flight plan - nasavi flt pln/122/fin introduction the sts-122 flight plan is the flight data file...

189
JSC-48000-122 Flight Plan STS-122/1E (December 6, 2007 Launch Trajectory) Mission Operations Directorate Operations Division Final November 13, 2007 EVENT FD MET LOCAL DATE CST GMT Launch 1 00/00:00 12/06/07 15:31 340/21:31 OBSS Survey 2 00/17:25 12/07/07 8:56 341/14:56 ISS Docking 3 01/20:43 12/08/07 12:14 342/18:14 Hatch Open 3 01/21:55 12/08/07 13:26 342/19:26 EVA 1 4 02/18:50 12/09/07 10:21 343/16:21 Columbus Unberth 4 02/22:45 12/09/07 14:16 343/20:16 EVA 2 6 04/18:50 12/11/07 10:21 345/16:21 EVA 3 8 06/17:50 12/13/07 9:21 347/15:21 Hatch Close 9 07/23:45 12/14/07 15:16 348/21:16 Undock 10 08/15:50 12/15/07 7:21 349/13:21 OBSS Survey 10 08/19:40 12/15/07 11:11 349/17:11 Deorbit 12 10/18:56 12/17/07 10:27 351/16:27 KSC Landing 12 10/19:58 12/17/07 11:29 351/17:29 National Aeronautics and Space Administration Lyndon B. Johnson Space Center Houston, Texas Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html For the latest working copy of the Flight Plan, visit http://mod.jsc.nasa.gov/do4/flightplan/main/fp.cfm?id=122

Upload: others

Post on 14-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

JSC-48000-122

Flight Plan

STS-122/1E (December 6, 2007 Launch Trajectory)

Mission Operations Directorate Operations Division

Final November 13, 2007 EVENT FD MET LOCAL DATE CST GMT Launch 1 00/00:00 12/06/07 15:31 340/21:31 OBSS Survey 2 00/17:25 12/07/07 8:56 341/14:56 ISS Docking 3 01/20:43 12/08/07 12:14 342/18:14 Hatch Open 3 01/21:55 12/08/07 13:26 342/19:26 EVA 1 4 02/18:50 12/09/07 10:21 343/16:21 Columbus Unberth 4 02/22:45 12/09/07 14:16 343/20:16 EVA 2 6 04/18:50 12/11/07 10:21 345/16:21 EVA 3 8 06/17:50 12/13/07 9:21 347/15:21 Hatch Close 9 07/23:45 12/14/07 15:16 348/21:16 Undock 10 08/15:50 12/15/07 7:21 349/13:21 OBSS Survey 10 08/19:40 12/15/07 11:11 349/17:11 Deorbit 12 10/18:56 12/17/07 10:27 351/16:27 KSC Landing 12 10/19:58 12/17/07 11:29 351/17:29

National Aeronautics and Space Administration

Lyndon B. Johnson Space Center Houston, Texas Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html

For the latest working copy of the Flight Plan, visit http://mod.jsc.nasa.gov/do4/flightplan/main/fp.cfm?id=122

Page 2: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines
Page 3: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines
Page 4: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

ii FLT PLN/122/FIN

Incorporates the following: 482#: FLT PLN-2049

AREAS OF TECHNICAL RESPONSIBILITY

Book Manager/Lead FAO DO4/L. Hearon 281-244-0110

Lead Timeliner DO4/T. Harris 281-244-1081

Lead Pointer DO4/A. Rigas 281-483-2596

Lead Ops Planner DO4/J. Kitchen 281-244-5430

Lead RPE DO4/S. David 281-244-5837

Page 5: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

iii FLT PLN/122/FIN

FLIGHT PLAN STS-122

LIST OF EFFECTIVE PAGES

FINAL 11/13/07 Sign Off ........................... * 122/FIN ii....................................... * 122/FIN iii...................................... * 122/FIN iv...................................... * 122/FIN v ...................................... * 122/FIN vi...................................... * 122/FIN 1-1................................... 122/FIN 1-2................................... 122/FIN 1-3................................... 122/FIN 1-4................................... 122/FIN 2-1................................... 122/FIN 2-2................................... 122/FIN 2-3................................... 122/FIN 2-4................................... 122/FIN 2-5................................... 122/FIN 2-6................................... 122/FIN 2-7................................... 122/FIN 2-8................................... 122/FIN 2-9................................... 122/FIN 2-10................................. 122/FIN 2-11................................. 122/FIN 2-12................................. 122/FIN 2-13................................. 122/FIN 2-14................................. 122/FIN 2-15................................. 122/FIN 2-16................................. 122/FIN 2-17................................. 122/FIN 2-18................................. 122/FIN 2-19................................. 122/FIN 2-20................................. 122/FIN 2-21................................. 122/FIN 2-22................................. 122/FIN 2-23................................. 122/FIN 2-24................................. 122/FIN 2-25................................. 122/FIN 2-26................................. 122/FIN 2-27................................. 122/FIN 2-28................................. 122/FIN 2-29................................. 122/FIN 2-30................................. 122/FIN 2-31................................. 122/FIN 2-32................................. 122/FIN 2-33................................. 122/FIN 2-34................................. 122/FIN 2-35................................. 122/FIN 2-36................................. 122/FIN 2-37................................. 122/FIN 2-38................................. 122/FIN 2-39................................. 122/FIN 2-40................................. 122/FIN

3-1 ................................... 122/FIN 3-2 ................................... 122/FIN 3-3 ................................... 122/FIN 3-4 ................................... 122/FIN 3-5 ................................... 122/FIN 3-6 ................................... 122/FIN 3-7 ................................... 122/FIN 3-8 ................................... 122/FIN 3-9 ................................... 122/FIN 3-10 ................................. 122/FIN 3-11 ................................. 122/FIN 3-12 ................................. 122/FIN 3-13 ................................. 122/FIN 3-14 ................................. 122/FIN 3-15 ................................. 122/FIN 3-16 ................................. 122/FIN 3-17 ................................. 122/FIN 3-18 ................................. 122/FIN 3-19 ................................. 122/FIN 3-20 ................................. 122/FIN 3-21 ................................. 122/FIN 3-22 ................................. 122/FIN 3-23 ................................. 122/FIN 3-24 ................................. 122/FIN 3-25 ................................. 122/FIN 3-26 ................................. 122/FIN 3-27 ................................. 122/FIN 3-28 ................................. 122/FIN 3-29 ................................. 122/FIN 3-30 ................................. 122/FIN 3-31 ................................. 122/FIN 3-32 ................................. 122/FIN 3-33 ................................. 122/FIN 3-34 ................................. 122/FIN 3-35 ................................. 122/FIN 3-36 ................................. 122/FIN 3-37 ................................. 122/FIN 3-38 ................................. 122/FIN 3-39 ................................. 122/FIN 3-40 ................................. 122/FIN 3-41 ................................. 122/FIN 3-42 ................................. 122/FIN 3-43 ................................. 122/FIN 3-44 ................................. 122/FIN 3-45 ................................. 122/FIN 3-46 ................................. 122/FIN 3-47 ................................. 122/FIN 3-48 ................................. 122/FIN 3-49 ................................. 122/FIN 3-50 ................................. 122/FIN

* – Omit from flight book

Page 6: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

iv FLT PLN/122/FIN

3-51................................. 122/FIN 3-52................................. 122/FIN 3-53................................. 122/FIN 3-54................................. 122/FIN 3-55................................. 122/FIN 3-56................................. 122/FIN 3-57................................. 122/FIN 3-58................................. 122/FIN 3-59................................. 122/FIN 3-60................................. 122/FIN 3-61................................. 122/FIN 3-62................................. 122/FIN 3-63................................. 122/FIN 3-64................................. 122/FIN 3-65................................. 122/FIN 3-66................................. 122/FIN 3-67................................. 122/FIN 3-68................................. 122/FIN 3-69................................. 122/FIN 3-70................................. 122/FIN 3-71................................. 122/FIN 3-72................................. 122/FIN 3-73................................. 122/FIN 3-74................................. 122/FIN 3-75................................. 122/FIN 3-76................................. 122/FIN 3-77................................. 122/FIN 3-78................................. 122/FIN 3-79................................. 122/FIN 3-80................................. 122/FIN 3-81................................. 122/FIN 3-82................................. 122/FIN 3-83................................. 122/FIN 3-84................................. 122/FIN 3-85................................. 122/FIN 3-86................................. 122/FIN 3-87................................. 122/FIN 3-88................................. 122/FIN 3-89................................. 122/FIN 3-90................................. 122/FIN 3-91................................. 122/FIN 3-92................................. 122/FIN 3-93................................. 122/FIN 3-94................................. 122/FIN 3-95................................. 122/FIN 3-96................................. 122/FIN 3-97................................. 122/FIN 3-98................................. 122/FIN 3-99................................. 122/FIN 3-100............................... 122/FIN 3-101............................... 122/FIN 3-102............................... 122/FIN 3-103............................... 122/FIN 3-104............................... 122/FIN 3-105............................... 122/FIN 3-106............................... 122/FIN

3-107 ............................... 122/FIN 3-108 ............................... 122/FIN 3-109 ............................... 122/FIN 3-110 ............................... 122/FIN 3-111 ............................... 122/FIN 3-112 ............................... 122/FIN 3-113 ............................... 122/FIN 3-114 ............................... 122/FIN 3-115 ............................... 122/FIN 3-116 ............................... 122/FIN 3-117 ............................... 122/FIN 3-118 ............................... 122/FIN 3-119 ............................... 122/FIN 3-120 ............................... 122/FIN 3-121 ............................... 122/FIN 3-122 ............................... 122/FIN 3-123 ............................... 122/FIN 3-124 ............................... 122/FIN 3-125 ............................... 122/FIN 3-126 ............................... 122/FIN 3-127 ............................... 122/FIN 3-128 ............................... 122/FIN 3-129 ............................... 122/FIN 3-130 ............................... 122/FIN 3-131 ............................... 122/FIN 3-132 ............................... 122/FIN 4-i.....................................* 122/FIN 4-ii ....................................* 122/FIN 4-iii ...................................* 122/FIN 4-iv...................................* 122/FIN 4-1 ...................................* deleted 4-2 ...................................* deleted 4-3 ...................................* deleted 4-4 ...................................* deleted 4-5 ...................................* deleted 4-6 ...................................* deleted 4-7 ...................................* deleted 4-8 ...................................* deleted 4-9 ...................................* deleted 4-10 .................................* deleted 5-1 ...................................* deleted 5-2 ...................................* deleted 5-3 ...................................* deleted 5-4 ...................................* deleted 5-5 ...................................* deleted 5-6 ...................................* deleted 6-1 ...................................* deleted 6-2 ...................................* deleted 6-3 ...................................* deleted 6-4 ...................................* deleted

* – Omit from flight book

Page 7: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

v FLT PLN/122/FIN

CONTENTS PAGE

INTRODUCTION ............................................................................................................. vi

OVERVIEW TIMELINE .................................................................................................... 1-1

SUMMARY TIMELINE AND ISS SHORT TERM PLAN .................................................. 2-1

DETAILED TIMELINE...................................................................................................... 3-1

