DRAFT 2014 PROPOS IT ION K
5 -YEAR PR IOR IT IZAT ION PROGRAM
TRANSPORTATION AND LAND USE COORDINATION
Approved: [DATE]
Prepared for the San Francisco County Transportation Authority
By San Francisco County Transportat ion Authority
In Coordination with Bay Area Rapid Transit (BART), Department of Publ ic Works,
Peninsula Corr idor Joint Powers Board (PCJPB or Caltrain), Planning Department, and
San Francisco Municipal Transportat ion Agency (SFMTA)
1Item 6 Enclosure P Plans and Programs Committee July 15, 2014
DRAFT 2014 PROP K 5-YEAR PR IORIT IZATION PROGRAM TRANSPORTATION AND LAND USE
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
Table of Contents
Eligibility
Prioritization Criteria
Stretching Your Prop K Sales Tax Dollars Farther
Table 1 - Prop K Leveraging
Table 2 - Project Delivery Snapshot
Table 3 - Prioritization Criteria and Scoring Table
Table 4 – Prop K 5-Year Project List (FY 2014/15 – FY 2018/19)
Project Information Forms
2009 Prop K 5-Year Prioritization Program – Program of Projects (as adopted)
2009 Prop K 5-Year Prioritization Program – Program of Projects (as amended)
Eligibility
Eligibility as identified in the voter approved Prop K Expenditure Plan is as follows:
“Transportation and Land Use Coordination: Transportation studies and planning to support transit oriented development and neighborhood transportation planning. Local match for San Francisco and regional Transportation for Livable Communities (TLC)/Housing Incentive Program (HIP) grant programs that support transit oriented development and fund related improvements for transit, bicyclists, and pedestrians including streetscape beautification improvements such as landscaping, lighting and street furniture. Includes planning, project development and capital costs. Sponsoring Agencies: DPT, DPW, MUNI, Planning, SFCTA, BART, PCJPB. The first $17.6M is Priority 1 and the remainder is Priority 2. Total Funding: $33.6M; Prop K: $20.0M.”
DPT stands for Department of Parking and Traffic, and MUNI for San Francisco Municipal Railway. DPT and MUNI are now under the San Francisco Municipal Transportation Agency (SFMTA). DPW stands for Department of Public Works, Planning for the Planning Department, SFCTA for the San Francisco County Transportation Authority, BART for Bay Area Rapid Transit, and PCJPB for Peninsula Corridor Joint Powers Board (Caltrain).
Prioritization Criteria
One of the key required elements of the 5YPPs is a transparent process for how projects get selected. Prop K requires at a minimum that each category include prioritization criteria that address project readiness, community support, and relative level of need or urgency. For this 5YPP update, the Citizens Advisory Committee requested that the Transportation Authority and project sponsors develop a user-friendly, transparent scoring table that could apply to all 5YPPs, and that the scoring prioritize safety and community input highly.
2
DRAFT 2014 PROP K 5-YEAR PR IORIT IZATION PROGRAM TRANSPORTATION AND LAND USE
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
Table 3 shows the new Prioritization Criteria and Scoring Table. Each project can receive a maximum of 20 points, with 10 points allocated programwide criteria and 10 points allocated for category specific criteria.
The Expenditure Plan also requires consideration of geographic equity in terms of project distribution that takes into account the various needs of San Francisco’s neighborhoods. The Transportation and Land Use Coordination category is the primary source for planning grants from the Transportation Authority’s Neighborhood Transportation Improvement Program (NTIP), which has been created in response to the San Francisco Transportation Plan’s (SFTP’s) call for addressing equity issues and improving mobility in neighborhoods citywide. Over the 5YPP period, each supervisorial district will have $100,000 in Prop K funds (ideally intended to leverage other funds) to use for district-identified community-based planning needs.
This category also helps to provide local match for various capital and planning grants, such as OneBayArea Grant, Caltrans Planning Grants, and Priority Development Area (PDA) Planning Grants. Given limited Prop K funds in this highly competitive Prop K category, the category-specific prioritization criteria generally give weight to projects with limited or no other opportunities to secure the needed local match, and to projects that benefit Communities of Concern.
Stretching Your Prop K Sales Tax Dollars Farther
Leveraging Prop K funds against non-Prop K fund sources (e.g., federal, state, other local funds) is necessary to fully fund the Expenditure Plan projects and programs. For the Transportation and Land Use Coordination category, the Prop K Expenditure Plan assumes that for every $1 of every dollar of sales tax revenue spent, it would be leveraged by about $0.68 in non-Prop K funds. The table below compares Prop K Expenditure Plan assumptions with proposed leveraging in the 2014 5-year project lists.
Table 1. Prop K Leveraging1
Category Expected Leveraging (Non-Prop K Funds)
Proposed Leveraging (Non-Prop K Funds)
Transportation and Land Use Coordination
40% 80%
1 This table compares the expected leveraging assumed in the Expenditure Plan with the proposed leveraging assumed in the 5-Year Project List.
3
Tab
le 2
. Pro
ject
Del
iver
y Sn
apsh
otT
ran
spor
tati
on/
Lan
d U
se C
oord
inat
ion
Tab
le 2
a. P
rop
K F
un
ds
Allo
cate
d
5-Y
ear
Pri
orit
izat
ion
Pro
gram
(5Y
PP
) P
erio
d
Pro
gram
med
(A
vaila
ble
for
A
lloca
tion
)T
otal
Allo
cate
d a
s of
3/
31/
2014
% A
lloca
ted
2005
5Y
PP
(F
Y 2
004/
05-2
008/
09)
*$2
,467
,000
$1,7
33,0
0570
%20
09 5
YP
P (
FY
200
9/10
-20
13/
14)
*$3
,225
,721
$3,4
12,6
1210
6%T
otal
*$5
,145
,617
Tab
le 2
b. P
erce
nt
Com
ple
teT
able
s sh
ow a
lloca
tions
and
per
cent
com
plet
e th
roug
h M
arch
31,
201
4, b
ased
on
proj
ect s
pons
ors'
prog
ress
rep
orts
.
Com
ple
ted
Pro
ject
s/P
roje
ct P
has
es (s
orte
d by
allo
catio
n ye
ar, t
hen
spon
sor,
then
pro
ject
nam
e)
Spon
sor
Fis
cal Y
ear
of
Allo
cati
onP
roje
ct N
ame
Ph
ase(
s)
Fu
nd
edT
otal
Allo
cate
d a
s of
3/
31/
2014
% C
omp
lete
as o
f 3/
31/
2014
DP
W20
04/0
5B
road
way
Str
eets
cape
Im
prov
emen
ts P
hase
II
Des
ign
$29,
000
100%
DP
W20
04/0
5Sa
n Jo
se/G
uerr
ero
Liv
able
Str
eets
Pla
nP
lann
ing
$8,9
9010
0%B
AR
T20
05/0
624
th S
tree
t Com
mun
ity P
lan
Upd
ate
Pla
nnin
g$2
5,00
010
0%SF
CT
A20
05/0
6L
and
Use
Mod
el A
lloca
tion
Too
lP
lann
ing
$25,
000
100%
SFC
TA
2005
/06
Mis
sion
Sou
th o
f C
have
z P
lan
Pla
nnin
g$5
0,00
010
0%SF
CT
A20
05/0
6St
reet
scap
e M
aste
r P
lan
Pla
nnin
g$9
0,00
010
0%SF
CT
A20
05/0
6T
ende
rloin
/Litt
le S
aigo
n N
eigh
borh
ood
Tra
nspo
rtat
ion
Pla
nP
lann
ing
$40,
000
100%
DP
W20
06/0
7B
road
way
Str
eets
cape
Im
prov
emen
ts P
hase
II
Con
stru
ctio
n$2
31,0
0010
0%D
PW20
06/0
7R
enew
ed V
alen
cia
Stre
etsc
ape
Des
ign
$010
0%SF
CT
A20
06/0
7C
olum
bus
Ave
nue
Rev
italiz
atio
n M
aste
r P
lan
Pla
nnin
g$1
2,00
010
0%D
PW
2007
/08
Bro
adw
ay S
tree
tsca
pe I
mpr
ovem
ents
Pha
se I
IC
onst
ruct
ion
$250
,415
100%
DP
W20
07/0
8L
elan
d A
venu
e St
reet
scap
e Im
prov
emen
tsD
esig
n$5
3,12
010
0%D
PW
2008
/09
Lel
and
Ave
nue
Stre
etsc
ape
Impr
ovem
ents
Con
stru
ctio
n$2
12,4
8010
0%D
PW20
08/0
9R
enew
ed V
alen
cia
Stre
etsc
ape
Con
stru
ctio
n$5
00,0
0010
0%SF
CT
A20
08/0
9B
ayvi
ew H
unte
rs P
t Nei
ghbo
rhoo
d T
rans
port
atio
n P
lan
Pla
nnin
g$1
1,00
010
0%SF
CT
A20
08/0
9C
entr
al F
reew
ay/O
ctav
ia B
oule
vard
Circ
ulat
ion
Stud
yP
lann
ing
$90,
000
100%
SFC
TA
2008
/09
Eas
tern
Nei
ghbo
rhoo
ds T
rave
l Beh
avio
r Su
rvey
- P
hase
2P
lann
ing
$50,
000
100%
* F
unds
pro
gram
med
in th
e 20
09 5
YP
P m
ay in
clud
e pr
ogra
mm
ed b
ut u
nallo
cate
d fu
nds
from
the
2005
5Y
PP
, as
wel
l as
de-o
blig
ated
fun
ds.
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\Pr
ojec
t Del
iver
y\C
hapt
er 3
Pro
ject
Del
iver
y; E
P 4
4Pa
ge 1
of 3
4
Tab
le 2
. Pro
ject
Del
iver
y Sn
apsh
otT
ran
spor
tati
on/
Lan
d U
se C
oord
inat
ion
Com
ple
ted
Pro
ject
s/P
roje
ct P
has
es (s
orte
d by
allo
catio
n ye
ar, t
hen
spon
sor,
then
pro
ject
nam
e)
Spon
sor
Fis
cal Y
ear
of
Allo
cati
onP
roje
ct N
ame
Ph
ase(
s)
Fu
nd
edT
otal
Allo
cate
d a
s of
3/
31/
2014
% C
omp
lete
as o
f 3/
31/
2014
SFC
TA
2008
/09
Ten
derlo
in T
raff
ic C
alm
ing
and
Circ
ulat
ion
Impr
ovem
ents
P
lann
ing
$15,
000
100%
SFC
TA
2008
/09
Wes
tern
SoM
a N
eigh
borh
ood
Tra
nspo
rtat
ion
Pla
nnin
g St
udy
Pla
nnin
g$4
0,00
010
0%D
CP
2010
/11
Ces
ar C
have
z E
ast C
omm
unity
Des
ign
Pla
nP
lann
ing
$22,
729
100%
DP
W20
10/1
1B
road
way
Str
eets
cape
Im
prov
emen
ts P
hase
III
Des
ign
$31,
000
100%
DP
W20
10/1
1F
olso
m S
tree
t Str
eets
cape
Im
prov
emen
tsC
onst
ruct
ion
$604
,235
100%
DP
W20
10/1
1Se
cond
Str
eet S
tree
tsca
pe I
mpr
ovem
ents
Des
ign
$3,2
0010
0%SF
CT
A20
10/1
1B
ayvi
ew H
unte
rs P
oint
Mob
ility
Sol
utio
ns S
tudy
Pla
nnin
g$2
0,00
010
0%SF
CT
A20
10/1
1C
esar
Cha
vez
Eas
t Com
mun
ity D
esig
n P
lan
Pla
nnin
g$0
100%
BA
RT
2011
/12
24th
Str
eet/
Mis
sion
BA
RT
Pla
za a
nd P
edes
tria
n Im
prov
emen
tsD
esig
n$3
03,0
4710
0%D
PW
2011
/12
24th
/ M
issi
on B
AR
T P
laza
Bus
Bul
bC
onst
ruct
ion
$179
,000
100%
SFC
TA
2011
/12
19th
Ave
nue
Tra
nsit
Cor
ridor
Inv
estm
ent S
tudy
Pla
nnin
g$1
01,4
0010
0%
Pro
ject
s/P
roje
ct P
has
es U
nd
erw
ay (s
orte
d by
allo
catio
n ye
ar, t
hen
spon
sor,
then
pro
ject
nam
e)
Spon
sor
Fis
cal Y
ear
of
Allo
cati
onP
roje
ct N
ame
Ph
ase(
s)
Fu
nd
edT
otal
Allo
cate
d a
s of
3/
31/
2014
% C
omp
lete
as o
f 3/
31/
2014
DP
W20
11/1
2B
road
way
Str
eets
cape
Im
prov
emen
ts P
hase
III
Con
stru
ctio
n$2
45,0
005%
DP
W20
11/1
2M
arin
a G
reen
Bic
ycle
Tra
ilC
onst
ruct
ion
$113
,625
99%
SFC
TA
2011
/12
Bal
boa
Par
k St
atio
n A
rea
Circ
ulat
ion
Stud
yP
lann
ing
$65,
600
70%
BA
RT
2012
/13
24th
Str
eet M
issi
on B
AR
T S
W P
laza
and
Ped
estr
ian
Impr
ovem
ents
Con
stru
ctio
n$1
7,20
398
%D
PW
2012
/13
24th
St-
Mis
sion
BA
RT
Sid
ewal
k, C
urb,
and
Lan
dsca
ping
Con
stru
ctio
n$2
8,00
098
%D
PW
2012
/13
Bro
adw
ay S
tree
tsca
pe I
mpr
ovem
ents
Pha
se I
IIC
onst
ruct
ion
$150
,000
97%
DP
W20
13/1
4E
R T
aylo
r E
lem
enta
ry S
choo
l - S
afe
Rou
tes
to S
choo
lD
esig
n$1
9,26
90%
DP
W20
13/1
4E
R T
aylo
r E
lem
enta
ry S
choo
l - S
afe
Rou
tes
to S
choo
lE
nviro
nmen
tal
$915
0%D
PW
2013
/14
Lon
gfel
low
Ele
men
tary
Sch
ool -
Saf
e R
oute
s to
Sch
ool
Env
ironm
enta
l$9
150%
DP
W20
13/1
4L
ongf
ello
w S
choo
l - S
afe
Rou
tes
to S
choo
lD
esig
n$2
4,06
60%
SFC
TA
2013
/14
Bal
boa
Par
k St
atio
n A
rea
Cir
cula
tion
Stud
y -
Am
endm
ent
Pla
nnin
g$5
9,40
025
%SF
CT
A20
13/1
4B
road
way
Chi
nato
wn
Nei
ghbo
rhoo
d T
rans
port
atio
n P
lan
Pla
nnin
g, C
onst
r u$2
09,1
7415
%SF
MT
A20
13/1
4M
arke
t and
Hai
ght S
tree
t Tra
nsit
and
Ped
estr
ian
Impr
ovem
ents
Con
stru
ctio
n$2
09,0
000%
SFM
TA
2013
/14
Man
sell
Cor
ridor
Im
prov
emen
t Pro
ject
Des
ign
$330
,840
0%SF
CT
A20
13/1
4C
entr
al S
ubw
ay P
hase
3 -
Initi
al S
tudy
Pla
nnin
g$9
8,08
70%
DP
T20
13/1
419
th A
venu
e/M
-Oce
an V
iew
Pla
nnin
g$3
06,0
000%
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\Pr
ojec
t Del
iver
y\C
hapt
er 3
Pro
ject
Del
iver
y; E
P 4
4Pa
ge 2
of 3
5
Tab
le 2
. Pro
ject
Del
iver
y Sn
apsh
otT
ran
spor
tati
on/
Lan
d U
se C
oord
inat
ion
Pro
ject
s/P
roje
ct P
has
es U
nd
erw
ay (s
orte
d by
allo
catio
n ye
ar, t
hen
spon
sor,
then
pro
ject
nam
e)
Spon
sor
Fis
cal Y
ear
of
Allo
cati
onP
roje
ct N
ame
Ph
ase(
s)
Fu
nd
edT
otal
Allo
cate
d a
s of
3/
31/
2014
% C
omp
lete
as o
f 3/
31/
2014
DP
W20
13/1
42n
d St
reet
Im
prov
emen
tE
nviro
nmen
tal
$2,2
990%
DP
W20
13/1
42n
d St
reet
Im
prov
emen
tD
esig
n$1
70,5
430%
MU
NI
2013
/14
Cen
tral
Sub
way
Pha
se 3
- I
nitia
l Stu
dyP
lann
ing
$75,
125
0%P
CJP
B20
13/1
4C
altr
ain
Nor
th T
erm
inal
Stu
dyP
lann
ing
$22,
940
0%
For
mor
e in
form
atio
n on
Pro
p K
and
oth
er T
rans
port
atio
n A
utho
rity
fun
ded
proj
ects
, vis
it ht
tp:/
/ww
w.s
fcta
.org
/mys
tree
tsf-
proj
ects
-map
to a
cces
s an
in
tera
ctiv
e m
ap s
how
ing
proj
ects
in y
our
neig
hbor
hood
and
city
wid
e.
