Subscribe Print Permalink Share Blogs First steps to work with Change Request Management scenario Dolores Correa Business Card Company: SAP Spain Posted on Jul. 26, 2008 06:20 AM in SAP Solution Manager First steps to work with Change Request Management scenario With the following steps you will be able to create a test landscape to practice with the Charm scenario in Solution Manager 7.0 without creating interferences with real TMS landscapes. Also I will try to give tips and tricks for the common mistakes in the configuration of this scenario. The configurations given are valid for Solution Manager 7.0 since SP9 and above. Step 1- Create the test landscape Usually you would like to use Charm to manage the changes in this kind of TMS landscapes: DEV:100 -->QUA:200 -->PRD:300 The test landscape that I am proposing is this one: your Solution Manager is installed in system SMM for example, and you are configuring client 001 for being used as Charm client, them SMM:001 is your Charm client. Create three additional clients in SMM, like local client copy from client 000 with SAP_ALL profile (this will need some extra space in SMM system, but not too much), let say you create clients 100, 200 and 300. We assume that SMM:100 is going to be the Development system, SMM:200 the Quality system and SMM:300 is the Production system. In SCC4 assign the following client settings, roles, etc. to these clients, this is important! Customizing role for SMM client 100 Test role for SMM:200 Production role for SMM:300 SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429 1 of 27 26-01-2011 18:54

Upload: alihamed-sa

Post on 03-Apr-2015

1.468 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: First steps to work with Charm

Subscribe

Print

Permalink

Share

Blogs

First steps to work with Change Request ManagementscenarioDolores Correa

Business Card

Company: SAP Spain

Posted on Jul. 26, 2008 06:20 AM in SAP Solution Manager

First steps to work with Change Request Managementscenario

With the following steps you will be able to create a test landscape to practice with the Charm scenario in Solution Manager 7.0 withoutcreating interferences with real TMS landscapes.

Also I will try to give tips and tricks for the common mistakes in the configuration of this scenario.

The configurations given are valid for Solution Manager 7.0 since SP9 and above.

Step 1- Create the test landscape

Usually you would like to use Charm to manage the changes in this kind of TMS landscapes:

DEV:100 -->QUA:200 -->PRD:300

The test landscape that I am proposing is this one: your Solution Manager is installed in system SMM for example, and you areconfiguring client 001 for being used as Charm client, them SMM:001 is your Charm client.

Create three additional clients in SMM, like local client copy from client 000 with SAP_ALL profile (this will need some extra space inSMM system, but not too much), let say you create clients 100, 200 and 300.

We assume that SMM:100 is going to be the Development system, SMM:200 the Quality system and SMM:300 is the Productionsystem.

In SCC4 assign the following client settings, roles, etc. to these clients, this is important!

Customizing role for SMM client 100

Test role for SMM:200

Production role for SMM:300

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

1 of 27 26-01-2011 18:54

Page 2: First steps to work with Charm

The indications given for this test case from now on also apply to for your real TMS landscape, to DEV, QUA and PRD system.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

2 of 27 26-01-2011 18:54

Page 3: First steps to work with Charm

Note:

In ChaRM we do support two-system landscape, to use it you should firstly configure the consolidation route in STMS correctly.

Then set up the development system as type of role "Source System", and production system as type of role "Production System"in your project system landscape. In such projects there should be no target system needed.

Please always keep in mind that production system is very special in ChaRM so make sure there is at least one in each of your project.

See that in two-system landscape no test transport will be generated for normal correction SDMJ, since officially this functionality isonly designed for test system, see note 1419150 ChaRM: Transport of Copies (ToC) with two-system landscape.

