Page 1: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

Federal AviationAdministrationFANS 1/A over Iridium

(FOI)

Status

By: Tom [email protected]

Date: 8-10 February 2012

Presented to: SOCM/2

Page 2: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

2Federal AviationAdministration

Introduction

• Mar 08 – FOI project plan

• May-Jul 2010 – FOI operational evaluation

• 17 Sep 2010 – PARC submits FOI and Performance Based Concept Recommendations to FAA

• In June 2011, the FAA responded to the PARC, agreeing with the recommendations in the report

Page 3: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

3Federal AviationAdministration

Why the spotlight on Iridium?

• Iridium promotes FANS 1/A expansion

– Lower cost solution than other alternatives

– Draws less power

– Lighter in weight

– Global coverage, including the Polar Region

• FANS 1/A enables

– Reduced ADS‑C-based separations

– More efficient operations

– Reduced CO2 emissions minimizing environmental impact

– Reduced effects of operational errors/pilot deviations

Iridium enables applications –

Passenger (APC)Company (AAC, AOC)

FANS 1/A (ATS)

FANS 1/A enables ATM

benefits

Page 4: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

4Federal AviationAdministration

PARC FOI & PBC recommendations

• PARC submitted letter to FAA in Sep 2010

“RECOMMENDATION 1. Expedite the steps necessary to remove restrictions on current FOI operations to realize immediate gains in efficiency and safety benefits.”

“RECOMMENDATION 2. In the near and mid terms, plan for and implement a performance-based framework for RCP and surveillance performance specifications.”

(See PARC CWG presentation for PBC update)

Page 5: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

5Federal AviationAdministration

FAA responded in June 2011

“ With proven benefits in operational efficiency, environmental impact, and safety, the FAA has identified FANS 1/A as an enabler for NextGen. … The FAA agrees FOI will promote FANS 1/A expansion, and accepts FOI as a viable means for air traffic service (ATS) communications, particularly in accordance with performance specifications for reduced oceanic separations based on automatic dependent surveillance – contract (ADS C).”

Page 6: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

6Federal AviationAdministration

FOI planning and implementation

• Remove airspace restrictions – to apply reduced ADS-C-based separations to eligible FOI aircraft

– In Oakland Flight Information Region (FIR)

– FAA will advocate removal of any restrictions imposed by other air navigation service providers

• FAA has been and will continue to approve FOI installations and operations

– Design approval of FOI installations per FAA Advisory Circular (AC) 20 140A

– Data link operational authorizations via A056 Ops Spec per FAA AC 120 70B & FAA Order N8900.66

Page 7: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

7Federal AviationAdministration

Potential for FOI growth

• Approximately 1,400 flights daily in the NAT, 48% fleet currently equipped with FANS 1/A CPDLC & ADS-C

• All aircraft shall operate FANS 1/A CPDLC & ADS-C(outside VHF data link coverage)

a) from 7 February 2013, on specified tracks and flight levels within the NAT organized track system (OTS); and

b) from 5 February 2015, in specified portions of NAT minimum navigation specifications (MNPS) airspace.

• Current thinking, initially

– No more than 2 specified tracks in the OTS, FL360 to FL390, inclusive

– No exemptions in the applicable airspace

– Beyond 2015 to be determined

in the NAT Region (1 of 2)

Page 8: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

8Federal AviationAdministration

Potential for FOI growth

• Other operational improvements being investigated in the NAT for implementation 2015 and beyond

– Transition Minimum Navigation Performance Specification (MNPS) to Performance-Based Navigation (PBN)

– NAT Required Communication Performance (RCP) and Required Surveillance Performance (RSP) Operations Implementation Plan (for Feb 2015) – applies to FANS 1/A

– Reduced (5-min) Longitudinal Separation Minimum (RLongSM) (in trials March 2011) – will require FANS 1/A

– Reduced (25 NM) Lateral Separation Minimum (RLatSM) – will require FANS 1/A

in the NAT Region (2 of 2)

Page 9: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

9Federal AviationAdministration

Potential for FOI growth

• Polar Region – FOI provides “true” global coverage

• PACOTS – FOI can increase equipage rates

– Increasing the number to opportunities to apply reduced separations when more aircraft are FANS 1/A capable

Elsewhere

Page 10: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

10Federal AviationAdministration

FOI recognition

• NAT SPG planning to formally acknowledge FANS 1/A over Iridium Short Burst Data and Inmarsat I3 Classic Aero as eligible for NAT data link operations

