flight corridor safety program sites p4 & p5 workshop · 6/5/2017  · flight corridor safety...

12
Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Upload: others

Post on 20-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Flight Corridor Safety Program – Sites P4 & P5 Workshop

Seattle-Tacoma International Airport

June 5, 2017

Page 2: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Why Obstruction Removal?

• FAA regulations and WA State law require airports to identify and remove obstructions to navigable airspace

• Obstruction removal ensures safe operation of aircraft

• Airports around the country manage similar programs to protect the safety of the flying public

6/5/2017 www.portseattle.org 2

Page 3: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Example of Flight Corridor Surfaces

6/5/2017 www.portseattle.org 3

Page 4: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

How the Program Ensures the Safe Operation of Aircraft

6/5/2017 www.portseattle.org 4

• Equipment Failure

• Weather

• Pilot Error

• Certification Compliance

• FAA Safety Regulations

• Vegetation Management

Page 5: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

What are Obstructions?

• At Sea-Tac Airport – Primarily trees

• Existing Obstruction – Obstructions currently penetrating flight surfaces

• Potential Obstruction – Obstructions that are within 0-6’of penetrating flight surfaces

• Understory Vegetation – Non-obstruction vegetation consisting of smaller trees and shrubs growing beneath large trees (obstructions)

6/5/2017 www.portseattle.org 5

Page 6: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Obstructions by Property

6/5/2017 www.portseattle.org 6

Page 7: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Multi-year Program

6/5/2017 www.portseattle.org 7

• 2016 – 2017: Port-Owned Property

• 2017 – 2018 : Publicly-Owned Property – Includes WSDOT, Seattle Public Utilities, Highline Public School

District and possible City right-of-way in the cities of Burien, Des Moines, and SeaTac

• 2018 – 2019: Residential & Commercial Property – 66 known residential properties

– 9 known commercial properties

Page 8: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Port Property Update

8

• All obstructions have been removed from approved Port Property (except P-4 & P-5)

• Replanting trees has occurred on Port property (except P-1, P-4 & P-5)

• On-going irrigation throughout the summer as-needed to increase plant survivability/establishment

• On-going maintenance of invasive species to increase plant survivability/establishment

• Additional shrubs to be planted in October, 2017

6/5/2017 www.portseattle.org

Page 9: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

P-4 & P-5 Update

9

• After receiving feedback from the local community, Port Commission called for more community engagement before determining the removal and replanting approach on Sites P-4 and P-5 – Both sites contain a high number of large conifers – Both sites adjacent to residential properties

• June 5 – Public workshop • July 25 – Commission briefing • October – Work begins

6/5/2017 www.portseattle.org

Page 10: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Overview of Port Sites

6/5/2017 10 www.portseattle.org

Page 11: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

Overview of P-4 & P-5 Sites

6/5/2017 11 www.portseattle.org

Page 12: Flight Corridor Safety Program Sites P4 & P5 Workshop · 6/5/2017  · Flight Corridor Safety Program – Sites P4 & P5 Workshop Seattle-Tacoma International Airport June 5, 2017

What We Heard from the Public on P-4 & P-5

12

• Stagger the tree removal to allow younger trees to mature

• Protect and prioritize conifers

• Remove invasive species

• Maintain a buffer between sites and adjacent neighborhoods

6/5/2017 www.portseattle.org