    2012 to 2016

    Five-Year Idaho TransportationInvestment Plan

    November 2011

  • 8/13/2019 Five Year Plan 2011

    2/63

    TABLE OF CONTENTSOverview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

    Funding Needs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

    Funding Assumptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

    Investment Strategies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

    Project Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    Accountability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

    PROJECT LISTS

    Statewide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    District 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

    District 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    District 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

    District 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39

    District 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

    District 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

    Terms and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

  • 8/13/2019 Five Year Plan 2011

    3/63

    Making it Easier to Track Projects

    With New Five-Year Plan

    To increase transparency and accountability, the

    department developed the FY12 to FY16 Five-

    Year Idaho Transportation Investment Plan.

    This document includes projects for highways,

    bridges, public transportation, railroad cross-

    ings, aviation, and non-motorized transporta-

    tion. This is the first year the department is

    publishing this document. Taxpayers can learn

    in non-technical terms about:

    Funding needs and assumptions

    How projects are prioritized and selected

    What projects are selected and when they will

    be completed

    How progress is measured

    Assuming Flat Revenue Levels

    The departments revenue forecasts assume fed-

    eral highway apportionments will remain flat at

    approximately $296 million annually through

    federal fiscal year 2016. The State HighwayAccount is forecasted to increase from the

    FY12 level of $234.1 million by approximately

    one percent per year.

    To achieve its performance goals with a flat

    revenue stream, the department utilizes the fol-

    lowing investment strategies:

    Invest for Performance The department

    targets investments to meet performance

    measure goals.

    Preserve the Current System Timely

    preservation and restoration measures extend

    the useful lives of roads and bridges. Current

    revenue levels do not allow the department to

    fund expansion projects.

    Achieving State and Local

    Transportation Objectives

    State Highway System projects are designed to

    achieve both state and local goals and objec-

    tives. The department supports a transportation

    system that links state and local roads and

    bridges, public transportation, airports, bicy-

    cle/pedestrian facilities, railways, and the ship-

    ping port in Lewiston.

    The 2012 to 2016 Five-Year Transportation

    Plan invests over $2.3 billion in the following

    categories.

    Highways $1.6 Billion

    Bridges $293 Million

    Aeronautics* $308 Million

    Public Transportation* $72 Million

    TOTAL $2.3 Billion

    * Most of these funds do not pass through ITD.

    The department strategically targets invest-

    ments to improve safety, enhance mobility, and

    provide economic opportunity.

    ITD is using integrated, state-of-the-art man-

    agement systems to ensure all transportation in-

    vestments align with the departments goals,

    objectives, and performance targets.

    Balancing Needed Projects with

    Available Revenue

    Each of ITDs six districts programmed their list

    of projects to balance available revenue with the

    ability to achieve the departments statewideperformance goals. The departments investment

    strategies reflect each districts efforts to address

    safety needs, coordinate road and bridge work,

    maintain and operate the existing system, and

    make the most efficient use of forecasted rev-

    enue.

    Energizing the EconomyIdahos gross domestic product and transporta-

    tion system are inextricably linked. Improving

    and maintaining Idahos transportation infra-

    structure is a key component of Governor C.L.

    Butch Otters vision to strengthen the states

    economy through his Project 60 Initiative. Proj-

    ect 60 is a plan to grow Idahos gross domestic

    product from $51.5 billion to $60 billion.

    In the past, ITD and most other transportation

    departments in the country used project lists to

    calculate how many jobs were created by each

    project. ITDs new strategic plan breaks fromthe past by investing transportation funds to sup-

    port Governor Otters Project 60 goals. This is a

    major cultural shift for the department and sepa-

    rates ITD from most of the transportation depart-

    ments in the country.

    How to Comment

    If you would like to comment on this five-year

    plan, call Adam Rush, Public Involvement

    Coordinator, at (208) 334-8005 or e-mail your

    comments to [email protected].

    OVERVIEWFive-Year Transportation Plan

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 1

  • 8/13/2019 Five Year Plan 2011

    4/63

    Idahos Roads and Bridges are Aging

    One-third of bridges on the State Highway Sys-

    tem are over 50 years old. Many of them were

    built during the interstate-construction era of

    the 1950s and 1960s. These bridges were de-signed to last 40 to 60 years before being re-

    placed. At current funding levels, they will have

    to last 120 years.

    The State Highway System has 369 bridges that

    were built prior to World War II. Those bridges

    are now between 60 and 90 years old and in

    need of replacement.

    The State Highway System has approximately

    12,000 lane miles of paved highway. These

    pavements were designed to last 20 years,

    which requires the department to pave at least

    600 lane miles per year to keep the percentage

    of deficient pavement in Idaho from increasing.

    The American Reinvestment and Recovery Act

    (ARRA) stimulus funds helped the department

    drive the amount of deficient pavement down

    from 20 percent in 2008 to 16 percent in 2010.

    Idaho is one of the fastest-growing states in the

    country, but the growth is not solving the states

    transportation-revenue issues. The departments

    revenue projections are flat, but costs and de-

    mands are high.

    To balance the departments budget, this five-

    year program will spend less money than is

    needed on Idahos deteriorating but heavily

    used transportation system.

    Governors Transportation TaskForce Identifies Funding GapIn 2009 Governor Otter formed the Governors

    Task Force on Modernizing Transportation

    Funding in Idaho. The taskforce met nine timesduring 15 months, completing its work and is-

    suing its findings in December 2010.

    Lieutenant Governor Brad Little chaired the

    task force. In the cover letter he wrote to Gover-

    nor Otter that accompanied the task forces

    findings, he stated First and perhaps foremost,

    the Task Force members solidly confirmed

    Idahos real and significant transportation

    funding shortfall.

