figure 4-7: united utilities internal & external dg5
TRANSCRIPT
Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 30
Figure 4-7 provides a spatial overview of DG5 records in Warrington BC aggregated to United Utilities drainage areas. These have been coloured to illustrate the total number of properties on the register as listed below.
Low - Less than 10 properties on internal register Medium - Less than 10 properties on internal register and some on external register High - Greater than 10 properties on internal register and some on external register
Figure 4-7: United Utilities Internal & External DG5 Records Map
© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848
4.3.4 United Utilities Hydraulic Sewer Modelling
Sewers are generally designed to a 1 in 30-year design standard, which means sewer flooding will often be associated with larger events that are less frequent but have a higher consequence. In these situations, sewer inputs from the surrounding land will exceed the sewer system, discharge from manholes and flow across the surface of the land. Overland flows will therefore often follow the same flow paths and pond in the same areas as overland flows identified in the Environment Agency's national surface water maps.
As part of their ongoing drainage area programme, United Utilities have constructed hydraulic models of some of the main sewer systems through Warrington. A series of design storms representing rainfall events of different return periods (1, 2, 5, 10, 20 & 30-years) were applied to the models with the surcharging volume at individual model nodes recorded and supplied as a GIS layer.
Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 31
Figure 4-8 illustrates the volume discharged (m³) by each manhole during the 1 in 30 year flood event at a strategic scale. Each manhole has been colour coded to indicate the total flood volume.
Whilst this map allows a high-level analysis of sewer flood risk to be made there are a number of limitations with the data that must be acknowledged. Firstly, not all sewer networks in Warrington have been modelled; those that are identify previous high-risk areas from other sources (fluvial and surface water). United Utilities have run all models available, although age and confidence in the models are unknown. Older models may be outdated because of sewer network improvements. The data, shown as it is, does not provide an illustration of which areas would be affected once the floodwater is discharged from the system only where the discharge would occur. For example, floodwater may flow down streets, through properties, nearby watercourses or simply re-enter the sewerage systems further downstream.
Figure 4-8: 1 in 30 years Sewer Flooding
© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848
4.3.5 Sewer Flooding Conclusion
Whilst the DG5, SIRS and WIRS registers can give an idea of those areas with limited drainage capacity, or are susceptible to blockage and may result in flooding to properties, gardens or highways, it must be acknowledged that they are purely a historical register of incidents or properties that have already been flooded. They do not provide the data required to assess the current risk of flooding.
Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 34
Figure 4-9: Warrington Critical Drainage Areas
© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848
Table 4-2: Warrington Critical Drainage Areas
Drainage Area Comment
Burtonwood Burtonwood drainage area is located to the west of Warrington between the M62 and Great Sankey. Whilst flood risk within the drainage area is low, there is natural drainage south to Barrow Brook (Whittle Brook) or east to North Park Brook (Sankey Brook), which are both at high risk of flooding (and are themselves CDAs). This drainage area also includes the large development site of Omega. If development is unmanaged, surface water runoff/volume could increase risk downstream to areas that are already at risk of flooding.
Penketh The Penketh drainage area has been identified as a high risk area within Warrington. There are two main watercourses, Whittle Brook and Penketh Brook, which flow through this area, underneath the St Helens canal and outfall into the River Mersey. The downstream extent of both watercourses and contributing urban drainage system will be at risk of tidal locking during high tides. There are a significant number of historical flood events which fit well with both fluvial and surface water flood zones. Whilst this area has been subject to flood risk management schemes by United Utilities, reducing the risk to a standard 1 in 30 year standard of protection, the area will still be sensitive to any additional flows. Development may have to look at alternative connections other than the current surface water drainage systems. The Penketh area was the focus of the pilot SWMP. It is recommended that it is one of the hotspot areas for further assessment of any upcoming Warrington SWMP.
Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 39
Figure 5-2: Bridgewater Canal Aqueduct and Stop Plank Locations
© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848
Table 5-2: Bridgewater Canal Breach Modelling Methodology
Task Approach Comment
Identify breach locations
Aqueducts listed above These are the only areas through Warrington in which the canal is raised
Calculate breach volume
Estimating the volume of water per impounded length using average depth and width
Impounded length is the distance either side of breach to the nearest stop log
Average depth of 1.25m Average width calculated using GIS
for each impounded length Create JFLOW model
Import breach location and potential discharge volume into JFLOW
The breach was using a standard hydrograph with the extents created every hour
There are a number of assumptions with the canal breach methodology.
Potential breaches are located at aqueducts and raised embankments. Unlike the HR Wallingford study, no structural condition assessment has been made on assets through Warrington to verify breach locations.
The MSCC work on canal risk is welcomed, as it starts to assign probabilities to the breach mechanisms. However, the SFRA does not attempt to calculate the probability of such events occurring, as this would be too detailed for this level of assessment and as such, the SFRA has adopted a more precautionary approach where data is uncertain.
The impounded length of the canal has been calculated using the first set of stop planks either side of the breach location. This is contrary to what was seen in the breach at Durham where the predefined stop plank locations could not be used because the velocities were too high, and so stop log locations were sought further away from the breach. However, due to the significant distances between stop plank
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
APPENDIX L: PRELIMINARY DRAINAGE STRATEGY PLAN
This page has been left intentionally blank
LEG
END
Site
Ext
ents
EXIS
TIN
G D
RA
INA
GE
INFR
AST
RU
CTU
RE
Fou
l Wat
er
Surf
ace
Wat
er
Co
mb
ined
PRO
POSE
D D
RA
INA
GE
CO
NN
ECTI
ON
S
Surf
ace
Wat
er
Fou
l Wat
er
Not
es:
THIS
DR
AW
ING
IS
NO
T A
DR
AIN
AG
E 'D
ESIG
N'
IT I
S A
PR
ELIM
INA
RY
DR
AIN
AG
E ST
RA
TEG
Y SH
OW
ING
IND
ICA
TIV
E SE
WER
LO
CA
TIO
NS.
N
O H
YDR
AU
LIC
SIM
ULA
TIO
N O
R A
SSES
SMEN
T O
F TH
ESE
PR
OP
OSA
LS
HA
S B
EEN
UN
DER
TAKE
N.
PR
OPO
SED
PO
INTS
O
F C
ON
NEC
TIO
N
TO
THE
EXIS
TIN
G
CU
LVER
TS
REQ
UIR
E IN
VER
T LE
VEL
S TO
BE
AC
CU
RA
TELY
EST
AB
LISH
ED.
SUR
CH
AR
GIN
G O
F TH
E P
RO
PO
SED
OU
TFA
LL W
ILL
REQ
UIR
E M
OD
ELLI
NG
TO
SA
TISF
Y TH
E R
EQU
IREM
ENTS
OF
UN
ITED
UTI
LITI
ES A
LON
G W
ITH
FU
LL H
YDR
AU
LIC
AN
ALY
SIS.
`
Da
te: 2
8.0
2.1
7
Rev
isio
n 3
.1
41 H
AW
THO
RN
E ST
REE
T, W
AR
RIN
GTO
N
OU
R R
EF. H
YD15
7 PR
ELIM
INA
RY
PRO
POSE
D D
RA
INA
GE
STR
ATE
GY
PLA
N
SITU
ATI
ON
PLA
N
The
fou
l wat
er f
low
s ge
ner
ate
d b
y th
e d
evel
op
men
t ar
e p
rop
ose
d t
o c
on
nec
t to
th
e p
ub
lic
com
bin
ed/f
ou
l w
ater
sew
er (
22
5m
m d
ia.)
ru
nn
ing
sou
th t
hro
ugh
sit
e w
ith
in H
awth
orn
e
Lan
e. E
xist
ing
leve
ls o
nsi
te f
all
gen
eral
ly t
ow
ard
s th
e so
uth
-wes
tern
bo
un
dar
y an
d i
t is
assu
med
th
at a
gra
vity
so
luti
on
will
be
ach
ieva
ble
, h
ow
ever
fu
rth
er i
nve
stig
atio
n s
ho
uld
con
firm
.
Det
aile
d d
esig
n w
ill b
e re
qu
ire
d t
o c
on
firm
th
e o
vera
ll d
rain
age
stra
tegy
pro
po
sed
ab
ove
(bas
ed o
n a
sses
smen
t o
f le
vels
, la
you
t an
d o
ther
en
gin
ee
rin
g co
nst
rain
ts).
