This Failure Reporting Webex was focused around the first steps you may want to use.TRANSCRIPT
![Page 1: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/1.jpg)
Copyright 2009 GPAllied©
Failure Reporting, Analysis, Corrective Action System
“FRACAS”Presented by: Ricky Smith, CMRPMarch 9, 2010
![Page 2: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/2.jpg)
Copyright 2009 GPAllied©
Nowlan and Heap Study stated…“…Without a precise definition of what
condition represents a failure, there is no way to assess its consequences or to define the physical evidence for which to inspect. The term failure must, in fact, be given a far more explicit definition than “an inability to function” in order to clarify the basis of Reliability-Centered Maintenance.”
![Page 3: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/3.jpg)
Copyright 2009 GPAllied©
Nowlan and Heap Study further stated…
“…A failure is an unsatisfactory condition. In other words, a failure is an identifiable deviation from the original condition which is unsatisfactory to a particular user.”
![Page 4: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/4.jpg)
Copyright 2009 GPAllied©
What is a Failure?• “A functional failure is the inability of an item
(or the equipment containing it) to meet a specified performance standard and is usually identified by an operator”.
![Page 5: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/5.jpg)
Copyright 2009 GPAllied©
What is a Failure?• “A potential failure is an identifiable physical
condition which indicates a functional failure is imminent and is usually identified by a Maintenance Technician using predictive or quantitative preventive maintenance”
![Page 6: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/6.jpg)
Copyright 2009 GPAllied©
Potential Failures
![Page 7: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/7.jpg)
Copyright 2009 GPAllied©
Functional Failure
![Page 8: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/8.jpg)
Copyright 2009 GPAllied©
Our Goal
![Page 9: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/9.jpg)
Copyright 2009 GPAllied©
Where do you start? With Baby Steps
Begin Measuring MTBF- Of you total operation- By area- By asset
Calculation: Time / Number of Failures
Example: 24 hours / 3 failures = MTBF of 8
![Page 10: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/10.jpg)
Copyright 2009 GPAllied©
How many can Measure MTBF?• Send me your report please
• What are the barriers?
![Page 11: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/11.jpg)
Copyright 2009 GPAllied©
Let’s define Roles and Responsibilities
Tasks Maintenance Supervisors
Maintenance Planner
Maintenance Technician
Maintenance Manager
Reliability Engineer
PdM Technician
Inputting Failure Data -CMMS/EAM
A I R C C
Work Order Close Out
R C R A R R
Validating Failure Data and Codes
C I C A R C
QA of Failure Data Input
I C A R C
Analyze Failure Reports
R I C R A/R R
Making Maintenance StrategyAdjustments
I I I A R C
Responsibility “the Doer”Accountable “the Buck stops hereConsulted “in the Loop”Informed “kept in the picture”
![Page 12: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/12.jpg)
Copyright 2009 GPAllied©
The next step• Define your failure reports (outputs)
– Dominant Failure Pattern?
• Causes of Infant Mortality?– Lack of Lubrication– Bolts not torque to specifications– Electrical connections RTF (run to failure)
![Page 13: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/13.jpg)
Copyright 2009 GPAllied©
Next Steps• Develop a Process which delivers the Report
you want.– Dominant Failure Pattern
![Page 14: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/14.jpg)
Copyright 2009 GPAllied©
Other Reports• % of Assets with No Identifiable Defect
• Failure Rate for Specific ComponentsDrive Belt-Broken-Ageing Failure Rate
0 602.49 1205 1807.5 2410 3012.5 3614.9 4217.4 4819.9 5422.4 6024.9
Time
0
0.00010696
0.00021393
0.00032089
0.00042785
0.00053481
0.00064178
0.00074874
0.0008557
0.00096266
0.0010696
Failu
re Ra
te
Regionalised rate
Distribution rate
P0: 0%
B20: 3492
B15: 3208
B10: 2858
ε: 0.05664
ρ: 0.9781
γ: 0
β: 3.745
η: 5212
Median rank
2-parameterWeibull
![Page 15: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/15.jpg)
Copyright 2009 GPAllied©
Comments“ Like the tortoise - slow and steady wins the
race!”Kim Hunt – Reliability Leader / Domtar
![Page 16: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/16.jpg)
Copyright 2009 GPAllied©
What are your next steps?• ???
![Page 17: Failure Reporting Webex Slides - March 9, 2010](https://reader034.vdocument.in/reader034/viewer/2022051411/545cf2aab0af9f12318b4c30/html5/thumbnails/17.jpg)
Copyright 2009 GPAllied©
Recommendation• Measure MTBF• Educate your leaders and followers
– If you want a private session, let me know• Join me a Reliability 2.0 Conference in April.http://maintenanceconference.com/reliability/