    The task force affirmed a growing transporta-

    tion funding shortfall for both the state and lo-

    cal highway systems. The task forces final

    report stated the following averaged amounts

    are needed for the state and local transportation

    systemsin addition to current funding levels:

    $155 million annually for operation, preserva-

    tion, and restoration of the state system

    $107 million annually for operation, preserva-

    tion, and restoration of the local system

    $207 million annually for capacity and safety

    enhancement for the state system

    $74 million annually for capacity and safety

    enhancement for the local system

    FUNDING NEEDSFive-Year Transportation Plan

    369 Bridges on the

    State Highway System

    Were Built Prior to WWII

    Bridges on the State Highway

    System Were Designed to

    Last 40 to 60 Years.

    At Current Funding Levels,

    They Must Last 120 Years.

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 2

  • 8/13/2019 Five Year Plan 2011

    5/63

  • 8/13/2019 Five Year Plan 2011

    6/63

    Meeting State and Local NeedsOnce the department identifies its funding pri-orities and makes its funding assumptions, it be-gins working closely with local transportationagencies and municipal planning organizationsto develop the transportation program. Thisbrings broad community representation and in-put into the decision-making process.

    State Highway System projects are designed toachieve both state and local goals and objec-tives. The departments investment strategy isto provide complete transportation systems thatlink local roads and bridges, public transporta-tion, airports, bicycle/pedestrian facilities, rail-ways, and the shipping port in Lewiston.

    ITDs resources are strategically targeted toprovide transportation infrastructure and serv-ices that contribute to and enhance Idahos eco-nomic opportunity.

    Using Management Systemsto Maximize Funding EfficiencyThe department uses integrated, state-of-the-artmanagement systems to ensure all state trans-portation investments align with the depart-ments goals, objectives, and performancetargets.

    These management systems provide the data re-quired to track performance measures, allowbetter planning and management of infrastruc-ture investments, and improve the departmentsability to measure and adjust performance.

    These systems allow the department to use itslimited funds more efficiently and reduce oper-ating and system-management costs. Perform-

    ance management is the key to the departmentssuccess.

    Investing for Performance

    The department developed a new strategic plan

    in 2011. The plan has three primary goals that

    drive the departments investment strategies:

    GOALCommit to having the safest trans-

    portation system possible.

    GOALProvide a mobility-focused trans-

    portation system that drives economic oppor-

    tunity.

    GOALBecome the best organization by

    continually developing employees and imple-

    menting innovative business practices.

    To achieve its performance goals with a flat

    revenue stream, the department utilizes the fol-

    lowing investment strategies:

    Invest for Performance The department

    targets investments to meet measurable per-

    formance goals.

    Preserve the Current System Timely

    preservation and restoration measures extendthe useful lives of roads and bridges. Current

    revenue levels do not allow the department to

    fund expansion projects.

    ITD forecasts its future revenue stream andcontinuously reviews actual receipts against therevenue forecast in all major funding sources. Ifprogram adjustments are necessary, they areacted upon immediately.

    INVESTMENT STRATEGIESFive-Year Transportation Plan

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 4

  • 8/13/2019 Five Year Plan 2011

    7/63

    Selecting and Prioritizing ProjectsIdahos Five-Year Transportation Plan includesprojects for highways, bridges, public trans-portation, and aeronautics. The transportation

    board and department select projects to furtherthe departments mission of improving safety,enhancing mobility, and providing economicopportunity. The first step in the process occurswhen the departments management team estab-lishes program performance measures, priori-ties, and funding levels. Teams for eachprogram area (pavements, bridges, etc.) thenmeet to:

    Collect and analyze data to make project-tim-

    ing decisions, such as determining the idealtime to perform a pavement-preservation or abridge-rehabilitation project.

    Review and prioritize needs to provide thehighest return on investment performance andthe most benefit to Idaho citizens.

    Recommend projects to meet performancemeasures within fiscal constraints.

    The department also seeks input and recom-mendations within the established guidelinesfrom the states metropolitan planning organiza-tions and local governments. ITDs manage-ment team reviews recommended projects andforwards approved projects to the Idaho Trans-portation Board for input.

    Following the transportation boards review, thepublic is invited to comment. After the com-ment period ends, the transportation board again

    reviews the selected projects and approves atransportation program.

    PROJECT SELECTIONFive-Year Transportation Plan

    January ITD makes federal and state revenue forecasts.February ITD provides its federal and state revenue forecasts to metro-

    politan planning organizations, the Local Highway TechnicalAssistance Council (LHTAC), and ITDs six district offices.

    April May ITD receives project requests from transportation agencies andprepares a draft Idaho Transportation Investment Program (ITIP).

    June Draft ITIP submitted to the Idaho Transportation Board forreview.

    July Draft ITIP available for public review and comment.August ITD develops final recommended ITIP.September Final ITIP submitted to the Idaho Transportation Board

    for approval.

    October Board-approved ITIP submitted to the Federal HighwayAdministration and the Federal Transit Administration forapproval.

    November Federal Highway Administration and the Federal TransitAdministration approve ITIP Federal Submittal Document.

    Ongoing ITD obtains input from citizens, elected officials, tribalgovernments, state and federal agencies, metropolitanplanning organizations, the Local Highway TechnicalAssistance Council, and other interested public and private

    organizations.