Step 2- Configuration of TMS for this scenario according to Charm prerequisites

In Solution Manager, in client 000, call STMS (the same must be done in the domain controller system of your real landscape)

Note: SMM client 001 does not need to take part of your TMS landscape.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

3 of 27 26-01-2011 18:54

Page 4: First steps to work with Charm

Select Transport Routes icon:

For this test landscape initially you have system SMM and none transport route defined (for a real landscape you will have the threesystem boxes DEV, QUA and PRD):

Make double-click on system SMM and fill the following values (or in the box of the development system and after in the quality box):

In System Attributes tab: the use of Single transport is a prerequisite for Charm for all the systems in the landscape; you will see this indetail in section Step 3.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

4 of 27 26-01-2011 18:54

Page 5: First steps to work with Charm

In Standard Transport Layer tab: ensure you enter the client 100, (client with customizing role for the development box, client with testrole for the quality box).

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

5 of 27 26-01-2011 18:54

Page 6: First steps to work with Charm

Create the consolidation transport routes to SMM:200, transport route must be CLIENT SPECIFIC for the use in Charm scenario, this isreal important!

From development system to quality system you need at least two consolidation routes, SAP and ZXXX.

Go with the pencil from the system SMM to system SMM and get this pop-up:

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

6 of 27 26-01-2011 18:54

Page 7: First steps to work with Charm

I create the consolidation route for transport layer SAP and I do the same to create transport route for transport layer ZSMM (forcustomer developments).

In case of a real landscape you need to choose from which system to which system and client.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

7 of 27 26-01-2011 18:54

Page 8: First steps to work with Charm

I make the same to create the Delivery transport route from SMM:200 to SMM:300, delivery routes are always from quality toproduction systems.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

8 of 27 26-01-2011 18:54

Page 9: First steps to work with Charm

Finally you will get the following situation:

Save and distribute the changes:

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

9 of 27 26-01-2011 18:54

Page 10: First steps to work with Charm

All the previous work has to be done in the satellite systems in real landscapes.

Step 3- Review of the main configuration points in SPRO

1. All point under SAP Solution Manager -->Configuration -->Basis Settings must be performed.

Especially important point is:

RFC connections from Solution Manager to DEV, QUA and PRD system, don’t forget to create also SM_..._TMW connection to allsatellites DEV, QUA and PRD, to clients with customizing, test and production roles, in our example, we will create the RFC connectionto 100, 200 and 300. Also to client 000 of all the involved systems, DEV, QUA and PRD systems in our example.

In transaction SMSY:

Also you need to create the RFC connections from Solution Manager SMM:001 to client 000 in the system that is the domain controllerof your real landscape, this is really IMPORTANT!!! You will see more information about this in spro point “Generate RFC Destinationsto Client 000"

Note: usually the domain controller is always in DEV system as this was the first system in the landscape to be installed. If you movethe domain controller to PRD system, as it is recommended, don´t forget to create the RFC connection to client 000 of this domaincontroller system.

2. In SPRO go to Scenario-Specific Settings-->Change Request Management -->Standard Configuration

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

10 of 27 26-01-2011 18:54

Page 11: First steps to work with Charm

General Activities:

2.1. Run “Activate Integration with Change Request Management”

After this check in SM30 that view BCOS_CUST has the following entries:

CHARM W NONE CUST620 1.0

CHARM_DEST W NONE CUST620 1.0

This means that Charm configuration has been done in this client.

2.2. Activate BC Sets: Check note 903527

Bc Set for Charm: SOLMAN40_CHARM_BASICFUNC_001

Under Transport Management System check the following in detail:

2.3. Define Transport Routes for System Landscape: already explain in steps above

2.4 Activate Extended Transport Control: apply this point to all systems in real scenario

2.5 Configure Transport Strategy: apply this point to all systems in real scenario

2.6. Activate TMS Trusted Services: apply this point to all systems in real scenario

2.7. Activate Domain Links: you have to create inter-domain links

If you go to STMS in the solman system you can see that the solman system is in transport domain DOMAIN_SMM for example.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

11 of 27 26-01-2011 18:54

Page 12: First steps to work with Charm

In your real landscape, DEV, QUA and PRD will belong to another transport domain, usually called DOMAIN_DEV.