Page 8: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

vi FLT PLN/122/FIN

INTRODUCTION

The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines that are covered in the Ascent, Post Insertion, Deorbit Prep, and Entry Checklists. The detailed rendezvous and undocking timelines and procedures are contained in the Rendezvous Checklist. The detailed EVA task timelines and procedures are contained in the EVA Checklist. This Flight Plan satisfies the mission requirements specified in the following documents:

NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-122, STS-122 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints NSTS-21396, ISS 1E Mission Integration Plan

The timeline formats used in this Flight Plan are based on JSC-19933, Timeline Format Definitions and Standard Notes, Rev C, May 1990. The STS-122 Flight Plan is based on a launch date of December 6, 2007 at 21:31 GMT (15:31 CDT). Orbiter inertial attitudes are expressed relative to a mean of 1950 (M50) reference frame. The following SCSC Exceptions have been submitted in order to meet Category 1 objectives:

None The Flight Plan and other related mission information are available on the following Space Shuttle Flight Planning web site:

http://mod.jsc.nasa.gov/do4/flightplan/main/fp.cfm?id=122

Page 9: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

1-1 FLT PLN/122/FIN

OVE

RVI

EW

TIM

ELIN

E

OVERVIEW TIMELINE

Page 10: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

1-2 FLT PLN/122/FIN

OVE

RVI

EW

TIM

ELIN

E

This Page Intentionally Blank

Page 11: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

1-3 FLT PLN/122/FIN

Page 12: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

1-4 FLT PLN/122/FIN

This Page Intentionally Blank

Page 13: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

2-1 FLT PLN/122/FIN

SUM

MA

RY

TIM

ELIN

E

SUMMARY TIMELINE AND ISS SHORT TERM PLAN

Page 14: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

2-2 FLT PLN/122/FIN

SUM

MA

RY

TIM

ELIN

E

This Page Intentionally Blank

Page 15: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD01

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

EYHARTS

NC1Δ

OMS-2

LAUNCH

2-3

STS-122

22 23 12/07 01 02 03 04 05 06 07 08 09GMT 12/06/07 (340) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR

AFT C/O

APU*

BLEED*

ELEVON

GRP B

PWRDN

IMU

MNVR

-ZLV

OMSBURN PMC

A/GPOST INSERTION PRE

SLEEP

PRE

SLEEP

SEESETUP SLEEP

PLT

GRP B

PWRDN

OMSBURN

P/TV01VIDEO SETUPPOST INSERTION PRE SLEEP# SLEEP

TPS

IMAGERY

D/L

MS1DCS

SET*

OCAC

SETUP

POST INSERTION PRE SLEEPRMS*

WATCH

SLEEP

SSV

SETUP

MS2

APCU@

ETPHOTO

GIRA INSTALLOMSBURN

ETVIDEO

D/LPOST INSERTION PRE SLEEP

WATCH

SLEEP

MS3 PGSC SETUP (PART I)POST INSERTION PRE SLEEP

WATCH

SLEEPWLESACT

MS4

MCIU*

PGSC SETUP(PART I)POST INSERTION PRE SLEEP

RMS*

WATCH

SLEEP

FE-2 EXP16MOP

MUS

POST INSERTION PRE SLEEP

WATCH

SLEEP

DAY/NIGHTORBIT 2 3 4 5 6 7 8

TDRSW -171.0E -46.0Z -275.0

OMS2BIAS -ZLV +YVV

NC1-ZLV -XVV

MNVR-ZLV -XVVORB ATT

*FD1 RECONFIG*ORIFICE #√HUM SEP*DATE/TIME

*ON-ORBIT INIT@ACT

*FILTER CHECKNOTES

2-3

FD01

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

EYHARTS

NC1Δ

OMS-2

LAUNCH

STS-122

22 23 12/07 01 02 03 04 05 06 07 08 09GMT 12/06/07 (340) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR

AFT C/O

APU*

BLEED*

ELEVON

GRP B

PWRDN

IMU

MNVR

-ZLV

OMSBURN PMC

A/GPOST INSERTION PRE

SLEEP

PRE

SLEEP

SEESETUP SLEEP

PLT

GRP B

PWRDN

OMSBURN

P/TV01VIDEO SETUPPOST INSERTION PRE SLEEP# SLEEP

TPS

IMAGERY

D/L

MS1DCS

SET*

OCAC

SETUP

POST INSERTION PRE SLEEPRMS*

WATCH

SLEEP

SSV

SETUP

MS2

APCU@

ETPHOTO

GIRA INSTALLOMSBURN

ETVIDEO

D/LPOST INSERTION PRE SLEEP

WATCH

SLEEP

MS3 PGSC SETUP (PART I)POST INSERTION PRE SLEEP

WATCH

SLEEPWLESACT

MS4

MCIU*

PGSC SETUP(PART I)POST INSERTION PRE SLEEP

RMS*

WATCH

SLEEP

FE-2 EXP16MOP

MUS

POST INSERTION PRE SLEEP

WATCH

SLEEP

DAY/NIGHTORBIT 2 3 4 5 6 7 8

TDRSW -171.0E -46.0Z -275.0

ORB ATT OMS2BIAS -ZLV +YVV

NC1-ZLV -XVV

MNVR-ZLV -XVV

NOTES*FD1 RECONFIG*ORIFICE #√HUM SEP

*DATE/TIME*ON-ORBIT INIT

@ACT*FILTER CHECK

Page 16: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD02

NC2

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

EYHARTS

Δ

2-4

STS-122

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/07/07 (341) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDRIMU

MEALMNVR

-ZLV

MNVR

PORT

MNVR

STBD

NOSE CAPSURVEY PORT WING SURVEYSTBD WING SURVEYOMS

BURNPOST SLEEPRCS*

SLEEP

PLT

APCU*

CRYO02SNSRCK

EVA PREP FOR XFER

FC PRG*

FILTERCLEANING

H2OCWC S/U MEAL

MNVR

NOSE

O2 INIT

O2 TERM

OMSBURN

P/TV01VIDEOSETUP

POST SLEEPSLEEPWSB

MS1 MEAL PORT WING SURVEYSTBD WING SURVEYOBSS UNBERTHPOSTSLEEPPOST SLEEP RMS C/O

RMS

PWRUP

LOG

SLEEP

MS2 EMU C/OEMUC/OPREP

EVA PREP FOR XFEREXERCISE MEALOMSBURNPOST SLEEP

LOG

SLEEP

MS3 EMU C/OEMUC/OPREP

ERGSETUP MEALNOSE CAP

SURVEY PORT WING SURVEYPGSC SETUP(PART II)POST SLEEP

LOG

SLEEP

MS4 EVA PREPFOR XFER

EXERCISEMEALNOSE CAP

SURVEYSTBD WING SURVEYOBSS UNBERTHPOST SLEEP POSTSLEEPRMS C/O

RMS

PWRUP

LOG

SLEEP

FE-2 EXP16

CWC

INIT #1

CWC

TERM

ERGSETUP EXERCISE H2O

CWC S/U MEALPOST SLEEPSLEEP XFER PREP

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16

TDRSW -171.0E -46.0Z -275.0

-ZLV -XVVNC2 STBD SURVEY

NOSE SURVEYPORT SURVEYORB ATT

*HEATER RCNFG*CONFIG

*MANUALNOTES

2-4

FD02

NC2

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

EYHARTS

Δ

STS-122

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/07/07 (341) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDRIMU

MEALMNVR

-ZLV

MNVR

PORT

MNVR

STBD

NOSE CAPSURVEY PORT WING SURVEYSTBD WING SURVEYOMS

BURNPOST SLEEPRCS*

SLEEP

PLT

APCU*

CRYO02SNSRCK

EVA PREP FOR XFER

FC PRG*

FILTERCLEANING

H2OCWC S/U MEAL

MNVR

NOSE

O2 INIT

O2 TERM

OMSBURN

P/TV01VIDEOSETUP

POST SLEEPSLEEPWSB

MS1 MEAL PORT WING SURVEYSTBD WING SURVEYOBSS UNBERTHPOSTSLEEPPOST SLEEP RMS C/O

RMS

PWRUP

LOG

SLEEP

MS2 EMU C/OEMUC/OPREP

EVA PREP FOR XFEREXERCISE MEALOMSBURNPOST SLEEP

LOG

SLEEP

MS3 EMU C/OEMUC/OPREP

ERGSETUP MEALNOSE CAP

SURVEY PORT WING SURVEYPGSC SETUP(PART II)POST SLEEP

LOG

SLEEP

MS4 EVA PREPFOR XFER

EXERCISEMEALNOSE CAP

SURVEYSTBD WING SURVEYOBSS UNBERTHPOST SLEEP POSTSLEEPRMS C/O

RMS

PWRUP

LOG

SLEEP

FE-2 EXP16

CWC

INIT #1

CWC

TERM

ERGSETUP EXERCISE H2O

CWC S/U MEALPOST SLEEPSLEEP XFER PREP

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16

TDRSW -171.0E -46.0Z -275.0

ORB ATT -ZLV -XVVNC2 STBD SURVEY

NOSE SURVEYPORT SURVEY

NOTES*HEATER RCNFG

*CONFIG*MANUAL

Page 17: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD02

NC3

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

EYHARTS

Δ

2-5

STS-122

22 23 12/08 01 02 03 04 05 06 07 08 09GMT 12/07/07 (341) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR+XRCSBURN

APCU 2@

EXERCISEMNVR

-ZLV

MNVR

-ZLV

FUTURE

LOAD

PORT

WING

SURVEY

PMCA/G

PRE SLEEPPRESLEEP SLEEP

PLT+XRCSBURN

CDM ACT

CDM S/U

EXERCISE FCMSC/O

OMSPODSRVY

PRE SLEEPRNDZ TOOLSC/O SLEEP

MS1 LDRIDOWNLINK

OBSSBERTH

PORT

WING

SURVEY

PRE SLEEP

RMS PDN

SLEEP

MS2+XRCSBURN

HHLC/O

PRE SLEEPSETUPC/LCAMR

SLEEPWLES

MS3ODSRINGEXT

EXERCISEMUS

PORT

WING

SURVEY

PRE SLEEPSETUPC/LCAMR

SLEEP

MS4ODSRINGEXT

EXERCISE

OBSSBERTH PRE SLEEP

RMS PDN

RNDZ TOOLSC/O SLEEP

FE-2 EXP16MOP

MUS

PMCA/G

PRE SLEEP SLEEP

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24

TDRSW -171.0E -46.0Z -275.0

BIAS -ZLV +YVVNC3

-ZLV -XVVORB ATT@ACT

NOTES

2-5

FD02

NC3

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

EYHARTS

Δ

STS-122

22 23 12/08 01 02 03 04 05 06 07 08 09GMT 12/07/07 (341) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR+XRCSBURN