Co
nse
nt
to
dis
char
ge t
o t
he
pu
blic
sew
er
net
wo
rk w
ill b
e r
equ
ire
d f
rom
Un
ited
Uti
litie
s an
d i
t is
advi
sed
th
at
earl
y d
iscu
ssio
n
is
un
der
take
n
to
det
erm
ine
thei
r p
refe
rred
p
oin
ts
of
con
nec
tio
n, d
isch
arge
rat
es a
nd
an
y ad
dit
ion
al s
yste
m c
on
stra
ints
.
In a
cco
rdan
ce w
ith
th
e d
rain
age
hie
rarc
hy,
th
e su
rfac
e w
ater
gen
erat
ed b
y th
e d
evel
op
men
t is
pro
po
sed
to
mim
ic t
he
pre
-dev
elo
pm
ent
bro
wn
fie
ld s
itu
atio
n a
nd
dis
char
ge t
o t
he
pu
blic
sew
er (
22
5m
m d
ia.)
ru
nn
ing
sou
th
thro
ugh
th
e si
te (
uti
lisin
g th
e ex
isti
ng
con
ne
ctio
ns
wh
ere
feas
ible
). D
etai
led
dra
inag
e d
esig
n w
ill b
e re
qu
ire
d t
o
con
firm
th
e fe
asib
ility
of
this
str
ateg
y fo
llow
ing
mo
re in
-de
pth
rev
iew
of
layo
ut
and
leve
ls. C
on
sen
t fo
r an
y w
ork
s
to t
he
pu
blic
sew
er n
etw
ork
will
be
req
uir
ed f
rom
Un
ite
d U
tilit
ies,
in
clu
din
g ag
reem
ent
of
the
pro
po
sed
dis
char
ge r
ates
an
d a
ny
req
uir
ed n
ew c
on
nec
tio
n(s
).
The
site
is lo
cate
d w
ith
in a
Cri
tica
l Dra
inag
e A
rea
(CD
A)
ther
efo
re in
acc
ord
ance
wit
h lo
cal p
olic
y th
ere
will
be
a
req
uir
emen
t to
pro
vid
e 5
0%
bet
term
ent
on
th
e ex
isti
ng
situ
atio
n. I
n t
erm
s o
f th
e p
re-d
evel
op
me
nt
situ
atio
n t
he
mo
re c
on
stra
inin
g fa
cto
r is
lik
ely
to b
e th
e ex
isti
ng
cap
acit
y w
ith
in t
he
exis
tin
g p
ipe
con
nec
tio
n(s
) ra
ther
th
an
the
rate
gen
erat
ed b
y th
e ex
isti
ng
imp
erm
eab
le a
reas
. UU
hav
e id
enti
fied
th
at a
max
imu
m d
isch
arge
rat
e fr
om
the
site
to
th
e p
ub
lic c
om
bin
ed
sew
er o
f 6
.5l/
s w
ou
ld b
e ac
cep
tab
le.
Sho
uld
intr
usi
ve in
vest
igat
ion
s o
r fu
rth
er
dis
cuss
ion
wit
h U
U id
enti
fy f
urt
her
cap
acit
y co
nst
rain
ts t
he
n t
his
will
be
con
sid
ered
du
rin
g d
etai
led
des
ign
.
On
site
in
tru
sive
dra
inag
e in
vest
igat
ion
, h
as
iden
tifi
ed
th
at t
he
on
site
dra
inag
e co
mb
ines
bo
th
the
surf
ace
wat
er
and
fo
ul
wat
er
syst
ems
and
co
nn
ect
s in
to t
he
sho
rt le
ngt
h o
f
pu
blic
fo
ul
wat
er
sew
er
(22
5m
m
dia
.)
cro
ssin
g th
e si
te s
ho
wn
on
th
e U
U r
eco
rds.
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
APPENDIX M: TYPICAL SUDS DETAILS
This page has been left intentionally blank
PE
RV
IOU
SP
AV
EM
EN
T
GE
OTE
XTI
LE(O
PTI
ON
AL)
SU
B-B
AS
E
SU
BG
RA
DE
TYP
E A
: TO
TAL
INFI
LTR
ATI
PN
OU
TLE
T
PE
RV
IOU
SP
AV
EM
EN
T
GE
OTE
XTI
LE(O
PTI
ON
AL)
SU
B-B
AS
E
SU
BG
RA
DE
TYP
E B
: PA
RTI
AL
INFI
LTR
ATI
ON
OU
TLE
T
PE
RV
IOU
SP
AV
EM
EN
T
GE
OTE
XTI
LE(O
PTI
ON
AL)
SU
B-B
AS
E
SU
BG
RA
DE
TYP
E C
: NO
INFI
LTR
ATI
ON
SU
BG
RA
DE
50mm
201
450m
m M
INIM
UM
LAN
DS
CA
PIN
G
OU
TLE
T
GE
OTE
XTI
LE (O
PTI
ON
AL
- TY
PE
S A
&B
) OR
GE
OM
EM
BR
AN
E (T
YP
E C
)A
GG
RE
GA
TE S
UB
-BA
SE
(MA
Y B
ER
EP
LAC
ED
WIT
H G
EO
CE
LLU
LAR
BLO
CK
S
PE
RV
IOU
S S
UR
FAC
E
LAY
ING
CO
UR
SE
LAY
ING
CO
UR
SE
PE
RFO
RA
TED
PIP
EC
OLL
EC
TIO
N S
YS
TEM
PE
RFO
RA
TED
PIP
EC
OLL
EC
TIO
N S
YS
TEM
KE
RB
TUR
F O
VE
R 1
50m
m T
OP
SO
IL/ P
AV
ING
SLA
BS
/ 150
mm
PE
A G
RA
VE
L S
LOP
ING
AW
AY
FR
OM
PA
VE
ME
NT
LAN
DS
CA
PIN
G D
ETA
IL
DO
NO
T S
CA
LE
PR
ELI
MIN
AR
Y
A10
5B
ETT
S
PE
RV
IOU
S P
AV
EM
EN
TS
TYP
ICA
L S
UD
S D
ETA
IL
INLE
T
INS
PE
CTI
ON
CO
VE
R
PE
RFO
RA
TED
CO
NC
RE
TE R
ING
S
HIG
H V
OID
S M
ED
IA
CO
NC
RE
TEFO
OTI
NG
CO
NC
RE
TEC
HA
MB
ER
OIL
& S
ED
IME
NT
CO
LLE
CTO
R
WA
TER
INFI
LTR
ATE
STO
SU
B -
SO
IL
SO
AK
AW
AY
DE
TAIL
S(IN
CLU
DIN
G P
RE
-TR
EA
TME
NT
DE
VIC
E)
DO
NO
T S
CA
LE
PR
ELI
MIN
AR
Y
A10
8B
ETT
S
SO
AK
AW
AY
S
TYP
ICA
L S
UD
S D
ETA
IL
GR
AS
S F
ILTE
R S
TRIP
SH
EE
T R
UN
OFF
FR
OM
CA
R P
AR
K
SU
BS
UR
FAC
E P
ER
FOR
ATE
DP
IPE
CO
LLE
CTI
ON
SY
STE
M
GR
AV
EL
CU
RTA
IND
RA
IN O
VE
RFL
OW
INS
PE
CTI
ON
PO
INT
&O
VE
RFL
OW
(TO
DIR
EC
TE
XC
ES
S F
LOW
S T
O O
UTL
ET)
INS
PE
CTI
ON
PO
INT
&O
VE
RFL
OW
(TO
DIR
EC
TE
XC
ES
S F
LOW
S T
O O
UTL
ET) OU
TLE
T
INS
PE
CTI
ON
PO
INT
& O
VE
RFL
OW
GE
OTE
XTI
LEFI
LTE
R F
AB
RIC
PE
RFO
RA
TED
UN
DE
RD
RA
IN (S
ING
LEO
R M
ULT
IPLE
AC
RO
SS
SE
CTI
ON
,D
EP
EN
DIN
G O
N W
IDTH
)
SU
BS
UR
FAC
E P
ER
FOR
ATE
DP
IPE
CO
LLE
CTI
ON
SY
STE
M
SH
EE
T FL
OW
FR
OM
HA
RD
SU
RFA
CE
DE
SIG
N L
EV
EL
75m
m M
ULC
H
GE
OTE
XTI
LEFI
LTE
R F
AB
RIC
PE
RFO
RA
TED
PIP
E/
UN
DE
RD
RA
IN S
YS
TEM
MIN
Ø15
0mm
PE
A G
RA
VE
L M
IND
EP
TH 2
00m
m
300m
m S
AN
DLA
YE
R
1200
mm
PLA
NTI
NG
SO
IL
PO
ND
ING
MA
XD
EP
TH 1
50m
m
PLA
N V
IEW
PR
OFI
LETY
PIC
AL
SE
CTI
ON
DO
NO
T S
CA
LE
PR
ELI
MIN
AR
Y
A11
2B
ETT
S
BIO
RE
TEN
TIO
N A
PP
LIC
ATI
ON
S
TYP
ICA
L S
UD
S D
ETA
IL
B'
PIP
EW
OR
K B
EN
EA
TH S
TOR
AG
E T
O B
E P
ER
FOR
ATE
D
B
AA
'
PLA
N
FGL
SE
CTI
ON
A -
A'
TYP
ICA
LLY
0.5
- 1m
500
AP
PR
OX
.
