Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 30 Figure 4-7 provides a spatial overview of DG5 records in Warrington BC aggregated to United Utilities drainage areas. These have been coloured to illustrate the total number of properties on the register as listed below. Low - Less than 10 properties on internal register Medium - Less than 10 properties on internal register and some on external register High - Greater than 10 properties on internal register and some on external register Figure 4-7: United Utilities Internal & External DG5 Records Map © Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848 4.3.4 United Utilities Hydraulic Sewer Modelling Sewers are generally designed to a 1 in 30-year design standard, which means sewer flooding will often be associated with larger events that are less frequent but have a higher consequence. In these situations, sewer inputs from the surrounding land will exceed the sewer system, discharge from manholes and flow across the surface of the land. Overland flows will therefore often follow the same flow paths and pond in the same areas as overland flows identified in the Environment Agency's national surface water maps. As part of their ongoing drainage area programme, United Utilities have constructed hydraulic models of some of the main sewer systems through Warrington. A series of design storms representing rainfall events of different return periods (1, 2, 5, 10, 20 & 30-years) were applied to the models with the surcharging volume at individual model nodes recorded and supplied as a GIS layer.

Upload: others

Post on 20-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Figure 4-7: United Utilities Internal & External DG5

Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 30

Figure 4-7 provides a spatial overview of DG5 records in Warrington BC aggregated to United Utilities drainage areas. These have been coloured to illustrate the total number of properties on the register as listed below.

Low - Less than 10 properties on internal register Medium - Less than 10 properties on internal register and some on external register High - Greater than 10 properties on internal register and some on external register

Figure 4-7: United Utilities Internal & External DG5 Records Map

© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848

4.3.4 United Utilities Hydraulic Sewer Modelling

Sewers are generally designed to a 1 in 30-year design standard, which means sewer flooding will often be associated with larger events that are less frequent but have a higher consequence. In these situations, sewer inputs from the surrounding land will exceed the sewer system, discharge from manholes and flow across the surface of the land. Overland flows will therefore often follow the same flow paths and pond in the same areas as overland flows identified in the Environment Agency's national surface water maps.

As part of their ongoing drainage area programme, United Utilities have constructed hydraulic models of some of the main sewer systems through Warrington. A series of design storms representing rainfall events of different return periods (1, 2, 5, 10, 20 & 30-years) were applied to the models with the surcharging volume at individual model nodes recorded and supplied as a GIS layer.

Page 2: Figure 4-7: United Utilities Internal & External DG5

Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 31

Figure 4-8 illustrates the volume discharged (m³) by each manhole during the 1 in 30 year flood event at a strategic scale. Each manhole has been colour coded to indicate the total flood volume.

Whilst this map allows a high-level analysis of sewer flood risk to be made there are a number of limitations with the data that must be acknowledged. Firstly, not all sewer networks in Warrington have been modelled; those that are identify previous high-risk areas from other sources (fluvial and surface water). United Utilities have run all models available, although age and confidence in the models are unknown. Older models may be outdated because of sewer network improvements. The data, shown as it is, does not provide an illustration of which areas would be affected once the floodwater is discharged from the system only where the discharge would occur. For example, floodwater may flow down streets, through properties, nearby watercourses or simply re-enter the sewerage systems further downstream.

Figure 4-8: 1 in 30 years Sewer Flooding

© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848

4.3.5 Sewer Flooding Conclusion

Whilst the DG5, SIRS and WIRS registers can give an idea of those areas with limited drainage capacity, or are susceptible to blockage and may result in flooding to properties, gardens or highways, it must be acknowledged that they are purely a historical register of incidents or properties that have already been flooded. They do not provide the data required to assess the current risk of flooding.

Page 3: Figure 4-7: United Utilities Internal & External DG5

Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 34

Figure 4-9: Warrington Critical Drainage Areas

© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848

Table 4-2: Warrington Critical Drainage Areas

Drainage Area Comment

Burtonwood Burtonwood drainage area is located to the west of Warrington between the M62 and Great Sankey. Whilst flood risk within the drainage area is low, there is natural drainage south to Barrow Brook (Whittle Brook) or east to North Park Brook (Sankey Brook), which are both at high risk of flooding (and are themselves CDAs). This drainage area also includes the large development site of Omega. If development is unmanaged, surface water runoff/volume could increase risk downstream to areas that are already at risk of flooding.

Penketh The Penketh drainage area has been identified as a high risk area within Warrington. There are two main watercourses, Whittle Brook and Penketh Brook, which flow through this area, underneath the St Helens canal and outfall into the River Mersey. The downstream extent of both watercourses and contributing urban drainage system will be at risk of tidal locking during high tides. There are a significant number of historical flood events which fit well with both fluvial and surface water flood zones. Whilst this area has been subject to flood risk management schemes by United Utilities, reducing the risk to a standard 1 in 30 year standard of protection, the area will still be sensitive to any additional flows. Development may have to look at alternative connections other than the current surface water drainage systems. The Penketh area was the focus of the pilot SWMP. It is recommended that it is one of the hotspot areas for further assessment of any upcoming Warrington SWMP.

Page 4: Figure 4-7: United Utilities Internal & External DG5

Warrington BC SFRA - Volume II - SFRA Technical Report - v3.0.doc 39

Figure 5-2: Bridgewater Canal Aqueduct and Stop Plank Locations

© Crown copyright and database rights 2011 Ordnance Survey Warrington BC Licence No. 100022848

Table 5-2: Bridgewater Canal Breach Modelling Methodology

Task Approach Comment

Identify breach locations

Aqueducts listed above These are the only areas through Warrington in which the canal is raised

Calculate breach volume

Estimating the volume of water per impounded length using average depth and width

Impounded length is the distance either side of breach to the nearest stop log

Average depth of 1.25m Average width calculated using GIS

for each impounded length Create JFLOW model

Import breach location and potential discharge volume into JFLOW

The breach was using a standard hydrograph with the extents created every hour

There are a number of assumptions with the canal breach methodology.

Potential breaches are located at aqueducts and raised embankments. Unlike the HR Wallingford study, no structural condition assessment has been made on assets through Warrington to verify breach locations.

The MSCC work on canal risk is welcomed, as it starts to assign probabilities to the breach mechanisms. However, the SFRA does not attempt to calculate the probability of such events occurring, as this would be too detailed for this level of assessment and as such, the SFRA has adopted a more precautionary approach where data is uncertain.

The impounded length of the canal has been calculated using the first set of stop planks either side of the breach location. This is contrary to what was seen in the breach at Durham where the predefined stop plank locations could not be used because the velocities were too high, and so stop log locations were sought further away from the breach. However, due to the significant distances between stop plank

Page 5: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

APPENDIX L: PRELIMINARY DRAINAGE STRATEGY PLAN

This page has been left intentionally blank

Page 6: Figure 4-7: United Utilities Internal & External DG5

LEG

END

Site

Ext

ents

EXIS

TIN

G D

RA

INA

GE

INFR

AST

RU

CTU

RE

Fou

l Wat

er

Surf

ace

Wat

er

Co

mb

ined

PRO

POSE

D D

RA

INA

GE

CO

NN

ECTI

ON

S

Surf

ace

Wat

er

Fou

l Wat

er

Not

es:

THIS

DR

AW

ING

IS

NO

T A

DR

AIN

AG

E 'D

ESIG

N'

IT I

S A

PR

ELIM

INA

RY

DR

AIN

AG

E ST

RA

TEG

Y SH

OW

ING

IND

ICA

TIV

E SE

WER

LO

CA

TIO

NS.

N

O H

YDR

AU

LIC

SIM

ULA

TIO

N O

R A

SSES

SMEN

T O

F TH

ESE

PR

OP

OSA

LS

HA

S B

EEN

UN

DER

TAKE

N.

PR

OPO

SED

PO

INTS

O

F C

ON

NEC

TIO

N

TO

THE

EXIS

TIN

G

CU

LVER

TS

REQ

UIR

E IN

VER

T LE

VEL

S TO

BE

AC

CU

RA

TELY

EST

AB

LISH

ED.

SUR

CH

AR

GIN

G O

F TH

E P

RO

PO

SED

OU

TFA

LL W

ILL

REQ

UIR

E M

OD

ELLI

NG

TO

SA

TISF

Y TH

E R

EQU

IREM

ENTS

OF

UN

ITED

UTI

LITI

ES A

LON

G W

ITH

FU

LL H

YDR

AU

LIC

AN

ALY

SIS.

