final rep ort on stakeholder commi tments - greengain.eu€¦ · final rep ort on stakeholder commi...
TRANSCRIPT
greenGain project
Grant Agreement n°646443
This project has received funding from the European Union’s Horizon 2020
research and innovation programme under grant agreement No 646443.
D3.8
Final report on stakeholder commi31.10.2017
Grant Agreement n°646443
This project has received funding from the European Union’s Horizon 2020
research and innovation programme under grant agreement No 646443.
ort on stakeholder commitments
This project has received funding from the European Union’s Horizon 2020
research and innovation programme under grant agreement No 646443.
About greenGain project
The greenGain project is looking for solutions to increase
feedstock coming from landscape conservation and maintenance works
in the public interest. The main target groups are regional and local players, who are
responsible for maintenance and conservation work and for the biomass residue
management in their regions.
farmers and forest owners, their associations, NGOs and energy providers and consumers.
The three year project which started on January 2015 is supported by the Horizon 2020,
European program to foster research and innovative solutions in the EU.
gathering partners and researchers from Germany, Italy, Spain and Czech Republic.
Researchers will map biomass potential coming from landscape conservation
maintenance work, various te
provide recommendations to a wide range of stakeholders in the EU 28.
Project coordinator
Project partners
greenGain
is looking for solutions to increase the energy use of biomass
ndscape conservation and maintenance works (LCMW) carried out
The main target groups are regional and local players, who are
responsible for maintenance and conservation work and for the biomass residue
management in their regions. Moreover, the focus will be on service providers
farmers and forest owners, their associations, NGOs and energy providers and consumers.
The three year project which started on January 2015 is supported by the Horizon 2020,
foster research and innovative solutions in the EU.
gathering partners and researchers from Germany, Italy, Spain and Czech Republic.
Researchers will map biomass potential coming from landscape conservation
, various technological options to utilise it, identify possible obstacles and
provide recommendations to a wide range of stakeholders in the EU 28.
greenGain: D3.8| 2
energy use of biomass
(LCMW) carried out
The main target groups are regional and local players, who are
responsible for maintenance and conservation work and for the biomass residue
Moreover, the focus will be on service providers - including
farmers and forest owners, their associations, NGOs and energy providers and consumers.
The three year project which started on January 2015 is supported by the Horizon 2020,
foster research and innovative solutions in the EU. The project is
gathering partners and researchers from Germany, Italy, Spain and Czech Republic.
Researchers will map biomass potential coming from landscape conservation and
chnological options to utilise it, identify possible obstacles and
About this document
This report corresponds to D3.8
Due date of deliverable:
Actual submission date:
Start date of project:
Duration:
Work package
Task
Lead contractor for this deliverable
Editor
Authors
Quality reviewer
Dissemination Level
PU Public
PP Restricted to other programme participants
(including the Commission Services)
RE Restricted to a group specified by the consortium
(including the Commission Services):
CO Confidential, only for members of the consortium
(including the Commission Services)
Version Date Author(s)
0.5 23.10.2017 Christiane Volkmann
0.8 29.10.2017 Christiane Volkmann
1.0 31.10.2017 Christiane Volkmann
This project has received funding from the European Union’s Horizon 2020 research and innovation
programme under grant agreement No 646443.
The sole responsibility of this publication lies with the author. The European Union is not responsible
for any use that may be made of the
greenGain
D3.8 “Final reports on stakeholder commitments
31-10-2017
31-10-2017
01-01-2015
36 months
WP3
Task 3.3
Lead contractor for this deliverable 1 - FNR
Christiane Volkmann
Christiane Volkmann
Project Consortium
Restricted to other programme participants
mmission Services)
Restricted to a group specified by the consortium
(including the Commission Services):
Confidential, only for members of the consortium
(including the Commission Services)
Author(s) Reason for modification
Christiane Volkmann Draft version send to request
feedback from all partner
Christiane Volkmann New version of report
Christiane Volkmann Final version to submit
d funding from the European Union’s Horizon 2020 research and innovation
programme under grant agreement No 646443.
The sole responsibility of this publication lies with the author. The European Union is not responsible
for any use that may be made of the information contained therein.
greenGain: D3.8| 3
commitments” of greenGain.
x
Reason for modification Status
send to request
eedback from all partner done
done
done
d funding from the European Union’s Horizon 2020 research and innovation
The sole responsibility of this publication lies with the author. The European Union is not responsible
Summary
The objectives of the work package
feedstocks and reach the commitment of non
to support EU 28 stakeholders arrang
stating recommended procedures,
towards successful exploitation and ensuring the future use of the gained know
WP4 to 6 to be at the reach of the target s
In detail the Task 3.3 “Attracting and supporting external stakeholders to achieve their
commitments to implement project results fostering LCMW
stakeholders to confirm their commitment to implement project results at other locations in
EU 28 than the model regions focused on in the greenGain project.
exchange of information and experiences between relevant
greenGain project will raise the awareness of potential regional authorities as well as
attention to financial, administrative and technical concerns and barriers along the value
chains which need to be implemented or where s
Results of external stakeholder commitments are summarized within this deliverable 3.8
"Final report on stakeholder commitments
participating stakeholders as well as their experiences (see Annex).
greenGain
of the work package 3 “Creating an EU knowledge platform for LCMW
feedstocks and reach the commitment of non-project LCMW stakeholders” is among others
EU 28 stakeholders arranging relevant LCMW information with the purpose of
stating recommended procedures, overcome bottlenecks, address constraints and barriers
towards successful exploitation and ensuring the future use of the gained know
WP4 to 6 to be at the reach of the target stakeholders to be involved in future LCMW chains.
Attracting and supporting external stakeholders to achieve their
commitments to implement project results fostering LCMW” is striving to motivate
ir commitment to implement project results at other locations in
EU 28 than the model regions focused on in the greenGain project.
exchange of information and experiences between relevant external
raise the awareness of potential regional authorities as well as
attention to financial, administrative and technical concerns and barriers along the value
hich need to be implemented or where solutions have to be found.
takeholder commitments are summarized within this deliverable 3.8
Final report on stakeholder commitments". This document contains a
participating stakeholders as well as their experiences (see Annex).
greenGain: D3.8| 4
3 “Creating an EU knowledge platform for LCMW
project LCMW stakeholders” is among others
with the purpose of
constraints and barriers
towards successful exploitation and ensuring the future use of the gained know-how from
takeholders to be involved in future LCMW chains.
Attracting and supporting external stakeholders to achieve their
to motivate external
ir commitment to implement project results at other locations in
Facilitating a vital
external players and the
raise the awareness of potential regional authorities as well as draw
attention to financial, administrative and technical concerns and barriers along the value
olutions have to be found.
takeholder commitments are summarized within this deliverable 3.8
This document contains also the list of
Table of Contents
About this document ................................
Summary ................................
1. Purpose of the commitments and monitoring in WP3
2. Procedure for commitment and monitoring of external stakeholders
3. External stakeholders involved in LCMW
4. Experiences from regions beyond model regions of greenGain
5. Annex ................................
List of Tables
Table 1: Type of sstakeholders active in the field of LCMW
Table 2: List of external stakeholders who committed to implement the greenGain results in
their region ................................
greenGain
................................................................................................
................................................................................................................................
Purpose of the commitments and monitoring in WP3 ................................
Procedure for commitment and monitoring of external stakeholders ..............................
External stakeholders involved in LCMW ................................................................
Experiences from regions beyond model regions of greenGain ................................
................................................................................................................................
stakeholders active in the field of LCMW ................................
: List of external stakeholders who committed to implement the greenGain results in
...............................................................................................................................
greenGain: D3.8| 5
.................................................. 3
.................................... 4
....................................................... 6
.............................. 7
........................................... 8
...................................... 11
................................ 12
....................................................... 8
: List of external stakeholders who committed to implement the greenGain results in
............................... 10
1. Purpose of the commitments and
This document relates to Task 3.3
achieve their commitments to implement project results fostering LCMW
leverage the commitment of the project participants from external stakeholders to
implement project results at other locations
outcomes. These outcomes underline the results
to foster LCMW.
The results of this implementation wil
guidelines which will prepared at
makers' (D6.4) and they will contribute mainly to raise the awareness of
increase the market uptake of this resources and finally
and dynamic strategies.
It is a main target of the greenGain
knowledge and results from WP 4
and the adaptation of these to other European regions, to a
WP 4 'LCMW feedstock potential and best usage in conversion
evaluation of available information on LCMW feedstock in Europe. This WP
potential and challenges of the feedstock
foster a sustainable use of
member state level. Further th
gained in the model regions.
WP 5 'Pilot experiences for market supply of LCMW
potentials from LCMW in four model regions (Czech Repu
development of local feedstock sustainable supply concepts
conversion pathways to bioenergy as well as the development of local feedstock sustainable
supply strategy is also covered within this WP
support best practice guidelines.
WP 6 'Policies, finance, governance and public acceptance'
EU 28 policy frameworks and financial
energy plans and assesses
mitigation conflicts. The main
systematic analysis of legal, policy, financial and
greenGain
commitments and monitoring in WP3
Task 3.3 “Attracting and supporting external stakeholders to
achieve their commitments to implement project results fostering LCMW
he commitment of the project participants from external stakeholders to
implement project results at other locations than the model regions and to monitor their
outcomes. These outcomes underline the results of greenGain and could make a real change
results of this implementation will be used to refine the recommendations and
prepared at the end of project within the 'Strategy paper
and they will contribute mainly to raise the awareness of
increase the market uptake of this resources and finally set the baseline f
greenGain project to transfer the gained experiences
and results from WP 4, 5 and 6 but also the steps achieved by the model regions
and the adaptation of these to other European regions, to an EU wide group of stakeholders:
LCMW feedstock potential and best usage in conversion routes to bioenergy
ilable information on LCMW feedstock in Europe. This WP
of the feedstock conversion into energy intermediates that can
foster a sustainable use of bioenergy feedstocks on regional, inter-regional
the WP provides business on base of the greenGain experiences
for market supply of LCMW' is about the identification of biomass
potentials from LCMW in four model regions (Czech Republic, Germany, Italy and Spain) and
development of local feedstock sustainable supply concepts’. The identification of
conversion pathways to bioenergy as well as the development of local feedstock sustainable
supply strategy is also covered within this WP. Finally the pilot experiences
support best practice guidelines.
governance and public acceptance' concerns regional, national and
and financial barriers. It summarizes the availability
structure and tools for good governance,
. The main goal of this WP is to foster regional, nation and
of legal, policy, financial and governance frameworks.
greenGain: D3.8| 6
Attracting and supporting external stakeholders to
achieve their commitments to implement project results fostering LCMW” which aims to
he commitment of the project participants from external stakeholders to
than the model regions and to monitor their
and could make a real change
ine the recommendations and
trategy paper for policy
and they will contribute mainly to raise the awareness of LCMW biomass,
set the baseline for future flexible
experiences, developed
the steps achieved by the model regions
n EU wide group of stakeholders:
bioenergy’ is about
ilable information on LCMW feedstock in Europe. This WP includes also the
into energy intermediates that can
regional and cross
the greenGain experiences
the identification of biomass
blic, Germany, Italy and Spain) and
. The identification of
conversion pathways to bioenergy as well as the development of local feedstock sustainable
. Finally the pilot experiences were analysed to
concerns regional, national and
availability of regional
ools for good governance, preventing and
is to foster regional, nation and EU policy by a
s.