FGL
TYP
ICA
LLY
0.5
- 4.5
m
DE
TAIL
1
ALL
DIM
EN
SIO
NS
AN
DD
EP
THS
DE
PE
ND
EN
T O
NR
EQ
UIR
ED
VO
LUM
E A
ND
LOC
AL
GR
OU
ND
CO
ND
ITIO
NS
BA
CK
FILL
, BU
ILD
-UP
AN
DS
UR
FAC
ING
AS
AP
PR
OP
RIA
TE10
0 M
IN S
AN
DV
EN
TIN
G L
AY
ER
- M
IN 1
50m
m(S
ING
LE C
LEA
N S
TON
E 2
5 - 4
0mm
)C
ON
TAIN
ING
VE
NTI
NG
PIP
ES
DE
TAIL
S T
BC
BY
SU
PP
LIE
RG
EO
TEX
TILE
ME
MB
RA
NE
CO
VE
RIN
GTO
P F
AC
E O
F C
ELL
ULA
R B
LOC
KS
1040
mm
DE
PTH
CE
LLU
LAR
STO
RA
GE
BLO
CK
SD
ISTR
IBU
TIO
N L
AY
ER
(SIN
GLE
CLE
AN
STO
NE
20
- 40m
m)
FILL
ER
TP
PR
OV
IDE
PR
OTE
CTI
ON
FO
RIM
PE
RM
EA
BLE
ME
MB
RA
NE
. MA
TER
IAL
AN
DTH
ICK
NE
SS
TO
BE
CO
NFI
RM
ED
IN C
ON
JUN
CTI
ON
WIT
H G
EO
- M
EM
BR
AN
E S
UP
PLI
ER
PE
RFO
RA
TED
DIS
TRIB
UTI
ON
PIP
ES
WIT
HM
IN 1
50m
m S
UR
RO
UN
D
100
SA
ND
IMP
ER
ME
AB
LE M
EM
BR
AN
E
100
SA
ND
UN
DIS
TUR
BE
D F
OR
MA
TIO
N
FGL
SE
CTI
ON
B -
B'
DE
TAIL
1
DO
NO
T S
CA
LE
PR
ELI
MIN
AR
Y
A11
3B
ETT
SCE
LLU
LAR
STO
RA
GE
TYP
ICA
L S
UD
S D
ETA
IL
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
This page has been left intentionally blank
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
APPENDIX N: IMPERMEABLE AREAS PLAN
This page has been left intentionally blank
1
1
.
7
7
1
1
.7
1
1
1
.
6
7
1
1
.
9
6
1
2
.
0
3
1
1
.
9
9
1
2
.
0
2
1
1
.
8
9
1
1
.
8
6
1
1
.8
7
1
1
.8
3
1
1
.9
1
1
1
.9
2
1
1
.8
7
1
1
.8
1
1
2
.
0
3
1
2
.
0
8
1
2
.
1
1
1
1
.
9
5
1
1
.
9
6
1
2
.
1
2
1
2
.
1
8
1
2
.
1
7
1
2
.
1
4
1
2
.
1
3
1
2
.
2
8
1
2
.
2
8
1
1
.
9
1
1
1
.
9
8
1
2
.
0
8
1
2
.
0
7
1
2
.
0
0
1
2
.
0
2
1
2
.
0
7
1
2
.
0
4
1
2
.
1
0
1
2
.
1
3
1
2
.
1
5
1
2
.
1
4
1
2
.
1
3
1
2
.
2
2
1
2
.
2
1
1
2
.
1
9
1
2
.
1
8
1
2
.
1
0
1
2
.
1
4
1
1
.
9
6
1
1
.
7
0
1
1
.
5
6
1
2
.
0
5
1
2
.
1
4
1
2
.
1
2
1
2
.
1
8
1
2
.
1
2
1
2
.
1
5
1
1
.
5
4
1
1
.
6
3
1
1
.
7
3
1
1
.
7
8
1
1
.
8
1
1
1
.
6
4
1
1
.
6
3
1
1
.8
4
1
1
.9
0
1
1
.8
5
1
1
.8
6
1
1
.8
2
1
1
.
9
6
1
1
.
9
8
1
2
.
0
1
1
2
.
0
3
12.02
1
1
.6
1
1
1
.6
2
1
1
.
6
9
1
1
.
6
9
1
1
.
8
0
1
1
.
9
7
1
1
.7
4
1
1
.
8
7
1
1
.
7
3
1
2
.
1
4
1
1
.
9
7
1
1
.
8
8
1
1
.
9
2
1
1
.
9
5
1
1
.
9
7
1
2
.
0
2
1
2
.0
1
1
2
.
0
1
1
2
.
1
2
1
2
.
0
9
1
2
.
0
8
1
2
.
1
3
1
2
.0
7
1
2
.
0
3
1
2
.
2
4
1
2
.
1
8
1
2
.
1
4
1
2
.
1
8
1
2
.
1
9
1
2
.
2
9
1
2
.
3
3
Gate
Gate
G
a
t
e
Ga
te
BD
BD
BD
15.09
EH
14.22
EH
14.68
EH
19.56
EH
16.89
EH
19.44
EH
16.80
EH
16.80
EH
17.04
EH
17.52
EH
15.66
EH
17.30
EH
17.30
EH
17
.7
0
EH
17
.5
4
EH
15.74
EH
14.29
EH
16.73
EH
16.89
EH
17.15
EH
17.39
EH
16.62
EH
16.87
EH
17.29
EH
15
.8
1
EH
16
.0
6
EH
15
.3
2
EH
15
.5
7
EH
15
.6
2
EH
17
.2
6
EH
17
.1
7
EH
15
.7
0
EH
15
.6
7
EH
17
.1
9
EH
17
.1
9
EH
17
.6
2
EH
20
.6
4
EH
15
.5
7
EH
14
.9
9
EH
20
.8
6
EH
15
.6
1
EH
15
.8
3
EH
15
.9
1
EH
15
.6
1
EH
17
.0
1
EH
17.46
EH
EP
12.02
FL
12.04
FL
12.12
FL
12.01
FL
12.20
FL
11.92
FL
11.93
FL
12
.1
0
FL
12
.1
2
FL
12.04
FL
12.05
FL
12.13
FL
12
.1
3
FL
12
.1
9
FL
12
.2
3
FL
12
.2
5
FL
12
.2
4
FL
12
.2
3
FL
12
.2
4
FL
12
.1
9
FL
12
.3
1
FL
12
.3
7
FL
12
.2
6
FL
12
.1
5
FL
12
.1
9
FL
12
.2
2
FL
12
.2
8
FL
12
.2
4
FL
12
.4
7
FL
12
.5
0
FL
12
.4
3
FL
12
.5
4
FL
12
.3
2
FL
12
.2
5
FL
12
.2
7
FL
12
.2
2
FL
12
.1
2
FL
16.33
Flat R
oof
14.60
Flat R
oof
14.73
Flat R
oof
15.61
Flat R
oof
GP
GP
GP
GP
G
G
G
G
G
G
G
G
G
G
G
LP
LP
LP
11.66
MH
C
L
11.63
MH
C
L
Post
Post
Post
Post
Post
Post
Post
Post
Po
st
RE
17.23
RH
22.71
RH
19.78
RH
19.72
RH
22.58
RH
19.48
RH
21.11
RH
17.33
RH
19.73
RH
20
.0
4
RH
20
.1
7
RH
19.65
RH
15.60
RH
19.77
RH
19.66
RH
19.41
RH
19.27
RH
20.24
RH
20.23
RH
20.88
RH
19.77
RH
18
.8
8
RH
18
.9
6
RH
18
.7
2
RH
18
.9
1
RH
18
.9
0
RH
17
.8
6
RH
19
.7
2
RH
17
.3
3
RH
20
.1
0
RH
21
.1
6
RH
24
.5
4
RH
17.22
RH
18
.8
8
RH
18
.8
9
RH
16
.7
9
RH
24
.3
5
RH
23
.3
0
RH
18
.9
3
RH
18
.9
2
RH
18
.8
1
RH
19.90
RH
Sign
Stay
Stay
TP
TP
TP
TP
1
1
.