`

Da

te: 2

8.0

2.1

7

Rev

isio

n 3

.1

41 H

AW

THO

RN

E ST

REE

T, W

AR

RIN

GTO

N

OU

R R

EF. H

YD15

7 PR

ELIM

INA

RY

PRO

POSE

D D

RA

INA

GE

STR

ATE

GY

PLA

N

SITU

ATI

ON

PLA

N

The

fou

l wat

er f

low

s ge

ner

ate

d b

y th

e d

evel

op

men

t ar

e p

rop

ose

d t

o c

on

nec

t to

th

e p

ub

lic

com

bin

ed/f

ou

l w

ater

sew

er (

22

5m

m d

ia.)

ru

nn

ing

sou

th t

hro

ugh

sit

e w

ith

in H

awth

orn

e

Lan

e. E

xist

ing

leve

ls o

nsi

te f

all

gen

eral

ly t

ow

ard

s th

e so

uth

-wes

tern

bo

un

dar

y an

d i

t is

assu

med

th

at a

gra

vity

so

luti

on

will

be

ach

ieva

ble

, h

ow

ever

fu

rth

er i

nve

stig

atio

n s

ho

uld

con

firm

.

Det

aile

d d

esig

n w

ill b

e re

qu

ire

d t

o c

on

firm

th

e o

vera

ll d

rain

age

stra

tegy

pro

po

sed

ab

ove

(bas

ed o

n a

sses

smen

t o

f le

vels

, la

you

t an

d o

ther

en

gin

ee

rin

g co

nst

rain

ts).

Co

nse

nt

to

dis

char

ge t

o t

he

pu

blic

sew

er

net

wo

rk w

ill b

e r

equ

ire

d f

rom

Un

ited

Uti

litie

s an

d i

t is

advi

sed

th

at

earl

y d

iscu

ssio

n

is

un

der

take

n

to

det

erm

ine

thei

r p

refe

rred

p

oin

ts

of

con

nec

tio

n, d

isch

arge

rat

es a

nd

an

y ad

dit

ion

al s

yste

m c

on

stra

ints

.

In a

cco

rdan

ce w

ith

th

e d

rain

age

hie

rarc

hy,

th

e su

rfac

e w

ater

gen

erat

ed b

y th

e d

evel

op

men

t is

pro

po

sed

to

mim

ic t

he

pre

-dev

elo

pm

ent

bro

wn

fie

ld s

itu

atio

n a

nd

dis

char

ge t

o t

he

pu

blic

sew

er (

22

5m

m d

ia.)

ru

nn

ing

sou

th

thro

ugh

th

e si

te (

uti

lisin

g th

e ex

isti

ng

con

ne

ctio

ns

wh

ere

feas

ible

). D

etai

led

dra

inag

e d

esig

n w

ill b

e re

qu

ire

d t

o

con

firm

th

e fe

asib

ility

of

this

str

ateg

y fo

llow

ing

mo

re in

-de

pth

rev

iew

of

layo

ut

and

leve

ls. C

on

sen

t fo

r an

y w

ork

s

to t

he

pu

blic

sew

er n

etw

ork

will

be

req

uir

ed f

rom

Un

ite

d U

tilit

ies,

in

clu

din

g ag

reem

ent

of

the

pro

po

sed

dis

char

ge r

ates

an

d a

ny

req

uir

ed n

ew c

on

nec

tio

n(s

).

The

site

is lo

cate

d w

ith

in a

Cri

tica

l Dra

inag

e A

rea

(CD

A)

ther

efo

re in

acc

ord

ance

wit

h lo

cal p

olic

y th

ere

will

be

a

req

uir

emen

t to

pro

vid

e 5

0%

bet

term

ent

on

th

e ex

isti

ng

situ

atio

n. I

n t

erm

s o

f th

e p

re-d

evel

op

me

nt

situ

atio

n t

he

mo

re c

on

stra

inin

g fa

cto

r is

lik

ely

to b

e th

e ex

isti

ng

cap

acit

y w

ith

in t

he

exis

tin

g p

ipe

con

nec

tio

n(s

) ra

ther

th

an

the

rate

gen

erat

ed b

y th

e ex

isti

ng

imp

erm

eab

le a

reas

. UU

hav

e id

enti

fied

th

at a

max

imu

m d

isch

arge

rat

e fr

om

the

site

to

th

e p

ub

lic c

om

bin

ed

sew

er o

f 6

.5l/

s w

ou

ld b

e ac

cep

tab

le.

Sho

uld

intr

usi

ve in

vest

igat

ion

s o

r fu

rth

er

dis

cuss

ion

wit

h U

U id

enti

fy f

urt

her

cap

acit

y co

nst

rain

ts t

he

n t

his

will

be

con

sid

ered

du

rin

g d

etai

led

des

ign

.

On

site

in

tru

sive

dra

inag

e in

vest

igat

ion

, h

as

iden

tifi

ed

th

at t

he

on

site

dra

inag

e co

mb

ines

bo

th

the

surf

ace

wat

er

and

fo

ul

wat

er

syst

ems

and

co

nn

ect

s in

to t

he

sho

rt le

ngt

h o

f

pu

blic

fo

ul

wat

er

sew

er

(22

5m

m

dia

.)

cro

ssin

g th

e si

te s

ho

wn

on

th

e U

U r

eco

rds.

Page 7: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

APPENDIX M: TYPICAL SUDS DETAILS

This page has been left intentionally blank

Page 8: Figure 4-7: United Utilities Internal & External DG5

PE

RV

IOU

SP

AV

EM

EN

T

GE

OTE

XTI

LE(O

PTI

ON

AL)

SU

B-B

AS

E

SU

BG

RA

DE

TYP

E A

: TO

TAL

INFI

LTR

ATI

PN

OU

TLE

T

PE

RV

IOU

SP

AV

EM

EN

T

GE

OTE

XTI

LE(O

PTI

ON

AL)

SU

B-B

AS

E

SU

BG

RA

DE

TYP

E B

: PA

RTI

AL

INFI

LTR

ATI

ON

OU

TLE

T

PE

RV

IOU

SP

AV

EM

EN

T

GE

OTE

XTI

LE(O

PTI

ON

AL)

SU

B-B

AS

E

SU

BG

RA

DE

TYP

E C

: NO

INFI

LTR

ATI

ON

SU

BG

RA

DE

50mm

201

450m

m M

INIM

UM

LAN

DS

CA

PIN

G

OU

TLE

T

GE

OTE

XTI

LE (O

PTI

ON

AL

- TY

PE

S A

&B

) OR

GE

OM

EM

BR

AN

E (T

YP

E C

)A

GG

RE

GA

TE S

UB

-BA

SE

(MA

Y B

ER

EP

LAC

ED

WIT

H G

EO

CE

LLU

LAR

BLO

CK

S

PE

RV

IOU

S S

UR

FAC

E

LAY

ING

CO

UR

SE

LAY

ING

CO

UR

SE

PE

RFO

RA

TED

PIP

EC

OLL

EC

TIO

N S

YS

TEM

PE

RFO

RA

TED

PIP

EC

OLL

EC

TIO

N S

YS

TEM

KE

RB

TUR

F O

VE

R 1

50m

m T

OP

SO

IL/ P

AV

ING

SLA

BS

/ 150

mm

PE

A G

RA

VE

L S

LOP

ING

AW

AY

FR

OM

PA

VE

ME

NT

LAN

DS

CA

PIN

G D

ETA

IL

DO

NO

T S

CA

LE

PR

ELI

MIN

AR

Y

A10

5B

ETT

S

PE

RV

IOU

S P

AV

EM

EN

TS

TYP

ICA

L S

UD

S D

ETA

IL

Page 9: Figure 4-7: United Utilities Internal & External DG5

INLE

T

INS

PE

CTI

ON

CO

VE

R

PE

RFO

RA

TED

CO

NC

RE

TE R

ING

S

HIG

H V

OID

S M

ED

IA

CO

NC

RE

TEFO

OTI

NG

CO

NC

RE

TEC

HA

MB

ER

OIL

& S

ED

IME

NT

CO

LLE

CTO

R

WA

TER

INFI

LTR

ATE

STO

SU

B -

SO

IL

SO

AK

AW

AY

DE

TAIL

S(IN

CLU

DIN

G P

RE

-TR

EA

TME

NT

DE

VIC

E)

DO

NO

T S

CA

LE

PR

ELI

MIN

AR

Y

A10

8B

ETT

S

SO

AK

AW

AY

S

TYP

ICA

L S

UD

S D

ETA

IL

Page 10: Figure 4-7: United Utilities Internal & External DG5

GR

AS

S F

ILTE

R S

TRIP

SH

EE

T R

UN

OFF

FR

OM

CA

R P

AR

K

SU

BS

UR

FAC

E P

ER

FOR

ATE

DP

IPE

CO

LLE

CTI

ON

SY

STE

M

GR

AV

EL

CU

RTA

IND

RA

IN O

VE

RFL

OW

INS

PE

CTI

ON

PO

INT

&O

VE

RFL

OW

(TO

DIR

EC

TE

XC

ES

S F

LOW

S T

O O

UTL

ET)

