Åpen informasjon#
FB external report for w10, 2017
Contents of the reportSubject Page
Comments 1
Market analysis 2
Socio-economical welfare 3-5
Congestion rent 6
Non-intuitive flow 7
Net positions 8-9
Prices 10-13
System Price 14
Power system impact analysis 15-16
Cross-border flows and capacities 17-25
CommentsHighlights
Known errors
Missing hours
In some of the hours the NTC domain was unsafe in regards to N-1 security. As Flow Based does not allow over loads the FB domain is smaller durring these hours than NTC. This means that in some hours there is a negative welfare from switcing from NTC to FB, however the CTNC domain would have been equally restricted as the FB domain.
Some hours are missing in the weekly simulations. This can be due to different issues:-The input data for this hour was not available.-They were differences in the available input data for NTC and FB, which made the comparison between the two impossible.
1
Åpen informasjon#
Market analysis
Nordic
Denmark
Norway
Finland
Sweden
Due to overloads in NTC, export from NO5 and NO2 is reduced in
FB. This is replaced by production in Denmark, Finland and Sweden,
leading to increased prices and concequently reduced export to the
Continent due to reduced export in Norway. Change in total
producer/consumer income is therefore negative. In total the
change in Nordic SEW is positiv due to increased internal
congestion income in Norway.
Being a surplus area this week, Denmark benefits from increased
prices. Decpite smaller price difference with the Continent there is
an increase in congestion income due to higher price difference
with NO2.
In Norway the prices decreases because production in NO2 and
NO5 is replaced with production in the other nordic countries. Since
Norway is a surplus area, this leads to a negative change in PS+CS.
However, due to increased internal congestion income, total
change in SEW is positive.
Because Finland is a deficit area, increased prices leads to a
negative change in PS+CS. This causes the total change in SEW to be
negative, decpite some increased congestion income, mainly due to
trade with NO4.
As Denmark, Sweden benefits from being a surplus area and
increased prices. Decpite reduced congestion income due to more
continental prices, the change is SEW is positive.
Summary of market analysis
2
Åpen informasjon#
Socio-economical welfareThe socio-economical welfare, i.e. the sum of consumer surplus, producer surplus and congestion rent, for Flow Based (FB) compared to Net Transfer Capacity (NTC) are shown in the following charts.
The weekly socio-economical welfare per day and in total are shown in the following charts.
- 1,5
- 1,0
- 0,5
0,0
0,5
1,0
1,5
DK NO SE FIN
FB-NTC
M€
Nordic socio-economic per country
Congestion rent Producer surplus
Consumer surplus -100
-50
0
50
100
150
DK NO SE FIN
FB-NTC
k€
Total Nordic socio-economic welfare per country
- 1,5
- 1,0
- 0,5
0,0
0,5
1,0
1,5
FB-NTC
M€
External socio-economic welfare per stakeholder
Congestion rent Producer surplus
Consumer surplus -12
-10
-8
-6
-4
-2
0
FB-NTC
k€
Total External socio-economic welfare
3
Åpen informasjon#
The weekly socio-economical welfare per day and in total are shown in the following charts.
The hourly socio-economical welfare for each country are shown in the following charts.
-0,6
-0,4
-0,2
0
0,2
0,4
0,6
0,80
6.0
3.2
01
7
07
.03
.20
17
08
.03
.20
17
09
.03
.20
17
10
.03
.20
17
11
.03
.20
17
12
.03
.20
17
FB-NTC
M€
Nordic socio-economic welfare per stakeholder and day
Congestion rent Producer surplus Consumer surplus
-2-1,5
-1-0,5
00,5
11,5
2
FB-NTC
M€
…and in total
-40
-20
0
20
40
06
.03
.20
17
07
.03
.20
17
08
.03
.20
17
09
.03
.20
17
10
.03
.20
17
11
.03
.20
17
12
.03
.20
17
FB-NTC
k€
Total Nordic socio-economic welfare per day
0
20
40
60
80
100
120
FB-NTC
k€
...and in total
-1
-0,5
0
0,5
1
06
.03
.20
17
07
.03
.20
17
08
.03
.20
17
09
.03
.20
17
10
.03
.20
17
11
.03
.20
17
12
.03
.20
17
FB-NTC
M€
External socio-economic welfare per stakeholder and day
Congestion rent Producer surplus Consumer surplus
-1,5
-1
-0,5
0
0,5
1
1,5
FB-NTC
M€
...and in total
-20
-10
0
10
20
30
40
06
.03
.20
17
07
.03
.20
17
08
.03
.20
17
09
.03
.20
17
10
.03
.20
17
11
.03
.20
17
12
.03
.20
17
FB-NTC
k€
Total External socio-economic welfare per day
-25
-20
-15
-10
-5
0
FB-NTC
k€
…and in total
4
Åpen informasjon#
The hourly socio-economical welfare for each country are shown in the following charts.