APCU 2@

EXERCISEMNVR

-ZLV

MNVR

-ZLV

FUTURE

LOAD

PORT

WING

SURVEY

PMCA/G

PRE SLEEPPRESLEEP SLEEP

PLT+XRCSBURN

CDM ACT

CDM S/U

EXERCISE FCMSC/O

OMSPODSRVY

PRE SLEEPRNDZ TOOLSC/O SLEEP

MS1 LDRIDOWNLINK

OBSSBERTH

PORT

WING

SURVEY

PRE SLEEP

RMS PDN

SLEEP

MS2+XRCSBURN

HHLC/O

PRE SLEEPSETUPC/LCAMR

SLEEPWLES

MS3ODSRINGEXT

EXERCISEMUS

PORT

WING

SURVEY

PRE SLEEPSETUPC/LCAMR

SLEEP

MS4ODSRINGEXT

EXERCISE

OBSSBERTH PRE SLEEP

RMS PDN

RNDZ TOOLSC/O SLEEP

FE-2 EXP16MOP

MUS

PMCA/G

PRE SLEEP SLEEP

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -ZLV +YVVNC3

-ZLV -XVV

NOTES@ACT

Page 18: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

DOCKING*

FD03

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

MNVR NC4 Ti

WHITSON

TANI

MALENCHENKO

Δ Δ Δ

*1/20:43:43

2-6

STS-122

UP

ISS

DN

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/08/07 (342) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDRH/O

APPROACH W/RPM

BPSMU

/ RWS

GRP B

PWRDN

ISS RNDZ OPS HATCHOPEN

O2 RCNFG/PURGEPOST SLEEP

PGRPL

SFTYBRIEFSIMO

INITSIMOTERM

SLEEP

PLT APPROACH W/RPM

CDM-D

GRP B

PWRDN

GRP B

PWRUP

IMU

ISS RNDZ OPS

MCIU*

MNVR-XLVPOST SLEEP PST DK EVA

XFR RCNFG

RCS@

SFTYBRIEFSLEEP

SSV-2

MS1 APPROACH W/RPMEXERCISE CTBXFER

GRP B

PWRUP

ISS RNDZ OPSN2*

N2*

P/TV02DOCKS/U

PTVO4

SETUP

PTV05

SETUP

POST SLEEPPOST SLEEP

PGRPL

SFTYBRIEF

LOG

SLEEPOBSS

GRPL

MS2/EV1 APPROACH W/RPM

DOCK

AUDIO

EXERCISEISS RNDZ OPSISS RNDZ OPSOIU*

POST SLEEP PST DK EVAXFR RCNFG

REBA*

SFTYBRIEFSLEEP

SSV-3

MS3/EV2 EMURMVL

ISS RNDZOPS

HATCHOPEN

MDDK

PREP

ODSPREPFORINGR

P/TV02 DOCK OPSPOST SLEEP PST DK EVAXFR RCNFG

REBA*

SFTYBRIEFSLEEP

HATCHLEAKCK

MS4/EV3 APPROACH W/RPMCONDCWCS/U

EMURMVLEXERCISE ISS RNDZ

OPS

MDDK

PREP

ODSPREPFORINGR

POSTRNDZPGSCCONFG

POST SLEEP SFTYBRIEF

LOG

SLVA

SLEEPOBSS

GRPL

HATCHLEAKCK

WLES

FE-2 EXP16 SLEEPS/U

SLVA

POST SLEEPISSRNDZOPS

ISS RNDZOPSP/TV02 DOCK OPS APPROACH W/RPM SFTY

BRIEF

OBSS

GRPL

ISS CDR SLEEPS/U

SLVA

POST SLEEP DPCPW

O2 PR

PREP

P/TVRPMVRFYS/U

EXERCISECEVIS EXERCISE RED MIDDAY-MEAL

PREP

400MM

PHOTO

RPMDL

PMA2CFG

HATCHLEAK

CK ISS

HATCHOPEN

SFTYBRIEF

BPSMU

/ RWS

O2 RCNFG/PURGE

FE-1 SLEEP POST SLEEP PW PWDPCCNFG

STOW

P/TVRPMVRFYS/U

СОЖMNT EXERCISE TVIS MIDDAY-MEAL

СТТС

PREP

800MM

PHOTO

PMA2CFG

CAM D

HATCHLEAK

CK ISS

HATCH

OPEN

СОГС

SMPL

SFTYBRIEF VELO

DWNLD

FE-2 SLEEP POST SLEEP PW PWDPC

WINDW

EXERCISE RED EXERCISE CEVIS MIDDAY-MEAL

TIMER

TIMER

DOCKVIDEO

PMA2CFG

AUDIO

HATCHOPEN

SFTYBRIEF

DCSCNFG

OBSS

GRPL

DAY/NIGHTORBIT 24 25 26 27 28 29 30 31 32

TDRSW -171.0E -46.0Z -275.0

-ZLV -XVV -ZLV +YVV RNDZ DOCK BIAS -XLV -ZVVORB ATT♣CSA O2 CA*FILTER CHECK

@REG RCNFG*RPRS INIT *RPRS TERM*ACT *INSTALLNOTES

2-6

DOCKING*

FD03

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

MNVR NC4 Ti

WHITSON

TANI

MALENCHENKO

Δ Δ Δ

*1/20:43:43

STS-122

UP

ISS

DN

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/08/07 (342) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDRH/O

APPROACH W/RPM

BPSMU

/ RWS

GRP B

PWRDN

ISS RNDZ OPS HATCHOPEN

O2 RCNFG/PURGEPOST SLEEP

PGRPL

SFTYBRIEFSIMO

INITSIMOTERM

SLEEP

PLT APPROACH W/RPM

CDM-D

GRP B

PWRDN

GRP B

PWRUP

IMU

ISS RNDZ OPS

MCIU*

MNVR-XLVPOST SLEEP PST DK EVA

XFR RCNFG

RCS@

SFTYBRIEFSLEEP

SSV-2

MS1 APPROACH W/RPMEXERCISE CTBXFER

GRP B

PWRUP

ISS RNDZ OPSN2*

N2*

P/TV02DOCKS/U

PTVO4

SETUP

PTV05

SETUP

POST SLEEPPOST SLEEP

PGRPL

SFTYBRIEF

LOG

SLEEPOBSS

GRPL

MS2/EV1 APPROACH W/RPM

DOCK

AUDIO

EXERCISEISS RNDZ OPSISS RNDZ OPSOIU*

POST SLEEP PST DK EVAXFR RCNFG

REBA*

SFTYBRIEFSLEEP

SSV-3

MS3/EV2 EMURMVL

ISS RNDZOPS

HATCHOPEN

MDDK

PREP

ODSPREPFORINGR

P/TV02 DOCK OPSPOST SLEEP PST DK EVAXFR RCNFG

REBA*

SFTYBRIEFSLEEP

HATCHLEAKCK

MS4/EV3 APPROACH W/RPMCONDCWCS/U

EMURMVLEXERCISE ISS RNDZ

OPS

MDDK

PREP

ODSPREPFORINGR

POSTRNDZPGSCCONFG

POST SLEEP SFTYBRIEF

LOG

SLVA

SLEEPOBSS

GRPL

HATCHLEAKCK

WLES

FE-2 EXP16 SLEEPS/U

SLVA

POST SLEEPISSRNDZOPS

ISS RNDZOPSP/TV02 DOCK OPS APPROACH W/RPM SFTY

BRIEF

OBSS

GRPL

ISS CDR SLEEPS/U

SLVA

POST SLEEP DPCPW

O2 PR

PREP

P/TVRPMVRFYS/U

EXERCISECEVIS EXERCISE RED MIDDAY-MEAL

PREP

400MM

PHOTO

RPMDL

PMA2CFG

HATCHLEAK

CK ISS

HATCHOPEN

SFTYBRIEF

BPSMU

/ RWS

O2 RCNFG/PURGE

FE-1 SLEEP POST SLEEP PW PWDPCCNFG

STOW

P/TVRPMVRFYS/U

СОЖMNT EXERCISE TVIS MIDDAY-MEAL

СТТС

PREP

800MM

PHOTO

PMA2CFG

CAM D

HATCHLEAK

CK ISS

HATCH

OPEN

СОГС

SMPL

SFTYBRIEF VELO

DWNLD

FE-2 SLEEP POST SLEEP PW PWDPC

WINDW

EXERCISE RED EXERCISE CEVIS MIDDAY-MEAL

TIMER

TIMER

DOCKVIDEO

PMA2CFG

AUDIO

HATCHOPEN

SFTYBRIEF

DCSCNFG

OBSS

GRPL

DAY/NIGHTORBIT 24 25 26 27 28 29 30 31 32

TDRSW -171.0E -46.0Z -275.0

ORB ATT -ZLV -XVV -ZLV +YVV RNDZ DOCK BIAS -XLV -ZVV

NOTES♣CSA O2 CA*FILTER CHECK

@REG RCNFG*RPRS INIT *RPRS TERM*ACT *INSTALL

Page 19: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

(DOCK)FD03

DOCKING*

*342/18:15

2-7

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/08/07 (342)

12 13 14 15 16 17 18 19 20 21 22 23 002/00MET Day 001 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/08/07 (342)DAY/NIGHTORBIT

DAILY ORBIT 13 14 15 1 2 3 4 5 6TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

+XVV +ZLV TEAMNVR TO DOCK

+XVV +ZLVFREE DRIFT

-XVV +ZLV TEAISS ATTITUDE

JKK JJK JKK JJKTLM FORMATSAA

ACS-CCDB-PARAM-UPDTACS-GNC PPL-UPDATESDMS-PPL-DOCKING-U/LCOL-CC-NO OP-CMDCCS-TLM FORMAT-SWAPSPS-PWR DWN & RCVRYMSS-POWERUPDPCETCS-LPA TRRJ-LOCKPPS-SARJ-FTHRUHF-SSSR-ACTETCS-LPB TRRJ-LOCKPPS-BGA-FTHRC&T-AUDIO-CNFGACS-CMG DATA-DUMPCDH-PROX VAL CK-INHC&T-AUDIO RSA-CNFGACS-H/O-USOS-TO-RSVDS-CNFGLOCK-OPS-RECORDERVDS-VTR-ACTKU-BD-MASK-ENAACS-PRE-ARVL-CNFGSDMS-DATA-TAKEVDS-VTR-RECORDCDH-STND VAL CK-INHACS-PMA2-ARVL-CNFGDOCKINGACS-POST-ARVL-CNFGC&DH-DOCK-CNFGC&T-H/L AUDIO-CNFGACS-CMG GMBL ANG-PSNVDS-CVIU-P/UETCS-LPA TRRJ-AUTOKU-BD-RNDZ MASK-DISPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTOETCS-LPB TRRJ-AUTOACS-GPS-RECNFGTHC-IMV-DEP ENAISS-RAP DPRS-INHETCS-PPL-INCORPMSS-LIGHTS-POWERUP

S-BD

ACS-CCDB-PARAM-UPDT ACS-CCDB-PARAM-UPDTACS-GNC PPL-UPDATE

SDMS-PPL-DOCKING-U/LCOL-CC-NO OP-CMD

CCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWAPSPS-PWR DWN & RCVRY SPS-PWR DWN & RCVR

