State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
Fall 2013 Levee Maintenance Deficiency Summary ReportOverall LMA & Unit Ratings, including USACE Erosion Survey
Sacramento River Basin
Overall LMARating
A
Total LMAMiles
3.51Design & System
Obsolescence
M Miles M + 4U Miles Threshold %U Miles M Miles U Miles
Enforcement
Sacramento Maintenance Yard Sacramento Bypass
ST0008
Rated ItemM Miles U Miles
Maintenance Deficiancy
Earthen Levee
0.02Encroachments Supplemental
0.11DWR UCIP Field Study
0.00 0.00%0.00 0.00 0.13 0.00LMA Totals: 0.00 0.00
Overall UnitRating
A
Total UnitMiles
1.73Design & System
Obsolescence
Unit No. 01 Sacramento Bypass or North Levee RB
ST0008
Rated ItemM Miles M + 4U Miles Threshold %U Miles M Miles U Miles
Enforcement
M Miles U Miles
Maintenance Deficiancy
Earthen Levee
0.01Encroachments Supplemental
0.09DWR UCIP Field Study
0.00 0.00%0.00 0.00 0.10 0.00Unit Totals: 0.00 0.00
Overall UnitRating
A
Total UnitMiles
1.78Design & System
Obsolescence
Unit No. 02 Sacramento Bypass or South Levee LB
ST0008
Rated ItemM Miles M + 4U Miles Threshold %U Miles M Miles U Miles
Enforcement
M Miles U Miles
Maintenance Deficiancy
Earthen Levee
0.01Encroachments Supplemental
0.02DWR UCIP Field Study
0.00 0.00%0.00 0.00 0.03 0.00Unit Totals: 0.00 0.00
Tuesday, December 10, 2013 08:42 Page 1 of 1
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
LMA District Cover SheetFall 2013 Levee Inspection Results
Sacramento Maintenance Yard Sacramento Bypass
Non-receipt of Summer or Winter Inspection Reports may effect overall annual rating.
Overall LMA Rating (Fall Only)
Comments
Overall maintenance ratings are not determined for the spring inspection results. Individual maintenance deficiencies are rated using the same criteria in the spring and in the fall.
SPRING INSPECTIONS:
FALL INSPECTIONS: The overall maintenance rating shown above is based on operation and maintenance deficiencies identified within the attached unit inspection reports. This rating is not intended to be an indiction of risk.
*
*
**
A
Summer Winter(September - November)
Spring Fall(June - August) (December - February)(March - May)
** **
Tuesday, December 10, 2013 08:42
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Unit Cover SheetFall 2013 Levee Inspection Results
Sacramento Maintenance Yard Sacramento Bypass
Waterway
Unit No. 01 Sacramento Bypass or North Levee
Bank
Right
Unit Miles
1.73
Summer Winter
Date of Inspection
(September - November)
10/15/2013 - 10/15/2013
Unit Maintenance Rating (Fall Only)
SpringFall(June - August) (December - February)(March - May)
A
-
DWR Inspector John WilliamsonJohn Williamson
Sacramento Maintenance YardSacramento Maintenance YardCasey LundAccompanied By Casey Lund
If the LMA is unable to submit information on this webpage, please contact DWR for assistance.
The Local Maintaining Agency (LMA) is responsible for summer and winter inspections. The LMA is required to submit a report regarding summer and winter inspections to the California Department of Water Resources (DWR).
DWR must be informed on the: a) completion of the inspection b) any changes other than the results of normal maintenance c) corrections to deficiencies noted in this report
If additional items are noted, further documentation of those items must also be submitted.
The LMA should submit this information to DWR using the LMA web application tool available at:
http://cdec.water.ca.gov/lma.html
The LMA should submit the information and any associated documentation by September 30 for summer inspections and March 31 for winter inspections.
Summer & Winter Inspections
Tuesday, December 10, 2013 08:42
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 01 Sacramento Bypass or North Levee
Bank
Right
Unit Miles
1.73
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
Issue No.
StartStart EndCategory Item
Loc
atio
n*
Ratin
g ** + Action/Comment
Levee Mile GPS Latitude/Longitude
End Photo
LMR
No
.