-10
-5
0
5
10
-100
-50
0
50
100
0 5 101520 1 6 111621 2 7 121722 3 8 131823 4 9 1419 0 5 101520 1 6 111621
06.03.2017 07.03.2017 08.03.2017 10.03.2017 11.03.2017 12.03.2017 09.03.2017
FB-NTC
Sum
k€
SEW
per
sta
keh
old
er k
€
Denmark, socio-economic welfare per stakeholder and hour
Congestion rent Producer surplus Consumer surplus Sum
-4
-2
0
2
4
-60
-40
-20
0
20
40
60
80
0 5 101520 1 6 111621 2 7 121722 3 8 131823 4 9 1419 0 5 101520 1 6 111621
06.03.2017 07.03.2017 08.03.2017 10.03.2017 11.03.2017 12.03.2017 09.03.2017
FB-NTC
Sum
k€
SEW
per
sta
keh
old
er k
€
Finland, socio-economic welfare per stakeholder and hour
Congestion rent Producer surplus Consumer surplus Sum
-15
-10
-5
0
5
10
15
-80
-30
20
70
0 5 101520 1 6 111621 2 7 121722 3 8 131823 4 9 1419 0 5 101520 1 6 111621
06.03.2017 07.03.2017 08.03.2017 10.03.2017 11.03.2017 12.03.2017 09.03.2017
FB-NTC
Sum
k€
SEW
per
sta
keh
old
er k
€
Norway, socio-economic welfare per stakeholder and hour
Congestion rent Producer surplus Consumer surplus Sum
-10
-5
0
5
10
-150
-100
-50
0
50
100
150
0 5 101520 1 6 111621 2 7 121722 3 8 131823 4 9 1419 0 5 101520 1 6 111621
06.03.2017 07.03.2017 08.03.2017 10.03.2017 11.03.2017 12.03.2017 09.03.2017
FB-NTC
Sum
k€
SEW
per
sta
keh
old
er k
€
Sweden, socio-economic welfare per stakeholder and hour
Congestion rent Producer surplus Consumer surplus Sum
5
Åpen informasjon#
Congestion rentThe total congestion rent, i.e. the product of flow volume and price difference, per border is shown in the following chart. Some borders are experience negative congestion rent with Flow Based due to non-intuitive netflows from a higher priced bidding area to a lower priced bidding area. A decrease in congestion rent is due to less border flow and/or smaller price area difference.
-1 0 1 2 3 4 5
BE > FRBE > NL
DE > DK1DE > DK2
DE > FRDE > NL
DE > SE4DK1 > DK1A
DK1 > DK2DK1 > NO2DK1 > SE3
DK1A > NO2DK1A > SE3
DK2 > SE4EE > ERIEE > FINEE > LV
FIN > FREFIN > NO4FIN > SE1FIN > SE3FR > GB1
GB1 > GB2GB2 > NLLBE > LTLBI > LT
LRE > LVLRI > LVLT > LV
LT > PLALT > SE4
NL > NO2NO1 > NO1A
NO1 > NO2NO1 > NO3NO1 > NO5NO1 > SE3
NO1A > NO2NO1A > NO5
NO2 > NO5NO3 > NO4NO3 > NO5NO3 > SE2NO4 > SE1NO4 > SE2
PL > PLAPLA > SE4SE1 > SE2SE2 > SE3SE3 > SE4
M€
FB NTC
6
Åpen informasjon#
Non-intuitive flowThe number of hours with "non-intuitive flow", i.e. hours with flow from a high priced area to a low priced area, and the sum of the resulting negative congestion rent is shown in the following diagram.