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\Pr
ojec
t Del
iver
y\C
hapt
er 3
Pro
ject
Del
iver
y; E
P 4
4Pa
ge 3
of 3
6
Tab
le 3
- P
rior
itiz
atio
n C
rite
ria
and
Sco
rin
g T
able
Tra
nsp
orta
tion
/L
and
Use
Coo
rdin
atio
n (
EP
44)
Pro
ject
Rea
din
ess
Com
mu
nit
y Su
pp
ort
Tim
e Se
nsi
tive
U
rgen
cySa
fety
Lim
ited
Loc
al
Mat
ch
Op
tion
s
Ben
efit
s C
omm
un
ity
of
Con
cern
Geo
grap
hic
E
qu
ity
Tot
al
On
e B
ay A
rea
Gra
nt
(OB
AG
) M
atch
T
otal
Pos
sib
le S
core
43
34
33
20
Broa
dway
Stre
etsc
ape
Impr
ovem
ent P
hase
IV4
33
41
318
Long
fello
w E
lemen
tary
Sch
ool S
afe
Rout
es
to S
choo
l4
23
31
013
ER
Taylo
r Elem
enta
ry S
choo
l Saf
e Ro
utes
to
Scho
ol4
23
31
013
Man
sell
Corr
idor
Impr
ovem
ent
43
33
22
17Se
cond
Stre
et S
treet
scap
e Im
prov
emen
t4
23
41
317
OBA
G M
atch
(Cyc
le 2)
Pers
ia Tr
iangl
e Im
prov
emen
ts4
33
30
013
Nei
ghb
orh
ood
Tra
nsp
orta
tion
Pla
nn
ing/
Cor
rid
or P
lan
nin
gT
otal
Pos
sib
le S
core
43
34
33
20N
eighb
orho
od T
rans
porta
tion
Impr
ovem
ent
Prog
ram
(NTI
P) P
lanni
ngLo
mba
rd S
treet
Ped
estri
an a
nd T
rans
it Tr
eatm
ents
[NTI
P]4
22
31
315
Wes
tern
Add
ition
Com
mun
ity B
ased
Tr
ansp
orta
tion
Plan
[NTI
P]4
22
42
317
Plan
ning
Gra
nt M
atch
(e.g
. Calt
rans
Plan
ning
G
rant
s)M
TC
Pri
orit
y D
evel
opm
ent
Are
as P
lan
nin
g M
atch
Tot
al P
ossi
ble
Sco
re4
33
33
22
20
Prio
rity
Dev
elopm
ent A
rea
Plan
ning
Mat
ch
PR
OP
K P
RO
GR
AM
-WID
E C
RIT
ER
I AC
AT
EG
OR
Y-S
PE
CIF
IC C
RIT
ER
IA
Loca
tions
will
be
scor
ed a
t the
tim
e of
allo
catio
n. S
ee te
xt a
nd P
rojec
t Inf
orm
atio
n Fo
rm fo
r mor
e de
tails
.
Loca
tions
will
be
scor
ed a
t the
tim
e of
allo
catio
n. S
ee te
xt a
nd P
rojec
t Inf
orm
atio
n Fo
rm fo
r mor
e de
tails
.
Loca
tions
will
be
scor
ed a
t the
tim
e of
allo
catio
n. S
ee te
xt a
nd P
rojec
t Inf
orm
atio
n Fo
rm fo
r mor
e de
tails
.
Loca
tions
will
be
scor
ed a
t the
tim
e of
allo
catio
n. S
ee te
xt a
nd P
rojec
t Inf
orm
atio
n Fo
rm fo
r mor
e de
tails
.
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
3 Pr
iori
tizat
ion\
EP44
Pri
oriti
zatio
nPa
ge 1
of 2
7
Tab
le 3
- P
rior
itiz
atio
n C
rite
ria
and
Sco
rin
g T
able
Tra
nsp
orta
tion
/L
and
Use
Coo
rdin
atio
n (
EP
44)
Pri
orit
izat
ion
Cri
teri
a D
efin
itio
ns:
Safe
ty: O
ne p
oint
for e
ach:
Add
ress
es d
emon
stra
ted
safe
ty is
sue;
redu
ces p
oten
tial c
onfli
cts b
etw
een
mod
es; b
enef
its u
sers
of m
ultip
le m
odes
; and
incr
ease
s sec
urity
.
Ben
efit
s a
Com
mu
nit
y of
Con
cern
(C
oC):
Pro
ject i
s loc
ated
with
in a
CoC
as d
efin
ed b
y M
TC (o
ne p
oint
); w
ill d
irect
ly be
nefit
the
iden
tified
nee
ds o
f a C
oC (t
wo
poin
ts) o
r w
ill g
ener
ally
bene
fit th
e ne
eds o
f a C
oC (o
ne p
oint
). Fo
r mor
e de
tail
on C
oCs,
visit
MTC
's in
tera
ctiv
e Co
C m
ap p
age
at h
ttp:/
/bit.
ly/Sz
gKX
G.
Pro
ject
Rea
din
ess:
Pro
ject l
ikely
to n
eed
fund
ing
in fi
scal
year
pro
pose
d. F
acto
rs to
be
cons
ider
ed in
clude
ade
quac
y of
scop
e, sc
hedu
le, b
udge
t and
fund
ing
plan
relat
ive
to c
urre
nt p
rojec
t sta
tus (
e.g.
expe
ct m
ore
deta
il an
d ce
rtain
ty fo
r a p
rojec
t abo
ut to
ent
er c
onst
ruct
ion
than
des
ign)
; whe
ther
prio
r pro
ject p
hase
s are
com
plet
ed o
r exp
ecte
d to
be
com
plet
ed b
efor
e be
ginn
ing
the
next
pha
se; a
nd
whe
ther
litig
atio
n, c
omm
unity
opp
ositi
on o
r oth
er fa
ctor
s may
sign
ifica
ntly
delay
pro
ject.
Com
mu
nit
y Su
pp
ort:
Pro
ject h
as c
lear a
nd d
iver
se c
omm
unity
supp
ort a
nd/o
r was
it id
entif
ied th
roug
h a
com
mun
ity-b
ased
plan
ning
pro
cess
. An
exam
ple
of a
com
mun
ity-b
ased
plan
is a
ne
ighb
orho
od tr
ansp
orta
tion
plan
, but
not
a c
ount
ywid
e pl
an o
r age
ncy
capi
tal i
mpr
ovem
ent p
rogr
am.
Thre
e po
ints
for a
pro
ject i
n an
ado
pted
com
mun
ity b
ased
plan
with
evi
denc
e of
div
erse
com
mun
ity su
ppor
t.Tw
o po
ints
for a
pro
ject w
ith e
vide
nce
of su
ppor
t fro
m b
oth
neig
hbor
hood
stak
ehol
ders
and
gro
ups a
nd c
ityw
ide
grou
ps.
One
poi
nt fo
r a p
rojec
t with
evi
denc
e of
supp
ort f
rom
eith
er n
eighb
orho
od st
akeh
olde
rs a
nd g
roup
s or c
ityw
ide
grou
ps.
Tim
e Se
nsi
tive
Urg
ency
: Pro
ject n
eeds
to p
roce
ed in
pro
pose
d tim
efra
me
to e
nabl
e co
nstru
ctio
n co
ordi
natio
n w
ith a
noth
er p
rojec
t (e.g
., m
inim
ize
cost
s and
con
stru
ctio
n im
pact
s); t
o su
ppor
t ano
ther
fu
nded
or p
ropo
sed
proj
ect (
e.g. n
ew si
gnal
cont
rolle
rs n
eed
to b
e in
stall
ed to
supp
ort T
EP
impl
emen
tatio
n); o
r to
mee
t tim
ely u
se o
f fun
ds d
eadl
ines
ass
ociat
ed w
ith m
atch
ing
fund
s.
Lim
ited
Loc
al M
atch
Op
tion
s: P
rojec
t has
no
or li
mite
d ot
her o
ptio
ns (i
nclu
ding
oth
er P
rop
K c
ateg
ories
and
non
-Pro
p K
fund
s) to
pro
vide
mat
ch to
an
exte
rnal
gran
t.
Geo
grap
hic
Eq
uit
y: P
oint
s will
be
give
n to
add
ress
geo
grap
hic
equi
ty.
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
3 Pr
iori
tizat
ion\
EP44
Pri
oriti
zatio
nPa
ge 2
of 2
8
2014
/15
2015
/16
2016
/17
2017
/18
2018
/19
DP
WB
road
way
Str
eets
cape
Im
prov
emen
t Pha
se I
V
CO
N
Pla
nned
$701
,886
$701
,886
DP
WL
ongf
ello
w E
lem
enta
ry S
choo
l Saf
e R
oute
s to
Sc
hool
C
ON
P
lann
ed$6
1,86
5$6
1,86
5
DP
WE
R T
aylo
r E
lem
enta
ry S
choo
l Saf
e R
oute
s to
Sc
hool
CO
N
Pla
nned
$47,
140
$47,
140
SFM
TA
Man
sell
Cor
ridor
Im
prov
emen
t C
ON
P
lann
ed$5
58,0
63$5
58,0
63
DP
WSe
cond
Str
eet S
tree
tsca
pe I
mpr
ovem
ent
CO
N
Pla
nned
$1,4
39,5
84$1
,439
,584
Any
Elig
ible
OB
AG
Loc
al M
atch
(Cyc
le 2
)A
nyP
lann
ed$1
,250
,000
$1,2
50,0
00
SFM
TA
Per
sia
Tria
ngle
Tra
nsit
Impr
ovem
ents
CO
N
Pla
nned
$200
,685
$200
,685
Nei
ghbo
rhoo
d T
rans
port
atio
n Im
prov
emen
t Pla
nnin
g (N
TIP
)/C
orrid
or P
lann
ing
Any
Elig
ible
Lom
bard
Str
eet T
rans
it an
d P
edes
tria
n T
reat
men
ts [N
TIP
] P
LA
N/C
ER
P
lann
ed$1
00,0
00$1
00,0
00
Any
Elig
ible
Wes
tern
Add
ition
Com
mun
ity B
ased
T
rans
port
atio
n P
lan
(NT
IP)
PL
AN
/CE
R
Pla
nned
$240
,000
$240
,000
Any
Elig
ible
NT
IP P
lann
ing
PL
AN
/CE
R
Pla
nned
$300
,000
$300
,000
Any
Elig
ible
NT
IP P
lann
ing
PL
AN
/CE
R
Pla
nned
$600
,000
$600
,000
SFM
TA
/SF
CT
AN
TIP
Pre
-Dev
elo p
men
t/P
rogr
am S
uppo
rtP
LA
N/C
ER
P
lann
ed$1
50,0
00$1
50,0
00
SFM
TA
/SF
CT
AN
TIP
Pre
-Dev
elo p
men
t/P
rogr
am S
uppo
rtP
LA
N/C
ER
P
lann
ed$1
50,0
00$1
50,0
00
SFM
TA
/SF
CT
AN
TIP
Pre
-Dev
elo p
men
t/P
rogr
am S
uppo
rtP
LA
N/C
ER
P
lann
ed$1
50,0
00$1
50,0
00
SFM
TA
/SF
CT
AN
TIP
Pre
-Dev
elo p
men
t/P
rogr
am S
uppo
rtP
LA
N/C
ER
P
lann
ed$1
00,0
00$1
00,0
00
SFM
TA
/SF
CT
AN
TIP
Pre
-Dev
elo p
men
t/P
rogr
am S
uppo
rtP
LA
N/C
ER
P
lann
ed$1
00,0
00$1
00,0
00
Any
Elig
ible
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
P
lann
ed$1
50,0
00$1
50,0
00
Any
Elig
ible
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
P
lann
ed$1
50,0
00$1
50,0
00
Any
Elig
ible
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
P
lann
ed$1
50,0
00$1
50,0
00
Any
Elig
ible
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
P
lann
ed$1
50,0
00$1
50,0
00
Any
Elig
ible
Prio
rity
Dev
elop
men
t Are
a P
lann
ing
Mat
chP
LA
N/C
ER
P
lann
ed$4
00,0
00$4
00,0
00
Any
Elig
ible
Prio
rity
Dev
elop
men
t Are
a P
lann
ing
Mat
chP
LA
N/C
ER
P
lann
ed$1
00,0
00$1
00,0
00
Reg
iona
l Prio
rity
Are
as P
lann
ing
Mat
ch
One
Bay
Are
a G
rant
(OB
AG
) Mat
ch
Stat
usF
isca
l Yea
rT
otal
Age
ncy
Pro
ject
Nam
eP
hase
Tra
nsp
orta
tion
/L
and
Use
Coo
rdin
atio
n (
EP
44)
Pro
gram
min
g
Tab
le 4
- D
raft
Pro
p K
5-Y
ear
Pro
ject
Lis
t (F
Y 2
014/
15 -
201
8/19
)
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
1 Pr
ojec
t Lis
t\EP
44
Proj
ect L
ist
Tab
: 06.