Earthen Levee
A °°° °
LS1 Operations & Maintenance Manuals
3
Ma
DWR ID: DWR_ST0008_01_s _ 2013_3
Earthen Levee
A °°° °
LS2 Emergency Supplies & Equipment
4
Ma
DWR ID: DWR_ST0008_01_s _ 2013_4
Earthen Levee
A °°° °
LS3 Flood Preparedness & Training
5
Ma
DWR ID: DWR_ST0008_01_s _ 2013_5
0.04 1.73 Earthen Levee
A V1 : Control annual grass and weeds on the levee slopes and easements.
38.607017 °38.599432-121.560548 -121.590072
°° °
LS4
YVegetation 14
MaDWR ID: DWR_ST0008_01_f _ 2013_14
0.44 1.73 Earthen Levee
A V1 : Control annual grass and weeds on the levee slopes and easements.
38.604832 °38.599432-121.567445 -121.590073
°° °
WS5
YVegetation 15
MaDWR ID: DWR_ST0008_01_f _ 2013_15
0.46 0.46 Earthen Levee
A/W S1 : Repair slope instability. 38.604712 °38.604712-121.567738 -121.567738
°° °
LS6
YSlope Stability 12
MaDWR ID: DWR_ST0008_01_s _ 2012_12
1.14 1.14 Supplemental M Inspector Comments: FS_ID:6414EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012
38.602180 °38.602180-121.579130 -121.579130
°° °
LS7 DWR UCIP Field Study
1
En
DWR ID: DWR_ST0008_01_f _ 2013_1
1.14 1.14 Supplemental M Inspector Comments: FS_ID:6413EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012
38.602180 °38.602180-121.579130 -121.579130
°° °
LS8
YDWR UCIP Field Study
2
En
DWR ID: DWR_ST0008_01_f _ 2013_2
Page 1 of 6Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 01 Sacramento Bypass or North Levee
Bank
Right
Unit Miles
1.73
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
Issue No.
StartStart EndCategory Item
Loc
atio
n*
Ratin
g ** + Action/Comment
Levee Mile GPS Latitude/Longitude
End Photo
LMR
No
.
1.14 1.14 Supplemental M Inspector Comments: FS_ID:6460EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: horizontal air vent on waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012
38.602180 °38.602180-121.579130 -121.579130
°° °
LS9 DWR UCIP Field Study
6
En
DWR ID: DWR_ST0008_01_f _ 2013_6
1.14 1.14 Supplemental M Inspector Comments: FS_ID:12703EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: After more investigation depressions are from water run off. erosion repair neededFIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 5/7/2013 9:09:11 AM
38.602180 °38.602180-121.579130 -121.579130
°° °
LS10 DWR UCIP Field Study
7
En
DWR ID: DWR_ST0008_01_f _ 2013_7
1.14 1.14 Supplemental M Inspector Comments: FS_ID:6384EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012
38.602130 °38.602130-121.579130 -121.579130
°° °
LS11 DWR UCIP Field Study
8
En
DWR ID: DWR_ST0008_01_f _ 2013_8
Page 2 of 6Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 01 Sacramento Bypass or North Levee
Bank
Right
Unit Miles
1.73
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
Issue No.
StartStart EndCategory Item
Loc
atio
n*
Ratin
g ** + Action/Comment
Levee Mile GPS Latitude/Longitude
End Photo
LMR
No
.
1.14 1.14 Supplemental M Inspector Comments: FS_ID:6382EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope. More investigation required.FIELD_STRUCT_DESC: 1 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012
38.602130 °38.602130-121.579130 -121.579130
°° °
LS12 DWR UCIP Field Study
9
En
DWR ID: DWR_ST0008_01_f _ 2013_9
1.14 1.14 Supplemental M Inspector Comments: FS_ID:6383EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Air vent exposed horizontally in waterside slope. Green vegetation and depressions found on waterside slope.FIELD_STRUCT_DESC: 2 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012
38.602128 °38.602128-121.579146 -121.579146
°° °
LS13 DWR UCIP Field Study
10
En
DWR ID: DWR_ST0008_01_f _ 2013_10
1.14 1.14 Supplemental M Inspector Comments: FS_ID:6445EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Horizontal Air vent on waterside slope. Green vegetation and depressions also found on waterside slope.FIELD_STRUCT_DESC: 2 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 10/4/2012
38.602128 °38.602128-121.579150 -121.579150
°° °
LS14 DWR UCIP Field Study
11
En
DWR ID: DWR_ST0008_01_f _ 2013_11
Page 3 of 6Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 01 Sacramento Bypass or North Levee
Bank
Right
Unit Miles
1.73
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
Issue No.
