ferry - san francisco county transportation authority · 2018-11-14 · ferry category, the prop k...

22
2019 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM FERRY Approved : October 23, 2018 Prepared for the San Francisco County Transportation Authority By Port of San Francisco and Golden Gate Bridge, Highway and Transportation District

Upload: others

Post on 07-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2019 PROPOS IT ION K

5 -YEAR PR IOR IT IZAT ION PROGRAM

FERRY

Approved: October 23, 2018

Prepared for the San Francisco County Transportation Authority

By Port of San Francisco and

Golden Gate Bridge, Highway and Transportat ion Distr ict

Page 2: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

This Page Intentionally Left Blank

Page 3: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2019 PROP K 5 -YEAR PR IORIT IZAT ION PROGRAM FERRY

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Table of Contents

Eligibility

Prioritization Criteria

Stretching Your Prop K Sales Tax Dollars Farther

Performance Measures

Table 2 - Project Delivery Snapshot

Table 3 - Prioritization Criteria and Scoring Table

Table 4 - Prop K 5-Year Project List (FY 2019/20 – 2023/24)

Project Information Forms

2014 Prop K 5-Year Prioritization Program – Program of Projects (as adopted)

2014 Prop K 5-Year Prioritization Program – Program of Projects (as proposed)

Eligibility

Eligibility as identified in the voter approved Prop K Expenditure Plan is as follows:

“Improvements to downtown ferry terminals to accommodate increases in ferry ridership. Included are additional intermodal connections, new ferry berths, improved emergency response systems, and landside improvements to serve increased passenger flows. Also included is rehabilitation of passenger-serving facilities. Includes project development and capital costs. Sponsoring Agencies: Port of San Francisco, GGBHTD. The first $4.4M is Priority 1 and the remainder is Priority 2. Total Funding: $105.7M; Prop K: $5M.”

GGBHTD stands for Golden Gate Bridge, Highway and Transportation District.

Prioritization Criteria

One of the key required elements of the 5YPPs is a transparent process for how projects get selected. Prop K requires at a minimum that each category include prioritization criteria that address project readiness, community support, and relative level of need or urgency. For the 2014 5YPP update, the Citizens Advisory Committee requested that the Transportation Authority and project sponsors develop a user-friendly, transparent scoring table that could apply to all 5YPPs, and that the scoring prioritize safety and community input highly. For the 2019 5YPP update, we added a category specific criteria, Rehabilitates Passenger-Serving Facility, to capture the priority of projects that bring an existing passenger-serving facility to a state of good repair.

1

Page 4: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2019 PROP K 5 -YEAR PR IORIT IZAT ION PROGRAM FERRY

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Table 3 shows the Prioritization Criteria and Scoring Table. Each project can receive a maximum of 22 points, with 10 points allocated programwide criteria and 12 points allocated for category specific criteria.

The Expenditure Plan also requires consideration of geographic equity in terms of project distribution that takes into account the various needs of San Francisco’s neighborhoods. The Downtown Ferry Terminal is the hub of water transit for the San Francisco Bay Area and serves the vast majority of San Francisco ferry passengers. Prop K funds and other funds leveraged by Prop K funding will allow the Downtown Ferry Terminal to handle the projected tripling of ferry ridership within the next 15 years both on the water-side and through the Terminal’s landside intermodal connections.

Stretching Your Prop K Sales Tax Dollars Farther

Leveraging Prop K funds against non-Prop K fund sources (e.g., federal, state, other local funds) is necessary to fully fund the Expenditure Plan projects and programs. For the Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue spent, it would be leveraged by about $20 in non-Prop K funds. The table below compares Prop K Expenditure Plan assumptions with proposed leveraging in the 2019 5-year project lists.

Table 1. Prop K Leveraging1

Category Expected

Leveraging (Non-Prop K Funds)

Proposed Leveraging (Non-

Prop K Funds)

Ferry 95% 94%1 This table compares the expected leveraging assumed in the Expenditure Plan with the proposed leveraging assumed in the 5-Year Project List.

Performance Measures

Prop K requires the establishment of performance measures for each programmatic category in the Expenditure Plan. The intent is to demonstrate the system performance benefits of sales tax projects (e.g. reduced transit travel time), to ensure funds are being used cost effectively, and to inform allocation of Prop K funds and programming and prioritization of other funds by the Transportation Authority (e.g. Transportation Fund for Clean Air, Prop AA Vehicle Registration Fee funds).All improvements of the Downtown Ferry Terminal project are intended to enhance the ferry transit experience and increase the quantity of ferry riders. Many ferry riders are also dependent on connections to other forms of transit. The Port will coordinate with the Water Emergency Transportation Authority (WETA) to measure performance by the number of ferry riders and the number of intermodal connections occurring at the Downtown Ferry Terminal. Performance will be both quantitative and qualitative.

2

Page 5: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

Tab

le 2

. Pro

ject

Del

iver

y Sn

apsh

otF

erry

(E

P 9

)

5-Y

ear

Pri

orit

izat

ion

Pro

gram

(5Y

PP

) P

erio

d *

Pro

gram

med

(Ava

ilabl

e fo

rA

lloca

tion

)

Allo

cate

d (a

s of

Jul

y 20

18)

% A

lloca

ted

2005

5Y

PP

(FY

200

4/05

-200

8/09

)61

0,00

0$

36

,620

$

6%20

09 5

YP

P (F

Y 2

009/

10-2

013/

14)

1,30

0,00

0$

1,30

0,00

0$

100%

2014

5Y

PP

(FY

201

4/15

- 2

018/

19) a

s of

7/2

4/20

182,

200,

000

$

1,

100,

000

$

50

%T

otal

2,43

6,62

0$

*Una

lloca

ted

fund

s ar

e ca

rrie

d fo

rwar

d fo

r pr

ogra

mm

ing

in th

e fo

llow

ing

5YP

P p

erio

d.