What you need to do in this spro point is to make these two transport domains known each other, I mean as the solman system isgoing to call TMS functions in the transport domain of DEV, QUA and PRD, the TMS of solman must know this other transport domain.

From help.sap.com:

To request a link between two transport domains, proceed as follows:

- Log on to one of the two domain controller systems, in solman system for example.

- Call transaction STMS (always being in client 000).

- Choose Overview --> Systems.

The system overview appears.

- Choose SAP System-->Create --> Domain link.

The dialog box Request for Linking 2 Domains appears.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

12 of 27 26-01-2011 18:54

Page 13: First steps to work with Charm

Enter system name, DEV for example, hostname where is installed the system and system number, all this information is in SM51 ofthis DEV system, if DEV system is the domain controller of your real landscape.Your SAP System performs the following actions automatically:- Generates the required RFC destinations. - Sends the address data ofthe controller to the controller in the other domain.After you have to logon in the domain controller, client 000, of your real landscapeand confirm the link between these two domains as follows:

- Log on to the domain controller in the other domain.

- Call Transaction STMS in client 000.

- Choose Overview -->Systems. The system overview appears.

- Position the cursor on the domain controller where you requested the domain link, DOMAIN_SMM in our example, and choose SAPSystemà Approve.

- Confirm the prompt and distribute the configuration.

The two domain controllers now exchange all necessary information about the systems in their domains. This information is distributedto all systems in the domain whose controller you are currently logged on to. A transport profile is generated, which contains allsystems in both domains.

You have to see something like this in your solman system (called SSM in this real example):

And this in the DEV system (called ED4 in this real example):

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

13 of 27 26-01-2011 18:54

Page 14: First steps to work with Charm

To check that the domain link is ok go in solman system and in development system to STMS->transport routes, in the top of thescreen you will see that in solman system the systems belonging to the other transport domain appear like boxes and the same if yougo to STMS in DEV system, the box of the solman system can be seen.

The information about the systems in the other domain is not automatically distributed to the systems in the domain where yourequested the domain link. This means that you must distribute the new configuration to these systems.

2.8. Generate RFC Destinations to Client 000: already explained.

2.9. Add Import Authorization to Operator/Administrator: According to note 913232

"Therefore, the TMS requires that the people responsible for the import (operator or administrators with import authorization) have auser in the client 000 of the target system".

This means that you need to define these users in the client 000 of all target systems involved in the landscape with importauthorizations.

Under Change Request Management:

2. 10. Set Project Assignment of Requests as Mandatory: not totally mandatory but this will avoid users creating transport ordersdirectly in development system. All transport orders in development system in your real landscape must be created from the solmansystem via a Change Request.

2. 11. Maintain Number Ranges: run this.

None of the configuration points under “Extended configuration” are required if you want to use the standard Charm scenario.

Now you are ready to create a project.

Step 4. In Solution Manager go to transaction SOLAR_PROJECT_ADMIN

Please go to http://service.sap.com/rkt-solman

Select SAP Solution Manager 7.0, select Learning Map for Supp Organizations/Serv providers, open Change Request Managementsection and see the iTutor called:

“Create a Project”

The main points in the creation of a project for Change Request Scenario are:

- Decide if your project is an implementation or a Maintenance project; see the differences in the Solution Manager Documentation. Forour test case select a maintenance project.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

14 of 27 26-01-2011 18:54

Page 15: First steps to work with Charm

- In System Landscape Tab

o Systems: here you have to enter your logical component

Take into account that all systems that belongs to the TMS landscape must be assigned to the same logical component,because all system must have the same product version (exception in case of an upgrade).

This means that in the same logical component each system must have assigned a role, you can have a minimum of twosystems for Charm scenario but you can have for example 5 systems with different roles in your real landscape.

