CERTIFICATION STATEMENTS
I hereby certify that this Final Drainage Report for the design of Monument Powder Coating was
prepared by me, or under my direct supervision, in accordance with the provisions of the Storm
Water Management Manual for the owners thereof. I understand that the City of Fruita does not and
will not assume liability for drainage facilities designed by others.
__________________________
Brynn Boyd, P.E.
Registered Professional Engineer
State of Colorado No. 44855
I, ____________, hereby certify that the Drainage facilities for Monument Powder Coating shall be
constructed according to the design presented in this report. I understand that the City of Fruita does
not and will not assume liability for drainage facilities designed and/or certified by my engineer. I
understand that the City of Fruita reviews drainage plans but cannot, on behalf of Monument Powder
Coating, guarantee that final drainage design review will absolve _______________ and/or their
successors and/or assigns of future liability for improper design. I further understand that approval
of the Final Plat and/or Final Development Plan does not imply approval of my engineer’s drainage
design.
________________________________
Name of Developer
__________________________ _____________
Authorized Signature Date
TABLE OF CONTENTS certification statements ............................................................................................................................... 2
I. SITE LOCATION AND DESCRIPTION ...................................................................................................... 4
II. MAJOR BASIN DESCRIPTION ............................................................................................................... 4
III. EXISTING SITE DESCRIPTION AND SOIL GROUP ............................................................................... 4
IV. PROPOSED SITE DESCRIPTION .......................................................................................................... 5
V. EXISTING DRAINAGE CONDITIONS ...................................................................................................... 5
VI. PROPOSED DRAINAGE CONDITIONS ................................................................................................. 5
VII. DESIGN CRITERIA ............................................................................................................................... 6
VIII. CONCLUSIONS................................................................................................................................... 7
APPENDIX A .................................................................................................................................................. 8
APPENDIX B .................................................................................................................................................. 9
APPENDIX C ............................................................................................................................................... 10
APPENDIX D ............................................................................................................................................... 11
I. SITE LOCATION AND DESCRIPTION
The project site is located in the SE¼ Section 12 T1N, R3W, of the Ute Meridian, Mesa County,
Fruita, Colorado. The proposed project is for a commercial building that will house a powder coating
company. The lot is approximately 2.05 acres. The project is about 3 miles west of Fruita, Colorado.
The project is bordered by 16 Road to the east, Cipolla Road to the south, another commercial
development to the north and vacant, undeveloped commercial land to the west. About 1000 feet
north of the property is Colorado State Highway 6 & 50 and about 1500 feet south is Interstate 70
and the Colorado River. There is a large pond, owned by the City of Fruita just south of Cipolla Road.
Refer to the provided General Location Map below.
II. MAJOR BASIN DESCRIPTION The site lies directly north of the Colorado River and it’s associated lakes and wetland areas.
According to FEMA FIRM map 0420F (Appendix A), this site is in an area designated “Zone X” which
is described as an area determined to be outside a 500- year floodplain. Drainage characteristics
within the major drainage basin will remain unchanged.
III. EXISTING SITE DESCRIPTION AND SOIL GROUP The site is currently undeveloped. Historically the site has been undeveloped. According to the USDA
Soil Survey, Grand Junction Area, Colorado, United States department of Agriculture, Soil
Conservation Service, the soil type for this site is 100% Turley clay loam (0-2 percent slopes). The
site has an SCS Hydrologic Soil Group C. Runoff coefficients were averaged for runoff calculations.
The average slope across the existing site is approximately 3% to the southwest. See Appendix B.
Subject Property
NORTH
Vicinity Map
IV. PROPOSED SITE DESCRIPTION Proposed improvements will be consistent with commercial development, including a large building
with associated parking lot. There will be one large building, approximately 12,100 sf and one
smaller building approximately 800 sf. The parking lot and drive ways will be about 47,086 sf.
Landscaping will consist of 28,480 sf. The site will be graded to flow to a detention pond at the
southwest corner of the site. The detention pond will then release the drainage according to the
allowable release rates to the existing gutter in the street.
V. EXISTING DRAINAGE CONDITIONS
On-Site Flows
The site is considered to be one basin that drains from northeast to southwest at an average slope
of 3 percent. Runoff flows to an existing drainage channel which flows south along the east site
boundary. Flows are tributary to the Colorado River.
Off-Site Flows
There are no anticipated off-site flows that run onto the site.