Tab

le b

elow

sho

ws

perc

ent c

ompl

ete

as r

epor

ted

by p

roje

ct s

pons

ors

in J

uly

2018

Com

plet

ed P

roje

cts/

Pro

ject

Pha

ses

(sor

ted

by a

lloca

tion

year

, the

n sp

onso

r, th

en p

roje

ct n

ame)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Pha

se(s

) F

unde

dA

lloca

ted

(as

of J

uly

2018

)%

Com

plet

e

Por

tSF

2004

/05

5-Y

ear

Prio

ritiz

atio

n P

rogr

am -

Fer

ryP

lann

ing

8,64

7$

10

0%P

ortS

F20

05/0

6D

ownt

own

Fer

ry T

erm

inal

Env

iron

men

tal

27,9

73$

10

0%P

ortS

F20

12/1

3D

ownt

own

Fer

ry T

erm

inal

Pha

se I

I -

Pie

r 1/

2 D

emol

ition

Con

stru

ctio

n1,

300,

000

$

10

0%

Und

erw

ay P

roje

cts/

Pro

ject

Pha

ses

(sor

ted

by a

lloca

tion

year

, the

n sp

onso

r, th

en p

roje

ct n

ame)

Spon

sor

Fis

cal Y

ear

of

Allo

cati

onP

roje

ct N

ame

Pha

se(s

) F

unde

dA

lloca

ted

(as

of J

uly

2018

)%

Com

plet

e

Por

tSF

2016

/17

Dow

ntow

n F

erry

Ter

min

al -

Sou

th B

asin

Im

prov

emen

tsC

onst

ruct

ion

1,10

0,00

0$

44%

For

mor

e in

form

atio

n ab

out t

he p

roje

cts

fund

ed b

y th

e T

rans

port

atio

n A

utho

rity

, as

wel

l as

proj

ects

for

whi

ch w

e he

lp o

vers

ee in

our

rol

e as

the

Con

gest

ion

Man

agem

ent A

genc

y fo

r Sa

n F

ranc

isco

, vis

it ou

r in

tera

ctiv

e pr

ojec

t map

at m

ystr

eets

f.sfc

ta.o

rg

3

Page 6: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

Tab

le 3

- P

rior

itiz

atio

n C

rite

ria

and

Scor

ing

Tab

leF

erry

(E

P 9

)

Pro

ject

R

eadi

ness

Com

mun

ity

Supp

ort

Tim

e Se

nsit

ive

Urg

ency

Safe

tyL

ever

agin

gP

rovi

des

Ben

efit

s to

M

ulti

ple

Use

rs

Reh

abili

tate

s P

asse

nger

-Ser

ving

F

acili

tyT

otal

Tot

al P

ossi

ble

Scor

e4

33

44

22

22D

ownt

own

Fer

ry T

erm

inal

- P

asse

nger

C

ircul

atio

n Im

prov

emen

ts4

10

40

20

11

Dow

ntow

n F

erry

Ter

min

al F

loat

R

ehab

ilita

tion

41

03

42

216

Gan

gway

and

Pie

rs P

roje

ct -

Rec

onst

ruct

ion

20

12

42

213

Pro

vide

s B

enef

its

to M

ulti

ple

Use

rs: P

roje

ct p

rovi

des

mul

ti-m

odal

ben

efits

(e.g

. saf

ety

impr

ovem

ents

for

ped

estr

ians

or

peop

le o

n bi

kes)

in a

dditi

on to

impr

ovem

ents

in f

erry

saf

ety.

Pro

ject

s re

ceiv

es o

ne

poin

t eac

h fo

r ad

dres

sing

the

need

s of

ped

estr

ians

or

bicy

clis

ts.

Lev

erag

ing:

Pro

ject

leve

rage

s no

n-P

rop

K f

unds

.Sa

fety

: (T

wo

poin

ts f

or e

ach)

: Pro

ject

add

ress

es d

ocum

ente

d sa

fety

issu

e an

d in

crea

ses

secu

rity

.

CA

TE

GO

RY

SP

EC

IFIC

CR

ITE

RIA

Pri

orit

izat

ion

Cri

teri

a D

efin

itio

ns:

PR

OP

K P

RO

GR

AM

-WID

E C

RIT

ER

IA

Reh

abili

tate

s P

asse

nger

-Ser

ving

Fac

ility

: Pro

ject

bri

ngs

an e

xist

ing

pass

enge

r-se

rvin

g fa

cilit

y to

a s

tate

of

good

rep

air.

Tim

e Se

nsit

ive

Urg

ency

: Pro

ject

nee

ds to

pro

ceed

in p

ropo

sed

timef

ram

e to

ena

ble

cons

truc

tion

coor

dina

tion

with

ano

ther

pro

ject

(e.g

., m

inim

ize

cost

s an

d co

nstr

uctio

n im

pact

s), t

o su

ppor

t ano

ther

fu

nded

or

prop

osed

pro

ject

(e.g

. new

sig

nal c

ontr

olle

rs n

eed

to b

e in

stal

led

to s

uppo

rt T

EP

impl

emen

tatio

n) o

r to

mee

t tim

ely

use

of f

unds

dea

dlin

es a

ssoc

iate

d w

ith m

atch

ing

fund

s.

Com

mun

ity

Supp

ort:

Pro

ject

has

cle

ar a

nd d

iver

se c

omm

unity

sup

port

and

/or

was

it id

entif

ied

thro

ugh

a co

mm

unity

-bas

ed p

lann

ing

proc

ess.

