over Pacheco Pass. The improvements would accommodate the long-term travel needs of commercial,

Ho

w to

Reach U

sFor m

ore information on this p

roject, please call V

TA’s Com

munity O

utreach toll free line at (855) 880-6981, TTY for the hearing-im

paired

(855) 880-6982. You m

ay also visit us on the web

at vta.org/SR

152, or e-mail us at com

munity.outreach@

vta.org.

EB

TR

UC

K C

LIMB

ING

LAN

ES

R 152 R

EA

LIGN

ME

NT

ST

UD

Y A

RE

A

US

101/SR

25 Interchange

1S

R 152/156 Interchang

e2

SR 152 on East Side of P

acheco Pass

3

ME

RC

ED

CO

UN

TY

ME

RC

ED

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

SA

NTA

CR

UZ

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

MO

NT

ER

EY

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

FR

ES

NO

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

Mo

rgan

Hill

Gilro

y

San Juan

Bautista

Ho

llister

ToLos B

anos

HE

NR

Y W

. CO

ES

TATE

PA

RK

PA

CH

EC

OS

TATE

PA

RK

AN

DE

RS

ON

LAK

E

CO

YO

TE

LAK

E

SA

N LU

ISR

ES

EV

OIR

PA

CH

EC

OLA

KE

3

21

Ro

ute 152 Trade C

orrid

or P

roject (U

S 101 to

Santa C

lara Co

unty Line)M

ajor H

ighw

ay Imp

rovem

ents

PR

ELIM

INA

RY

DR

AF

T S

UB

JEC

T T

O C

HA

NG

E.

FO

R D

ISC

US

SIO

N P

UR

PO

SE

S O

NLY.

FE

BR

UA

RY

2017

LEG

EN

DS

tate Hig

hway

Co

unty LineLo

cal Ro

ad

Pro

po

sed H

ighw

ay Imp

rovem

ent

Airp

ort/A

irtrackTruck S

cale Facility

Route 152 Trade Corridor ProjectE

B T

RU

CK

CLIM

BIN

G LA

NE

SR

152 RE

ALIG

NM

EN

T S

TU

DY

AR

EA

US

101/SR

25 Interchange

1S

R 152/156 Interchang

e2

SR 152 on East Side of P

acheco Pass

3

ME

RC

ED

CO

UN

TY

ME

RC

ED

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

SA

NTA

CR

UZ

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

MO

NT

ER

EY

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

FR

ES

NO

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

Mo

rgan

Hill

Gilro

y

San Juan

Bautista

Ho

llister

ToLos B

anos

HE

NR

Y W

. CO

ES

TATE

PA

RK

PA

CH

EC

OS

TATE

PA

RK

AN

DE

RS

ON

LAK

E

CO

YO

TE

LAK

E

SA

N LU

ISR

ES

EV

OIR

PA

CH

EC

OLA

KE

3

21

Ro

ute 152 Trade C

orrid

or P

roject (U

S 101 to

Santa C

lara Co

unty Line)M

ajor H

ighw

ay Imp

rovem

ents

PR

ELIM

INA

RY

DR

AF

T S

UB

JEC

T T

O C

HA

NG

E.

FO

R D

ISC

US

SIO

N P

UR

PO

SE

S O

NLY.

FE

BR

UA

RY

2017

LEG

EN

DS

tate Hig

hway

Co

unty LineLo

cal Ro

ad

Pro

po

sed H

ighw

ay Imp

rovem

ent

Airp

ort/A

irtrackTruck S

cale Facility

152 Corrid

or 2/1/17

EB

TR

UC

K C

LIMB

ING

LAN

ES

R 152 R

EA

LIGN

ME

NT

ST

UD

Y A

RE

A

US

101/SR

25 Interchange

1S

R 152/156 Interchang

e2

SR 152 on East Side of P

acheco Pass

3

ME

RC

ED

CO

UN

TY

ME

RC

ED

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

SA

NTA

CR

UZ

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

MO

NT

ER

EY

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

FR

ES

NO

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

Mo

rgan

Hill

Gilro

y

San Juan

Bautista

Ho

llister

ToLos B

anos

HE

NR

Y W

. CO

ES

TATE

PA

RK

PA

CH

EC

OS

TATE

PA

RK

AN

DE

RS

ON

LAK

E

CO

YO

TE

LAK

E

SA

N LU

ISR

ES

EV

OIR

PA

CH

EC

OLA

KE

3

21

Ro

ute 152 Trade C

orrid

or P

roject (U

S 101 to

Santa C

lara Co

unty Line)M

ajor H

ighw

ay Imp

rovem

ents

PR

ELIM

INA

RY

DR

AF

T S

UB

JEC

T T

O C

HA

NG

E.

FO

R D

ISC

US

SIO

N P

UR

PO

SE

S O

NLY.

FE

BR

UA

RY

2017

LEG

EN

DS

tate Hig

hway

Co

unty LineLo

cal Ro

ad

Pro

po

sed H

ighw

ay Imp

rovem

ent

Airp

ort/A

irtrackTruck S

cale Facility

EB

TR

UC

K C

LIMB

ING

LAN

ES

R 152 R

EA

LIGN

ME

NT

ST

UD

Y A

RE

A

US

101/SR

25 Interchange

1S

R 152/156 Interchang

e2

SR 152 on East Side of P

acheco Pass

3

ME

RC

ED

CO

UN

TY

ME

RC

ED

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

SA

NTA

CR

UZ

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

MO

NT

ER

EY

CO

UN

TY

SA

N B

EN

ITO

CO

UN

TY

FR

ES

NO

CO

UN

TY

SA

NTA

CLA

RA

CO

UN

TY

Mo

rgan

Hill

Gilro

y

San Juan

Bautista

Ho

llister

ToLos B

anos

HE

NR

Y W

. CO

ES

TATE

PA

RK

PA

CH

EC

OS

TATE

PA

RK

AN

DE

RS

ON

LAK

E

CO

YO

TE

LAK

E

SA

N LU

ISR

ES

EV

OIR

PA

CH

EC

OLA

KE

3

21

Ro

ute 152 Trade C

orrid

or P

roject (U

S 101 to

Santa C

lara Co

unty Line)M

ajor H

ighw

ay Imp

rovem

ents

PR

ELIM

INA

RY

DR

AF

T S

UB

JEC

T T

O C

HA

NG

E.

FO

R D

ISC

US

SIO

N P

UR

PO

SE

S O

NLY.

FE

BR

UA

RY

2017

LEG

EN

DS

tate Hig

hway

Co

unty LineLo

cal Ro

ad

Pro

po

sed H

ighw

ay Imp

rovem

ent

Airp

ort/A

irtrackTruck S

cale Facility