    PROJECT DEVELOPMENT CALENDAR

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 5

  • 8/13/2019 Five Year Plan 2011

    8/63

  • 8/13/2019 Five Year Plan 2011

    9/63

    PROJECT LISTSFive-Year Transportation Plan

    Statewide (Districts 1 - 6)

    Highways Contact:Tom Cole, P.E., Chief EngineerIdaho Transportation DepartmentP.O. Box 7129

    Boise, ID 83707(208) 334-8806

    Aeronautics Contact:Bill Statham, Project Manager, Division of AeronauticsIdaho Transportation Department

    P.O. Box 7129

    Boise, ID 83707(208) 334-8784

    Public Transportation Contact:Randy Kyrias, Division of Transportation Performance Administrator

    Idaho Transportation DepartmentP.O. Box 7129Boise, ID 83707

    (208) 334-8281

    Land area: 82,690 sq. miles

    Lane miles: 12,039

    Centerline miles: 4,945

    Bridges: 1,803

    84

    90

    90

    84

    84

    15

    15

    15

    86

    95

    2

    95

    91

    95

    20

    20

    93

    26

    93

    30

    9389

    20

    26

    95

    95

    12

    95

    20

    95

    95

    26

    2

    93

    12

    )38

    )52

    )97

    )36

    )21

    )37

    )33

    )22

    )200

    )14

    )39

    )77

    )51

    )45

    )1

    )31

    )3)60

    )75

    )27

    )64

    )47

    )61

    )7

    )34

    )71

    )24

    )11

    )3

    )34

    )33

    )8

    )46

    )28)55

    )55 )29

    )57

    )75

    )51

    )28

    )87

    )78

    )67

    Ada

    Adams

    Bannock

    Benewah

    Bingham

    Blaine

    Boise

    Bonner

    Bonneville

    Boundary

    ButteCamas

    Canyon

    Cassia

    Clark

    Clearwater

    Custer

    Elmore

    Franklin

    Fremont

    Gem

    Gooding

    Idaho

    Jefferson

    Jerome

    Kootenai

    Latah

    Lemhi

    Lewis

    Lincoln

    Madison

    Minidoka

    NezPerce

    Oneida

    Owyhee

    Payette

    Power

    Shoshone

    Teton

    TwinFalls

    Valley

    Washington

    Caribou

    BearLake

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 7

  • 8/13/2019 Five Year Plan 2011

    10/63

  • 8/13/2019 Five Year Plan 2011

    11/63

  • 8/13/2019 Five Year Plan 2011

    12/63

  • 8/13/2019 Five Year Plan 2011

    13/63

  • 8/13/2019 Five Year Plan 2011

    14/63

    FY12-16 Costs

    Statewide Highways Project List

    PROJECT NAME/LOCATION Year Develo

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    LOCAL, FY12 RECREATIONAL TRAILS 2012STATE WIDE (No County Recreational Trails

    LOCAL, FY13 RECREATIONAL TRAILS 2013STATE WIDE (No County Recreational Trails

    LOCAL, FY14 RECREATIONAL TRAILS 2014STATE WIDE (No County Recreational Trails

    LOCAL, FY15 RECREATIONAL TRAILS 2015STATE WIDE (No County Recreational Trails

    2Report Sums

  • 8/13/2019 Five Year Plan 2011

    15/63

    Statewide Public Transit Project List

    Scheduled CostsScheduled Cos

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    TRANSIT, STATEWIDE - 762CapitalSTATE WIDE (No County

    TRANSIT, STATEWIDE 876 -Mobility ServicesSTATE WIDE (No County

    TRANSIT, STATEWIDE - 4,176Mobility ServicesSTATE WIDE (No County

    TRANSIT, STATEWIDE SMALL URBAN - 680Mobility ServicesSTATE WIDE (No County

    TRANSIT, STATEWIDE RURAL - 158Mobility ServicesSTATE WIDE (No County

    TRANSIT, STATEWIDE SMALL URBAN - 1,315Mobility ServicesSTATE WIDE (No County

    TRANSIT, STATEWIDE RURAL - 300Mobility ServicesSTATE WIDE (No County

    TRANSIT, STATEWIDE - 876Mobility ServicesSTATE WIDE (No County

    TRANSIT, STATEWIDE 102 -Multi Modal PlanningSTATE WIDE (No County

    TRANSIT, STATEWIDE - 102Multi Modal PlanningSTATE WIDE (No County

    TRANSIT, STATEWIDE 63 -AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE SMALL URBAN 38 -AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE RURAL 31 -AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE RURAL 14 -AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE SMALL URBAN 20 -AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE 876 -AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE SMALL URBAN - 20AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE - 876AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE RURAL - 31AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE SMALL URBAN - 38AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE RURAL - 14AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE - 63AdministrationSTATE WIDE (No County

    TRANSIT, STATEWIDE 101 -MiscellaneousSTATE WIDE (No County

    TRANSIT, STATEWIDE - 101MiscellaneousSTATE WIDE (No County

    2,121 9,512 Report Sums

  • 8/13/2019 Five Year Plan 2011

    16/63

    Statewide Aeronautics Project List

    Scheduled Costs

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    AERO, AIRPORT SUPPLIES, INVENTORY RESTOCK AND SMALL PROJ 10 -Airport Facility MaintenanceSTATE WIDE (No County

    AERO, AIRPORT SUPPLIES, INVENTORY RESTOCK AND SMALL PROJ - 10Airport Facility MaintenanceSTATE WIDE (No County

    AERO, AIRPORT SUPPLIES, INVENTORY RESTOCK AND SMALL PROJ - -Airport Facility MaintenanceSTATE WIDE (No County

    AERO, AIRPORT SUPPLIES, INVENTORY RESTOCK AND SMALL PROJ - -Airport Facility MaintenanceSTATE WIDE (No County

    AERO, AIRPORT SUPPLIES, INVENTORY RESTOCK AND SMALL PROJ - -Airport Facility MaintenanceSTATE WIDE (No County

    AERO, LAYOUT AND AIRSPACE PLANNING AT SMALL AIRPORTS 80 -Airport PlanningSTATE WIDE (No County

    AERO, LAYOUT AND AIRSPACE PLANNING AT SMALL AIRPORTS - 80Airport PlanningSTATE WIDE (No County

    AERO, LAYOUT AND AIRSPACE PLANNING AT SMALL AIRPORTS - -Airport PlanningSTATE WIDE (No County