5
8
1
1
.
6
0
1
1
.
6
1
1
1
.6
0
1
1
.
6
2
1
1
.
6
6
1
1
.
6
9
1
1
.6
4
1
1
.
6
7
1
1
.
6
6
1
1
.6
9
1
1
.
8
6
1
1
.
8
9
1
1
.
9
1
1
1
.
9
5
1
2
.
0
0
1
2
.
1
0
1
2
.
1
3
1
2
.
1
3
1
2
.
1
2
1
1
.5
4
1
1
.4
8
1
1
.
5
2
1
1
.
5
6
1
1
.
6
5
Sign
Sign
1
1
.9
1
1
1
.
8
9
1
1
.8
5
S
t
e
p
1
1
.
8
6
1
1
.9
4
2001
2003
2004
2005
20
07
20
08
2009
20
10
20
11
20
06
G
11.74
1
1
.
7
2
1
1
.
7
2
11.7
0
1
1
.
7
1
1
1
.
6
8
1
1
.
6
7
1
1
.
6
5
1
1
.
6
2
1
1
.6
6
1
1
.
7
0
1
1
.
7
4
1
1
.
8
1
1
1
.
9
2
G
G
1
1
.
6
8
1
1
.6
4
1
1
.
5
6
1
1
.
5
9
1
1
.
6
0
1
1
.8
4
1
1
.
6
9
1
1
.
6
6
1
1
.
6
4
1
1
.
6
7
1
1
.
6
0
11.58
IC
C
L
1
1
.6
8
1
1
.
7
3
1
1
.
7
5
1
1
.
6
5
1
1
.6
7
1
1
.7
2
1
1
.6
9
1
1
.6
1
1
1
.6
0
1
1
.
6
0
1
1
.6
2
11.68
1
1
.7
3
1
1
.8
5
11.88
IC
C
L
1
1
.
8
7
11.86
IC
C
L
1
1
.8
8
1
1
.
8
9
1
1
.9
0
1
1
.8
8
1
1
.8
8
1
1
.8
8
1
1
.8
8
1
1
.8
5
1
1
.8
4
1
1
.8
3
11.90
IC
C
L
1
1
.8
3
1
1
.8
4
1
1
.8
8
1
1
.9
8
1
1
.
8
6
BT
11.90
IC
C
L
1
1
.8
6
1
1
.8
3
1
1
.8
3
1
1
.8
5
11.89
IC
C
L
11.93
IC
C
L
12.22
WM
C
L
11.98
MH
C
L
1
1
.
8
7
1
1
.
8
7
1
1
.
8
6
1
1
.
8
5
1
2
.
0
6
1
1
.
9
2
1
1
.
8
4
1
2
.
0
1
1
2
.
0
0
1
1
.
8
0
1
1
.
8
4
1
2
.
2
5
1
2
.
2
8
11.94
IC
C
L
G
G
1
1
.
9
7
1
1
.
9
3
1
1
.
9
51
1
.8
9
1
1
.
9
3
1
1
.
9
4
1
1
.
9
2
1
1
.
8
9
1
1
.
8
8
1
1
.
8
5
1
1
.
8
1
1
1
.
8
6
1
1
.
8
4
11.88
IC
C
L
11.81
IC
C
L
11.58
MH
C
L
11.63
IC
C
L
G
11.64
MH
C
L
11.69
IC
C
L
G
1
1
.
6
1
1
1
.
6
6
1
1
.
9
9
1
1
.
9
8
1
1
.
7
6
1
1
.
6
9
1
1
.
7
6
1
1
.8
8
1
1
.
8
4
1
1
.
7
9
1
1
.8
8
1
1
.8
8
1
1
.
8
8
1
1
.6
3
1
1
.6
2
1
1
.6
2
1
1
.
6
0
1
1
.
6
2
1
1
.
7
1
1
2
.
0
5
1
1
.
9
4
1
1
.
8
4
1
1
.
8
2
1
1
.
7
1
1
1
.7
1
G
1
2
.
0
1
1
2
.
0
2
1
1
.
8
3
1
1
.
7
3
1
1
.
6
7
1
1
.
6
1
11.5
7
11.5
5
1
1
.
5
0
1
1
.
5
4
1
1
.
6
1
11.63
1
1
.
6
4
1
1
.
6
7
1
1
.
6
8
1
1
.
7
5
1
1
.
8
4
1
1
.8
5
11.87
1
1
.
8
9
1
1
.
9
5
1
2
.
0
3
1
2
.
0
5
12.01
1
2
.
1
1
1
2
.
0
8
1
2
.
0
6
1
2
.
0
4
1
2
.
1
1
1
2
.1
1
1
2
.
1
0
1
2
.
0
2
1
1
.
9
5
1
1
.
9
2
1
1
.
8
4
11.96
MH
C
L
D
r
a
i
n
1
2
.
1
4
G
G
1
2
.
2
4
1
2
.
2
1
1
2
.
1
2
1
2
.
1
6
1
2
.
1
2
1
2
.
1
5
1
2
.
1
1
1
2
.
2
1
1
2
.
2
4
1
2
.
3
7
1
2
.
5
1
1
2
.
4
9
1
2
.
9
8
1
2
.9
8
1
2
.
2
5
1
2
.
2
3
1
2
.
1
8
GV
12
.2
5
Ga
s
12
.7
0
IC
C
L
1
1
.
6
0
1
1
.
6
6
1
1
.
8
6
1
1
.
8
2
1
2
.
0
9
1
2
.
1
5
1
2
.
2
3
1
2
.
2
7
1
2
.
3
0
1
2
.
3
5
1
2
.
4
5
1
2
.
5
6
1
2
.
5
9
1
2
.
6
6
1
2
.5
7
12.6
1
12.5
6
12.4
5
12.2
9
12.2
7
12.2
7
12.3
0
12
.4
1
IC
C
L
1
2
.
3
3
1
2
.
4
3
1
2
.
3
5
S
t
e
p
1
2
.
3
9
1
2
.
3
7
S
t
e
p
1
2
.3
6
11
.9
7
IC
C
L
11
.9
5
IC
C
L
1
1
.
9
7
1
1
.
9
5
1
1
.
9
7
1
2
.
2
1
1
2
.
2
2
1
2
.
1
5
1
2
.
1
5
1
1
.
9
9
1
1
.
9
8
G
12
.0
2
IC
C
L
G
G
11.59
11.58
11.59
11.60
11.61
11.67
11.69
11.66
11.67
11.80
11.88
11.59
11.62
11.62
11.58
11.85
11.94
11.87
11.81
11.91
12.18
12.23
12.10
12.27
12.13
12.14
11.94
12.05
12.03
11.94
11.96
11.92
12.30
12.28
12.28
12.10
12
.0
9
12
.1
7
12.14
12.00
12
.1
5
11.99
11.78
11.70
11.68
11.92
11.73
11.74
11.69
11.65
11.75
11.77
11.70
11.67
11.92
1
1
.
9
9
12.04
12.29
12.20
11.85
1
1
.