INS

PE

CTI

ON

PO

INT

&O

VE

RFL

OW

(TO

DIR

EC

TE

XC

ES

S F

LOW

S T

O O

UTL

ET) OU

TLE

T

INS

PE

CTI

ON

PO

INT

& O

VE

RFL

OW

GE

OTE

XTI

LEFI

LTE

R F

AB

RIC

PE

RFO

RA

TED

UN

DE

RD

RA

IN (S

ING

LEO

R M

ULT

IPLE

AC

RO

SS

SE

CTI

ON

,D

EP

EN

DIN

G O

N W

IDTH

)

SU

BS

UR

FAC

E P

ER

FOR

ATE

DP

IPE

CO

LLE

CTI

ON

SY

STE

M

SH

EE

T FL

OW

FR

OM

HA

RD

SU

RFA

CE

DE

SIG

N L

EV

EL

75m

m M

ULC

H

GE

OTE

XTI

LEFI

LTE

R F

AB

RIC

PE

RFO

RA

TED

PIP

E/

UN

DE

RD

RA

IN S

YS

TEM

MIN

Ø15

0mm

PE

A G

RA

VE

L M

IND

EP

TH 2

00m

m

300m

m S

AN

DLA

YE

R

1200

mm

PLA

NTI

NG

SO

IL

PO

ND

ING

MA

XD

EP

TH 1

50m

m

PLA

N V

IEW

PR

OFI

LETY

PIC

AL

SE

CTI

ON

DO

NO

T S

CA

LE

PR

ELI

MIN

AR

Y

A11

2B

ETT

S

BIO

RE

TEN

TIO

N A

PP

LIC

ATI

ON

S

TYP

ICA

L S

UD

S D

ETA

IL

Page 11: Figure 4-7: United Utilities Internal & External DG5

B'

PIP

EW

OR

K B

EN

EA

TH S

TOR

AG

E T

O B

E P

ER

FOR

ATE

D

B

AA

'

PLA

N

FGL

SE

CTI

ON

A -

A'

TYP

ICA

LLY

0.5

- 1m

500

AP

PR

OX

.

FGL

TYP

ICA

LLY

0.5

- 4.5

m

DE

TAIL

1

ALL

DIM

EN

SIO

NS

AN

DD

EP

THS

DE

PE

ND

EN

T O

NR

EQ

UIR

ED

VO

LUM

E A

ND

LOC

AL

GR

OU

ND

CO

ND

ITIO

NS

BA

CK

FILL

, BU

ILD

-UP

AN

DS

UR

FAC

ING

AS

AP

PR

OP

RIA

TE10

0 M

IN S

AN

DV

EN

TIN

G L

AY

ER

- M

IN 1

50m

m(S

ING

LE C

LEA

N S

TON

E 2

5 - 4

0mm

)C

ON

TAIN

ING

VE

NTI

NG

PIP

ES

DE

TAIL

S T

BC

BY

SU

PP

LIE

RG

EO

TEX

TILE

ME

MB

RA

NE

CO

VE

RIN

GTO

P F

AC

E O

F C

ELL

ULA

R B

LOC

KS

1040

mm

DE

PTH

CE

LLU

LAR

STO

RA

GE

BLO

CK

SD

ISTR

IBU

TIO

N L

AY

ER

(SIN

GLE

CLE

AN

STO

NE

20

- 40m

m)

FILL

ER

TP

PR

OV

IDE

PR

OTE

CTI

ON

FO

RIM

PE

RM

EA

BLE

ME

MB

RA

NE

. MA

TER

IAL

AN

DTH

ICK

NE

SS

TO

BE

CO

NFI

RM

ED

IN C

ON

JUN

CTI

ON

WIT

H G

EO

- M

EM

BR

AN

E S

UP

PLI

ER

PE

RFO

RA

TED

DIS

TRIB

UTI

ON

PIP

ES

WIT

HM

IN 1

50m

m S

UR

RO

UN

D

100

SA

ND

IMP

ER

ME

AB

LE M

EM

BR

AN

E

100

SA

ND

UN

DIS

TUR

BE

D F

OR

MA

TIO

N

FGL

SE

CTI

ON

B -

B'

DE

TAIL

1

DO

NO

T S

CA

LE

PR

ELI

MIN

AR

Y

A11

3B

ETT

SCE

LLU

LAR

STO

RA

GE

TYP

ICA

L S

UD

S D

ETA

IL

Page 12: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

This page has been left intentionally blank

Page 13: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

APPENDIX N: IMPERMEABLE AREAS PLAN

This page has been left intentionally blank

Page 14: Figure 4-7: United Utilities Internal & External DG5

1

1

.

7

7

1

1

.7

1

1

1

.

6

7

1

1

.

9

6

1

2

.

0

3

1

1

.

9

9

1

2

.

0

2

1

1

.

8

9

1

1

.

8

6

1

1

.8

7

1

1

.8

3

1

1

.9

1

1

1

.9

2

1

1

.8

7

1

1

.8

1

1

2

.

0

3

1

2

.

0

8

1

2

.

1

1

1

1

.

9

5

1

1

.

9

6

1

2

.

1

2

1

2

.

1

8

1

2

.

1

7

1

2

.

1

4

1

2

.

1

3

1

2

.

2

8

1

2

.

2

8

1

1

.

9

1

1

1

.

9

8

1

2

.

0

8

1

2

.

0

7

1

2

.

0

0

1

2

.

0

2

1

2

.

0

7

1

2

.

0

4

1

2

.

1

0

1

2

.

1

3

1

2

.

1

5

1

2

.

1

4

1

2

.

1

3

1

2

.

2

2

1

2

.

2

1

1

2

.

1

9

1

2

.

1

8

1

2

.

1

0

1

2

.

1

4

1

1

.

9

6

1

1

.

7

0

1

1

.

5

6

1

2

.

0

5

1

2

.

1

4

1

2

.

1

2

1

2

.

1

8

1

2

.

1

2

1

2

.

1

5

1

1

.

5

4

1

1

.

6

3

1

1

.

7

3

1

1

.

7

8

1

1

.

8

1

1

1

.

6

4

1

1

.

6

3

1

1

.8

4

1

1

.9

0

1

1

.8

5

1

1

.8

6

1

1

.8

2

1

1

.

9

6

1

1

.

9

8

1

2

.

0

1

1

2

.

0

3

12.02

1

1

.6

1

1

1

.6

2

1

1

.

6

9

1

1

.

6

9

1

1

.

8

0

1

1

.

9

7

1

1

.7

4

1

1

.

8

7

1

1

.

7

3

1

2

.

1

4

1

1

.

9

7

1

1

.

8

8

1

1

.

9

2

1

1

.

9

5

1

1

.

9

7

1

2

.

0

2

1

2

.0

1

1

2

.

0

1

1

2

.

1

2

1

2

.

0

9

1

2

.

0

8

1

2

.

1

3

1

2

.0

7

1

2

.

0

3

1

2

.

2

4

1

2

.

1

8

1

2

.

1

4

1

2

.

1

8

1

2

.

1

9

1

2

.

2

9

1

2

.

3

3

Gate

Gate

G

a

t

e

Ga

te

BD

BD

BD

15.09

EH

14.22

EH

14.68

EH

19.56

EH

16.89

EH

19.44

EH

16.80

EH

16.80

EH

17.04

EH

17.52

EH

15.66

EH

17.30

EH

17.30

EH

17

.7

0

EH

17

.5

4

EH

15.74

EH

14.29

EH

16.73

EH

16.89

EH

17.15

EH

17.39

EH

16.62

EH

16.87

EH

17.29

EH

15

.8

1

EH

16

.0

6

EH

15

.3

2

EH

15

.5

7

EH

15

.6

2

EH

17

.2

6

EH

17

.1

7

EH

15

.7

0

EH

15

.6

7

EH

17

.1

9

EH

17

.1

9

EH

17

.6

2

EH

20

.6

4

EH

15

.5

7

EH

14

.9

9

EH

20

.8

6

EH

15

.6

1

EH

15

.8

3

EH

15

.9

1

EH

15

.6

1

EH

17

.0

1

EH

17.46

EH

EP

12.02

FL

12.04

FL

12.12

FL

12.01

FL

12.20

FL

11.92

FL

11.93

FL

12

.1

0

FL

12

.1

2

FL

12.04

FL

12.05

FL

12.13

FL

12

.1

3

FL

12

.1

9

FL

12

.2

3

FL

12

.2

5

FL

12

.2

4

FL

12

.2

3

FL

12

.2

4

FL

12

.1

9

FL

12

.3

1

FL

12

.3

7

FL

12

.2

6

FL

12

.1

5

FL

12

.1

9

FL

12

.2

2

FL

12

.2

8

FL

12

.2

4

FL

12

.4

7

FL

12

.5

0

FL

12

.4

3

FL

12

.5

4

FL

12

.3

2

FL

12

.2

5

FL

12

.2

7

FL

12

.2

2

FL

12

.1

2

FL

16.33

Flat R

oof

14.60

Flat R

oof

14.73

Flat R

oof

15.61

Flat R

oof

GP

GP

GP

GP

G

G

G

G

G

G

G

G

G

G

G

LP

LP

LP

11.66

MH

C

L

11.63

MH

C

L

Post

Post

Post

Post

Post

Post

Post

Post

Po

st

RE

17.23

RH

22.71

RH

19.78

RH

19.72

RH

22.58

RH

19.48

RH

21.11

RH

17.33

RH

19.73

RH

20

.0

4

RH

20

.1

7

RH

19.65

RH

15.60

RH

19.77

RH

19.66

RH

19.41

RH

19.27

RH

20.24

RH

20.23

RH

20.88

RH

19.77

RH

18

.8

8

RH

18

.9

6

RH

18

.7

2

RH

18

.9

1

RH

18

.9

0

RH

17

.8

6

RH

19

.7

2

RH

17

.3

3

RH

20

.1

0

RH

21

.1

6

RH

24

.5

4

RH

17.22

RH

18

.8

8

RH

18

.8

9

RH

16

.7

9

RH

24

.3

5

RH

23

.3

0

RH

18

.9

3

RH

18

.9

2

RH

18

.8

1

RH

19.90

RH

Sign

Stay

Stay

TP

TP

TP

TP

1

1

.