    AERO, LAYOUT AND AIRSPACE PLANNING AT SMALL AIRPORTS - -Airport PlanningSTATE WIDE (No County

    AERO, LAYOUT AND AIRSPACE PLANNING AT SMALL AIRPORTS - -Airport PlanningSTATE WIDE (No County

    AERO, SYSTEM PLAN, UPDATE STATEWIDE SYSTEM PLAN 368 -Aviation System PlanningSTATE WIDE (No County

    AERO, SYSTEM PLAN, UPDATE STATEWIDE SYSTEM PLAN - 368Aviation System PlanningSTATE WIDE (No County

    AERO, SYSTEM PLAN, UPDATE STATEWIDE SYSTEM PLAN - -Aviation System PlanningSTATE WIDE (No County

    AERO, SYSTEM PLAN, UPDATE STATEWIDE SYSTEM PLAN - -Aviation System PlanningSTATE WIDE (No County

    AERO, SYSTEM PLAN, UPDATE STATEWIDE SYSTEM PLAN - -Aviation System PlanningSTATE WIDE (No County

    458 458 Report Sums

  • 8/13/2019 Five Year Plan 2011

    17/63

    District 1 has five counties (Boundary, Bonner, Kootenai,

    Benewah, and Shoshone), has a U.S. Navy submarine base,

    and is Idahos only district with an international border.

    The district is mountainous with numerous rivers, streams, and

    lakes, and is home to approximately 212,000 residents (14% of

    the states total population).

    PROJECT LISTSFive-Year Transportation Plan

    District 1Damon L. Allen, District Engineer District 1 Board Member600 W. Prairie Ave. R. James (Jim) ColemanCoeur dAlene, Idaho 83815-8764 Coeur dAlene(208) 772-1200

    Land area: 7,752 sq. miles

    Lane miles: 1,469

    Centerline miles: 593

    Bridges: 269

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 15

  • 8/13/2019 Five Year Plan 2011

    18/63

  • 8/13/2019 Five Year Plan 2011

    19/63

  • 8/13/2019 Five Year Plan 2011

    20/63

  • 8/13/2019 Five Year Plan 2011

    21/63

    District 1 Public Transit Project List

    Scheduled CostsScheduled Cos

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    TRANSIT, VVCC - BENEWAH CTY BUS SRVCS 44 -CapitalBENEWAH COUNTY Benewah

    TRANSIT, CITYLINK - BUS SRVCS BENEWAH CTY & US95 CORRIDOR 308 -Mobility ServicesBENEWAH COUNTY Benewah

    TRANSIT, VVCC - BENEWAH CTY BUS SRVCS 121 -Mobility ServicesBENEWAH COUNTY Benewah

    TRANSIT, CITYLINK - BUS SRVCS BENEWAH CTY & US95 CORRIDOR 391 -Mobility ServicesBENEWAH COUNTY Benewah

    TRANSIT, SPOT - FIXED ROUTE & PARATRANSIT FOR DOVER AREA 112 -Mobility ServicesBONNER COUNTY Dover

    TRANSIT, SMSI - BUS SRVCS RURAL TO SPOKANE & CDA 7 -Mobility ServicesDISTRICT 1 (No County

    TRANSIT, COEUR D'ALENE URBANIZED AREA 1,107 -Mobility ServicesKOOTENAI COUNTY Coeur d'Alene

    TRANSIT, COEUR D'ALENE URBANIZED AREA (SET ASIDE) - 1,107Mobility ServicesKOOTENAI COUNTY Coeur d'Alene

    TRANSIT, DISTRICT 1 46 -Multi Modal PlanningKOOTENAI COUNTY

    TRANSIT, DISTRICT 1 - 46Multi Modal PlanningKOOTENAI COUNTY

    TRANSIT, DISTRICT 1 - -Multi Modal PlanningKOOTENAI COUNTY

    TRANSIT, DISTRICT 1 - -Multi Modal PlanningKOOTENAI COUNTY

    2,136 1,153 Report Sums

  • 8/13/2019 Five Year Plan 2011

    22/63

  • 8/13/2019 Five Year Plan 2011

    23/63

    PROJECT LISTSFive-Year Transportation Plan

    District 2James F. Carpenter, District Engineer District 2 Board Member2600 Frontage Rd. Janice (Jan) VasserP.O. Box 837 LewistonLewiston, Idaho 83501-0837

    (208) 799-5090

    Land area: 13,403 sq. miles

    Lane miles: 1,483

    Centerline miles: 694

    Bridges: 173

    District 2 has five counties (Clearwater, Idaho, Latah, Lewis, andNez Perce), and is Idahos only district with a seaport, which is the

    west coasts most inland port. This is also Idahos only district

    without an interstate highway.

    The topography varies from highly productive rolling hills of the

    agricultural Palouse Region to the mountains of the

    Continental Divide, and is a destination for outdoor

    enthusiasts. District 2 is home to approximately 128,000 residents

    (8% of the states total population).