20.1
4Pa
ge 1
of 4
9
2014
/15
2015
/16
2016
/17
2017
/18
2018
/19
Stat
usF
isca
l Yea
rT
otal
Age
ncy
Pro
ject
Nam
eP
hase
$2,3
59,6
39
$2,3
39,5
84
$1,9
50,0
00
$250
,000
$3
50,0
00
$7,2
49,2
23
$1,9
51,1
53
$522
,500
$5
46,0
13
$570
,583
$5
96,2
59
$4,1
86,5
08
($40
8,48
6)($
2,22
5,57
0)($
3,62
9,55
7)($
3,30
8,97
4)($
3,06
2,71
5)($
3,06
2,71
5)
Tot
al P
rogr
amm
ed in
201
3 St
rate
gic
Pla
n B
asel
ine
Cu
mu
lati
ve R
emai
nin
g P
rogr
amm
ing
Cap
acit
y
Tot
al P
rogr
amm
ed in
5Y
PP
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
1 Pr
ojec
t Lis
t\EP
44
Proj
ect L
ist
Tab
: 06.
20.1
4Pa
ge 2
of 4
10
2014
/15
2015
/16
2016
/17
2017
/18
2018
/19
2019
/20
One
Bay
Are
a G
rant
(OB
AG
) Mat
ch
Bro
adw
ay S
tree
tsca
pe I
mpr
ovem
ent P
hase
IV
C
ON
$3
50,9
43$3
50,9
43$7
01,8
86
Lon
gfel
low
Ele
men
tary
Sch
ool S
afe
Rou
tes
to
Scho
ol
CO
N
$61,
865
$61,
865
ER
Tay
lor
Ele
men
tary
Sch
ool S
afe
Rou
tes
to
Scho
olC
ON
$4
7,14
0$4
7,14
0
Man
sell
Cor
ridor
Im
prov
emen
t C
ON
$0
$558
,063
$558
,063
Seco
nd S
tree
t Str
eets
cape
Im
prov
emen
t C
ON
$7
19,7
92$7
19,7
92$1
,439
,584
OB
AG
Loc
al M
atch
(Cyc
le 2
)A
ny$2
50,0
00$5
00,0
00$5
00,0
00$1
,250
,000
Per
sia
Tria
ngle
Tra
nsit
Impr
ovem
ents
CO
N
$200
,685
$200
,685
Pla
nnin
g (N
TIP
)/C
orrid
or P
lann
ing
Lom
bard
Str
eet T
rans
it an
d P
edes
tria
n T
reat
men
ts [N
TIP
] P
LA
N/C
ER
$1
00,0
00$1
00,0
00
Wes
tern
Add
ition
Com
mun
ity B
ased
T
rans
port
atio
n P
lan
(NT
IP)
PL
AN
/CE
R
$120
,000
$120
,000
$240
,000
NT
IP P
lann
ing
PL
AN
/CE
R
$300
,000
$300
,000
NT
IP P
lann
ing
PL
AN
/CE
R
$600
,000
$600
,000
NT
IP P
re-D
evel
opm
ent/
Pro
gram
Sup
port
PL
AN
/CE
R
$150
,000
$150
,000
NT
IP P
re-D
evel
opm
ent/
Pro
gram
Sup
port
PL
AN
/CE
R
$150
,000
$150
,000
NT
IP P
re-D
evel
opm
ent/
Pro
gram
Sup
port
PL
AN
/CE
R
$150
,000
$150
,000
NT
IP P
re-D
evel
opm
ent/
Pro
gram
Sup
port
PL
AN
/CE
R
$100
,000
$100
,000
NT
IP P
re-D
evel
opm
ent/
Pro
gram
Sup
port
PL
AN
/CE
R
$100
,000
$100
,000
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
$1
50,0
00$1
50,0
00
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
$1
50,0
00$1
50,0
00
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
$1
50,0
00$1
50,0
00
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)P
LA
N/C
ER
$1
50,0
00$1
50,0
00
Re g
iona
l Prio
rity
Are
as P
lann
ing
Mat
ch
Prio
rity
Dev
elop
men
t Are
a P
lann
ing
Mat
chP
LA
N/C
ER
$2
00,0
00$2
00,0
00$4
00,0
00
Prio
rity
Dev
elop
men
t Are
a P
lann
ing
Mat
chP
LA
N/C
ER
$5
0,00
0$5
0,00
0$1
00,0
00
Fis
cal Y
ear
Tot
al
Tra
nsp
orta
tion
/L
and
Use
Coo
rdin
atio
n (
EP
44)
Cas
h F
low
Pro
ject
Nam
eP
hase
Tab
le 4
- D
raft
Pro
p K
5-Y
ear
Pro
ject
Lis
t (F
Y 2
014/
15 -
201
8/19
)
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
1 Pr
ojec
t Lis
t\EP
44
Proj
ect L
ist
Tab
: 06.
20.1
4Pa
ge 3
of 4
11
2014
/15
2015
/16
2016
/17
2017
/18
2018
/19
2019
/20
Fis
cal Y
ear
Tot
alP
roje
ct N
ame
Pha
se
$1,3
30,6
33
$2,6
48,7
98
$1,4
69,7
92
$950
,000
$8
00,0
00
$50,
000
$7,2
49,2
23
$1,1
40,0
00
$522
,500
$5
46,0
13
$570
,583
$5
96,2
59
$623
,091
$7
,560
,590
($
190,
633)
($2,
316,
931)
($3,
240,
710)
($3,
620,
127)
($3,
823,
868)
($3,
250,
777)
$311
,367
Tot
al C
ash
Flo
w in
5Y
PP
Tot
al C
ash
Flo
w in
201
3 St
rate
gic
Pla
n B
asel
ine
Cu
mu
lati
ve R
emai
nin
g C
ash
Flo
w C
apac
ity
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
1 Pr
ojec
t Lis
t\EP
44
Proj
ect L
ist
Tab
: 06.
20.1
4Pa
ge 4
of 4
12
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:
Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%) 100% In-house 2 2012/13 4 2012/13
Environmental Studies (PA&ED) 90% In-house 4 2012/13 4 2013/14
Design Engineering (PS&E) 20% In-house 3 2013/14 2 2014/15
R/W Activities/Acquisition
Advertise Construction 2 2014/15 4 2014/2015
Start Construction (i.e. Award Contract) 0% Both 4 2014/15
End Construction (i.e. Open for Use) 3 2015/16
Start Procurement (e.g. rolling stock)
Project Close-out 3 2016/17
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
Project Information
38
ii. Transportation/Land Use Coordination
b. Transportation/Land Use Coordination
Broadway between Columbus Avenue and the Broadway Tunnel
Broadway Streetscape Improvement Phase IV
Comments/Concerns
3
In partnership with the Chinatown Community Development Center, the Planning Department, DPW, and SFMTA conducted an extensive outreach to better understand the needs and concerns of local residents, including four community meetings with translation. For more information on the public outreach and conceptual design stage of the project, please visit the Planning Department's Chinatown Broadway Street design page <http://www.sf-planning.org/index.aspx?page=2646>. This project is consistent with the Chinatown Area Plan, Objective 7 and Policy 7.1.
Department of Public Works
John Dennis
(415) 558-4495
This is a cycle 1 OneBayArea Grant (OBAG) project. The overall project includes calming traffic by narrowing the roadway and travel lanes; improving pedestrian crossings with bulb-outs, raised crosswalks, and special paving; improving transit access with new bus bulbs and enhanced bus stops; landscaping the existing sidewalk, new medians, and the Wayne Place; installing bike sharrows; and adding new benches and street lights. The San Francisco Municipal Transportation Agency (SFMTA) is also implementing the Jean Parker Elementary School Safe Routes to School project as part of this project. More detail can be found on Department of Public Works' (DPW's) project page <http://sfdpw.org/index.aspx?page=1753>.
Broadway in Chinatown is one of the most recognizable districts in the city. With neighborhood-serving retail, schools, large-scale housing developments, and distinct historic character, great volumes of people travel to and through daily. This project aims to provide a safer and more pleasant walking experience, with new paving, streetlights, street trees, and street furnishings inspired by the unique history of the neighborhood.
Start Date End Date
Categorically Exempt
CEQA completed; NEPA underway
CEQA 3/29/13; NEPA anticipated 6/30/14
Environmental Clearance
Page 1 of 2
13
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
-$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
30,0
00$
30,0
00$
Des
ign
Eng
inee
ring
(PS&
E)
880,
851
$
5,68
6$
87
5,16
5$
R/W
-$
Con
stru
ctio
n6,
191,
635
$
701,
886
$
5,
489,
749
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
7,10
2,48
6$
70
7,57
2$
6,39
4,91
4$
Per
cen
t of
Tot
al10
%90
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Env
ironm
enta
l Stu
dies
(PA
&E
D)
OB
AG
Allo
cate
d13
/14
27,6
00$
2,40
0$
30
,000
$
Des
ign
Eng
inee
ring
(PS&
E)
OB
AG
Allo
cate
d13
/14
160,
072
$
13,9
19$
173,
991
$
Des
ign
Eng
inee
ring
(PS&
E)
Pro
p A
AA
lloca
ted
13/1
460
0,00
0$
50
,000
$
65
0,00
0$
Des
ign
Eng
inee
ring
(PS&
E)
Stat
e SR
2SA
lloca
ted
13/1
451
,174
$
51
,174
$
Des
ign
Eng
inee
ring
(PS&
E)
Pro
p K
EP
38
Allo
cate
d13
/14
5,68
6$
5,
686
$
Con
stru
ctio
nO
BA
GP
rogr
amm
ed14
/15
2,55
8,27
3$
2,
558,
273
$
5,11
6,54
5$
Con
stru
ctio
nP
rop
K E
P 4
4P
lann
ed14
/15
350,
943
$
35
0,94
3$
701,
886
$
Con
stru
ctio
nSt
ate
SR2S
Allo
cate
d14
/15
335,
884
$
33
5,88
4$
Con
stru
ctio
nP
rop
K E
P 3
8A
lloca
ted
13/1
437
,320
$
37
,320
$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r84
4,53
2$
3,
348,
739
$
2,90
9,21
6$
-
$
-
$
-
$
7,
102,
486
$
Com
men
ts/
Con
cern
s
Fun
ding
pla
n is
bas
ed o
n F
Y 2
013/
14 a
lloca
tion
of f
unds
for
des
ign
phas
e.T
he S
tate
Saf
e R
oute
s to
Sch
ool (
SR2S
) Gra
nt a
mou
nt is
for
the
capi
tal p
roje
ct o
nly,
not
incl
udin
g no
n-in
fras
truc
ture
ele
men
ts.
Bro
adw
ay S
tree
tsca
pe I
mpr
ovem
ent P
hase
IV
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
14
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:
Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%) 100% In-house 2 2012/13 3 2012/13
Environmental Studies (PA&ED) 65% In-house 3 2013/14 4 2013/14
Design Engineering (PS&E) 35% In-house 3 2013/14 2 2014/15
R/W Activities/Acquisition
Advertise Construction 2 2014/15 3 2014/15
Start Construction (i.e. Award Contract) 0% Both 4 2014/15
End Construction (i.e. Open for Use) 1 2015/16
Start Procurement (e.g. rolling stock)
Project Close-out 1 2016/17
Comments/Concerns
11
A recommendation for bulb-outs was made as a result of a Longfellow Elementary School Walking Audit in May 2010. The community strongly supports the bulb-outs. Project staff will periodically update the school staff and immediate neighborhood residents and businesses on the project schedule.
Department of Public Works
Kenneth Spielman
(415) 558-4519
This project includes 6 new pedestrian bulb-outs at the intersections of Mission and Whittier Streets, Mission Street and Whipple Avenue, and Mission and Lowell Streets, rectangular rapid flashing beacons at the intersection of Mission Street and Whipple Avenue, and landscaping (if feasible) near Longfellow Elementary School. This is an OBAG cycle 1 project with Prop K funds proposed for local match.
Bulb-outs will create shorter pedestrian crossings, improve sight distance by increasing visibility of pedestrians waiting to cross, and help prevent speeding turns. Of Longfellow Elementary School's 600 students, roughly 35 percent walk to school. Situated just south of Mission Street, the school is located in a Community of Concern and in close proximity to affordable housing. The school and surrounding area are accessible by several Muni routes, which are all part of the Mission Street MUNI Rapid Network and connect to BART. Many students and adults using transit to enter and exit the area access that transit on foot and will benefit from pedestrian safety improvements.