8
2
12
.2
3
11
.9
6
12
.0
2
11
.9
9
12
.0
6
12
.0
4
12
.1
3
12
.5
8
12
.5
2
12
.4
0
12
.2
4
12
.2
4
12
.2
2
12
.2
5
12
.3
5
12
.2
6
12
.3
0
12
.3
9
12
.5
3
12
.4
8
12
.4
5
12
.6
2
12
.4
9
12
.3
8
12
.2
4
G
C
P
S
C
P
S
Gravel
Gravel
Gravel
C
o
n
c
r
e
te
Gravel
Grass
Gravel
Gravel
Tarm
ac
Co
ncre
te
Co
ncre
te
C
o
n
c
r
e
t
e
Co
ncre
te
Tarm
ac
Tarm
ac
Ta
rm
ac
2002
Concre
te P
anel F
ence
Grass
Concre
te P
anel F
ence
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
P
o
s
t
&
R
a
il
F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
CP
S
Gas
Meter
CP
S
CP
S
S
t
e
p
S
t
e
p
CP
S
CP
S
No
Acce
ss
1
1
.6
9
C
lo
s
e
d
B
o
a
r
d
F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
Concrete
Concrete
Grass
C
o
n
c
r
e
te
P
a
n
e
l F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
Unable to
Survey
Un
ab
le
to
Su
rve
y
DO
N
OT
S
CA
LE
PR
EL
IM
IN
AR
Y
C1
01
HY
D1
57
IM
PE
RM
EA
BL
E A
RE
AS
P
LA
N
WA
RR
IN
GT
ON
41
H
AW
TH
OR
NE
S
TR
EE
T
DO
N
OT
S
CA
LE
PR
EL
IM
IN
AR
Y
D2
01
HY
D1
57
IM
PE
RM
EA
BL
E A
RE
AS
P
LA
N
WA
RR
IN
GT
ON
41
H
AW
TH
OR
NE
S
TR
EE
T
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
This page has been left intentionally blank
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
APPENDIX O: OVERLAND FLOOD FLOW ROUTING
This page has been left intentionally blank
1
1
.
7
7
1
1
.
7
1
1
1
.
6
7
1
1
.
9
6
1
2
.
0
3
1
1
.
9
9
1
2
.
0
2
1
1
.
8
9
1
1
.
8
6
1
1
.8
7
1
1
.8
3
1
1
.9
1
1
1
.
9
2
1
1
.8
7
1
1
.8
1
1
2
.
0
3
1
2
.
0
8
1
2
.
1
1
1
1
.
9
5
1
1
.
9
6
1
2
.
1
2
1
2
.
1
8
1
2
.
1
7
1
2
.
1
4
1
2
.
1
3
1
2
.
2
8
1
2
.
2
8
1
1
.
9
1
1
1
.
9
8
1
2
.
0
8
1
2
.
0
7
1
2
.
0
0
1
2
.
0
2
1
2
.
0
7
1
2
.
0
4
1
2
.
1
0
1
2
.
1
3
1
2
.
1
5
1
2
.
1
4
1
2
.
1
3
1
2
.
2
2
1
2
.
2
1
1
2
.
1
9
1
2
.
1
8
1
2
.
1
0
1
2
.
1
4
1
1
.
9
6
1
1
.
7
0
1
1
.
5
6
1
2
.
0
5
1
2
.
1
4
1
2
.
1
2
1
2
.
1
8
1
2
.
1
2
1
2
.
1
5
1
1
.
5
4
1
1
.
6
3
1
1
.
7
3
1
1
.
7
8
1
1
.
8
1
1
1
.
6
4
1
1
.
6
3
1
1
.8
4
1
1
.9
0
1
1
.8
5
1
1
.8
6
1
1
.8
2
1
1
.
9
6
1
1
.
9
8
1
2
.
0
1
1
2
.
0
3
12.02
1
1
.6
1
1
1
.6
2
1
1
.
6
9
1
1
.
6
9
1
1
.
8
0
1
1
.
9
7
1
1
.
7
4
1
1
.
8
7
1
1
.
7
3
1
2
.
1
4
1
1
.
9
7
1
1
.
8
8
1
1
.
9
2
1
1
.
9
5
1
1
.
9
7
1
2
.
0
2
1
2
.0
1
1
2
.
0
1
1
2
.
1
2
1
2
.
0
9
1
2
.
0
8
1
2
.
1
3
1
2
.0
7
1
2
.
0
3
1
2
.
2
4
1
2
.
1
8
1
2
.
1
4 1
2
.
1
8
1
2
.
1
9
1
2
.
2
9
1
2
.
3
3
Gate
Gate
G
a
t
e
Ga
te
BD
BD
BD
15.09
EH
14.22
EH
14.68
EH
19.56
EH
16.89
EH
19.44
EH
16.80
EH
16.80
EH
17.04
EH
17.52
EH
15.66
EH
17.30
EH
17.3
0
EH
17
.7
0
EH
17
.5
4
EH
15.74
EH
14.29
EH
16.73
EH
16.89
EH
17.15
EH
17.39
EH
16.62
EH
16.87
EH
17.29
EH
15
.8
1
EH
16
.0
6
EH
15
.3
2
EH
15
.5
7
EH
15
.6
2
EH
17
.2
6
EH
17
.1
7
EH
15
.7
0
EH
15
.6
7
EH
17
.1
9
EH
17
.1
9
EH
17
.6
2
EH
20
.6
4
EH
15
.5
7
EH
14
.9
9
EH
20
.8
6
EH
15
.6
1
EH
15
.8
3
EH
15
.9
1
EH
15
.6
1
EH
17
.0
1
EH
17.46
EH
EP
12.02
FL
12.04
FL
12.12
FL
12.01
FL
12.20
FL
11.92
FL
11.93
FL
12
.1
0
FL
12
.1
2
FL
12.04
FL
12.05
FL
12.13
FL
12
.1
3
FL
12
.1
9
FL
12
.2
3
FL
12
.2
5
FL
12
.2
4
FL
12
.2
3
FL
12
.2
4
FL
12
.1
9
FL
12
.3
1
FL
12
.3
7
FL
12
.2
6
FL
12
.1
5
FL
12
.1
9
FL
12
.2
2
FL
12
.2
8
FL
12
.2
4
FL
12
.4
7
FL
12
.5
0
FL
12
.4
3
FL
12
.5
4
FL
12
.3
2
FL
12
.2
5
FL
12
.2
7
FL
12
.2
2
FL
12
.1
2
FL
16.33
Flat R
oof
14.60
Flat R
oof
14.73
Flat R
oof
15.61
Flat R
oof
GP
GP
GP
GP
G
G
G
G
G
G
G
G
G
G
G
LP
LP
LP
11.66
MH
C
L
11.63
MH
C
L
Post
Post
Post
Post
Post
Post
Post
Post
Po
st
RE
17.23
RH
22.71
RH
19.78
RH
19.72
RH
22.58
RH
19.48
RH
21.11
RH
17.33
RH
19.73
RH
20
.0
4
RH
20
.1
7
RH
19.65
RH
15.60
RH
19.77
RH
19.66
RH
19.41
RH
19.27
RH
20.24
RH
20.23
RH
20.88
RH
19.77
RH
18
.8
8
RH
18
.9
6
RH
18
.7
2
RH
18
.9
1
RH
18
.9
0
RH
17
.8
6
RH
19
.7
2
RH
17
.3
3
RH
20
.1
0
RH
21
.1
6
RH
24
.5
4
RH
17.22
RH
18
.8
8
RH
18
.8
9
RH
16
.7
9
RH
24
.3
5
RH
23
.3
0
RH
18
.9
3
RH
18
.9
2
RH
18
.8
1
RH
19.90
RH
Sign
Stay
Stay
TP
TP
TP
TP
1
1
.
5
8
1
1
.
6
0
1
1
.
6
1
1
1
.6
0
1
1
.
6
2
1
1
.
6
6
1
1
.
6
9
1
1
.6
4
1
1
.
6
7
1
1
.
6
6
1
1
.6
9
1
1
.
8
6
1
1
.
8
9
1
1
.
9
1
1
1
.
9
5
1
2
.
0
0
1
2
.
1
0
1
2
.
1
3
1
2
.
1
3
1
2
.
1
2
1
1
.5
4
1
1
.4
8
1
1
.
5
2
1
1
.
5
6
1
1
.
6
5
Sign
Sign
1
1
.9
1
1
1
.
8
9
1
1
.8
5
S
t
e
p
1
1
.
8
6
1
1
.9
4
2001
2003
2004
2005
20
07
20
08
2009
20
10
20
11
20
06
G
11.74
1
1
.
7
2
1
1
.
7
2
11.7
0
1
1
.
7
1
1
1
.
6
8
1
1
.
6
7
1
1
.
6
5
1
1
.
6
2
1
1
.
6
6
1
1
.
7
0
1
1
.
7
4
1
1
.
8
1
1
1
.
9
2
G
G
1
1
.
6
8
1
1
.
6
4
1
1
.
5
6
1
1
.
5
9
1
1
.
6
0
1
1
.8
4
1
1
.
6
9
1
1
.
6
6
1
1
.
6
4
1
1
.
6
7
1
1
.
6
0
11.58
IC
C
L
1
1
.6
8
1
1
.7
3
1
1
.
