First Phase of the European Supergrid. InnoQube Conference London, 20 January 2011 Ana Aguado – CEO, Friends of the Supergrid. The Friends of the Supergrid : “is a group of companies and organisations with a mutual interest in promoting the policy agenda for a European Supergrid .”. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: First Phase of the European Supergrid

First Phase of the European Supergrid

InnoQube ConferenceLondon, 20 January 2011Ana Aguado – CEO, Friends of the Supergrid

Page 2: First Phase of the European Supergrid

www.friendsofthesupergrid.eu

The Friends of the Supergrid:

“is a group of companies and organisations with a mutual interest in promoting the policy agenda for a European Supergrid.”

Page 3: First Phase of the European Supergrid

www.friendsofthesupergrid.eu

Definition of Supergrid

“an electricity transmission system, mainly based on direct current, designed to facilitate large-scale sustainable power generation in remote areas for transmission to centres of consumption, one of whose fundamental attributes will be the enhancement of the market in electricity.”

Page 4: First Phase of the European Supergrid

Policy and Regulatory aspects

• A single planner: Entso-e

• A single operator: ISO

• A single grid code: Entso-e

• A single European regulator: ACER

• Regulated financing: merchant and socialised

• Ownership by interested investors

• Technology: interconnected system mainly by HVDC

Page 5: First Phase of the European Supergrid

Supergrid Phase one

This proposal recognises the willingness of countries such as the UK, Germany, Norway and Belgium to connect a further respectively 25GW of offshore wind to their already congested networks by 2020 or to trade up hydro generation in markets where prices are higher.

Page 6: First Phase of the European Supergrid

1- Financing the first phaseTransmission Use of System (TUOS) Charge is paid by the

direct users of the system.- Project finance:

Capex = €28 billion (2010 value) 30 % Return on Equity 23 GW of Wind at 40% Capacity Factor must carry the cost 6 year build out with 40 years of operation

- Capacity Factor: 40% - if the wind alone trades on the system 90% - when wind and other energy/service providers use the network

Result: from 4.67 cents to as low as 1.55 cents per kilowatt- hour (c/kWh) depending on gearing and utilisation.

Page 7: First Phase of the European Supergrid

2- Financing the first phase

Socialised Cost model - where the costs are recovered through the electricity retail tariff in the connected countries (Germany, UK, Norway and Belgium).

Assumptions: Income: 2,820,720,000€ / annum Total Energy consumption: 1,241,853GWh / annum (IEA source) Cost: 2.27€ / MWh

Result: an increase in the retail tariff of 0.23 cents per kWh over 40 years.

Page 8: First Phase of the European Supergrid

Technology for Phase 1SuperNode interconnects a number

of DC links together with wind parks via a small islanded AC network (node).

It is an important advantage of this concept that it is largely based on technology existing today.

The preferred DC transmission technology for building SuperNodes is VSC (Voltage Sourced Converter)

Page 9: First Phase of the European Supergrid

Thank-you

Ana Aguado – CEO, Friends of the [email protected]