Cross-Border Infrastructure: A Toolkit Toll Road Financing Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent.

Upload: prahladtripathi

Post on 21-Oct-2015

11 views

Category:

Documents


3 download

DESCRIPTION

jsk

TRANSCRIPT

Page 1: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Toll Road Financing

Session on Finance

Sidharth Sinha

Indian Institute of Management, Ahmedabad

The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they

represent.

Page 2: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itForms of Government Support for Road Concessions

• Land acquisition

Expropriation of right of way for toll road construction. Cost

of land acquired maybe borne either by the government or

the concessionaire.

• Provision of development rights and third-party revenue

This measure involves the transfer of right of commercial

development along the toll road to supplement project

economics. The advantage is that this enhances project

economics but excessive dependence on this measure

may reduce incentive to make the road a success.

Page 3: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itGovernment Support for Road Concessions (continued)

• Construction of related facilities The government commonly provide for the construction

of connecting roads, access ramp, etc. This contributes significantly to the project since connecting roads and other facilities are critical elements for commencement of operation. However, construction delays may critically impair the commencement of operation.

• Revenue support Revenue support is usually done with a minimum

threshold for compensation paid by the governments During construction During operation

Page 4: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itGrant Supported BOTs

Grant During Construction

Grant During Operations

Extent of funds

leveraging

Lower, as the grant amount in capital structure reduces the amount of equity & debt raised in the project

Higher as the entire initial project investment is raised through debt & equity

Lender protection

Lower Lender dues entirely met through toll revenues

Higher part of lender dues assured through grant disbursement during operations regardless of project revenues

Cash flow impact from

road agency’s perspective

Grant amount to be disbursed by road agency within a short span of time, and during actual asset (road) creation

Grant amount to be disbursed by road agency over a longer period of time, after creation of asset

Page 5: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itGovernment Support for Road Concessions (continued)

• Revenue sharing with existing facilities Concession agreements which combine the

construction of new stretches with the rehabilitation and upgrading of an existing stretch

This would address the problem that the new stretches have low traffic densities making them commercially not viable.

Existing stretches could generate enough toll revenue to improve the cash flows of the concessionaire, especially during the construction stage.

Page 6: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itGovernment Support for Road Concessions (continued)

• Shadow toll

Government pays toll to the concessionaires according

to the vehicle - kilometers of the traffic counted

automatically. This provides for a means of introducing

private financing without stimulating resistance to tolling.

Possible financial burden/ fiscal inflexibility in later years

may hinder transition to real tolling.

Page 7: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itGovernment Support for Road Concessions (continued)

• Shadow toll (continued)

A modification to the conventional shadow toll model is

suggested, through payment of shadow tolls to the

Concessionaire by the road agency in two tiers:

A base payment which is assured regardless of

actual traffic on the road;

An additional payment per vehicle that actually uses

the road

This provides the concessionaire incentive to

improve the road condition and usage.

Page 8: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itFixed IRR or Assured Return

• Guaranteed level of net return on equity/project, taking the time value of money into account.

If the actual traffic is lower than the projected level, the concession period will get extended

Although this results in improved project economics, its effect on current cash flow is negligible.

• Since the fixed IRR model guarantees a return over and above the costs of the toll road operator, there is less incentive for cost efficiencies.

Standard problem with rate of return regulation

Page 9: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it Least Present Value of Revenue

(LPVR) Based Bidding

• The bidding variable is the present value of revenue throughout the life of the concession that firms are willing to accept to undertake the project.

• The duration of the concession is then flexible and depends on the effective traffic levels encountered.

• Encourages operating and capital cost efficiencies as opposed to fixed IRR mode

Page 10: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itImplications of LPVR

• Tolls can be adjusted without negotiation with the concessionaire

• They transfer political and demand-related risks to the user in the form of an endogenous concession period

• Calculation of compensation payments on concession termination is straightforward at any point in time during the concession period.

Page 11: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itRoad Funds

• Ring-fenced government sponsored special purpose entities

limits amount of liabilities arising from public support to public-private partnerships projects

assists to improve governance and transparency of the allocation of government contribution.

• Funded by government’s contribution (tax payers), fuel cess, user charges & donors-multilateral interventions.

Page 12: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itMaintenance Road Funds (ADB Report)

• Capital bias Even when the road budget is adequate for proper

maintenance, maintenance can still be inadequate, because of capital bias. Politicians want to build new roads.

‘The public mistakenly thinks the remedy for bad roads is renewal, not maintenance.’

• Unless a culture of (preventive) maintenance can become entrenched in a country, road maintenance and new roads, should not be funded from the same pot.

Page 13: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itSecond Generation Road Funds

• The concept of the second generation road fund and board is that of an autonomous agency

controlling the funding of road maintenance, directed predominantly by road users, having power to raise revenue and control funding

allocations, having a strong incentive to insist on commercially

and professionally efficient management.