StartStart EndCategory Item
Loc
atio
n*
Ratin
g ** + Action/Comment
Levee Mile GPS Latitude/Longitude
End Photo
LMR
No
.
1.14 1.14 Supplemental M Inspector Comments: FS_ID:12705EP_NO: 13616Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Horizontal Air vent on waterside slope. Green vegetation and depressions also found on waterside slope.FIELD_STRUCT_DESC: 2 of 2. A agricultureal drainage pumping system with 24-inch and 20-inch steel discharge pipelines through the north levee of the Sacramento Bypass. The pipe is 6.33 ft below the crown and a siphon breaker on the WS. Vertical GI pipe trash rack on inlet structure. Application no. 13616, 1995 (revised).FS Date: 5/7/2013 9:12:36 AM
38.602128 °38.602128-121.579150 -121.579150
°° °
CR15 DWR UCIP Field Study
13
En
DWR ID: DWR_ST0008_01_f _ 2013_13
1.14 1.14 Earthen Levee
M DE : Debris 38.601947 °38.601947-121.579838 -121.579838
°° °
CR16
YEncroachments 16
EnDWR ID: DWR_ST0008_01_f _ 2013_16
Page 4 of 6Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 01 Sacramento Bypass or North Levee
Bank
Right
Unit Miles
1.73
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
The levee has been burned and the new vegetation is starting to grow. Fall 2013
Start Levee Mile 0.04End Levee Mile 1.73
Levee Mile Report Line 4
Category Earthen Levee
Item Vegetation
Location Land Side
johngw_f_20131021_138.JPG
The levee has been burned and the new vegetation has begun to grow. Fall 2013
Start Levee Mile 0.44End Levee Mile 1.73
Levee Mile Report Line 5
Category Earthen Levee
Item Vegetation
Location Water Side
johngw_f_20131021_139.JPG
The area has been resloped and complies with standards. Fall 2013
Start Levee Mile 0.46End Levee Mile 0.46
Levee Mile Report Line 6
Category Earthen Levee
Item Slope Stability
Location Land Side
johngw_f_20131021_140.JPG
Page 5 of 6Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 01 Sacramento Bypass or North Levee
Bank
Right
Unit Miles
1.73
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
Landside view: pumping plant overview
Start Levee Mile 1.14End Levee Mile 1.14
Levee Mile Report Line 8
Category Supplemental
Item DWR UCIP Field Study
Location Crown
UCIP_2819.jpg
Prunings and furniture are left on the levee crown. Fall 2013
Start Levee Mile 1.14End Levee Mile 1.14
Levee Mile Report Line 16
Category Earthen Levee
Item Encroachments
Location Crown
johngw_f_20131021_141.JPG
Page 6 of 6Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Unit Cover SheetFall 2013 Levee Inspection Results
Sacramento Maintenance Yard Sacramento Bypass
Waterway
Unit No. 02 Sacramento Bypass or South Levee
Bank
Left
Unit Miles
1.78
Summer Winter
Date of Inspection
(September - November)
10/15/2013 - 10/15/2013
Unit Maintenance Rating (Fall Only)
SpringFall(June - August) (December - February)(March - May)
A
-
DWR Inspector John WilliamsonJohn Williamson
Sacramento Maintenance YardSacramento Maintenance YardCasey LundAccompanied By Casey Lund
If the LMA is unable to submit information on this webpage, please contact DWR for assistance.
The Local Maintaining Agency (LMA) is responsible for summer and winter inspections. The LMA is required to submit a report regarding summer and winter inspections to the California Department of Water Resources (DWR).
DWR must be informed on the: a) completion of the inspection b) any changes other than the results of normal maintenance c) corrections to deficiencies noted in this report
If additional items are noted, further documentation of those items must also be submitted.
The LMA should submit this information to DWR using the LMA web application tool available at:
http://cdec.water.ca.gov/lma.html
The LMA should submit the information and any associated documentation by September 30 for summer inspections and March 31 for winter inspections.
