Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC – ZONE 4/1 Location : Khalifa City ZONE – 4/1 Dated: 24-02-2015 Document # RA/F/02/15RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENTS/N
HAZARDRISK Risk Rating CONTROL MEASURES Residual Risk Responsible
person Probability (P)
Severity (S)
Rating (P) x (S)
Probability (P)
Severity (S)
Rating (P) x (S)
01 Storage of materials , chemicals, quantity, location, characteristic of materials (flammable/explosive/oxidizer)
Increased risk of fire starting
4 4 16 Ensure that correct storage of materials , hazardous substance assessment done and available for all substances.
Ensure that only minimum amount shall be stored on site.
Ensure that MSDS is available.
Ensure that chemical containers are labeled.
Ensure that chemical containers are closed properly.
Ensure that impervious flooring and bunded area provided .
2 1 2 Storekeeper
02Potential ignition source, Hot work, smoking, electrical hazard,
Increased risk of fire starting
Loss/Damage
4 4 16 Ensure that electrical inspection and testing regime are followed.
Ensure that PTW is raised for maintenance work involving hot work
Designated smoking areas are available with appropriate facilities for extinguishing cigarettes.
2 1 2 Administration officer.
Page | 1 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC – ZONE 4/1 Location : Khalifa City ZONE – 4/1 Dated: 24-02-2015 Document # RA/F/02/15RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENTS/N
HAZARDRISK Risk Rating CONTROL MEASURES Residual Risk Responsible
person Probability (P)
Severity (S)
Rating (P) x (S)
Probability (P)
Severity (S)
Rating (P) x (S)
03 Means of escape and evacuation Delayed evacuation
4 4 16 Ensure that regular checks of escape routes are conducted.
Regular Fire drill is conduced. Encourage reporting of fire
hazards
2 1 2 Electrical Engineer/Administration officer/EHSE.
04 Lighting and emergency lightings.
Personal Injury/Delay in evacuation
4 4 16 Monthly checks of emergency lighting recorded and defects reported.
2 1 2 Administration Officer
05 Signage and information Confusion and delayed in evacuation
4 5 20 Ensure that correct signage is displayed conspicuous locations.
Signage to be displayed in Arabic and English language.
Ensure that Fire Emergency Evacuation Plan , Procedures and emergency contact numbers are displayed at noticeable locations.
2 1 2 Office Engineer /EHSE
06 Arson Injury/Loss to property
4 4 16 Ensure that security is available during out of working hours.
Ensure that security is trained.
Ensure that area is secured and fenced properly
2 1 2 Administration Officer
07 Fire Fighting Equipments Failure to mitigate small
4 5 20 Fire extinguishers sited properly , serviced and
2 1 2 PM/HSE
Page | 2 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC – ZONE 4/1 Location : Khalifa City ZONE – 4/1 Dated: 24-02-2015 Document # RA/F/02/15RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENTS/N
HAZARDRISK Risk Rating CONTROL MEASURES Residual Risk Responsible
person Probability (P)
Severity (S)
Rating (P) x (S)
Probability (P)
Severity (S)
Rating (P) x (S)
fires resulting to further loss
maintained. Fire hydrants and fire hoses
are inspected and maintained as per Civil Defense requirements.
Ensure that civil Defense NOC is available and valid.
08 Alarms and systems Injury/Loss of property
4 4 16 Ensure that Fire Alarm system is maintained and records are kept
2 1 2 Electrical Engineer
09 Spread of Fire Injury/Loss of property
4 4 16 Fire door are fitted and kept closed.
Regular checks of escape routes including storage of flammable materials
2 1 2 Administration Officer
RISK MATRIX
Seve
rity
5 0 5 10 15 20 25 Probability Severity
Risk =Probability X severity
4 0 4 8 12 16 20 Rating 0 = Zero to very low Rating 0 = No injury or illness3 0 3 6 9 12 15 Rating 1 = Very unlikely Rating 0 = First aid injury or illness2 0 2 4 6 8 10 Rating 2 = Unlikely Rating 1 = Minor injury or illness1 0 1 2 3 4 5 Rating 3 = Likely Rating 2 = Lost Time injury or illness0 0 0 0 0 0 0 Rating 4 = Very likely Rating 3 = Major injury or illness
0 1 2 3 4 5 Rating 5 = Almost Certain Rating 4 = Fatality / Disability injuryProbability Acceptable Further review Unacceptable
Page | 3 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC – ZONE 4/1 Location : Khalifa City ZONE – 4/1 Dated: 24-02-2015 Document # RA/F/02/15RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENTS/N
HAZARDRISK Risk Rating CONTROL MEASURES Residual Risk Responsible
person Probability (P)
Severity (S)
Rating (P) x (S)
Probability (P)
Severity (S)
Rating (P) x (S)
Prepared by:
Khawaja Abdul WahedRamodkumar
Date:
25th of January 2015
Reviewed by:
EHS Engineer
Approved by:
Project Manager:Consultant Approval: Date: Approval:
Resident Engineer:
Page | 4 of 4