    FIELD

    INSTALLATIONINSTRUCTIONSJANUARY 2004

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    2/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Material Handling Procedures 3

    Tools Recommended For Installation 4

    Leveling Course - Steps 1-7 5

    Typical Coursing - Steps 1-7 7

    Points To Check 1-3 - Coursing 9

    Routing Channels - Steps 1-6 10

    Tools Recommended For Installation 12

    Installing Horizontal Wall Panels Steps 1-11 13

    Points To Check 1-5 - Horizontal AAC Wall Panels 17

    Tools Recommended For Installation 18

    Installing Panels - Steps 1-6 19

    Filling Joints Steps 1-3 21

    Panel Penetration Guidelines 22

    Points To Check 1-4 23

    Routing Channels - Steps 1-3 24

    Points To Check 1-3 25

    TABLE OF CONTENTS

    AAC MASONRY PRODUCTS:I

    HORIZONTAL AAC WALL PANELSII

    PRECAST FLOOR PANELSIII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    3/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Material Handling Procedures

    General:

    In general, all construction products are susceptible to minor damage if mishandled. Lesshandling means lower potential for damaged. In some instances, damage may occur

    from shipping.

    For All AAC Construction Products:

    Deliver only an amount of material that can readily be installed.

    Unload panels using pallet forks (either forklift, nylon straps, slings or pallet fork on a crane

    cable). Consult your OSHA safety manual for "rigging" or other safety considerations.

    Storage areas should be accessible to delivery trucks and convenient to material staging areas. If

    possible, drop-deliver the material right to the material staging areas.

    Storage material should always be stored away from other construction activities on a flat-grade

    area that is not susceptible to standing water, erosion or settling.

    Keep the material covered and banded until ready for installation.

    Special Considerations For Panel Construction:

    As with most precast concrete products, the panels should be set directly from the delivery trailer,if permissible.

    If the materials cannot be set directly from the delivery trailers, deliver only an amount of material

    that can be installed readily.

    Do not "shake-out" stored materials until they are ready to be installed. Excessive handling may

    cause damage. Set delivery schedule to match the erection sequence exactly.

    Most chipped corners and edges can be repaired. If any reinforcing is visible, contact an

    authorized AAC representative.

    All damage must be repaired using an approved structural-grade AAC patching compounddeveloped specifically for AAC products.

    AAC panels that have surface or minor cracks are usable, but contact an authorized AAC

    representative when cracks continue completely through the panel.

    Stored or staged materials should always be set on flat, load-bearing, stable grade on pallets or

    dunnage.

    3

    AAC MASONRY PRODUCTS:I

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    4/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    AAC BlockThere are a full range of tools that are specially

    designed to assist the block layer in installing AAC

    masonry products and increase productivity at thejob site.

    Tools Recommended For Installation

    AAC JumboBlock

    Additional tools required for installing AAC

    JumboMasonry Units.

    AAC masonry installation will also require the

    following standard masonry tools.

    Electric Jumbo Bandsaw Electric Minicrane

    Hand Saw

    Rasp

    Electric Bandsaw

    Notched Trowel

    Margin Trowel

    Small Hand Brush

    Builders Level

    Sanding Float

    4 Level

    String Line

    Rubber Mallet

    Low Speed Drill with Mixing Paddle

    4

    AAC MASONRY PRODUCTS:I

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    5/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Leveling Course

    Step 1 - Layout wall lines.Lay out wall lines building slab by control lines.

    Step 2 - Start the leveling bed.At the highest corner of the slab place a full width 1/2

    deep sand-cement mortar joint using a masonry trowel(Mortar to be either Ready-Mix or 3:1 Sand: Portland

    Cement ratio).

    Salvage additional mortar. Do not use thin-bed mortar

    for the leveling bed joint.

    If moisture and wicking is a problem, add waterproofing

    admixture to sand-cement mortar.

    Step 3 - Set the first corner block.Set the first corner block in the sand-cement mortar

    and adjust the joint as needed.

    To achieve the required height, lower or raise the

    block by tapping down with a rubber mallet or by

    adding additional mortar beneath.

    Step 4 - Mix thin-bed mortar.Mix approved AAC thin-bed mortar in a cleanmixing container (5 gallon bucket or pail) per

    manufacturers directions.

    The consistency of the mixed thin-bed mortar

    should be such that it flows easily through the teeth

    of the notched trowel leaving the shape of the teeth

    in the mortar bed.

    Thin-bed mortar droppings

    should not be used.

    5

    AAC MASONRY PRODUCTS:I

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    6/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Leveling Course

    Step 5 - Set second corner block.Set the second corner block adding thin-bed

    mortar to the head joint with the notched trowel.

    Step 6 - Repeat for additional corners.Repeat subsequent steps for each corner using a

    builders level to maintain an equal elevation.

    Triple check each lead corner in all three planes.

    Step 7 - Fill-in complete leveling

    course.After building lead corners, pull a string between

    corners to complete the leveling course. Sand-

    cement mortar should be used for the bed joint

    and thin-bed mortar for each head joint.

    Level across each block to insure a

    plumb wall.