7
5
1
1
.6
5
1
1
.6
7
1
1
.7
2
1
1
.6
9
1
1
.6
1
1
1
.6
0
1
1
.
6
0
1
1
.6
2
11.68
1
1
.7
3
1
1
.8
5
11.88
IC
C
L
1
1
.
8
7
11.86
IC
C
L
1
1
.8
8
1
1
.
8
9
1
1
.9
0
1
1
.8
8
1
1
.8
8
1
1
.8
8
1
1
.8
8
1
1
.8
5
1
1
.8
4
1
1
.8
3
11.90
IC
C
L
1
1
.8
3
1
1
.8
4
1
1
.
8
8
1
1
.9
8
1
1
.
8
6
BT
11.90
IC
C
L
1
1
.8
6
1
1
.8
3
1
1
.8
3
1
1
.8
5
11.89
IC
C
L
11.93
IC
C
L
12.22
WM
C
L
11.98
MH
C
L
1
1
.
8
7
1
1
.
8
7
1
1
.
8
6
1
1
.
8
5
1
2
.
0
6
1
1
.
9
2
1
1
.
8
4
1
2
.
0
1
1
2
.
0
0
1
1
.
8
0
1
1
.
8
4
1
2
.
2
5
1
2
.
2
8
11.94
IC
C
L
G
G
1
1
.
9
7
1
1
.
9
3
1
1
.9
51
1
.8
9
1
1
.
9
3
1
1
.
9
4
1
1
.
9
2
1
1
.
8
9
1
1
.
8
8
1
1
.
8
5
1
1
.
8
1
1
1
.
8
6
1
1
.
8
4
11.88
IC
C
L
11.81
IC
C
L
11.58
MH
C
L
11.63
IC
C
L
G
11.64
MH
C
L
11.69
IC
C
L
G
1
1
.
6
1
1
1
.
6
6
1
1
.
9
9
1
1
.
9
8
1
1
.
7
6
1
1
.
6
9
1
1
.
7
6
1
1
.8
8
1
1
.8
4
1
1
.
7
9
1
1
.8
8
1
1
.8
8
1
1
.
8
8
1
1
.6
3
1
1
.6
2
1
1
.6
2
1
1
.
6
0
1
1
.
6
2
1
1
.
7
1
1
2
.
0
5
1
1
.
9
4
1
1
.
8
4
1
1
.
8
2
1
1
.
7
1
1
1
.
7
1
G
1
2
.
0
1
1
2
.
0
2
1
1
.
8
3
1
1
.
7
3
1
1
.
6
7
1
1
.
6
1
11.5
7
11.55
1
1
.
5
0
1
1
.
5
4
1
1
.
6
1
11.63
1
1
.
6
4
1
1
.
6
7
1
1
.
6
8
1
1
.
7
5
1
1
.
8
4
1
1
.8
5
11.87
1
1
.
8
9
1
1
.
9
5
1
2
.
0
3
1
2
.
0
5
12.01
1
2
.
1
1
1
2
.
0
8
1
2
.
0
6
1
2
.
0
4
1
2
.
1
1
1
2
.1
1
1
2
.
1
0
1
2
.
0
2
1
1
.
9
5
1
1
.
9
2
1
1
.
8
4
11.96
MH
C
L
D
r
a
in
1
2
.
1
4
G
G
1
2
.
2
4
1
2
.
2
1
1
2
.
1
2
1
2
.
1
6
1
2
.
1
2
1
2
.
1
5
1
2
.
1
1
1
2
.
2
1
1
2
.
2
4
1
2
.
3
7
1
2
.
5
1
1
2
.
4
9
1
2
.
9
8
1
2
.9
8
1
2
.
2
5
1
2
.
2
3
1
2
.
1
8
GV
12
.2
5
Ga
s
12
.7
0
IC
C
L
1
1
.
6
0
1
1
.
6
6
1
1
.
8
6
1
1
.
8
2
1
2
.
0
9
1
2
.
1
5
1
2
.
2
3
1
2
.
2
7
1
2
.
3
0
1
2
.
3
5
1
2
.
4
5
1
2
.
5
6
1
2
.
5
9
1
2
.
6
6
12.5
7
12.6
1
12.5
6
12.4
5
12.2
9
12.2
7
12.2
7
12.3
0
12
.4
1
IC
C
L
1
2
.
3
3
1
2
.
4
3
1
2
.
3
5
S
t
e
p
1
2
.
3
9
1
2
.
3
7
S
t
e
p
1
2
.3
6
11
.9
7
IC
C
L
11
.9
5
IC
C
L
1
1
.
9
7
1
1
.
9
5
1
1
.9
7
1
2
.
2
1
1
2
.
2
2
1
2
.
1
5
1
2
.
1
5
1
1
.
9
9
1
1
.
9
8
G
12
.0
2
IC
C
L
G
G
11.59
11.58
11.59
11.60
11.61
11.67
11.69
11.66
11.67
11.80
11.88
11.59
11.62
11.62
11.58
11.85
11.94
11.87
11.81
11.91
12.18
12.23
12.10
12.27
12.13
12.14
11.94
12.05
12.03
11.94
11.96
11.92
12.30
12.28
12.28
12.10
12
.0
9
12
.1
7
12
.1
4
12.00
12
.1
5
11.99
11.78
11.70
11.68
11.92
11.73
11.74
11.69
11.65
11.75
11.77
11.70
11.67
11.92
1
1
.
9
9
12.04
12.29
12.20
11.85
1
1
.
8
2
12
.2
3
11
.9
6
12
.0
2
11
.9
9
12
.0
6
12
.0
4
12
.1
3
12
.5
8
12
.5
2
12
.4
0
12
.2
4
12
.2
4
12
.2
2
12
.2
5
12
.3
5
12
.2
6
12
.3
0
12
.3
9
12
.5
3
12
.4
8
12
.4
5
12
.6
2
12
.4
9
12
.3
8
12
.2
4
G
C
P
S
C
P
S
Gravel
Gravel
Gravel
C
o
n
c
r
e
t
e
Gravel
Grass
Gravel
Gravel
Tarm
ac
Co
ncre
te
Co
ncre
te
C
o
n
c
r
e
t
e
Co
ncre
te
Tarm
ac
Tarm
ac
Ta
rm
ac
2002
Concre
te P
anel F
ence
Grass
Concre
te P
anel F
ence
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
P
o
s
t
&
R
a
il
F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
CP
S
Gas
Meter
CP
S
CP
S
S
t
e
p
S
t
e
p
CP
S
CP
S
No
Acce
ss
1
1
.6
9
C
lo
s
e
d
B
o
a
r
d
F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
Concrete
Concrete
Grass
C
o
n
c
r
e
te
P
a
n
e
l F
e
n
c
e
C
o
n
c
r
e
t
e
P
a
n
e
l
F
e
n
c
e
Unable to
Survey
Un
ab
le
to
Su
rve
y
DO
N
OT
S
CA
LE
PR
EL
IM
IN
AR
Y
C1
02
HY
D1
57
WA
RR
IN
GT
ON
41
H
AW
TH
OR
NE
S
TR
EE
T
DO
N
OT
S
CA
LE
PR
EL
IM
IN
AR
Y
C2
02
HY
D1
57
WA
RR
IN
GT
ON
41
H
AW
TH
OR
NE
S
TR
EE
T
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
This page has been left intentionally blank
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
APPENDIX P: ONSITE DRAINAGE INVESTIGATION
This page has been left intentionally blank
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 1 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB1 (D/S) D/S241016_1
HB1
D/S
CombinedZSample survey to determine asset condition2.79 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:50 Position Code Observation MPEG Photo Grade
161014__00 // Page: 2
0.00 MH 00:00:01 (Constr) 0Start node type, manhole reference number: HB1
0.00 WL 00:00:01 (Serv) 0Water level 15 % of the vertical dimension
0.50 B 00:00:05 (Struct) 4Broken pipe from 11 O'Clock to 2 O'Clock
1.01 CXI 00:00:17 (Constr) 3Connection intruding from 2 O'Clock diameter: 150 mm intrusion: 15 %
2.79 SA 00:01:29 (Misc) 0Survey abandoned Unable to pass
HB1
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 80 28.67 80 4 1 2 0.72 2 3
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 2 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB1 (D/S) D/S241016_1
HB1
D/S
CombinedZSample survey to determine asset condition18.14 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:147 Position Code Observation MPEG Photo Grade
161014__00 // Page: 3
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB1
0.00 WL 00:00:01 (Serv) 0Water level 15 % of the vertical dimension
1.34 CXI 00:00:12 (Constr) 3Connection intruding from 2 O'Clock diameter: 150 mm intrusion: 15 %
18.14 BRF 00:01:03 (Constr) 0Finish node type, major connection without manhole reference number: D/S Main
HB1
D/S
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.11 2 3
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 3 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB1 (U/S) HB11241016_1
HB11
HB1
CombinedZSample survey to determine asset condition18.46 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:147 Position Code Observation MPEG Photo Grade
161014__00 // Page: 4
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB1
0.00 WL 00:00:00 (Serv) 0Water level 15 % of the vertical dimension
0.98 DER 00:00:11 (Serv) 3Settled deposits, coarse 15 % cross-sectional area loss
4.52 CN 00:00:36 (Constr) 0Connection other than junction from 12 O'Clock diameter:100 mm
18.46 DEEJ 00:01:50 (Serv) 4Attached deposits, encrustation at joint from 7 O'Clock to 5O'Clock 50 % cross-sectional area loss
18.46 SA 00:01:56 (Misc) 0Survey abandoned Unable to proceed
HB1
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.11 2 3
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 4 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB3 (U/S) HB12241016_1
HB12
HB3
CombinedZSample survey to determine asset condition23.83 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:189 Position Code Observation MPEG Photo Grade
161014__00 // Page: 5
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB3
0.00 WL 00:00:00 (Serv) 0Water level 5 % of the vertical dimension
4.96 JXD 00:00:32 (Constr) 0Junction defective, connecting pipe is damaged from 10O'Clock diameter: 150 mm
8.51 S1 DER 00:00:58 (Serv) 3Settled deposits, coarse 15 % cross-sectional area loss S1
8.77 CN 00:01:11 (Constr) 0Connection other than junction from 11 O'Clock diameter:150 mm
8.77 CC 00:01:20 (Struct) 2Crack, circumferential from 12 O'Clock to 2 O'Clock
8.77 CC 00:01:26 (Struct) 2Crack, circumferential from 7 O'Clock to 10 O'Clock
12.53 F1 DER 00:01:57 (Serv) 3Settled deposits, coarse 15 % cross-sectional area loss F1
14.56 CN 00:02:14 (Constr) 0Connection other than junction from 11 O'Clock diameter:100 mm