MSS-POWERUPDPC

ETCS-LPA TRRJ-LOCKPPS-SARJ-FTHR

UHF-SSSR-ACTETCS-LPB TRRJ-LOCK

PPS-BGA-FTHRC&T-AUDIO-CNFG

ACS-CMG DATA-DUMPCDH-PROX VAL CK-INH

C&T-AUDIO RSA-CNFGACS-H/O-USOS-TO-RSVDS-CNFG

LOCK-OPS-RECORDERVDS-VTR-ACT

KU-BD-MASK-ENAACS-PRE-ARVL-CNFG

SDMS-DATA-TAKEVDS-VTR-RECORD

CDH-STND VAL CK-INHACS-PMA2-ARVL-CNFGDOCKING

ACS-POST-ARVL-CNFGC&DH-DOCK-CNFGC&T-H/L AUDIO-CNFG

ACS-CMG GMBL ANG-PSNVDS-CVIU-P/U

ETCS-LPA TRRJ-AUTOKU-BD-RNDZ MASK-DISPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKACS-STS/CMG ATT-H/O

ACS-MM-ACTIV W/ USTOETCS-LPB TRRJ-AUTO

ACS-GPS-RECNFGTHC-IMV-DEP ENA

ISS-RAP DPRS-INHETCS-PPL-INCORP

MSS-LIGHTS-POWERUPLOCK-OPS-RECORDEROCA-MAIL-SYNC

KU-BD

LOCK-OPS-RECORDEROCA-MAIL-SYNC

ISS-PROX MODE-XTIONСУДН-ОГНИ-ON

С-СОСБ-FTHRС-СОСБ-MODEISS-STAND MODE-XTIONСЗП-АБ-PARTIAL CHRG

RS

ISS-PROX MODE-XTIONСУДН-ОГНИ-ON

СУДН-ОГНИ-ONС-СОСБ-FTHR

С-СОСБ-MODEISS-STAND MODE-XTION

СЗП-АБ-PARTIAL CHRGCOL-CC-NO OP-CMDC

OL

COL-CC-NO OP-CMD

S

2-7

(DOCK)FD03

DOCKING*

*342/18:15

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/08/07 (342)

12 13 14 15 16 17 18 19 20 21 22 23 002/00MET Day 001 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/08/07 (342)DAY/NIGHTORBIT

DAILY ORBIT 13 14 15 1 2 3 4 5 6TDRS AVAIL

VHF

ISS ATTITUDE +XVV +ZLV TEAMNVR TO DOCK

+XVV +ZLVFREE DRIFT

-XVV +ZLV TEA

TLM FORMAT JKK JJK JKK JJKSAA

ACS-CCDB-PARAM-UPDTACS-GNC PPL-UPDATESDMS-PPL-DOCKING-U/LCOL-CC-NO OP-CMDCCS-TLM FORMAT-SWAPSPS-PWR DWN & RCVRYMSS-POWERUPDPCETCS-LPA TRRJ-LOCKPPS-SARJ-FTHRUHF-SSSR-ACTETCS-LPB TRRJ-LOCKPPS-BGA-FTHRC&T-AUDIO-CNFGACS-CMG DATA-DUMPCDH-PROX VAL CK-INHC&T-AUDIO RSA-CNFGACS-H/O-USOS-TO-RSVDS-CNFGLOCK-OPS-RECORDERVDS-VTR-ACTKU-BD-MASK-ENAACS-PRE-ARVL-CNFGSDMS-DATA-TAKEVDS-VTR-RECORDCDH-STND VAL CK-INHACS-PMA2-ARVL-CNFGDOCKINGACS-POST-ARVL-CNFGC&DH-DOCK-CNFGC&T-H/L AUDIO-CNFGACS-CMG GMBL ANG-PSNVDS-CVIU-P/UETCS-LPA TRRJ-AUTOKU-BD-RNDZ MASK-DISPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTOETCS-LPB TRRJ-AUTOACS-GPS-RECNFGTHC-IMV-DEP ENAISS-RAP DPRS-INHETCS-PPL-INCORPMSS-LIGHTS-POWERUP

S-BD

ACS-CCDB-PARAM-UPDT ACS-CCDB-PARAM-UPDTACS-GNC PPL-UPDATE

SDMS-PPL-DOCKING-U/LCOL-CC-NO OP-CMD

CCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWAPSPS-PWR DWN & RCVRY SPS-PWR DWN & RCVR

MSS-POWERUPDPC

ETCS-LPA TRRJ-LOCKPPS-SARJ-FTHR

UHF-SSSR-ACTETCS-LPB TRRJ-LOCK

PPS-BGA-FTHRC&T-AUDIO-CNFG

ACS-CMG DATA-DUMPCDH-PROX VAL CK-INH

C&T-AUDIO RSA-CNFGACS-H/O-USOS-TO-RSVDS-CNFG

LOCK-OPS-RECORDERVDS-VTR-ACT

KU-BD-MASK-ENAACS-PRE-ARVL-CNFG

SDMS-DATA-TAKEVDS-VTR-RECORD

CDH-STND VAL CK-INHACS-PMA2-ARVL-CNFGDOCKING

ACS-POST-ARVL-CNFGC&DH-DOCK-CNFGC&T-H/L AUDIO-CNFG

ACS-CMG GMBL ANG-PSNVDS-CVIU-P/U

ETCS-LPA TRRJ-AUTOKU-BD-RNDZ MASK-DISPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKACS-STS/CMG ATT-H/O

ACS-MM-ACTIV W/ USTOETCS-LPB TRRJ-AUTO

ACS-GPS-RECNFGTHC-IMV-DEP ENA

ISS-RAP DPRS-INHETCS-PPL-INCORP

MSS-LIGHTS-POWERUPLOCK-OPS-RECORDEROCA-MAIL-SYNC

KU-BD

LOCK-OPS-RECORDEROCA-MAIL-SYNC

ISS-PROX MODE-XTIONСУДН-ОГНИ-ON

С-СОСБ-FTHRС-СОСБ-MODEISS-STAND MODE-XTIONСЗП-АБ-PARTIAL CHRG

RS

ISS-PROX MODE-XTIONСУДН-ОГНИ-ON

СУДН-ОГНИ-ONС-СОСБ-FTHR

С-СОСБ-MODEISS-STAND MODE-XTION

СЗП-АБ-PARTIAL CHRGCOL-CC-NO OP-CMDC

OL

COL-CC-NO OP-CMD

S

Page 20: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD03

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

NO EXERCISE

2-8

STS-122

UP

ISS

DN

22 23 12/09 01 02 03 04 05 06 07 08 09GMT 12/08/07 (342) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR EVA1 PROCRVW

O2 RCNFG/PURGE PMC

A/GPRE SLEEP

RMS

GRPL

RMS*

SLEEP

PLT E-LKPREP

EVA1 PROCRVW

PLYBK

OPS PRE SLEEP* SLEEP

MS1 EVA1 PROCRVW PRE SLEEPPRE

SLEEP SLEEP

UNGRP

H/O

OBSS

GRPL

SSRMS OBSSUNBRTH

MS2/EV1 MASK PB/TOOLCONFIG

E-LKPREP

EVA1 PROCRVWPRE SLEEP PRE

SLEEPPRE SLEEPREBA

C/O SLEEP

MS3/EV2 MASK PB/TOOLCONFIG

E-LKPREP

EVA1 PROCRVWPRE SLEEP PRE SLEEP PRE

SLEEP

REBA

C/O SLEEP

MS4/EV3 EVA1 PROCRVW

MRL@

PRESLEEP PRE SLEEP

RMS

GRPL

RMS*

RMS

SETUP

SLEEPOBSS

GRPL

SSRMSOBSSUNBRTH

FE-2 EXP16OBSS

GRPL

SSRMS OBSSUNBRTH PREP

WORK

UNGRP

H/O

SSRMS

MNVRDPC EVA1 PROC

RVW PRE SLEEP-ISS SLEEP

ISS CDR O2 RCNFG/PURGE PREP WORK

SODF

XFERDPC EVA1 PROC

RVW PRE SLEEP-ISS SLEEP

FE-1CSAO2CAL

PREP WORK DPC EVA1 PROCRVW PRE SLEEP-ISS SLEEP

FE-2OBSS

GRPL

SSRMS OBSSUNBRTH PREP

WORK

UNGRP

H/O

SSRMS

MNVRDPC EVA1 PROC

RVW PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 32 33 34 35 36 37 38 39 40

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT*MNVR-COL VIEW *√ HUM SEP@RELEASE

NOTES

2-8

FD03

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

NO EXERCISE

STS-122

UP

ISS

DN

22 23 12/09 01 02 03 04 05 06 07 08 09GMT 12/08/07 (342) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR EVA1 PROCRVW

O2 RCNFG/PURGE PMC

A/GPRE SLEEP

RMS

GRPL

RMS*

SLEEP

PLT E-LKPREP

EVA1 PROCRVW

PLYBK

OPS PRE SLEEP* SLEEP

MS1 EVA1 PROCRVW PRE SLEEPPRE

SLEEP SLEEP

UNGRP

H/O

OBSS

GRPL

SSRMS OBSSUNBRTH

MS2/EV1 MASK PB/TOOLCONFIG

E-LKPREP

EVA1 PROCRVWPRE SLEEP PRE

SLEEPPRE SLEEPREBA

C/O SLEEP

MS3/EV2 MASK PB/TOOLCONFIG

E-LKPREP

EVA1 PROCRVWPRE SLEEP PRE SLEEP PRE

SLEEP

REBA

C/O SLEEP

MS4/EV3 EVA1 PROCRVW

MRL@

PRESLEEP PRE SLEEP

RMS

GRPL

RMS*

RMS

SETUP

SLEEPOBSS

GRPL

SSRMSOBSSUNBRTH

FE-2 EXP16OBSS

GRPL

SSRMS OBSSUNBRTH PREP

WORK

UNGRP

H/O

SSRMS

MNVRDPC EVA1 PROC

RVW PRE SLEEP-ISS SLEEP

ISS CDR O2 RCNFG/PURGE PREP WORK

SODF

XFERDPC EVA1 PROC

RVW PRE SLEEP-ISS SLEEP

FE-1CSAO2CAL

PREP WORK DPC EVA1 PROCRVW PRE SLEEP-ISS SLEEP

FE-2OBSS

GRPL

SSRMS OBSSUNBRTH PREP

WORK

UNGRP

H/O

SSRMS

MNVRDPC EVA1 PROC

RVW PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 32 33 34 35 36 37 38 39 40

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES*MNVR-COL VIEW *√ HUM SEP@RELEASE

Page 21: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD03

2-9

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/09 01 02 03CT 12/08/07 (342)

002/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 002 22 23 12/09 01 02 03 04 05 06 07 08 09

GMT 12/08/07 (342)DAY/NIGHTORBIT

DAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JJK JKKTLM FORMATSAA

AR-CDRA-ACTIATCS-A/L LTL-TERMDPCIATCS-MTL FLOW-ADJSTIATCS-A/L LTL-INITMSS-POWERDOWNCCS-TLM FORMAT-SWAPA/L-10.2 PSI OP-INIT

ND2-MECH A/S PPL-U/LNOD2-CBM PREP-MATEA/L-CCAA-SPD-CHGACS-AUTO-H/O-RS-ENAVDS-VTR-DEACTA/L-CAMPOUT-CNFGCHECS-DEFIB DLY-CMD SDMS-DATA-DUMPCHECS-COMMANDINGPPS-PCU-ACT