In our test case you will have this:

Always define here the same landscape that you have defined in the STMS of the real landscape, if not the Charm scenario can not beactivated. This point is always the point that more problems gives in the activation of Charm scenario!!!

- In IMG project tab: define always a project in the development system ONLY! You need to define this project in the developmentsystem in order to assign to this project all transport orders that you are going to create via a Change request in the solman system,this is a prerequisite for Charm scenario!

See the above iTutor to see how to define this IMG project.

Don’t define IMG projects in other roles, systems, different to development.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

15 of 27 26-01-2011 18:54

Page 16: First steps to work with Charm

- In Change Request tab: Select “Activate Change Request Management”

Select Create Task List

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

16 of 27 26-01-2011 18:54

Page 17: First steps to work with Charm

Select the name of your Maintenance Cycle also called Project Cycle.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

17 of 27 26-01-2011 18:54

Page 18: First steps to work with Charm

Note: Choose Lock/Unlock Grroup/Subsequent Groups to unlock the tasks in the task list.If all is working correctly a Task List and a Maintenance transaction type SDMN (called Service Desk Transaction in the screenshot) isbeing created.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

18 of 27 26-01-2011 18:54

Page 19: First steps to work with Charm

Service Desk Transaction Tab: This tab is not appearing in SP9 but appears in SP13 and above and shows the SDMN document for thisproject cycle.

The task list is one representative of the cycle and represents the system landscape tracks with tasks to be used by an IT operator formanaging project related IT activities, especially imports.

The SDMN transaction represents the service request for managing the phase changes.

In SP9 you went to Task List to Activate the maintenance cycle and also to change the phases of this maintenance cycle, in SP13 andabove it are recommended to go to the maintenance transaction directly, via CRM_DNO_MONITOR (select transaction type SDMN) andactivate and change the phase via Actions in the transaction directly.

So, phase shifts should be done from within the cycle transaction SDMN but not from within the tasklist.

In case of the Task list in not created please run the Check (transaction /n/tmwflow/charmchk) or go to the Application Log via thebutton or calling SLG1 directly.

In both place you will get information above the reasons why the Task List and the Maintenance Cycle is not being created.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

19 of 27 26-01-2011 18:54

Page 20: First steps to work with Charm

As summary pay special attention to the following points:

- Ensure that the Logical Component in Systems tab and the TMS information in STMS in the domain controller of your real landscapefits together

- Transport routes must be set client specific

Now is time to check the RKT material, iTutors:

- Regular correction

- Urgent correction

to fully understand the complete process.

When everything in the test scenario is running fine, then you can connect the Production System landscape to Solman system.

This will ensure that you do not stop the TMS in the production landscape. Update information of Charm can be found in:

907768 “General note for Change Request Management ST 400”

881553 “Roles for Change Request Management (SAP Solution Man 7.0)”

For further information about the Charm scenario see also the following SDN blogs:

- Change Request Management scenario: Usual questions

- Change Request Management scenario: Working examples

- Change Request Management scenario: Retrofit Functionality

Dolores Correa is a technology consultant for SAP Spain.

Your comments and experiences about the contents are very welcome.

Comment on this weblog

Showing messages 1 through 31 of 31.

Titles Only Main Topics Oldest First

Connect to production landscape

2010-12-15 04:32:15 Natalyia Veleva Business Card [Reply]

Hello Dolores,

you wrote:

"When everything in the test scenario is running fine, then you can connect the Production System landscape to Solman system.

This will ensure that you do not stop the TMS in the production landscape."

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

20 of 27 26-01-2011 18:54

Page 21: First steps to work with Charm

Could you please explain this step in detail?

As far as I know, you need to switch the production landscape to client specific and completely change the transport routes so that

they can be client specific. One also has to create a new ChaRM project and activate it. The production project can not be activated

if the production landscape is not client specific.