2. Procedure for commitment and
The deliverable 3.3 'Interim reports on external stakeholder commitment' provide
concept regarding how to attract
and to raise the application
already existing value chains
results in order to achieve a successful dissemination
stakeholders the following steps
1. Activation of interest and dedicated contact with interested stakeholders
2. Profound advanced information about national workshop, project results and
recommendations
3. Active involvement in the national worksh
4. Working out of feasible measures of project results that can be implemented in their
region/case/facility
5. Ratification of Letter of Intent (LoI) to implement dedicated recommendations
6. Monitoring of implementation
7. Consent declaration for publication
Database
Relevant stakeholders in the field of biomass coming from LCMW, renewable energy, waste
management, conversion technologies and others were contacted and informed regularly
about the greenGain project a
implement the greenGain results by their commitment, which was agree
Intent. Once stakeholders ratified they were monitored regularly. In practical
means that they were contacted
The monitoring did not intend to
support and report the knowledge transfer achieved followed by improvements in
processes like collection, cutting, storage, transport and conversion into bioenergy.
Monitoring started when results
experiences (D5.4) were achieved. P
in summer 2017. Listed by order of performance c
2017. So afterwards stakeholders improved results of greenGain
ending in September 2017 towards
During the monitoring phase stakeholders
information, support them in
administrative issues and to ask for concerns
greenGain
commitment and monitoring of external stakeholders
The deliverable 3.3 'Interim reports on external stakeholder commitment' provide
attract external stakeholders in order to contribute to greenGain
of LCMW biomass or the integration of this f
s and also how to elaborate recommendation
in order to achieve a successful dissemination. To motivate and support external
ollowing steps were performed:
Activation of interest and dedicated contact with interested stakeholders
Profound advanced information about national workshop, project results and
the national workshop(s)
Working out of feasible measures of project results that can be implemented in their
Ratification of Letter of Intent (LoI) to implement dedicated recommendations
Monitoring of implementation
Consent declaration for publication in greenGain publications and in the Expert
Relevant stakeholders in the field of biomass coming from LCMW, renewable energy, waste
management, conversion technologies and others were contacted and informed regularly
about the greenGain project and its results. Further they were asked and invited to actively
implement the greenGain results by their commitment, which was agree
Intent. Once stakeholders ratified they were monitored regularly. In practical
were contacted through a personal meeting, e-mail or by a phone call.
The monitoring did not intend to control the work done by the stakeholders but rather
support and report the knowledge transfer achieved followed by improvements in
ection, cutting, storage, transport and conversion into bioenergy.
results from model regions of greenGain gained during pilot
ces (D5.4) were achieved. Pilot experiences started in mid-2016 and were finished
Listed by order of performance commitments were collected
stakeholders improved results of greenGain for the next
towards the end of the project.
During the monitoring phase stakeholders were contacted regularly
information, support them in processes, developments relating to practical, technical and
ask for concerns and demands, which need to be
greenGain: D3.8| 7
of external stakeholders
The deliverable 3.3 'Interim reports on external stakeholder commitment' provides a
to contribute to greenGain
tion of this feedstock into
recommendations and project
. To motivate and support external
Activation of interest and dedicated contact with interested stakeholders
Profound advanced information about national workshop, project results and
Working out of feasible measures of project results that can be implemented in their
Ratification of Letter of Intent (LoI) to implement dedicated recommendations
in greenGain publications and in the Expert
Relevant stakeholders in the field of biomass coming from LCMW, renewable energy, waste
management, conversion technologies and others were contacted and informed regularly
nd its results. Further they were asked and invited to actively
implement the greenGain results by their commitment, which was agreed with a Letter of
Intent. Once stakeholders ratified they were monitored regularly. In practical terms this
mail or by a phone call.
control the work done by the stakeholders but rather
support and report the knowledge transfer achieved followed by improvements in
ection, cutting, storage, transport and conversion into bioenergy.
gained during pilot
2016 and were finished
ommitments were collected in spring
the next six months,
regularly to offer them
processes, developments relating to practical, technical and
which need to be addressed.
3. External stakeholders
In general the main target groups of greenGain
responsible for LCMW in their regions
owners, their associations, NGOs and energy providers and consumers (see
Table 1: Type of sstakeholders active in the field of LCMW
Type of stakeholder
Owner
Person, company, private institution or public body, who owns the
land on which LCMW occurs, or having some legal bound for th
execution of works
LCMW service co. Companies able to execute the LCMWs, e.g.: forestry service
companies
Logistic operator Any stakeholder dedicated to handle, pre
biomass
Conversion plant Plants producing energy and energy c
pyrolysis oil, torrified biomass, syngas, biogas, electricity and heat
Final consumer Energy provider and consumer, which could be interested in the
utilisation of LCMW biomass for energy production
Permitting
authorities
Public body or service providing licenses, official certificates or
documents granting authorization for execution of LCMW and the
operation of conversion plants
Government bodies Public administration carrying out the political direction and control
Social groups
Relevant social groups which may neither be owners, nor actors of the
value chain, but which live in the area and may have some opinion:
neighbour association, NGOs, ecologist groups, associations for local
development, etc.
Favourable attributes and conditions of regions of external stakeholders, where greenGain
results can be implemented and monitored
− other landscape than landscape of the model regions
− new type of LCMW biomass, which can be adapted to the greenGain pathways
− Existing value chain that could take advantege or being usefull to implement an
LCMW biomass value chain
− experiences and data through past projects related to the greenGain topics
− possible facilities to close and improve the value chain in neighbouring regions
the model regions,
− public acceptance and support by a strong local community which is in
new and sustainable forms of energy production
greenGain
involved in LCMW
In general the main target groups of greenGain are regional and local players, who are
responsible for LCMW in their regions and service providers – including farmers and forest
owners, their associations, NGOs and energy providers and consumers (see
active in the field of LCMW
Description
Person, company, private institution or public body, who owns the
land on which LCMW occurs, or having some legal bound for th
execution of works
Companies able to execute the LCMWs, e.g.: forestry service
companies
Any stakeholder dedicated to handle, pre-treat and/or distribute
biomass
Plants producing energy and energy carriers like pellets, briquettes,
pyrolysis oil, torrified biomass, syngas, biogas, electricity and heat
Energy provider and consumer, which could be interested in the
utilisation of LCMW biomass for energy production
Public body or service providing licenses, official certificates or
documents granting authorization for execution of LCMW and the
operation of conversion plants
Public administration carrying out the political direction and control
Relevant social groups which may neither be owners, nor actors of the
value chain, but which live in the area and may have some opinion:
neighbour association, NGOs, ecologist groups, associations for local
development, etc.
ributes and conditions of regions of external stakeholders, where greenGain
results can be implemented and monitored are:
other landscape than landscape of the model regions,
new type of LCMW biomass, which can be adapted to the greenGain pathways
g value chain that could take advantege or being usefull to implement an
LCMW biomass value chain
experiences and data through past projects related to the greenGain topics
possible facilities to close and improve the value chain in neighbouring regions
public acceptance and support by a strong local community which is in
forms of energy production.
greenGain: D3.8| 8
regional and local players, who are
including farmers and forest
owners, their associations, NGOs and energy providers and consumers (see Table 1).
Person, company, private institution or public body, who owns the
land on which LCMW occurs, or having some legal bound for the
Companies able to execute the LCMWs, e.g.: forestry service
treat and/or distribute
arriers like pellets, briquettes,
pyrolysis oil, torrified biomass, syngas, biogas, electricity and heat
Energy provider and consumer, which could be interested in the
Public body or service providing licenses, official certificates or
documents granting authorization for execution of LCMW and the
Public administration carrying out the political direction and control
Relevant social groups which may neither be owners, nor actors of the
value chain, but which live in the area and may have some opinion:
neighbour association, NGOs, ecologist groups, associations for local
ributes and conditions of regions of external stakeholders, where greenGain
new type of LCMW biomass, which can be adapted to the greenGain pathways,
g value chain that could take advantege or being usefull to implement an
experiences and data through past projects related to the greenGain topics,
possible facilities to close and improve the value chain in neighbouring regions of
public acceptance and support by a strong local community which is interested in
In total 17 external stakeholders
the greenGain results gained in
greenGain
external stakeholders signed the Letter of Intent and committed
esults gained in the WP4-6 in their region.
greenGain: D3.8| 9
committed to implement
Table 2: List of external stakeholders who committed to implement the greenGain results in their region
No. Type of stakeholder Stakeholder
1 Entepreneur Leonard Römer
2 Farmer-Forest Operator Maurizi Federico
3 Farmer-Forest Operator Federico Sottili
4 Farmer-Forest Operator Peccia Pietro
5 Farmer-Forest Operator Salaris Antonio
6 Owner Granivrchello Fabio
7 Engineer in Agronomy Juanjo Mayans
8 Manager Irache Roa
9 Manager Albert PuigvertTuneu
10 Responsible of HeizomatSpain
Gregor Baer
11 Manager Rubén Serrano Ortín
12 Manager José Vincente Querol
13 Manager Paco Guillén
14 Manager Enrique Asín
15 Manager Sagrario Sanz
16 Manager José María Lamana
17 Manager José Manuel Salvador
who committed to implement the greenGain results in their region
Stakeholder Organisation
LiPRO Energy
CIA Umbria
Confagricoltura
COLDIRETTI
CIA Umbria
Granivrchello Fabio Molino Nuovo SRL
City Council of Serra
GAL TEDER /GAL Bajo Aragón-Matarrana
Albert PuigvertTuneu ARCA (Associaciód’iniciatves Rural de Catalunya)
Heimomat S.L.U.
Rubén Serrano Ortín GAL ADECOBEL
José Vincente Querol Monterde GAL ADIBAMA
GAL ADRI Teruel
GAL AGUJAMA
GAL ASIADER
Lamana GAL ASOMO
José Manuel Salvador CAIRE ARAGÓN
greenGain: D3.8| 10
Country
Germany
Italy
Italy
Italy
Italy
Italy
Spain
Spain
Spain
Spain
Spain
Spain
Spain
Spain
Spain
Spain
Spain
4. Experiences from regions beyond model regions of greenGain
The Task 3.3 was conducted successfully and
the greenGain results in their regions
significant, the awareness of LCMW biomass
compiled were transferred beyond the
The reports and the feedback from stakeholders are valuable
biomass can be integrated into already existing value chains and secondly show obstacles
and bottlenecks which need further development to improve the value chain o
feedstocks.
The advantage was on both sides
consortium.