    DO NOT PROCEED TO SUBSEQUENT

    COURSE UNTIL LEVELING COURSE

    HAS SET SUFFICIENTLY.

    STOP

    DO NOT TOOTH

    6

    AAC MASONRY PRODUCTS:I

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    7/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Typical Coursing

    DO NOT USE SAND-CEMENT

    MORTAR FOR COURSES OTHERTHAN THE LEVELING COURSE.

    Step 2 - Clean bed joint surface.With a brush, sweep off all dust and loose

    particles to insure adhesion of thin-bed mortar.

    Step 1 - Mix thin-bed mortar.Mix thin-bed mortar.

    Before mixing new batch, wash out the bucket or pail

    to prevent any old thin-bed from accelerating the

    drying time of the new mix.

    Step 3 - Apply thin-bed mortar to head

    and bed joints.Using a clean, notched trowel the same width as the

    block spread thin-bed mortar up the head joint of theadjoining block and then along the bed joint.

    Spread only enough thin-bed mortar to lay one block

    at a time. The thin-bed mortar must cover the full

    width of the joints.

    Install block in a running bond

    with a minimum 4 bearing

    (overlap) or 40% of the blocks

    height (whichever is greater).

    STOP

    DO NOT TOOTH

    7

    AAC MASONRY PRODUCTS:I

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    8/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Typical Coursing

    Step 6 - Rasp as needed.As needed, rasp (sand) the topside of the wall to

    ensure a level bed-joint for the next course.

    This is required less often if block is installed

    within tolerances.

    Step 7 - Install lintels as required.Install lintels with a minimum 8 bearing (overlap)

    where required.

    Step 5 - Tap the end of the block.Tap the end of the block to insure a full surfacecoverage of thin-bed mortar at the head joint and

    align with string line.

    Clean off spilled or dripped thin-bed mortar from

    face of wall as work proceeds.

    Repeat installation for subsequent courses.

    Step 4 - Set block.Pick up each block and move it as close to thehead joint as possible before lowering the block

    onto the bed joint

    Excessive movement along the bed joint will force

    the thin-bed mortar into the corner preventing full

    adhesion with the head joint.

    Joints should

    maintain a

    thickness of

    1/16 or 1/8.

    8

    AAC MASONRY PRODUCTS:I

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    9/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Points To Check

    Point 1Leveling course must be level and plumb. Do not proceed to subsequentcourses until leveling course has set sufficiently.

    Point 2Blocks must be installed in a running bond with a minimum 4 bearing (overlap)

    or 40% of the blocks height (whichever is greater). Lintels must be installed

    with a minimum 8 bearing (overlap).

    Point 3All head and bed joints must be solid with approved

    AAC thin-bed mortar for full adhesion. Do not tooth.

    DO NOT TOOTH

    9

    AAC MASONRY PRODUCTS:I

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    10/25

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    11/25

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    12/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    AAC installation will also require the following

    standard industry tools.

    There are a full range of tools that are specially

    designed to assist in installing wall panels and

    increase productivity at the job site.

    Slings

    Quick Cut Saw

    Rasp

    Chamfering Tool

    Grinder/Sander or

    Electric Cut-Off Saw

    Steel Bar Clamp

    Margin Trowel

    Small Hand Brush

    Builders Level

    Rubber Float

    4 Level

    Chalk Box/String Line

    Pinch Bar

    Wall Panel Lifting Gear

    12

    HORIZONTAL AAC WALL PANELSII

    Tools Recommended For Installation

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    13/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Installing Panels

    Step 2 - Unload bundles.Unload the bundles of panels in a proper manner

    using approved unloading gear.

    Eliminate excessive handling by storing panels

    nearest to where they will be installed.

    Step 1 - Check layout.Check panel layout of approved AAC shop

    drawings and deliver panels to job site

    accordingly.

    Protect the panels from rain and water

    saturation by leaving them on pallets

    and away from standing water.

    13

    HORIZONTAL AAC WALL PANELSII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    14/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Installing Panels

    Step 5 - Check panel height and plumbness.Check the height, levelness and plumbness of the panel.

    Temporarily suspend loose panel with clamps. See plans

    and specification for allowable tolerances.

    Step 4 - Place first panel.Measure down from the benchmark elevators to

    establish the highest point on the slab. Install the

    first panel, male side up, at the highest point ofthe slab or stem wall, on top of preleveled shims

    to establish a minimum depth of setting bed.

    Place sand-cement mortar joint of at least 1/2

    using a conventional masonry trowel (mortar to be

    either Ready-mix or 3:1 Sand: Portland Cement

    ratio) along wall line in between plastic shims or

    pack with non-shrink grout. Other bays will require

    adjusting the depth of the setting bed prior to

    installing the first panel.

    Step 3 - Check plumbness of column line.Check column line layout and plumbness. Varify layout

    is within industry standards. Using a level and transit,

    establish benchmark elevators onto the columns that willact as a control line for setting the first AAC panels.

    Alert General Contractor

    to column line problems and

    correct before proceeding.

    Step 6 - Notch each end of the panel.Notch ends of each panel with grinder/saw to receive anchors.

