felipe garcia portfolio & cv
DESCRIPTION
architect designer portfolioTRANSCRIPT
2 3
CONTENT
Curriculum Vitae.....................................................................04
00. Winery and hotel in banyalbufar..................06-10
A-Transport Projects....................................................11-13
01. Airport Air Traffic Control, Girona (Spain)..........1102. Acoruna Airport, La Coruna (Spain)........................12
B- Sport Projects............................................................14-21
03. Football Stadium, Babil (Iraq)...................................1404. Salahedin Football Stadium,Baghdad (Iraq)......1605. Al Talaba F.C Complex,Baghdad (Iraq)...............20
C- Residential Projects.....................................22-39
06. Residential Masterplan Sabyat,Bagdad (Iraq).....2207. Forest House, Spain.........................................2408. Areca Tower, Penang (Malaysia)........................2609. Bayan Muntiara P3 (Malaysia)...........................3210. Parkings,Baghdad (Iraq)..................................38
5
CV FELIPE GARCIA
Unit 4/6/3, Tivoli villa condominium. Jalan Medang Tanduk, Bangsar, Kuala Lumpur, Malaysia
014 3389269
SKILLS
EDUCATION
JOB EXPERIENCE21/09/1984 Jaen, (Spain)
PERSONAL SKILLS
UNIVERSITY ALFONSO 10 EL SAVIO (MADRID,
ADITIONAL TRAINING Madrid
Title : Master of Architecture 2002-2010
Architect Designer
- Course of Adobe Photoshop, Advance Level (30 Hours) COAM
- Course of Architectural Photomontage (40 Hours) COAM
- Course of Revit Architecture, Advance Level (40 Hours) UPM
- Course of Adobe Indesign (30 Hours) UPM
-Architect Assistant. residential competitions.
-Architect Designer. retails rehabilitations.
-Architect Designer. Airports competitions.
-Architect Designer.design and construction drawings of Sports Buildings.
-Architect Designer handling mix developments projects
Actual role and responsabilities in my work:
-Liase with client representative to ensure that the project goals are met.-Menagement the project from inception throu-gh construction.-Provide leadership to the project and the pro-ject design team consisting of architects, engi-neers and external consultants.-Participating in preliminary studies and estima-tes of proposed building projects.-Prepare concept designs proposal in colabora-tion with others designers.
02/2009-06/2009
11/2010-02/2011
02/2011-09/2011
10/2011-12/2012
02/2013- actual
AURIENS Arquitectura
Antonio Parra (Madrid)
FBArquitectura (Madrid)
Triarena (Madrid)
GDParchitects ( Kuala Lumpur)
PROFESONAL SKILLS
Comunication
Autocad
Teamwork
Revit
Creativity
Vectoworks
Leadership
Adobe Photoshop
Menagement
Adobe Indesign
Microsoft Office
6 7
00Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
Winery in Banyalbufart
Thesis
Mallorca, Spain
September 2010
Felipe Garcia Garcia
conceptual model
situation
site plan
10 11
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
01Airport Air Traffic Control, Girona
Competition
Girona Airport, Spain
April 2010
Initec
FBarquitectura
In progress
12 13
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
A Coruna Airport, A coruna
Competition
A Coruna, Spain
April 2010
Initec
FBarquitectura
In progress
02
14 15
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
03Babil F.C Stadium, Babil
Competition
Babil, Irak
September 2010
Initec
Triarena
Winners,Construction
The client, Ministry of youth and sports, wants a stadium belonging to FIFA standars with a capacity of 30.000 seats, qualified to host international competitions with te-levision broadcast.To fulfill their wish, we tried to apply in our design three concepts: MODERNITY, FUNCTIONALITY AND TECHNOLOGY, by adopting the newest architectural tendencies, combining the use of new treated materials like light steel, thin precast concrete, ultra resistant textile and polymers, and tens of latest inventions helping to create easy adaptable spaces to the most exigent needs, using at the same time the material technology as an aesthetic and functional appeal.
section general plan
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
16 17
Salah el-Din F.C Stadium
Competition
Baghdad, Irak
February 2011
Initec
Triarena
Winners, In progress
04
The design of the Salah el-Din Stadium reflects simplicity and modernity. A generic volume streamlined with a subtle gesture, as simple as the formation of a sand dune everyday by desert breeze. Modern as the latest shapes that architecture can offer today; a spatial design based on the concept of trans-parency and the integration of the surrounding exteriors inside the building.Facades are flirting with the opposite duality of materials such as allegory for clean sports competition, while VIP sector facade embraces same move-ment reinforcing this gestureby wearing noble material and a crown is created by roof folds allowing natural light topenetrate into the noble building to illuminate the interior space.
perspective
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
20 21
Al Talaba F.C complex
Competition
Baghdad, Iraq
June 2012
Baghdad Authorities
Triarena
In progres
05
The aim of the project is create a Multi-sports complex for Al Talaba Foot-ball Club, at the same site of the current one, in Baghdad.The topography of the site is mainly flat and the area of the plot is 71.150 m2 and has an approximate shape of a “scalene triangle” with the base in its longest side, at East-West axis.