The greenGain project enabled
same challenges to share experiences.
regions is crucial, to avoid mistakes and apply proven strategies.
greenGain provides textual, formal and knowledge
between diverse rural stakeholders to contribute to the conservation and promotion of
landscaping. Furthermore, greenGain p
types of LCMW, best practices, business models
The greenGain Consortium could use the actor’s
other key players in the field of LCMW
to use LCMW biomass successfully as additional resource for the production of bioen
In the Annex the summary reports gained during the monitoring of stak
attached. The reports describe shortly the external stakeholders (organisation, filed of
work), what kind of results from the
and which improvements were achieved.
The knowledge and results of
the project or the publication of this deliverable.
by external stakeholders in their regions
successes cannot be reported
be expected after the project lifetime of greenGain in December 2017.
greenGain
Experiences from regions beyond model regions of greenGain
he Task 3.3 was conducted successfully and 16 stakeholders were interested to evaluate
in their regions. Hence, the interest raised among stakeholders was
the awareness of LCMW biomass increased and the knowledge and expe
beyond the model regions of greenGain.
The reports and the feedback from stakeholders are valuable as they show that LCW
biomass can be integrated into already existing value chains and secondly show obstacles
necks which need further development to improve the value chain o
The advantage was on both sides for the external stakeholders and the greenGain
The greenGain project enabled connecting with stakeholders from other regions
experiences. Thus, the exchange with key actors from other
regions is crucial, to avoid mistakes and apply proven strategies.
extual, formal and knowledge support and it increase
rural stakeholders to contribute to the conservation and promotion of
greenGain provides expert literature on the topic of
, best practices, business models and conversion technologies
ould use the actor’s feedback to include it in reports to inform
key players in the field of LCMW; or could give recommendations which are necessary
to use LCMW biomass successfully as additional resource for the production of bioen
In the Annex the summary reports gained during the monitoring of stak
The reports describe shortly the external stakeholders (organisation, filed of
from the greenGain project were implement
and which improvements were achieved.
he knowledge and results of the greenGain project will be applied beyond the end
the project or the publication of this deliverable. Many actions and connections were started
rs in their regions with the support of the greenGain Consortium
reported as it is time consuming to integrate them and first results will
after the project lifetime of greenGain in December 2017.
greenGain: D3.8| 11
Experiences from regions beyond model regions of greenGain
stakeholders were interested to evaluate
raised among stakeholders was
knowledge and experiences
as they show that LCWM
biomass can be integrated into already existing value chains and secondly show obstacles
necks which need further development to improve the value chain of LCMW
external stakeholders and the greenGain
other regions facing the
Thus, the exchange with key actors from other
increases the cooperation
rural stakeholders to contribute to the conservation and promotion of
expert literature on the topic of different
technologies.
feedback to include it in reports to inform
give recommendations which are necessary
to use LCMW biomass successfully as additional resource for the production of bioenergy.
In the Annex the summary reports gained during the monitoring of stakeholders are
The reports describe shortly the external stakeholders (organisation, filed of
were implemented in their regions
beyond the end date of
and connections were started
with the support of the greenGain Consortium, but
time consuming to integrate them and first results will
5. Annex
greenGain
greenGain: D3.8| 12
Implementation of project results fostering LCMW beyond model regions
1.
Name and surname: Leonard Römer
Country/Region/City: Germany, County Oldenburg
Organization/Institution: LiPRO Energy GmbH
Position: manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
Experiences with stakeholders from other regions with the same issues were exchanges and
implemented, e.g. in the case of improving the relationship bet
and nature protection agencies. Enabled connecting with stakeholders from other regions with
same issue (e.g. Nature Protection Agency of the neighbouring county Friesland) to exchange
experiences.
Expert literature on the topi
greenGain was used to build the knowledge base of Mr. Römer.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also desc
implementation and eventual solutions for deviation.
Textual, formal and knowledge support was provided by greenGain for the application of the
financing program “Landschaftspflege und Gebietsmanagement (LaGE) ELER
state Lower Saxony and the EU. The aim is to increase the cooperative cooperation between
various rural stakeholders to contribute to the conservation and promotion of biological
biodiversity in the cultural landscape. However, i
financing program was rejected. Mr. Römer will have the possibility to take part in the next
round and will optimise and improve the application according to the received feedback (e.g.
provide concrete information on stakeholders whi
geographical area, here a nature park).
greenGain
tion of project results fostering LCMW beyond model regions
Leonard Römer
Germany, County Oldenburg
: LiPRO Energy GmbH
Landscape maintenance and biomass
Please describe briefly which, why and how the greenGain results have been implemented?
Experiences with stakeholders from other regions with the same issues were exchanges and
implemented, e.g. in the case of improving the relationship between owners (mostly farmers)
and nature protection agencies. Enabled connecting with stakeholders from other regions with
same issue (e.g. Nature Protection Agency of the neighbouring county Friesland) to exchange
Expert literature on the topic of hedge- and tree rows on banks collected and provided by
greenGain was used to build the knowledge base of Mr. Römer.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Textual, formal and knowledge support was provided by greenGain for the application of the
financing program “Landschaftspflege und Gebietsmanagement (LaGE) ELER
state Lower Saxony and the EU. The aim is to increase the cooperative cooperation between
various rural stakeholders to contribute to the conservation and promotion of biological
biodiversity in the cultural landscape. However, in October 2017, th
financing program was rejected. Mr. Römer will have the possibility to take part in the next
round and will optimise and improve the application according to the received feedback (e.g.
provide concrete information on stakeholders which he plans to cooperate with, define a clear
geographical area, here a nature park).
greenGain: D3.8| 13
tion of project results fostering LCMW beyond model regions
Please describe briefly which, why and how the greenGain results have been implemented?
Experiences with stakeholders from other regions with the same issues were exchanges and
ween owners (mostly farmers)
and nature protection agencies. Enabled connecting with stakeholders from other regions with
same issue (e.g. Nature Protection Agency of the neighbouring county Friesland) to exchange
and tree rows on banks collected and provided by
Please describe if the new/adapted system/procedure is already integrated and if
ribe challenges that hindered
Textual, formal and knowledge support was provided by greenGain for the application of the
financing program “Landschaftspflege und Gebietsmanagement (LaGE) ELER-Code 16.7” of the
state Lower Saxony and the EU. The aim is to increase the cooperative cooperation between
various rural stakeholders to contribute to the conservation and promotion of biological
n October 2017, the application for the
financing program was rejected. Mr. Römer will have the possibility to take part in the next
round and will optimise and improve the application according to the received feedback (e.g.
ch he plans to cooperate with, define a clear
2.
Name and surname: MAURIZI FEDERICO
Country/Region/City: ITALY/UMBRIA/PERUGIA
Organization/Institution: CIA
Position: farmer, contractor, forest operator
Field of work/Responsibility:
trees cultivator, owner of a big area to transform it in
logistic platform (Picture: Paolo Burini, view of Ferro di Cavallo cross roads, near Perugia, done
from Maurizi farm – olive trees plantation)
Please describe briefly which, why and how the greenGain results have been implemented?
The maintenance works for abandoned olive trees plantations studied in greenGain resulted
very interesting to Mr. Maurizi in the view of increasing their actual potenti
harvesting wood material.
logistic Centre) in his farm, considering the MOLINO NUOVO biomass gasification plant in
Magione as one of his potential customers.
The eventuality of creating such infrastructure
agriculture incomes.
Mr. Maurizi will speak with the other stakeholders to create an operative network between
Perugino and Trasimeno areas.
Please describe if the new/adapted syst
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Mr. Maurizi has elaborated a brief roadmap for the implementation of the BTLC,
for its realization:
1 STEP)
Contacts with five stakeholders, in five different areas, to inform near farmers about the
possibility to build logistic platform for herbaceous and woody biomass harvesting. Every
stakeholder has an operatin
2 STEP)
Examination of the best use of green and woody biomass to produce compost material or
energetic material to feed biogas or biomass plants;
3 STEP)
Cost benefit analysis for each affected operator, single or ass
4 STEP)
greenGain
MAURIZI FEDERICO
ITALY/UMBRIA/PERUGIA
CIA
farmer, contractor, forest operator
rk/Responsibility: forest operator, olive
trees cultivator, owner of a big area to transform it in
(Picture: Paolo Burini, view of Ferro di Cavallo cross roads, near Perugia, done
olive trees plantation)
ibe briefly which, why and how the greenGain results have been implemented?
for abandoned olive trees plantations studied in greenGain resulted
Maurizi in the view of increasing their actual potenti
wood material. Mr. Maurizi wants to build a logistic platform (or Biomass Trade and
logistic Centre) in his farm, considering the MOLINO NUOVO biomass gasification plant in
Magione as one of his potential customers.
creating such infrastructure would provide an added value to their actual
Maurizi will speak with the other stakeholders to create an operative network between
Perugino and Trasimeno areas.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Maurizi has elaborated a brief roadmap for the implementation of the BTLC,
Contacts with five stakeholders, in five different areas, to inform near farmers about the
possibility to build logistic platform for herbaceous and woody biomass harvesting. Every
stakeholder has an operating area with a range of about 40 km;
Examination of the best use of green and woody biomass to produce compost material or
energetic material to feed biogas or biomass plants;
Cost benefit analysis for each affected operator, single or associate;
greenGain: D3.8| 14
(Picture: Paolo Burini, view of Ferro di Cavallo cross roads, near Perugia, done
ibe briefly which, why and how the greenGain results have been implemented?
for abandoned olive trees plantations studied in greenGain resulted
Maurizi in the view of increasing their actual potential of producing and
Maurizi wants to build a logistic platform (or Biomass Trade and
logistic Centre) in his farm, considering the MOLINO NUOVO biomass gasification plant in
would provide an added value to their actual
Maurizi will speak with the other stakeholders to create an operative network between
em/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
Maurizi has elaborated a brief roadmap for the implementation of the BTLC, and is striving
Contacts with five stakeholders, in five different areas, to inform near farmers about the
possibility to build logistic platform for herbaceous and woody biomass harvesting. Every
Examination of the best use of green and woody biomass to produce compost material or
Analysis of the nutritional potential of compost sample quantities and of energy potential of
different types of biomass in relation to those used in MOLINO NUOVO and AGRICOLA PECCIA
plants.
The new initiative though is still not integrate
identified for the BTLC, located in
cover all the needs of the near territory. Buying or renting other 1
enlarge the actual logistic platform,
Development Funds).
In this moment the farmer is studying all the technical and financial instruments and procedures
to create a logistic platform and to buy new specif
wood material coming from his farm and other near farms, in a ray of 30
greenGain
Analysis of the nutritional potential of compost sample quantities and of energy potential of
different types of biomass in relation to those used in MOLINO NUOVO and AGRICOLA PECCIA
The new initiative though is still not integrated in the operations of Mr.