S-BD

AR-CDRA-ACTIATCS-A/L LTL-TERM

DPCIATCS-MTL FLOW-ADJST

IATCS-A/L LTL-INITMSS-POWERDOWN

CCS-TLM FORMAT-SWAPA/L-10.2 PSI OP-INIT

A/L-10.2 PSI OP-INITND2-MECH A/S PPL-U/L

NOD2-CBM PREP-MATEA/L-CCAA-SPD-CHG

ACS-AUTO-H/O-RS-ENAVDS-VTR-DEACTA/L-CAMPOUT-CNFG

CHECS-DEFIB DLY-CMDSDMS-DATA-DUMP

CHECS-COMMANDINPPS-PCU-ACT

OCA-MAIL-SYNCCHECS-KU-D/L

KU-BD

OCA-MAIL-SYNC OCA-MAIL-SYNCCHECS-KU-

RSCOLSYS

MCC-H FCT H/O (1/2)NO EXERCISECCS-TLM FORMAT-SWAPA/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

MCC-H FCT H/O (1/2)NO EXERCISE

CCS-TLM FORMAT-SWAPA/L-CAMPOUT-CNFG

MCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINCHECS-KU-

NOTES:

2-9

FD03 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/09 01 02 03CT 12/08/07 (342)

002/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 002 22 23 12/09 01 02 03 04 05 06 07 08 09

GMT 12/08/07 (342)DAY/NIGHTORBIT

DAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JJK JKKSAA

AR-CDRA-ACTIATCS-A/L LTL-TERMDPCIATCS-MTL FLOW-ADJSTIATCS-A/L LTL-INITMSS-POWERDOWNCCS-TLM FORMAT-SWAPA/L-10.2 PSI OP-INIT

ND2-MECH A/S PPL-U/LNOD2-CBM PREP-MATEA/L-CCAA-SPD-CHGACS-AUTO-H/O-RS-ENAVDS-VTR-DEACTA/L-CAMPOUT-CNFGCHECS-DEFIB DLY-CMD SDMS-DATA-DUMPCHECS-COMMANDINGPPS-PCU-ACT

S-BD

AR-CDRA-ACTIATCS-A/L LTL-TERM

DPCIATCS-MTL FLOW-ADJST

IATCS-A/L LTL-INITMSS-POWERDOWN

CCS-TLM FORMAT-SWAPA/L-10.2 PSI OP-INIT

A/L-10.2 PSI OP-INITND2-MECH A/S PPL-U/L

NOD2-CBM PREP-MATEA/L-CCAA-SPD-CHG

ACS-AUTO-H/O-RS-ENAVDS-VTR-DEACTA/L-CAMPOUT-CNFG

CHECS-DEFIB DLY-CMDSDMS-DATA-DUMP

CHECS-COMMANDINPPS-PCU-ACT

OCA-MAIL-SYNCCHECS-KU-D/L

KU-BD

OCA-MAIL-SYNC OCA-MAIL-SYNCCHECS-KU-

RSCOLSYS

MCC-H FCT H/O (1/2)NO EXERCISECCS-TLM FORMAT-SWAPA/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

MCC-H FCT H/O (1/2)NO EXERCISE

CCS-TLM FORMAT-SWAPA/L-CAMPOUT-CNFG

MCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINCHECS-KU-

NOTES:

Page 22: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD04

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

A/LREP

EVA 1 (06:30)

NO EXERCISE ~

2-10

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/09/07 (343) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR C_LKDPRS

CWC#3

INIT

CWC#2

INIT

CWC

TERM

CWCXFER(2)

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREP

HYGBRK/HATCHCLS

EXERCISEIMU

MEAL

MNVR

UPDAT

N2*

N2*

P/TV07EVASPPT

P/TV07

PMCA/G

POSTSLEEP

POST

SLEEP

PRLA

PWRFILL#1

SLEEP

PLT

P_DPS

INHIB

PAD EVA1 IVA SPPRTEVA1 IVA

SPPRT PREP

MCIU*

P/TV07EVAS/U

POST SLEEPSLEEP

MS1KU#

POST SLEEPLOG

SLEEP

SSRMS

GRPL*

SSRMS COL UNBRTHSSRMS PDGF INSTALLSSRMS PDGF SETUP

XFR

UPDAT

XFER OPS

MS2/EV1 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

P1 NTARMVLPREP

PDGF INSTALLPDGF SETUPPOSTSLEEPSLEEP

MS3/EV2 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

P1NTARMVLPREP

PDGF INSTALLPDGF SETUPPOSTSLEEPSLEEP

MS4/EV3

CBCS

PWRUP

EXERCISEKU#

PGSC^

POST SLEEPLOG

SLEEP

SSRMS

GRPL*

SSRMS COL UNBRTHSSRMS PDGF INSTALLSSRMS PDGF SETUP

XFER$

FE-2 SLEEP POST SLEEP PREPWORK DPC

WINDW

PWR

XFER

EXERCISETVIS EXERCISE RED SSRMS PDGF SETUP

ACBM

MIDDAY-MEAL ACS-PPRVSP

SEAL-R&R

SSRMS COL UNBRTH

ISS CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS EXERCISE RED MIDDAY-MEAL VEST OUTFIT

PREP VAJS/U

FE-1 SLEEP POST SLEEP PREPWORK DPC

HAM

IELKRMVL IELK INST & C/O EXERCISE TVIS

SOKOL

LK CKSOKLDRY

MIDDAY-MEAL

GLOVE

СОЖMNT

SOKOL

CLS РБО-3-2

INIT

FE-2 EXP16 SLEEP POST SLEEP PREPWORK DPC

IELKRMVL& XFER

IELK INST & C/O CMSOV

UOP

UOP

INSTL

PWS ADAPT ADAPT

ADAPT

REDH/O

TVIS

H/O

SOKOL

LK CK

ACBM

MIDDAY-MEAL PFAS/U

VEST OUTFITPREP

DAY/NIGHTORBIT 40 41 42 43 44 45 46 47 48

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT*RPRS INIT *RPRS TERM*FILTER CHECK #STOW

*SSRMS PWR LATCHES CONNECTED

^POWERDOWN *SSRMS PWR LATCHES CONNECTED

$PCMCIA-SSCNOTES

2-10

FD04

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

A/LREP

EVA 1 (06:30)

NO EXERCISE ~

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/09/07 (343) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR C_LKDPRS

CWC#3

INIT

CWC#2

INIT

CWC

TERM

CWCXFER(2)

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREP

HYGBRK/HATCHCLS

EXERCISEIMU

MEAL

MNVR

UPDAT

N2*

N2*

P/TV07EVASPPT

P/TV07

PMCA/G

POSTSLEEP

POST

SLEEP

PRLA

PWRFILL#1

SLEEP

PLT

P_DPS

INHIB

PAD EVA1 IVA SPPRTEVA1 IVA

SPPRT PREP

MCIU*

P/TV07EVAS/U

POST SLEEPSLEEP

MS1KU#

POST SLEEPLOG

SLEEP

SSRMS

GRPL*

SSRMS COL UNBRTHSSRMS PDGF INSTALLSSRMS PDGF SETUP

XFR

UPDAT

XFER OPS

MS2/EV1 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

P1 NTARMVLPREP

PDGF INSTALLPDGF SETUPPOSTSLEEPSLEEP

MS3/EV2 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

P1NTARMVLPREP

PDGF INSTALLPDGF SETUPPOSTSLEEPSLEEP

MS4/EV3

CBCS

PWRUP

EXERCISEKU#

PGSC^

POST SLEEPLOG

SLEEP

SSRMS

GRPL*

SSRMS COL UNBRTHSSRMS PDGF INSTALLSSRMS PDGF SETUP

XFER$

FE-2 SLEEP POST SLEEP PREPWORK DPC

WINDW

PWR

XFER

EXERCISETVIS EXERCISE RED SSRMS PDGF SETUP

ACBM

MIDDAY-MEAL ACS-PPRVSP

SEAL-R&R

SSRMS COL UNBRTH

ISS CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS EXERCISE RED MIDDAY-MEAL VEST OUTFIT

PREP VAJS/U

FE-1 SLEEP POST SLEEP PREPWORK DPC

HAM

IELKRMVL IELK INST & C/O EXERCISE TVIS

SOKOL

LK CKSOKLDRY

MIDDAY-MEAL

GLOVE

СОЖMNT

SOKOL

CLS РБО-3-2

INIT

FE-2 EXP16 SLEEP POST SLEEP PREPWORK DPC

IELKRMVL& XFER

IELK INST & C/O CMSOV

UOP

UOP

INSTL

PWS ADAPT ADAPT

ADAPT

REDH/O

TVIS

H/O

SOKOL

LK CK

ACBM

MIDDAY-MEAL PFAS/U

VEST OUTFITPREP

DAY/NIGHTORBIT 40 41 42 43 44 45 46 47 48

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES*RPRS INIT *RPRS TERM*FILTER CHECK #STOW

*SSRMS PWR LATCHES CONNECTED

^POWERDOWN *SSRMS PWR LATCHES CONNECTED

$PCMCIA-SSC

Page 23: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD04

2-11

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/09/07 (343)

12 13 14 15 16 17 18 19 20 21 22 23 003/00MET Day 002 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/09/07 (343)DAY/NIGHTORBIT

DAILY ORBIT 14 15 16 1 2 3 4 5 6TDRS AVAIL

VHF ALL VHFALL VHF

ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JKK JJK JKKTLM FORMATSAA

ETCS-LPB TRRJ-LOCKACS-AUTO-H/O-RS-INHACS-GNC PPL-UPDATEUHF-SSSR-ACTC&T-AUDIO-CNFGEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAP

MSS-LIGHTS-POWERUPPPS-PCU FDIR-ENABLEVDS-VIDEO-CNFGA/L RAPID DPRS-ENADPCETCS-LOOP B-PRESSVDS-WETA-ACTISS-RAP DPRS-INHISS-RAP DPRS-ENAACS-PCA VRIV-OPA/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHGVDS-EV1 CAM-RECORDACS-CCDB-ATT-CHANGEETCS-NTA-VENT

S-BD

ETCS-LPB TRRJ-LOCKACS-AUTO-H/O-RS-INH

ACS-GNC PPL-UPDATE ACS-GNC PPL-UPDAUHF-SSSR-ACT

C&T-AUDIO-CNFGEVA-HYGIENE-BREAK

EVA-HYGIENE-BREAKCCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWA

CCS-TLM FOMSS-LIGHTS-POWERUP

PPS-PCU FDIR-ENABLEVDS-VIDEO-CNFGA/L RAPID DPRS-ENA

DPCETCS-LOOP B-PRESS

VDS-WETA-ACTISS-RAP DPRS-INH

ISS-RAP DPRS-ENAACS-PCA VRIV-OP

A/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHG

VDS-EV1 CACS-CCDB-ATETCS-NTA-

CHECS-KU-D/LOCA-MAIL-SYNC

KU-BD

CHECS-KU-D/LOCA-MAIL-SYNC

RSCOLSYS

CHECS-KU-D/LACS-GNC PPL-UPDATEMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAP

EVA INHIBIT PADMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LACS-GNC PPL-UPDATE ACS-GNC PPL-UPDA

MCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWA

CCS-TLM FOEVA INHIBIT PAD

MCC-H FCT H/O (1/2)

NOTES: 2-11

FD04 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/09/07 (343)

12 13 14 15 16 17 18 19 20 21 22 23 003/00MET Day 002 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/09/07 (343)DAY/NIGHTORBIT

DAILY ORBIT 14 15 16 1 2 3 4 5 6TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JKK JJK JKKSAA

ETCS-LPB TRRJ-LOCKACS-AUTO-H/O-RS-INHACS-GNC PPL-UPDATEUHF-SSSR-ACTC&T-AUDIO-CNFGEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAP

MSS-LIGHTS-POWERUPPPS-PCU FDIR-ENABLEVDS-VIDEO-CNFGA/L RAPID DPRS-ENADPCETCS-LOOP B-PRESSVDS-WETA-ACTISS-RAP DPRS-INHISS-RAP DPRS-ENAACS-PCA VRIV-OPA/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHGVDS-EV1 CAM-RECORDACS-CCDB-ATT-CHANGEETCS-NTA-VENT

S-BD

ETCS-LPB TRRJ-LOCKACS-AUTO-H/O-RS-INH

ACS-GNC PPL-UPDATE ACS-GNC PPL-UPDAUHF-SSSR-ACT

C&T-AUDIO-CNFGEVA-HYGIENE-BREAK

EVA-HYGIENE-BREAKCCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWA

CCS-TLM FOMSS-LIGHTS-POWERUP

PPS-PCU FDIR-ENABLEVDS-VIDEO-CNFGA/L RAPID DPRS-ENA

DPCETCS-LOOP B-PRESS

VDS-WETA-ACTISS-RAP DPRS-INH

ISS-RAP DPRS-ENAACS-PCA VRIV-OP

A/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHG

VDS-EV1 CACS-CCDB-ATETCS-NTA-

CHECS-KU-D/LOCA-MAIL-SYNC

KU-BD

CHECS-KU-D/LOCA-MAIL-SYNC

RSCOLSYS

CHECS-KU-D/LACS-GNC PPL-UPDATEMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAP

EVA INHIBIT PADMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LACS-GNC PPL-UPDATE ACS-GNC PPL-UPDA

MCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAP CCS-TLM FORMAT-SWA

CCS-TLM FOEVA INHIBIT PAD

MCC-H FCT H/O (1/2)

NOTES:

Page 24: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD04

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

NO EXERCISE~

2-12

STS-122

DN

ISS

UP

22 23 12/10 01 02 03 04 05 06 07 08 09GMT 12/09/07 (343) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDRCWC

TERM

CWC

XFER

POST EVAW/H20,METOX

P/TV07 EVASPPT PMC

A/GPRE SLEEP SLEEP

PLT

P-RPS

RPRS

CDM-A

CDM*

EVA1 IVA SPPRT EXERCISELCC@

LCC%

PRE SLEEP SLEEP

MS1 1STSTGCAP

2NDSTGCAP

PRE SLEEP SLEEPLIMP

SAFE

SSRMSCOL

UNBRTH

BRIEF

XFER OPSXFER

TAG

MS2/EV1

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX

P1 NTARMVL PREP PRE SLEEP SLEEP

MS3/EV2

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX

MUS

P1 NTARMVL PREP PRE SLEEP SLEEP

MS4/EV3CBCSCAMRARMV

1STSTGCAP

2NDSTGCAP

ACQ

BOLTS

BSAINIT PRE SLEEP SLEEP

LIMP

SAFE

SSRMSCOL

UNBRTHXFER OPS

XFER

TAG

FE-2SSRMSCOL

UNBRTH

1STSTGCAP

LIMP

2NDSTGCAP

ACQ

BOLTS

SAFE

POST EVAW/H20,METOX

D/L#

DPC

O2 LK

PW PRE SLEEP-ISS SLEEP

ISS CDR VAJS/U

NODE2 QDDISCNCT

EXERCISECEVIS

LK CK

PWREADPS PSDPC

LKCKTERM

LEAK*

PRE SLEEP-ISS SLEEP

FE-1

GLOVE

PREPWORK

PREP

WORK

PREP

WORK

VELO

DWNLD

DPC PRE SLEEP-ISS SLEEP

FE-2 EXP16 ADAPT

ADAPT

1STSTGCAP

LIMP

2NDSTGCAP

ACQ

BOLTS

PREPWORK

PREP

WORK

CEVIS

H/O PMC

MUS

MOPDPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT*BATT C/O @ACT

%Deact#EVA Image Downlink

*CHECK-INITNOTES

2-12

FD04

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

NO EXERCISE~

STS-122

DN

ISS

UP

22 23 12/10 01 02 03 04 05 06 07 08 09GMT 12/09/07 (343) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDRCWC

TERM

CWC

XFER

POST EVAW/H20,METOX

P/TV07 EVASPPT PMC

A/GPRE SLEEP SLEEP

PLT

P-RPS

RPRS

CDM-A

CDM*

EVA1 IVA SPPRT EXERCISELCC@

LCC%

PRE SLEEP SLEEP

MS1 1STSTGCAP

2NDSTGCAP

PRE SLEEP SLEEPLIMP

SAFE

SSRMSCOL

UNBRTH

BRIEF

XFER OPSXFER

TAG

MS2/EV1

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX

P1 NTARMVL PREP PRE SLEEP SLEEP

MS3/EV2

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX

MUS

P1 NTARMVL PREP PRE SLEEP SLEEP

MS4/EV3CBCSCAMRARMV

1STSTGCAP

2NDSTGCAP

ACQ

BOLTS

BSAINIT PRE SLEEP SLEEP

LIMP

SAFE

SSRMSCOL

UNBRTHXFER OPS

XFER

TAG

FE-2SSRMSCOL

UNBRTH

1STSTGCAP

LIMP

2NDSTGCAP

ACQ

BOLTS

SAFE

POST EVAW/H20,METOX

D/L#

DPC

O2 LK

PW PRE SLEEP-ISS SLEEP

ISS CDR VAJS/U

NODE2 QDDISCNCT

EXERCISECEVIS

LK CK

PWREADPS PSDPC

LKCKTERM

LEAK*

PRE SLEEP-ISS SLEEP

FE-1

GLOVE

PREPWORK

PREP

WORK

PREP

WORK

VELO

DWNLD

DPC PRE SLEEP-ISS SLEEP

FE-2 EXP16 ADAPT

ADAPT

1STSTGCAP

LIMP

2NDSTGCAP

ACQ

BOLTS

PREPWORK

PREP

WORK

CEVIS

H/O PMC

MUS

MOPDPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES*BATT C/O @ACT

%Deact#EVA Image Downlink

*CHECK-INIT

Page 25: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD04

2-13

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/10 01 02 03CT 12/09/07 (343)

003/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 003 22 23 12/10 01 02 03 04 05 06 07 08 09

GMT 12/09/07 (343)DAY/NIGHTORBIT

DAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JJK JKKTLM FORMATSAA

ETCS-NTA-VENTOIU-FORMAT-CHANGEA/L-CCAA-RECNFGETCS-LPB TRRJ-AUTONOD2-CBM BOLT LOADNGC&T-AUDIO-CNFGMSS-POWERDOWNND2-MECH A/S PPL-U/LHMS-PMCUHF-SSSR-DEACTPPS-PCU FDIR-INHIBITVDS-WETA-DEACTVDS-VIDEO-DCNFGDPCCCS-TLM FORMAT-SWAPACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD CHECS-COMMANDINGC&C-MDM-PPL-LOAD

S-BD

ETCS-NTA-VENTOIU-FORMAT-CHANGE

A/L-CCAA-RECNFGETCS-LPB TRRJ-AUTO

NOD2-CBM BOLT LOADNGC&T-AUDIO-CNFG

MSS-POWERDOWNND2-MECH A/S PPL-U/L

HMS-PMCUHF-SSSR-DEACT

PPS-PCU FDIR-INHIBITVDS-WETA-DEACT

VDS-VIDEO-DCNFGDPC

CCS-TLM FORMAT-SWAP CCS-TLM FORMACS-AUTO-H/O-RS-ENA

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

C&C-MDM-PPL-LOADOCA-MAIL-SYNCCHECS-KU-D/L

KU-BD

OCA-MAIL-SYNC OCA-MAIL-SYNCCHECS-KU-

RSCOL

IWIS-DATA-TAKEACS-O2 FINE-LK CKACS-COL FINE-LK CK

SYS

IWIS-DATA-TAKEACS-O2 FIACS-COL F

CCS-TLM FORMAT-SWAPCHECS-DEFIB DLY-CMD CHECS-COMMANDINGMCC-H FCT H/O (2/3)CHECS-KU-D/L

MCC

CCS-TLM FORMAT-SWAP CCS-TLM FORMCHECS-DEFIB DLY-CMD

CHECS-COMMANDINGMCC-H FCT H/O (2/3)

CHECS-KU-

NOTES:

2-13

FD04 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/10 01 02 03CT 12/09/07 (343)

003/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 003 22 23 12/10 01 02 03 04 05 06 07 08 09

GMT 12/09/07 (343)DAY/NIGHTORBIT

DAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JJK JKKSAA

ETCS-NTA-VENTOIU-FORMAT-CHANGEA/L-CCAA-RECNFGETCS-LPB TRRJ-AUTONOD2-CBM BOLT LOADNGC&T-AUDIO-CNFGMSS-POWERDOWNND2-MECH A/S PPL-U/LHMS-PMCUHF-SSSR-DEACTPPS-PCU FDIR-INHIBITVDS-WETA-DEACTVDS-VIDEO-DCNFGDPCCCS-TLM FORMAT-SWAPACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD CHECS-COMMANDINGC&C-MDM-PPL-LOAD

S-BD

ETCS-NTA-VENTOIU-FORMAT-CHANGE

A/L-CCAA-RECNFGETCS-LPB TRRJ-AUTO

NOD2-CBM BOLT LOADNGC&T-AUDIO-CNFG

MSS-POWERDOWNND2-MECH A/S PPL-U/L

HMS-PMCUHF-SSSR-DEACT

PPS-PCU FDIR-INHIBITVDS-WETA-DEACT

VDS-VIDEO-DCNFGDPC

CCS-TLM FORMAT-SWAP CCS-TLM FORMACS-AUTO-H/O-RS-ENA

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

C&C-MDM-PPL-LOADOCA-MAIL-SYNCCHECS-KU-D/L

KU-BD

OCA-MAIL-SYNC OCA-MAIL-SYNCCHECS-KU-

RSCOL

IWIS-DATA-TAKEACS-O2 FINE-LK CKACS-COL FINE-LK CK

SYS

IWIS-DATA-TAKEACS-O2 FIACS-COL F

CCS-TLM FORMAT-SWAPCHECS-DEFIB DLY-CMD CHECS-COMMANDINGMCC-H FCT H/O (2/3)CHECS-KU-D/L

MCC

CCS-TLM FORMAT-SWAP CCS-TLM FORMCHECS-DEFIB DLY-CMD

CHECS-COMMANDINGMCC-H FCT H/O (2/3)