Page 14: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itEvaluation of Road Funds

Road Funds Revisited: A Preliminary Appraisal of the Effectiveness

of the “Second Generation” Road Funds, World Bank, 2002

• The paper is based on detailed reviews of experience in seven African countries in which the World Bank has had some involvement in the establishment of second generation road funds

Most countries are still not able to fully fund their desired levels of road maintenance because of residual controls of the Ministry of Finance over the level of the fuel tax levy

Many countries are unable to disburse even those funds that are allocated because of the low absorptive capacity of the maintenance contracting sector.

Page 15: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itEvaluation of Road Funds (continued)

Despite this limitation on overall funding, there is already evidence of increased efficiency in implementation associated with greater security of funding and extended private sector contracting.

There is no strong and systematic link between the form of the fund (user majority on boards, private sector chair, etc) and their performance (reduction in costs, improvement in road condition). Even continued reliance on the budget for a substantial part of funding has not been a particular impediment.

Page 16: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itEvaluation of Road Funds (continued)

• “The elements which link and reconcile these conclusions in our sample of countries is a commitment of government to

facilitate a more businesslike approach to road maintenance, and

ensure that road maintenance receive high priority in budget allocation.”

• The importance of the creation of the funds has been as much an indicator of the willingness of the country and a focus for change of process as an essential mechanism for efficient maintenance policy.

Page 17: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Toll Roads - Case Study:Noida Toll Bridge Company Limited (NTBCL)

Page 18: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itBackground

• The river Yamuna that runs north-south forms a natural barrier that restrains expansion of Delhi to the east.

• The New Okhla Industrial Development Authority (NOIDA) in the neighbouring state of Uttar Pradesh established a new integrated industrial township in close proximity to Delhi.

• Noida located east of Yamuna is a township that is under development since 1976. Today it has become one of the satellite towns of Delhi.

Page 19: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itBackground (continued)

• The traffic that is generated by this satellite town is substantial and the interaction with Delhi is also substantial.

• The traffic between the east of river Yamuna including Noida and Delhi was of the order of 3,70,000 PCUs daily in 2002 and was serviced by three existing toll free bridges.

Page 20: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itProject Alignment

Page 21: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itBackground (continued)

• 30% of Delhi’s population lives across the river Yamuna

• NOIDA is inhabited by 700,000 people - 50% of whom commute to Delhi for work

• Population of Noida/Greater Noida will increase manifold over next few years

Page 22: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itProject Development

• Infrastructure leasing and financial services (IL&FS), NOIDA & the Delhi Administration (DA) reached an in-principle agreement for the implementation of a fourth bridge across the Yamuna, the Delhi Noida Toll Bridge, on build, own, operate & transfer (BOOT) basis.

• A tripartite memorandum of understanding (MoU) was signed between IL&FS, NOIDA, & DA on April 7, 1992 for establishing the new bridge and defining the scope and mutual obligation of the various partners.

Page 23: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itFormation of Project Company

• A steering committee consisting of representatives ofGovernment of Uttar Pradesh (GoUP), Delhi Government (DG), Ministry of Urban Affairs and Employment,

Government of India, Delhi Development Authority (DDA), NOIDA and IL&FS

Page 24: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itFormation of Project Company (continued)

• Noida Toll Bridge Company limited (NTBCL) was incorporated on April 8, 1996.

• NTBCL, is a special purpose company promoted by Infrastructure Leasing & Financial Services Ltd (IL&FS) for the purpose of development, construction, operation and maintenance of a bridge across the river Yamuna connecting Delhi and Noida on a build-own-operate-transfer (BOOT) basis.

Page 25: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itThe Project

• Bridge specifications An 8 lane link across the river Yamuna A 552 meter long main bridge, 3 minor bridges 8 lane approach roads on embankments A 27 lane automated toll plaza

• Time saving: Travel time from south Delhi to Noida reduced to 5 minutes as against 30/45 minutes via alternative routes

Page 26: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itThe Project (continued)

• Distance saving: 6-7 kilometers which implies petrol saving much in excess of toll rate (presently Rs 17/ trip for cars)

• Least polluted route

• Reduction in pollution/congestion in alternate routes due to traffic diversion

Page 27: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itStakeholders

• Government of India• Governments of Uttar Pradesh (UP) and NCT Delhi

(entered into a support agreement to the concession agreement)

• NOIDA - concession grantor• IL&FS - sponsor• The World Bank - line of credit to IL&FS• Kampsax International, Denmark - project consultants• Mitsui Marubeni Corporation, Japan - EPC contractor• Intertoll, South Africa - O&M operator• Users of the bridge