BTLC, located in Mr. Maurizi farm, has a surface of about 2 h
cover all the needs of the near territory. Buying or renting other 1-
e actual logistic platform, even using the current financial measures of the PSR (Rural
In this moment the farmer is studying all the technical and financial instruments and procedures
to create a logistic platform and to buy new specific machines to harvest, treat and chip the
wood material coming from his farm and other near farms, in a ray of 30
greenGain: D3.8| 15
Analysis of the nutritional potential of compost sample quantities and of energy potential of
different types of biomass in relation to those used in MOLINO NUOVO and AGRICOLA PECCIA
Mr. Maurizi. The actual area
Maurizi farm, has a surface of about 2 ha, not sufficient to
-2 ha, Mr. Maurizi could
even using the current financial measures of the PSR (Rural
In this moment the farmer is studying all the technical and financial instruments and procedures
ic machines to harvest, treat and chip the
wood material coming from his farm and other near farms, in a ray of 30-40 km.
3.
Name and surname: PECCIA PIETRO
Country/Region/City:
ITALY/UMBRIA/PERUGIA
Organization/Institution: COLDIRETTI
Position: farmer, contractor
Field of work/Responsibility:
preparing, seeding, silage harvesting,
transforming of breeding and
agriculture residues in electricity
farm)
Please describe briefly which, why and how the greenGain results have been implemented?
The company is owner of a biogas plant. The inputs provided by the greenGain project have
raised the awareness about the possibility of enlarging the feedstock types for the dig
low-cost materials: the river side and rural roads maintenance works are in fact very interesting,
because the herbaceous material coming from it could increase the biomass actually used by his
biogas plant (silage crops, breeding wastes and agricultu
The visit to MOLINO NUOVO plant in Magione was actually inspiring and was the main reason to
create a new plant in his farm and improve the existing biogas plant in CAPANNE (P
The evaluation of the potential of the wood and herbaceous
future, considering the presence of about 30
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe cha
implementation and eventual solutions for deviation.
Actually the farmer is recognizing all the technical and financial instruments and procedures to
enlarge the actual existing plant and to
greenGain
PECCIA PIETRO
COLDIRETTI
farmer, contractor
Field of work/Responsibility: land
preparing, seeding, silage harvesting,
transforming of breeding and
agriculture residues in electricity (Picture: Paolo Burini – residues of cereals cultivation in Peccia
riefly which, why and how the greenGain results have been implemented?
The company is owner of a biogas plant. The inputs provided by the greenGain project have
raised the awareness about the possibility of enlarging the feedstock types for the dig
the river side and rural roads maintenance works are in fact very interesting,
because the herbaceous material coming from it could increase the biomass actually used by his
biogas plant (silage crops, breeding wastes and agriculture residues).
The visit to MOLINO NUOVO plant in Magione was actually inspiring and was the main reason to
create a new plant in his farm and improve the existing biogas plant in CAPANNE (P
The evaluation of the potential of the wood and herbaceous biomass will be the next step in the
future, considering the presence of about 30-40 farms in a ray of 30-40 km.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe cha
implementation and eventual solutions for deviation.
Actually the farmer is recognizing all the technical and financial instruments and procedures to
enlarge the actual existing plant and to build the new biomass plant.
greenGain: D3.8| 16
residues of cereals cultivation in Peccia
riefly which, why and how the greenGain results have been implemented?
The company is owner of a biogas plant. The inputs provided by the greenGain project have
raised the awareness about the possibility of enlarging the feedstock types for the digester with
the river side and rural roads maintenance works are in fact very interesting,
because the herbaceous material coming from it could increase the biomass actually used by his
The visit to MOLINO NUOVO plant in Magione was actually inspiring and was the main reason to
create a new plant in his farm and improve the existing biogas plant in CAPANNE (Perugia).
biomass will be the next step in the
40 km.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
Actually the farmer is recognizing all the technical and financial instruments and procedures to
4.
Name and surname: SALARIS ANTONIO
Country/Region/City:
ITALY/UMBRIA/PERUGIA
Organization/Institution: CIA
Position: farmer, forest operator, service
provider (owner of chipping machine)
Field of work/Responsibility:
riversides; works and forest operator, owner
of many machines in Cittàdella
and east Tuscany. He is in frequent work contact with MOLINO NUOVO SRL.
BANDINO countryside – surroundings
Please describe briefly which, why and how the greenGain results have been implemented?
The maintenance works for abandoned lands and plantations are very interesting to increase
our current potential of harvesting wood material and producing wood
The greenGain project has provided Salaris with the vision of increasing their business
opportunity by using LCMW biomass, and has provided encouragement to build the value chain
of such material which was considered of lower value. Especially, re
and the quality of the material was provided. The workgroup during the workshop in Perugia
has provided the certainty that the other operators of the supply chain, both public and private,
are interested in the same topics and
Salaris is currently working on the idea of building a new biomass plant in CHIUSI (S
produce power and heat which will be used for the production of flowers, ornamental species
and horticulture, in order to boost an
other stakeholders to create a work chain between Perugino, Trasimeno and Tuscany areas for
the valorization of LCMW.
Please describe if the new/adapted system/procedure is already integrated an
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Salaris has positively committed to the idea of the Biomass Trade and Logistic Centre and has
proposed to start the operations in their own existing properties, in order to test if the concept
of the BTLC works in the area. Besides,
financial instruments and procedures to create a new biomass plant to be used with
that they harvest and to buy other machines to give a very important service to
Mountain Community municipalities, both to public and private lands owners.
greenGain
SALARIS ANTONIO
CIA
farmer, forest operator, service
provider (owner of chipping machine)
Field of work/Responsibility: maintenance of
nd forest operator, owner
of many machines in Cittàdella Pieve (Perugia). The big area in which he works is west Umbria
and east Tuscany. He is in frequent work contact with MOLINO NUOVO SRL.
surroundings of Salaris Farm)
Please describe briefly which, why and how the greenGain results have been implemented?
The maintenance works for abandoned lands and plantations are very interesting to increase
our current potential of harvesting wood material and producing wood
The greenGain project has provided Salaris with the vision of increasing their business
opportunity by using LCMW biomass, and has provided encouragement to build the value chain
of such material which was considered of lower value. Especially, reassurance about availability
and the quality of the material was provided. The workgroup during the workshop in Perugia
has provided the certainty that the other operators of the supply chain, both public and private,
are interested in the same topics and has helped in identifying them.
Salaris is currently working on the idea of building a new biomass plant in CHIUSI (S
produce power and heat which will be used for the production of flowers, ornamental species
and horticulture, in order to boost and differentiate their business. So they will speak with the
other stakeholders to create a work chain between Perugino, Trasimeno and Tuscany areas for
Please describe if the new/adapted system/procedure is already integrated an
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Salaris has positively committed to the idea of the Biomass Trade and Logistic Centre and has
operations in their own existing properties, in order to test if the concept
TLC works in the area. Besides, the farmer is currently analyzing all the technical and
financial instruments and procedures to create a new biomass plant to be used with
that they harvest and to buy other machines to give a very important service to
municipalities, both to public and private lands owners.
greenGain: D3.8| 17
). The big area in which he works is west Umbria
and east Tuscany. He is in frequent work contact with MOLINO NUOVO SRL. (Picture: PO
Please describe briefly which, why and how the greenGain results have been implemented?
The maintenance works for abandoned lands and plantations are very interesting to increase
our current potential of harvesting wood material and producing woodchips.
The greenGain project has provided Salaris with the vision of increasing their business
opportunity by using LCMW biomass, and has provided encouragement to build the value chain
assurance about availability
and the quality of the material was provided. The workgroup during the workshop in Perugia
has provided the certainty that the other operators of the supply chain, both public and private,
Salaris is currently working on the idea of building a new biomass plant in CHIUSI (Siena) to
produce power and heat which will be used for the production of flowers, ornamental species
So they will speak with the
other stakeholders to create a work chain between Perugino, Trasimeno and Tuscany areas for
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
Salaris has positively committed to the idea of the Biomass Trade and Logistic Centre and has
operations in their own existing properties, in order to test if the concept
the farmer is currently analyzing all the technical and
financial instruments and procedures to create a new biomass plant to be used with the LCMW
that they harvest and to buy other machines to give a very important service to Trasimeno
municipalities, both to public and private lands owners.
5.
Name and surname: MOLINO NUOVO SRL
Country/Region/City: ITALIA
Organization/Institution: CONFAGRICOLTURA UMBRIA
Position: WOODY BIOMASS PLANT OWNER
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
Green Gain Pilot Actions showed to Molino Nuovo SRL how to create a bigger logistic platform
to harvest large quantity of woody biomass coming from green maintenance works in an area of
about 40 km. MOLINO NUOVO SRL wants to double the current processing capacity of its own
woody biomass plant. It also makes it possible to provide residual heat to feed a municipal
heating network in Magione. MOLINO NUOVO SRL currently uses materials from its own farm
and other farms in the territory of
Community “Alta Umbria” (Umbertide), in a ray of about 40 km. Contacts with other identified
stakeholders are already underway and will grow in the next
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Actually the new procedure is not integrated. MOLINO NUOVO SRL
Magione a request for author
The actual area is sufficient to cover the future necessity, but a feasibility study is also required
with the help of Trasimeno Mountain Community
MAURIZI FEDERICO and SALAR
plant expansion and, above all, increasing the woody biomass to feed it.
greenGain
MOLINO NUOVO SRL
ITALIA - UMBRIA - MAGIONE
CONFAGRICOLTURA UMBRIA
WOODY BIOMASS PLANT OWNER
Field of work/Responsibility: CONTRACTOR, FARMER
Please describe briefly which, why and how the greenGain results have been implemented?
showed to Molino Nuovo SRL how to create a bigger logistic platform
to harvest large quantity of woody biomass coming from green maintenance works in an area of
MOLINO NUOVO SRL wants to double the current processing capacity of its own
biomass plant. It also makes it possible to provide residual heat to feed a municipal
heating network in Magione. MOLINO NUOVO SRL currently uses materials from its own farm
and other farms in the territory of Trasimeno Mountain Community and that of the M
Community “Alta Umbria” (Umbertide), in a ray of about 40 km. Contacts with other identified
stakeholders are already underway and will grow in the next six months.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Actually the new procedure is not integrated. MOLINO NUOVO SRL has submitted to the City of
Magione a request for authorization to doubling the current plant.
The actual area is sufficient to cover the future necessity, but a feasibility study is also required
Trasimeno Mountain Community technicians. Meanwhile, SOTTILI FEDERICO,
MAURIZI FEDERICO and SALARIS ANTONIO are profitably collaborating on the assumption of
plant expansion and, above all, increasing the woody biomass to feed it.
greenGain: D3.8| 18
Please describe briefly which, why and how the greenGain results have been implemented?
showed to Molino Nuovo SRL how to create a bigger logistic platform
to harvest large quantity of woody biomass coming from green maintenance works in an area of
MOLINO NUOVO SRL wants to double the current processing capacity of its own
biomass plant. It also makes it possible to provide residual heat to feed a municipal
heating network in Magione. MOLINO NUOVO SRL currently uses materials from its own farm
and that of the Mountain
Community “Alta Umbria” (Umbertide), in a ray of about 40 km. Contacts with other identified
months.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
has submitted to the City of
The actual area is sufficient to cover the future necessity, but a feasibility study is also required
technicians. Meanwhile, SOTTILI FEDERICO,
IS ANTONIO are profitably collaborating on the assumption of
plant expansion and, above all, increasing the woody biomass to feed it.
