fiscal year 2010 annual plan ecosystem restoration and hurricane protection in louisiana...

33
Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location: CPRA Meeting, LaSalle Building Date: February 18, 2009 www.lacpra.org

Upload: oscar-malone

Post on 01-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in

Louisiana

Location: CPRA Meeting, LaSalle Building

Date: February 18, 2009

www.lacpra.org

Page 2: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

FY 2010 Annual Plan Team

Kirk Rhinehart, OCPR Planning Branch Administrator Karim Belhadjali, Coastal Resources Scientist Manager Mandy Green, Coastal Resources Scientist Supervisor Other OCPR technical staff Brown and Caldwell staff RAND staff

billyh
Move OCPR LOGO to Top left
Page 3: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Presentation Outline

Introduction Legislative Requirements Annual Plan Overview Budget Summary Project Execution Next Steps

Page 4: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Annual Plan Complements Master Plan

The Master Plan is a conceptual document that will be updated roughly every five years.

The Master Plan did not:– inventory all ongoing and future coastal projects,– establish specific schedules by which these projects

would be implemented, or – set forth funding schedules.

Instead, the Annual Plan is published each year by the Office of Coastal Protection and Restoration (OCPR) and includes these aspects of coastal planning.

Page 5: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Legislature and Governor’s Office Directed

Act 8 of the 2005 1st Special Session created the Coastal Protection & Restoration Authority (CPRA).

Act 8 directs the CPRA to prepare an Annual Coastal Protection and Restoration Plan for submission to the legislature.

Executive Order BJ 2008-7, signed January 2008, requires state agencies to administer activities in accordance with the tenets of the Master Plan.

Act 545 of 2008 directs the CPRA to integrate staff from DNR and DOTD to form the Office of Coastal Protection and Restoration.

Page 6: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

The Louisiana Office of Coastal Protection and Restoration

July 1, 2008 Office of Coastal Protection and Restoration was established.

Combined staff from the Department of Natural Resources and the Department of Transportation and Development.

OCPR will be the lead in planning, design, construction, and operations, maintenance, and monitoring of all coastal projects.

OCPR includes the Louisiana Applied Coastal Engineering and Science (LACES) program committed to applying best science and engineering practices to all phases of the program.

Page 7: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

The FY 2010 Annual Plan

Presents progress made in the prior year.

Lists projects planned for the following year and planned two years out.

Identifies funding needs.

Describes how CPRA and our partners intend to protect and restore Louisiana’s coast in 2010.

Gives budgets and schedules for coastal protection and restoration efforts to increase accountability.

Page 8: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

New Information and Format

Act 545 requires the Annual Plan to include:– a three-year budget,– an implementation projection, and– a program progress assessment.

Appendix A provides annual project summaries. Appendix B provides 3-year program spending

projections. Appendix C is The Barrier Island Report. Appendix D is a compilation of project concepts for

future consideration. Appendix E provides a list of Master Plan Urgent

Early Actions associated with specific on-going projects

Page 9: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Projected 3-Year Revenues (FY 2010 through FY 2012

Revenue Sources2009

($1,000)2010

($1,000)2011

($1,000)2012

($1,000)3-Year Total

($1,000)

CPR Trust Fund $55,299 $45,921 $45,113 $45,313 $136,347

CIAP $67,000 $75,000 $75,000 $50,000 $200,000

Surplus '07 and '08 remaining $435,925 $0 $0 $0 $435,925

GOMESA $0 $0 $4,800 $12,000 $16,800

Carry Over From Previous Year $65,625 $35,421 $0 $0 $35,421

Total $623,849 $156,342 $124,913 $107,313 $824,493

Page 10: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Potential Additional Funding

$300M State Surplus 2009 requested by Governor Jindal.

$28M for the state $417M for coastal parishes from Community Development Block Grants (CDBG).

$50M Hazard Mitigation Grant from FEMA. Federal Economic Stimulus may provide additional

funds to the state. Tobacco Settlement Funds may be made available

through securitization of the Louisiana Tobacco Settlement.

GOMESA Bond Money could contribute an additional $500M to $1B over the near team.

Page 11: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Project Funding Sources

StateSurplus

LocalFunds

CWPPRA

CIAPMMS

CapitalOutlay

HSDRRSFED

LPV

State Trust Fund

CDBG

Page 12: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Total Projected 3-Year Expenditures

Programs2009

($1,000) 2010($1,000)

2011($1,000)

2012($1,000)

Total($1,000)