VI. PROPOSED DRAINAGE CONDITIONS General Discussion
The general drainage pattern from northeast to southwest is maintained in the proposed drainage
basin. Developed Basins surface runoff will flow toward the southwest corner of the site via concrete
valley pans and swales and flow to the detention basin in the southwest corner. Grading provides for
runoff to be directed to the detention pond and minimal undetained runoff is anticipated to leave the
site.
BASIN DESCRIPTIONS
Basin A: This developed basin is 2.03 acres and flows in a southwesterly direction to the detention
pond. Flows are detained and released at allowable rates to the existing gutter.
Off-Site and Undetained Flows and System Impact
Off-site flow will remain unchanged in the proposed drainage condition. No offsite, undetained flows
are anticipated.
Detention Pond Summary
The detention pond will be required to detain for WQV (Water Quality Volume), release specific rates
for 10 year and 100 year events. Using UCFD’s software, UD-Detention, the pond was calculated to
have a total volume of 0.12 acre-ft. No reduction factor was used for the WQCV. Information input to
the spreadsheet included Soils information from the Web Soil Survey (Appendix B) and NOAA Rainfall
Data (Appendix C). Due to the nature of the site, the pond cannot be very deep. The outlet to the
pond has to run to the gutter in Cipolla. In addition, the site is not steep. Therefore the pond is only 2
feet deep. UD Detention information can be found in Appendix D.
WQCV elevation = 1.25 feet depth
100 YR elevation = 2 foot depth
Volume Summary
WQCV Volume = 0.044 acre-ft
100 YR Volume = 0.073 acre-ft
Allowable Release Rates
The pond release rates are calculated using Detention Basin Outlet Structure Design, UD-Detention,
Version 3.07. The Detention Basin Outlet Structure Design spreadsheet was used to calculate actual
release rates which are below the allowable rates and are as follows. UD Detention information can
be found in Appendix D.
100 YR = 0.1 cfs
Due to the shallow nature of the outlet structure, a curb chase will be installed with a weir plate on
the front of the chase to control flows. The weir plate is designed according to UD Detention
information. And the sidewalk chase will guide the water to the gutter.
Operation and Maintenance
The detention pond and outlet structure will be the responsibility of the property owner.
Easements
None.
VII. DESIGN CRITERIA Regulation
The drainage analysis and design for this project is prepared using methods as described the Mesa
County (SWMM) Development Criteria. There are no known drainage constraints affecting this site
from major basin studies or other nearby drainage studies. According to the SWMM, the site requires
a detention pond sized to capture water quality volume and detain the 100 year storm event
volumes.
Hydrologic Criteria
The hydrologic analysis for this project is prepared using methods as described in the Mesa County
SWMM. Historic and developed runoff rates have been calculated for the 100 Year storm event
using the Rational Formula method as outlined in the Mesa County SWMM. The detention pond will
be sized to capture the water quality design volume and detain the 100 year storm event volumes. A
release structure in the detention area will control the release from the pond such that the release
rate will not exceed historic rates for the site.
Hydraulic Criteria
Detention Pond Volume
Detention pond volume was determined using UDFCD’s software, UD-Detention v3.07. Allowable
release rates were determined via SWMM requirements of 0.1 cfs/acre for the 100 year event.
VIII. CONCLUSIONS The site designed and presented in this report was prepared based upon the Storm Water
Management Manual. Proposed construction will not increase the flow rates to the existing storm
infrastructure which is tributary to the Colorado River. Construction of the proposed drainage
facilities will improve runoff conditions and reduce sediments leaving the site and will not increase
flows leaving the site.
Hydrologic Soil Group—Mesa County Area, Colorado
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
9/27/2019Page 1 of 4
4337
410
4337
420
4337
430
4337
440
4337
450
4337
460
4337
470
4337
480
4337
490
4337
500
4337
410
4337
420
4337
430
4337
440
4337
450
4337
460
4337
470
4337
480
4337
490
4337
500
693640 693650 693660 693670 693680 693690 693700 693710 693720 693730 693740 693750 693760 693770 693780 693790
693650 693660 693670 693680 693690 693700 693710 693720 693730 693740 693750 693760 693770 693780 693790
39° 9' 54'' N10
8° 4
5' 3
1'' W
39° 9' 54'' N
108°
45'
24'
' W
39° 9' 51'' N
108°
45'
31'
' W
39° 9' 51'' N
108°
45'
24'
' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 12N WGS840 35 70 140 210
Feet0 10 20 40 60
MetersMap Scale: 1:720 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)Area of Interest (AOI)
SoilsSoil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating LinesA
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating PointsA
A/D
B
B/D
C
C/D
D
Not rated or not available
Water FeaturesStreams and Canals
TransportationRails
Interstate Highways
US Routes
Major Roads
Local Roads
BackgroundAerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map measurements.