Background job

2010-07-07 22:13:26 Nayab Siddiqui Business Card [Reply]

Hi,

This error occurs if the background job is not scheduled

Error in background job for program RSGET_SMSY error message No active job found

Why it is required and do I need to schedule background job, each time the project is created.

Regards,

Nayab

Problems with creating _TRUSTED RFC conns to SolMan clients

2010-06-17 00:44:30 Nenad Nikolic Business Card [Reply]

Hi Dolores, thank you for nice blog. However, I have a problem performing the described steps.

How do you create multiple trusted RFCs from one client in SolMan to other clients in the same Solman (step 3)?

Please take a look at forum's toppic where I explained my problem:

http://forums.sdn.sap.com/thread.jspa?forumID=156&threadID=1712261

Thank You in advance for Your help.

Nenad

Grate Work

2010-05-25 22:03:36 kalenthiran p Business Card [Reply]

HI,Really help me lot,in my case We have three system landscape (DEV,QA,PRD),in dev we have two client (100,200)we are doing

customizing in client 100 and workbench changes in client 200,QA 300 PRD 330.for charm configuration how i have do define

transport layer and route and logical componet

Grate Work

2010-05-27 06:59:44 Dolores Correa Business Card [Reply]

Hello,

See SDN blog:

Change Request Management scenario: Usual questions and known errors

https://weblogs.sdn.sap.com/pub/wlg/15116

Point 1 and 2.

Hope this helps,

Dolores

Grate Work

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

21 of 27 26-01-2011 18:54

Page 22: First steps to work with Charm

2010-06-03 23:56:11 kalenthiran p Business Card [Reply]

Hi,

Thanks,its working.How and where i can define change manager for a system or Ibase.

Outstanding!

2010-05-13 14:13:40 Jose Garcia Business Card [Reply]

Thanks for taking the time to do this; well done.

Jose

Charm configuration

2010-03-02 04:14:13 Ana Abad Business Card [Reply]

Hello Dolores,

I'm following your detailed steps to configure the charm, but I allways get the following errors:

- Warning: Problems occurred during synchronization of the system landscape --> When I activate the change request management

in solar_project_admin transaction.

- The project is not released. Hence cycle can not be created -- when I push the buttom "create task List" in the same transaction.

The system landscape are two system: dev --> prod, we don't have quality system. Could it be the cause of the errors?

How can I follow the configuration?

Thanks for you help and you great blog and best regards,

Ana.

Charm configuration

2010-03-10 12:27:32 Kevin Richman Business Card [Reply]

Ana,

From what I have seen and experienced, ChaRM really wants a 3 system landscape at a minimum. Even if this means creating

a logical component and transport route that goes through 2 clients on your dev system (1 for Config/Dev, and 1 that can be

used for Test) before going to prod, or creating a virtual QA system that can be included in your transport routes and

landscape.

Charm configuration

2010-03-02 05:02:02 Dolores Correa Business Card [Reply]

Hi Ana,

Send me an email to [email protected], I will call you if you want.

Best regards,

Dolores

Configuration For WorkFlow In Solution Manager

2009-08-11 05:09:27 Sandeep Menon Business Card [Reply]

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

22 of 27 26-01-2011 18:54

Page 23: First steps to work with Charm

Hi Dolores ,

I have a requirement to do a workflow for Transaction 'CRM_DNO_MONITOR' In Solution Manager. If you have any information

details on the configuration for workflow, Any business object that can be used for workflow . Please do provide me the details.

There are two process,

1. I need the workflow to trigger when a ticket is created

2. When the status of the ticket is changed.

Very helpful Blog

2009-07-09 23:23:38 Amrita Amrita Business Card [Reply]

Its really helpful blog. Very good effort.

Amrita

Great post!

2009-06-15 16:44:51 Fabio Sato Business Card [Reply]

Hello Dolores.

Your posts are perfect! I made a SDesk and a ChaRM only with your informations. Thank you so much. Now i have a issue and i

believe then only you can help me to resolved.