6.
Name and surname: SOTTILI FEDERICO
Country/Region/City: ITALIA
Organization/Institution: CONFAGRI
Position: FARMER, FOREST OPERATOR
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
Green Gain Results showed to SOTTILI FEDERICO
from the forest cuts and abandoned olive groves, in a more economically interesting way.
Trasimeno Mountain Community
months to submit a project to the Region in o
the Rural Development Programme for the diffusion and development of the use of renewable
energies in Umbria
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Actually the new procedure is not integrated, but in the next months
Community will try to find a technical solutio
with the exact goals of development of collection, selection and treatment of waste woody
biomass in the local area of Perugino and Corciano.
greenGain
SOTTILI FEDERICO
ITALIA - UMBRIA - CORCIANO
CONFAGRICOLTURA UMBRIA
FARMER, FOREST OPERATOR
Field of work/Responsibility: CONTRACTOR, FARMER, AGRITOURISM
Please describe briefly which, why and how the greenGain results have been implemented?
Green Gain Results showed to SOTTILI FEDERICO the opportunity to use the woody biomass
from the forest cuts and abandoned olive groves, in a more economically interesting way.
Trasimeno Mountain Community will provide financial technical consultancy in the coming
months to submit a project to the Region in order to obtain the contributions provided for in
the Rural Development Programme for the diffusion and development of the use of renewable
Please describe if the new/adapted system/procedure is already integrated and if
ave been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Actually the new procedure is not integrated, but in the next months
will try to find a technical solution to reach the objectives of SOTTILI FEDERICO,
with the exact goals of development of collection, selection and treatment of waste woody
biomass in the local area of Perugino and Corciano.
greenGain: D3.8| 19
Please describe briefly which, why and how the greenGain results have been implemented?
ortunity to use the woody biomass
from the forest cuts and abandoned olive groves, in a more economically interesting way.
will provide financial technical consultancy in the coming
rder to obtain the contributions provided for in
the Rural Development Programme for the diffusion and development of the use of renewable
Please describe if the new/adapted system/procedure is already integrated and if
ave been recognized. Please also describe challenges that hindered
Actually the new procedure is not integrated, but in the next months Trasimeno Mountain
the objectives of SOTTILI FEDERICO,
with the exact goals of development of collection, selection and treatment of waste woody
7.
Name and surname: Irache
Country/Region/City: Estella, Na
Organization/Institution: GAL Tierra Estella
Position: Manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
Teder is a non-profit associati
environmental and social development in the territory of "Tierra Estella".
related to biomass.
Forest maintenance work needs and experiences
of the biomass surface in the
Those areas need to be maintained
roads and edges of agricultural fields
taken into account in order
agricultural and forest residues combined with extraction and transport actions
costs), additionally planning
center that will manage among others
The Tierra Estella Group ha
within the EURENERS 3, Europe and Ener
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Teder has been working for some time to implement a chip logistics center in “Tierra Estella”, a
project that years ago identified a
Forestry Congress was organized
study was carried out on the potential of f
Líder.
Results of this study concluded that there were 35,085 tons of dry biomass
usedannually in the region, which
Lursarea, a study has been carried out
the administrative and tax law in order to articulate the implementation of a logistics center
which objective is to serve to take advantage of resources
(clearing of shrib vegetaion and dead wood for instance)
At the moment the initiative is under development
transferred to Teder which may increase the chances
territory as LCMW biomass would contribute to
greenGain
Irache Roa
Estella, Navarra, España
GAL Tierra Estella
Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
profit association founded in 1996 with the aim of promoting economic,
environmental and social development in the territory of "Tierra Estella".
needs and experiences of greenGain are of interest to TEDER
of the biomass surface in the territory of Earth Estella corresponds to forest
Those areas need to be maintained in order to avoid fires, therefore
roads and edges of agricultural fields are performed periodically. Results of
in order to improve the performance yield of the operations
agricultural and forest residues combined with extraction and transport actions
dditionally planning phase was initiate to evaluate the possibility to
that will manage among others LCMW biomass type.
has collaborated with OMEZYMA in the operation of
within the EURENERS 3, Europe and Energy cooperation project.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
working for some time to implement a chip logistics center in “Tierra Estella”, a
identified a potential and has not been forgotten. In fact, in 2008 the 1st
was organized in the city of Tierra Estella (Eureners Pr
study was carried out on the potential of forest biomass in the region at
study concluded that there were 35,085 tons of dry biomass
in the region, which set out different options. For this reason, with the support of
Lursarea, a study has been carried out recently and a legal report has been drawn up
administrative and tax law in order to articulate the implementation of a logistics center
serve to take advantage of resources and have cleanest mountains
(clearing of shrib vegetaion and dead wood for instance)
the initiative is under development, the results of
ich may increase the chances regarding this logistics center in
LCMW biomass would contribute to increase the amount of tons of biomass
greenGain: D3.8| 20
Please describe briefly which, why and how the greenGain results have been implemented?
in 1996 with the aim of promoting economic,
environmental and social development in the territory of "Tierra Estella".Its main field of works
are of interest to TEDER as 41 %
corresponds to forest next to the farms.
therefore cleaning of margins of
esults of greenGain were
of the operations (harvesting of
agricultural and forest residues combined with extraction and transport actions aiming toreduce
phase was initiate to evaluate the possibility to create a logistics
in the operation of infoenergy point
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
working for some time to implement a chip logistics center in “Tierra Estella”, a
potential and has not been forgotten. In fact, in 2008 the 1st
Tierra Estella (Eureners Project) and in 2013 a
orest biomass in the region at local level within Axis 4
study concluded that there were 35,085 tons of dry biomass that could be
. For this reason, with the support of
and a legal report has been drawn up regarding
administrative and tax law in order to articulate the implementation of a logistics center
have cleanest mountains
(clearing of shrib vegetaion and dead wood for instance) ,etc..
, the results of greenGain have been
this logistics center in the
increase the amount of tons of biomass
produced, taking into account the boilers to install, collecting machinery and chippers
to process this type of biomass
In particular, the results of g
region, given the characteristics of forest resources, the remains of cl
forest are used to produce one of
the avaialble information from the greenGain project, time has not been enough to
develop greenGain's experiences.
expected in the future.
greenGain
, taking into account the boilers to install, collecting machinery and chippers
ss this type of biomass and will consider adding the LCMW biomass type to the process.
In particular, the results of greenGain have been transferred to TEDER, but in principle in this
given the characteristics of forest resources, the remains of cleaning and thinning of the
forest are used to produce one of the types of LCMW biomass. Currently they are processing
the avaialble information from the greenGain project, time has not been enough to
reenGain's experiences. Currently, there are no actions implemented
greenGain: D3.8| 21
, taking into account the boilers to install, collecting machinery and chippers needed
biomass type to the process.
reenGain have been transferred to TEDER, but in principle in this
eaning and thinning of the
Currently they are processing
the avaialble information from the greenGain project, time has not been enough to deeply
actions implemented, but actions be
8.
Name and surname: Juanjo Mayans
Country/Region/City: Serra, Valencia, España
Organization/Institution: City Council of Serra
Position: Project Manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
The Municipality of Serra, has not implemented
moment in the same ways. In the greenGain ex
energy generation through
municipality produce pellets since
to burn biomass from LCMW in the form
energy production they consider
pellets.
The municipality, in the heart of the Serra Calderona, is surrounded by forests
many houses with gardens
Municipality‘ technicians saw the opportunity
garden waste). They were
source. An investment of 150,000
deputation and the European Union
The balance, according to municipal data, is v
year in waste and energy treatment and
cleaner of vegetation and therfore
advantage due to it isin an area of great ecological value. The magazine of the European
biomass association reported
obtained form the surrounding area
several municipal facilities, the building of its town hall, which s
court, the police and municipal offices, the public school Sant Josep and the municipal nursery,
sports center, winter cinema and the House of Culture.
In order to open up/export
of Serra" and already this year the first stock
sale of this pellets will revert to the amortization of machinery and the creation of
employment, according to Mayans. This project ha
since even a delegation of the European Commission traveled to Serra to see its progress and
results.
It has been reported as: "Biomass management and treatment program for its conversion into
solid fuel used in th
greenGain
Juanjo Mayans
Serra, Valencia, España
City Council of Serra
Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
The Municipality of Serra, has not implemented the results from greenG
in the same ways. In the greenGain experiences the product obtained and used for
energy generation through its combustion in biomass boilers was chips, on the
municipality produce pellets since they do not account with boilers in the municipality
MW in the format of G30 chips. Although they use LCMW biomass
energy production they consider that the best way to burn this type of biomass
The municipality, in the heart of the Serra Calderona, is surrounded by forests
and carrying out some agricultural activity.
echnicians saw the opportunity to use this raw material (forest
y were willing to replace conventional energy with a clean
ource. An investment of 150,000 € was required – accounting with subsidies from the
deputation and the European Union - and the municipality of Serra installed a pellet factory.
The balance, according to municipal data, is very positive resulting in
and energy treatment and generatedeight new jobs.
of vegetation and therfore more protected against fire which respresent an important
in an area of great ecological value. The magazine of the European
reported this initiative very positivelyas the 'The Serra's model'. The fuel
obtained form the surrounding area feeds a boiler that generates clean and cheap energy for
several municipal facilities, the building of its town hall, which serves the health center, the
court, the police and municipal offices, the public school Sant Josep and the municipal nursery,
sports center, winter cinema and the House of Culture.
In order to open up/export to the external market, an own brand was created
this year the first stockhas been produced. The profit obtained from the
will revert to the amortization of machinery and the creation of
employment, according to Mayans. This project has also become an international benchmark,
since even a delegation of the European Commission traveled to Serra to see its progress and
: "Biomass management and treatment program for its conversion into
solid fuel used in the heating of public buildings of the City of Serra
greenGain: D3.8| 22
Please describe briefly which, why and how the greenGain results have been implemented?
reenGain experiences for the
periences the product obtained and used for
its combustion in biomass boilers was chips, on the contrary Serra
in the municipality adapted
lthough they use LCMW biomass for
burn this type of biomass is in form of
The municipality, in the heart of the Serra Calderona, is surrounded by forests and accounts
raw material (forest, agricultural or
to replace conventional energy with a cleaner and cheaper
with subsidies from the
and the municipality of Serra installed a pellet factory.
ery positive resulting in 41,000 € of savings per
. 130 ha of forest ended
which respresent an important
in an area of great ecological value. The magazine of the European
'The Serra's model'. The fuel
feeds a boiler that generates clean and cheap energy for
erves the health center, the
court, the police and municipal offices, the public school Sant Josep and the municipal nursery,
was created: "Pellet of quality
. The profit obtained from the
will revert to the amortization of machinery and the creation of local
s also become an international benchmark,
since even a delegation of the European Commission traveled to Serra to see its progress and
: "Biomass management and treatment program for its conversion into
e heating of public buildings of the City of Serra."