5

8

1

1

.

6

0

1

1

.

6

1

1

1

.6

0

1

1

.

6

2

1

1

.

6

6

1

1

.

6

9

1

1

.6

4

1

1

.

6

7

1

1

.

6

6

1

1

.6

9

1

1

.

8

6

1

1

.

8

9

1

1

.

9

1

1

1

.

9

5

1

2

.

0

0

1

2

.

1

0

1

2

.

1

3

1

2

.

1

3

1

2

.

1

2

1

1

.5

4

1

1

.4

8

1

1

.

5

2

1

1

.

5

6

1

1

.

6

5

Sign

Sign

1

1

.9

1

1

1

.

8

9

1

1

.8

5

S

t

e

p

1

1

.

8

6

1

1

.9

4

2001

2003

2004

2005

20

07

20

08

2009

20

10

20

11

20

06

G

11.74

1

1

.

7

2

1

1

.

7

2

11.7

0

1

1

.

7

1

1

1

.

6

8

1

1

.

6

7

1

1

.

6

5

1

1

.

6

2

1

1

.6

6

1

1

.

7

0

1

1

.

7

4

1

1

.

8

1

1

1

.

9

2

G

G

1

1

.

6

8

1

1

.6

4

1

1

.

5

6

1

1

.

5

9

1

1

.

6

0

1

1

.8

4

1

1

.

6

9

1

1

.

6

6

1

1

.

6

4

1

1

.

6

7

1

1

.

6

0

11.58

IC

C

L

1

1

.6

8

1

1

.

7

3

1

1

.

7

5

1

1

.

6

5

1

1

.6

7

1

1

.7

2

1

1

.6

9

1

1

.6

1

1

1

.6

0

1

1

.

6

0

1

1

.6

2

11.68

1

1

.7

3

1

1

.8

5

11.88

IC

C

L

1

1

.

8

7

11.86

IC

C

L

1

1

.8

8

1

1

.

8

9

1

1

.9

0

1

1

.8

8

1

1

.8

8

1

1

.8

8

1

1

.8

8

1

1

.8

5

1

1

.8

4

1

1

.8

3

11.90

IC

C

L

1

1

.8

3

1

1

.8

4

1

1

.8

8

1

1

.9

8

1

1

.

8

6

BT

11.90

IC

C

L

1

1

.8

6

1

1

.8

3

1

1

.8

3

1

1

.8

5

11.89

IC

C

L

11.93

IC

C

L

12.22

WM

C

L

11.98

MH

C

L

1

1

.

8

7

1

1

.

8

7

1

1

.

8

6

1

1

.

8

5

1

2

.

0

6

1

1

.

9

2

1

1

.

8

4

1

2

.

0

1

1

2

.

0

0

1

1

.

8

0

1

1

.

8

4

1

2

.

2

5

1

2

.

2

8

11.94

IC

C

L

G

G

1

1

.

9

7

1

1

.

9

3

1

1

.

9

51

1

.8

9

1

1

.

9

3

1

1

.

9

4

1

1

.

9

2

1

1

.

8

9

1

1

.

8

8

1

1

.

8

5

1

1

.

8

1

1

1

.

8

6

1

1

.

8

4

11.88

IC

C

L

11.81

IC

C

L

11.58

MH

C

L

11.63

IC

C

L

G

11.64

MH

C

L

11.69

IC

C

L

G

1

1

.

6

1

1

1

.

6

6

1

1

.

9

9

1

1

.

9

8

1

1

.

7

6

1

1

.

6

9

1

1

.

7

6

1

1

.8

8

1

1

.

8

4

1

1

.

7

9

1

1

.8

8

1

1

.8

8

1

1

.

8

8

1

1

.6

3

1

1

.6

2

1

1

.6

2

1

1

.

6

0

1

1

.

6

2

1

1

.

7

1

1

2

.

0

5

1

1

.

9

4

1

1

.

8

4

1

1

.

8

2

1

1

.

7

1

1

1

.7

1

G

1

2

.

0

1

1

2

.

0

2

1

1

.

8

3

1

1

.

7

3

1

1

.

6

7

1

1

.

6

1

11.5

7

11.5

5

1

1

.

5

0

1

1

.

5

4

1

1

.

6

1

11.63

1

1

.

6

4

1

1

.

6

7

1

1

.

6

8

1

1

.

7

5

1

1

.

8

4

1

1

.8

5

11.87

1

1

.

8

9

1

1

.

9

5

1

2

.

0

3

1

2

.

0

5

12.01

1

2

.

1

1

1

2

.

0

8

1

2

.

0

6

1

2

.

0

4

1

2

.

1

1

1

2

.1

1

1

2

.

1

0

1

2

.

0

2

1

1

.

9

5

1

1

.

9

2

1

1

.

8

4

11.96

MH

C

L

D

r

a

i

n

1

2

.

1

4

G

G

1

2

.

2

4

1

2

.

2

1

1

2

.

1

2

1

2

.

1

6

1

2

.

1

2

1

2

.

1

5

1

2

.

1

1

1

2

.

2

1

1

2

.

2

4

1

2

.

3

7

1

2

.

5

1

1

2

.

4

9

1

2

.

9

8

1

2

.9

8

1

2

.

2

5

1

2

.

2

3

1

2

.

1

8

GV

12

.2

5

Ga

s

12

.7

0

IC

C

L

1

1

.

6

0

1

1

.

6

6

1

1

.

8

6

1

1

.

8

2

1

2

.

0

9

1

2

.

1

5

1

2

.

2

3

1

2

.

2

7

1

2

.

3

0

1

2

.

3

5

1

2

.

4

5

1

2

.

5

6

1

2

.

5

9

1

2

.

6

6

1

2

.5

7

12.6

1

12.5

6

12.4

5

12.2

9

12.2

7

12.2

7

12.3

0

12

.4

1

IC

C

L

1

2

.

3

3

1

2

.

4

3

1

2

.

3

5

S

t

e

p

1

2

.

3

9

1

2

.

3

7

S

t

e

p

1

2

.3

6

11

.9

7

IC

C

L

11

.9

5

IC

C

L

1

1

.

9

7

1

1

.

9

5

1

1

.

9

7

1

2

.

2

1

1

2

.

2

2

1

2

.

1

5

1

2

.

1

5

1

1

.

9

9

1

1

.

9

8

G

12

.0

2

IC

C

L

G

G

11.59

11.58

11.59

11.60

11.61

11.67

11.69

11.66

11.67

11.80

11.88

11.59

11.62

11.62

11.58

11.85

11.94

11.87

11.81

11.91

12.18

12.23

12.10

12.27

12.13

12.14

11.94

12.05

12.03

11.94

11.96

11.92

12.30

12.28

12.28

12.10

12

.0

9

12

.1

7

12.14

12.00

12

.1

5

11.99

11.78

11.70

11.68

11.92

11.73

11.74

11.69

11.65

11.75

11.77

11.70

11.67

11.92

1

1

.

9

9

12.04

12.29

12.20

11.85

1

1

.