CHECS-KU-

NOTES:

Page 26: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD05

N2 DDCU PWRDN ><

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

#

#SSRMS PWR LATCHES DISCONNECT2-14

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/10/07 (344) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDRFIDOUGREVIEW

FOCUSED INSPECTIONIMU

MEAL

PAO

EVENT

POST SLEEPSLEEP XFER OPS

PLT

CWC#6

INIT

CWC#5

INIT

CWC#4

INIT

CWC

TERM

CWC

TERM

CWC

TERM

CWC XFER(3)

CDM-D

EXERCISE

MCIU*

MEALPOST SLEEPPWRFILL#2

SLEEP XFER OPSXFER OPSWCS

MS1FIDOUGREVIEW

FOCUSED INSPECTIONKU$

KU*

MEALP/TV05S/U

PAO

EVENT

POST SLEEPLOG

SLEEPSSRMSUNGRP

COL-MNVR

SSRMSFIMNVR

XFR

UPDAT

MS2/EV1

ASPRN

E-LK PREPEMUINIT

BSA-T

TOOL CONFIGEXERCISE MEAL

PAO

EVENT

POST SLEEPLOG

SLEEP XFER OPS

MS3/EV2

ASPRN

DSK CVR RMV& STRAP 1553

DATA

HARD

WIRED

ITCSJMPR

PWR

JMPR

E-LK PREP TOOL CONFIGMEAL

BATT/

METX

INSTL

METX@

FWD & AFT CPARMVPOST SLEEPSLEEP

MS4/EV3FIDOUGREVIEW

FOCUSED INSPECTIONKU$

KU*

MEAL

PAO

EVENT

PGSC^

POST SLEEPLOG

SLVA

SLEEPSSRMSUNGRP

COL-MNVR

SSRMSFIMNVR

FE-2 SLEEPS/U

S/U

SLVA

POST SLEEP PW

O2 LK

DPCPREP

WORKH/O H/O IWIS

D/L

SSRMSUNGRP

COL-MNVR

SODFDPLY EXERCISE RED

OVHD &DECK

CPA RMVMIDDAY-MEAL XFER OPS DCB

UNPACK♣

ISS CDR SLEEPSLVA

POST SLEEP PREPWORK DPC

LKCKT/D

PFA

DSK CVR RMV& STRAP

PWR

JMPR

HARD

WIRED

1553DATA

FWD & AFT CPARMV

OVHD &DECK

CPA RMV

OVHD &DECK CPA

RMVMIDDAY-MEAL

COND

JMPR

FIBER

ARS

RED

FE-1 SLEEP POST SLEEP PREPWORK DPC ⊕

ГФИ-8

БФСО2

MNT СОЖ

MNT

ALC

ИПДAKPREP

ИПДAK1SMPL

COTPКОНТУРMNT

COTP КОНТУР MNTEXERCISE TVIS MIDDAY-MEAL

FE-2 EXP16 SLEEPSLVA

POST SLEEP PREPWORK DPCPMC H/O H/O

S/U

ADAPT ADAPT

ADAPT

PARTLINGRS

NPRV IMVSPLY VLV

IMVSPLYDCT

MIDDAY-MEALOVHD &DECK CPA

RMV

NPRV IMVRTRN VLV

IMVRTRNDUCT

PBA

PFEX

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT♣EXERCISE T⊕СВ-ВПхО-ВПрК-MNT

*FILTER CHECK$ACT

*DEPLOY@TERM

^CHECKNOTES

2-14

FD05

N2 DDCU PWRDN ><

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

#

#SSRMS PWR LATCHES DISCONNECT

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/10/07 (344) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDRFIDOUGREVIEW

FOCUSED INSPECTIONIMU

MEAL

PAO

EVENT

POST SLEEPSLEEP XFER OPS

PLT

CWC#6

INIT

CWC#5

INIT

CWC#4

INIT

CWC

TERM

CWC

TERM

CWC

TERM

CWC XFER(3)

CDM-D

EXERCISE

MCIU*

MEALPOST SLEEPPWRFILL#2

SLEEP XFER OPSXFER OPSWCS

MS1FIDOUGREVIEW

FOCUSED INSPECTIONKU$

KU*

MEALP/TV05S/U

PAO

EVENT

POST SLEEPLOG

SLEEPSSRMSUNGRP

COL-MNVR

SSRMSFIMNVR

XFR

UPDAT

MS2/EV1

ASPRN

E-LK PREPEMUINIT

BSA-T

TOOL CONFIGEXERCISE MEAL

PAO

EVENT

POST SLEEPLOG

SLEEP XFER OPS

MS3/EV2

ASPRN

DSK CVR RMV& STRAP 1553

DATA

HARD

WIRED

ITCSJMPR

PWR

JMPR

E-LK PREP TOOL CONFIGMEAL

BATT/

METX

INSTL

METX@

FWD & AFT CPARMVPOST SLEEPSLEEP

MS4/EV3FIDOUGREVIEW

FOCUSED INSPECTIONKU$

KU*

MEAL

PAO

EVENT

PGSC^

POST SLEEPLOG

SLVA

SLEEPSSRMSUNGRP

COL-MNVR

SSRMSFIMNVR

FE-2 SLEEPS/U

S/U

SLVA

POST SLEEP PW

O2 LK

DPCPREP

WORKH/O H/O IWIS

D/L

SSRMSUNGRP

COL-MNVR

SODFDPLY EXERCISE RED

OVHD &DECK

CPA RMVMIDDAY-MEAL XFER OPS DCB

UNPACK♣

ISS CDR SLEEPSLVA

POST SLEEP PREPWORK DPC

LKCKT/D

PFA

DSK CVR RMV& STRAP

PWR

JMPR

HARD

WIRED

1553DATA

FWD & AFT CPARMV

OVHD &DECK

CPA RMV

OVHD &DECK CPA

RMVMIDDAY-MEAL

COND

JMPR

FIBER

ARS

RED

FE-1 SLEEP POST SLEEP PREPWORK DPC ⊕

ГФИ-8

БФСО2

MNT СОЖ

MNT

ALC

ИПДAKPREP

ИПДAK1SMPL

COTPКОНТУРMNT

COTP КОНТУР MNTEXERCISE TVIS MIDDAY-MEAL

FE-2 EXP16 SLEEPSLVA

POST SLEEP PREPWORK DPCPMC H/O H/O

S/U

ADAPT ADAPT

ADAPT

PARTLINGRS

NPRV IMVSPLY VLV

IMVSPLYDCT

MIDDAY-MEALOVHD &DECK CPA

RMV

NPRV IMVRTRN VLV

IMVRTRNDUCT

PBA

PFEX

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES♣EXERCISE T⊕СВ-ВПхО-ВПрК-MNT

*FILTER CHECK$ACT

*DEPLOY@TERM

^CHECK

Page 27: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD05

2-15

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/10/07 (344)

12 13 14 15 16 17 18 19 20 21 22 23 004/00MET Day 003 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/10/07 (344)DAY/NIGHTORBIT

DAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JJK JKK JJK JLKTLM FORMATSAA

SSRMS-PWR LTCH-DCNCTHK2-TLM-CNFGCOL-CC-NO OP-CMDCCS-TLM FORMAT-SWAP

ACS-AUTO-H/O-RS-INHDPCSPS-NOD2 DDCU-PWRDNHMS-PMCMSS-LIGHTS-POWERUPPAO EVENTSPS-NOD2 DDCU-PWRUPCOL-BRTH SRVIVAL-ACT

SPS-NOD2-RECOVERYCOL-FINAL-ACTIVATION

S-BD

SSRMS-PWR LTCH-DCNCTHK2-TLM-C

COL-CC-NO OP-CMDCCS-TLM FORMAT-SWAP

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

ACS-AUTO-H/O-RS-INHDPC

SPS-NOD2 DDCU-PWRDNHMS-PMC

MSS-LIGHTS-POWERUPPAO EVENT

SPS-NOD2 DDCU-PWRUPCOL-BRTH SRVIVAL-ACT

COL-BRTH SRVIVAL-ACTSPS-NOD2-RECOVERY

COL-FINALCHECS-KU-D/LPAO EVENT

KU-BD

CHECS-KU-D/LPAO EVENT

RS

COL-CC-NO OP-CMDCOL-BRTH SRVIVAL-ACTCOL-FINAL-ACTIVATIONWPA-ACTDMS-ACTCOL-CFA-ACTCOL-IMV-ACT

COL

COL-CC-NO OP-CMDCOL-BRTH SRVIVAL-ACT

COL-FINALWPA-ACT

DMS-ACTCOL-CFA-ACT

COL-IMV-AACS-O2 FINE-LK CKACS-COL FINE-LK CK

SYS

ACS-O2 FINE-LK CKACS-COL FINE-LK CK

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAP

MCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

CCS-TLM FORMAT-SWAP

MCC-H FCT H/O (

NOTES:

2-15

FD05 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/10/07 (344)

12 13 14 15 16 17 18 19 20 21 22 23 004/00MET Day 003 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/10/07 (344)DAY/NIGHTORBIT

DAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JJK JKK JJK JLKSAA

SSRMS-PWR LTCH-DCNCTHK2-TLM-CNFGCOL-CC-NO OP-CMDCCS-TLM FORMAT-SWAP

ACS-AUTO-H/O-RS-INHDPCSPS-NOD2 DDCU-PWRDNHMS-PMCMSS-LIGHTS-POWERUPPAO EVENTSPS-NOD2 DDCU-PWRUPCOL-BRTH SRVIVAL-ACT

SPS-NOD2-RECOVERYCOL-FINAL-ACTIVATION

S-BD

SSRMS-PWR LTCH-DCNCTHK2-TLM-C

COL-CC-NO OP-CMDCCS-TLM FORMAT-SWAP

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

ACS-AUTO-H/O-RS-INHDPC

SPS-NOD2 DDCU-PWRDNHMS-PMC

MSS-LIGHTS-POWERUPPAO EVENT

SPS-NOD2 DDCU-PWRUPCOL-BRTH SRVIVAL-ACT

COL-BRTH SRVIVAL-ACTSPS-NOD2-RECOVERY

COL-FINALCHECS-KU-D/LPAO EVENT

KU-BD

CHECS-KU-D/LPAO EVENT

RS

COL-CC-NO OP-CMDCOL-BRTH SRVIVAL-ACTCOL-FINAL-ACTIVATIONWPA-ACTDMS-ACTCOL-CFA-ACTCOL-IMV-ACT

COL

COL-CC-NO OP-CMDCOL-BRTH SRVIVAL-ACT

COL-FINALWPA-ACT

DMS-ACTCOL-CFA-ACT

COL-IMV-AACS-O2 FINE-LK CKACS-COL FINE-LK CK

SYS

ACS-O2 FINE-LK CKACS-COL FINE-LK CK

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAP

MCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

CCS-TLM FORMAT-SWAP

MCC-H FCT H/O (

NOTES:

