Page 1: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

vFINAL DESIGN PRESENTATION

SCHOOL BOARD INFORMATION ITEM

ABINGDON ELEMENTARY SCHOOL

ADDITION + RENOVATION

FEBRUARY 18, 2016

Page 2: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

Agenda

01 Project Introduction

02 Educational Enhancements

03 Transportation Study

04 Final Design

2

Page 3: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

PROJECT INTRODUCTION

3

Page 4: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

PROJECT MILESTONES:• Contractor Pre-qualification – March 7, 2016• Final Design Submission to APS Board - Information – February 18, 2016• Final Design Submission to APS Board – Approval – March 3, 2016• Invitation for Bid – March 9, 2016• Bids Received – April 7, 2016• APS Board Award of Contract – April 21, 2016• Building Permit Received – May / June 2016• Building packing and moving –June 27, 2016• Start of Construction – July 5, 2016• Building Fully Occupied – September 2017 (Construction phases continue between September & December)

4 OVERALL PROJECT SCHEDULE

Page 5: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

• Expanded Enrollment Capacity:589 – current capacity (building only) 729 – projected capacity140 additional seats

• 27,000 SF Addition• 12 new classrooms & Support spaces• Gymnasium• Kitchen

• Address existing space needs:• Library & multi-purpose• Administration

• Building systems improvements

• Site improvements• Multi-modal transportation & Pedestrian access• Address traffic, drop-off/pick-up and parking

• Phased construction keeping school fully operational

5

ABINGDON ELEMENTARY SCHOOL: PROJECT SCOPE OVERVIEW

Page 6: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

6

ABINGDON BLPC & PFRC MEETINGSBLPC: 15 MEETINGS

• September 16th

• September 30th

• October 28th

• November 18th

• December 2nd

• December 16th

• January 6th

• January 20th

• February 3rd

• March 3rd

• March 17th

• April 7th

• April 21st

• September 8th

• January 28th, 2016

PFRC: 8 MEETINGS

• October 15th

• November 19th

• December 17th

• January 21st

• February 4th

• March 18th

• April 15th

• September 2nd

Page 7: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

Hord Coplan Macht’s Baltimore Location

7

EDUCATIONAL ENHANCEMENTS

Page 8: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

Goal 1: Challenge and Engage All Students• Create new and renovated spaces that will

stimulate students and enhance engagement

• Optimize corridor spaces to provide alternative learning environments for instruction.

• New small group instruction spaces distributed within the building will allow for breakaway instruction enhancing focused instruction to small groups of students.

88

APS STRATEGIC GOALS THROUGH CAPACITY PROJECTS: EDUCATIONAL ENHANCEMENTS

Page 9: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

Goal 4: Provide Optimal Learning Environments• Maximize additional day lighting in existing instructional areas

• Optimize corridor spaces and other alcoves to create small group instruction nooks to take advantage of all potential learning spaces

• Provide opportunities for the building to become a teaching tool, through active dashboards and visible construction / systems

• Create adaptable learning environments through creative design and flexible furniture

• Create flex classrooms with movable partitions to accommodate fluctuating enrollment

Goal 5: Meet the Needs of the Whole Child• Improvements to the field and outdoor play areas promoting better

physical activities

9

APS STRATEGIC GOALS THROUGH CAPACITY PROJECTS: EDUCATIONAL ENHANCEMENTS

Page 10: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

10

Howard Gardner’s Multiple IntelligencesProject GIFT

All-inclusive – Grade Level Classrooms

Abingdon Wheel Courses:1. Architecture2. Communications3. Living Histories4. Science Lab5. Spanish6. Violin7. Instrumental Music

OPTIMAL LEARNING ENVIRONMENTS …. WHAT?

Page 11: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

11

OPTIMAL LEARNING ENVIRONMENTS …. HOW?

Page 12: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

Hord Coplan Macht’s Baltimore Location

12

TRANSPORTATION STUDY

Page 13: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

On-Site Ped/Bike Access Recommendations

Raised crosswalk with curb extensions

Page 14: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

Off-Site Recommendations

Raised crosswalk with curb extensions

Priority School Access Improvement (Community Amenity Fund)

Page 15: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

Hord Coplan Macht’s Baltimore Location

15

FINAL DESIGN

Page 16: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

SITE PLAN

16

Page 17: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

FLOOR PLAN

17 FINAL DESIGN Main Level & Second LevelLower Level

Third Level

Page 18: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

EXTERIOR PERSPECTIVE

18 FINAL DESIGN ENTRANCE + GYMNASIUM

Page 19: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

EXTERIOR PERSPECTIVE

19 FINAL DESIGN CAFETERIA + CLASSROOM ADDITION

Page 20: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

INTERIOR FINSHES

20 FINAL DESIGN

It is of the utmost importance that we recognize and nurture all of the varied human intelligences, and all of the combinations of intelligences.

~ Howard Gardner

Page 21: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

GRAPHIC PANELS

21 FINAL DESIGNGraphic panels are preliminary and additional refinements are anticipated during further coordination with APS staff.

Page 22: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

INTERIOR PERSPECTIVES

22 FINAL DESIGN

MAIN ENTRY ADDITION

GYMNASIUM ADDITION

LIBRARY RENOVATION

Page 23: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

INTERIOR PERSPECTIVES

23 FINAL DESIGN

CAFETERIA RENOVATION

STAIRCLASSROOM CORRIDOR

Page 24: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

24 FINAL DESIGN

FINAL DESIGN – FUNDING AVAILABLE 2014 Bond (Per FY2015-2024 CIP) $28,750,000

Maintenance LTP & MC/MM Funding:• 2016 HVAC Bond Funding $750,000• 2017 Roofing Bond Funding $800,000• 2017 Infrastructure (Windows) Bond Funding* $402,000• 2017 MC/MM Funding (Fields): $103,000• 2017 MC/MM Funding (Flooring): $70,000• 2017 MC/MM Funding (Painting) $115,365• 2017 MC/MM Funding (Playground) $200,000• 2017 MC/MM Funding (Plumbing) $51,000

Subtotal LTP & MC/MM $2,491,365

Capital Reserve** $400,000

County/School Board Joint Fund***• APS Funding $600,000• County Funding $600,000

Subtotal Joint Fund $1,200,000

Grand Total Funding Available $32,841,365

Total APS Funding $32,241,365Total County Funding $600,000

Notes:* Not included at the Schematic Design phase.** Not included at the Schematic Design phase. APS Staff coverage for 33 months (July 2015 through March 2018).*** Pending final negotiation with County

Page 25: FINAL DESIGN PRESENTATION SCHOOL BOARD ......• Final Design Submission to APS Board - Information – February 18, 2016 • Final Design Submission to APS Board – Approval –

25 FINAL DESIGN

FINAL DESIGN – COST ESTIMATE

Construction Costs* $24,390,000 

Construction Contingency $1,950,000 Soft Costs $6,101,365 

APS Staff Costs $400,000 

Estimated Total Project Cost $32,841,365 

Total Funding Available $32,841,365 Over (Under) Funding Available $0 

Note:* Based on two independent professional cost estimates; one from the A/E firm and one from the Construction Management firm.