8

2

12

.2

3

11

.9

6

12

.0

2

11

.9

9

12

.0

6

12

.0

4

12

.1

3

12

.5

8

12

.5

2

12

.4

0

12

.2

4

12

.2

4

12

.2

2

12

.2

5

12

.3

5

12

.2

6

12

.3

0

12

.3

9

12

.5

3

12

.4

8

12

.4

5

12

.6

2

12

.4

9

12

.3

8

12

.2

4

G

C

P

S

C

P

S

Gravel

Gravel

Gravel

C

o

n

c

r

e

te

Gravel

Grass

Gravel

Gravel

Tarm

ac

Co

ncre

te

Co

ncre

te

C

o

n

c

r

e

t

e

Co

ncre

te

Tarm

ac

Tarm

ac

Ta

rm

ac

2002

Concre

te P

anel F

ence

Grass

Concre

te P

anel F

ence

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

P

o

s

t

&

R

a

il

F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

CP

S

Gas

Meter

CP

S

CP

S

S

t

e

p

S

t

e

p

CP

S

CP

S

No

Acce

ss

1

1

.6

9

C

lo

s

e

d

B

o

a

r

d

F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

Concrete

Concrete

Grass

C

o

n

c

r

e

te

P

a

n

e

l F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

Unable to

Survey

Un

ab

le

to

Su

rve

y

DO

N

OT

S

CA

LE

PR

EL

IM

IN

AR

Y

C1

01

HY

D1

57

IM

PE

RM

EA

BL

E A

RE

AS

P

LA

N

WA

RR

IN

GT

ON

41

H

AW

TH

OR

NE

S

TR

EE

T

Page 15: Figure 4-7: United Utilities Internal & External DG5

DO

N

OT

S

CA

LE

PR

EL

IM

IN

AR

Y

D2

01

HY

D1

57

IM

PE

RM

EA

BL

E A

RE

AS

P

LA

N

WA

RR

IN

GT

ON

41

H

AW

TH

OR

NE

S

TR

EE

T

Page 16: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

This page has been left intentionally blank

Page 17: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

APPENDIX O: OVERLAND FLOOD FLOW ROUTING

This page has been left intentionally blank

Page 18: Figure 4-7: United Utilities Internal & External DG5

1

1

.

7

7

1

1

.

7

1

1

1

.

6

7

1

1

.

9

6

1

2

.

0

3

1

1

.

9

9

1

2

.

0

2

1

1

.

8

9

1

1

.

8

6

1

1

.8

7

1

1

.8

3

1

1

.9

1

1

1

.

9

2

1

1

.8

7

1

1

.8

1

1

2

.

0

3

1

2

.

0

8

1

2

.

1

1

1

1

.

9

5

1

1

.

9

6

1

2

.

1

2

1

2

.

1

8

1

2

.

1

7

1

2

.

1

4

1

2

.

1

3

1

2

.

2

8

1

2

.

2

8

1

1

.

9

1

1

1

.

9

8

1

2

.

0

8

1

2

.

0

7

1

2

.

0

0

1

2

.

0

2

1

2

.

0

7

1

2

.

0

4

1

2

.

1

0

1

2

.

1

3

1

2

.

1

5

1

2

.

1

4

1

2

.

1

3

1

2

.

2

2

1

2

.

2

1

1

2

.

1

9

1

2

.

1

8

1

2

.

1

0

1

2

.

1

4

1

1

.

9

6

1

1

.

7

0

1

1

.

5

6

1

2

.

0

5

1

2

.

1

4

1

2

.

1

2

1

2

.

1

8

1

2

.

1

2

1

2

.

1

5

1

1

.

5

4

1

1

.

6

3

1

1

.

7

3

1

1

.

7

8

1

1

.

8

1

1

1

.

6

4

1

1

.

6

3

1

1

.8

4

1

1

.9

0

1

1

.8

5

1

1

.8

6

1

1

.8

2

1

1

.

9

6

1

1

.

9

8

1

2

.

0

1

1

2

.

0

3

12.02

1

1

.6

1

1

1

.6

2

1

1

.

6

9

1

1

.

6

9

1

1

.

8

0

1

1

.

9

7

1

1

.

7

4

1

1

.

8

7

1

1

.

7

3

1

2

.

1

4

1

1

.

9

7

1

1

.

8

8

1

1

.

9

2

1

1

.

9

5

1

1

.

9

7

1

2

.

0

2

1

2

.0

1

1

2

.

0

1

1

2

.

1

2

1

2

.

0

9

1

2

.

0

8

1

2

.

1

3

1

2

.0

7

1

2

.

0

3

1

2

.

2

4

1

2

.

1

8

1

2

.

1

4 1

2

.

1

8

1

2

.

1

9

1

2

.

2

9

1

2

.

3

3

Gate

Gate

G

a

t

e

Ga

te

BD

BD

BD

15.09

EH

14.22

EH

14.68

EH

19.56

EH

16.89

EH

19.44

EH

16.80

EH

16.80

EH

17.04

EH

17.52

EH

15.66

EH

17.30

EH

17.3

0

EH

17

.7

0

EH

17

.5

4

EH

15.74

EH

14.29

EH

16.73

EH

16.89

EH

17.15

EH

17.39

EH

16.62

EH

16.87

EH

17.29

EH

15

.8

1

EH

16

.0

6

EH

15

.3

2

EH

15

.5

7

EH

15

.6

2

EH

17

.2

6

EH

17

.1

7

EH

15

.7

0

EH

15

.6

7

EH

17

.1

9

EH

17

.1

9

EH

17

.6

2

EH

20

.6

4

EH

15

.5

7

EH

14

.9

9

EH

20

.8

6

EH

15

.6

1

EH

15

.8

3

EH

15

.9

1

EH

15

.6

1

EH

17

.0

1

EH

17.46

EH

EP

12.02

FL

12.04

FL

12.12

FL

12.01

FL

12.20

FL

11.92

FL

11.93

FL

12

.1

0

FL

12

.1

2

FL

12.04

FL

12.05

FL

12.13

FL

12

.1

3

FL

12

.1

9

FL

12

.2

3

FL

12

.2

5

FL

12

.2

4

FL

12

.2

3

FL

12

.2

4

FL

12

.1

9

FL

12

.3

1

FL

12

.3

7

FL

12

.2

6

FL

12

.1

5

FL

12

.1

9

FL

12

.2

2

FL

12

.2

8

FL

12

.2

4

FL

12

.4

7

FL

12

.5

0

FL

12

.4

3

FL

12

.5

4

FL

12

.3

2

FL

12

.2

5

FL

12

.2

7

FL

12

.2

2

FL

12

.1

2

FL

16.33

Flat R

oof

14.60

Flat R

oof

14.73

Flat R

oof

15.61

Flat R

oof

GP

GP

GP

GP

G

G

G

G

G

G

G

G

G

G

G

LP

LP

LP

11.66

MH

C

L

11.63

MH

C

L

Post

Post

Post

Post

Post

Post

Post

Post

Po

st

RE

17.23

RH

22.71

RH

19.78

RH

19.72

RH

22.58

RH

19.48

RH

21.11

RH

17.33

RH

19.73

RH

20

.0

4

RH

20

.1

7

RH

19.65

RH

15.60

RH

19.77

RH

19.66

RH

19.41

RH

19.27

RH

20.24

RH

20.23

RH

20.88

RH

19.77

RH

18

.8

8

RH

18

.9

6

RH

18

.7

2

RH

18

.9

1

RH

18

.9

0

RH

17

.8

6

RH

19

.7

2

RH

17

.3

3

RH

20

.1

0

RH

21

.1

6

RH

24

.5

4

RH

17.22

RH

18

.8

8

RH

18

.8

9

RH

16

.7

9

RH

24

.3

5

RH

23

.3

0

RH

18

.9

3

RH

18

.9

2

RH

18

.8

1

RH

19.90

RH

Sign

Stay

Stay

TP

TP

TP

TP

1

1

.

5

8

1

1

.

6

0

1

1

.

6

1

1

1

.6

0

1

1

.

6

2

1

1

.

6

6

1

1

.

6

9

1

1

.6

4

1

1

.

6

7

1

1

.

6

6

1

1

.6

9

1

1

.

8

6

1

1

.

8

9

1

1

.

9

1

1

1

.

9

5

1

2

.

0

0

1

2

.

1

0

1

2

.

1

3

1

2

.

1

3

1

2

.

1

2

1

1

.5

4

1

1

.4

8

1

1

.

5

2

1

1

.

5

6

1

1

.

6

5

Sign

Sign

1

1

.9

1

1

1

.

8

9

1

1

.8

5

S

t

e

p

1

1

.

8

6

1

1

.9

4

2001

2003

2004

2005

20

07

20

08

2009

20

10

20

11

20

06

G

11.74

1

1

.

7

2

1

1

.

7

2

11.7

0

1

1

.

7

1

1

1

.

6

8

1

1

.

6

7

1

1

.

6

5

1

1

.

6

2

1

1

.

6

6

1

1

.

7

0

1

1

.

7

4

1

1

.

8

1

1

1

.

9

2

G

G

1

1

.

6

8

1

1

.

6

4

1

1

.

5

6

1

1

.

5

9

1

1

.

6

0

1

1

.8

4

1

1

.

6

9

1

1

.

6

6

1

1

.

6

4

1

1

.

6

7

1

1

.

6

0

11.58

IC

C

L

1

1

.6

8

1

1

.7

3

1

1

.