Source of Map: Natural Resources Conservation ServiceWeb Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Mesa County Area, ColoradoSurvey Area Data: Version 10, Sep 13, 2019
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Sep 13, 2010—Aug 8, 2017
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Mesa County Area, Colorado
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
9/27/2019Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Tr Turley clay loam, 0 to 2 percent slopes
C 2.1 100.0%
Totals for Area of Interest 2.1 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Hydrologic Soil Group—Mesa County Area, Colorado
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
9/27/2019Page 3 of 4
Tie-break Rule: Higher
Hydrologic Soil Group—Mesa County Area, Colorado
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
9/27/2019Page 4 of 4
Project:
Basin ID:
Depth Increment = 0.5 ft
Required Volume Calculation Top of Micropool 0.00 4.2 4.2 18 0.000
Selected BMP Type = EDB ISV 0.33 4.2 4.2 18 0.000 6 0.000
Watershed Area = 2.03 acres 0.50 16.4 8.2 134 0.003 12 0.000
Watershed Length = 323 ft Floor 0.91 99.6 35.5 3,538 0.081 609 0.014
Watershed Slope = 0.030 ft/ft 1.00 101.8 36.6 3,726 0.086 940 0.022
Watershed Imperviousness = 67.00% percent Zone 1 (WQCV) 1.25 103.4 38.1 3,944 0.091 1,937 0.044
Percentage Hydrologic Soil Group A = 0.0% percent 1.50 104.8 39.6 4,150 0.095 2,908 0.067
Percentage Hydrologic Soil Group B = 0.0% percent 2.00 107.8 42.6 4,592 0.105 5,093 0.117
Percentage Hydrologic Soil Groups C/D = 100.0% percent Zone 2 (100-year) 2.00 107.9 42.6 4,601 0.106 5,139 0.118
Desired WQCV Drain Time = 40.0 hours 2.50 110.9 45.6 5,062 0.116 7,554 0.173
Location for 1-hr Rainfall Depths = User Input 3.00 113.9 48.6 5,540 0.127 10,204 0.234
Water Quality Capture Volume (WQCV) = 0.044 acre-feet 3.50 116.9 51.6 6,037 0.139 13,098 0.301
Excess Urban Runoff Volume (EURV) = 0.132 acre-feet 4.00 119.9 54.6 6,552 0.150 16,244 0.373
2-yr Runoff Volume (P1 = 0.47 in.) = 0.050 acre-feet 0.47 inches 4.50 122.9 57.6 7,084 0.163 19,652 0.451
5-yr Runoff Volume (P1 = 0.63 in.) = 0.074 acre-feet 0.63 inches 5.00 125.9 60.6 7,635 0.175 23,331 0.536
10-yr Runoff Volume (P1 = 0.77 in.) = 0.095 acre-feet 0.77 inches 5.50 128.9 63.6 8,204 0.188 27,290 0.626
25-yr Runoff Volume (P1 = 0.97 in.) = 0.133 acre-feet 0.97 inches 6.00 131.9 66.6 8,790 0.202 31,538 0.724
50-yr Runoff Volume (P1 = 1.14 in.) = 0.162 acre-feet 1.14 inches 6.50 134.9 69.6 9,395 0.216 36,083 0.828
100-yr Runoff Volume (P1 = 1.31 in.) = 0.196 acre-feet 1.31 inches 7.00 137.9 72.6 10,017 0.230 40,936 0.940
500-yr Runoff Volume (P1 = 1.73 in.) = 0.273 acre-feet 1.73 inches 7.50 140.9 75.6 10,658 0.245 46,104 1.058
Approximate 2-yr Detention Volume = 0.047 acre-feet 8.00 143.9 78.6 11,317 0.260 51,597 1.184
Approximate 5-yr Detention Volume = 0.070 acre-feet 8.50 146.9 81.6 11,993 0.275 57,423 1.318