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions f
They have a biomass pellet factory to
forest clearings operations,
and have provide knowledge based on their experein
project.
greenGain
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
pellet factory to produce the pelletsfrom pruning debris from gardens, and
, being bothbiomass types under the scope of
knowledge based on their expereince and contributed to
greenGain: D3.8| 23
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
from pruning debris from gardens, and
under the scope of the greenGain project,
contributed to improve to the
9.
Name and surname: Eduard Paredes
Country/Region/City: Ripoll, Cataluña, España
Organization/Institution: Ass
Position: Technician
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
Ripollès Ges Bisaura (ALRGB) is a non
the Department of Agriculture, Lives
of local LEADER participatory development ("Liaison Entre Actions de Développement del
Économie Rurale"), a methodology of work to promote the local development of rural areas and
to help the agents of the rural world to improve the potential of their territory in the framework
of the Rural Development Program (RDP) of Catalonia 2014
Collaboration in the project
climate change. A study
analysis of the demands,
technological solutions that allow energy self
Energy, Forest and Climate Change (ENFO
awareness among the local authorities, the different economic sectors and the general
publicregarding the idea that a new energy and forestry culture is possible, in order to to
generate an important impact in
This "non-productive" project adds value to all local or regional initiatives related to the
implementation of biomass and recovery of forest management. A transnational,
interterritorial, supra-regional framework of exchang
is key, on the one hand, to give a global vision to the most specific experiences and, on the
other hand, to optimize resources, provide information and give robustness to this process.
Through the transfer of know
to contribute to sustainable forest management and improve the capacities to mitigate and
adapt to climate change in the territories.
Please describe if the new/adapted system/procedure i
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
The maintenance of forest
interesting to increase the biomass production potential in the form
transferred the bargaining experiences, and will test the use of type biomass LCMW. It is also of
greenGain
Eduard Paredes – Albert Puigvert
Ripoll, Cataluña, España
Association Leader Ripollès Ges Bisaura
bility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
Ripollès Ges Bisaura (ALRGB) is a non-profit organization incorporated in 2009, recognized by
the Department of Agriculture, Livestock, Fisheries and Food as result of their
local LEADER participatory development ("Liaison Entre Actions de Développement del
a methodology of work to promote the local development of rural areas and
s of the rural world to improve the potential of their territory in the framework
of the Rural Development Program (RDP) of Catalonia 2014-2020.
Collaboration in the project took place between the Local Action Groups ENFOC Energy and
was carreid out on energy solutions forsmall towns,
, assessment of the resources and waste available
technological solutions that allow energy self-sufficiency.
Energy, Forest and Climate Change (ENFOCC) is a cooperation project whose purpose is to
the local authorities, the different economic sectors and the general
the idea that a new energy and forestry culture is possible, in order to to
mpact in the rural territories.
productive" project adds value to all local or regional initiatives related to the
implementation of biomass and recovery of forest management. A transnational,
regional framework of exchange, knowledge, coordination and awareness
is key, on the one hand, to give a global vision to the most specific experiences and, on the
other hand, to optimize resources, provide information and give robustness to this process.
Through the transfer of knowledge around the concepts of energy, forestry and climate, it aims
to contribute to sustainable forest management and improve the capacities to mitigate and
adapt to climate change in the territories.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
The maintenance of forest biomass, abandoned plantations, and prunings of gardens is
teresting to increase the biomass production potential in the form
transferred the bargaining experiences, and will test the use of type biomass LCMW. It is also of
greenGain: D3.8| 24
Please describe briefly which, why and how the greenGain results have been implemented?
profit organization incorporated in 2009, recognized by
as result of their implementation
local LEADER participatory development ("Liaison Entre Actions de Développement del
a methodology of work to promote the local development of rural areas and
s of the rural world to improve the potential of their territory in the framework
Local Action Groups ENFOC Energy and
small towns, including an
available to be valued and
CC) is a cooperation project whose purpose is to raise
the local authorities, the different economic sectors and the general
the idea that a new energy and forestry culture is possible, in order to to
productive" project adds value to all local or regional initiatives related to the
implementation of biomass and recovery of forest management. A transnational,
e, knowledge, coordination and awareness
is key, on the one hand, to give a global vision to the most specific experiences and, on the
other hand, to optimize resources, provide information and give robustness to this process.
ledge around the concepts of energy, forestry and climate, it aims
to contribute to sustainable forest management and improve the capacities to mitigate and
s already integrated and if
improvements have been recognized. Please also describe challenges that hindered
ations, and prunings of gardens is very
teresting to increase the biomass production potential in the format of G30 chips, have
transferred the bargaining experiences, and will test the use of type biomass LCMW. It is also of
interest to reduce the danger of fire, cleaning and quality improvemen
and to give out waste yard pruning.
Work is underway regarding
companies. In connection with the boiler installation, participation in the Climate Projects of the
Carbon Fund for a Sustainable Economy (FES
to the territories adhered to certify the emissions of 2013
the new call.
In the project "ENFOCC" technical guides are elaborated
during the project greenG
publication of technical guides will also be promoted, as in the
address the issue noted in numerous
specialized in the different complements to boilers, or risks associated with its misuse ".
greenGain
interest to reduce the danger of fire, cleaning and quality improvemen
and to give out waste yard pruning.
regardingthe installation of biomass boilers in public buildings and
In connection with the boiler installation, participation in the Climate Projects of the
for a Sustainable Economy (FES-CO2) is promoted, providing technical assistance
to the territories adhered to certify the emissions of 2013-2015 and request the extension of
In the project "ENFOCC" technical guides are elaborated allowing to add experiences
Gain. Within the interest of forest management and biomass, the
publication of technical guides will also be promoted, as in the greenG
address the issue noted in numerous meetings and held "a lack of technical documentation
specialized in the different complements to boilers, or risks associated with its misuse ".
greenGain: D3.8| 25
interest to reduce the danger of fire, cleaning and quality improvement of abandoned fields,
the installation of biomass boilers in public buildings and
In connection with the boiler installation, participation in the Climate Projects of the
CO2) is promoted, providing technical assistance
2015 and request the extension of
add experiences carried out
of forest management and biomass, the
greenGain project, which aim to
held "a lack of technical documentation
specialized in the different complements to boilers, or risks associated with its misuse ".
10. Name and surname: Gregon Baer
Country/Region/City: Teulada, Alicante, España
Organization/Institution: Heizomat
Position: Project Manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
Heizomat is a company that manufactures biomass boilers and machinery to convert all
biomass-related waste into fuel. They have 30,000 boilers installed around the world and stand
out for the robustness and
The regions of Bajo Aragón Matarraña
included in the pilot experiences
chippers and the boilers. The boiler manufacturer advised
selection in the future boilers
The installations of the Heizomat boilers in Calpe and
optimized for the use of th
boiler operated satisfactorily
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for
Heizomat boilers is able to operate with
been needed to burn the feedstock collected during the
The mayors of the territories v
LCMW biomass and samples of the
boilers to the specificneeds.
greenGain
Gregon Baer
Teulada, Alicante, España
Heizomat
Field of work/Responsibility: Manufacturer of boilers
Please describe briefly which, why and how the greenGain results have been implemented?
Heizomat is a company that manufactures biomass boilers and machinery to convert all
related waste into fuel. They have 30,000 boilers installed around the world and stand
and simplicity of their equipments.
of Bajo Aragón Matarraña had problems during the combustion test carried out
uded in the pilot experiences with LCMW biomass as it got stuck in the
chippers and the boilers. The boiler manufacturer advised to take this into considerations when
future boilers to install in public buildings and farms.
The installations of the Heizomat boilers in Calpe and locally confirmed
of this type of LCMW biomass since this feedstock was
satisfactorily.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
is able to operate with LCMW-type biomass perfectly;
feedstock collected during the greenGain project.
the territories visitedHeizomat to check the boilers that
samples of the biomass were taken to discuss the quality and adapt the
needs.
greenGain: D3.8| 26
Please describe briefly which, why and how the greenGain results have been implemented?
Heizomat is a company that manufactures biomass boilers and machinery to convert all kinds of
related waste into fuel. They have 30,000 boilers installed around the world and stand
during the combustion test carried out
stuck in the feeding system of the
to take this into considerations when
confirmed that this equipment was
biomass since this feedstock was testedand he
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
perfectly; no improvements have
ain project.
boilers that are to operate with
the quality and adapt the
11. Name and surname: Ruben SerranoCountry/Region/City: Spain/Zaragoza/ Belchite
Organization/Institution: Grupo
Position: Project Manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
ADECOBEL was selected as the Local Action Group
based on the RESOLUTION OF MAY 5, 2015 OF THE DIRECTOR
DEVELOPMENT.
As its name indicates, participation in the Local Leader Development Strategy (EDLL) is essential
and must establishthe possible lines of action of ADECOBEL, based o
territory.
In Belchite region, biomass from agricultural fields
beexploited in order to produce chips
Please describe if the new/adapt
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Actio
other groups to develop and execute greenG
Inforenergia. It will begin in 2018
experiences developed.
The maintenance of abandone
biomass potential, since this region
it does account with residues from
to the logistic center .In addition
companies could be increased
boilers.
Based on the results of the greenG
LCMW in real cases and not only in
After the transfer of the results
government to develop the “Aragon Infonergy
around eight territories of the province of Teruel, so that
be collected to supply biomass to all the province of Teruel and part of Zaragoza.
one of those territories.
greenGain
Ruben Serrano Spain/Zaragoza/ Belchite
Grupo ADECOBEL
Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
ADECOBEL was selected as the Local Action Group managing an EDLL in Campo de Belc
the RESOLUTION OF MAY 5, 2015 OF THE DIRECTOR
As its name indicates, participation in the Local Leader Development Strategy (EDLL) is essential
the possible lines of action of ADECOBEL, based on the needs detected in the
In Belchite region, biomass from agricultural fields, vineyard and olive groves,
ed in order to produce chips to provide fuel to farms and public buildings.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Actio
groups to develop and execute greenGain practices in other territories called Aragón
t will begin in 2018 and it will be possible to propose improvements and
The maintenance of abandoned lands and plantations is interesting to increase the current
potential, since this region presents a reduced and low density of forest mass, although
account with residues from agricultural and garden cleanings, which can be transferred
n addition, the number of biomass boilers in public buildings and
could be increased, through the guidelines of good practices in LCMW biomass
the results of the greenGain project, it arise from ADECOBAL
in real cases and not only in the greenGain territory but in the neighboring territories
fter the transfer of the results was carried out, it was decided to request help to the Aragon
government to develop the “Aragon Infonergy Project” aiming to create
territories of the province of Teruel, so that within a range of
biomass to all the province of Teruel and part of Zaragoza.
greenGain: D3.8| 27
Please describe briefly which, why and how the greenGain results have been implemented?
an EDLL in Campo de Belchite
the RESOLUTION OF MAY 5, 2015 OF THE DIRECTOR-GENERAL FOR RURAL
As its name indicates, participation in the Local Leader Development Strategy (EDLL) is essential
n the needs detected in the
vineyard and olive groves, issusceptible to
to provide fuel to farms and public buildings.
ed system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
Omezyma has requested an aid which has been granted to this Local Action Group and eight
ain practices in other territories called Aragón
be possible to propose improvements and present
interesting to increase the current
and low density of forest mass, although
agricultural and garden cleanings, which can be transferred
mass boilers in public buildings and
, through the guidelines of good practices in LCMW biomass
it arise from ADECOBAL the need to implement
territory but in the neighboring territories.
decided to request help to the Aragon
to create two logistic centers
within a range of 50 km biomass could
biomass to all the province of Teruel and part of Zaragoza. ADECOBEL is
12. Name and surname: José Vicente QuerolCountry/Region/City: Spain/Teruel(Aragón)/Albalate del Arzobispo
Organization/Institution: Asociación para el Desarrollo Integral del Bajo Martín y Andorrade Arcos (ADIBAMA) Position: Project manager
Field of work/Responsibility:
Web: www.adibama.es
Please describe briefly which, why and how the greenGain results have been implemented?