7

5

1

1

.6

5

1

1

.6

7

1

1

.7

2

1

1

.6

9

1

1

.6

1

1

1

.6

0

1

1

.

6

0

1

1

.6

2

11.68

1

1

.7

3

1

1

.8

5

11.88

IC

C

L

1

1

.

8

7

11.86

IC

C

L

1

1

.8

8

1

1

.

8

9

1

1

.9

0

1

1

.8

8

1

1

.8

8

1

1

.8

8

1

1

.8

8

1

1

.8

5

1

1

.8

4

1

1

.8

3

11.90

IC

C

L

1

1

.8

3

1

1

.8

4

1

1

.

8

8

1

1

.9

8

1

1

.

8

6

BT

11.90

IC

C

L

1

1

.8

6

1

1

.8

3

1

1

.8

3

1

1

.8

5

11.89

IC

C

L

11.93

IC

C

L

12.22

WM

C

L

11.98

MH

C

L

1

1

.

8

7

1

1

.

8

7

1

1

.

8

6

1

1

.

8

5

1

2

.

0

6

1

1

.

9

2

1

1

.

8

4

1

2

.

0

1

1

2

.

0

0

1

1

.

8

0

1

1

.

8

4

1

2

.

2

5

1

2

.

2

8

11.94

IC

C

L

G

G

1

1

.

9

7

1

1

.

9

3

1

1

.9

51

1

.8

9

1

1

.

9

3

1

1

.

9

4

1

1

.

9

2

1

1

.

8

9

1

1

.

8

8

1

1

.

8

5

1

1

.

8

1

1

1

.

8

6

1

1

.

8

4

11.88

IC

C

L

11.81

IC

C

L

11.58

MH

C

L

11.63

IC

C

L

G

11.64

MH

C

L

11.69

IC

C

L

G

1

1

.

6

1

1

1

.

6

6

1

1

.

9

9

1

1

.

9

8

1

1

.

7

6

1

1

.

6

9

1

1

.

7

6

1

1

.8

8

1

1

.8

4

1

1

.

7

9

1

1

.8

8

1

1

.8

8

1

1

.

8

8

1

1

.6

3

1

1

.6

2

1

1

.6

2

1

1

.

6

0

1

1

.

6

2

1

1

.

7

1

1

2

.

0

5

1

1

.

9

4

1

1

.

8

4

1

1

.

8

2

1

1

.

7

1

1

1

.

7

1

G

1

2

.

0

1

1

2

.

0

2

1

1

.

8

3

1

1

.

7

3

1

1

.

6

7

1

1

.

6

1

11.5

7

11.55

1

1

.

5

0

1

1

.

5

4

1

1

.

6

1

11.63

1

1

.

6

4

1

1

.

6

7

1

1

.

6

8

1

1

.

7

5

1

1

.

8

4

1

1

.8

5

11.87

1

1

.

8

9

1

1

.

9

5

1

2

.

0

3

1

2

.

0

5

12.01

1

2

.

1

1

1

2

.

0

8

1

2

.

0

6

1

2

.

0

4

1

2

.

1

1

1

2

.1

1

1

2

.

1

0

1

2

.

0

2

1

1

.

9

5

1

1

.

9

2

1

1

.

8

4

11.96

MH

C

L

D

r

a

in

1

2

.

1

4

G

G

1

2

.

2

4

1

2

.

2

1

1

2

.

1

2

1

2

.

1

6

1

2

.

1

2

1

2

.

1

5

1

2

.

1

1

1

2

.

2

1

1

2

.

2

4

1

2

.

3

7

1

2

.

5

1

1

2

.

4

9

1

2

.

9

8

1

2

.9

8

1

2

.

2

5

1

2

.

2

3

1

2

.

1

8

GV

12

.2

5

Ga

s

12

.7

0

IC

C

L

1

1

.

6

0

1

1

.

6

6

1

1

.

8

6

1

1

.

8

2

1

2

.

0

9

1

2

.

1

5

1

2

.

2

3

1

2

.

2

7

1

2

.

3

0

1

2

.

3

5

1

2

.

4

5

1

2

.

5

6

1

2

.

5

9

1

2

.

6

6

12.5

7

12.6

1

12.5

6

12.4

5

12.2

9

12.2

7

12.2

7

12.3

0

12

.4

1

IC

C

L

1

2

.

3

3

1

2

.

4

3

1

2

.

3

5

S

t

e

p

1

2

.

3

9

1

2

.

3

7

S

t

e

p

1

2

.3

6

11

.9

7

IC

C

L

11

.9

5

IC

C

L

1

1

.

9

7

1

1

.

9

5

1

1

.9

7

1

2

.

2

1

1

2

.

2

2

1

2

.

1

5

1

2

.

1

5

1

1

.

9

9

1

1

.

9

8

G

12

.0

2

IC

C

L

G

G

11.59

11.58

11.59

11.60

11.61

11.67

11.69

11.66

11.67

11.80

11.88

11.59

11.62

11.62

11.58

11.85

11.94

11.87

11.81

11.91

12.18

12.23

12.10

12.27

12.13

12.14

11.94

12.05

12.03

11.94

11.96

11.92

12.30

12.28

12.28

12.10

12

.0

9

12

.1

7

12

.1

4

12.00

12

.1

5

11.99

11.78

11.70

11.68

11.92

11.73

11.74

11.69

11.65

11.75

11.77

11.70

11.67

11.92

1

1

.

9

9

12.04

12.29

12.20

11.85

1

1

.

8

2

12

.2

3

11

.9

6

12

.0

2

11

.9

9

12

.0

6

12

.0

4

12

.1

3

12

.5

8

12

.5

2

12

.4

0

12

.2

4

12

.2

4

12

.2

2

12

.2

5

12

.3

5

12

.2

6

12

.3

0

12

.3

9

12

.5

3

12

.4

8

12

.4

5

12

.6

2

12

.4

9

12

.3

8

12

.2

4

G

C

P

S

C

P

S

Gravel

Gravel

Gravel

C

o

n

c

r

e

t

e

Gravel

Grass

Gravel

Gravel

Tarm

ac

Co

ncre

te

Co

ncre

te

C

o

n

c

r

e

t

e

Co

ncre

te

Tarm

ac

Tarm

ac

Ta

rm

ac

2002

Concre

te P

anel F

ence

Grass

Concre

te P

anel F

ence

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

P

o

s

t

&

R

a

il

F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

CP

S

Gas

Meter

CP

S

CP

S

S

t

e

p

S

t

e

p

CP

S

CP

S

No

Acce

ss

1

1

.6

9

C

lo

s

e

d

B

o

a

r

d

F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

Concrete

Concrete

Grass

C

o

n

c

r

e

te

P

a

n

e

l F

e

n

c

e

C

o

n

c

r

e

t

e

P

a

n

e

l

F

e

n

c

e

Unable to

Survey

Un

ab

le

to

Su

rve

y

DO

N

OT

S

CA

LE

PR

EL

IM

IN

AR

Y

C1

02

HY

D1

57

WA

RR

IN

GT

ON

41

H

AW

TH

OR

NE

S

TR

EE

T

Page 19: Figure 4-7: United Utilities Internal & External DG5

DO

N

OT

S

CA

LE

PR

EL

IM

IN

AR

Y

C2

02

HY

D1

57

WA

RR

IN

GT

ON

41

H

AW

TH

OR

NE

S

TR

EE

T

Page 20: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

This page has been left intentionally blank

Page 21: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

APPENDIX P: ONSITE DRAINAGE INVESTIGATION

This page has been left intentionally blank

Page 22: Figure 4-7: United Utilities Internal & External DG5
Page 23: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 1 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB1 (D/S) D/S241016_1

HB1

D/S

CombinedZSample survey to determine asset condition2.79 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:50 Position Code Observation MPEG Photo Grade

161014__00 // Page: 2

0.00 MH 00:00:01 (Constr) 0Start node type, manhole reference number: HB1

0.00 WL 00:00:01 (Serv) 0Water level 15 % of the vertical dimension

0.50 B 00:00:05 (Struct) 4Broken pipe from 11 O'Clock to 2 O'Clock

1.01 CXI 00:00:17 (Constr) 3Connection intruding from 2 O'Clock diameter: 150 mm intrusion: 15 %

2.79 SA 00:01:29 (Misc) 0Survey abandoned Unable to pass

HB1

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 80 28.67 80 4 1 2 0.72 2 3

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 24: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 2 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB1 (D/S) D/S241016_1

HB1

D/S

CombinedZSample survey to determine asset condition18.14 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:147 Position Code Observation MPEG Photo Grade

161014__00 // Page: 3

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB1

0.00 WL 00:00:01 (Serv) 0Water level 15 % of the vertical dimension

1.34 CXI 00:00:12 (Constr) 3Connection intruding from 2 O'Clock diameter: 150 mm intrusion: 15 %

18.14 BRF 00:01:03 (Constr) 0Finish node type, major connection without manhole reference number: D/S Main

HB1

D/S

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.11 2 3

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 25: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 3 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB1 (U/S) HB11241016_1