Approximate 10-yr Detention Volume = 0.084 acre-feet 9.00 149.9 84.6 12,688 0.291 63,593 1.460
Approximate 25-yr Detention Volume = 0.099 acre-feet 9.50 152.9 87.6 13,400 0.308 70,114 1.610
Approximate 50-yr Detention Volume = 0.106 acre-feet 10.00 155.9 90.6 14,131 0.324 76,996 1.768
Approximate 100-yr Detention Volume = 0.118 acre-feet 10.50 158.9 93.6 14,880 0.342 84,248 1.934
11.00 161.9 96.6 15,646 0.359 91,879 2.109
Stage-Storage Calculation 11.50 164.9 99.6 16,431 0.377 99,898 2.293
Zone 1 Volume (WQCV) = 0.044 acre-feet 12.00 167.9 102.6 17,234 0.396 108,313 2.487
Zone 2 Volume (100-year - Zone 1) = 0.073 acre-feet 12.50 170.9 105.6 18,054 0.414 117,134 2.689
Select Zone 3 Storage Volume (Optional) = acre-feet 13.00 173.9 108.6 18,893 0.434 126,370 2.901
Total Detention Basin Volume = 0.118 acre-feet 13.50 176.9 111.6 19,749 0.453 136,030 3.123
Initial Surcharge Volume (ISV) = 6 ft 3̂ 14.00 179.9 114.6 20,624 0.473 146,123 3.355
Initial Surcharge Depth (ISD) = 0.33 ft 14.50 182.9 117.6 21,517 0.494 156,657 3.596
Total Available Detention Depth (Htotal) = 2.00 ft 15.00 185.9 120.6 22,427 0.515 167,642 3.849
Depth of Trickle Channel (HTC) = 0.10 ft
Slope of Trickle Channel (STC) = 0.005 ft/ft
Slopes of Main Basin Sides (Smain) = 3 H:V
Basin Length-to-Width Ratio (RL/W) = 3
Initial Surcharge Area (AISV) = 18 ft 2̂
Surcharge Volume Length (LISV) = 4.2 ft
Surcharge Volume Width (WISV) = 4.2 ft
Depth of Basin Floor (HFLOOR) = 0.48 ft
Length of Basin Floor (LFLOOR) = 101.3 ft
Width of Basin Floor (WFLOOR) = 36.1 ft
Area of Basin Floor (AFLOOR) = 3,658 ft 2̂
Volume of Basin Floor (VFLOOR) = 627 ft 3̂
Depth of Main Basin (HMAIN) = 1.09 ft
Length of Main Basin (LMAIN) = 107.9 ft
Width of Main Basin (WMAIN) = 42.6 ft
Area of Main Basin (AMAIN) = 4,601 ft 2̂
Volume of Main Basin (VMAIN) = 4,497 ft 3̂
Calculated Total Basin Volume (Vtotal) = 0.118 acre-feet
Optional User Override1-hr Precipitation
Volume (ft 3̂)
Volume (ac-ft)
Area (acre)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional Override
Area (ft 2̂)Length
(ft)
Optional Override Stage (ft)
Stage(ft)
Stage - StorageDescription
Area (ft 2̂)
Width (ft)
Monument Powder Coating
On-Site
UD-Detention, Version 3.07 (February 2017)
Example Zone Configuration (Retention Pond)
UD-Detention_v3.07, Basin 9/30/2019, 11:32 AM
0 User Defined Stage-Area Boolean for Message
0 Equal Stage-Area Inputs Watershed L:W
1 CountA
0 Calc_S_TC
0.48 H_FLOOR
L_FLOOR_OTHER
0.33 ISV 0.33 ISV
0.91 Floor 0.91 Floor
1.25 Zone 1 (WQCV) 1.25 Zone 1 (WQCV)
2.00 Zone 2 (100-year) 2.00 Zone 2 (100-year)
0.00 Zone 3 0.00 Zone 3
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
UD-Detention, Version 3.07 (February 2017)
0.000
0.965
1.930
2.895
3.860
0.000
0.130
0.260
0.390
0.520
0.00 4.00 8.00 12.00 16.00
Vo
lum
e (
ac-f
t)
Are
a (a
cre
s)
Stage (ft.)
Area (acres) Volume (ac-ft)
0
5700
11400
17100
22800
0
50
100
150
200
0.00 4.00 8.00 12.00 16.00
Are
a (s
q.f
t.)
