final ppl 23 public mtg candidate presentation 11-6-2013€¦ · november 13, 2013 baton rouge, la...

14
11/14/2013 1 CWPPRA Priority Project List 23 Candidate Project Evaluation Results bl Public Meeting November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules The public will be provided an opportunity to ask questions or provide comments on the candidate projects presented tonight The public should come to the microphone at the front of the room and state their name and any affiliation they may be representing Please neatly sign in so we can make sure we have the correct spelling of your name in the minutes

Upload: others

Post on 30-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

1

CWPPRAPriorityProjectList23

CandidateProjectEvaluationResults

blPublicMeeting

November13,2013BatonRouge,LA

CWPPRAGroundRules

• Thepublicwillbeprovidedanopportunitytoaskquestionsorprovidecommentsonthecandidateprojectspresentedtonight

• Thepublicshouldcometothemicrophoneatthefrontoftheroomandstatetheirnameandanyaffiliationtheymayberepresenting

• Pleaseneatlysigninsowecanmakesurewehavethecorrectspellingofyournameintheminutes

Page 2: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

2

CWPPRAOverviewofProjectNomination

andSelectionProcess

• RegionalPlanning TeammeetingswereheldJanuary29‐31,2013(Abbeville,MorganCity,andNewOrleans)toacceptprojectideasfromthepublicandgovernmentparticipants.

• RegionalPlanningTeamsvotedelectronicallyonFebruary19,2013toselect18nomineeprojects.

• TheTechnicalCommitteeselected10candidateprojectsfordetailedevaluationonApril16,2013.TheTechnicalCommitteedid not select any demonstration projects for further reviewdidnotselectanydemonstrationprojectsforfurtherreviewbasedonarecommendationfromtheEnvironmentalandEngineeringWorkGroupsthatthedemonstrationprojectslackedsufficientmeritforfurtherinvestigation.

CWPPRAPPL23NomineeProjects

Page 3: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

3

CWPPRAPPL23CandidateProjects

CWPPRAProjectEvaluationProcedures

• Interagencysitevisitswereconductedwithlandownersandlocalgovernments.g

• TheEnvironmentalWorkgroupconductedWetlandValueAssessments(WVA)toestimatewetlandbenefits.

• TheEngineeringWorkgroupreviewedprojectfeatures andcostestimates.

• TheEconomicsWorkgroupdevelopedfully‐fundedcostsg p p yforengineeringanddesign,construction,and20yearsofoperation,maintenance,andmonitoringforeachproject.

Page 4: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

4

CWPPRARegion1

New Orleans Landbridge Shoreline StabilizationNewOrleansLandbridge ShorelineStabilization&MarshCreation

CWPPRAPPL23CandidateProjects

Page 5: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

5

CWPPRA

192acofmarshcreation

Twoborrowareas:LakesSt.Catherine & PontchartrainCatherine&Pontchartrain

12,716linearftofearthenbermtoprotectshoreline&structuralintegrityofOrleansLandbridge

104netacres

$12,499,983

CWPPRARegion2

C d dl d k h CCaminada HeadlandsBackBarrierMarshCreation

WilkinsonCanalMarshCreation&Nourishment

BayouGrandCheniere Marsh&RidgeRestoration

Page 6: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

6

CWPPRAPPL23CandidateProjects

CWPPRA

430acofmarshcreationbehind3.5milesoftheCaminada beach

Createplatformuponwhichthebeachanddunecanmigrate

BeachandduneconstructedaspartofCIAPproject

181netacres

$31,034,094

Page 7: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

7

CWPPRA

484acofmarshcreation

HydraulicallypumpsedimentfromMississippi RiverfromMississippiRiverborrowsite

ReestablishaportionoftheBayouDupont bankwhileprovidingprotectiontothelocalfloodprotectionlevee

395netacres

$36,292,706

CWPPRA

342acofmarshcreation

Hydraulicallydredgeandpump material from apumpmaterialfromaMississippiRiverborrowsite

10,820linearft(12acres)offorestedcoastalridge

264netacres

$29,937,575

Page 8: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

8

CWPPRARegion3

Island Road Marsh Creation & NourishmentIslandRoadMarshCreation&Nourishment

GrandBayouFreshwaterEnhancement

SouthwestPassShorelineProtection

CWPPRAPPL23CandidateProjects

Page 9: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

9

CWPPRA

383acofmarshcreation

FormalandbridgealongCutoff Canal the TwinCutoffCanal,theTwinPipelines,andIslandRoad

BorrowsitenearLakeFelicity

312netacres3 et ac es

$39,185,267

CWPPRA

IncreaseflowoffreshwaterfromGIWWintoGrandBayouCanalfromapprox.600to1,600cfs,

Redirectfreshwaterintomarsheseast&westofGrandBayouCanal

126acofmarshcreation

676netacres

$22,618,793

Page 10: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

10

CWPPRA

9,195linearft ofrockshorelineprotectionalongtheVermilionBayshorelineatSouthwestPoint

16,882linearft ofrockshorelineprotectionalongtheGulfofMexicoshorelineatTojan Island

91 net acres91netacres

$38,679,382

CWPPRARegion4

West Cove Marsh Creation & NourishmentWestCoveMarshCreation&Nourishment

SoutheastPecanIslandMarshCreation&FreshwaterEnhancement

SouthGrandChenierMarshCreation– BakerTract

Page 11: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

11

CWPPRAPPL23CandidateProjects

CWPPRA

409acofmarshcreation

Beneficiallyusematerialfromthe Calcasieu River ShiptheCalcasieuRiverShipChanneldredgedduringroutinemaintenancedredgingoperations

Tidalcreekswillalsobeconstructed

359netacres

$20,034,472

Page 12: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

12

CWPPRA

531acofmarshcreation

GulfofMexicoborrowsite

ConstructionofanoutletstructureatFrontRidge,replacementof4setsofculvertsalongtheconveyancechannel,&potentialcleanoutofculvertsunderHwy82y

372netacres

$39,835,500

CWPPRA

420acofmarshcreation

GulfofMexicoborrowsite

Approximately11,756linearft.oftidalcreeks

Vegetativeplantings

393netacres393 et ac es

$25,441,833

Page 13: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

13

CWPPRA

ThismatrixisalsolocatedinthePPL23CandidateBooklet

CWPPRAProjectSelection

• CWPPRATechnicalCommitteemeetsonDecember12inBatonRougeattheLADepartmentofWildlifed Fi h i (L i i R ) 2000 Q il D iandFisheries(Louisiana Room)– 2000QuailDrive.

4projectswillbeselectedbyagencyvoteforPhase1(E&D)funding

• CWPPRATaskForcemeetsonJanuary16inNewOrleans at the Corps of Engineers.OrleansattheCorpsofEngineers.

ProjectselectionbytheTechnicalCommitteeisusuallyaccepted

Page 14: FINAL PPL 23 Public Mtg Candidate Presentation 11-6-2013€¦ · November 13, 2013 Baton Rouge, LA CWPPRA Ground Rules ... for engineering and design, construction, and 20 years of

11/14/2013

14

CWPPRAComments

WrittencommentsmaybeprovidednolaterthanNovember26,2013totheCWPPRATaskForcebymail,faxoremailto:

Mail: Colonel Richard HansenMail:ColonelRichardHansenDistrictEngineer,NewOrleansc/o:BradInmanU.S.ArmyCorpsofEngineersP.O.Box60267NewOrleans,Louisiana70160

Fax: 504‐862‐2572(Attn:BradInman)

Email:[email protected]

ThisinformationisprovidedonthebackpageofthePPL23CandidateProjectBookletaswellastheagenda.