Start Date End Date
Categorically Exempt
Underway
06/30/14
Environmental Clearance
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
Project Information
ii. Transportation/Land Use Coordination
b. Transportation/Land Use Coordination
Mission Street between Lowell and Whittier Streets
Longfellow Elementary School Safe Routes to School
Page 1 of 2
15
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
17,4
83$
17,4
83$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
8,62
7$
91
5$
7,71
2$
Des
ign
Eng
inee
ring
(PS&
E)
209,
166
$
24,0
66$
18
5,10
0$
R/W
-$
Con
stru
ctio
n53
9,36
0$
61
,865
$
477,
495
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
774,
636
$
86,8
46$
68
7,79
0$
Per
cen
t of
Tot
al11
%89
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
SFM
TA
Ope
ratin
gA
lloca
ted
09/1
017
,483
$
17
,483
$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
Pro
p K
Allo
cate
d13
/14
915
$
91
5$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
OB
AG
Allo
cate
d13
/14
7,71
2$
7,
712
$
Des
ign
Eng
inee
ring
(PS&
E)
Pro
p K
Allo
cate
d13
/14
13,7
52$
10,3
14$
24,0
66$
Des
ign
Eng
inee
ring
(PS&
E)
OB
AG
Allo
cate
d13
/14
105,
507
$
79,5
93$
185,
100
$
Con
stru
ctio
nP
rop
KP
lann
ed14
/15
61,8
65$
61,8
65$
Con
stru
ctio
nO
BA
GP
lann
ed14
/15
477,
495
$
47
7,49
5$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r14
5,36
9$
62
9,26
7$
-$
-
$
-
$
-
$
77
4,63
6$
Com
men
ts/
Con
cern
s
Fun
ding
pla
n is
bas
ed o
n F
Y 2
013/
14 a
lloca
tion
of f
unds
for
des
ign
phas
e.
Lon
gfel
low
Ele
men
tary
Sch
ool S
afe
Rou
tes
to S
choo
l
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
16
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:
Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%) 100% In-house 2 2012/13 3 2012/13
Environmental Studies (PA&ED) 65% In-house 3 2013/14 4 2013/14
Design Engineering (PS&E) 35% In-house 3 2013/14 2 2014/15
R/W Activities/Acquisition
Advertise Construction 2 2014/15 3 2014/15
Start Construction (i.e. Award Contract) 0% Both 4 2014/15
End Construction (i.e. Open for Use) 1 2015/16
Start Procurement (e.g. rolling stock)
Project Close-out 1 2016/17
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
Project Information
ii. Transportation/Land Use Coordination
b. Transportation/Land Use Coordination
Bacon and Goettingen Streets
ER Taylor Elementary School Safe Routes to School
Comments/Concerns
11
A recommendation for bulb-outs was made as a result of a ER Taylor Elementary School Walking Audit in January 2011. Project staff has also spoken to the residents immediately adjacent to the intersection on the phone, and met with school principal and staff as well as the manager of the adjacent library. The community strongly supports the bulb-outs. Project staff will periodically update the school staff and immediate neighborhood residents and businesses on the project schedule.
Department of Public Works
Kenneth Spielman
(415) 558-4519
The scope includes 8 new pedestrian bulb outs at the intersection of Bacon and Goettingen Streets. This is an OneBayArea Grant (OBAG) funded project with Prop K funds proposed for local match.
Bulb-outs will create shorter pedestrian crossings, improve sight distance by increasing visibility of pedestrians waiting to cross, and help prevent speeding turns. Of ER Taylor Elementary School's 600 students, roughly 30 percent walk to school. The intersection of Bacon and Goettingen Streets is a busy vehicular intersection with a high number of student-age pedestrians. This project will improve the safety of students and other pedestrians within the area.
Start Date End Date
Categorically Exempt
Underway
06/30/14
Environmental Clearance
Page 1 of 2
17
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
17,6
18$
17,6
18$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
8,70
4$
91
5$
7,78
9$
Des
ign
Eng
inee
ring
(PS&
E)
167,
266
$
19,2
69$
14
7,99
7$
R/W
-$
Con
stru
ctio
n41
0,98
5$
47
,140
$
363,
845
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
604,
573
$
67,3
24$
53
7,24
9$
Per
cen
t of
Tot
al11
%89
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
SFM
TA
Ope
ratin
gA
lloca
ted
09/1
017
,618
$
17
,618
$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
Pro
p K
Allo
cate
d13
/14
915
$
91
5$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
OB
AG
Allo
cate
d13
/14
7,78
9$
7,
789
$
Des
ign
Eng
inee
ring
(PS&
E)
Pro
p K
Allo
cate
d13
/14
11,0
11$
8,25
8$
19
,269
$
Des
ign
Eng
inee
ring
(PS&
E)
OB
AG
Allo
cate
d13
/14
84,3
58$
63,6
39$
147,
997
$
Con
stru
ctio
nP
rop
KP
lann
ed14
/15
47,1
40$
47,1
40$
Con
stru
ctio
nO
BA
GP
lann
ed14
/15
363,
845
$
36
3,84
5$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r12
1,69
1$
482,
882
$
-
$
-$
-$
-$
604,
573
$
Com
men
ts/
Con
cern
s
Fun
ding
pla
n is
bas
ed o
n F
Y 2
013/
14 a
lloca
tion
of f
unds
for
des
ign
phas
e.
ER
Tay
lor
Ele
men
tary
Sch
ool S
afe
Rou
tes
to S
choo
l
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
18
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering 100% In-house 3 2012/13 4 2012/13
Environmental Studies (PA&ED) 50% In-house 4 2012/13 2 2014/15
Design Engineering (PS&E) 0% In-house 4 2013/14 3 2014/15
R/W Activities/Acquisition
Advertise Construction 3 2014/15 4 2014/15
Start Construction (i.e. Award Contract) 0% Both 1 2015/16
End Construction (i.e. Open for Use) 1 2016/17
Start Procurement (e.g. rolling stock)
Project Close-out 2 2017/18
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
Project Information
ii. Transportation/Land Use Coordination
b. Transportation/Land Use Coordination
Mansell Street in McLaren Park between Visitacion Avenue and Sunnydale Avenue
Mansell Corridor Improvement
Comments/Concerns
9, 10, 11
This project reflects the community's concerns and needs as identified through RPD's 2010 McLaren Park Needs Assessment workshops and refined through additional outreach, including a site walk and community meetings in 2013.
San Francisco Municipal Transportation Agency (SFMTA)
John Dennis (DPW)
(415) 558-4495
In partnership with the Recreation and Parks Department (RPD) and Department of Public Works (DPW), SFMTA will implement the following elements as Phase 1 of this OneBayArea Grant (OBAG) complete streets project:- reduction of the number of vehicular lanes from four to two (one lane each way);- separation of vehicular traffic to the south side of the median between Visitacion and Brazil;- a multiuse path on the north side of the median; - sidewalks along the south side of Mansell from Visitacion/Mansell to Persia/Sunnydale;- class II and III bicycle facilities between Brazil and Dublin;- raised crosswalks and flashing beacons at all unimproved intersections; - a corner bulb-out at Mansell/Sunnydale; and- street-level lighting and site furnishings.Phase 2 elements, e.g. trees, landscape, and public art, will be included in the construction contract bid documents as alternates and will be implemented concurrently with Phase 1 if additional funding gets secured. For more information, visit DPW's project page <http://sfdpw.org/index.aspx?page=1789>.
Mansell Street is a divided highway in the middle of McLaren Park, the largest park in southeastern San Francisco. The park serves as both a regional and neighborhood recreation facility for this area, especially for many low income communities. Primarily designed for auto traffic, existing facilities do not support multi-modal travel or foster community vitality. This project will improve safety and access of residents, commuters, and park users to and through the park and encourage walking and biking.
Start Date End Date
Categorically Exempt
Underway
09/30/14
Environmental Clearance
Page 1 of 2
19
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
311,
471
$
172,
724
$
13
8,74
7$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
88,8
24$
88,2
59$
56
5$
Des
ign
Eng
inee
ring
(PS&
E)
743,
693
$
330,
840
$
41
2,85
3$
R/W
-$
Con
stru
ctio
n4,
531,
048
$
558,
063
$
3,
972,
985
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
5,67
5,03
6$
1,14
9,88
6$
4,
525,
150
$
Per
cen
t of
Tot
al20
%80
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
EP
39
Allo
cate
d12
/13
53,6
12$
53,6
12$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
EP
40
Allo
cate
d12
/13
119,
112
$
119,
112
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
RP
D in
-kin
d an
d op
erat
ing
Allo
cate
d12
/13
138,
747
$
138,
747
$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
Pro
p K
EP
39
Allo
cate
d13
/14
44,1
29$
44,1
29$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
Pro
p K
EP
40
Allo
cate
d13
/14
44,1
30$
44,1
30$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
RP
D in
-kin
d an
d op
erat
ing
Allo
cate
d13
/14
565
$
56
5$
Des
ign
Eng
inee
ring
(PS&
E)
Pro
p K
EP
44
Allo
cate
d13
/14
-$
33
0,84
0$
330,
840
$
Des
ign
Eng
inee
ring
(PS&
E)
Pro
p A
AA
lloca
ted
13/1
420
2,22
8$
20
2,22
8$
Des
ign
Eng
inee
ring
(PS&
E)
OB
AG
Allo
cate
d13
/14
76,7
18$
133,
907
$
21
0,62
5$
Con
stru
ctio
nP
rop
K E
P 4
4P
lann
ed14
/15
558,
063
$
55
8,06
3$
Con
stru
ctio
nP
rop
AA
Pro
gram
med
14/1
52,
325,
624
$
2,32
5,62
4$
Con
stru
ctio
nO
BA
GP
rogr
amm
ed14
/15
1,55
1,61
4$
1,
551,
614
$
Con
stru
ctio
nR
PD
Pro
gram
med
14/1
595
,747
$
95
,747
$
Tot
al B
y F
isca
l Yea
r67
9,24
1$
46
4,74
7$
4,53
1,04
8$
-
$
-
$
-
$
5,
675,
036
$
Com
men
ts/
Con
cern
s
Fun
ding
pla
n is
bas
ed o
n F
Y 2
013/
14 a
lloca
tion
of f
unds
for
des
ign
phas
e.
Man
sell
Cor
ridor
Im
prov
emen
t
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
20
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:
Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%) In-house 4 2011/12 4 2012/13
Environmental Studies (PA&ED) Both 1 2013/14 2 2014/15
Design Engineering (PS&E) In-house 3 2013/14 4 2014/15
R/W Activities/Acquisition
Advertise Construction 1 2015/16 2 2015/16
Start Construction (i.e. Award Contract) 0% Both 2 2015/16
End Construction (i.e. Open for Use) 2 2016/17
Start Procurement (e.g. rolling stock)
Project Close-out 3 2016/17
Comments/Concerns
6
Second Street was identified by the community as a primary pedestrian, bicycle and transit thoroughfare and a ‘green connector’ for the neighborhood as part of the 2008 East SoMa Area Plan, which is included in the City’s 2009 Eastern Neighborhoods Plan. Second Street is also identified as a bicycle route in the City’s bicycle network, and a proposed bike lane design was one of the projects evaluated in the Bicycle Plan EIR. DPW, SFMTA, and the Planning Department conducted extensive public outreach, including four community meetings, door-to-door visits to all buildings on Second Street between Market and King Streets, and meetings with neighborhood and merchant associations.
Department of Public Works
Cristina Olea
(415) 558-4004
This cycle 1 OneBayArea Grant (OBAG)-funded project will transform the 2nd Street corridor to a pedestrian and bicycle-friendly complete street by implementing wider sidewalks, buffered and raised cycletracks, lane reduction, pedestrian safety improvements, bus stop improvements, a new traffic signal, and associated sewer rehabilitation. To accommodate the proposed project, some on-street parking may be removed along the corridor. More detail can be found on Department of Public Works' (DPW's) project page <http://www.sfdpw.org/index.aspx?page=1489>.
Second Street is a heavily used multi-modal corridor, designated as a key walking and biking route. The street is also served by 10 and 12 Muni bus routes. This project will improve safety, provide a more attractive pedestrian environment, provide a dedicated bicycle facility, and improve Muni travel time.
Start Date End Date
Supplemental Focused EIR
Underway
11/30/14
Environmental Clearance
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2015/16
Project Information
39
ii. Transportation/Land Use Coordination
b. Transportation/Land Use Coordination
Second Street between Market and King Streets
Second Street Streetscape Improvement
Page 1 of 2
21
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
-$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
489,
531
$
2,29
9$
48
7,23
2$
Des
ign
Eng
inee
ring
(PS&
E)
1,48
6,86
5$
17
0,54
3$
1,31
6,32
2$
R/W
-$
Con
stru
ctio
n11
,871
,264
$
1,
549,
584
$
10,3
21,6
80$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
13,8
47,6
60$
1,72
2,42
6$
12
,125
,234
$
Per
cen
t of
Tot
al12
%88
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Env
ironm
enta
l Stu
dies
(PA
&E
D)
Pro
p K
EP
44
Allo
cate
d13
/14
862
$
1,
437
$
2,29
9$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
OB
AG
Allo
cate
d13
/14
6,56
6$
11
,180
$
17
,746
$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
Gen
eral
Fun
dA
lloca
ted
13/1
417
3,71
0$
29
5,77
6$
469,
486
$
Des
ign
Eng
inee
ring
(PS&
E)
Pro
p K
EP
44
Allo
cate
d13
/14
34,1
09$
136,
434
$
17
0,54
3$
Des
ign
Eng
inee
ring
(PS&
E)
OB
AG
Allo
cate
d13
/14
263,
264
$
1,05
3,05
8$
1,
316,
322
$
Con
stru
ctio
nP
rop
K E
P 4
4P
lann
ed15
/16
719,
792
$
71
9,79
2$
1,
439,
584
$
Con
stru
ctio
nP
rop
K E
P 3
9P
lann
ed15
/16
55,0
00$
55,0
00$
11
0,00
0$
Con
stru
ctio
nO
BA
GP
rogr
amm
ed15
/16
4,59
0,84
0$
4,
590,
840
$
9,
181,
680
$
Con
stru
ctio
nG
ener
al F
und
Pro
gram
med
15/1
657
0,00
0$
570,
000
$
1,14
0,00
0$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r47
8,51
1$
1,
497,
885
$
5,93
5,63
2$
5,
935,
632
$
-$
-$
13,8
47,6
60$
Com
men
ts/
Con
cern
s
Fun
ding
pla
n is
bas
ed o
n F
Y 2
013/
14 a
lloca
tion
of f
unds
for
des
ign
phas
e.