Len
gth
, W
idth
(ft
.)
Stage (ft)
Length (ft) Width (ft) Area (sq.ft.)
UD-Detention_v3.07, Basin 9/30/2019, 11:32 AM
Project:
Basin ID:
Stage (ft) Zone Volume (ac-ft) Outlet Type
Zone 1 (WQCV) 1.25 0.044 Orifice Plate
Zone 2 (100-year) 2.00 0.073 Rectangular Orifice
Zone 3
0.118 Total
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2
Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate
Invert of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 1.389E-03 ft2
Depth at top of Zone using Orifice Plate = 1.50 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet
Orifice Plate: Orifice Vertical Spacing = 2.00 inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = 0.20 sq. inches (diameter = 1/2 inch) Elliptical Slot Area = N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft) 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
Orifice Area (sq. inches) 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches) 0.20 0.20 0.20 0.20 0.20 0.20 0.20
User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical Orifice
Zone 2 Rectangular Not Selected Zone 2 Rectangular Not Selected
Invert of Vertical Orifice = ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area =
Depth at top of Zone using Vertical Orifice = ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid =
Vertical Orifice Height = inches
Vertical Orifice Width = inches
User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped) Calculated Parameters for Overflow Weir
Not Selected Not Selected Not Selected Not Selected
Overflow Weir Front Edge Height, Ho = ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, Ht =
Overflow Weir Front Edge Length = feet Over Flow Weir Slope Length =
Overflow Weir Slope = H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area =
Horiz. Length of Weir Sides = feet Overflow Grate Open Area w/o Debris =
Overflow Grate Open Area % = %, grate open area/total area Overflow Grate Open Area w/ Debris =
Debris Clogging % = %
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Not Selected Not Selected Not Selected Not Selected
Depth to Invert of Outlet Pipe = ft (distance below basin bottom at Stage = 0 ft) Outlet Orifice Area =
Circular Orifice Diameter = inches Outlet Orifice Centroid =
Half-Central Angle of Restrictor Plate on Pipe = N/A N/A
User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for Spillway
Spillway Invert Stage= ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= feet
Spillway Crest Length = feet Stage at Top of Freeboard = feet
Spillway End Slopes = H:V Basin Area at Top of Freeboard = acres
Freeboard above Max Water Surface = feet
Routed Hydrograph ResultsDesign Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 YearOne-Hour Rainfall Depth (in) = 0.53 1.07 0.47 0.63 0.77 0.97 1.14 1.31
Calculated Runoff Volume (acre-ft) = 0.044 0.132 0.050 0.074 0.095 0.133 0.162 0.196OPTIONAL Override Runoff Volume (acre-ft) =
Inflow Hydrograph Volume (acre-ft) = 0.044 0.131 0.050 0.074 0.095 0.133 0.163 0.196Predevelopment Unit Peak Flow, q (cfs/acre) = 0.00 0.00 0.01 0.07 0.20 0.50 0.68 0.90
Predevelopment Peak Q (cfs) = 0.0 0.0 0.0 0.1 0.4 1.0 1.4 1.8Peak Inflow Q (cfs) = 0.9 2.8 1.1 1.6 2.0 2.8 3.4 4.1
Peak Outflow Q (cfs) = 0.0 0.1 0.0 0.0 0.1 0.1 0.1 0.1Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A 0.3 0.1 0.1 0.0 0.0
Structure Controlling Flow = Plate Plate Plate Plate Plate Plate Plate PlateMax Velocity through Grate 1 (fps) = N/A N/A N/A N/A N/A N/A N/A N/AMax Velocity through Grate 2 (fps) = N/A N/A N/A N/A N/A N/A N/A N/A
Time to Drain 97% of Inflow Volume (hours) = 22 41 24 30 34 41 46 51Time to Drain 99% of Inflow Volume (hours) = 23 43 25 31 36 43 49 54
