Figure 2-C.2September 2009
Barrio Logan Community Plan Update
N
LEGEND
2
28th Street Freeway Access Improvements - Option B - between Main St and National Ave
Construct new I-5 southbound on-ramp along 28th Street. 4
Widen east side of 28th St to accomodate third NB through lane.3 Convert eastbound and westbound left-turn phasing from permissive to protectiveleft-turns at Main Street and 28th Street intersection.
5Convert Boston Ave from 28th Street to 29th Street to a Commercial Local Street with diagonal parking along both sides.
1
3
4
5
3
Remove I-5 southbound on-ramp along Boston Avenue.2 Install linear park between Boston Avenue and Interstate 5 with Class I bike facility.6
6
7
Convert Boston Avenue between 29th Street to 32nd Street to a lowvolume residential local street with 30 feet of curb to curb width.
7
see Figure X forproposed improvementalong this segment
MA
IN S
T
ALL
EY
28TH ST
I-5
NAT
ION
AL
AVE
NEW
TON
AVE
BOST
ON
AVE
C E N T R E C I T YC O M M U N I T Y P L A N
A R E A
S O U T H E A S T E R NS A N D I E G O
C O M M U N I T Y P L A N A R E A
B A R R I O L O G A NC O M M U N I T Y P L A N
A R E A
Logan HeightsMountain View
Southcrest
Shel l town
East Vi l lage
Barr io Logan
I-5 Sb
Main
32nd
28th
Irving
02nd
03rd
05th
Sam
pson
Newton
26th
27th
Dewey
Cesar
E C
have
z
Attu04th
Hoover
Sigs
bee
Inchon
Una
Tara
wa
Thor
06th Tompkins
Ravenscroft
07th
Doyle
Eniwetok
Siva
Paun
ack
Bear
dsle
y
Boston
05th
29th
Sica
rd
31st
Newton
Logan
Wod
en
06th
04th
30th
Privat
e Mc C
andless
Privat
e
Newton
A
Logan
Evan
s
32nd
Cumm
ings
Cesar
E C
have
z
Attu
Roosevelt
Woden04th
Hoover
Inchon
Bougain
ville
Vesta
Tara
wa
06th Tompkins12th
Rio
Ravenscroft07
th
Gilette
Eniwetok
05th
04th
Gilette
I-5 Sb On
Vest
a
Privat
e Mc C
andless
Privat
e
Harbor
28th
National
Main
Belt
Commercial
National National
Dalbergia
Rige
l
Main
National
National
Logan
Logan
Ocean View
17th
19th
Boston
Ocean View
Imperial
Alpha
Logan
National
Sam
pson
Sica
rd
Evan
s
Una
Wod
en
Vest
a
Boston
Newton
35th
40th
36th
37th
38th
39th
41st
30th
31st
32nd
Main
Harbor
Julian
22th 25
th
Commercial
N AT I O N A L C I T YS A N D I E G O
San Diego Bay
Cesar Chavez
Park
To City of Coronado
Memorial Park
Recreation Center
Chicano Park
Barrio LoganStation
HarborsideStation
Las C
holla
s C
reek
S. Las Chollas Creek
La Poleta Creek
Memorial Academy
LoganPreschool
EmersonElementary
PerkinsElementary
School
12th and Imperial MTS Transit Center
Tenth Avenue Marine Terminal
25th and Commercial Station
32nd and Commercial Station
Pacific FleetStation
P O R T O FS A N D I E G O
ChavezElementary
School
BalboaElementary
School
St. JudeAcademy
Burbank Elementary
School
To Downtown
N AVA L S TAT I O NS A N D I E G O
po5
75
15
po5
Community Plan Area February 2009
Barrio Logan Community Plan Update
0 500 1000 2000 feet
N
THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS, FOR A PARTICULAR PURPOSE. Copyright SanGIS. All Rights Reserved.
This product may contain information from the SANDAG Regional Information System which cannot be reproduced without written permission of SANDAG.
This product may contain information which has been reproduced with permission granted by Thomas Bros. Maps.