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 21

  • 8/13/2019 Five Year Plan 2011

    24/63

  • 8/13/2019 Five Year Plan 2011

    25/63

  • 8/13/2019 Five Year Plan 2011

    26/63

    FY12-16 Costs

    District 2 Highways Project List

    PROJECT NAME/LOCATION Year Develo

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    STC-4759, WEBB RD, NEZ PERCE CO 2013NEZ PERCE COUNTY STP - Local Rural

    SMA-7014, INT SNAKE RV AVE/SOUTHWAY AVE, LEWISTON 2012NEZ PERCE COUNTY Lewiston STP - Local Urban

    LOCAL, PEDESTRIAN SAFETY IMPROVEMENTS, LAPWAI 2012NEZ PERCE COUNTY Lapwai Public Lands (L)

    OFFSYS, CHERRY LANE BR, NEZ PERCE CO 2013NEZ PERCE COUNTY Other (L)

    LOCAL, FY12 LCVMPO METRO PLANNING 2012NEZ PERCE COUNTY Metro Planning

    LOCAL, FY13 LCVMPO METRO PLANNING 2013NEZ PERCE COUNTY Metro Planning

    LOCAL, FY14 LCVMPO METRO PLANNING 2014NEZ PERCE COUNTY Metro Planning

    LOCAL, FY15 LCVMPO METRO PLANNING 2015NEZ PERCE COUNTY Metro Planning

    OFFSYS, GRELLE AVE SIDEWALK, LEWISTON SR2S 2013PAYETTE COUNTY Lewiston Safe Routes to School

    OFFSYS, LEWISTON SR2S COORDINATOR 2013PAYETTE COUNTY Lewiston Safe Routes to School

    Report Sums

  • 8/13/2019 Five Year Plan 2011

    27/63

    District 2 Public Transit Project List

    Scheduled CostsScheduled Cos

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    TRANSIT, CABS - GRANGEVILLE TO RIGGINS SERVICES 19 -Mobility ServicesIDAHO COUNTY

    TRANSIT, CABS - GRANGEVILLE TO RIGGINS SERVICES 65 -Mobility ServicesIDAHO COUNTY

    TRANSIT, RPT - MOSCOW SERVICES 11 -Mobility ServicesLATAH COUNTY Moscow

    TRANSIT, RPT - FIXED ROUTE & PARATRANSIT SRVCS MOSCOW 350 -Mobility ServicesLATAH COUNTY Moscow

    TRANSIT, DAC NW - RURAL SRVCS NEZ PERCE & IDAHO CTYS 83 -CapitalNEZ PERCE COUNTY

    TRANSIT, LEWISTON SAFETY EQUP 4 -CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON SIDEWALKS 500 -CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA 30 -CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON SMALL URBAN PASSENGER AMENITIES 21 -CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - 30CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - -CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON SIDEWALKS - -CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - -CapitalNEZ PERCE COUNTY Lewiston

    TRANSIT, COAST - BUS SRVCS ALONG US 12 AND ID13 CORRIDORS 40 -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, COAST - BUS SRVCS ALONG US 12 AND ID13 CORRIDORS 50 -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA 304 -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA 41 -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - 315Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - 41Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, LEWISTON URBANIZED AREA - -Mobility ServicesNEZ PERCE COUNTY Lewiston

    TRANSIT, DISTRICT 2 19 -Multi Modal PlanningNEZ PERCE COUNTY Lewiston

    TRANSIT, DISTRICT 2 - 19Multi Modal PlanningNEZ PERCE COUNTY Lewiston

    TRANSIT, DISTRICT 2 - -Multi Modal PlanningNEZ PERCE COUNTY Lewiston

    TRANSIT, DISTRICT 2 - -Multi Modal PlanningNEZ PERCE COUNTY Lewiston

    1,537 405 Report Sums

  • 8/13/2019 Five Year Plan 2011

    28/63

  • 8/13/2019 Five Year Plan 2011

    29/63

    PROJECT LISTSFive-Year Transportation Plan

    District 3David Jones, District Engineer District 3 Board Member8150 Chinden Blvd. Jerry WhiteheadP.O. Box 8028 BoiseBoise, Idaho 83714-8028

    (208) 334-8300

    Land area: 21,884 sq. miles

    Lane miles: 2,547

    Centerline miles: 1,025

    Bridges: 393

    District 3 has 10 counties (Ada, Adams, Boise, Canyon,

    Elmore, Gem, Owyhee, Payette, Valley, and Washington),

    is Idahos most populated district, and also has the most

    lane miles and bridges of Idahos six districts.

    The districts terrain varies from high desert to agricultural

    to rugged mountains, and is home to approximately

    668,000 residents (43% of the states total population).

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 27

  • 8/13/2019 Five Year Plan 2011

    30/63

  • 8/13/2019 Five Year Plan 2011

    31/63

  • 8/13/2019 Five Year Plan 2011

    32/63

  • 8/13/2019 Five Year Plan 2011

    33/63

  • 8/13/2019 Five Year Plan 2011

    34/63

  • 8/13/2019 Five Year Plan 2011

    35/63

  • 8/13/2019 Five Year Plan 2011

    36/63

  • 8/13/2019 Five Year Plan 2011

    37/63

  • 8/13/2019 Five Year Plan 2011

    38/63

    District 3 Public Transit Project List

    Scheduled CostsScheduled Cos

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    TRANSIT, NAMPA URBANIZED AREA - -Mobility ServicesCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA - -Mobility ServicesCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA - -Mobility ServicesCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA 113 -Multi Modal PlanningCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA 113 -Multi Modal PlanningCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA - 113Multi Modal PlanningCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA - -Multi Modal PlanningCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA - -Multi Modal PlanningCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA - -Multi Modal PlanningCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA 11 -MiscellaneousCANYON COUNTY Nampa

    TRANSIT, NAMPA URBANIZED AREA 11 -MiscellaneousCANYON COUNTY Nampa

    TRANSIT, TVT - FIXED ROUTE & PARATRANSIT PURCH OF SRVCS D3 257 -CapitalDISTRICT 3 (No County

    TRANSIT, WITCO - MAINTAIN & EXPAND SRVCS ADA & CANYON CTYS 57 -CapitalDISTRICT 3 (No County

    TRANSIT, EOA - BUS REHAB & IMPROV FOR D3 SENIOR CENTERS 82 -CapitalDISTRICT 3 (No County

    TRANSIT, DISTRICT 3 228 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, TVT - FIXED ROUTE & PARATRANSIT PURCH OF SRVCS D3 1,016 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, TVT - JARC SRVCS FOR D3 115 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, VRT - MOBILITY MGMT SRVS ADA/CANYON 13 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, VRT - MOBILITY MGMT SRVS ADA/CANYON 26 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, VRT - MOBILITY MANAGEMENT SRVS ADA & CANYON CTYS 13 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, TVT - DIAL A RIDE SRVCS FOR SOUTHERN D3 29 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, VRT - MOBILITY MANAGEMENT SRVS ADA & CANYON CTYS 26 -Mobility ServicesDISTRICT 3 (No County