Maximum Ponding Depth (ft) = 1.20 2.05 1.26 1.51 1.72 2.07 2.33 2.61Area at Maximum Ponding Depth (acres) = 0.09 0.11 0.09 0.10 0.10 0.11 0.11 0.12
Maximum Volume Stored (acre-ft) = 0.040 0.123 0.045 0.069 0.088 0.125 0.154 0.186
Detention Basin Outlet Structure Design
UD-Detention, Version 3.07 (February 2017)Graff Meadows
On-Site
Example Zone Configuration (Retention Pond)
ft2
feet
feet
feet
should be > 4
ft2
ft2
Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
ft2
feet
radians
500 Year1.73
0.273
0.2731.382.85.70.10.0
PlateN/AN/A6165
3.210.13
0.261
COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1 Vert Orifice 2
Count_Underdrain = 0 0.11(diameter = 3/8 inch) 2 3 1
Count_WQPlate = 1 0.14(diameter = 7/16 inch)
Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean
Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch) 1 1 5yr, <72hr 1
Count_Weir1 = 0 0.29(diameter = 5/8 inch) >5yr, <120hr 1
Count_Weir2 = 0 0.36(diameter = 11/16 inch) Max Depth Row
Count_OutletPipe1 = 0 0.42(diameter = 3/4 inch) WQCV 120 Watershed Constraint Check
Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch) 2 Year 126 Slope 0.030
COUNTA_2 (Standard FSD Setup)= 0 0.58(diameter = 7/8 inch) EURV 205 Shape 1.18
MaxPondDepth_Error? FALSE 0.67(diameter = 15/16 inch) 5 Year 151
Hidden Parameters & Calculations 0.76 (diameter = 1 inch) 10 Year 172 Spillway Depth
0.86(diameter = 1-1/16 inches) 25 Year 208
WQ Plate Flow at 100yr depth = 0.07 0.97(diameter = 1-1/8 inches) 50 Year 234
CLOG #1= 0% 1.08(diameter = 1-3/16 inches) 100 Year 262 1 Z1_Boolean
Cdw #1 = 1.20(diameter = 1-1/4 inches) 500 Year 322 0 Z2_Boolean
Cdo #1 = 1.32(diameter = 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean
Overflow Weir #1 Angle = 1.45(diameter = 1-3/8 inches) 1 Opening Message
CLOG #2= 0% 1.59(diameter = 1-7/16 inches) Draintime Running
Cdw #2 = 1.73(diameter = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4)
Cdo #2 = 1.88(diameter = 1-9/16 inches) Vertical Orifice 1 0 0 0
Overflow Weir #2 Angle = 2.03(diameter = 1-5/8 inches) Vertical Orifice 2 0 0 Boolean
Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches) Overflow Weir 1 0 0 0 Max Depth
VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches) Overflow Weir 2 0 0 0 500yr Depth
VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches) Outlet Pipe 1 0 0 0 Freeboard
EURV_draintime_user = 2.72(diameter = 1-7/8 inches) Outlet Pipe 2 0 0 0 Spillway
Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches) 0 Spillway Length
CountA_3 (EURV & 100yr) = 0 3.09(diameter = 2 inches) Button Visibility Boolean FALSE Time Interval
CountA_4 (100yr Only) = 0 3.29(use rectangular openings) 1 Button_Trigger
0 Underdrain
1 WQCV Plate
0 EURV-WQCV Plate
0 EURV-WQCV VertOrifice
0 Outlet 90% Qpeak
0 Outlet Undetained
S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis
minimum bound
maximum bound
Detention Basin Outlet Structure Design
UD-Detention, Version 3.07 (February 2017)
0
1
2
3
4
5
6
0.1 1 10
FLO
W [
cfs]
TIME [hr]
500YR IN
500YR OUT
100YR IN
100YR OUT
50YR IN
50YR OUT
25YR IN
25YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
EURV IN
EURV OUT
WQCV IN
WQCV OUT
0
0.5
1
1.5
2
2.5
3
3.5
0.1 1 10 100
PO
ND
ING
DEP
TH [
ft]
DRAIN TIME [hr]
500YR
100YR
50YR
25YR
10YR
5YR
2YR
EURV
WQCV
0.00
0.05
0.10
0.15
0.20
0.25
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
OU
TFLO
W [
cfs]
AR
EA [
ft^2
], V
OLU
ME
[ft^
3]
PONDING DEPTH [ft]
User Area [ft^2]
Interpolated Area [ft^2]
Summary Area [ft^2]
Volume [ft^3]
Summary Volume [ft^3]
Outflow [cfs]
Summary Outflow [cfs]
Outflow Hydrograph Workbook Filename:
Storm Inflow Hydrographs
The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program.