In ChaRM, on schedule plan, before the request importation to QAS, if i change the status to "Go Live", is able to me to import the

request to productive environment. Wouldn't have a check or a lock on this schedule. The status of the correct document is "in

develop". Can you help me?

Sorry for this inconvenience. I already try everything.

Great post!

2009-06-16 13:06:03 Dolores Correa Business Card [Reply]

Hi Fabio,

Could you please give me your e-mail address? I will send you some slides where you can see which action can be done in each

phase for normal and urgent correction.

Best regards,

Dolores

Great post!

2009-09-16 05:05:42 nsingh sihag Business Card [Reply]

Hi Dolores!

we are having a different scenario. Our Landscape is something like this.

ECD(DEV)->EC1(QA1) and

EA2(QA2)->EAP(PRD)

we are not having any network connectivity in between DEV-QA1 to QA2 and PRD. DEV and QA1 are in one network and

QA2 and PRD are on other network.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

23 of 27 26-01-2011 18:54

Page 24: First steps to work with Charm

Now we need to implement ChaRM from Dev to PRD, so please suggest me how to implemet this. Whether this is possible

or not? what different settings we have to do from standards.

Aslp please send me the configuration Docs and Slides on my mail ID [email protected].

It would be very great if you suggest us on this.

thanks

narpal

Great post!

2009-06-18 13:17:22 Srujan Kumar Jakkampudi Business Card [Reply]

Hi Dolores,

Your compilation helped me a lot in understanding the underlying concept of Service Desk and Charm Activation. Can you

pls share the slides that you mentioned to send Fabio.

My email id is [email protected]

Thanks in advance.

Srujan

Great post!

2009-06-17 05:46:11 Fabio Sato Business Card [Reply]

Hello Dolores.

Thank you so much. You are my reference in Solution Manager.

My email: [email protected]

Best regards,

Fabio Sato.

CHARM with multiple DEV and QA systems

2009-05-06 10:27:45 Brad Donovan Business Card [Reply]

Hi - We have a complex landscape, in which we have multiple DEV (AGD/AGM) and QA (AGQ/AGV) systems. Is it possible to

configure CHARM to use in this scenario?

CHARM with multiple DEV and QA systems

2009-07-03 02:20:01 Sadi Yilmaz Business Card [Reply]

Hi Brad,

We have the same landscape, could you find any solution for this scenario?

one question about charm landscape

2009-04-30 19:24:11 Carol Wang Business Card [Reply]

do you meet such scenario: one DEV -> one QAS-> two prd? can this possibe?

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

24 of 27 26-01-2011 18:54

Page 25: First steps to work with Charm

Status in CHaRM workflow with tasks in TMS

2009-03-26 01:46:31 Jamuna Nithyanandam Business Card [Reply]

Thank you for a very detailed blog.

After we have the tms set up for satellite systems, project created and activated for CTS in solution manager:

How do we set the status in the CHaRM workflow with the corresponding task in Scheduler? Can you please help me with this

query.. I am really not sure how to proceed further.

Thank you very much,

Jamuna Nithyanandam

using Solman DEV and Solman PRD

2009-02-26 06:45:48 Aldo Ortiz Business Card [Reply]

Hello Dolores,

Thanks for your very complete definition. We have a case where we are using a Solman DEV, client 100 and SolMan PRD, client

300. We have a transport layer already defined where we can create transport request and send to the Solman PRD (for example

for Service Desk customizing). Now we are implementing ChaRM and creating a test landscape of 3 clients in the same SolMan Dev

system, in our case 500, 600, and 700 (dev, qa, prd. Can we have these two transport layer in the same SolMan DEV?

I appreciate your comments.

Regards

Aldo

using Solman DEV and Solman PRD

2009-02-26 22:27:00 Dolores Correa Business Card [Reply]

Hi Aldo,

In this case you have a real TMS landscape from DEV:100-->PRD:300 so consolidation routes SAP and ZXXX are already used

for the real TMS landscape.