Seco
nd S
tree
t Str
eets
cape
Im
prov
emen
t
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
22
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%)
Environmental Studies (PA&ED)
Design Engineering (PS&E)
R/W Activities/Acquisition
Advertise Construction
Start Construction (i.e. Award Contract)
End Construction (i.e. Open for Use)
Start Procurement (e.g. rolling stock)
Project Close-out
MTC created OBAG to better integrate the region's federal transportation program with California's climate law (SB 375, Steinberg, 2008) and the Sustainable Communities Strategy (SCS). MTC designed OBAG to reward communities and neighborhoods that have a track record of and/or plans in place to support TOD, particularly in areas that are slated for accepting growth in housing and/or employment. Federal funds typically require at least 11.47% local match.
This is a placeholder. Schedule will be determined when projects are identified.
TBD
OBAG prioritizes projects with clear and diverse (e.g. broad) community support, as demonstrated through letters of support, adopted plans and community meetings regarding the project, with a preference for projects identified in adopted plans that were developed with community input (e.g. area plans, traffic calming plans, neighborhood transportation plans).
TBD
This placeholder will provide local match for the second cycle of the OneBayArea Grant (OBAG) program, which supports multi-modal travel, livable communities and transit oriented development (TOD), particularly in areas that are slated for accepting growth in housing and/or employment (Priority Development Areas or PDAs). Key OBAG criteria include projects in High Impact Areas, multi-modal/complete streets projects, and projects that will comply with stringent timely use of funds requirements. Most of the funds need to be spent in or in projects provide proximate access to PDAs. For definitions and more details, visit the San Francisco County Transportation Authority's (SFCTA's) Cycle 1 OBAG page <http://www.sfcta.org/funding-opportunities/onebayarea-grant>.
As the Congestion Management Agency for San Francisco, SFCTA is responsible for prioritizing San Francisco's share of OBAG funds consistent with the Metropolitan Transportation Commission's (MTC's) OBAG guidelines. Priority for limited Prop K OBAG local match funds will be given to projects that have no or limited alternate sources of matching funds (including other Prop K categories and non-Prop K funds).
Start Date End Date
Environmental Clearance
Comments/Concerns
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2016/17
TBD
Project Information
ii. Transportation/Land Use Coordination
OneBayArea Grant - Local Match (Cycle 2)
b. Transportation/Land Use Coordination
Page 1 of 2
23
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
-$
-
$
-$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
-
$
-$
Des
ign
Eng
inee
ring
(PS&
E)
-$
R/W
-$
-
$
-$
Con
stru
ctio
n7,
800,
000
$
1,25
0,00
0$
6,
550,
000
$
Pla
ceho
lder
for
any
pro
ject
pha
se.
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
-
$
-$
Tot
al P
roje
ct C
ost
7,80
0,00
0$
1,
250,
000
$
6,55
0,00
0$
Per
cen
t of
Tot
al16
%84
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Con
stru
ctio
nP
rop
KP
lann
ed16
/17
250,
000
$
25
0,00
0$
Con
stru
ctio
nO
BA
GP
lann
ed16
/17
2,00
0,00
0$
2,
000,
000
$
Con
stru
ctio
nT
BD
Pla
nned
16/1
725
0,00
0$
250,
000
$
Con
stru
ctio
nP
rop
KP
lann
ed17
/18
500,
000
$
50
0,00
0$
1,00
0,00
0$
Con
stru
ctio
nO
BA
GP
lann
ed17
/18
1,65
0,00
0$
1,
650,
000
$
3,30
0,00
0$
Con
stru
ctio
nT
BD
Pla
nned
17/1
850
0,00
0$
500,
000
$
1,
000,
000
$
-$
-$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r-
$
-$
-$
2,50
0,00
0$
2,65
0,00
0$
2,65
0,00
0$
7,80
0,00
0$
Com
men
ts/
Con
cern
s
One
Bay
Are
a G
rant
- L
ocal
Mat
ch (C
ycle
2)
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Pro
ject
OB
AG
fun
ding
am
ount
is b
ased
on
the
prio
r cy
cle.
Thi
s P
rop
K c
ateg
ory
(EP
44)
is a
ntic
ipat
ed to
pro
vide
app
roxi
mat
ely
50%
of
the
requ
ired
mat
ch. W
hen
proj
ects
are
id
entif
ied,
pro
ject
s w
ill n
eed
to m
eet O
BA
G m
atch
ing
requ
irem
ents
per
the
late
st g
uide
lines
and
cal
l for
pro
ject
s.
Page
2 o
f 2
24
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:
Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Year Quarter Year
Planning/Conceptual Engineering (30%) 100% In-House 1 2010/11 1 2013/14
Environmental Studies (PA&ED) 95% In-House 2 2013/14 4 2013/14
Design Engineering (PS&E) 95% 1 2013/14 4 2013/14
R/W Activities/Acquisition
Advertise Construction
Start Construction (i.e. Award Contract) 2 2014/15 2 2014/15
End Construction (i.e. Open for Use) 4 2014/15 4 2014/15
Start Procurement (e.g. rolling stock)
Project Close-out
In the past 5 years there have been 9 vehicle-pedestrian collisions in this area. As a result, the City's WalkFirst Report recommends various changes to enhance pedestrian safety in this area.
Construction contract advertisement is scheduled for the end of June 2014 with the Notice-To-Proceed to be issued by fall 2014.
11
This project was originally identified through the SFCTA's Mission-Geneva Neighborhood Transportation Plan. The locations for pilot and permanent work (to be constructed as part of the Department of Public Works' (DPW's) Ocean Avenue Paving project) were developed through multiple meetings with the community (March and June 2013) and Supervisor Avalos' staff.
San Francisco Municipal Transportation Agency (SFMTA)
Cathal Hennessy
(415) 701-4596
The "Persia Triangle" is the area bounded by Mission Street, Ocean Avenue, and Persia Avenue. With support from Supervisor John Avalos and the community, the Planning Department proposes a pilot project to implement several temporary street changes to ensure pedestrian safety in advance of permanent work planned for Fall 2014. As part of the pilot, temporary paint will be applied to multiple intersections to simulate bulb-outs. Permanent construction will convert the temporary pilot locations to concrete bulb-outs. Permanent work also includes traffic signal upgrades, new street light fixtures to improve the lighting and the re-alignment of the Alemany and Ocean intersection. The proposed Prop K project includes the permanent work. This is a carry-forward project from the 2009 5YPP given its orgin in the Mission-Geneva Neighborhood Transportation Plan and the Transportation Authority's prior programming of Lifeline Transportation Program funds to the project. Prop K funds will match the Lifeline funds.
Start Date End Date
EIR
Underway
06/30/14
Environmental Clearance
Comments/Concerns
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
Mission Street, Ocean Avenue and Persia Avenue
Project Information
ii. Transportation/Land Use Coordination
Persia Triangle Improvements
b. Transportation/Land Use Coordination
Page 1 of 2
25
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
100,
000
$
-
$
100,
000
$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
Des
ign
Eng
inee
ring
(PS&
E)
323,
415
$
-
$
323,
415
$
R/W
Con
stru
ctio
n1,
044,
000
$
20
0,68
5$
843,
315
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
1,46
7,41
5$
200,
685
$
1,
266,
730
$
Per
cen
t of
Tot
al14
%86
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Life
line/
Pro
p 1B
Allo
cate
d10
/11
$
100
,000
10
0,00
0$
Des
ign
Eng
inee
ring
(PS&
E)
Life
line/
Pro
p 1B
Allo
cate
d10
/11
$
323
,415
32
3,41
5$
Con
stru
ctio
nL
ifelin
e/P
rop
1BA
lloca
ted
10/1
1 $
3
79,3
19
379,
319
$
Con
stru
ctio
nP
rop
KP
lann
ed14
/15
$
200
,685
20
0,68
5$
Con
stru
ctio
nSF
MT
A R
even
ue B
ond
Pla
nned
14/1
5 $
4
63,9
96
463,
996
$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r$4
23,4
15$1
,044
,000
-$
-
$
-$
-
$
1,46
7,41
5$
Com
men
ts/
Con
cern
s
Per
sia
Tri
angl
e Im
prov
emen
ts
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
26
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:
Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Year Quarter Year
Planning/Conceptual Engineering (30%) 1 2014/15 2 2015/16
Environmental Studies (PA&ED)
Design Engineering (PS&E)
R/W Activities/Acquisition
Advertise Construction
Start Construction (i.e. Award Contract)
End Construction (i.e. Open for Use)
Start Procurement (e.g. rolling stock)
Project Close-out
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
Lombard Street from Lyon to Van Ness
Project Information
ii. Transportation/Land Use Coordination
Lombard Street Pedestrian and Transit Treatments [NTIP]
b. Transportation/Land Use Coordination
2
This project would build on public outreach conducted by the Office of Economic and Workforce Development on the Lombard corridor as part of the Invest in Neighborhoods Initiative. Strong community engagement is a focus of the Transportation Authority's Neighborhood Transportation Planning Program, which would fund the subject project.
Department of Public Works
John Thomas
415-558-4498
Informed by several meetings with Commissioner Farrell's office, the SFMTA has proposed a series of treatments to improve pedestrian safety and transit efficiency along Lombard St based on analysis completed for the Walkfirst Investment Strategy and the Transit Effectiveness Project. This project would fund conceptual design of these treatments so they can be integrated with a planned Caltrans re-paving of the corridor in FY 17, which would minimize construction impacts on the community and potential result in cost efficiencies. Project elements include but are not limited to landscaping, corner and bus bulbs, daylighting and re-timing signals.
Start Date End Date
TBD
Environmental Clearance
Comments/Concerns
Lombard Street from Richardson to Buchanan is included in San Francisco’s list of High Injury Corridors. It has also been targeted by the Supervisor's office as a priority corridor for pedestrian and streetscape improvements, and is one of the corridors to be improved as part of the SFMTA's Transit Effectiveness Project.
Cost, schedule and funding information for future phases will be a deliverable of the planning/conceptual engineering effort.
Page 1 of 2
27
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
100,
000
$
10
0,00
0$
-$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
Des
ign
Eng
inee
ring
(PS&
E)
-$
R/W
-$
Con
stru
ctio
n-
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
100,
000
$
10
0,00
0$
-$
Per
cen
t of
Tot
al10
0%0%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pri
or14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
14/1
590
,000
$
10
,000
$
10
0,00
0$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r90
,000
$
10
,000
$
-
$
-$
-
$
100,
000
$
Com
men
ts/
Con
cern
s
Lom
bard
Str
eet P
edes
tria
n an
d T
rans
it T
reat
men
ts [N
TIP
]
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
28
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Year Quarter Year
Planning/Conceptual Engineering (30%) 0% In-house 2 2014/15 2 2015/16
Environmental Studies (PA&ED)
Design Engineering (PS&E)
R/W Activities/Acquisition
Advertise Construction
Start Construction (i.e. Award Contract)
End Construction (i.e. Open for Use)
Start Procurement (e.g. rolling stock)
Project Close-out
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
Western Addition neighborhood, approximately bounded by Van Ness Avenue, Geary Boulevard, Divisadero Street, and Fulton Street.
Project Information
ii. Transportation/Land Use Coordination
Western Addition Neighborhood Transportation Plan
b. Transportation/Land Use Coordination
5, 6
This planning effort will include a significant community outreach component to engage residents in identifying transportation needs in the neighborhood, including safety issues, and potential solutions.
San Francisco County Transportation Authority
Colin Dentel-Post
415-522-4836
This neighborhood-scale planning effort is intended to identify key transportation needs in the Western Addition; identify and evaluate potential solutions, particularly those that can be implemented in the near term; and recommend next steps to implement those solutions. Potential project concepts for development could include pedestrian improvements along Geary Boulevard or traffic calming along Webster Street or Turk Street. The Metropolitan Transportation Commission (MTC) has identified Communities of Concern (CoCs) throughout the nine county Bay Area region. MTC's Community Based Transportation Planning (CBTP) grants, one of which will fund the subject project, are intended to support community-based planning in the CoCs to help build a pipeline of projects that can compete for MTC and other funds. The objectives of MTC's CBTP grant program, align closely with the Transportation Authority's Neighborhood Transportation Improvement Program (NTIP), which will provide the Prop K funds to match the MTC grant.
Start Date End Date
N/A
Environmental Clearance
Comments/Concerns
The Western Addition is a traditionally underserved Community of Concern with a high concentration of low-income housing and, as a historic center of San Francisco's African-American community, a large population of minority residents. As a legacy of urban renewal projects in the 20th century, the neighborhood has a number of wide streets, such as Geary Boulevard and Webster Street, and one-way streets, including Turk Street, that encourage high vehicle speeds and are detrimental to pedestrian safety.
Page 1 of 2
29
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
300,
000
$
240,
000
$
60,0
00$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
-
$
-$
Des
ign
Eng
inee
ring
(PS&
E)
-$
-
$
-$
R/W
-$
-
$
-$
Con
stru
ctio
n-
$
-$
-
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
-
$
-$
Tot
al P
roje
ct C
ost
300,
000
$
240,
000
$
60,0
00$
Per
cen
t of
Tot
al80
%20
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
14/
1515
/16
16/
1717
/18
18/
19T
otal
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
(30%
)P
rop
KP
lann
ed14
/15
120,
000
$
120,
000
$
240,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
(30%
)M
TC
-CB
TP
Pro
gram
med
14/1
560
,000
$
60
,000
$
-$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r18
0,00
0$
12
0,00
0$
-
$
-$
-
$
300,
000
$
Com
men
ts/
Con
cern
s
Wes
tern
Add
ition
Nei
ghbo
rhoo
d T
rans
port
atio
n P
lan
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
30
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%)
Environmental Studies (PA&ED)
Design Engineering (PS&E)
R/W Activities/Acquisition
Advertise Construction
Start Construction (i.e. Award Contract)
End Construction (i.e. Open for Use)
Start Procurement (e.g. rolling stock)
Project Close-out
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
TBD
Project Information
ii. Transportation/Land Use Coordination
Neighborhood Transportation Improvement Program Planning Placeholder
b. Transportation/Land Use Coordination
Citywide (one in each supervisorial district)
NTIP planning program is specifically designed to be community-based, with priority given to plans that address needs in communities of concern.TBD
The NTIP program came out of the San Francisco Transportation Plan's needs assessment that identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives. (See Purpose and Need below.) The NTIP has two components: a planning component to fund community-based planning efforts in each Supervisorial district ($100,000 for each district over the next 5 years); and a capital component to provide local matching funds for two neighborhood-scale projects in each district in the next five years. Examples of NTIP planning projects include: district-wide needs and prioritization processes (e.g. District 4 Sunset Blueprint); traditional neighborhood transportation plan development (e.g. Tenderloin-Little Saigon Neighborhood Transportation Plan, Mission District Streetscape Plan); corridor plans (e.g. Leland Avenue Street Design Project, McLaren Park Needs Assessment/Mansell Corridor Improvements, and Columbus Avenue Neighborhood Transportation Study); and project-level plans or smaller efforts (e.g. Bayview Shuttle Project, community mini-grants, safety project concepts development, and transportation demand management planning including neighborhood parking analysis). Transportation Authority staff will develop NTIP planning guidelines in consultation with project sponsors, for anticipated approval by the Transportation Authority Board in Fall 2014.