SOURCE WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK
Time Interval TIME WQCV [cfs] EURV [cfs] 2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs]
4.01 min 0:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0:04:01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hydrograph 0:08:01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Constant 0:12:02 0.04 0.13 0.05 0.07 0.09 0.13 0.16 0.19 0.26
1.248 0:16:02 0.12 0.34 0.13 0.19 0.25 0.34 0.42 0.50 0.69
0:20:03 0.30 0.87 0.34 0.50 0.63 0.88 1.07 1.28 1.77
0:24:04 0.82 2.38 0.92 1.37 1.74 2.41 2.94 3.52 4.86
0:28:04 0.95 2.77 1.07 1.58 2.02 2.81 3.43 4.12 5.71
0:32:05 0.89 2.63 1.01 1.50 1.91 2.67 3.25 3.92 5.43
0:36:05 0.81 2.39 0.91 1.36 1.74 2.43 2.96 3.56 4.94
0:40:06 0.71 2.12 0.80 1.20 1.53 2.15 2.62 3.16 4.39
0:44:07 0.60 1.81 0.68 1.02 1.31 1.83 2.24 2.71 3.77
0:48:07 0.53 1.58 0.60 0.89 1.14 1.60 1.96 2.37 3.29
0:52:08 0.48 1.43 0.54 0.81 1.03 1.45 1.77 2.14 2.98
0:56:08 0.38 1.16 0.43 0.65 0.84 1.18 1.44 1.74 2.44
1:00:09 0.30 0.93 0.34 0.52 0.67 0.95 1.16 1.41 1.97
1:04:10 0.22 0.70 0.25 0.38 0.50 0.71 0.87 1.06 1.50
1:08:10 0.16 0.50 0.18 0.27 0.36 0.51 0.63 0.77 1.10
1:12:11 0.12 0.37 0.13 0.20 0.26 0.38 0.47 0.57 0.80
1:16:11 0.09 0.29 0.11 0.16 0.21 0.30 0.37 0.45 0.63
1:20:12 0.08 0.24 0.09 0.13 0.17 0.25 0.30 0.37 0.52
1:24:13 0.07 0.21 0.08 0.11 0.15 0.21 0.26 0.31 0.44
1:28:13 0.06 0.18 0.07 0.10 0.13 0.19 0.23 0.28 0.39
1:32:14 0.05 0.17 0.06 0.09 0.12 0.17 0.21 0.25 0.35
1:36:14 0.05 0.15 0.06 0.09 0.11 0.16 0.19 0.23 0.33
1:40:15 0.04 0.11 0.04 0.06 0.08 0.11 0.14 0.17 0.24
1:44:16 0.03 0.08 0.03 0.05 0.06 0.08 0.10 0.12 0.17
1:48:16 0.02 0.06 0.02 0.03 0.04 0.06 0.08 0.09 0.13
1:52:17 0.01 0.04 0.02 0.02 0.03 0.04 0.05 0.07 0.09
1:56:17 0.01 0.03 0.01 0.02 0.02 0.03 0.04 0.05 0.07
2:00:18 0.01 0.02 0.01 0.01 0.02 0.02 0.03 0.03 0.05
2:04:19 0.00 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.03
2:08:19 0.00 0.01 0.00 0.00 0.01 0.01 0.01 0.01 0.02
2:12:20 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01
2:16:20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01
2:20:21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:24:22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:28:22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:32:23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:36:23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:40:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:44:25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:48:25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:52:26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:56:26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:00:27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:04:28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:08:28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:12:29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:16:29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:20:30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:24:31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:28:31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:32:32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:36:32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:40:33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:44:34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:48:34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:52:35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:56:35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:00:36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:04:37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:08:37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:12:38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:16:38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:20:39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:24:40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:28:40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:32:41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:36:41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:40:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:44:43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:48:43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Detention Basin Outlet Structure Design
UD-Detention, Version 3.07 (February 2017)
Summary Stage-Area-Volume-Discharge Relationships
The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically.
The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points.
Stage Area Area Volume VolumeTotal
Outflow
[ft] [ft^2] [acres] [ft^3] [ac-ft] [cfs]
For best results, include the
stages of all grade slope
changes (e.g. ISV and Floor)
from the S-A-V table on
Sheet 'Basin'.
Also include the inverts of all
outlets (e.g. vertical orifice,
overflow grate, and spillway,
where applicable).
Detention Basin Outlet Structure Design
Stage - Storage
Description
UD-Detention, Version 3.07 (February 2017)