    STOP

    14

    HORIZONTAL AAC WALL PANELSII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    15/25

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    16/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Installing Panels

    Step 10 - Install the second panel.Align the ends and groove of the second panel with

    the ends and tongue of the first panel and set into

    place. Repeat Steps 5 - 9 for the subsequent panels

    in accordance with AAC shop drawings.

    Step 11 - After installation.After panels are installed, clean all horizontal and

    vertical joints with a brush and apply exterior joint

    sealers in accordance with AAC instructions.

    16

    HORIZONTAL AAC WALL PANELSII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    17/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Points To Check

    Point 1

    Supporting columns must be plumb, level and within linear building linetolerances.

    Point 2Protect the panels from rain and water saturation

    by leaving them on pallets and away from standing water.

    Point 3Set panels with tongue side up and follow

    specifications and shop drawings for

    placement of adhesive and joint filler.

    Point 4Panel(s) must lay flush against face of column.

    Point 5In the event bowing occurs with the AAC panels within a column bay, stack

    the AAC panels so that the bow is constant in one direction.

    AAC horizontal

    panels

    Acrylic

    coating

    2 beads of

    adhesive

    Fill joint

    with

    joint filler

    Correct installation

    of bowed panels

    Incorrect installation

    of bowed panels

    17

    PRECAST WALL PANELSIII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    18/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Slings/ Ropes

    Quick Cut Saw

    Rasp

    Hatchet Hammer

    Chamfering Tool

    Margin Trowel

    Small Hand Brush

    Builders Level

    Rubber Float

    4 Level

    Chalk Box/String Line

    Pinch Bar

    Lifting

    Fork

    Panel Turners

    Floor Panel Lifting Gear

    18

    PRECAST FLOOR PANELSIII

    Tools Recommended For Installation

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    19/25

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    20/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Installing Panels

    Step 5 - Repeat for remaining panels.Lay the remaining panels ensuring that each one is

    seated firmly beside the preceding one.

    Step 6 - Placing last panel.The correct lifting gear will greatly assist

    placement of the last panel. Special procedures

    may be required if other lifting devices are used

    (I.e. slings or ropes).

    20

    PRECAST FLOOR PANELSIII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    21/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Filling Joints

    Step 1 - Set screen block.Set minimum 2 screen block in thin-bed mortar

    around exterior perimeter for formwork for all ringbeams according to detail drawings.

    Step 2 - Place reinforcement steel.Install reinforcing steel in panel joints, ring beams,

    and lintels according to detail drawings.

    Make sure all rebar is in correct position before

    concrete is placed. Tie wire or chairs may be used to

    hold rebar at correct heights.

    Hanger wire for suspended ceilings may be installed

    through floor panel joints at this time.

    Step 3 - Fill joints with concrete.Fill wet joints with concrete. Firmly tamp into all

    joints, screed off excess and finish.

    A Pencil Vibrator should be used for ring beam and

    lintel pours.

    21

    PRECAST FLOOR PANELSIII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    22/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Panel Penetration Guidelines

    PANELS WITH HOLES MUST BE DESIGNED

    TO HAVE SUFFICIENT REINFORCEMENT

    Less than or

    equal to 6

    INCORRECT!DO NOT PENETRATE THE PANEL

    ACROSS ITS WIDTH MORE THAN

    ONCE WITH HOLES GREATER THAN

    OR EQUAL TO 6.

    Opening may not

    exceed 25% of

    panel width

    Less than or equal to25% of panel width

    2 - 0

    typical

    panel

    INCORRECT METHOD CORRECT METHOD

    PLAN VIEWS

    AAC floor panel

    STOP

    22

    PRECAST FLOOR PANELSIII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    23/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Points To Check

    Point 1Supporting walls must be level.

    Point 2Minimum bearing as shown in detail drawings must be maintained.

    Point 3Concrete poured into joints must completely cover all reinforcement.

    Point 4Do not cut or modify a panel without first checking with AAC Building

    Systems. Observe all guidelines for coring and other floor penetrations.

    Never cut the floor panel to shorten it.

    23

    PRECAST FLOOR PANELSIII

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    24/25

    BABB TECHNOLOGIES, INC.Phone: (706) 965-4587

    Fax: (706) 965-4597

    website: www.SafeCrete.com

    Field Installation Instructions Rev. 1-07-2004

    Routing Channels

    Step 1 - Routing bottom of floor panels.The underside of floor panels may be routed to a depth no greater than 3/4 in the middle or no greater than

    1 1/2 on the sides. Stop if reinforcing becomes exposed.

    Step 2 - Top of floor panels.DO NOT ROUT the topside of panels.

    Place conduit in the panel joints.

  • 8/10/2019 Field Installation Instructions-102802 - r2.ppt

    25/25

    Points To Check

    Point 1Do not rout horizontally less than 24 from the top of load bearing walls.

    Point 2Do not rout horizontally greater than 1/3 of the total wall thickness.

    A + B < 1/3 of total thickness

    Point 3Do not rout back-to-back wall channels. Offset channels at least 12.

    PRECAST FLOOR PANELSIII