An

exam

ple

of a

com

mun

ity-b

ased

pla

n is

a n

eigh

borh

ood

tran

spor

tatio

n pl

an, b

ut n

ot a

cou

ntyw

ide

plan

or

agen

cy c

apita

l im

prov

emen

t pro

gram

.T

hree

poi

nts

for

a pr

ojec

t in

an a

dopt

ed c

omm

unity

bas

ed p

lan

with

evi

denc

e of

div

erse

com

mun

ity s

uppo

rt.

Tw

o po

ints

for

a p

roje

ct w

ith e

vide

nce

of s

uppo

rt f

rom

bot

h ne

ighb

orho

od s

take

hold

ers

and

grou

ps a

nd c

ityw

ide

grou

ps.

One

poi

nt f

or a

pro

ject

with

evi

denc

e of

sup

port

fro

m e

ither

nei

ghbo

rhoo

d st

akeh

olde

rs a

nd g

roup

s or

city

wid

e gr

oups

.

Pro

ject

Rea

dine

ss: P

roje

ct li

kely

to n

eed

fund

ing

in f

isca

l yea

r pr

opos

ed. F

acto

rs to

be

cons

ider

ed in

clud

e ad

equa

cy o

f sc

ope,

sch

edul

e, b

udge

t and

fun

ding

pla

n re

lativ

e to

cur

rent

pro

ject

sta

tus

(e.g

. ex

pect

mor

e de

tail

and

cert

aint

y fo

r a

proj

ect a

bout

to e

nter

con

stru

ctio

n th

an d

esig

n); w

heth

er p

rior

proj

ect p

hase

s ar

e co

mpl

eted

or

expe

cted

to b

e co

mpl

eted

bef

ore

begi

nnin

g th

e ne

xt p

hase

; and

w

heth

er li

tigat

ion,

com

mun

ity o

ppos

ition

or

othe

r fa

ctor

s m

ay s

igni

fican

tly d

elay

pro

ject

.

4

Page 7: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

Por

tD

ownt

own

Fer

ry T

erm

inal

- P

asse

nger

C

ircu

latio

n Im

prov

emen

tsC

ON

Pla

nned

$240

,000

$240

,000

Por

tD

ownt

own

Fer

ry T

erm

inal

Flo

at R

ehab

ilita

tion

PS&

EP

lann

ed$2

00,0

00$2

00,0

00

Por

tD

ownt

own

Fer

ry T

erm

inal

Flo

at R

ehab

ilita

tion

CO

NP

lann

ed$4

00,0

00$4

00,0

00

GG

BH

TD

Gan

gway

and

Pie

rs P

roje

ct -

Rec

onst

ruct

ion

PA

&E

DP

lann

ed$6

5,00

0$6

5,00

0G

GB

HT

DG

angw

ay a

nd P

iers

Pro

ject

- R

econ

stru

ctio

nP

S&E

Pla

nned

$282

,000

$282

,000

GG

BH

TD

Gan

gway

and

Pie

rs P

roje

ct -

Rec

onst

ruct

ion

CO

NP

lann

ed$9

00,0

00$9

00,0

00

$240

,000

$6

5,00

0 $2

82,0

00

$200

,000

$1

,300

,000

$2

,087

,000

$7

2,11

8 $7

5,00

2 $7

7,70

9 $8

6,98

4 $9

7,22

6 $4

09,0

40

($16

7,88

2)($

157,

880)

($36

2,17

1)($

475,

187)

($1,

677,

960)

($1,

677,

960)

Tab

le 4

- P

rop

K 5

-Yea

r P

roje

ct L

ist

(FY

201

9/20

- F

Y 2

023/

24)

Fer

ry C

ateg

ory

(EP

9)

Pro

gram

min

g

Age

ncy

Pro

ject

Nam

eP

hase

Stat

usF

isca

l Yea

r

Cum

ulat

ive

Rem

aini

ng P

rogr

amm

ing

Cap

acit

y

Tot

al

Fun

ds R

eque

sted

in 2

019

5YP

PF

unds

Pro

gram

med

in 2

019

Stra

tegi

c P

lan

Bas

elin

e

E6B-55

Page 8: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

Dow

ntow

n F

erry

Ter

min

al -

Pas

seng

er C

ircu

latio

n Im

prov

emen

tsC

ON

$200

,000

$40,

000

$240

,000

Dow

ntow

n F

erry

Ter

min

al F

loat

Reh

abili

tatio

nP

S&E

$200

,000

$200

,000

Dow

ntow

n F

erry

Ter

min

al F

loat

Reh

abili

tatio

nC

ON

$100

,000

$300

,000

$400

,000

Gan

gway

and

Pie

rs P

roje

ct -

Rec

onst

ruct

ion

PA

&E

D$6

5,00

0$6

5,00

0G

angw

ay a

nd P

iers

Pro

ject

- R

econ

stru

ctio

nP

S&E

$141

,000

$141

,000

$282

,000

Gan

gway

and

Pie

rs P

roje

ct -

Rec

onst

ruct

ion

CO

N$1

00,0

00$2

50,0

00$2

50,0

00$3

00,0

00$9

00,0

00

$200

,000

$1

05,0

00

$141

,000

$3

41,0

00

$200

,000

$5

50,0

00

$250

,000

$3

00,0

00

$2,0

87,0

00

$72,

118

$75,

002

$77,

709

$86,

984

$97,

226

$0

$0

$409

,040

($

127,

882)

($15

7,88

0)($

221,

171)

($47

5,18

7)($

577,

960)

($1,

127,

960)

($1,

377,

960)

($1,

677,

960)

($1,

677,

960)

Tab

le 4

- P

rop

K 5

-Yea

r P

roje

ct L

ist

(FY

201

9/20

- F

Y 2

023/

24)

Fer

ry C

ateg

ory

(EP

9)

Cas

h F

low

(M

axim

um A

nnua

l Rei

mbu

rsem

ent)

Pro

ject

Nam

eP

hase

Fis

cal Y

ear

Tot

al

Cum

ulat

ive

Rem

aini

ng C

ash

Flo

w C

apac

ity

Cas

h F

low

Req

uest

ed in

201

9 5Y

PP

Cas

h F

low

in 2

019

Stra

tegi

c P

lan

Bas

elin

e

E6B-6 6

Page 9: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Name:

Implementing Agency:

Category:

Subcategory:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Location:

Supervisorial District(s):

Project Manager:

Phone Number:

Email:

Brief Project Description for MyStreetSF (80 words max):

Detailed Scope (may attach Word document): Please describe the project goals, scope, benefits and how the project was prioritized. Also, describe any coordination with other projects (e.g. paving, MuniForward, Vision Zero).