HB11

HB1

CombinedZSample survey to determine asset condition18.46 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:147 Position Code Observation MPEG Photo Grade

161014__00 // Page: 4

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB1

0.00 WL 00:00:00 (Serv) 0Water level 15 % of the vertical dimension

0.98 DER 00:00:11 (Serv) 3Settled deposits, coarse 15 % cross-sectional area loss

4.52 CN 00:00:36 (Constr) 0Connection other than junction from 12 O'Clock diameter:100 mm

18.46 DEEJ 00:01:50 (Serv) 4Attached deposits, encrustation at joint from 7 O'Clock to 5O'Clock 50 % cross-sectional area loss

18.46 SA 00:01:56 (Misc) 0Survey abandoned Unable to proceed

HB1

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.11 2 3

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 26: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 4 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB3 (U/S) HB12241016_1

HB12

HB3

CombinedZSample survey to determine asset condition23.83 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:189 Position Code Observation MPEG Photo Grade

161014__00 // Page: 5

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB3

0.00 WL 00:00:00 (Serv) 0Water level 5 % of the vertical dimension

4.96 JXD 00:00:32 (Constr) 0Junction defective, connecting pipe is damaged from 10O'Clock diameter: 150 mm

8.51 S1 DER 00:00:58 (Serv) 3Settled deposits, coarse 15 % cross-sectional area loss S1

8.77 CN 00:01:11 (Constr) 0Connection other than junction from 11 O'Clock diameter:150 mm

8.77 CC 00:01:20 (Struct) 2Crack, circumferential from 12 O'Clock to 2 O'Clock

8.77 CC 00:01:26 (Struct) 2Crack, circumferential from 7 O'Clock to 10 O'Clock

12.53 F1 DER 00:01:57 (Serv) 3Settled deposits, coarse 15 % cross-sectional area loss F1

14.56 CN 00:02:14 (Constr) 0Connection other than junction from 11 O'Clock diameter:100 mm

20.46 JN 00:02:55 (Constr) 0Junction from 1 O'Clock diameter: 150 mm

23.83 MHF 00:03:18 (Constr) 0Finish node type, manhole reference number: HB12

HB3

HB12

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade2 20 0.84 20 2 1 2 0.34 8 3

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 27: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 5 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB3 (D/S) 0506241016_1

HB3

0506

CombinedZSample survey to determine asset condition3.60 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:50 Position Code Observation MPEG Photo Grade

161014__00 // Page: 6

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB3

0.00 WL 00:00:01 (Serv) 0Water level 5 % of the vertical dimension

3.60 DER 00:01:18 (Serv) 4Settled deposits, coarse 20 % cross-sectional area loss

3.60 SA 00:01:19 (Misc) 0Survey abandoned Unable to proceed

HB3

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 5 1.39 5 4

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 28: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 6 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB9 (D/S) D/S241016_1

HB9

D/S

CombinedZSample survey to determine asset condition17.98 m

Circular150.00 mmVitrified clay

CCTV SURVEY

1:147 Position Code Observation MPEG Photo Grade

161014__00 // Page: 7

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB9

0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension

3.98 JN 00:00:13 (Constr) 0Junction from 3 O'Clock diameter: 150 mm

17.98 MHF 00:00:46 (Constr) 0Finish node type, manhole reference number: D/S

HB9

D/S

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 29: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 7 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB9 (U/S) HB8241016_1

HB8

HB9

CombinedZSample survey to determine asset condition29.44 m

Circular150.00 mmVitrified clay

CCTV SURVEY

1:252 Position Code Observation MPEG Photo Grade

161014__00 // Page: 8

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB9

0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension

14.28 JN 00:01:03 (Constr) 0Junction from 10 O'Clock diameter: 100 mm

14.28 S1 DES 00:01:04

16.06 JN 00:01:15 (Constr) 0Junction from 10 O'Clock diameter: 100 mm

16.41 RPZ 00:01:23 (Constr) 0Point repair, other trenchless method from 11 O'Clock to 1O'Clock Hole repair

20.72 RPZ 00:01:54 (Constr) 0Point repair, other trenchless method from 10 O'Clock to 2O'Clock Hole re

29.44 MHF 00:02:24 (Constr) 0Finish node type, manhole reference number: HB8

HB9

HB8

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 30: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 8 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB8a (D/S) HB12241016_1

HB8a

HB12

CombinedZSample survey to determine asset condition21.79 m

Circular150.00 mmVitrified clay

CCTV SURVEY

1:189 Position Code Observation MPEG Photo Grade

161014__00 // Page: 9

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB8a

0.00 WL 00:00:00 (Serv) 0Water level 5 % of the vertical dimension

3.82 CN 00:00:16 (Constr) 0Connection other than junction from 10 O'Clock diameter:100 mm

10.95 JN 00:00:43 (Constr) 0Junction from 10 O'Clock diameter: 100 mm

20.15 JN 00:01:14 (Constr) 0Junction from 10 O'Clock diameter: 100 mm

21.79 MHF 00:01:24 (Constr) 0Finish node type, manhole reference number: HB12

HB8a

HB12

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 31: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 9 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB6 (D/S) HB7241016_1

HB6

HB7

CombinedZSample survey to determine asset condition17.43 m

Circular100.00 mmVitrified clay

CCTV SURVEY

1:147 Position Code Observation MPEG Photo Grade

161014__00 // Page: 10

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB6

0.00 WL 00:00:00 (Serv) 0Water level 5 % of the vertical dimension

5.97 JN 00:00:18 (Constr) 0Junction from 2 O'Clock diameter: 100 mm

17.43 MHF 00:01:19 (Constr) 0Finish node type, manhole reference number: HB7

HB6

HB7

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 32: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 10 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB6 (U/S) U/S241016_1

U/S

HB6

CombinedZSample survey to determine asset condition28.98 m

Circular100.00 mmVitrified clay

CCTV SURVEY

1:231 Position Code Observation MPEG Photo Grade

161014__00 // Page: 11

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB6

0.00 WL 00:00:01 (Serv) 0Water level 5 % of the vertical dimension

0.99 JN 00:00:08 (Constr) 0Junction from 2 O'Clock diameter: 100 mm

10.56 JN 00:00:32 (Constr) 0Junction from 10 O'Clock diameter: 100 mm

14.86 RPZ 00:00:53 (Constr) 0Point repair, other trenchless method from 10 O'Clock to 2O'Clock Hole repair

26.03 JN 00:01:30 (Constr) 0Junction from 2 O'Clock diameter: 100 mm

26.03 S1 DES 00:01:32 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss S1

28.26 RPZ 00:01:45 (Constr) 0Point repair, other trenchless method from 10 O'Clock to 2O'Clock Hole repair

28.98 JN 00:01:52 (Constr) 0Junction from 10 O'Clock diameter: 100 mm

28.98 F1 DES 00:01:52 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss F1

28.98 BRF 00:01:52 (Constr) 0Finish node type, major connection without manhole reference number: U/S Head of system

HB6

U/S

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.2 5.8 3

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 33: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 11 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB5 (D/S) HB4241016_1

HB5

HB4

CombinedZSample survey to determine asset condition17.33 m

Circular150.00 mmVitrified clay

CCTV SURVEY

1:147 Position Code Observation MPEG Photo Grade

161014__00 // Page: 12

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB5

0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension

0.00 DES 00:00:02 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss

0.20 H 00:00:05 (Struct) 5Hole in drain/sewer from 9 O'Clock to 1 O'Clock

0.20 VV 00:00:10 (Constr) 0Void visible beyond defect

10.80 JN 00:00:46 (Constr) 0Junction from 3 O'Clock diameter: 150 mm

17.33 MHF 00:01:08 (Constr) 0Finish node type, manhole reference number: HB4

HB5

HB4

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 165 9.52 165 5 1 2 0.12 2 3

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 34: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 12 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB4 (D/S) D/S241016_1

HB4

D/S

CombinedZSample survey to determine asset condition45.05 m

Circular150.00 mmVitrified clay

CCTV SURVEY

1:357 Position Code Observation MPEG Photo Grade

161014__00 // Page: 13

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB4

0.00 WL 00:00:01 (Serv) 0Water level 5 % of the vertical dimension

1.30 B 00:00:16 (Struct) 4Broken pipe from 7 O'Clock to 3 O'Clock

24.80 JN 00:01:36 (Constr) 0Junction from 2 O'Clock diameter: 100 mm

41.91 JN 00:02:42 (Constr) 0Junction from 2 O'Clock diameter: 100 mm

45.05 MHF 00:02:59 (Constr) 0Finish node type, manhole reference number: HB14

HB4

D/S

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 80 1.78 80 4 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 35: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 13 X

no rain or snow no D Hampson

WA5Hawthorne Street

0506 (U/S) HB10241016_1

HB10

0506

CombinedZSample survey to determine asset condition16.11 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:147 Position Code Observation MPEG Photo Grade