Start Date End Date
Environmental Clearance
Comments/Concerns
The San Francisco Transportation Plan's needs assessment identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives, and concluded that meeting these transportation needs is an important way to improve mobility in neighborhoods and to address socioeconomic and geographic disparities in San Francisco. As a result of this finding and in response to public and Board input, the Transportation Authority developed the NTIP.
This is a placeholder. Schedule will be determined once a specific NTIP plan proposal is developed.
Page 1 of 2
31
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
1,10
0,00
0$
1,
100,
000
$
-$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
-
$
-$
Des
ign
Eng
inee
ring
(PS&
E)
-$
-
$
-$
R/W
-$
-
$
-$
Con
stru
ctio
n-
$
-$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
-
$
-$
Tot
al P
roje
ct C
ost
1,10
0,00
0$
1,
100,
000
$
-$
Per
cen
t of
Tot
al10
0%0%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
14/1
530
0,00
0$
300,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
15/1
660
0,00
0$
600,
000
$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r-
$
300,
000
$
60
0,00
0$
-$
-
$
-$
90
0,00
0$
Com
men
ts/
Con
cern
s
Nei
ghbo
rhoo
d T
rans
port
atio
n Im
prov
emen
t Pro
gram
Pla
nnin
g P
lace
hold
er
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
The
NT
IP in
clud
es $
100,
000
for
each
sup
ervi
soria
l dis
tric
t ove
r th
e ne
xt 5
yea
rs to
und
erta
ke n
eigh
borh
ood-
scal
e, c
omm
unity
bas
ed p
lann
ing
effo
rts.
As
part
of
the
5YP
P u
pdat
e, s
ome
spec
ific
NT
IP P
lann
ing
proj
ects
are
kno
wn.
The
y ar
e lis
ted
as s
epar
ate
proj
ects
. W
hen
NT
IP p
lann
ing
proj
ects
are
iden
tifie
d, th
ey a
re e
xpec
ted
to in
clud
e ap
prop
riate
leve
ragi
ng.
Page
2 o
f 2
32
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:
Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%) 1 2014/15 4 2018/19
Environmental Studies (PA&ED)
Design Engineering (PS&E)
R/W Activities/Acquisition
Advertise Construction
Start Construction (i.e. Award Contract)
End Construction (i.e. Open for Use)
Start Procurement (e.g. rolling stock)
Project Close-out
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2014/15
TBD
Project Information
ii. Transportation/Land Use Coordination
Neighborhood Transportation Improvement Program Pre-Development/Program Support
b. Transportation/Land Use Coordination
TBD
NTIP projects are intended to funds projects that have been identified through community-based transportation planning efforts.
San Francisco Municipal Transportation Agency (SFMTA), San Francisco County Transportation Authority (SFCTA)
The NTIP program came out of the San Francisco Transportation Plan's needs assessment that identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives. (See Purpose and Need below.) The NTIP has two components: a planning component to fund community-based planning efforts in each Supervisorial district; and a capital component to provide local matching funds for two neighborhood-scale projects in each district in the next five years. Examples of project types include colorizing dedicated transit lanes, transit signal priority, and transit only lane enforcement cameras. Prop K funds for the subject project would enable SFMTA and SFCTA staff to support Commissioner's efforts to identify, scope, and develop an implementation approach to proposed NTIP planning and capital projects. NTIP guidelines will be brought to the Board in September 2014.
Start Date End Date
n/a
Environmental Clearance
Comments/Concerns
The San Francisco Transportation Plan's needs assessment identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives, and concluded that meeting these transportation needs is an important way to improve mobility in neighborhoods and to address socioeconomic and geographic disparities in San Francisco. As a result of this finding and in response to public and Board input, the Transportation Authority developed the NTIP.
Page 1 of 2
33
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
-$
-
$
-$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
-
$
-$
Des
ign
Eng
inee
ring
(PS&
E)
-$
-
$
-$
R/W
-$
-
$
-$
Con
stru
ctio
n65
0,00
0$
650,
000
$
-
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
-
$
-$
Tot
al P
roje
ct C
ost
650,
000
$
65
0,00
0$
-$
Per
cen
t of
Tot
al10
0%0%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
14/1
515
0,00
0$
150,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
15/1
615
0,00
0$
150,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
16/1
715
0,00
0$
150,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
17/1
810
0,00
0$
100,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
18/1
910
0,00
0$
100,
000
$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r-
$
150,
000
$
15
0,00
0$
150,
000
$
100,
000
$
100,
000
$
650,
000
$
Com
men
ts/
Con
cern
s
Whe
n pr
ojec
ts a
re id
entif
ied,
pro
ject
s ar
e ex
pect
ed to
incl
ude
appr
opria
te le
vera
ging
.
Nei
ghbo
rhoo
d T
rans
port
atio
n Im
prov
emen
t Pro
gram
Pre
-Dev
elop
men
t/P
rogr
am S
uppo
rt
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
Page
2 o
f 2
34
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Planning/Conceptual Engineering (30%)
Environmental Studies (PA&ED)
Design Engineering (PS&E)
R/W Activities/Acquisition
Advertise Construction
Start Construction (i.e. Award Contract)
End Construction (i.e. Open for Use)
Start Procurement (e.g. rolling stock)
Project Close-out
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2015/16
TBD
Project Information
ii. Transportation/Land Use Coordination
Planning Grant Match (e.g. Caltrans Planning Grants)
b. Transportation/Land Use Coordination
TBD
Projects should include a collaborative planning process with community stakeholders such as residents, business proprietors, transit agencies, human service agencies, neighborhood associations, non-profit or other community-based organizations and faith-based organizations. The purpose of this collaboration is to solicit comments from these stakeholders, review preliminary findings with them, and to utilize their perspective in identifying potential strategies and solutions for addressing transportation issues.
TBD
This placeholder will provide the local match for planning grants that support transit oriented development and fund related improvements for ransit, pedestrians, and bicyclists. Planning grants should help promote the development of a balanced, comprehensive multi-modal transportation system. The implementation of these grants should ultimately lead to the adoption, initiation, and programming of transportation improvements. The Prop K funds can also be used if leveraged by other funds (e.g. private/developer funds, other agency funds). The Transportation Authority will prioritize Prop K local match funds from this placeholder, given weight to factors such as whether the plannign project has limited local match options (will be given higher priority) and whether it would benefit a community of concern.
Start Date End Date
Environmental Clearance
Comments/Concerns
The San Francisco Transportation Plan's needs assessment identified significant unmet demand for pedestrian and bicycle circulation projects and transit reliability initiatives, and concluded that meeting these transportation needs is an important way to improve mobility in neighborhoods and to address socioeconomic and geographic disparities in San Francisco.
This is a placeholder. Schedule will be determined when projects are identified.
Page 1 of 2
35
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
2,10
0,00
0$
60
0,00
0$
1,50
0,00
0$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
Des
ign
Eng
inee
ring
(PS&
E)
-$
R/W
-$
Con
stru
ctio
n-
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
2,10
0,00
0$
60
0,00
0$
1,50
0,00
0$
Per
cen
t of
Tot
al29
%71
%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
Tot
al
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
15/1
615
0,00
0$
150,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
16/1
715
0,00
0$
150,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
17/1
815
0,00
0$
150,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
18/1
915
0,00
0$
150,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
TB
DP
lann
edF
Y15
/16-
18/1
937
5,00
0$
375,
000
$
37
5,00
0$
375,
000
$
1,
500,
000
$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r-
$
-$
525,
000
$
52
5,00
0$
52
5,00
0$
52
5,00
0$
2,
100,
000
$
Com
men
ts/
Con
cern
s
Pla
nnin
g G
rant
Mat
ch (e
.g. C
altr
ans
Pla
nnin
g G
rant
s)
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
App
ropr
iate
leve
ragi
ng w
ill b
e ex
pect
ed w
hen
allo
catio
n re
ques
ts a
re s
ubm
itted
. A
side
fro
m C
altr
ans
Pla
nnin
g gr
ants
ther
e ar
e ot
her
sour
ces
of f
undi
ng th
at c
ould
leve
rage
the
prop
osed
P
rop
K f
unds
suc
h as
Com
mun
ity B
ased
Tra
nspo
rtat
ion
Pla
nnin
g gr
ants
fro
m th
e M
etro
polit
an T
rans
port
atio
n C
omm
issi
on a
nd lo
cal a
genc
y re
venu
es.
Page
2 o
f 2
36
San Francisco County Transportation AuthorityProposition K Sales Tax Program Project Information Form
Category:
Subcategory:
Prop K EP Project/Program:
EP Line (Primary):
Other EP Line Number/s:
Fiscal Year of Allocation:
Project Name:
Project Location:
Project Supervisorial District(s):
Project Description:
Purpose and Need:
Community Engagement/Support:
Implementing Agency:
Project Manager:
Phone Number:
Email:
Type:
Status:Completion Date (Actual or Anticipated):
Project Delivery Milestones Status Work
Phase % CompleteIn-house -
Contracted - Both
Quarter Fiscal Year Quarter Fiscal Year
Prop K Expenditure Plan Information
D. TSM/Strategic Initiatives
44
2016/17
TBD
Project Information
ii. Transportation/Land Use Coordination
Priority Development Area Planning Match
b. Transportation/Land Use Coordination
TBD
Prioritization criteria for PDA planning programs include plans for outreach and community support.
TBD
This placeholder will provide local match for the Metropolitan Transportation Commission's (MTC's) Priority Development Area (PDA) Planning program to support comprehensive planning in PDAs that will result in intensified land uses around public transit hubs and corridors. PDA Planning funds are mainly distributed in two ways:- Under the regionwide competitive Regional PDA Planning program, MTC prioritizes projects based on the following criteria: location within Community of Concerns, project impact (e.g. potential to increase housing, employment, transit ridership, and multi-modal transportation options), existing policies demonstrating commitment to increase housing and transportation policies, planning process to address the planning elements, and local commitment and capacity for implementation. For more information, please visit MTC's PDA Planning page <http://www.mtc.ca.gov/planning/smart_growth/stations>.- Local PDA Planning funds are administered by the Planning Department in San Francisco. Projects are prioritized based on similar criteria to the OneBayArea Grant (OBAG) program (see OBAG Local Match Project Information Form), as well as the level of need for additional planning and geographic equity among PDAs. Local PDA Planning funds help prepare candidate projects to become ready for future OBAG and other capital funding; to assess transportation needs in PDAs (or citywide needs that impact PDAs); and for land use planning in PDAs.
To be eligible for matching funds form this category, projects must support Transit-Oriented Development and fund related improvements for transit, bicyclists, and pedestrians. Priority will be given to projects that have no or limited alternate sources of matching funds. Further additional priority will go toward projects that benefit Communities of Concern and that address geographic equity.
Start Date End Date
Environmental Clearance
Key goals of the PDA Planning program are to increase both housing (including affordable housing) and jobs; increase transit ridership; promote multimodal connections; and locate key services and retail within the PDAs. Federal funds for these programs typically require at least 11.47% local match.
This is a placeholder. Schedule will be determined when projects are identified.
Page 1 of 2
37
San
Fra
nci
sco
Cou
nty
Tra
nsp
orta
tion
Au
thor
ity
Pro
pos
itio
n K
Sal
es T
ax P
rogr
am P
roje
ct I
nfo
rmat
ion
For
m
Pro
ject
Nam
e:
Pro
ject
Cos
t E
stim
ate
Ph
ase
Cos
tP
rop
KO
ther
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
4,08
0,00
0$
400,
000
$
3,68
0,00
0$
Env
ironm
enta
l Stu
dies
(PA
&E
D)
-$
Des
ign
Eng
inee
ring
(PS&
E)
-$
R/W
-$
Con
stru
ctio
n-
$
Pro
cure
men
t (e.
g. r
ollin
g st
ock)
-$
Tot
al P
roje
ct C
ost
4,08
0,00
0$
400,
000
$
3,68
0,00
0$
Per
cen
t of
Tot
al9.
80%
90.2
0%
Ph
ase
Fu
nd
Sou
rce
Fu
nd
Sou
rce
Stat
us
Fis
cal Y
ear
Fu
nd
s A
vaila
ble
Pre
viou
s14
/15
15/
1616
/17
17/
1818
/19
19/
20T
otal
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Pro
p K
Pla
nned
16/1
720
0,00
0$
20
0,00
0$
40
0,00
0$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Loc
al P
DA
Pla
nned
16/1
72,
380,
000
$
2,
380,
000
$
Pla
nnin
g/C
once
ptua
l Eng
inee
ring
Reg
iona
l PD
AP
lann
ed16
/17
600,
000
$
600,
000
$
1,20
0,00
0$
Pro
p K
Pla
nned
18/1
950
,000
$
50
,000
$
10
0,00
0$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
Tot
al B
y F
isca
l Yea
r-
$
-$
-
$
3,18
0,00
0$
200,
000
$
650,
000
$
50,0
00$
4,08
0,00
0$
Com
men
ts/
Con
cern
s
Prio
rity
Dev
elop
men
t Are
a P
lann
ing
Mat
ch
Fu
nd
ing
Sou
rce
Pro
ject
Exp
end
itu
res
(Cas
h F
low
) B
y F
isca
l Yea
r E
nte
r C
ash
Flo
w H
ere
PD
A f
undi
ng a
mou
nts
are
base
d on
the
prio
r cy
cle.
Whe
n pr
ojec
ts a
re id
entif
ied,
pro
ject
s w
ill n
eed
to m
eet r
espe
ctiv
e m
atch
ing
requ
irem
ents
per
the
late
st g
uide
lines
and
cal
l for
pr
ojec
ts. A
bove
leve
ragi
ng is
an
estim
ate
base
d on
info
rmat
ion
curr
ently
ava
ilabl
e.