Prior Community Engagement/Support (may attach Word document): Please reference any community outreach that has occurred and whether the project is included in any plans (e.g. neighborhood transportation plan, corridor improvement study, station area plans).

Partner Agencies: Please list partner agencies and identify a staff contact at each agency.

Type of Environmental Clearance Required:

Attachments: Please attach maps, drawings, photos of current conditions, etc. to support understanding of the project.

Yes

District 03

Water Emergency Transportation Authority, Michael Gougherty, project mananger, (415) 364-3189. Golden Gate Bridge Highway and Transportation District, Amy Frye,

The Port and WETA have conducted public outreach efforts to involve stakeholders throughout development of the project, presenting the project and updates to several organizations, including the Port’s Northeastern Waterfront Advisory Group, Maritime Commerce Advisory Committee, and Waterfront Design Advisory Committee, the San Francisco Historical Preservation Commission and the BCDC Design Review Board. Additionally, regular project updates have been posted to both the Port’s website and the WETA website.

Dan Hodapp

415-274-0625

[email protected]

The proposed project would separate vehicles and pedestrians with furnishings including walkway lighting and seating. The project shares its scope with the South Terminal Expansion project of the Downtown Ferry Terminal (DTFT), which is constructing a seismic joint to connect two independent pile supported structures, stormwater drainage, and other surface improvements.

The project was publicly reviewed, completed environmental review and fully entitled through the DTFT project which includes the following: Construction of two new ferry gates and vessel berthing facilities (new Gates F and G), rehabilitation or replacement of one existing ferry gate and vessel berthing facilities (existing Gate E), pile supported pedestrian circulation areas, amenities such as weather protection canopies, and a new pile supported plaza between the Ferry Building and the Agriculture Building for passenger queuing, staging for evacuees in the event of a major emergency.

The project is consistent with the Port’s Waterfront Land Use Plan (WLUP) by “…providing a safe connection between land and water areas”, and with the Waterfront Design & Access Element of the WLUP by “…include a clear walkway or other circulation route …from The Promenade”. The Project is also consistent with the City’s Vision Zero ” …goal is to create a culture that prioritizes traffic safety…”. The Project Goal is to provide a safe and comfortable vehicle separated walkway for ferry passengers between The Embarcadero Promenade and ferry pier.

EIR/EIS

Construct a protected pedestrian walkway between The Embarcadero Promenade and the Ferry Pier Plaza, located between the south end of the Ferry Building and the new passenger emergency staging plaza for the South Terminal. Currently, ferry passengers accessing Golden Gate and public spaces on the pier share the access to the pier with about 250 vehicles daily. Improvements would provide a separated walkway, lighting, and seating to improve the safety, comfort and quality of the passenger experience.

Project Map

Prop K Project Information Form

Prop K Expenditure Plan Information

A. Transit

9-Ferry

2019/20

Downtown Ferry Terminal, adjacent to the southern end of the Ferry Building, east to the Embarcadero Rdwy

Project Information

i. Major Capital Projects (transit)

Downtown Ferry Terminal - Passenger Circulation Improvements

Port of San Francisco

7

Page 10: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - BothQuarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering 100% Contracted Q1-Jul-Aug-Sep 2010/11 Q4-Apr-May-Jun 2011/12Environmental Studies (PA&ED) 100% Contracted Q1-Jul-Aug-Sep 2012/13 Q2-Oct-Nov-Dec 2014/15Right of Way 100% In-house

Design Engineering (PS&E) 30%In-house and Contracted

Q3-Jan-Feb-Mar 2013/14 Q4-Apr-May-Jun 2018/19

Advertise Construction 0% In-house Q4-Apr-May-Jun 2018/19Start Construction (i.e. Award Contract) 0% Contracted Q2-Oct-Nov-Dec 2019/20Operations (i.e. paratransit) 0% TBDOpen for Use 0% In-house Q4-Apr-May-Jun 2019/20

Project Completion (means last eligible expenditure)

0% Contracted Q4-Apr-May-Jun 2019/20

Start Date End Date

Comments/Concerns

8

Page 11: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San

Fra

ncis

co C

ount

y T

rans

port

atio

n A

utho

rity

Pro

posi

tion

K S

ales

Tax

Pro

gram

Pro

ject

Inf

orm

atio

n F

orm

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Pha

seC

ost

Pro

p K

Oth

er

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

-$

-

$

-$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

-$

-

$

Rig

ht o

f W

ay-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

60,0

00$

60

,000

$

Con

stru

ctio

n24

0,00

0$

24

0,00

0$

Ope

ratio

ns (i

.e. p

arat

rans

it)-

$

-$

-

$

Tot

al P

roje

ct C

ost

300,

000

$

300,

000

$

-$

Per

cent

of T

otal

100%

0%

Fun

d So

urce

Pro

p K

Exp

endi

ture

L

ine

Pha

seF

und

Sour

ce

Stat

us

Fis

cal Y

ear

of

Allo

cati

on

(Pro

gram

min

g Y

ear)