This means that you can not create the test scenarion in DEV without interfering the real TMS.

So, in this case I would suggest to create the test scenario in PRD or in other development system of other product, for

example in the development system of your R/3 system.

Hope this helps,

Dolores

using Solman DEV and Solman PRD

2009-09-24 06:44:14 HAI HUYNH Business Card [Reply]

Hi Dolores,

Great Article and contribution to SDN on CHARM.

On EHP1 Solman, do we still follow the OSS Note number to activate CHARM. There is no NOTE# indicated on the IMG

Documentation in EHP1.

When I run it automatically in EHP1 after hitting execute in the IMG, I check the BC Sets and nothing is activated. So,

should I manually activate BC Set Solman40_CHARM_BASICFUN001 in SCPR20.

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

25 of 27 26-01-2011 18:54

Page 26: First steps to work with Charm

Thanks

using Solman DEV and Solman PRD

2009-09-24 07:33:48 Dolores Correa Business Card [Reply]

Hello,

For EhP1 firstly you run solman_setup. In the Basic Configuration in point 7 BC Set

SOLMAN40_CHARM_PROXYFACT_001 is activated.

After you have to follow the spro point Change Request Management specailly an entry called "Activate Activate BC

Sets".

Hope this helps,

Dolores

using Solman DEV and Solman PRD

2009-09-24 08:22:12 HAI HUYNH Business Card [Reply]

Thanks for the quick response...

I ran the automatic configuration when i executed Activate BC Set for CHARM in the IMG.

If I check in SCPR20, SOLMAN40_CHARM_BASICFUNC001 has not been activated. If I click on the Manual, it does

nothing... Is this a bug in the system?

I would assume this should be activated...

I did see Solman40_proxyfact_001 activated in the system...

using Solman DEV and Solman PRD

2009-10-05 13:29:38 HAI HUYNH Business Card [Reply]

Hi Dolores,

For EHP1, how should we take the approach to move transport across clients. We are doing an upgrade and

would like to to move transport as well to our Golden Client in DEV. (DEV 100- Custom Development , DEV

200-Golden Client)

Do we configure a different route in the TMS and just include DEV-200 in the Locigical Component. I would

assume that we use the Task List to do the import manually.

Thanks for your advice...

using Solman DEV and Solman PRD

2009-09-24 10:10:10 Dolores Correa Business Card [Reply]

Hello,

I checked this and the correct name for the BC Set is SOLMAN40_CHARM_BASICFUNC_001, as far as I know

this BC set should be activated running the indicated spro point but also running Activate BC Set in the Basic

Configuration point of solman_setup according to the activation time in my solman test system.

Anyway follow note 903527 in order to activate this BC Set in expert mode and chosing overwrite option too.

Hope this helps,

Dolores

using Solman DEV and Solman PRD

2009-09-24 10:19:18 HAI HUYNH Business Card [Reply]

SAP Network Blog: First steps to work with Change Request Manageme... http://weblogs.sdn.sap.com/pub/wlg/10429

26 of 27 26-01-2011 18:54

Page 27: First steps to work with Charm

Thanks Dolores... I'm use to using that note in the past. I just think there is a bug with EHP1 for that img

activity...

Take care and great work. Much appreciated

using Solman DEV and Solman PRD

2009-08-05 01:55:23 Boris Milosevic Business Card [Reply]

In our case we have standard transport route ZDEV for the standard CHARM transports ( DEV:330-PRD:100). We created

test clients in our DEV environment and created new consolidations route ZCHM with source client charm development

client 800. (qas 801 prd 802) and CHARM test environment works fine :)

rgds

Boris

Gr8 Job Done !!

2008-07-26 20:47:22 Anand Rangarajan Business Card [Reply]

This was the Most frequently asked question in SDN solman forum...One of the best Compilation...