161014__00 // Page: 14

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0506

0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension

0.00 S1 DES 00:00:01

12.58 JN 00:02:14 (Constr) 0Junction from 1 O'Clock diameter: 150 mm

16.11 MHF 00:03:04 (Constr) 0Finish node type, manhole reference number: HB10

0506

HB10

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 36: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 14 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB10 (U/S) HB15241016_1

HB15

HB10

CombinedZSample survey to determine asset condition13.64 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:126 Position Code Observation MPEG Photo Grade

161014__00 // Page: 15

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB10

0.00 WL 00:00:00 (Serv) 0Water level 10 % of the vertical dimension

0.50 JN 00:00:01 (Constr) 0Junction from 2 O'Clock diameter: 150 mm

11.71 RFJ 00:01:21 (Serv) 2Roots, fine at joint

13.64 MHF 00:01:42 (Constr) 0Finish node type, manhole reference number: HB15

HB10

HB15

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 37: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 15 X

no rain or snow no D Hampson

WA5Hawthorne Street

HB15 (U/S) HB16241016_1

HB16

HB15

CombinedZSample survey to determine asset condition4.57 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:50 Position Code Observation MPEG Photo Grade

161014__00 // Page: 16

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: HB15

0.00 WL 00:00:00 (Serv) 0Water level 10 % of the vertical dimension

4.57 MHF 00:01:44 (Constr) 0Finish node type, manhole reference number: HB16

HB15

HB16

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 0 0 0 0 1

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 38: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 16 X

no rain or snow no D Hampson

WA5Hawthorne Street

0506 (U/S) HB3241016_1

HB3

0506

CombinedZSample survey to determine asset condition35.52 m

Circular225.00 mmVitrified clay

CCTV SURVEY - Overlap

1:294 Position Code Observation MPEG Photo Grade

161014__00 // Page: 17

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0506

0.00 WL 00:00:01 (Serv) 0Water level 10 % of the vertical dimension

0.00 S1 DES 00:00:02 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss S1

11.77 JN 00:01:07 (Constr) 0Junction from 1 O'Clock diameter: 150 mm

12.28 F1 DES 00:01:22 (Serv) 3Settled deposits, fine 15 % cross-sectional area loss F1

12.28 WL 00:01:23 (Serv) 0Water level 5 % of the vertical dimension

33.08 S2 DES 00:03:01

35.52 SA 00:03:51 (Misc) 0Survey abandoned Unable to proceed

0506

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 2 0.69 24.4 3

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 39: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 17 X

no rain or snow no D Hampson

WA5Hawthorne Street

0502 (U/S) HB2241016_1

HB2

0502

CombinedZSample survey to determine asset condition30.51 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:252 Position Code Observation MPEG Photo Grade

161014__00 // Page: 18

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0502

0.00 WL 00:00:01 (Serv) 0Water level 25 % of the vertical dimension

3.35 JN 00:00:28 (Constr) 0Junction from 10 O'Clock diameter: 150 mm

3.95 JN 00:00:34 (Constr) 0Junction from 1 O'Clock diameter: 150 mm

30.51 OBZ 00:03:24 (Serv) 5Other obstacles, other from 3 O'Clock to 9 O'Clock 50 %cross-sectional area loss Unknown

30.51 SA 00:03:29 (Misc) 0Survey abandoned Unable to pass

0502

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 10 0.33 10 5

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 40: Figure 4-7: United Utilities Internal & External DG5

Street : Tel: Fax:

Email:

Inspection report / Inspection: 1Date : Job number : Weather : Operator : Section number : PLR SUFFIX:

Weather Vehicle : Camera : Preset : Cleaned : Operator :

Place : Location details: U/S MH :Road : Catchment: U/S Depth :Location Tape number : D/S MH :Inspection Pipe Length D/S Depth :

Use: Pipe shape :Year laid : Pipe size :Purpose : Pipe material :Total length : Lining :

Comment :

14/10/2016 CL9318 no rain or snow D Hampson 18 X

no rain or snow no D Hampson

WA5Hawthorne Street

0502 (D/S) 0507241016_1

0502

0507

CombinedZSample survey to determine asset condition1.25 m

Circular225.00 mmVitrified clay

CCTV SURVEY

1:50 Position Code Observation MPEG Photo Grade

161014__00 // Page: 19

0.00 MH 00:00:00 (Constr) 0Start node type, manhole reference number: 0502

0.00 WL 00:00:00 (Serv) 0Water level 25 % of the vertical dimension

0.81 JN 00:00:26 (Constr) 0Junction from 9 O'Clock diameter: 150 mm

1.25 DER 00:01:16 (Serv) 4Settled deposits, coarse 25 % cross-sectional area loss

1.25 CUW 00:01:16 (Misc) 0Loss of vision, camera under water

1.25 SA 00:01:17 (Misc) 0Survey abandoned Cleaning required

0502

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0 0 0 1 1 5 4 5 4

Structural DefectsService Defects

Constructional FeaturesMiscellaneous Featuress

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

This is a demo-print by the 'Virtual Print Engine' from IDEAL Software®

Page 41: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

APPENDIX Q: PRELIMINARY DRAINAGE LAYOUT

This page has been left intentionally blank

Page 42: Figure 4-7: United Utilities Internal & External DG5

FOLLY FARM CLOSE

LONGSHAW STREET

EXIS

TIN

G FO

UL

WAT

ER S

EWER

TO

BE

ABAN

DON

ED.

ON

SITE

INTR

USI

VE D

RAIN

AGE

INVE

STIG

ATIO

N, H

AS ID

ENTI

FIED

THA

TTH

E O

NSI

TE D

RAIN

AGE

COM

BIN

ES B

OTH

THE

SU

RFAC

E W

ATER

AN

DFO

UL

WAT

ER S

YSTE

MS

AND

CON

NEC

TS IN

TO T

HE S

HORT

LEN

GTH

OF

PUBL

IC F

OU

L W

ATER

SEW

ER (

225m

m D

IA.)

CRO

SSIN

G T

HE S

ITE

SHO

WN

ON

THE

UU

REC

ORD

S. C

ON

FIRM

ATIO

N N

O U

PSTR

EAM

FLO

WEN

TERS

THI

S SY

STEM

IS R

EQU

IRED

, AN

Y LI

VE C

ON

NEC

TIO

NS

SHO

ULD

BE M

AIN

TAIN

ED.

HYDR

O-B

RAKE

CHA

MBE

RSU

RFAC

E W

ATER

RU

N-O

FF R

ATES

ARE

TO B

E RE

STRI

CTED

TO

6.5

l/s.

TO B

E CO

NFI

RMED

WIT

H U

U.

EXIS

TIN

G CO

MBI

NED

PU

BLIC

SEW

ER(IN

DICA

TED

ON

REC

ORD

S TO

BE

FOU

L)

INVE

RT L

EVEL

FO

R A

SOFF

IT T

O S

OFF

IT C

ON

NEC

TIO

N(F

OR

A 15

0mm

PIP

E) =

9.8

85m

AOD

INVE

RT L

EVEL

TO

BE

CON

FIRM

ED O

N S

ITE

PRIO

R TO

CON

STRU

CTIO

N.

DO

N

OT

S

CA

LE

PR

EL

IM

IN

AR

Y

B2

03

HY

D1

57

WA

RR

IN

GT

ON

41

H

AW

TH

OR

NE

S

TR

EE

T

Page 43: Figure 4-7: United Utilities Internal & External DG5

41 Hawthorne Street, Warrington

Flood Risk Assessment and Drainage Management Strategy

HYD157-41.HAWTHORNE.STREET-FRA&DMS

APPENDIX R: NOTES OF LIMITATIONS

The data essentially comprised a study of available documented information from various

sources together with discussions with relevant authorities and other interested parties. There

may also be circumstances at the site that are not documented. The information reviewed is not

exhaustive and has been accepted in good faith as providing representative and true data

pertaining to site conditions. If additional information becomes available which might impact our

conclusions, we request the opportunity to review the information, reassess the potential

concerns and modify our opinion if warranted.

It should be noted that any risks identified in this report are perceived risks based on the available

information.

This report was prepared by Betts Hydro Ltd for the sole and exclusive use of the titled client in

response to particular instructions. Any other parties using the information contained in this

report do so at their own risk and any duty of care to those parties is excluded.

This document has been prepared for the titled project only and should any third party wish to

use or rely upon the contents of the report, written approval from Betts Hydro Ltd must be sought.

Betts Hydro Ltd accepts no responsibility or liability for the consequences of this document being

used for the purpose other than that for which it was commissioned and for this document to any

other party other than the person by whom it was commissioned.