Tot

al

Fun

ding

Pre

viou

s20

19/2

020

20/2

120

21/2

220

22/2

320

23/2

4

Pro

p K

9-F

erry

Des

ign

Eng

inee

ring

(PS&

E)

Pla

nned

Pre

viou

s60

,000

$

-

$

60,0

00$

-$

-

$

-$

-

$

Pro

p K

9-F

erry

Con

stru

ctio

nP

lann

ed20

19/2

024

0,00

0$

20

0,00

0$

40

,000

$

-

$

-$

-

$

Tot

al B

y F

isca

l Yea

r30

0,00

0$

-

$

260,

000

$

40,0

00$

-

$

-$

-

$

Com

men

ts

Dow

ntow

n F

erry

Ter

min

al -

Pas

seng

er C

ircul

atio

n Im

prov

emen

ts

Fun

ding

Sou

rce

Fun

ding

Pla

n -

All

Pha

ses

Cas

h F

low

for

Pro

p K

Onl

y (i

.e. F

isca

l Yea

r of

Rei

mbu

rsem

ent)

9

Page 12: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

Port of  San Francisco

Downtow

n Ferry Term

inal ‐Passen

ger C

irculation Im

provem

ents

Golde

n Gate

Ferry Term

inal

Ferry Bu

ilding

Embarcadero Ro

adway

Project S

ite

Pier 14

10

Page 13: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Name:

Implementing Agency:

Category:

Subcategory:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Location:

Supervisorial District(s):

Project Manager:

Phone Number:

Email:

Brief Project Description for MyStreetSF (80 words max):

Detailed Scope (may attach Word document): Please describe the project goals, scope, benefits and how the project was prioritized. Also, describe any coordination with other projects (e.g. paving, MuniForward, Vision Zero).

Prior Community Engagement/Support (may attach Word document): Please reference any community outreach that has occurred and whether the project is included in any plans (e.g. neighborhood transportation plan, corridor improvement study, station area plans).

Partner Agencies: Please list partner agencies and identify a staff contact at each agency.

Type of Environmental Clearance Required:

Attachments: Please attach maps, drawings, photos of current conditions, etc. to support understanding of the project.

District 03

WETA, Kevin Connolly or Mike Gougherty

Continued use of the gate B, and therefore keeping the float in proper condition, is integral to achieving the vision for water transportation supported by the Community in their review of the WETA's strategic plan and the update to the Port's Waterfront Landuse Plan. Groups engaged have included:• Northeastern Waterfront and Central WaterfronT Advisory Groups• Waterfront Design Advisory Committee• San Francisco Bay Conservation & Development Commission's Design Review Board• Port Commission and WETA Board

Joe Roger

274-0556

[email protected]

Gate B at the Downtown Ferry Terminal and the associated float serves more than 1 million passengers per year traveling between San Francisco and Vallejo on Water Emergency Transportation Authority (WETA) and Blue and Gold ferries. Over the past five years, ridership on San Francisco-Vallejo ferries increased by more than 60% and other routes have seen similar or greater increases, as commuters and others around the Bay look for alternatives to congested Bay Area bridge corridors. This influx underscores how important it is to keep all downtown ferry terminal floats available and in a state of good repair.

According to industry standards, ferry floats should be taken out of the water put in to dry-dock for rehabilitation every 10 years due to the corrosive marine environment in which they operate. Float B has been in use for more than 15 years and is overdue for such capital repairs. In order to maintain the integrity of the float’s structural frame and ensure its continued safe operations, this project will refurbish the float and gangway, apply corrosion protection coatings, replace the float roof fabric, and repair or replace utilities.

Categorically Exempt

Ferry float, fendering, and mooring systems have been in use for over 15 years without proper drydocking for maintenance. In order to maintain the integrity of the float’s structural frame and ensure its continued safe operations, this project will refurbish the float and gangway, apply corrosion protection coatings, replace the float roof fabric, and repair or replace utilities.

No

Prop K Project Information Form

Prop K Expenditure Plan Information

A. Transit

9-Ferry

2022/23, 2023/24

Downtown Ferry Terminal Gate B

Project Information

i. Major Capital Projects (transit)

Downtown Ferry Terminal Float Rehabilitation

Port of San Francisco

11

Page 14: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - BothQuarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering 30% In-house Q1-Jul-Aug-Sep 2022/23 Q1-Jul-Aug-Sep 2022/23Environmental Studies (PA&ED) 0% In-house Q1-Jul-Aug-Sep 2022/23 Q1-Jul-Aug-Sep 2022/23Right of WayDesign Engineering (PS&E) 0% Contracted Q1-Jul-Aug-Sep 2022/23 Q4-Apr-May-Jun 2022/23Advertise Construction 0% In-house Q1-Jul-Aug-Sep 2023/24Start Construction (i.e. Award Contract) 0% Contracted Q3-Jan-Feb-Mar 2023/24Operations (i.e. paratransit) 0%Open for Use 0% Q2-Oct-Nov-Dec 2024/25

Project Completion (means last eligible expenditure)

Q4-Apr-May-Jun 2024/25

Start Date End Date

Comments/Concerns

12

Page 15: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San

Fra

ncis

co C

ount

y T

rans

port

atio

n A

utho

rity

Pro

posi

tion

K S

ales

Tax

Pro

gram

Pro

ject

Inf

orm

atio

n F

orm

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Pha

seC

ost

Pro

p K

Oth

er

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

-$

-

$

-$

Env

iron

men

tal S

tudi

es (P

A&

ED

)-

$

-$

-

$

Rig

ht o

f W

ay-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

200,

000

$

200,

000

$

-$

Con

stru

ctio

n2,

800,

000

$

400,

000

$

2,40

0,00

0$

Ope

ratio

ns (i

.e. p

arat

rans

it)-

$

-$

-

$

Tot

al P

roje

ct C

ost

3,00

0,00

0$

60

0,00

0$

2,

400,

000

$

Per

cent

of T

otal

20%

80%

Fun

d So

urce

Pro

p K

Exp

endi

ture

L

ine

Pha

seF

und

Sour

ce

Stat

us

Fis

cal Y

ear

of

Allo

cati

on

(Pro

gram

min

g Y

ear)