Summer & Winter Inspections
Tuesday, December 10, 2013 08:42
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 02 Sacramento Bypass or South Levee
Bank
Left
Unit Miles
1.78
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
Issue No.
StartStart EndCategory Item
Loc
atio
n*
Ratin
g ** + Action/Comment
Levee Mile GPS Latitude/Longitude
End Photo
LMR
No
.
0.01 1.76 Earthen Levee
A V1 : Control annual grass and weeds on the levee slopes and easements.
38.602773 °38.594775-121.555775 -121.586542
°° °
LS1
YVegetation 3
MaDWR ID: DWR_ST0008_02_f _ 2013_3
1.19 1.19 Supplemental M Inspector Comments: FS_ID:6408EP_NO: 11826Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Vertical GI pipe trash rack in inlet structure; trash rack is falling apart and found in the water. Big pumping plant with 5 pipes.FIELD_STRUCT_DESC: A 36-inch drainage pipe through the levee, 2.0 feet below the crown. A steel pipe pump structure and pump house on the landward side with a vertical pump. A siphon breaker located on the apex of the pipe near the LS of the levee. A flapgate installed on the discharge end of the pipe. (App. No. 11826 - R.D. 537) 10/76.FS Date: 10/4/2012
38.597544 °38.597544-121.576620 -121.576620
°° °
LS2
YDWR UCIP Field Study
1
En
DWR ID: DWR_ST0008_02_f _ 0_1
1.19 1.19 Supplemental M Inspector Comments: FS_ID:6441EP_NO: 11826Repair Type: Non-UrgentCrossing Status: FoundUCIP Comments: Vertical GI pipe trash rack in inlet structure; trash rack has fallen apart and found in the water. Big pumping plant with 5 pipes.FIELD_STRUCT_DESC: A 36-inch drainage pipe through the levee, 2.0 feet below the crown. A steel pipe pump structure and pump house on the landward side with a vertical pump. A siphon breaker located on the apex of the pipe near the LS of the levee. A flapgate installed on the discharge end of the pipe. (App. No. 11826 - R.D. 537) 10/76.FS Date: 10/4/2012
38.597544 °38.597544-121.576621 -121.576621
°° °
LS3 DWR UCIP Field Study
2
En
DWR ID: DWR_ST0008_02_f _ 0_2
1.76 1.76 Earthen Levee
M PR : Prunings 38.594777 °38.594777-121.586525 -121.586525
°° °
LS4
YEncroachments 5
EnDWR ID: DWR_ST0008_02_f _ 2013_5
Page 1 of 2Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type
State of California - Department of Water Resources - Division of Flood Management - Flood Project Integrity & Inspection Branch
Flood Control Project MaintenanceLevee Inspections
ST0008
Levee Inspection Report By Mile - Fall 2013
Waterway
Unit No. 02 Sacramento Bypass or South Levee
Bank
Left
Unit Miles
1.78
InspectionStart/End
10/15/201310/15/2013
Sacramento Maintenance Yard Sacramento BypassInspector
JohnWilliamson
The levee has no unwanted vegetation. Fall 2013
Start Levee Mile 0.01End Levee Mile 1.76
Levee Mile Report Line 1
Category Earthen Levee
Item Vegetation
Location Land Side
johngw_f_20131021_142.JPG
Landside view: overview of the pumping plant
Start Levee Mile 1.19End Levee Mile 1.19
Levee Mile Report Line 2
Category Supplemental
Item DWR UCIP Field Study
Location Land Side
UCIP_2809.jpg
The never ending pruning pile at the end of the unit. Fall 2013
Start Levee Mile 1.76End Levee Mile 1.76
Levee Mile Report Line 4
Category Earthen Levee
Item Encroachments
Location Land Side
johngw_f_20131021_144.JPG
Page 2 of 2Tuesday, December 10, 2013 08:42 FINAL DATA
* Location
: Land Side: Water Side: Crown
LSWSCR
: Acceptable: Minimally Acceptable: Unacceptable
AMU
** Rating
NC
A/W
MaObEn
: Not Inspected/Rated: Corrected: Acceptable but Monitor & Maintain
: Maintenance Deficiancy: Design & System Obsolescence: Enforcement
+ Issue Type