0 0
16 13 14 16 169
15 1712
2332
0 2
48 49
0
106105
0 0 0
18 17 18
0
2
4
6
8
10
12
14
16
18
20
0
20
40
60
80
100
120
DE
> D
K1
DE
> D
K2
DE
> SE
4
DK
1 >
DK
2
DK
1 >
NO
2
DK
1 >
SE3
DK
2 >
SE4
FIN
> N
O4
FIN
> S
E1
FIN
> S
E3
LT >
SE4
NL
> N
O2
NO
1 >
NO
2
NO
1 >
NO
3
NO
1 >
NO
5
NO
1 >
SE3
NO
2 >
NO
5
NO
3 >
NO
4
NO
3 >
NO
5
NO
3 >
SE2
NO
4 >
SE1
NO
4 >
SE2
PL
> SE
4
SE1
> S
E2
SE2
> S
E3
SE3
> S
E4
k€/w
eek
h/w
ee
k
Hours with non-intuitive flow and sum of negative congestion rent per border
Number of hours with non-intuitive flows Sum negative congestion rent
0
2
4
6
8
10
12
14
16
0 4 8 121620 0 4 8 121620 0 4 8 121620 0 4 8 121620 0 4 8 121620 0 4 8 121620 0 4 8 121620
2017.03.06 2017.03.07 2017.03.08 2017.03.09 2017.03.10 2017.03.11 2017.03.12
Number of Nordic borders with non-intuitive flow per hour
7
Åpen informasjon#
Nordic net position
-5000
0
5000
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
MW
h/h
Nordic net position per hour
FB NTC
0
50
100
150
Nordics
GW
h
…and in total
FB NTC
-5000
0
5000
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
MW
h/h
External net position per hour
FB NTC
-150
-100
-50
0
External
GW
h
...and in total
FB NTC
The Nordic and External countries daily average net position, i.e. the netted sum of electricity export and import for each market time period ,is shown in the following charts along with the change of buy and sell volymes.
-60
-40
-20
0
20
DK NO SE FIN
GW
h
Nordic buy and sell volume per country
Buy volume FB-NTC Sell volume FB-NTC
-20 000
-15 000
-10 000
-5 000
0
5 000
10 000
15 000
GW
h
Buy volume of FB compared to CNTC, External
Buy volume FB-NTC Sell volume FB-NTC
8
Åpen informasjon#
-2000
-1000
0
1000
2000
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
MW
h/h
Denmark, net position per hour
FB NTC
0
2000
4000
6000
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
MW
h/h
Sweden, net position per hour
FB NTC
-5000
0
5000
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
MW
h/h
Norway, net position per hour
FB NTC
-4000
-3000
-2000
-1000
0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
MW
h/h
Finland, net position per hour
FB NTC
202224262830
Denmark
GW
h
…and in total
FB NTC
320
325
330
Sweden
GW
h
…and in total
FB NTC
-20
0
20
40
Norway
GW
h
…and in total
FB NTC
-240
-235
-230
-225
-220
Finland
GW
h
…and in total
FB NTC
The hourly average net position per Nordic country is shown in the following charts .
9
Åpen informasjon#
Unique prices and price difference
0
5
10
15
0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
Number of Nordic bidding areas with unique price
FB NTC
0
20
40
60
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
Nordic hourly prices
FB NTC
0
50
€/M
Wh
…and in average
FB NTC
The average number of Nordic bidding areas with unique hourly prices, and the price area difference is shown in the following charts. The number of uniquely priced bidding areas is increasing with FB but the average price differences between the bidding areas are lower in FB compared to NTC.
In the shatter diagram below the price with FB and the price with NTC for each hour are plotted. The straight line represent the outcome if FB-price would be equal NTC-price. The plotted prices show more frequent above the straight line which indicates a decreased electricity price with Flow Base.
0
10
…and in average
FB NTC
17
22
27
32
37
17 22 27 32 37
NTC
, €/M
Wh
FB, €/MWh
Lower price difference with FB
Lower price difference with NTC
10
Åpen informasjon#
Area PriceThe hourly area price for FB and NTC for each Nordic bidding area are shown in the following charts.