Page 28: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it

Govt. of NCT of Delhi

Govt. of Uttar

Pradesh

NOIDA

NTBCL

Support Agreement

Concession Agreement

Banks/FIs

Mitsui Marubeni

Corp. Japan

Intertoll South Africa

Investors

Indpt. EngineerIndpt. Auditor

Loan Agreement

Shareholders Agreement

EPC ContractO&M Contract

Page 29: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itMilestones

• Apr 1992: Signing of MOU

• Jun 1993: Appointment of Kampsax

• Jan 1996: World Bank review & approval

• Dec 1996: Delhi Development Authority Technical

Committee approval

• Nov 1997: Concession agreement signed

• Nov 1997: Delhi Urban Arts Commission approval

• Jan 1998: Support agreement

• Jan 1998: EPC contract awarded to MMC

Page 30: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itMilestones (continued)

• May 1998: Land acquisition completed

• Aug 1998: Regulation authorising toll collection

• Dec 1998: Appointment of O&M contractor

• Dec 1998: Financial close

• Dec 1998: Commencement of construction

• Feb 2001: Commencement of commercial

operations

• Oct 2001: Completion of connecting flyover

Page 31: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itPrincipal Challenges

• The Delhi Noida Bridge Project was the first large private sector initiative in the surface transport sector.

• NTBCL had to contend with several governments, multiple departments, and ever changing political and bureaucratic interfaces.

• As the first project of its kind, it did not have the advantage of precedence, either in documentation or with respect to financing.

• The project was also implemented during a fragile political and economic environment in the country and state/s.

Page 32: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itConcession Agreement - Toll Determination

• Recovery of costs through fees/tolls: Right of NTBCL to recover the project costs and

operation and maintenance costs through the levy of fees over the concession period.

• Fee review mechanism: One representative each of NOIDA, the concessionaire

and a duly qualified person appointed by the representatives of NOIDA and concessionaire who shall be the Chairman of the committee.

The fees shall be determined by the FRC based on the CPI for urban non-manual employees.

The fees will be revised on February 1 of each year.

Page 33: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itAssured Returns

• The concession agreement allows NTBCL to earn an assured return of 20% net of taxes, calculated on the total capital employed in rupee terms.

• The capital employed, calculated by the independent project engineer and independent auditor, includes

project costs cost of major repairs shortfall in recovery of assured returns in the preceding

year.

Page 34: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itAssured Returns (continued)

• The Concession could also be extended by two years at a time beyond the 30-year stipulated period, in case the assured returns are not achieved.

• NOIDA has the discretion of granting land development rights to support any shortfall in revenues required to earn the assured returns of 20%.

• Once the targeted return has been achieved, the project facilities would revert to NOIDA for a nominal value of Re.1.

Page 35: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itCurrent Toll Rates (valid till 31 Jan 2007)

The toll rates were arrived at using:

• willingness to pay surveys• user benefits & VOC

savings • user acceptability• achievement of contracted

returns over concession period

Vehicle category Toll Rate (Rs./Trip)

2 Wheelers 8

Cars/3-Wheelers 17

LCVs 35

Buses/Trucks 40 to 75

Page 36: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itSupport Agreement

• “Support agreement” was signed between the

Government of Uttar Pradesh (GoUP) and the

Government of NCT Delhi (DG) on 14 January 1998.

The salient features of the Support Agreement are:

Leasing of the lands pertaining to the project site

and adjacent areas.

Obtain all necessary clearances from the Municipal

Corporation of Delhi.

Page 37: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itSupport Agreement (continued)

Not to allow construction of any other passage across the Yamuna which is toll free or charges lower toll than the Noida Bridge within a radius of 5 kms from the Delhi Noida Bridge site for a period of 10 years or till the Noida Bridge achieves full rated capacity, whichever is later, without the written consent of NTBCL.

• In the event of any breach of the support agreement GoUP and/or DG shall compensate NTBCL and/or NOIDA for any costs incurred by them and the lenders pertaining to the project.

Page 38: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itO&M Agreement

• O&M contract awarded to M/s Intertoll, South Africa on the basis of competitive bidding. Key contract features:

US$ 2.3 million equity participation US$ 2.2 million performance guarantee Intertoll shares traffic risk with NTBCL – the O&M fee for

first 10 year is directly related to the revenue generation Revenue leakage capped at 0.1% with strong penalties

• After 10 years the O&M fee will comprise of : Variable fee @ Rs 0.725 (US$ 0.015) per vehicle Fixed fee @ Rs 31.9 million (US$ 750,000) per annum

Page 39: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itAllocation of Risks

• Commercial and revenue risks - NTBCL

• Sovereign and political risks - Governments of UP and Delhi

• Time overruns - EPC contractor

• Operation & maintenance - O&M contractor

• Natural force majeure - Insurance

Page 40: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itRisk Mitigation Framework - 1