CIAP Projects $67,000 $75,000 $75,000 $50,000 $200,000

CWPPRA Projects $15,303 $16,000 $17,000 $18,000 $51,000

Surplus '07 and Surplus '08 Projects $64,075 $163,108 $116,908 $55,908 $435,925

WRDA Projects $20,000 $13,925 $16,039 $16,320 $46,284

Beneficial Use Program $21,000 $25,000 $25,000 $25,000 $75,000

Project OM&M $4,593 $11,417 $11,679 $7,814 $30,910

Barrier Island Maintenance Program $3,500 $3,500 $3,500 $3,500 $10,500

Ongoing Programs $16,275 $18,050 $18,150 $18,175 $54,375

Support/Emergency Response/Reserve $17,225 $17,225 $17,225 $17,225 $51,675

CPRA Operating Costs $20,107 $19,764 $20,527 $21,323 $61,421

HSDRRS LERRDS and 30 year payback $0 $300,000 $0 $62,000 $262,000

Total Planned Expenditures $249,078 $662,989 $321,028 $295,265 $1,279,090

Page 13: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

1% 4%

39%

2%5%3%

46%

Planning ($9.5 million) Engineering and Design ($29.3 million)Construction ($253.2 million) Operation, Maintenance and Monitoring ($16.0 million)Ongoing Programs ($35.2 million) Operating Costs ($19.7 million)LERRDS ($300 million)

FY 2010 Expenditures by Phase

Total Expenditures ($663M)

Page 14: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Restoration Projects in Design and in Construction

0

10

20

30

2006 2007 2008 2009 2010 2011 2012

Fiscal Year

E&D

ConstructionNo.

of

Pro

ject

s

Page 15: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

3-Year Project Expenditures by Planning Unit

Note: Includes planning, engineering, construction and OM&M, but excludes $362M LERRDs and 30 year payback, ongoing programs, and operating cost.

Figure 4-4 Projected 3-Year Project Expenditures by Planning Unit

$-

$20

$40

$60

$80

$100

$120

$140

$160

PU1 PU2 PU3a PU3b PU4

Planning Unit

Do

llars

in M

illio

ns

FY2010 FY2011 FY2012

$108M

$311M

$115M

$47M

$99M

Page 16: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Sample 3-Year Project SchedulesFiscal Year 2010 2011 2012

Quarter Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Project Name                        

STATE                        

Cameron Creole Levee O O O O O O O O O O O O

Larose to Golden Meadow C C C C C C C          

CWPPRA Phase 1 1                        

West Pointe a la Hache Outfall Management W W W W W W W W W W W W

Mississippi River Reintroduction Into Northwest Barataria Basin D D D D D D D D D D D D

Riverine Sand Mining/Scofield Island Restoration D D D D D D D W W W W W

CWPPRA Phase 2                        

Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration C                      

Dedicated Dredging on the Barataria Basin Landbridge C C C                  

Pelican Island and Pass La Mer to Chaland Pass Restoration (B) C C                    

CIAP                        

Barataria Landbridge C C C 0 0 0 0 0 0 0 0 0

Lake Salvador Shoreline Protection O O O O O O O O O O O O

Grand Lake Shoreline Protection C C C C C 0 0 0 0 0 0 0

Page 17: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Next steps

Include reporting on public, private, and federal protection and restoration efforts.

Improve project benefits analysis and feedback (adaptive management) through LACES.

Establish Regional Planning Teams. Further develop project prioritization and scheduling

tools.

Page 18: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

New Project Prioritization Tools

New tools for evaluating and selecting future projects. Tools include Project Benefit Scoring. Tools utilize Master Plan’s four objectives to evaluate

benefits. Tools anticipated to clarify which projects provide

most benefit based on achieving Master Plan objectives.

Tools can also associate benefits with project costs.

Page 19: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Project Benefits Are Scored for Each Objective within the Master Plan

Objective 1Reduce economic losses from storm based flooding---------------------Concentrated assets

Distributed assets

Strategic resources

Objective 2Promote a sustainable coastal ecosystem-------------------Ecosystem productivity

Process exchange

Objective 3Provide habitats for commercial and recreational activities------------------------Habitat suitability

Wetland area

Objective 4Sustain the unique heritage of Coastal Louisiana------------------------Coastal heritage

Natural resources

Sustainable balance

Page 20: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Raw Project Benefit Scores (Example Projects)

 

Reduce economic losses from storm based 

flooding

Promote sustainable coastal 

ecosystem

Provide habitats for commercial 

and recreational activities

Sustain the unique heritage of coastal 

Louisiana

Project 1 2 3 4 5 6 7 8 9 10

BA-71: Medium Diversion with Dedicated Dredging at Myrtle Grove - - - ++ + ++ + + + =

LA-10: LCA Barataria Basin Barrier Shoreline - 2007 - - - + ++ ++ = + + +

BS-13 (EB): Bayou Lamoque Floodgate Removal -- - -- + + + = + + =

ME-20: South Grand Chenier Hydrologic Restoration Project -- -- -- + + + = = = =

Lowest benefit Highest benefit

Page 21: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Prioritization as a Function of Cost (Example Projects)

 Project

Total Project Scores as a function of Cost Weight

0% 20% 40% 60% 80% 100% 

BA-71: Medium Diversion with Dedicated Dredging at Myrtle Grove

LA-10: LCA Barataria Basin Barrier Shoreline - 2007

BS-13 (EB): Bayou Lamoque Floodgate Removal

ME-20: South Grand Chenier Hydrologic Restoration ProjectKey:

Lowest Highest

Page 22: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Prioritization and Scheduling Summary

A work in progress.