– Based on PARC CWG FOI Project and Report

– Expected to occur in June 2012 (NAT SPG/48)

• At IPACG, JCAB still trialing FOI, need more time

– However, similar to FAA systems, JCAB systems have no operational means to determine the type of media the aircraft is using for FANS 1/A operations in the Fukuoka FIR

– Reduced separations can be applied (or mis-applied) to FOI aircraft that indicate RNP4 in their flight plan

Page 11: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

11Federal AviationAdministration

FANS 1/A aircraft definition

• GOLD definition of FANS 1/A aircraft an aircraft with a data link system that has been certified in accordance with the requirements specified in RTCA DO 258A/ EUROCAE ED 100A (FANS 1/A INTEROP Standard), or previous version

• DO‑258A/ED‑100A includes provisions for use of VHF, satellite and HF sub-networks that are compatible with the ACARS network.

– it does not require or specify any specific sub-network(s) that an aircraft must use for FANS 1/A operations

Page 12: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

12Federal AviationAdministration

Current FANS 1/A configurations

• Throughout the world, operators with FANS 1/A aircraft use CPDLC and ADS‑C services

– over a variety of subnetworks, including VHF (Mode 0/A and Mode 2), Inmarsat Classic Aero over the I3 and I4 satellites, Iridium SBD, and HFDL

Page 13: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

13Federal AviationAdministration

FAA means of compliance (1 of 2)

• The FAA certifies FANS 1/A aircraft in accordance with AC 20‑140A

• The FAA authorizes operational use of data link, i.e. CPDLC and ADS-C, in accordance with AC 120‑70B and FAA Order 8900.1

• For FANS 1/A aircraft, these FAA documents recognize DO‑258A/ED‑100A or previous version, as acceptable means of compliance

– consistent with the GOLD definition

Page 14: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

14Federal AviationAdministration

FAA means of compliance (2 of 2)

• Further, these FAA ACs recognize a number of sub-networks and associated standards as acceptable means of compliance for FANS 1/A aircraft

– Means of compliance for Iridium’s SBD services is RTCA DO‑262A, Normative Appendix, section 2

• The FAA have certified and continue to certify FANS 1/A aircraft that use the Iridium SBD sub-network in accordance with applicable ACs and Orders

• Other appropriate authorities have also issued design approvals and authorized operational use of FOI aircraft

Page 15: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

15Federal AviationAdministration

FOI aircraft – More than 100 by 2013Operator September 2010 February 2012

Cargolux13 Boeing 747‑400s to over 60 flight destinations worldwide

10 B747s worldwide(+3 Inmarsat)

Continental6 Boeing 737‑800s and 4 Boeing 737‑700s in and out of Guam

18 B757s in North Atlantic

Hawaiian 8 B767s in the Pacific

UPS

participating in pre-FOI data collection and are planning to participate in FOI in the near future

4 B747s, 39 B767s active42 B767s by October 2011, Crew training has begun, Significant use by May 2012+17 B767s by November 2013

Delta

participating in pre-FOI data collection and are planning to participate in FOI in the near future

8 B757s and 15 B747s planned for significant use in 2012-2013.Currently, 23 B757s, 15 B747s and 3 B737s do Iridium voice/AOC data

Qantas 1 B737 in the TasmanTotals 23 FOI aircraft 80 FOI aircraft

Page 16: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

16Federal AviationAdministration

ICAO provisions

• Standards and Recommended Practices (Annex 10), PANS/ATM (Doc 4444) and Regional Supplementary Procedures (Doc 7030) and other ICAO guidance material (e.g., ICAO Doc 9925)

• FOI is a viable means for conducting ATS communications and FOI aircraft are eligible for CPDLC and ADS‑C operations anywhere in the world

Page 17: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

17Federal AviationAdministration

Summary

• FANS 1/A over Iridium (FOI) is now being accepted as a means of compliance to CPDLC and ADS-C airspace requirements

– U.S.

– NAT

– Other States/regions may be pending further evaluation

Page 18: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

18Federal AviationAdministration

Page 19: Federal Aviation Administration FANS 1/A over Iridium (FOI) Status By:Tom Kraft tom.kraft@faa.gov tom.kraft@faa.gov Date:8-10 February 2012 Presented to:SOCM/2

FANS 1/A over Iridium8-10 February 2012

19Federal AviationAdministration