    TRANSIT, DISTRICT 3 - 228Mobility ServicesDISTRICT 3 (No County

    15,455 4,610 Report Sums

  • 8/13/2019 Five Year Plan 2011

    39/63

  • 8/13/2019 Five Year Plan 2011

    40/63

    District 3 Aeronautics Project List

    Scheduled Costs

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    AERO, HOMEDALE, PAVEMENT REHABILITATION - -Airport Facility MaintenanceOWYHEE COUNTY Homedale

    AERO, MURPHY, REHAB RUNWAY, TAXIWAY, AND APRON - -Airport Facility MaintenanceOWYHEE COUNTY Murphy

    AERO, PAYETTE, FUEL FACILITY - -New Airport FacilityPAYETTE COUNTY Payette

    AERO, PAYETTE, PAVEMENT REHABILITATION 50 -Airport Facility MaintenancePAYETTE COUNTY Payette

    AERO, CASCADE, RECONSTRUCT TAXIWAY, AWOS - 563New Airport FacilityVALLEY COUNTY Cascade

    AERO, CASCADE, PAPI, REIL, WAAS SURVEY - -New Airport FacilityVALLEY COUNTY Cascade

    AERO, CASCADE, INSTALL VERTICAL VISUAL GUIDANCE SYSTEM - -New Airport FacilityVALLEY COUNTY Cascade

    AERO, MCCALL, SNOW REMOVAL EQUIPMENT 158 -New Airport FacilityVALLEY COUNTY McCall

    AERO, MCCALL, LAND ACQUISITION - 8,316New Airport FacilityVALLEY COUNTY McCall

    AERO, MCCALL, RELOCATE PARALLEL TAXIWAY - -New Airport FacilityVALLEY COUNTY McCall

    AERO, MCCALL, RELOCATE PARALLEL TAXIWAY - -New Airport FacilityVALLEY COUNTY McCall

    AERO, MCCALL, SNOW REMOVAL EQUIPMENT - -New Airport FacilityVALLEY COUNTY McCall

    AERO, DONNELLY, REHAB RUNWAY, TAXIWAY, AND APRON - -Airport Facility MaintenanceVALLEY COUNTY Donnelly

    AERO, MCCALL, REHABILITATE AIRPORT BEACON - -Airport Facility MaintenanceVALLEY COUNTY McCall

    AERO, CASCADE, REHAB TAXIWAY AND MASTER PLAN 158 -Airport PlanningVALLEY COUNTY Cascade

    AERO, CASCADE, ENVIRONMENTAL AND DESIGN RUNWAY - -Airport PlanningVALLEY COUNTY Cascade

    AERO, CASCADE, CONDUCT AERONAUTICAL SURVEY FOR WAAS - -Airport PlanningVALLEY COUNTY Cascade

    AERO, WEISER, LAND ACQUISITION, AWOS - 400New Airport FacilityWASHINGTON COUNTY Weiser

    AERO, WEISER, CONSTRUCT TAXILANE AND FENCING - -New Airport FacilityWASHINGTON COUNTY Weiser

    AERO, MIDVALE, PAVEMENT REHABILITATION 30 -Airport Facility MaintenanceWASHINGTON COUNTY Midvale

    AERO, MIDVALE, PAVEMENT REHABILITATION - -Airport Facility MaintenanceWASHINGTON COUNTY Midvale

    AERO, WEISER, RUNWAY RECONSTRUCTION 2,012 -Airport Facility MaintenanceWASHINGTON COUNTY Weiser

    AERO, WEISER, MASTER PLAN - -Airport PlanningWASHINGTON COUNTY Weiser

    14,038 17,280 Report Sums

  • 8/13/2019 Five Year Plan 2011

    41/63

    PROJECT LISTSFive-Year Transportation Plan

    District 4

    Devin O. Rigby, District Engineer District 4 Board Member216 S. Date St. Gary BlickP.O. Box 2-A CastlefordShoshone, Idaho 83352-0820

    (208) 886-7800

    Land area: 11,572 sq. miles

    Lane miles: 2,322

    Centerline miles: 929

    Bridges: 295

    District 4 has eight counties (Blaine, Camas, Cassia, Gooding,

    Jerome, Lincoln, Minidoka, and Twin Falls), is a rural agricultural

    area, the worlds largest producer of Rainbow Trout, and is home

    to the Sawtooth Recreational Area.

    The district varies from mountains in the north to high desert in the

    south, and is home to approximately 186,000 residents (12% of

    the states total population).

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 39

  • 8/13/2019 Five Year Plan 2011

    42/63

  • 8/13/2019 Five Year Plan 2011

    43/63

  • 8/13/2019 Five Year Plan 2011

    44/63

  • 8/13/2019 Five Year Plan 2011

    45/63

    FY12-16 Costs

    District 4 Highways Project List

    PROJECT NAME/LOCATION Year Develo

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    US 30, 3400 E RD TURN LANE, TWIN FALLS CO 2014TWIN FALLS COUNTY Safety

    SH 50, INT 3800 E RD, TWIN FALLS CO 2015TWIN FALLS COUNTY Safety

    US 93, ROADSIDE PARK TO MP 11, TWIN FALLS CO 2012TWIN FALLS COUNTY Restoration

    US 93, MP 11 TO DEEP CREEK, TWIN FALLS CO 2012TWIN FALLS COUNTY Restoration

    US 30, JCT SH 50 INTERSECTION, TWIN FALLS CO 2013TWIN FALLS COUNTY Restoration

    OFFSYS, MAIN ST SIDEWALK & SR2S COORDINATOR, KIMBERLY 2014TWIN FALLS COUNTY Kimberly Safe Routes to School