Project level benefits scoring vs. regional level.

Model includes scheduling and funding optimization capabilities.

Tools limited by available data.

Regional Planning Team input key component to tool development.

Demo in the back of the room for those of you interested in the details.

Page 23: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Regional Planning Teams

Three Regional Planning Teams will be established in July 2009.

Goals:– improve the plan’s responsiveness to conditions on

the ground and the coastal communities affected,– provide regional input into prioritization and

scheduling tools,– identify issues and concerns, and– report back on the plan’s progress to their

communities.

Page 24: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Project Concepts for Future Consideration

FY 2010 Annual Plan expends all available dollars unless additional State Surplus Funds are made available.

If additional funds are made available new starts are possible.

Appendix D provides a compilation of project concepts for future consideration.

Public is encouraged to review Appendix D and provide ideas about projects listed and project prioritization.

Page 25: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Public Comments

Address written public comments to:Karim BelhadjaliP. O. Box 44027

Baton Rouge, LA 70804or

[email protected]

Public Comment Period Closes March 27, 2009

Page 26: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

QUESTIONS & DISCUSSIONComments

Page 27: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

State CPRA Operating Costs

Program FY2009 FY 2010 FY2011 FY 2012 3-Year Total

OCPR $14,609 $12,280 $12,718 $13,170 $38,168

DOTD Section 11 $2,100 $2,128 $2,266 $2,414 $6,808

CMD $1,718 $1,890 $2,013 $2,144 $5,854

GOCA $1,880 $1,880 $1,880 $1,880 $5,640

DNR Secretary $1,900 $1,586 $1,649 $1,715 $4,951

Total $22,207 $19,764 $20,527 $21,323 $61,421

Page 28: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Ongoing Programs Projected 3-Year Expenditures

ProgramFY2009($1,000)

FY 2010($1,000)

FY2011($1,000)

FY 2012($1,000)

3-Year Total($1,000)

Coastal Science Assistantship Program $100 $200 $300 $300 $800

Assistance to Levee Authorities $1,000 $1,000 $1,000 $1,000 $3,000

Donations for Mitigation Activities $933 $900 $900 $900 $2,700

CIAP Program Management $1,000 $1,000 $1,000 $1,000 $3,000

Louisiana Applied Coastal Engineering and Science Program $11,500 $10,500 $12,000 $12,000 $34,500

GIS Lab Support $250 $500 $500 $500 $1,500

Christmas Tree Projects $350 $350 $350 $350 $1,050

Vegetative Plantings $400 $400 $400 $400 $1,200

Flood Protection and Ecosystem Restoration Conference $100 $100 $100 $125 $325

Community Outreach (formerly America's Wetland Conservation Corps) $500 $500 $500 $500 $1,500

Restoration Partnerships $2,000 $3,000 $3,000 $3,000 $9,000

Atchafalaya Basin Natural Resources Inventory and Assessment $0 $1,500 $0 $0 $1,500

Support for Department of Wildlife and Fisheries $75 $0 $0 $0 $0

Programmatic Total $18,208 $18,050 $18,150 $18,175 $54,375

Page 29: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Estimated Federal and State Expenditures Planning Unit 1

$-

$5.000

$10.000

$15.000

$20.000

$25.000

$30.000

1

Do

lla

rs i

n M

illi

on

s

Planning Eng&Design Construction OMM

Page 30: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Estimated Federal and State Expenditures Planning Unit 2

$-

$20.000

$40.000

$60.000

$80.000

$100.000

$120.000

1

Dol

lars

in M

illio

ns

Planning Eng&Design Construction OMM

Page 31: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Estimated Federal and State Expenditures Planning Unit 3a

$-

$5.000

$10.000

$15.000

$20.000

$25.000

$30.000

$35.000

$40.000

1

Do

llar

s in

Mil

lio

ns

Planning Eng&Design Construction OMM

Page 32: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Estimated Federal and State Expenditures Planning Unit 3b

$-

$1.000

$2.000

$3.000

$4.000

$5.000

$6.000

$7.000

$8.000

$9.000

$10.000

1

Do

llar

s in

Mil

lio

ns

Planning Eng&Design Construction OMM

Page 33: Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009

FY 2010 Annual Plan

Estimated Federal and State Expenditures Planning Unit 4

$-

$5.000

$10.000

$15.000

$20.000

$25.000

1

Do

llar

s in

Mil

lio

ns

Planning Eng&Design Construction OMM