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
DK2, hourly prices
FB DK2 NTC DK2
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
FIN, hourly prices
FB FIN NTC FIN
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
NO1, hourly prices
FB NO1 NTC NO1
0
20
40
€/M
Wh
…and in average
DK2 NTC DK2
0
20
40
€/M
Wh
…and in average
FIN NTC FIN
0
20
40
€/M
Wh
…and in average
NO1 NTC NO1
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
DK1 hourly prices
FB DK1 NTC DK1
0
20
40
€/M
Wh
…and in average
FB DK1 NTC DK1
11
Åpen informasjon#
0,0
20,0
40,0
60,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
NO2, hourly prices
FB NO2 NTC NO2
0,0
20,0
40,0
60,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
NO3, hourly prices
FB NO3 NTC NO3
20,0 22,0 24,0 26,0 28,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
NO4, hourly prices
FB NO4 NTC NO4
0,0
20,0
40,0
60,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
NO5, hourly prices
FB NO5 NTC NO5
0
20
40
€/M
Wh
…and in average
NO2 NTC NO2
0
20
40
€/M
Wh
…and in average
NO3 NTC NO3
0
20
40
€/M
Wh
…and in average
NO4 NTC NO4
0
20
40
€/M
Wh
…and in average
NO5 NTC NO5
12
Åpen informasjon#
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
SE1, hourly prices
FB SE1 NTC SE1
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
SE2, hourly prices
FB SE2 NTC SE2
0
20
40
€/M
Wh
…and in average
SE1 NTC SE1
0
20
40
€/M
Wh
…and in average
SE2 NTC SE2
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
SE3, hourly prices
FB SE3 NTC SE3
0
20
40
€/M
Wh
…and in average
SE3 NTC SE3
0,0 20,0 40,0 60,0 80,0
0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218 0 6 1218
2017.03.062017.03.072017.03.082017.03.092017.03.102017.03.112017.03.12
€/M
Wh
SE4, hourly prices
FB SE4 NTC SE4
0,00
20,00
40,00
€/M
Wh
…and in average
SE4 NTC SE4
13
Åpen informasjon#
System priceThe Nordic system price is calculated without network constraints within the Nordic area, i.e. copper plate. In the parallel simulations of FB and NTC the Nordic system price is not calculated. The different modelling approach can though have an impact of system price due to different allocation of capacity to the interconnectors between the Nordics countries and the rest of Europe.
The system price is calculated locally at Nord Pool after PCR, area price calculation. Calculated flows between the Nordics and the Netherlands/Germany are taken into account as either price independent import or as price independent export for NO2, DK1, DK2 and SE4.
System price calculation has a different area configuration compared to areas price calculation. Norway, Denmark, Sweden and Finland constitute one bidding are. Baltic countries and Poland are configured as one area each, just as when calculating area prices. Between the Nordic region and the Baltic region + Poland the same capacities as in the PCR, area price calculation, are used when calculating the system price.
0 500 1000 1500 2000
DK1 -> DE
DK1 <- DE
DK2 -> SE4
DK2 <- SE4
FI -> EE
FI <- EE
NO2 -> NL
NO2 <- NL
SE4 -> DE
DE -> SE4
SE4 -> LT
LT -> SE4
PL - > SE4
SE4 -> PL
Capacity [MW]
Average capacities in and out from the Nordics per interconnector
Capacity FB
Capacity NTC
0
1000
2000
3000
4000
5000
6000
7000
NTC FB NTC FB
Capacityfrom theNordics
Capacityto the
Nordics
Cap
acit
y [M
W]
…and in total
14
Åpen informasjon#
Power system impact analysis
0
5000
10000
15000
20000
06.03.2017 07.03.2017 08.03.2017 09.03.2017 10.03.2017 11.03.2017 12.03.2017
Ove
rlo
ads
[MW
h/h
]
Sum of CNE overloads systemwide per day
NTC - Market relevant NTC - Not market relevant
FB - Market relevant FB - Not market relevant
0
100
200
300
400
500
600
700
06.03.2017 07.03.2017 08.03.2017 09.03.2017 10.03.2017 11.03.2017 12.03.2017
Max
ove
rlo
ad [
MW
h/h
]
Max CNE overloads systemwide per day
NTC - Market relevant NTC - Not market relevant
FB - Market relevant FB - Not market relevant
0
500
1000
1500
2000
2500
3000
3500
4000
0 5 10 16 21 2 7 12 17 22 3 8 13 18 23 4 9 14 19 0 5 10 15 20 1 6 11 16 21 2 7 12 17 22
06.03.2017 07.03.2017 08.03.2017 09.03.2017 10.03.2017 11.03.2017 12.03.2017
Ove
rlo
ads
[MW
h/h
]
Sum of CNE overloads systemwide per hour
Sum of NTC overloads Sum of FB overloads
15
Åpen informasjon#
Average welfare gain: 766 k€ Average reduction in overloads: -25 MWh/h
Median welfare gain: 1158 k€ Median reduction in overloads: -26 MWh/h
Border flows and Cross-border capacities
-25000
-20000
-15000
-10000
-5000
0
5000
10000
-1500 -1000 -500 0 500 1000
Increase in welfare and reduction in overloads
Hourly results Average Median
Net reduction in overloads (NTC overloads - FB overloads) [MWh/h]
Net
incr
ease
in w
elfa
re (
FB w
elfa
re -
NTC
w
elf
are)
[k€
]
The figure below shows the net increase in welfare against the net reduction in overloads when using FB instead of NTC. Each dot represents one hour of the week addressed in this report. Values in the quadrant A correspond to higher welfare and larger overloads with FB. Values in quadrant B correspond to higher welfare and smaller overloads with FB. Values in the quadrant C correspond to lower welfare and smaller overloads with FB. Values in the quadrant D correspond to lower welfare and larger overloads with FB.