LEGEND
School
Park/Open Space
SDMTS Trolley and Station
Freeway/RampBarrio Logan CommunityPlan Area
City Boundary
Port District*
*The Port District is not within the jurisdiction of the City but the existing plan shows it within its boundaries.
Figure 3-A.1Recommended Bicycle NetworkClass 3 Bikeway
Class 1 Bikeway
Class 2 Bikeway
Outside Barrio Logan ( Existing or Recommended under the City of San Diego’s Bicycle Masterplan (May 2002):
Class 3 Bikeway
Class 1 Bikeway
Class 2 Bikeway
Within Barrio Logan:
September 2009
Barrio Logan Community Plan Update
N
LEGEND
Beardsley St Improvements - between National Avenue and Logan Avenue
Convert segment to one directional tra�c only (northbound)
Remove WB left-turn lane from Logan Avenue to Beardsley Street2 Provide diagonal parking (15-18 spaces).44
Add striping marking to indicate change in directional tra�c.31
1
2
3
3
44
LOG
AN
AVE
ALL
EY
NAT
ION
AL
AVE
BEARDSLEY ST
Figure 4-A.1
September 2009
Barrio Logan Community Plan Update
N
LEGEND
Harbor Drive improvements - at Sigsbee Street and Beardsley Street
Extend raised median along Harbor Drive and restrict Beardsley Street toright-in/right-out only movements.
Provide roadway improvements to Sigsbee Street (curb, gutter and sidewalks).2 Landscape raised median.4
Install tra�c signal at Harbor Drive and Sigsbee Street intersection.31
1
2
34
4
Figure 4-A.2
HARBOR DR
BEA
RDSL
EY S
T
SIG
SBEE
ST
September 2009
Barrio Logan Community Plan Update
N
LEGEND
28th Street Freeway Access Improvements - Option A- between Harbor Drive and Main Street
Modify raised median along Harbor Drive to accomodate second EB left-turnlane from Harbor Drive to 28th Street to improve truck turning from Harbor Drive.
Add second SB left-turn lane from 28th Street to Harbor Drive.3
Modify median along 28th Street between Harbor Drive and Main Street.2 Add third NB through lane along 28th Street between Harbor Drive andMain Street, extend NB lane through intersection of Boston Avenue.
5Add exclusive NB right-turn lane.8
Remove parking along east side of 28th Street between Main Street and Harbor Drive. Widen roadway 6’ to the east to accomodate proposedimprovements. Reconstruct driveways and curb ramps (10-12 fewer parking spaces.)
7
Remove parking along west side of 28th Street between Main Street and Harbor Drive. Widen roadway 4’ to the west to accomodate proposedimprovements. Reconstruct driveways and curb ramps (8-10 fewer parking spaces).
6Add raised median to channelize SB left-turn movement ontoNaval Base.
41
2
2
3
8
77
5
6
5
4
2
1
Figure 5-A.1
HAR
BOR
DR
28TH ST
MA
IN S
T
September 2009
Barrio Logan Community Plan Update
N
LEGEND
28th Street Freeway Access Improvements - Option B- between Harbor Drive and Main Street
Modify raised median along Harbor Drive to accomodate second EB left-turnlane from Harbor Drive to 28th Street to improve truck turning from Harbor Drive.
Add second SB left-turn lane from 28th Street to Harbor Drive.3
Modify median along 28th Street between Harbor Drive and Main Street.2 Add third NB through lane along 28th Street between Harbor Drive andMain Street.
5Remove parking along east side of 28th Street between Main Street and Harbor Drive. Widen roadway 6’ to the east to accomodate proposedimprovements. Reconstruct driveways and curb ramps (8-10 fewer parking spaces).
7
Remove parking along west side of 28th Street between Main Street and Harbor Drive. Widen roadway 4’ to the west to accomodate proposedimprovements. Reconstruct driveways and curb ramps (8-10 fewer parking spaces).
6Add raised median to channelize SB left-turn movement ontoNaval Base.
41
2
2
3
77
5
6
5
4
2
1
Figure 5-B.1
HAR
BOR
DR
28TH ST
MA
IN S
T