    US 30, THOUSAND SPRINGS SB INTERPRETIVE SIGNAGE 2012TWIN FALLS COUNTY Twin Falls Scenic Byways (L)

    OFFSYS, CHENEY DR; WASHINGTON ST to N COLLEGE RD, CSI 2012TWIN FALLS COUNTY Twin Falls Appropriation Earmarks

    OFFSYS, CHENEY DR; WASHINGTON ST to N COLLEGE RD, CSI 2012TWIN FALLS COUNTY Twin Falls Non-Participating (L)

    Report Sums

  • 8/13/2019 Five Year Plan 2011

    46/63

    District 4 Public Transit Project List

    Scheduled CostsScheduled Cos

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    TRANSIT, MRTA - NEW FREEDOM SRVCS BLAINE CTY & ID 75 CORR 50 -Mobility ServicesBLAINE COUNTY

    TRANSIT, MRTA - JARC SRVCS BLAINE CTY & ID75 CORRIDOR 34 -Mobility ServicesBLAINE COUNTY

    TRANSIT, MRTA - FIXED ROUTE & PARATRANSIT BLAINE CTY & ID75 586 -Mobility ServicesBLAINE COUNTY

    TRANSIT, LINC - VOUCHER PROG TWIN FALLS & MINI-CASSIA AREA 215 -CapitalJEROME COUNTY Twin Falls

    TRANSIT, LINC - VOUCHER PROG TWIN FALLS & MINI-CASSIA AREA 63 -Mobility ServicesJEROME COUNTY Twin Falls

    TRANSIT, LINC - VOUCHER PROG TWIN FALLS & MINI-CASSIA AREA 58 -Mobility ServicesJEROME COUNTY Twin Falls

    TRANSIT, TRANS IV - DIAL A RIDE SRVCS TWIN FALLS AREA 401 -Mobility ServicesJEROME COUNTY Twin Falls

    1,407 -Report Sums

  • 8/13/2019 Five Year Plan 2011

    47/63

  • 8/13/2019 Five Year Plan 2011

    48/63

    District 4 Aeronautics Project List

    Scheduled Costs

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    AERO, BUHL, MASTER PLAN - -Airport PlanningTWIN FALLS COUNTY BuhlAERO, BUHL, ENVIRONMENTAL ASSESSMENT/EIS/UPDATE - -Airport PlanningTWIN FALLS COUNTY Buhl

    23,953 26,273 Report Sums

    P L

  • 8/13/2019 Five Year Plan 2011

    49/63

    PROJECT LISTSFive-Year Transportation Plan

    District 5Edward A. Bala, District Engineer District 5 Board Member

    5151 S. Fif th Ave., P.O. Box 4700 Dwight HorschPocatello, Idaho 83205-4700 Pocatello(208) 239-3300

    Land area: 9,491 square miles

    Lane miles: 1,841

    Centerline miles: 709

    Bridges: 315

    District 5 has seven counties (Bannock, Bear Lake, Bingham,

    Caribou, Franklin, Oneida, and Power), and is home to the Potato

    Capitol of the WorldBlackfoot, Idaho.

    The districts terrain includes fertile agricultural land, high desert,

    and aspen-covered mountains. District 5 is home to approximately

    212,000 residents (14% of the states total population).

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 47

  • 8/13/2019 Five Year Plan 2011

    50/63

  • 8/13/2019 Five Year Plan 2011

    51/63

  • 8/13/2019 Five Year Plan 2011

    52/63

  • 8/13/2019 Five Year Plan 2011

    53/63

    District 5 Public Transit Project List

    Scheduled CostsScheduled Cos

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    TRANSIT, POCATELLO URBANIZED AREA 10 -CapitalBANNOCK COUNTY PocatelloTRANSIT, POCATELLO URBANIZED AREA - 10CapitalBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -CapitalBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -CapitalBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA 73 -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA 185 -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA 583 -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - 73Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - 200Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - 583Mobility ServicesBANNOCK COUNTY PocatelloTRANSIT, POCATELLO URBANIZED AREA - -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -Mobility ServicesBANNOCK COUNTY Pocatello

    TRANSIT, DISTRICT 5 39 -Multi Modal PlanningBANNOCK COUNTY

    TRANSIT, DISTRICT 5 - 39Multi Modal PlanningBANNOCK COUNTY Pocatello

    TRANSIT, DISTRICT 5 - -Multi Modal PlanningBANNOCK COUNTY Pocatello

    TRANSIT, DISTRICT 5 - -Multi Modal PlanningBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA 20 -MiscellaneousBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - 5MiscellaneousBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -MiscellaneousBANNOCK COUNTY Pocatello

    TRANSIT, POCATELLO URBANIZED AREA - -MiscellaneousBANNOCK COUNTY Pocatello

    TRANSIT, PRT - FIXED ROUTE & PARATRANSIT SRVCS IN D5 558 -Mobility ServicesDISTRICT 5 (No County

    1,468 910 Report Sums

  • 8/13/2019 Five Year Plan 2011

    54/63

    PROJECT LISTS

  • 8/13/2019 Five Year Plan 2011

    55/63

    PROJECT LISTSFive-Year Transportation Plan

    District 6Blake Rindlisbacher, District Engineer District 6 Board Member

    206 N. Yellowstone Ave., P.O. Box 97 Lee GagnerRigby, Idaho 83442-0097 Idaho Falls(208) 745-7781

    Land area: 18,588 sq. miles

    Lane miles: 2,302

    Centerline miles: 990

    Bridges: 358

    District 6 has nine counties (Bonneville, Butte, Clark, Custer,

    Fremont, Jefferson, Lemhi, Madison, and Teton), and has the

    countrys longest main street33 milesin Island Park.