A B
CD
The charts in the following pages show the capacities and flows on the borders between bidding areas. The green areas show the maximum and minimum capacities calculated with the flow-based method and blue areas with the NTC method. The green line shows the border flow calculated with the flow-based method and the blue line with the NTC method. For example, the green areas above the blue areas show hours when the flow-based method would enable more cross-border capacity compared to the NTC method.
16
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1500
1000
500
0
500
1000
1500
Flow
(MW
h/h)
DK1-DK1_GE
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
600
400
200
0
200
400
600
800
Flow
(MW
h/h)
DK1-DK1_KontiSkan
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1500
1000
500
0
500
1000
1500
Flow
(MW
h/h)
DK1-DK1_Skagerrak
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
600
400
200
0
200
400
600
Flow
(MW
h/h)
DK1-DK1_Storebælt
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
600
400
200
0
200
400
600
Flow
(MW
h/h)
DK2-DK2_Kontek
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
600
400
200
0
200
400
600
Flow
(MW
h/h)
DK2-DK2_Storebælt
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1500
1000
500
0
500
1000
1500
2000
Flow
(MW
h/h)
DK2-SE4
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1000
500
0
500
1000
Flow
(MW
h/h)
FIN-FIN_Estlink
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1000
500
0
500
1000
Flow
(MW
h/h)
FIN-FIN_FennoSkan
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
150
100
50
0
50
100
150
Flow
(MW
h/h)
FIN-FRE
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
100
0
100
200
300
Flow
(MW
h/h)
FIN-NO4
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1500
1000
500
0
500
1000
Flow
(MW
h/h)
FIN-SE1
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
4000
3000
2000
1000
0
1000
2000
3000
Flow
(MW
h/h)
NO1-NO2
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1000
500
0
500
1000
Flow
(MW
h/h)
NO1-NO3
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
5000
4000
3000
2000
1000
0
1000
2000
Flow
(MW
h/h)
NO1-NO5
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
3000
2000
1000
0
1000
2000
Flow
(MW
h/h)
NO1-SE3
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
800
600
400
200
0
200
400
600
800Fl
ow (M
Wh/
h)NO2-NO2_NorNed
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1500
1000
500
0
500
1000
1500
Flow
(MW
h/h)
NO2-NO2_Skagerrak
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
2000
1000
0
1000
2000
3000
Flow
(MW
h/h)
NO2-NO5
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1500
1000
500
0
500
1000
Flow
(MW
h/h)
NO3-NO4
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
3000
2000
1000
0
1000
2000
3000
Flow
(MW
h/h)
NO3-NO5
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1500
1000
500
0
500
1000
1500
Flow
(MW
h/h)
NO3-SE2
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1000
500
0
500
1000
Flow
(MW
h/h)
NO4-SE1
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
400
200
0
200
400
600
Flow
(MW
h/h)
NO4-SE2
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
4000
3000
2000
1000
0
1000
2000
3000
4000
Flow
(MW
h/h)
SE1-SE2
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
7500
5000
2500
0
2500
5000
7500
Flow
(MW
h/h)
SE2-SE3
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
1000
500
0
500
1000
Flow
(MW
h/h)
SE3-SE3_FennoSkan
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
800
600
400
200
0
200
400
600
800
Flow
(MW
h/h)
SE3-SE3_KontiSkan
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
2000
1000
0
1000
2000
3000
4000
5000
6000Fl
ow (M
Wh/
h)SE3-SE4
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
600
400
200
0
200
400
600
Flow
(MW
h/h)
SE4-SE4_Baltic Cable
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
600
400
200
0
200
400
600
800
Flow
(MW
h/h)
SE4-SE4_NordBalt
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation
2017-03-06 2017-03-07 2017-03-08 2017-03-09 2017-03-10 2017-03-11 2017-03-12
400
200
0
200
400
600
Flow
(MW
h/h)
SE4-SE4_SwePol Link
Max/min FBMax/min NTCMissing PW dataFB simulationNTC simulation