Tot

al F

undi

ngP

revi

ous

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

Pro

p K

9-F

erry

Des

ign

Eng

inee

ring

(PS&

E)

Pla

nned

2022

/23

200,

000

$

-

$

-$

-

$

-$

20

0,00

0$

-

$

-$

Pro

p K

9-F

erry

Con

stru

ctio

nP

lann

ed20

23/2

440

0,00

0$

-$

-

$

-$

-

$

-$

10

0,00

0$

30

0,00

0$

Por

t Har

bor

Fun

dC

onst

ruct

ion

Pla

nned

2023

/24

2,40

0,00

0$

-

$

-$

-

$

-$

-

$

Tot

al B

y F

isca

l Yea

r3,

000,

000

$

-

$

-$

-

$

-$

20

0,00

0$

10

0,00

0$

30

0,00

0$

Com

men

ts

Dow

ntow

n F

erry

Ter

min

al F

loat

Reh

abili

tatio

n Fun

ding

Sou

rce

Fun

ding

Pla

n -

All

Pha

ses

Cas

h F

low

for

Pro

p K

Onl

y (i

.e. F

isca

l Yea

r of

Rei

mbu

rsem

ent)

13

Page 16: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Name:

Implementing Agency:

Category:

Subcategory:

EP Line (Primary):

Other EP Line Number/s:

Fiscal Year of Allocation:

Project Location:

Supervisorial District(s):

Project Manager:

Phone Number:

Email:

Brief Project Description for MyStreetSF (80 words max):

Detailed Scope (may attach Word document): Please describe the project goals, scope, benefits and how the project was prioritized. Also, describe any coordination with other projects (e.g. paving, MuniForward, Vision Zero).

Prior Community Engagement/Support (may attach Word document): Please reference any community outreach that has occurred and whether the project is included in any plans (e.g. neighborhood transportation plan, corridor improvement study, station area plans).

Partner Agencies: Please list partner agencies and identify a staff contact at each agency.Type of Environmental Clearance Required:

Attachments: Please attach maps, drawings, photos of current conditions, etc. to support understanding of the project.

Prop K Project Information Form

Prop K Expenditure Plan Information

A. Transit

9-Ferry

2020/21, 2021/22, 2023/24

San Francisco Ferry Terminal

Project Information

i. Major Capital Projects (transit)

Gangways and Piers Project - Reconstruction

Golden Gate Bridge, Highway and Transit District

[email protected];

Golden Gate Ferry is an integral part of Marin and San Francisco multi-modal transportation network, providing a fast, safe, comfortable and convenient alternative to automobile travel, relieving peak hour congestion in the Highway 101 Corridor. The ferry service provides over two million passengers trips and twenty-two million passenger miles per year.

This project replaces fixed guideway connectors, including floats, floating barges, fenders, ramps, and gangways in Sausalito, San Francisco, Larkspur. The Golden Gate Bridge, Highway and Transit District awarded the design contract in 2013 for three ferry facilities and will start the preliminary design at San Francisco in FY21/22. Prop K funds will only support the San Francisco portion of the project providing local match for federal funds for design and construction.

The 40-years old facilities in San Francisco require rehabilitation to continue ferry service. A series of camel floats hold up the fenders at each of the berths. Their buoyancy decreases with age. The outdated gangway/ramp system with camel floats and fenders need to be replaced with new floats technology consistent with adjacent ferry operators. Project also includes minor landside improvements to streamline passenger flow and correct security fences.

The benefits of the project include, but are not limited to: rehabilitate deteriorated passenger facility, improve passenger access and ADA compliance, streamline passenger traffic to main deck loading, greater operational efficiencies, and enhanced emergency preparedness and transit security.

EIR/EIS

Project replaces the hydraulic gangway/ramp system and camel floats and fenders at the San Francisco ferry terminals with new steel floats that adapt to the rising sea level. The outdated gangway/ramp system needs to be replaced with new floats technology consistent with adjacent ferry operators. The benefits of the project include, but are not limited to: rehabilitate deteriorated passenger facility, improve passenger access and ADA compliance, streamline passenger traffic to main deck loading, greater operational efficiencies, and enhanced emergency preparedness and transit security.

No

District 03

San Francisco Port, Ananda Hirsch

We anticipate public outreach in early 2021 as part of the PA&ED phase.

John Eberle

(415) 923-2003

14

Page 17: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form

Project Delivery Milestones Status Work

Phase % CompleteIn-house -

Contracted - BothQuarter Fiscal Year Quarter Fiscal Year

Planning/Conceptual Engineering 25%In-house and Contracted

Q1-Jul-Aug-Sep 2009/10 Q2-Oct-Nov-Dec 2020/21

Environmental Studies (PA&ED) 10% Contracted Q3-Jan-Feb-Mar 2013/14 Q2-Oct-Nov-Dec 2021/22Right of Way 50% In-house Q3-Jan-Feb-Mar 2013/14 Q4-Apr-May-Jun 2021/22

Design Engineering (PS&E) 0%In-house and Contracted

Q4-Apr-May-Jun 2018/19 Q4-Apr-May-Jun 2022/23

Advertise Construction 0% In-house Q1-Jul-Aug-Sep 2023/24Start Construction (i.e. Award Contract) 0% In-house Q3-Jan-Feb-Mar 2023/24Operations (i.e. paratransit) 0% In-houseOpen for Use 0% TBD Q1-Jul-Aug-Sep 2027/28

Project Completion (means last eligible expenditure)

0% In-house Q4-Apr-May-Jun 2027/28

Start Date End Date

Comments/ConcernsThe Gangway and Piers - Reconstruction Project at San Francisco Ferry Terminal is the second of three-terminal reconstructions, with the Sausalito Ferry Landing being the first location. Sausalito Ferry Landing is at 95% design; construction is anticipated in FY2019/2020. Consultant, Moffit & Nichols, will start the planning and design activities for the San Francisco Ferry Terminal as soon as the Sausalito Reconstruction is underway. Based on the current project schedule, the reconstruction of the San Francisco Ferry Terminal is anticipated in FY 23/24.