Risk Mitigation

Delay in completion

• Robust project scheduling

• Liquidated damages/Incentives on contractor

Increase in costs

• Detailed engineering prior to start of work

• Value engineering during construction phase

Revenue risks

• Alternative sources of revenue - development rights

• Extension of concession period if assured rate of return not achieved

Technology risks

• Selection of state-of-art tolling technology designed to cater for at least 8-10 years

• Periodic upgradation

Interest rate • All debt contracted are based on fixed rate of interest

Page 41: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itRisk Mitigation Framework - 2

Risk Mitigation

Revenue leakage

• Internationally reputed toll management company

• Self auditable toll management system with automatic vehicle classification (AVC)

• Revenue of operator linked to toll collection

• Operator to make good any loss of revenue

Regulatory risk (delay in toll revision)

• Pre-determined formula for revision in tolls

• Independent fee review committee

• Revisions do not require approval of NOIDA/Gov’t.

Natural force majuere risks

• Insurance policy

Page 42: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itRisk Mitigation Framework - 3

Risk Mitigation

Political risks • Concession agreement provides compensation formula for various types of direct and indirect political risks

• NOIDA to pay lender’s dues as well as cumulative equity returns in case of termination due to political risks

Competing routes

• Delhi Government has undertaken not to build an toll free facility until project achieves full capacity for a continuous period of 6 months

Inflation • Toll rates linked to consumer price index

Page 43: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

it Equity Amount (Rs Million)IL&FS 360.0NOIDA 100.0IFCI 50.0FCD Issue 207.8International Funds 400.0Intertoll (O&M Operator) 106.2

Total Equity 1224.0DebtDeep Discount Bond issue 500.0IL&FS (World Bank L/C) 600.0RTL from FIs/Banks 1758.0

Total Debt 2858.0

Financing Plan

Page 44: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itPublic Issue

• First green-field infrastructure project to raise equity and debt from capital markets through

Secured deep discount bonds (DDBs) aggregating Rs. 500 million

Secured fully convertible debentures (FCDs) aggregating to Rs. 207.8 million

• This was also the first initial public offering with take out financing arrangement

Page 45: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itTake-Out Financing

• Take-out financing facility offered by IDFC and IL&FS in the 5th and 9th years at the following rates :

Event Amount Yield

End of 5th Year Rs. 9,500/- 13.70%

End of 9th Year Rs. 16,500/- 14.19%

Page 46: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itClass-Wise Traffic Performance No. of Vehicles Per Day

Year ended 31 March 2001* 2002 2003 2004 2005 2006**

Cars 12,050 15,318 26,645 33,483 37,058 42,056

Two wheelers 4,833 6,684 10,969 12,935 14,590 16,828

Commercial vehicles 278 632 860 1128 1213 1299

Total traffic 17,161 22,634 38,474 47,547 52,860 60,184

Growth rate 32% 70% 24% 11% 14%

Projected traffic 97,452 103,836 110,274

Average revenue (Rs.)

Per vehicle 12.85 11.66 11.68 12.92 13.94 14.62

Per day 220,461 262,495 449,340 614,279 736,722 879,942

Growth rate 19% 71% 37% 20% 19%

* with effect from 7 February 2001 ** April 2005 to December 2005

Page 47: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itFinancial Performance

Page 48: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itNTBCL Share Price History

Page 49: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itDebt Restructuring

• Original project debt was contracted at an average cost of

15% pa.

• In view of the downward interest rate trends and revised

cash flow projections, the effective cost of term loans was

reduced to 8.5% pa.

• DDBs were restructured w.e.f. Nov 2004 with revised

interest yield of 8.5% pa and are proposed be refinanced in

the current financial year.

• The debt restructuring exercise has been fully completed

and the current carrying cost of debt is 8.5% pa with

complete repayment by 2017.

Page 50: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itValuation of Company

• Market capitalization=Rs. 35*122.4 million= Rs.4,284 million

• Debt book value = Rs.3,700 million

• Approximate enterprise value Rs.8,000 million

• Discounted cash flow value15 year cash flows Rs.7,000 millionTerminal value Rs.9,426 million

Page 51: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itLearnings

• Problem of long-term funding to realize value.

• The back-ended revenue profile coupled with high

interest rates lead to restructuring of NTBCL’s debts.

• The concession extension approach assumes that

investors are indifferent about the time period over

which they earn their return.

Page 52: Finance_05 Toll Road Financing - 29 Jan 07

Cro

ss-B

orde

r In

fras

truc

ture

: A T

oolk

itLearnings (continued)

• Financial markets may not offer funds with uncertain debt service and maturity. In that case, sponsors may be unwilling to participate in a concession in which the concession term is uncertain because they would be unable finance the project.