CWPPRAPriorityProjectList23
CandidateProjectEvaluationResults
blPublicMeeting
November13,2013BatonRouge,LA
CWPPRAGroundRules
• Thepublicwillbeprovidedanopportunitytoaskquestionsorprovidecommentsonthecandidateprojectspresentedtonight
• Thepublicshouldcometothemicrophoneatthefrontoftheroomandstatetheirnameandanyaffiliationtheymayberepresenting
• Pleaseneatlysigninsowecanmakesurewehavethecorrectspellingofyournameintheminutes
11/14/2013
2
CWPPRAOverviewofProjectNomination
andSelectionProcess
• RegionalPlanning TeammeetingswereheldJanuary29‐31,2013(Abbeville,MorganCity,andNewOrleans)toacceptprojectideasfromthepublicandgovernmentparticipants.
• RegionalPlanningTeamsvotedelectronicallyonFebruary19,2013toselect18nomineeprojects.
• TheTechnicalCommitteeselected10candidateprojectsfordetailedevaluationonApril16,2013.TheTechnicalCommitteedid not select any demonstration projects for further reviewdidnotselectanydemonstrationprojectsforfurtherreviewbasedonarecommendationfromtheEnvironmentalandEngineeringWorkGroupsthatthedemonstrationprojectslackedsufficientmeritforfurtherinvestigation.
CWPPRAPPL23NomineeProjects
11/14/2013
3
CWPPRAPPL23CandidateProjects
CWPPRAProjectEvaluationProcedures
• Interagencysitevisitswereconductedwithlandownersandlocalgovernments.g
• TheEnvironmentalWorkgroupconductedWetlandValueAssessments(WVA)toestimatewetlandbenefits.
• TheEngineeringWorkgroupreviewedprojectfeatures andcostestimates.
• TheEconomicsWorkgroupdevelopedfully‐fundedcostsg p p yforengineeringanddesign,construction,and20yearsofoperation,maintenance,andmonitoringforeachproject.
11/14/2013
4
CWPPRARegion1
New Orleans Landbridge Shoreline StabilizationNewOrleansLandbridge ShorelineStabilization&MarshCreation
CWPPRAPPL23CandidateProjects
11/14/2013
5
CWPPRA
192acofmarshcreation
Twoborrowareas:LakesSt.Catherine & PontchartrainCatherine&Pontchartrain
12,716linearftofearthenbermtoprotectshoreline&structuralintegrityofOrleansLandbridge
104netacres
$12,499,983
CWPPRARegion2
C d dl d k h CCaminada HeadlandsBackBarrierMarshCreation
WilkinsonCanalMarshCreation&Nourishment
BayouGrandCheniere Marsh&RidgeRestoration
11/14/2013
6
CWPPRAPPL23CandidateProjects
CWPPRA
430acofmarshcreationbehind3.5milesoftheCaminada beach
Createplatformuponwhichthebeachanddunecanmigrate
BeachandduneconstructedaspartofCIAPproject
181netacres
$31,034,094
11/14/2013
7
CWPPRA
484acofmarshcreation
HydraulicallypumpsedimentfromMississippi RiverfromMississippiRiverborrowsite
ReestablishaportionoftheBayouDupont bankwhileprovidingprotectiontothelocalfloodprotectionlevee
395netacres
$36,292,706
CWPPRA
342acofmarshcreation
Hydraulicallydredgeandpump material from apumpmaterialfromaMississippiRiverborrowsite
10,820linearft(12acres)offorestedcoastalridge
264netacres
$29,937,575
11/14/2013
8
CWPPRARegion3
Island Road Marsh Creation & NourishmentIslandRoadMarshCreation&Nourishment
GrandBayouFreshwaterEnhancement
SouthwestPassShorelineProtection
CWPPRAPPL23CandidateProjects
11/14/2013
9
CWPPRA
383acofmarshcreation
FormalandbridgealongCutoff Canal the TwinCutoffCanal,theTwinPipelines,andIslandRoad
BorrowsitenearLakeFelicity
312netacres3 et ac es
$39,185,267
CWPPRA
IncreaseflowoffreshwaterfromGIWWintoGrandBayouCanalfromapprox.600to1,600cfs,
Redirectfreshwaterintomarsheseast&westofGrandBayouCanal
126acofmarshcreation
676netacres
$22,618,793
11/14/2013
10
CWPPRA
9,195linearft ofrockshorelineprotectionalongtheVermilionBayshorelineatSouthwestPoint
16,882linearft ofrockshorelineprotectionalongtheGulfofMexicoshorelineatTojan Island
91 net acres91netacres
$38,679,382
CWPPRARegion4
West Cove Marsh Creation & NourishmentWestCoveMarshCreation&Nourishment
SoutheastPecanIslandMarshCreation&FreshwaterEnhancement
SouthGrandChenierMarshCreation– BakerTract
11/14/2013
11
CWPPRAPPL23CandidateProjects
CWPPRA
409acofmarshcreation
Beneficiallyusematerialfromthe Calcasieu River ShiptheCalcasieuRiverShipChanneldredgedduringroutinemaintenancedredgingoperations
Tidalcreekswillalsobeconstructed
359netacres
$20,034,472
11/14/2013
12
CWPPRA
531acofmarshcreation
GulfofMexicoborrowsite
ConstructionofanoutletstructureatFrontRidge,replacementof4setsofculvertsalongtheconveyancechannel,&potentialcleanoutofculvertsunderHwy82y
372netacres
$39,835,500
CWPPRA
420acofmarshcreation
GulfofMexicoborrowsite
Approximately11,756linearft.oftidalcreeks
Vegetativeplantings
393netacres393 et ac es
$25,441,833
11/14/2013
13
CWPPRA
ThismatrixisalsolocatedinthePPL23CandidateBooklet
CWPPRAProjectSelection
• CWPPRATechnicalCommitteemeetsonDecember12inBatonRougeattheLADepartmentofWildlifed Fi h i (L i i R ) 2000 Q il D iandFisheries(Louisiana Room)– 2000QuailDrive.
4projectswillbeselectedbyagencyvoteforPhase1(E&D)funding
• CWPPRATaskForcemeetsonJanuary16inNewOrleans at the Corps of Engineers.OrleansattheCorpsofEngineers.
ProjectselectionbytheTechnicalCommitteeisusuallyaccepted
11/14/2013
14
CWPPRAComments
WrittencommentsmaybeprovidednolaterthanNovember26,2013totheCWPPRATaskForcebymail,faxoremailto:
Mail: Colonel Richard HansenMail:ColonelRichardHansenDistrictEngineer,NewOrleansc/o:BradInmanU.S.ArmyCorpsofEngineersP.O.Box60267NewOrleans,Louisiana70160
Fax: 504‐862‐2572(Attn:BradInman)
Email:[email protected]