15

Page 18: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

San

Fra

ncis

co C

ount

y T

rans

port

atio

n A

utho

rity

Pro

posi

tion

K S

ales

Tax

Pro

gram

Pro

ject

Inf

orm

atio

n F

orm

Pro

ject

Nam

e:

Pro

ject

Cos

t E

stim

ate

Pha

seC

ost

Pro

p K

Oth

er

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

350,

000

$

-

$

350,

000

$

Env

ironm

enta

l Stu

dies

(PA

&E

D)

650,

000

$

65

,000

$

585,

000

$

Rig

ht o

f W

ay-

$

-$

-

$

Des

ign

Eng

inee

ring

(PS&

E)

3,01

0,00

0$

28

2,00

0$

2,

728,

000

$

Con

stru

ctio

n30

,000

,000

$

900,

000

$

29,1

00,0

00$

Ope

ratio

ns (i

.e. p

arat

rans

it)-

$

-$

-

$

Tot

al P

roje

ct C

ost

34,0

10,0

00$

1,

247,

000

$

32,7

63,0

00$

Per

cent

of T

otal

4%96

%

Cas

h F

low

for

Pro

p K

Onl

y (i

.e. F

isca

l Yea

r of

Rei

mbu

rsem

ent)

Fun

d So

urce

Pro

p K

E

xpen

ditu

re

Lin

eP

hase

Fun

d So

urce

St

atus

Fis

cal Y

ear

of

Allo

cati

on

(Pro

gram

min

g Y

ear)

Tot

al F

undi

ngP

revi

ous

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

GG

BH

TD

Pla

nnin

g/C

once

ptua

l Eng

inee

ring

Allo

cate

dP

revi

ous

350,

000

$

FT

AE

nviro

nmen

tal S

tudi

es (P

A&

ED

)P

rogr

amm

ed20

19/2

052

0,00

0$

GG

BH

TD

Env

ironm

enta

l Stu

dies

(PA

&E

D)

Pro

gram

med

2019

/20

65,0

00$

Pro

p K

9-F

erry

Env

ironm

enta

l Stu

dies

(PA

&E

D)

Pla

nned

2020

/21

65,0

00$

65,0

00$

FT

AD

esig

n E

ngin

eerin

g (P

S&E

)P

rogr

amm

ed20

19/2

02,

428,

000

$

GG

BH

TD

Des

ign

Eng

inee

ring

(PS&

E)

Pro

gram

med

2020

/21

300,

000

$

Pro

p K

9-F

erry

Des

ign

Eng

inee

ring

(PS&

E)

Pla

nned

2021

/22

282,

000

$

14

1,00

0$

14

1,00

0$

FT

A

Con

stru

ctio

nP

lann

ed20

23/2

424

,000

,000

$

GG

BH

TD

Con

stru

ctio

nP

lann

ed20

23/2

45,

100,

000

$

Pro

p K

9-F

erry

Con

stru

ctio

nP

lann

ed20

23/2

490

0,00

0$

100,

000

$

250,

000

$

250,

000

$

300,

000

$

Tot

al B

y F

isca

l Yea

r34

,010

,000

$

-

$

-

$

65

,000

$

141,

000

$

141,

000

$

100,

000

$

250,

000

$

250,

000

$

300,

000

$

Com

men

ts

Fun

ding

Sou

rce

Fun

ding

Pla

n -

All

Pha

ses

Cos

t est

imat

e an

d fu

ndin

g pl

an in

clud

es f

ull p

roje

ct s

cope

for

San

Fra

ncis

co, S

ausa

lito,

and

Lar

kspu

r fe

rry

term

inal

s.

Gan

gway

s an

d P

iers

Pro

ject

- R

econ

stru

ctio

n

16

Page 19: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

Por

tD

ownt

own

Fer

ry T

erm

inal

Exp

ansi

on -

N

orth

Bas

in P

hase

PS&

E

Pro

gram

med

$1,1

00,0

00$1

,100

,000

GG

BH

TD

GG

BH

TD

Gan

gway

s an

d P

iers

Pro

ject

CO

N

Pro

gram

med

$1,1

00,0

00$1

,100

,000

$2,2

00,0

00$0

$0$0

$0

$2,2

00,0

00$2

,200

,000

$0$0

$0$0

$2

,200

,000

$0$0

$0$0

$0$0

Pro

gram

med

in 5

YP

PP

rogr

amm

ed in

201

4 St

rate

gic

Pla

nC

umul

ativ

e R

emai

ning

Pro

gram

min

g C

apac

ity

Fis

cal Y

ear

Tot

al

Fer

ry (

EP

9)

Pro

gram

min

g an

d A

lloca

tion

s to

Dat

e

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

FY

201

8/19

)

App

rove

d 6/

24/2

014

Age

ncy

Pro

ject

Nam

eP

hase

(s)