The region of “Bajo Martin” and “Sierra de Arcos
bouderiesof the fields of cultivation, ditches and river banks.
greenhouses for tomato production and air
Please describe if the new/adapted system/procedure is already integrated a
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Action Group and eight
other groups to develop a
Inforenergia. It will begin in 2018 and it will be possible to propose improvements and present
experiences developed.
Based on the results of the greenG
LCMW biomass use in real cases and not only in
territories too. After the transfer of the results
to the Aragon government to develop the “Aragon Infon
logistic centers around eight
km biomass could be collected
Zaragoza.
In the Aragon infoenergía project, municipal ordinances have been drafted
management of public forests and the extraction of biomass, also models of agreements
between private and public owners for the extraction of forest and agricultural biomass.
In this region they have committed themselves positively to develop a
exploit the reed potentialin order
hurdles, etc..
In the Aragon infoenergía project, municipal ordinances have been
of public forests and the extraction of biomass, also models of agreements between private and
public owners for the extraction of forest and agricultural biomass.
greenGain
José Vicente Querol Spain/Teruel(Aragón)/Albalate del Arzobispo
Asociación para el Desarrollo Integral del Bajo Martín y Andorra
Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
he region of “Bajo Martin” and “Sierra de Arcos-Andorra” is dominate
of the fields of cultivation, ditches and river banks. This biomass
greenhouses for tomato production and air-conditioning of pig farms.
Please describe if the new/adapted system/procedure is already integrated a
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Action Group and eight
groups to develop and execute greenGain practices in other territories called Aragón
It will begin in 2018 and it will be possible to propose improvements and present
the results of the greenGain project, ADECOBAL detected
in real cases and not only in the model regions
fter the transfer of the results was carried out, it was
to the Aragon government to develop the “Aragon Infonergy Project”
centers around eight territories of the province of Teruel, so that
collected to supply biomass to all the province of Teruel and
gía project, municipal ordinances have been drafted
management of public forests and the extraction of biomass, also models of agreements
between private and public owners for the extraction of forest and agricultural biomass.
they have committed themselves positively to develop a biomass
exploit the reed potentialin order to produce heat and to manufacture instruments, baskets,
In the Aragon infoenergía project, municipal ordinances have been drafted for the management
of public forests and the extraction of biomass, also models of agreements between private and
public owners for the extraction of forest and agricultural biomass.
greenGain: D3.8| 28
Asociación para el Desarrollo Integral del Bajo Martín y Andorra-Sierra
Please describe briefly which, why and how the greenGain results have been implemented?
dominatedby reeds located in the
This biomass is being used to heat
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
Omezyma has requested an aid which has been granted to this Local Action Group and eight
ain practices in other territories called Aragón
It will begin in 2018 and it will be possible to propose improvements and present
detected the need to implement
the model regions but in the neighboring
was carried out, it was decided to request help
ergy Project” aiming to create two
territories of the province of Teruel, so that within a range of 50
biomass to all the province of Teruel and part of
gía project, municipal ordinances have been drafted regardingthe
management of public forests and the extraction of biomass, also models of agreements
between private and public owners for the extraction of forest and agricultural biomass.
biomass logistic center to
to produce heat and to manufacture instruments, baskets,
drafted for the management
of public forests and the extraction of biomass, also models of agreements between private and
13. Name and surname: Lucía SevillaCountry/Region/City: Spain/ Te
Organization/Institution: ADRI JILOCA GALLOCANTAPosition: Project Manager
Field of work/Responsibility:
www.adri.es
Please describe briefly which, why and how the greenGain results have b
ADRI JILOCA-GALLOCANTA is a non
improve the quality of life in rural areas comprised by the regions of Campo de Daroca and
Jiloca.
The purpose of the Association for Integral
cultural and environmental development, that is to say the integral development of the area
where its scope of action extend.
In the regions of Jiloca and Gallocanta
generated by pruning, the opportunity to take advantage of poplar biomass
the transfer of greenGain results
On the other hand, garden pruning will be used for biomass, but for this
install biomass boilers in public buildings of greater consumption
are also interested in proposing biogas plants to supply heat and electricity to farms and
municipalities.
Please describe if the new/adapted system/procedure is already integrat
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Based on the results of the greenG
implement LCMW biomass use
neighboring territories too
request help to the Aragon government to develop the “Aragon Infonergy Project”
create two logistic centers around eight
range of 50 km biomass could be
part of Zaragoza.
In the Aragon infoenergía project, municipal or
management of public forests and the extraction of biomass, also models of agreements
between private and public owners for the extraction of forest and agricultural biomass.
greenGain
Lucía Sevilla Spain/ Teruel/
ADRI JILOCA GALLOCANTA
Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have b
GALLOCANTA is a non-profit association created in 1991 whose main objective is to
improve the quality of life in rural areas comprised by the regions of Campo de Daroca and
The purpose of the Association for Integral Rural Development is to promote economic, social,
cultural and environmental development, that is to say the integral development of the area
where its scope of action extend.
In the regions of Jiloca and Gallocanta which is already facing a problem with
the opportunity to take advantage of poplar biomass
ain results.
On the other hand, garden pruning will be used for biomass, but for this
ilers in public buildings of greater consumption. Large consumer companies
are also interested in proposing biogas plants to supply heat and electricity to farms and
Please describe if the new/adapted system/procedure is already integrat
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
the results of the greenGain project, ADRI JILOCA-GALLOCANTA
ass use in real cases and not only in the model regions
too. After the transfer of the results was carried out, it was
request help to the Aragon government to develop the “Aragon Infonergy Project”
centers around eight territories of the province of Teruel, so that
biomass could be collected to supply biomass to all the province of Teruel and
In the Aragon infoenergía project, municipal ordinances have been drafted
management of public forests and the extraction of biomass, also models of agreements
between private and public owners for the extraction of forest and agricultural biomass.
greenGain: D3.8| 29
Please describe briefly which, why and how the greenGain results have been implemented?
profit association created in 1991 whose main objective is to
improve the quality of life in rural areas comprised by the regions of Campo de Daroca and
Rural Development is to promote economic, social,
cultural and environmental development, that is to say the integral development of the area
a problem with the residue
the opportunity to take advantage of poplar biomass was identified after
On the other hand, garden pruning will be used for biomass, but for this aim it is necessary to
arge consumer companies
are also interested in proposing biogas plants to supply heat and electricity to farms and
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
GALLOCANTA detected the need to
the model regions but in the
was carried out, it was decided to
request help to the Aragon government to develop the “Aragon Infonergy Project” aiming to
territories of the province of Teruel, so that within a
biomass to all the province of Teruel and
dinances have been drafted regarding the
management of public forests and the extraction of biomass, also models of agreements
between private and public owners for the extraction of forest and agricultural biomass.
14. Name and surname: Enrique Asín
Country/Region/City: Spain/Teruel/Mora de Rubielos
Organization/Institution: Agujama
Position: Project Manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
Gúdar-Javalambre and Maestrazgo Development Association (AGUJAMA) is one of more than
2000 Development Groups that exist in Europe. It was created in 2002 to access a LEADER
program in its field of action
process of all public and private agents domiciled in the regions of Gúdar
Maestrazgo (Teruel).
In the mountains of Gúdar, Javalambre and Maestrazgo, the
for the maintenance of tracks, firebreaks
areas where LCMW biomass could be exploited
Its priority concerns the environment and sustainability
the forest and process the
and saw wood.
In the Aragon infoenergía project, municipal ordinances have been drafted
management of public forests and the extraction of biomass, also models of agreements
between private and public owner
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solution
Omezyma has requested an aid which has been granted to this Local Action Group and eight
other groups to develop and execute greenG
Inforenergia. But it will begin in 2018 when it will be p
incidents developed. It is in an early stage.
Based on the results of the greenG
biomass use in real cases and not only in
territories. After the transfer of the results
the Aragon government to develop the “Aragon Infonergy Project”
centers around eight territories of the province of Te
kmbiomass could be collected
Zaragoza.
greenGain
Enrique Asín
Spain/Teruel/Mora de Rubielos
Agujama
Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
Javalambre and Maestrazgo Development Association (AGUJAMA) is one of more than
Development Groups that exist in Europe. It was created in 2002 to access a LEADER
program in its field of action. Nowadays its main reason is to participate in the dec
of all public and private agents domiciled in the regions of Gúdar
In the mountains of Gúdar, Javalambre and Maestrazgo, the operations have been
for the maintenance of tracks, firebreaks and recreational areas for tourist use
LCMW biomass could be exploited.
the environment and sustainability issues, operations performed to clean
the biomass in the format of pellet, chips, beds for
In the Aragon infoenergía project, municipal ordinances have been drafted
management of public forests and the extraction of biomass, also models of agreements
between private and public owners for the extraction of forest and agricultural biomass.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Action Group and eight
groups to develop and execute greenGain practices in other territories called Aragón
But it will begin in 2018 when it will be possible to propose improvements and
incidents developed. It is in an early stage.
the results of the greenGain project,AGUJAMAdetected the need to implement
in real cases and not only in the model regions‘ territory but in the ne
fter the transfer of the results was carried out, it was decided to request help to
the Aragon government to develop the “Aragon Infonergy Project” aiming
territories of the province of Teruel, so that
collected to supply biomass to all the province of Teruel and part of
greenGain: D3.8| 30
Please describe briefly which, why and how the greenGain results have been implemented?
Javalambre and Maestrazgo Development Association (AGUJAMA) is one of more than
Development Groups that exist in Europe. It was created in 2002 to access a LEADER
its main reason is to participate in the decision-making
of all public and private agents domiciled in the regions of Gúdar- Javalambre and
operations have beencarried out
and recreational areas for tourist use, these are the
perations performed to clean
, beds for livestock or petsand
In the Aragon infoenergía project, municipal ordinances have been drafted regarding the
management of public forests and the extraction of biomass, also models of agreements
s for the extraction of forest and agricultural biomass.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
Omezyma has requested an aid which has been granted to this Local Action Group and eight
ain practices in other territories called Aragón
ossible to propose improvements and
the need to implement LCMW
territory but in the neighboring
decided to request help to
aiming to create two logistic
ruel, so that within a range of 50
biomass to all the province of Teruel and part of
15. Name and surname: SagrarioCountry/Region/City: Spain/Teruel/Tramacastilla
Organization/Institution: ASIADERPosition: Project Manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
The Association for Integral Rural Development of the Sierra de Albarracín (ASIADER)
profit organization that currently manages the Leader 2014
the Sierra de Albarracín.