20.46 JN 00:02:55 (Constr) 0Junction from 1 O'Clock diameter: 150 mm
23.83 MHF 00:03:18 (Constr) 0Finish node type, manhole reference number: HB12
HB3
HB12
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade2 20 0.84 20 2 1 2 0.34 8 3
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 5 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB3 (D/S) 0506241016_1
HB3
0506
CombinedZSample survey to determine asset condition3.60 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:50 Position Code Observation MPEG Photo Grade
161014__00 // Page: 6
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB3
0.00 WL 00:00:01 (Serv) 0Water level 5 % of the vertical dimension
3.60 DER 00:01:18 (Serv) 4Settled deposits, coarse 20 % cross-sectional area loss
3.60 SA 00:01:19 (Misc) 0Survey abandoned Unable to proceed
HB3
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 5 1.39 5 4
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 6 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB9 (D/S) D/S241016_1
HB9
D/S
CombinedZSample survey to determine asset condition17.98 m
Circular150.00 mmVitrified clay
CCTV SURVEY
1:147 Position Code Observation MPEG Photo Grade
161014__00 // Page: 7
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB9
0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension
3.98 JN 00:00:13 (Constr) 0Junction from 3 O'Clock diameter: 150 mm
17.98 MHF 00:00:46 (Constr) 0Finish node type, manhole reference number: D/S
HB9
D/S
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 7 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB9 (U/S) HB8241016_1
HB8
HB9
CombinedZSample survey to determine asset condition29.44 m
Circular150.00 mmVitrified clay
CCTV SURVEY
1:252 Position Code Observation MPEG Photo Grade
161014__00 // Page: 8
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB9
0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension
14.28 JN 00:01:03 (Constr) 0Junction from 10 O'Clock diameter: 100 mm
14.28 S1 DES 00:01:04
16.06 JN 00:01:15 (Constr) 0Junction from 10 O'Clock diameter: 100 mm
16.41 RPZ 00:01:23 (Constr) 0Point repair, other trenchless method from 11 O'Clock to 1O'Clock Hole repair
20.72 RPZ 00:01:54 (Constr) 0Point repair, other trenchless method from 10 O'Clock to 2O'Clock Hole re
29.44 MHF 00:02:24 (Constr) 0Finish node type, manhole reference number: HB8
HB9
HB8
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 8 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB8a (D/S) HB12241016_1
HB8a
HB12
CombinedZSample survey to determine asset condition21.79 m
Circular150.00 mmVitrified clay
CCTV SURVEY
1:189 Position Code Observation MPEG Photo Grade
161014__00 // Page: 9
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB8a
0.00 WL 00:00:00 (Serv) 0Water level 5 % of the vertical dimension
3.82 CN 00:00:16 (Constr) 0Connection other than junction from 10 O'Clock diameter:100 mm
10.95 JN 00:00:43 (Constr) 0Junction from 10 O'Clock diameter: 100 mm
20.15 JN 00:01:14 (Constr) 0Junction from 10 O'Clock diameter: 100 mm
21.79 MHF 00:01:24 (Constr) 0Finish node type, manhole reference number: HB12
HB8a
HB12
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 9 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB6 (D/S) HB7241016_1
HB6
HB7
CombinedZSample survey to determine asset condition17.43 m
Circular100.00 mmVitrified clay
CCTV SURVEY
1:147 Position Code Observation MPEG Photo Grade
161014__00 // Page: 10
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB6
0.00 WL 00:00:00 (Serv) 0Water level 5 % of the vertical dimension
5.97 JN 00:00:18 (Constr) 0Junction from 2 O'Clock diameter: 100 mm
17.43 MHF 00:01:19 (Constr) 0Finish node type, manhole reference number: HB7
HB6
HB7
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 10 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB6 (U/S) U/S241016_1
U/S
HB6
CombinedZSample survey to determine asset condition28.98 m
Circular100.00 mmVitrified clay
CCTV SURVEY
1:231 Position Code Observation MPEG Photo Grade
161014__00 // Page: 11
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB6
0.00 WL 00:00:01 (Serv) 0Water level 5 % of the vertical dimension
0.99 JN 00:00:08 (Constr) 0Junction from 2 O'Clock diameter: 100 mm
10.56 JN 00:00:32 (Constr) 0Junction from 10 O'Clock diameter: 100 mm
14.86 RPZ 00:00:53 (Constr) 0Point repair, other trenchless method from 10 O'Clock to 2O'Clock Hole repair
26.03 JN 00:01:30 (Constr) 0Junction from 2 O'Clock diameter: 100 mm
26.03 S1 DES 00:01:32 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss S1
28.26 RPZ 00:01:45 (Constr) 0Point repair, other trenchless method from 10 O'Clock to 2O'Clock Hole repair
28.98 JN 00:01:52 (Constr) 0Junction from 10 O'Clock diameter: 100 mm
28.98 F1 DES 00:01:52 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss F1
28.98 BRF 00:01:52 (Constr) 0Finish node type, major connection without manhole reference number: U/S Head of system
HB6
U/S
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.2 5.8 3
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 11 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB5 (D/S) HB4241016_1
HB5
HB4
CombinedZSample survey to determine asset condition17.33 m
Circular150.00 mmVitrified clay
CCTV SURVEY
1:147 Position Code Observation MPEG Photo Grade
161014__00 // Page: 12
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB5
0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension
0.00 DES 00:00:02 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss
0.20 H 00:00:05 (Struct) 5Hole in drain/sewer from 9 O'Clock to 1 O'Clock
0.20 VV 00:00:10 (Constr) 0Void visible beyond defect
10.80 JN 00:00:46 (Constr) 0Junction from 3 O'Clock diameter: 150 mm
17.33 MHF 00:01:08 (Constr) 0Finish node type, manhole reference number: HB4
HB5
HB4
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 165 9.52 165 5 1 2 0.12 2 3
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 12 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB4 (D/S) D/S241016_1
HB4
D/S
CombinedZSample survey to determine asset condition45.05 m
Circular150.00 mmVitrified clay
CCTV SURVEY
1:357 Position Code Observation MPEG Photo Grade
161014__00 // Page: 13
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB4
0.00 WL 00:00:01 (Serv) 0Water level 5 % of the vertical dimension
1.30 B 00:00:16 (Struct) 4Broken pipe from 7 O'Clock to 3 O'Clock
24.80 JN 00:01:36 (Constr) 0Junction from 2 O'Clock diameter: 100 mm
41.91 JN 00:02:42 (Constr) 0Junction from 2 O'Clock diameter: 100 mm
45.05 MHF 00:02:59 (Constr) 0Finish node type, manhole reference number: HB14
HB4
D/S
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 80 1.78 80 4 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 13 X
no rain or snow no D Hampson
WA5Hawthorne Street
0506 (U/S) HB10241016_1
HB10
0506
CombinedZSample survey to determine asset condition16.11 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:147 Position Code Observation MPEG Photo Grade
161014__00 // Page: 14
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0506