Stat

us

17

Page 20: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

Dow

ntow

n F

erry

Ter

min

al E

xpan

sion

-

Nor

th B

asin

Pha

seP

S&E

$1,1

00,0

00$1

,100

,000

GG

BH

TD

Gan

gway

s an

d P

iers

Pro

ject

CO

N

$660

,000

$440

,000

$1,1

00,0

00

$1,1

00,0

00

$660

,000

$4

40,0

00

$0

$0

$2,2

00,0

00

$1,1

00,0

00

$660

,000

$4

40,0

00

$0

$0

$2,2

00,0

00

$0$0

$0$0

$0$0

Cas

h F

low

in 5

YP

P

Cum

ulat

ive

Rem

aini

ng C

ash

Flo

w C

apac

ity

Tot

alP

roje

ct N

ame

Pha

seF

isca

l Yea

r

Fer

ry (

EP

9)

Cas

h F

low

($)

Max

imum

Ann

ual R

eim

burs

emen

t

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

FY

201

8/19

)

App

rove

d 6/

24/2

014

Cas

h F

low

in 2

014

Stra

tegi

c P

lan

18

Page 21: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

Port

SFD

ownt

own

Ferr

y T

erm

inal

- S

outh

B

asin

Im

prov

emen

tsC

ON

A

lloca

ted

$1,1

00,0

00$1

,100

,000

GG

BH

TD

GG

BH

TD

Gan

gway

s an

d Pi

ers

Pro j

ect1

CO

N

Prog

ram

med

$0$0

GG

BH

TD

Gan

gway

s an

d Pi

ers

- St

ate

of G

ood

Re p

air1

CO

N

Pend

ing

$150

,000

$150

,000

Port

SFD

ownt

own

Ferr

y T

erm

inal

- P

asse

nger

Circ

ulat

ion

Impr

ovem

ents

1PS

&E

Pl

anne

d$6

0,00

0$6

0,00

0

$0$0

$1

,100

,000

$0

$210

,000

$1

,310

,000

$2,2

00,0

00$0

$0$0

$0

$2,2

00,0

00$2

,200

,000

$2

,200

,000

$1

,100

,000

$1

,100

,000

$8

90,0

00

$890

,000

FO

OT

NO

TE

S:

GG

BH

TD

Gan

gway

s an

d Pi

ers

Proj

ect:

Red

uced

fro

m $

1.1

mill

ion

to $

0 in

FY

14/

15. P

roje

ct w

ill a

dvan

ce in

201

9 5Y

PP.

Gan

gway

s an

d Pi

ers

- St

ate

of G

ood

Rep

air:

Add

ed p

roje

ct w

ith $

150,

000

in F

Y 1

8/19

for

con

stru

ctio

n.D

ownt

own

Ferr

y T

erm

inal

- P

asse

nger

Circ

ulat

ion

Impr

ovem

ents

: Add

ed p

roje

ct w

ith $

60,0

00 in

FY

18/

19 f

or d

esig

n.

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

FY

201

8/19

)

Fer

ry (

EP

9)

Pro

gram

min

g an

d A

lloca

tion

s to

Dat

ePe

ndin

g O

ctob

er 2

3, 2

018

Boa

rd

Age

ncy

Proj

ect N

ame

Phas

e(s)

Stat

usFi

scal

Yea

rT

otal

Pro

gram

med

in 5

YP

PP

rogr

amm

ed in

201

4 St

rate

gic

Pla

nC

umul

ativ

e R

emai

ning

Pro

gram

min

g C

apac

ity

** D

eobl

igat

ed f

rom

prio

r 5Y

PP c

ycle

s" in

clud

es d

eobl

igat

ions

fro

m a

lloca

tions

app

rove

d pr

ior

to th

e cu

rren

t 5Y

PP p

erio

d.P

rogr

amm

ed

1 C

ompr

ehen

sive

201

4 5Y

PP a

men

dmen

t con

curr

ent w

ith 2

019

5YPP

ado

ptio

n (r

esol

utio

n X

X, a

ppro

ved

YY

).

Pen

ding

Allo

catio

n/A

ppro

pria

tion

Boa

rd A

ppro

ved

Allo

catio

n/A

ppro

pria

tion

19

Page 22: FERRY - San Francisco County Transportation Authority · 2018-11-14 · Ferry category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

2019

/20

Dow

ntow

n Fe

rry

Ter

min

al -

Sou

th B

asin

Im

prov

emen

tsC

ON

$440

,000

$440

,000

$220

,000

$1,1

00,0

00

GG

BH

TD

Gan

gway

s an

d Pi

ers

Proj

ect1

CO

N

$0$0

$0

Gan

gway

s an

d Pi

ers

- St

ate

of G

ood

Rep

air1

CO

N$5

0,00

0$1

00,0

00$1

50,0

00

Dow

ntow

n Fe

rry

Ter

min

al -

Pas

seng

er

Circ

ulat

ion

Impr

ovem

ents

1PS

&E

$6

0,00

0$6

0,00

0

$0

$0

$0

$440

,000

$4

90,0

00

$380

,000

$1

,310

,000

$1

,100

,000

$6

60,0

00

$440

,000

$0$0

$0

$2,2

00,0

00$1

,100

,000

$1

,760

,000

$2

,200

,000

$1

,760

,000

$1

,270

,000

$8

90,0

00

$890

,000

Pro

p K

5-Y

ear

Pro

ject

Lis

t (F

Y 2

014/

15 -

FY

201

8/19

)

Fer

ry (

EP

9)

Cas

h F

low

($)

Max

imum

Ann

ual R

eim

burs

emen

tPe

ndin

g O

ctob

er 2

3, 2

018

Boa

rd

Proj

ect N

ame

Phas

eFi

scal

Yea

rT

otal

Cas

h F

low

in 5

YP

PC

ash

Flo

w in

201

4 St

rate

gic

Pla

nC

umul

ativ

e R

emai

ning

Cas

h F

low

Cap

acit

y

Pro

gram

med

Pen

ding

Allo

catio

n/A

ppro

pria

tion

Boa

rd A

ppro

ved

Allo

catio

n/A

ppro

pria

tion

20