It was set up in 1996 to manage the European Leader II program at the initiative of the
Community of Albarracín.
In the Sierra de Albarracín, forest resources with logging have always been of great importance.
Currently, the change of use to chip production is a new business opportunity.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Action Group and eight
other groups to develop and execute Greeng
Infoenergia”. It will begin in 2018 when it will be possible to propose improvements and
incidents developed.
In the use of the cane have more experience than the one developed in Greengain.
Based on the results of the greenG
real cases and not only in
the transfer of the results we decided to request help to the Aragon government to
“Aragon Infonergy Project” to create
province of Teruel, so that
province of Teruel and part of Zaragoza.
In the Aragon infoenergía project, municipal ordinances have been drafted for the management
of public forests and the extraction of biomass, also models of agreements between private and
public owners for the extraction of forest and agricultural biomass.
greenGain
Sagrario Sanz
Spain/Teruel/Tramacastilla
ASIADER
Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
The Association for Integral Rural Development of the Sierra de Albarracín (ASIADER)
profit organization that currently manages the Leader 2014-2020 Local Development Strategy in
It was set up in 1996 to manage the European Leader II program at the initiative of the
de Albarracín, forest resources with logging have always been of great importance.
, the change of use to chip production is a new business opportunity.
Please describe if the new/adapted system/procedure is already integrated and if
s have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Action Group and eight
other groups to develop and execute Greengain practices in other territories called “Aragón
t will begin in 2018 when it will be possible to propose improvements and
In the use of the cane have more experience than the one developed in Greengain.
esults of the greenGain project,ASIADER arises the need to implement
real cases and not only in the greenGain territory but in the neighboring territories
the transfer of the results we decided to request help to the Aragon government to
“Aragon Infonergy Project” to create two logistic centers around eight
province of Teruel, so that within a range of 50 km collected and abantecer of biomass to all the
province of Teruel and part of Zaragoza.
infoenergía project, municipal ordinances have been drafted for the management
of public forests and the extraction of biomass, also models of agreements between private and
public owners for the extraction of forest and agricultural biomass.
greenGain: D3.8| 31
Please describe briefly which, why and how the greenGain results have been implemented?
The Association for Integral Rural Development of the Sierra de Albarracín (ASIADER) is a non-
2020 Local Development Strategy in
It was set up in 1996 to manage the European Leader II program at the initiative of the
de Albarracín, forest resources with logging have always been of great importance.
, the change of use to chip production is a new business opportunity.
Please describe if the new/adapted system/procedure is already integrated and if
s have been recognized. Please also describe challenges that hindered
Omezyma has requested an aid which has been granted to this Local Action Group and eight
ain practices in other territories called “Aragón
t will begin in 2018 when it will be possible to propose improvements and
In the use of the cane have more experience than the one developed in Greengain.
arises the need to implement LCMW in
territory but in the neighboring territories too. After
the transfer of the results we decided to request help to the Aragon government to develop the
centers around eight territories of the
collected and abantecer of biomass to all the
infoenergía project, municipal ordinances have been drafted for the management
of public forests and the extraction of biomass, also models of agreements between private and
16. Name and surname: José María
Country/Region/City: Spain/Zaragoza/Tarazona
Organization/Institution: ASOMO Position: Project Manager
Field of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
The Association for the Development of the Lands of Moncayo (ASOMO) is a non
association that currently manages in the Comarcas de Tarazona
Axis 4 of the Rural Development Program of Aragon 2007
managed the Leader II and Leader Plus Community Initiatives.
The Association was constituted in 1994, under Law 191/64 of December 24 of Associations,
adapted its Statutes to the Organic Law 1/2002 of March 22 regulating the Right of Association
and complementary norms, with full legal capacity to act, lacking in profit and with the
objective of achieving the integral development of the Counties of Tarazona and Moncayo
Campo de Borja.
ASOMO has a great diversity of partners: natural and legal
companies, associations and other groups, representing all the economic, cultural and social
sectors of the territory.
In the Moncayo region, the use of forest resources from cleanings, thinnings and firebreaks
operations, as well as the rem
feedstocks.
Please describe if the new/adapted system/procedure is already integrated and
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Action Group and eight
other groups to develop and
Inforenergia. But it will begin in 2018 when it will be possible to propose improvements and
incidents developed. It is in an early stage.
Based on the results of the greenG
real cases and not only in
the transfer of the results we decided to request help to the Aragon government to develop the
“Aragon Infonergy Project” t
province of Teruel, so that
province of Teruel and part of Zaragoza.
In the Aragon infoenergía project, municipal ordinances
of public forests and the extraction of biomass, also models of agreements between private and
public owners for the extraction of forest and agricultural biomass.
greenGain
José María Lamana
Spain/Zaragoza/Tarazona
ASOMO (Asociación para el Desarrollo de las Tierras del Moncayo).
Field of work/Responsibility: Energy and climate change
describe briefly which, why and how the greenGain results have been implemented?
The Association for the Development of the Lands of Moncayo (ASOMO) is a non
association that currently manages in the Comarcas de Tarazona, Moncayo and Campo de Borja
Axis 4 of the Rural Development Program of Aragon 2007 -2013.The association
managed the Leader II and Leader Plus Community Initiatives.
The Association was constituted in 1994, under Law 191/64 of December 24 of Associations,
utes to the Organic Law 1/2002 of March 22 regulating the Right of Association
and complementary norms, with full legal capacity to act, lacking in profit and with the
objective of achieving the integral development of the Counties of Tarazona and Moncayo
ASOMO has a great diversity of partners: natural and legal persons, public entities as well as
companies, associations and other groups, representing all the economic, cultural and social
the use of forest resources from cleanings, thinnings and firebreaks
remsidues from the pruning of vine and olive, are the most important
Please describe if the new/adapted system/procedure is already integrated and
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
Omezyma has requested an aid which has been granted to this Local Action Group and eight
other groups to develop and execute Greengain practices in other territories called Aragón
Inforenergia. But it will begin in 2018 when it will be possible to propose improvements and
incidents developed. It is in an early stage.
the results of the greenGain project,ASOMO arises the need to implement
real cases and not only in the greenGain territory but in the neighboring territories
the transfer of the results we decided to request help to the Aragon government to develop the
“Aragon Infonergy Project” to create two logistic centers around eight
province of Teruel, so that within a range of 50 km collected and abantecer of biomass to all the
province of Teruel and part of Zaragoza.
In the Aragon infoenergía project, municipal ordinances have been drafted for the management
of public forests and the extraction of biomass, also models of agreements between private and
public owners for the extraction of forest and agricultural biomass.
greenGain: D3.8| 32
(Asociación para el Desarrollo de las Tierras del Moncayo).
describe briefly which, why and how the greenGain results have been implemented?
The Association for the Development of the Lands of Moncayo (ASOMO) is a non-profit
Moncayo and Campo de Borja
The association previously
The Association was constituted in 1994, under Law 191/64 of December 24 of Associations,
utes to the Organic Law 1/2002 of March 22 regulating the Right of Association
and complementary norms, with full legal capacity to act, lacking in profit and with the
objective of achieving the integral development of the Counties of Tarazona and Moncayo and
persons, public entities as well as
companies, associations and other groups, representing all the economic, cultural and social
the use of forest resources from cleanings, thinnings and firebreaks
pruning of vine and olive, are the most important
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
Omezyma has requested an aid which has been granted to this Local Action Group and eight
execute Greengain practices in other territories called Aragón
Inforenergia. But it will begin in 2018 when it will be possible to propose improvements and
rises the need to implement LCMW in
territory but in the neighboring territories too. After
the transfer of the results we decided to request help to the Aragon government to develop the
centers around eight territories of the
collected and abantecer of biomass to all the
province of Teruel and part of Zaragoza.
have been drafted for the management
of public forests and the extraction of biomass, also models of agreements between private and
17. Name and surname: Jose Manuel
Country/Region/City: Spain/Teruel/Molinos
Organization/Institution: CAIREField of work/Responsibility:
Please describe briefly which, why and how the greenGain results have been implemented?
The Aragonese Center for European Information has a lon
development office of Molinos and in the
In 1991, and under the initiative of the Town Hall of Mills, the
Maestrazgo (CEDEMATE) was set up
entities, including Diputación General de Aragón,
Molinos, associations of tourist entrepreneurs,
its inception, the center was
on rural development, encouraging private investment, job creation, etc.
In this territory, the use of forest resources from cleanings, thinnings and firebreaks, as well as
the remains of pruning of vine
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation
CAIRE has been positively committed to the idea of
the biomass logistics center in Teruel. In addition, farmers, owners of forest land, public
administration and forests are analyzing how to combine actions to ob
buy machinery for harvesting and serve the municipalities of the region, and reach agreements
between private owners and public of forest and agricultural biomass.
greenGain
: Jose Manuel
Spain/Teruel/Molinos
CAIRE Field of work/Responsibility: Energy and climate change
Please describe briefly which, why and how the greenGain results have been implemented?
he Aragonese Center for European Information has a long history
development office of Molinos and in the region of Maestrazgo.
the initiative of the Town Hall of Mills, the center for the
Maestrazgo (CEDEMATE) was set up. It is a non-profit organization t
entities, including Diputación General de Aragón, provincial council of
ssociations of tourist entrepreneurs, agrifood, tourist associations, unions, etc. Since
was responsible of the management of the Leader Program, focusing
on rural development, encouraging private investment, job creation, etc.
territory, the use of forest resources from cleanings, thinnings and firebreaks, as well as
the remains of pruning of vine and olive, are the most important ones.
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
implementation and eventual solutions for deviation.
CAIRE has been positively committed to the idea of technically supporting the development of
the biomass logistics center in Teruel. In addition, farmers, owners of forest land, public
administration and forests are analyzing how to combine actions to ob
buy machinery for harvesting and serve the municipalities of the region, and reach agreements
between private owners and public of forest and agricultural biomass.
greenGain: D3.8| 33
Please describe briefly which, why and how the greenGain results have been implemented?
g history related to the rural
enter for the development of
profit organization that was owned by 18
provincial council of Teruel , The Town Hall of
grifood, tourist associations, unions, etc. Since
the Leader Program, focusing
on rural development, encouraging private investment, job creation, etc.
territory, the use of forest resources from cleanings, thinnings and firebreaks, as well as
Please describe if the new/adapted system/procedure is already integrated and if
improvements have been recognized. Please also describe challenges that hindered
technically supporting the development of
the biomass logistics center in Teruel. In addition, farmers, owners of forest land, public
administration and forests are analyzing how to combine actions to obtain greater profitability,
buy machinery for harvesting and serve the municipalities of the region, and reach agreements