P R O J E C T D A T A
T E C H N I C A L D A T A
E n r i q u e C a m i n o ARCHITECTPORTFOLIO
B u i l d i n g T y p e:
P r o j e c t P h a s e:
L o c a t i o n:
Y e a r:
O f f i c e:
P o s i t i o n:
URBAN PLANNINGP R O J E C T S
SABYAT12.500 DEWELLINGS
P l o t A r e a:
U r b a n C o m p e t i t i o n
Tr i a r e n a
B a g h d a d ( I R A Q )
S e n i o r A r c h i t e c t
2 0 1 1
850.367 m
45.000 people
Undetermined
2
B u d g e t:
C a p a c i t y:
M A I N M E N U
NEXTBACK
R e s i d e n t i a l
C u r r i c u l u m
P r o j e c t s
S p o r t s
T r a n s p o r t
S e r v i c e
O f f i c e
I n d u s t r i a l
U r b a n P l a n n i n g
O t h e r s
P R O J E C T D A T A
T E C H N I C A L D A T A
E n r i q u e C a m i n o ARCHITECTPORTFOLIO
B u i l d i n g T y p e:
P r o j e c t P h a s e:
L o c a t i o n:
Y e a r:
O f f i c e:
P o s i t i o n:
URBAN PLANNINGP R O J E C T S
SABYAT12.500 DEWELLINGS
P l o t A r e a:
U r b a n C o m p e t i t i o n
Tr i a r e n a
B a g h d a d ( I R A Q )
S e n i o r A r c h i t e c t
2 0 1 1
850.367 m
45.000 people
Undetermined
2
B u d g e t:
C a p a c i t y:
M A I N M E N U
NEXTBACK
R e s i d e n t i a l
C u r r i c u l u m
P r o j e c t s
S p o r t s
T r a n s p o r t
S e r v i c e
O f f i c e
I n d u s t r i a l
U r b a n P l a n n i n g
O t h e r s
P R O J E C T D A T A
T E C H N I C A L D A T A
E n r i q u e C a m i n o ARCHITECTPORTFOLIO
B u i l d i n g T y p e:
P r o j e c t P h a s e:
L o c a t i o n:
Y e a r:
O f f i c e:
P o s i t i o n:
URBAN PLANNINGP R O J E C T S
SABYAT12.500 DEWELLINGS
P l o t A r e a:
U r b a n C o m p e t i t i o n
Tr i a r e n a
B a g h d a d ( I R A Q )
S e n i o r A r c h i t e c t
2 0 1 1
850.367 m
45.000 people
Undetermined
2
B u d g e t:
C a p a c i t y:
M A I N M E N U
NEXTBACK
R e s i d e n t i a l
C u r r i c u l u m
P r o j e c t s
S p o r t s
T r a n s p o r t
S e r v i c e
O f f i c e
I n d u s t r i a l
U r b a n P l a n n i n g
O t h e r s
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
22 23
Sabyat Masterplan
Competition
Baghdad, Iraq
September 2012
Baghdad Authorities
Triarena
In progres
06
Sabyat city is thought as a great residential, commercial and business.Is situated in the north-west of Baghdad and is communicated directly to the highway nor-th of Baghdad and the west that connects it to the airport. These conections influence the design of the city to facilitate accessibility and traffic conditions. Between these two main circulations will be located the main green areas, the tertiary sector and single-fa-mily residential, forming the green lung of the city and centralizing services so that the adjoining residential areas are free of traffic and noise. The perimeter of the green area is bordered by two strips of residential towers that will shape the skyline of the city, with both rows a reference axis in the city.
tipical units and layout
24 25
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
Forest House
Proposal
Jaen,Spain
may 2011
Felipe Garcia
07
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
26 27
Areca Tower
Soho residential
Penang, Malaysia
April 2013
Plenitude
GDP Architects
In progress
08
DESIGN CONCEPT
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
32 33
09Bayan Muntiara P3
Residential
Penang (Malaysia)
April 2013
Tropicana
GDP Architects
In Progress
Project title: Project type: Location: Project year: Client:
Archi-tects:
Status
38 39
Public Parking and Economy Bank Parking
Competition
Baghdad
February 2011
Triarena
In progress
10