0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension
0.00 S1 DES 00:00:01
12.58 JN 00:02:14 (Constr) 0Junction from 1 O'Clock diameter: 150 mm
16.11 MHF 00:03:04 (Constr) 0Finish node type, manhole reference number: HB10
0506
HB10
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 14 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB10 (U/S) HB15241016_1
HB15
HB10
CombinedZSample survey to determine asset condition13.64 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:126 Position Code Observation MPEG Photo Grade
161014__00 // Page: 15
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB10
0.00 WL 00:00:00 (Serv) 0Water level 10 % of the vertical dimension
0.50 JN 00:00:01 (Constr) 0Junction from 2 O'Clock diameter: 150 mm
11.71 RFJ 00:01:21 (Serv) 2Roots, fine at joint
13.64 MHF 00:01:42 (Constr) 0Finish node type, manhole reference number: HB15
HB10
HB15
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 15 X
no rain or snow no D Hampson
WA5Hawthorne Street
HB15 (U/S) HB16241016_1
HB16
HB15
CombinedZSample survey to determine asset condition4.57 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:50 Position Code Observation MPEG Photo Grade
161014__00 // Page: 16
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB15
0.00 WL 00:00:00 (Serv) 0Water level 10 % of the vertical dimension
4.57 MHF 00:01:44 (Constr) 0Finish node type, manhole reference number: HB16
HB15
HB16
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 16 X
no rain or snow no D Hampson
WA5Hawthorne Street
0506 (U/S) HB3241016_1
HB3
0506
CombinedZSample survey to determine asset condition35.52 m
Circular225.00 mmVitrified clay
CCTV SURVEY - Overlap
1:294 Position Code Observation MPEG Photo Grade
161014__00 // Page: 17
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0506
0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension
0.00 S1 DES 00:00:02 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss S1
11.77 JN 00:01:07 (Constr) 0Junction from 1 O'Clock diameter: 150 mm
12.28 F1 DES 00:01:22 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss F1
12.28 WL 00:01:23 (Serv) 0Water level 5 % of the vertical dimension
33.08 S2 DES 00:03:01
35.52 SA 00:03:51 (Misc) 0Survey abandoned Unable to proceed
0506
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.69 24.4 3
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 17 X
no rain or snow no D Hampson
WA5Hawthorne Street
0502 (U/S) HB2241016_1
HB2
0502
CombinedZSample survey to determine asset condition30.51 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:252 Position Code Observation MPEG Photo Grade
161014__00 // Page: 18
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0502
0.00 WL 00:00:01 (Serv) 0Water level 25 % of the vertical dimension
3.35 JN 00:00:28 (Constr) 0Junction from 10 O'Clock diameter: 150 mm
3.95 JN 00:00:34 (Constr) 0Junction from 1 O'Clock diameter: 150 mm
30.51 OBZ 00:03:24 (Serv) 5Other obstacles, other from 3 O'Clock to 9 O'Clock 50 %cross-sectional area loss Unknown
30.51 SA 00:03:29 (Misc) 0Survey abandoned Unable to pass
0502
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 10 0.33 10 5
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
Street : Tel: Fax:
Email:
Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:
Weather Vehicle : Camera : Preset : Cleaned : Operator :
Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :
Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :
Comment :
14/10/2016 CL9318 no rain or snow D Hampson 18 X
no rain or snow no D Hampson
WA5Hawthorne Street
0502 (D/S) 0507241016_1
0502
0507
CombinedZSample survey to determine asset condition1.25 m
Circular225.00 mmVitrified clay
CCTV SURVEY
1:50 Position Code Observation MPEG Photo Grade
161014__00 // Page: 19
0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0502
0.00 WL 00:00:00 (Serv) 0Water level 25 % of the vertical dimension
0.81 JN 00:00:26 (Constr) 0Junction from 9 O'Clock diameter: 150 mm
1.25 DER 00:01:16 (Serv) 4Settled deposits, coarse 25 % cross-sectional area loss
1.25 CUW 00:01:16 (Misc) 0Loss of vision, camera under water
1.25 SA 00:01:17 (Misc) 0Survey abandoned Cleaning required
0502
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 5 4 5 4
Structural DefectsService Defects
Constructional FeaturesMiscellaneous Featuress
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
APPENDIX Q: PRELIMINARY DRAINAGE LAYOUT
This page has been left intentionally blank
FOLLY FARM CLOSE
LONGSHAW STREET
EXIS
TIN
G FO
UL
WAT
ER S
EWER
TO
BE
ABAN
DON
ED.
ON
SITE
INTR
USI
VE D
RAIN
AGE
INVE
STIG
ATIO
N, H
AS ID
ENTI
FIED
THA
TTH
E O
NSI
TE D
RAIN
AGE
COM
BIN
ES B
OTH
THE
SU
RFAC
E W
ATER
AN
DFO
UL
WAT
ER S
YSTE
MS
AND
CON
NEC
TS IN
TO T
HE S
HORT
LEN
GTH
OF
PUBL
IC F
OU
L W
ATER
SEW
ER (
225m
m D
IA.)
CRO
SSIN
G T
HE S
ITE
SHO
WN
ON
THE
UU
REC
ORD
S. C
ON
FIRM
ATIO
N N
O U
PSTR
EAM
FLO
WEN
TERS
THI
S SY
STEM
IS R
EQU
IRED
, AN
Y LI
VE C
ON
NEC
TIO
NS
SHO
ULD
BE M
AIN
TAIN
ED.
HYDR
O-B
RAKE
CHA
MBE
RSU
RFAC
E W
ATER
RU
N-O
FF R
ATES
ARE
TO B
E RE
STRI
CTED
TO
6.5
l/s.
TO B
E CO
NFI
RMED
WIT
H U
U.
EXIS
TIN
G CO
MBI
NED
PU
BLIC
SEW
ER(IN
DICA
TED
ON
REC
ORD
S TO
BE
FOU
L)
INVE
RT L
EVEL
FO
R A
SOFF
IT T
O S
OFF
IT C
ON
NEC
TIO
N(F
OR
A 15
0mm
PIP
E) =
9.8
85m
AOD
INVE
RT L
EVEL
TO
BE
CON
FIRM
ED O
N S
ITE
PRIO
R TO
CON
STRU
CTIO
N.
DO
N
OT
S
CA
LE
PR
EL
IM
IN
AR
Y
B2
03
HY
D1
57
WA
RR
IN
GT
ON
41
H
AW
TH
OR
NE
S
TR
EE
T
41 Hawthorne Street, Warrington
Flood Risk Assessment and Drainage Management Strategy
HYD157-41.HAWTHORNE.STREET-FRA&DMS
APPENDIX R: NOTES OF LIMITATIONS
The data essentially comprised a study of available documented information from various
sources together with discussions with relevant authorities and other interested parties. There
may also be circumstances at the site that are not documented. The information reviewed is not
exhaustive and has been accepted in good faith as providing representative and true data
pertaining to site conditions. If additional information becomes available which might impact our
conclusions, we request the opportunity to review the information, reassess the potential
concerns and modify our opinion if warranted.
It should be noted that any risks identified in this report are perceived risks based on the available
information.
This report was prepared by Betts Hydro Ltd for the sole and exclusive use of the titled client in
response to particular instructions. Any other parties using the information contained in this
report do so at their own risk and any duty of care to those parties is excluded.
This document has been prepared for the titled project only and should any third party wish to
use or rely upon the contents of the report, written approval from Betts Hydro Ltd must be sought.
Betts Hydro Ltd accepts no responsibility or liability for the consequences of this document being
used for the purpose other than that for which it was commissioned and for this document to any
other party other than the person by whom it was commissioned.