Page
2 o
f 2
38
2009
/10
2010
/11
2011
/12
2012
/13
2013
/14
Any
E
li gib
leL
ocal
Cap
ital M
atch
Pla
ceho
lder
Des
ign
Prog
ram
med
$329
,820
$329
,820
Any
E
li gib
leL
ocal
Cap
ital M
atch
Pla
ceho
lder
CO
NPr
ogra
mm
ed$1
,319
,280
$1,3
19,2
80A
ny
Eli g
ible
Loc
al C
apita
l Mat
ch P
lace
hold
erD
esig
nPr
ogra
mm
ed$4
00,0
00$4
00,0
00A
ny
Eli g
ible
Loc
al C
apita
l Mat
ch P
lace
hold
erC
ON
Prog
ram
med
$1,6
00,0
00$1
,600
,000
MT
APe
rsia
Tri
angl
e T
rans
it Im
prov
emen
ts
(Life
line
Mat
ch)
TB
DPr
ogra
mm
ed$2
00,6
85$2
00,6
85
SFC
TA
Lan
d U
se A
lloca
tion
Mod
el U
pdat
ePL
AN
/CE
RPr
ogra
mm
ed$5
0,00
0$5
0,00
0SF
CT
AN
eigh
borh
ood
Plan
ning
(e.g
. CB
TP)
PLA
NPr
ogra
mm
ed$5
0,00
0$5
0,00
0SF
CT
AN
eigh
borh
ood
Plan
ning
(e.g
. CB
TP)
PLA
NPr
ogra
mm
ed$5
0,00
0$5
0,00
0SF
CT
AN
eigh
borh
ood
Plan
ning
(e.g
. CB
TP)
PLA
NPr
ogra
mm
ed$5
0,00
0$5
0,00
0
SFC
TA
NT
P Pr
ogra
m -
Eva
luat
ion
/ C
itize
ns
Gui
dePL
AN
/CE
RPr
ogra
mm
ed$7
5,00
0$7
5,00
0A
ny
Eli g
ible
Plan
ning
Pla
ceho
lder
(e.g
. Cal
tran
s Pl
anni
ng)
PLA
N/C
ER
Prog
ram
med
$54,
076
$54,
076
Any
E
li gib
lePl
anni
ng P
lace
hold
er (e
.g. C
altr
ans
Plan
ning
)PL
AN
/CE
RPr
ogra
mm
ed$5
4,07
6$5
4,07
6A
ny
Eli g
ible
Plan
ning
Pla
ceho
lder
(e.g
. Cal
tran
s Pl
anni
ng)
PLA
N/C
ER
Prog
ram
med
$54,
076
$54,
076
Any
E
li gib
lePl
anni
ng P
lace
hold
er (e
.g. C
altr
ans
Plan
ning
)PL
AN
/CE
RPr
ogra
mm
ed$5
4,07
6$5
4,07
6
2009
Pro
p K
5Y
PP
- P
rogr
am o
f P
roje
cts
Tra
nsp
orta
tion
/L
and
Use
Coo
rdin
atio
n (
EP
44)
Pro
gram
min
g an
d A
lloca
tion
s T
o-d
ate
Las
t Upd
ate:
Mar
ch 3
0, 2
010
Proj
ect N
ame
Phas
eSt
atus
Fisc
al Y
ear
Loc
al C
apita
l Mat
ch
Nei
ghbo
rhoo
d T
rans
port
atio
n Pl
anni
ng
Age
ncy
Tot
al
39
2009
/10
2010
/11
2011
/12
2012
/13
2013
/14
Proj
ect N
ame
Phas
eSt
atus
Fisc
al Y
ear
Age
ncy
Tot
al
Any
E
li gib
lePl
anni
ng P
lace
hold
er (e
.g. S
tatio
n A
rea
Plan
)PL
AN
/CE
RPr
ogra
mm
ed$7
2,20
0$7
2,20
0A
ny
Eli g
ible
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an)
PLA
N/C
ER
Prog
ram
med
$72,
200
$72,
200
Any
E
li gib
lePl
anni
ng P
lace
hold
er (e
.g. S
tatio
n A
rea
Plan
)PL
AN
/CE
RPr
ogra
mm
ed$7
2,20
0$7
2,20
0A
ny
Eli g
ible
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an)
PLA
N/C
ER
Prog
ram
med
$72,
200
$72,
200
Any
E
li gib
lePl
anni
ng P
lace
hold
er (e
.g. S
tatio
n A
rea
Plan
)PL
AN
/CE
RPr
ogra
mm
ed$7
2,20
0$7
2,20
0
$272
,885
$5
81,0
96
$1,5
45,5
56
$576
,276
$1
,726
,276
$4
,702
,089
$0
$0
$0
$0
$0
$0
$272
,885
$5
81,0
96
$1,5
45,5
56
$576
,276
$1
,726
,276
$4
,702
,089
$272
,885
$5
81,0
96
$1,5
45,5
56
$576
,276
$1
,726
,276
$4
,702
,089
$0
$0
$0
$0
$0
$0
*
The
200
9 St
rate
gic
Plan
was
am
ende
d on
Mar
ch 3
0, 2
010
thro
ugh
Res
. 10-
52.
Plan
ning
for
TO
D/I
nfill
Sup
port
Tot
al A
lloca
ted
Tot
al P
rogr
amm
ed in
5Y
PP
Tot
al U
nal
loca
ted
Tot
al P
rogr
amm
ed in
Am
end
ed 2
009
Stra
tegi
c P
lan
*C
umul
ativ
e R
emai
ning
Pro
gram
min
g C
apac
ity
40
2009
/10
2010
/11
2011
/12
2012
/13
2013
/14
Any
Elig
ible
Loc
al C
apita
l Mat
ch P
lace
hold
erD
esig
nP
rogr
amm
ed$0
$0
DP
WF
olso
m S
tree
tsca
pe I
mpr
ovem
ents
1C
ON
Allo
cate
d$2
67,0
00$2
67,0
00
DP
WSe
cond
Str
eet S
tree
tsca
pe I
mpr
ovem
ents
Des
ign
Allo
cate
d$3
5,00
0$3
5,00
0
DP
WSe
cond
Str
eet S
tree
tsca
pe I
mpr
ovem
ents
Des
ign
Deo
blig
ated
($31
,800
)($
31,8
00)
DP
WB
road
way
Str
eeet
scap
e Im
prov
emen
ts -
Pha
se I
IID
esig
nA
lloca
ted
$31,
000
$31,
000
Any
Elig
ible
Loc
al C
apita
l Mat
ch P
lace
hold
er 3,
6, 7
, 8, 1
2,15
CO
NP
rogr
amm
ed$1
,225
$1,2
25
BA
RT
24th
Str
eet/
Mis
sion
BA
RT
Pla
za a
nd P
edes
tria
n
Impr
ovem
ents
3D
esig
nA
lloca
ted
$303
,047
$303
,047
DP
W24
th S
tree
t/M
issi
on B
AR
T P
laza
Bus
-bul
b 6
CO
NA
lloca
ted
$179
,000
$179
,000
DP
WM
arin
a G
reen
Bic
ycle
Tra
il 6
CO
NA
lloca
ted
$113
,625
$113
,625
DP
WB
road
way
Str
eeet
scap
e Im
prov
emen
ts -
Pha
se I
II 6
CO
NA
lloca
ted
$245
,000
$245
,000
DP
WB
road
way
Str
eeet
scap
e Im
prov
emen
ts -
Pha
se I
II 6
CO
ND
eobl
igat
ed($
4,62
0)($
4,62
0)
DP
W24
th/M
issi
on B
AR
T S
W P
laza
- 2
4th
Stre
et
Side
wal
k, C
urb,
and
Lan
dsca
ping
7C
ON
Allo
cate
d$2
8,00
0$2
8,00
0
BA
RT
24th
/Mis
sion
BA
RT
SW
Pla
za a
nd P
edes
tria
n
Impr
ovem
ents
8C
ON
Allo
cate
d$1
7,20
3$1
7,20
3
DP
WB
road
way
Str
eeet
scap
e Im
prov
emen
ts -
Pha
se I
II -
Supp
lem
enta
l9C
ON
Allo
cate
d$1
50,0
00$1
50,0
00
SFM
TA
Mar
ket a
nd H
aigh
t Str
eet T
rans
it an
d P
edes
tria
n
Impr
ovem
ent12
CO
NA
lloca
ted
$209
,000
$209
,000
Any
Elig
ible
Loc
al C
apita
l Mat
ch P
lace
hold
er 13
, 14,
16
Des
ign
Pro
gram
med
$0
$0
Any
Elig
ible
Loc
al C
apita
l Mat
ch P
lace
hold
er18
CO
NP
rogr
amm
ed$1
,277
,941
$1,2
77,9
41
SFM
TA
Cen
tral
Sub
way
Pha
se I
II I
nitia
l Stu
dy18
PLA
NA
lloca
ted
$173
,212
$173
,212
DP
WL
ongf
ello
w E
lem
enta
ry S
choo
l Saf
e R
oute
s to
Sch
ool
13E
NV
, D
esig
nA
lloca
ted
$24,
981
$24,
981
2009
Pro
p K
5Y
PP
- P
rogr
am o
f P
roje
cts
Tra
nsp
orta
tion
/L
and
Use
Coo
rdin
atio
n (
EP
44)
Pro
gram
min
g an
d A
lloca
tion
s T
o-d
ate
Las
t Upd
ate:
Mar
ch 2
5, 2
014
Fis
cal Y
ear
Tot
al
Loc
al C
apita
l Mat
ch
Stat
usA
genc
yP
roje
ct N
ame
Pha
se
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
5 5Y
PP A
ppen
dice
s\EP
44
Tab
: EP
44 5
YPP
03.2
5.14
Page
1 o
f 4
41
2009
/10
2010
/11
2011
/12
2012
/13
2013
/14
Fis
cal Y
ear
Tot
alSt
atus
Age
ncy
Pro
ject
Nam
eP
hase
DP
WE
R T
aylo
r E
lem
enta
ry S
choo
l Saf
e R
oute
s to
Sch
ool
13E
NV
, D
esig
nA
lloca
ted
$20,
184
$20,
184
DP
WM
anse
ll C
orri
dor
Impr
ovem
ent 13
, 14
Des
ign
Allo
cate
d$3
30,8
40$3
30,8
40
DP
WSe
cond
Str
eet S
tree
tsca
pe I
mpr
ovem
ents
16E
NV
, D
esig
nA
lloca
ted
$172
,842
$172
,842
SFM
TA
Pers
ia T
rian
gle
Tra
nsit
Impr
ovem
ents
(Life
line
Mat
ch)
TB
DPr
ogra
mm
ed$2
00,6
85$2
00,6
85
SFM
TA
19th
Ave
nue/
M-O
cean
Vie
w P
roje
ct15
PLA
NA
lloca
ted
$306
,000
$306
,000
SFC
TA
Lan
d U
se A
lloca
tion
Mod
el U
pdat
e11P
LA
N/
CE
RP
rogr
amm
ed$0
$0
SFC
TA
Nei
ghbo
rhoo
d Pl
anni
ng (e
.g. C
BT
P) 4
PL
AN
Pro
gram
med
$0$0
SFC
TA
Bay
view
Hun
ters
Poi
nt M
obili
ty S
olut
ions
Stu
dyP
LA
NA
lloca
ted
$20,
000
$20,
000
SFC
TA
Nei
ghbo
rhoo
d Pl
anni
ng (e
.g. C
BT
P) 4,
11
PL
AN
Pro
gram
med
$0$0
SFC
TA
Nei
ghbo
rhoo
d Pl
anni
ng (e
.g. C
BT
P) 11
PL
AN
Pro
gram
med
$0$0
SFC
TA
NT
P Pr
ogra
m -
Eva
luat
ion
/ C
itize
ns G
uide
11P
LA
N/
CE
RP
rogr
amm
ed$0
$0
SFC
TA
Bro
adw
ay C
hina
tow
n N
eigh
borh
ood
Tra
nspo
rtat
ion
Pla
n11P
LA
N/
CE
RA
ppro
pria
ted
$209
,174
$209
,174
SFC
TA
Ces
ar C
have
z E
ast C
omm
unity
Des
ign
Pla
n2P
LA
N/
CE
RA
ppro
pria
ted
$29,
559
$29,
559
SFC
TA
Ces
ar C
have
z E
ast C
omm
unity
Des
ign
Pla
n2P
LA
N/
CE
RD
eobl
igat
ed($
24,3
97)
($24
,397
)
Plan
ning
C
esar
Cha
vez
Eas
t Com
mun
ity D
esig
n P
lan2
PL
AN
/ C
ER
Allo
cate
d$2
2,72
9$2
2,72
9
SFC
TA
19th
Ave
Tra
nsit
Cor
rido
r In
vest
men
t Stu
dy 4
PLA
NA
lloca
ted
$126
,827
$126
,827
SFC
TA
19th
Ave
Tra
nsit
Cor
rido
r In
vest
men
t Stu
dyP
LA
ND
eobl
igat
ed($
25,4
27)
($25
,427
)
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Cal
tran
s Pl
anni
ng)
PL
AN
/ C
ER
Pro
gram
med
$0$0
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Cal
tran
s Pl
anni
ng)11
, 17
PL
AN
/ C
ER
Prog
ram
med
$4,2
11$4
,211
PC
JPB
Cal
trai
n N
orth
Ter
min
al S
tudy
17P
LA
N/
CE
RA
lloca
ted
$22,
940
$22,
940
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Cal
tran
s Pl
anni
ng)
PL
AN
/ C
ER
Prog
ram
med
$54,
076
$54,
076
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an)1,
5, 1
0P
LA
N/
CE
RP
rogr
amm
ed$0
$0
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an) 10
, 15
PL
AN
/ C
ER
Pro
gram
med
$0$0
SFC
TA
Bal
boa
Park
Sta
tion
Are
a C
ircu
latio
n St
udy
PL
AN
/ C
ER
Allo
cate
d$6
5,60
0$6
5,60
0
Nei
ghbo
rhoo
d T
rans
port
atio
n Pl
anni
ng
Plan
ning
for
TO
D/I
nfill
Sup
port
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
5 5Y
PP A
ppen
dice
s\EP
44
Tab
: EP
44 5
YPP
03.2
5.14
Page
2 o
f 4
42
2009
/10
2010
/11
2011
/12
2012
/13
2013
/14
Fis
cal Y
ear
Tot
alSt
atus
Age
ncy
Pro
ject
Nam
eP
hase
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an)15
PL
AN
/ C
ER
Pro
gram
med
$0$0
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an)15
PL
AN
/ C
ER
Pro
gram
med
$0$0
SFC
TA
Bal
boa
Park
Sta
tion
Are
a C
ircu
latio
n St
udy
10P
LA
N/
CE
RA
ppro
pria
ted
$59,
400
$59,
400
Any
Elig
ible
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an)15
PL
AN
/ C
ER
Pro
gram
med
$0$0
$200
,685
$3
49,0
91
$1,0
04,2
77
$199
,414
$2
,860
,590
$4
,614
,057
$0
$405
,288
$1
,033
,099
$1
95,2
03
$1,5
28,5
73
$3,1
62,1
63
$0
($56
,197
)($
30,0
47)
$0
$0
($86
,244
)$2
00,6
85
$0
$1,2
25
$4,2
11
$1,3
32,0
17
$1,5
38,1
38
$272
,885
$5
81,0
96
$1,5
45,5
56
$576
,276
$1
,726
,276
$4
,702
,089
$3
8 $3
8 $7
2,23
8 $3
04,2
43
$845
,522
$1
,222
,384
$8
8,07
0 $8
8,07
0 *
The
200
9 St
rate
gic
Plan
was
am
ende
d on
Mar
ch 3
0, 2
010
thro
ugh
Res
. 10-
52.