    The terrain varies from the rugged Salmon River mountains in the

    north to high desert in the south, and is home to approximately

    207,000 residents (13% of the states total population).

    FY12 to FY16 Five-Year Idaho Transportation Investment Plan 53

  • 8/13/2019 Five Year Plan 2011

    56/63

  • 8/13/2019 Five Year Plan 2011

    57/63

  • 8/13/2019 Five Year Plan 2011

    58/63

  • 8/13/2019 Five Year Plan 2011

    59/63

  • 8/13/2019 Five Year Plan 2011

    60/63

    District 6 Public Transit Project List

    Scheduled CostsScheduled Cos

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    TRANSIT, START BUS - COMMUTER SRVCS DRIGGS JACKSON 15 -Mobility ServicesTETON COUNTY DriggsTRANSIT, DRIGGS - SERVICES W/ VICTOR-DRIGGS-GRAND TARGHEE 13 -Mobility ServicesTETON COUNTY Driggs

    1,869 1,514 Report Sums

  • 8/13/2019 Five Year Plan 2011

    61/63

  • 8/13/2019 Five Year Plan 2011

    62/63

    District 6 Aeronautics Project List

    Scheduled Costs

    PROJECT NAME/LOCATION 2012 2013

    SUBJECT TO REVISION BY THE TRANSPORTATION BOARD FOR REASONS SUCH AS FUNDING, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHA

    PROGRAMCOUNTY CITY

    AERO, DRIGGS, CONSTRUCT TAXIWAY - -New Airport FacilityTETON COUNTY DriggsAERO, DRIGGS, PAVEMENT REHABILITATION - -Airport Facility MaintenanceTETON COUNTY Driggs

    AERO, DRIGGS, RUNWAY REHABILITATION - -Airport Facility MaintenanceTETON COUNTY Driggs

    2,679 3,160 Report Sums

    TERMS AND ACRONYMS

  • 8/13/2019 Five Year Plan 2011

    63/63

    Terms Used in Project Lists

    District: The ITD District in which a projectis located

    Expand: Expansion project

    Key Number: A reference number ITD uses toidentify projects

    Program: Performance Program Rail: Safety rail Route: The highway or road on which the project

    is located

    Rural (L): Local rural Total Costs: Total costs of the project fund source

    over the life of the project

    Work Type: Actual type of work to be completed Sponsor: The entity responsible for the

    project and local matching funds

    Other: Any other non-ITD funding

    Acronyms Used in Project Lists

    ADVCN: Advanced construction AIRMTNC: Airport maintenance AIRNEW: New airport facility

    AIRPLAN: Airport planning AVISYS: Aviation system planning AWOS: Automated Weather Observation System

    BR(S): State bridge BRLOC: Local bridge BROFF: Local bridge off system

    CCTV: Closed Circuit Television (traffic camerasand intelligent transportation systems infrastruc-

    ture)

    Circle-M: Minor Pavement Rehabilitation CN: Construction, construction engineering, or

    capital/purchase costs

    CNL: Canal CSI: College of Southern Idaho EB: East Bound

    ENV: Environmental ER: Emergency Relief

    FA: Portion of federal aid used on the project FH: Forest highway HES: Safety hazard elimination

    HIPRT21: High-priority TEA-21 HIPRILU: High-priority SAFETEA-LU HSIP: Highway Safety Improvement Program

    ITD: Idaho Transportation Department, or IdahoTransportation Department state funds, or marked

    for federal funding

    IMPBR: Bridge improvement IMPCIG: Connecting Idaho GARVEE IMPRICMAQ: Congestion mitigation and

    air quality

    IMPENH: Enhancement IMPEXPAND: Expansion

    IMPPLAN: System planning IMPRESTORE: Restoration IMPSFTY: Safety

    INT: Intersection ITD BOARD: State funds allocated by the Idaho

    Transportation Board

    ISP: Idaho State Police ITS: Intelligent Transportation Systems L: Local

    LOCPART: Local participation only (STAR) MIRL: Medium Intensity Runway Lights MPOS: Metropolitan Planning Organizations

    MRTA: Mountain Rides Transportation Authority NON-Part: Non-participating funds not eligible

    for federal reimbursement

    NR: Near OPS: System support PAPI: Precision Approach Path Indicator

    PC: Professional engineering by consultant PE: Professional engineering completed by

    ITD staff

    PL: Public lands PRSVNPV: Pavement preservation

    RA: Rest Area REIL: Runway End Identifier Light

    RRFB: Rectangular Rapid Flashing Beacon RRX: Rail Road Crossing RW: Right-of-way acquisition

    SB: Scenic byways SHS: State Highway System SMA: Surface Transportation Minor

    SR2S: Safe Routes to School STC: Surface Transportation System Collector

    route type

    STP: Surface Transportation Program TIP: Transportation Investment Program TMA: Local transportation management area

    TRPTA: Targhee Regional Transportation Au-thority

    T/W: Taxiway

    WB: West Bound

    Notes Used in Project Lists

    1: Project is shown in a metropolitan TIP 2: Project is being advance-constructed with

    non-federal funds

    B: Project addresses ITDs strategic performancemeasures for bridges

    C: Project addresses ITDs strategic performance

    measures for congestion

    G: Grouped project M: Pavement rehabilitationminor surface

    treatment

    P: Project addresses ITDs strategic performancemeasures for pavement

    R: Bridge restricts commercial travel S: Project addresses ITDs strategic performance

    measures for safety

    SR: Bridge sufficiency rating (higher number =better condition using a scale from 1 to 100)

    TERMS AND ACRONYMSFive-Year Transportation Plan