final design - winnipeg · final design 0 5 10 20 40m jack blick ave. maroons rd. ve. st. matthews...

1
FINAL DESIGN 0 5 10 20 40M Jack Blick Ave. Maroons Rd. Portage Ave. St. Matthews Ave. Empress St. Omand’s Creek Empress St. East Westway Eastway CPR LaRivière Empress St. East St. John Ambulance Way Assiniboine River ONE WAY PARKING PROTECTED BIKE LANE SIDEWALK SIDEWALK TWO WAY BIKE PATH TWO WAY BIKE PATH TWO WAY PROTECTED BIKE LANE ON GRADE ACCESSIBLE PEDESTRIAN ROUTE TWO WAY BIKE PATH ELEVATED PEDESTRIAN ACCESSIBLE STRUCTURE MANITOBA BLUE CROSS CAPITAL FORD LINCOLN ST. JOHN AMBULANCE BLINDS ARE BEAUTIFUL WESTERN FINANCIAL GROUP THE HOME DEPOT EARLS DONWOOD MANOR WEST ST. JAMES CEMETERY MANITOBA HYDRO PARKADE CLARION HOTEL & PANCAKE HOUSE OMAND PARK PARKADE CF POLO PARK SHOPPING CENTRE BLUESTEM NATURE PARK SHINDICO POLO FESTIVAL Empress St. THE PLAZA AT POLO SECTION E SECTION D SECTION C SECTION B SECTION A ONE VEHICULAR LANE EACH DIRECTION WITH DESIGNATED LEFT TURN LANES Determined by Existing and Predicted Traffic Volumes and Detailed Traffic Analysis. Separated Medians and Dedicated Turn Lanes Improve Traffic Safety RIGHT YIELD TO EMPRESS ST. NORTHBOUND - NO SIGNAL REDUCE TO ONE RIGHT TURN LANE STABILIZATION & REVEGETATION WORKS REDUCE TO ONE VEHICULAR LANE EACH DIRECTION Determined by Existing and Predicted Traffic Volumes and Detailed Traffic Analysis REMOVING SIGNALIZED INTERSECTION IMPROVES AVERAGE DELAY TIME CHANGE TO ONE WAY ONE VEHICULAR LANE NORTHBOUND PLUS PARKING LANE Determined by Existing and Predicted Traffic Volumes and Detailed Traffic Analysis ON-STREET PARKING On Street Parking (Approx. 82 stalls) Direction of Travel Legend ON-STREET PARKING STABILIZATION & REVEGETATION WORKS ON-STREET PARKING CONNECTS TO EXISTING BIKE LANES ON ST. MATTHEWS AVE.

Upload: others

Post on 25-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINAL DESIGN - Winnipeg · FINAL DESIGN 0 5 10 20 40M Jack Blick Ave. Maroons Rd. ve. St. Matthews Ave. Empress St. Omand’s Creek Empress St. East estway Eastway CPR LaRivière

FINAL DESIGN

0 5 10 20 40M

Jack Blick Ave.

Maroons R

d.Portage Ave.

St. Matthew

s Ave.

Empress St.

Omand’s Creek

Empress St. East

Westw

ay

Eastway

CPR LaRivière

Empress St. East

St. John Ambulance Way

Assiniboine R

iver

ONE WAY PARKING PROTECTED BIKE LANE

SIDEWALK

SIDEWALK

TWO WAYBIKE PATH

TWO WAYBIKE PATH

TWO WAY PROTECTEDBIKE LANE

ON GRADE ACCESSIBLE PEDESTRIAN ROUTE

TWO WAYBIKE PATH

ELEVATED PEDESTRIANACCESSIBLE STRUCTURE

MANITOBA BLUE CROSS

CAPITAL FORD LINCOLN

ST. JOHN AMBULANCE BLINDS ARE

BEAUTIFUL

WESTERNFINANCIAL GROUP

THE HOME DEPOT

EARLS

DONWOOD MANOR WEST

ST. JAMES CEMETERY

MANITOBA HYDRO

PARKADE

CLARIONHOTEL & PANCAKE HOUSE

OMAND PARK

PARKADE

CF POLO PARKSHOPPING CENTRE

BLUESTEM NATURE PARK

SHINDICO POLO FESTIVAL

Empress St.

THE PLAZA AT POLO

SECTION E

SECTION D

SECTION C

SECTION B

SECTION A

ONE VEHICULAR LANE EACH DIRECTIONWITH DESIGNATED LEFT TURN LANES

Determined by Existing and Predicted Traffic Volumes and Detailed Traffic Analysis. Separated Medians and

Dedicated Turn Lanes Improve Traffic Safety

RIGHT YIELD TO EMPRESS ST.NORTHBOUND - NO SIGNAL

REDUCE TO ONE RIGHT TURN LANE

STABILIZATION & REVEGETATION WORKS

REDUCE TO ONE VEHICULAR LANE EACH DIRECTION

Determined by Existing and Predicted Traffic Volumes and Detailed Traffic Analysis

REMOVING SIGNALIZED INTERSECTION IMPROVES AVERAGE DELAY TIME

CHANGE TO ONE WAYONE VEHICULAR LANE NORTHBOUND

PLUS PARKING LANE

Determined by Existing and Predicted Traffic Volumes and Detailed Traffic Analysis

ON-STREET PARKING

On Street Parking (Approx. 82 stalls)

Direction of Travel

Legend

ON-STREET PARKING

STABILIZATION & REVEGETATION WORKS

ON-STREET PARKING

CONNECTS TO EXISTING BIKE LANES ON ST. MATTHEWS AVE.