FO
OT
NO
TE
S:
1
9th
Ave
nue
Tra
nsit
Cor
rido
r In
vest
men
t Stu
dy: A
dded
new
pro
ject
.
Fisc
al Y
ear
2011
/12
Nei
ghbo
rhoo
d Pl
anni
ng (e
.g. C
BT
P):
Red
uced
pro
gram
min
g fr
om $
50,0
00 to
$7,
249.
Cu
mu
lati
ve R
emai
nin
g P
rogr
amm
ing
Cap
acit
y
** "
Deo
blig
ated
fro
m p
rior
5Y
PP
cyc
les"
incl
udes
deo
blig
atio
ns f
rom
allo
catio
ns a
ppro
ved
prio
r to
the
curr
ent 5
YP
P p
erio
d, e
xclu
ding
deo
blig
atio
ns in
corp
orat
ed in
the
Dec
embe
r 31
, 201
2.
Tot
al P
rogr
amm
ed in
5Y
PP
Tot
al A
lloca
ted
an
d P
end
ing
in 5
YP
PT
otal
Deo
blig
ated
in 5
YP
PT
otal
Un
allo
cate
d in
5Y
PP
Tot
al P
rogr
amm
ed in
Am
end
ed 2
009
Stra
tegi
c P
lan
*D
eob
ligat
ed f
rom
Pri
or 5
YP
P C
ycle
s **
Pro
gram
med
Boa
rd A
ppro
ved
Allo
catio
n/A
ppro
pria
tion
1 5Y
PP
Am
endm
ent t
o fu
lly f
und
cons
truc
tion
of th
e F
olso
m S
tree
tsca
pe I
mpr
ovem
ents
(Res
. 11-
33, 1
2.14
.201
0)
FY
09/
10 P
lann
ing
Plac
ehol
der
decr
ease
d fr
om $
72,2
00 to
$69
,020
. Fu
nds
($3,
180)
red
irec
ted
to F
olso
m S
tree
tsca
pe I
mpr
ovem
ents
.2 C
esar
Cha
vez
Eas
t Com
mun
ity D
esig
n Pl
an: O
n Se
ptem
ber
28, 2
010,
thro
ugh
Res
olut
ion
11-1
3, th
e A
utho
rity
Boa
rd a
lloca
ted
up to
$54
,076
for
this
pro
ject
. Su
bseq
uent
ly, t
hat a
lloca
tion
was
low
ered
to
$52,
288
and
split
bet
wee
n an
allo
catio
n to
the
Plan
ning
Dep
artm
ent (
$22,
729)
and
an a
ppro
pria
tion
to th
e A
utho
rity
($29
,559
). I
nfor
mat
ion
on th
is a
ctio
n is
ava
ilabl
e in
MO
A#
10/
11 -
11.
3 Loc
al C
apita
l Mat
ch P
lace
hold
er w
as r
educ
ed b
y $3
03,0
47 to
fun
d th
e B
AR
T 2
4th
Stre
et P
laza
and
Ped
estr
ian
Impr
ovem
ents
(Res
. 11-
62, 6
.28.
11)
4 5Y
PP A
men
dmen
t to
add
$126
,827
for
the
19th
Ave
nue
Tra
nsit
Cor
rido
r In
vest
men
t Stu
dy (R
es. 1
2-24
, 11.
15.1
1).
Fi
scal
Yea
r 20
10/1
1 N
eigh
borh
ood
Plan
ning
(e.g
. CB
TP
): R
educ
ed p
rogr
amm
ing
from
$30
,000
to $
0.
5 Pla
nnin
g Pl
aceh
olde
r (e
.g. S
tatio
n A
rea
Plan
) red
uced
in F
Y 2
009/
10 f
rom
$69
,020
to $
3,42
0 to
fun
d B
albo
a Pa
rk S
tatio
n A
rea
Circ
ulat
ion
Stud
y (R
es. 1
2-27
, 12.
13.1
1)6 L
ocal
Cap
ital M
atch
Pla
ceho
lder
(Con
stru
ctio
n) w
as r
educ
ed f
rom
$83
7,23
3 to
$47
8,60
8 to
fun
d 3
DP
W p
roje
cts:
24t
h St
reet
/Mis
sion
BA
RT
Pla
za B
us-b
ulb
(Res
. 12-
28, 1
2.13
.201
1), a
nd M
arin
a G
reen
B
icyc
le T
rail
and
Bro
adw
ay S
tree
etsc
ape
Impr
ovem
ents
- P
hase
III
(Res
. 12-
60, 0
4.24
.201
2).
7 Loc
al C
apita
l Mat
ch P
lace
hold
er (C
onst
ruct
ion)
was
red
uced
fro
m $
478,
608
to $
450,
608
to f
und
DP
W's
24th
/Mis
sion
BA
RT
SW
Pla
za -
24th
Str
eet S
idew
alk,
Cur
b, a
nd L
ands
capi
ng p
roje
ct (R
es. 1
3-12
, 09
.25.
2012
).
8 Loc
al C
apita
l Mat
ch P
lace
hold
er (C
onst
ruct
ion)
was
red
uced
fro
m $
450,
608
to $
433,
405
to f
und
BA
RT
's 24
th/M
issi
on B
AR
T P
laza
and
Ped
estr
ian
Impr
ovem
ents
pro
ject
(Res
. 13-
30, 0
1.29
.201
3).
Pend
ing
Allo
catio
n/A
ppro
pria
tion
9 Loc
al C
apita
l Mat
ch P
lace
hold
er (C
onst
ruct
ion)
was
red
uced
fro
m $
433,
405
to $
283,
405
to p
rovi
de s
uppl
emen
tal f
unds
for
DP
W's
Bro
adw
ay S
tree
etsc
ape
Impr
ovem
ents
- P
hase
III
pro
ject
(Res
. 13-
43,
03.2
6.20
13).
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
5 5Y
PP A
ppen
dice
s\EP
44
Tab
: EP
44 5
YPP
03.2
5.14
Page
3 o
f 4
43
2009
/10
2010
/11
2011
/12
2012
/13
2013
/14
Fis
cal Y
ear
Tot
alSt
atus
Age
ncy
Pro
ject
Nam
eP
hase
B
road
way
Chi
nato
wn
Nei
ghbo
rhoo
d T
rans
port
atio
n Pl
an: A
dded
new
pro
ject
.
F
isca
l Yea
r 20
11/1
2 N
eigh
borh
ood
Plan
ning
(e.g
. CB
TP
): R
educ
ed p
rogr
amm
ing
from
$50
,000
to $
0.
Lan
d U
se A
lloca
tion
Mod
el U
pdat
e: R
educ
ed p
rogr
amm
ing
from
$50
,000
to $
0.
F
isca
l Yea
r 20
12/1
3 Pl
anni
ng P
lace
hold
er (e
.g. C
altr
ans
Plan
ning
): R
educ
ed p
rogr
amm
ing
from
$54
,076
to $
27,1
51.
10 P
lann
ing
Plac
ehol
der
(e.g
. Sta
tion
Are
a Pl
an) r
educ
ed in
FY
200
9/10
fro
m $
3,42
0 to
$0
and
in F
Y 2
010/
11 f
rom
$72
,200
to $
16,2
20 to
fun
d B
albo
a Pa
rk S
tatio
n A
rea
Cir
cula
tion
Stud
y (R
es. 1
4-05
, 07
.23.
13)
11 5
YPP
Am
endm
ent t
o ad
d $2
09,1
74 f
or th
e B
road
way
Chi
nato
wn
Nei
ghbo
rhoo
d T
rans
port
atio
n Pl
an (R
es. 1
4-05
, 07.
23.1
3).
Fi
scal
Yea
r 20
10/1
1 N
eigh
borh
ood
Plan
ning
(e.g
. CB
TP
): R
educ
ed p
rogr
amm
ing
from
$7,
249
to $
0.
N
TP
Prog
ram
- E
valu
atio
n /
Citi
zens
Gui
de: R
educ
ed p
rogr
amm
ing
from
$75
,000
to $
0.
12 L
ocal
Cap
ital M
atch
Pla
ceho
lder
(Con
stru
ctio
n) w
as r
educ
ed f
rom
$28
3,40
5 to
$74
,405
to p
rovi
de lo
cal m
atch
fun
ds f
or th
e co
nstr
uctio
n of
SF
MT
A's
Mar
ket a
nd H
aigh
t Str
eet T
rans
it an
d P
edes
tria
n Im
prov
emen
t pro
ject
(R
es. 1
4-20
, 09.
24.2
013)
.13
Loc
al C
apita
l Mat
ch P
lace
hold
er (D
esig
n) w
as r
educ
ed f
rom
$40
0,00
0 to
$35
4,83
5 to
pro
vide
loca
l mat
ch f
unds
for
the
envi
ronm
enta
l stu
dies
and
des
ign
phas
es o
f D
PW
's L
ongf
ello
w E
lem
enta
ry S
choo
l Sa
fe R
oute
s to
Sch
ool p
roje
ct ($
24,9
81) a
nd E
R T
aylo
r E
lem
enta
ry S
choo
l Saf
e R
oute
s to
Sch
ool p
roje
ct ($
20,1
84).
(Res
. 14-
29, 1
0.22
.201
3).
14 L
ocal
Cap
ital M
atch
Pla
ceho
lder
(Des
ign)
was
red
uced
fro
m $
354,
835
to $
23,9
95 to
pro
vide
loca
l mat
ch f
unds
for
the
desi
gn p
hase
of
SFM
TA
's M
anse
ll C
orri
dor
Impr
ovem
ent (
$330
,840
) (R
es. 1
4-34
, 11
.26.
2013
).15
5YPP
Am
endm
ent t
o ad
d $3
06,0
00 f
or th
e 19
th A
venu
e/M
-Oce
an V
iew
Pro
ject
(Res
. 14-
63, 0
3.25
.14)
.
1
9th
Ave
nue/
M-O
cean
Vie
w P
roje
ct: A
dded
new
pro
ject
.
F
isca
l Yea
r 20
11/1
2 L
ocal
Cap
ital M
atch
Pla
ceho
lder
: Red
uced
pro
gram
min
g fr
om $
74,4
05 to
$1,
225.
Fis
cal Y
ear
2010
/11
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an):
Red
uced
pro
gram
min
g fr
om $
16,2
20 to
$0.
Fis
cal Y
ear
2011
/12
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an):
Red
uced
pro
gram
min
g fr
om $
72,2
00 to
$0.
Fis
cal Y
ear
2012
/13
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an):
Red
uced
pro
gram
min
g fr
om $
72,2
00 to
$0.
Fis
cal Y
ear
2013
/14
Plan
ning
Pla
ceho
lder
(e.g
. Sta
tion
Are
a Pl
an):
Red
uced
pro
gram
min
g fr
om $
72,2
00 to
$0.
18 5Y
PP A
men
dmen
t to
add
$173
,212
for
the
Cen
tral
Sub
way
Pha
se I
II -
Ini
tial S
tudy
(Res
. 14-
63, 0
3.25
.14)
.
C
entr
al S
ubw
ay P
hase
III
- I
nitia
l Stu
dy: A
dded
new
pro
ject
.
F
isca
l Yea
r 20
13/1
4 L
ocal
Cap
ital M
atch
Pla
ceho
lder
: Red
uced
pro
gram
min
g fr
om $
1,45
1,15
3 to
$1,
277,
941.
16 L
ocal
Cap
ital M
atch
Pla
ceho
lder
(Des
ign)
was
red
uced
fro
m $
23,9
95 to
$0,
and
Loc
al C
apita
l Mat
ch P
lace
hold
er (C
onst
ruct
ion)
was
red
uced
fro
m $
1.6
mill
ion
to $
1,45
1,15
3 to
pro
vide
loca
l mat
ch f
unds
fo
r th
e en
viro
nmen
tal s
tudi
es a
nd d
esig
n ph
ases
of
DP
W's
Seco
nd S
tree
t Im
prov
emen
t ($1
72,8
42) (
Res
. 14-
63, 0
3.25
.14)
.17
5YPP
Am
endm
ent t
o ad
d $2
2,94
0 fo
r th
e C
altr
ain
Nor
th T
erm
inal
Stu
dy (R
es.1
4-63
, 03.
25.1
4).
Cal
trai
n N
orth
Ter
min
al S
tudy
: Add
ed n
ew p
roje
ct.
Fis
cal Y
ear
2012
/13
Plan
ning
Pla
ceho
lder
: Red
uced
pro
gram
min
g fr
om $
27,1
51 to
$4,
211.
P:\P
rop
K\SP
-5YP
P\20
13 U
pdat
e\3
5YPP
s\EP
44\
5 5Y
PP A
ppen
dice
s\EP
44
Tab
: EP
44 5
YPP
03.2
5.14
Page
4 o
f 4
44