Page 28: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD05

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

COL

INGRESS

ISS EXTERNAL SURVEY

2-16

STS-122

DN

ISS

UP

22 23 12/11 01 02 03 04 05 06 07 08 09GMT 12/10/07 (344) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR EVA2 PROCREVIEWEXERCISEFOCUSED

INSPECTION

PAO

EVENT

PMCA/G

PRESLEEP PRE SLEEP SLEEP

PLTCDM*

EVA2 PROCREVIEW

P/TV05S/U

P/TV07EVAS/U

PAO

EVENT

PRE SLEEP PRE SLEEPPWRFILL#3

PWRFILL#4

SLEEP

MS1 EVA2 PROCREVIEW

FOCUSEDINSPECTION

ILUM*

PRE SLEEP SLEEPSSRMSMNVRPARK

BRIEF

XFER

TAG

MS2/EV1 MASK PB/TOOLCONFIG

♣ EVA2 PROCREVIEW

PRESLEEP PRE SLEEP PRE

SLEEP SLEEPXFER OPS

MS3/EV2 MASK PB/TOOLCONFIG

⊕ EVA2 PROCREVIEWEXERCISE

MUS

PAO

EVENT

PRESLEEP

P SLP

PRESLEEPPRE SLEEP SLEEP

MS4/EV3 EVA2 PROCREVIEW

FOCUSEDINSPECTION PRE SLEEP SLEEPSSRMS

MNVRPARK

XFER

TAG

FE-2 EXERCISETVIS DCS

TRN

DCS

PREPWORK

PREPWORK

XFER

TAG DPC

EVA2 PROCREVIEW PRE SLEEP-ISS SLEEP

ISS CDR RED TVIS DPC EVA2 PROCREVIEW

PREPWORK PRE SLEEP-ISS SLEEP

FE-1 ♦ VELOPREP

WORK

PREPWORK

DWNLD

DPC EVA2 PROCREVIEW PRE SLEEP-ISS SLEEP

FE-2 EXP16 ®INSTLPARTPOSTS

ADAPTPFA

PREPWORK

PREPWORKDPC EVA2 PROC

REVIEW PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT♣TOOL CONFIG⊕TOOL CONFIG

♦COTP КОНТУР MNT®PBA PFEX

*BATT C/O *ONNOTES

2-16

FD05

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

COL

INGRESS

ISS EXTERNAL SURVEY

STS-122

DN

ISS

UP

22 23 12/11 01 02 03 04 05 06 07 08 09GMT 12/10/07 (344) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR EVA2 PROCREVIEWEXERCISEFOCUSED

INSPECTION

PAO

EVENT

PMCA/G

PRESLEEP PRE SLEEP SLEEP

PLTCDM*

EVA2 PROCREVIEW

P/TV05S/U

P/TV07EVAS/U

PAO

EVENT

PRE SLEEP PRE SLEEPPWRFILL#3

PWRFILL#4

SLEEP

MS1 EVA2 PROCREVIEW

FOCUSEDINSPECTION

ILUM*

PRE SLEEP SLEEPSSRMSMNVRPARK

BRIEF

XFER

TAG

MS2/EV1 MASK PB/TOOLCONFIG

♣ EVA2 PROCREVIEW

PRESLEEP PRE SLEEP PRE

SLEEP SLEEPXFER OPS

MS3/EV2 MASK PB/TOOLCONFIG

⊕ EVA2 PROCREVIEWEXERCISE

MUS

PAO

EVENT

PRESLEEP

P SLP

PRESLEEPPRE SLEEP SLEEP

MS4/EV3 EVA2 PROCREVIEW

FOCUSEDINSPECTION PRE SLEEP SLEEPSSRMS

MNVRPARK

XFER

TAG

FE-2 EXERCISETVIS DCS

TRN

DCS

PREPWORK

PREPWORK

XFER

TAG DPC

EVA2 PROCREVIEW PRE SLEEP-ISS SLEEP

ISS CDR RED TVIS DPC EVA2 PROCREVIEW

PREPWORK PRE SLEEP-ISS SLEEP

FE-1 ♦ VELOPREP

WORK

PREPWORK

DWNLD

DPC EVA2 PROCREVIEW PRE SLEEP-ISS SLEEP

FE-2 EXP16 ®INSTLPARTPOSTS

ADAPTPFA

PREPWORK

PREPWORKDPC EVA2 PROC

REVIEW PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71 72

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES♣TOOL CONFIG⊕TOOL CONFIG

♦COTP КОНТУР MNT®PBA PFEX

*BATT C/O *ON

Page 29: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD05

2-17

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/11 01 02 03CT 12/10/07 (344)

004/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 004 22 23 12/11 01 02 03 04 05 06 07 08 09

GMT 12/10/07 (344)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAIL

VHF ALL VHFALL VHF

ALL VHF ALL VHF ALL VHFALL VHF

-XVV +ZLV TEAISS ATTITUDE

JLK JJK JKKTLM FORMATSAA

HK2-TLM-CNFGCOL-FINAL-ACTIVATIONCCS-TLM FORMAT-SWAP

IATCS-A/L LTL-TERMDMS-MMC-SWOP CNFGCOL-FULL LOG FILE-DLDPCMSS-POWERDOWNCOL-PL C&W-CNFG1IATCS-A/L LTL-INITHK2-NOM TLM-CNFGA/L-10.2 PSI OP-INIT

PPS-LST-UPLINKA/L-CCAA-SPD-CHGA/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD CHECS-COMMANDINGCOL-LOG FILE-D/LDMS-SMALL FILE-UPLKDMS-LARGE FILE-UPLKDMS-MMU-FILE DNLK

S-BD

HK2-TLM-CNFG HK2-TLM-CNFGCOL-FINAL-ACTIVATION

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

IATCS-A/L LTL-TERMDMS-MMC-SWOP CNFG

COL-FULL LOG FILE-DLDPC

MSS-POWERDOWNCOL-PL C&W-CNFG1

IATCS-A/L LTL-INITHK2-NOM TLM-CNFG HK2-NOM TLM-CNFG

A/L-10.2 PSI OP-INITA/L-10.2 PSI OP-INIT

PPS-LST-UPLINKA/L-CCAA-SPD-CHG

A/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENA

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

COL-LOG FILE-D/LDMS-SMALL FILE-UPL

DMS-LARGE FILEDMS-MMU-F

COL-FULL LOG FILE-DLCOL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-FULL LOG FILE-DLCOL-LOG FILE-D/L

CHECS-KU-RS

COL-FINAL-ACTIVATIONCOL-CFA-FNL ACTDMS-NOM SBD PKT-CNFGDMS-NOM KBD PKT-CNFGDMS-MMC-SWOP CNFGCOL-FULL LOG FILE-DLECS-CAB SD1 LMT-UPDTECS-CAB SD2 LMT-UPDTDMS-ACS-DSBLCOL-LOAD SHED-CNFGTCS-WOOV-ADJUSTECS-CHX DP MEAN-ENAECS-HCU1 HTR-C/OCOL-PL C&W-CNFG2COL-LOG FILE-D/LECS-HCU2 HTR-C/ODMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFGDMS-SMALL FILE-UPLKDMS-LARGE FILE-UPLKDMS-MMU-FILE MGMTDMS-MMU-FILE DNLK

COL

COL-FINAL-ACTIVATIONCOL-CFA-FNL ACT

DMS-NOM SBD PKT-CNFGDMS-NOM KBD PKT-CNFG

DMS-MMC-SWOP CNFGCOL-FULL LOG FILE-DL

ECS-CAB SD1 LMT-UPDTECS-CAB SD2 LMT-UPDT

DMS-ACS-DSBLCOL-LOAD SHED-CNFGTCS-WOOV-ADJUSTECS-CHX DP MEAN-ENA

ECS-HCU1 HTR-C/OCOL-PL C&W-CNFG2

COL-LOG FILE-D/LECS-HCU2 HTR-C/O

DMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFG

DMS-SMALL FILE-UPLDMS-LARGE FILE

DMS-MMU-FILEDMS-MMU-FS

YS

CCS-TLM FORMAT-SWAP

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS DEFIB DLY CMD

MCC

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)

CHECS-DEFIB DLY-CMD

2-17

FD05 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/11 01 02 03CT 12/10/07 (344)

004/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 004 22 23 12/11 01 02 03 04 05 06 07 08 09

GMT 12/10/07 (344)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JLK JJK JKKSAA

HK2-TLM-CNFGCOL-FINAL-ACTIVATIONCCS-TLM FORMAT-SWAP

IATCS-A/L LTL-TERMDMS-MMC-SWOP CNFGCOL-FULL LOG FILE-DLDPCMSS-POWERDOWNCOL-PL C&W-CNFG1IATCS-A/L LTL-INITHK2-NOM TLM-CNFGA/L-10.2 PSI OP-INIT

PPS-LST-UPLINKA/L-CCAA-SPD-CHGA/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD CHECS-COMMANDINGCOL-LOG FILE-D/LDMS-SMALL FILE-UPLKDMS-LARGE FILE-UPLKDMS-MMU-FILE DNLK

S-BD

HK2-TLM-CNFG HK2-TLM-CNFGCOL-FINAL-ACTIVATION

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

IATCS-A/L LTL-TERMDMS-MMC-SWOP CNFG

COL-FULL LOG FILE-DLDPC

MSS-POWERDOWNCOL-PL C&W-CNFG1

IATCS-A/L LTL-INITHK2-NOM TLM-CNFG HK2-NOM TLM-CNFG

A/L-10.2 PSI OP-INITA/L-10.2 PSI OP-INIT

PPS-LST-UPLINKA/L-CCAA-SPD-CHG

A/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENA

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

COL-LOG FILE-D/LDMS-SMALL FILE-UPL

DMS-LARGE FILEDMS-MMU-F

COL-FULL LOG FILE-DLCOL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-FULL LOG FILE-DLCOL-LOG FILE-D/L

CHECS-KU-RS

COL-FINAL-ACTIVATIONCOL-CFA-FNL ACTDMS-NOM SBD PKT-CNFGDMS-NOM KBD PKT-CNFGDMS-MMC-SWOP CNFGCOL-FULL LOG FILE-DLECS-CAB SD1 LMT-UPDTECS-CAB SD2 LMT-UPDTDMS-ACS-DSBLCOL-LOAD SHED-CNFGTCS-WOOV-ADJUSTECS-CHX DP MEAN-ENAECS-HCU1 HTR-C/OCOL-PL C&W-CNFG2COL-LOG FILE-D/LECS-HCU2 HTR-C/ODMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFGDMS-SMALL FILE-UPLKDMS-LARGE FILE-UPLKDMS-MMU-FILE MGMTDMS-MMU-FILE DNLK

COL

COL-FINAL-ACTIVATIONCOL-CFA-FNL ACT

DMS-NOM SBD PKT-CNFGDMS-NOM KBD PKT-CNFG

DMS-MMC-SWOP CNFGCOL-FULL LOG FILE-DL

ECS-CAB SD1 LMT-UPDTECS-CAB SD2 LMT-UPDT

DMS-ACS-DSBLCOL-LOAD SHED-CNFGTCS-WOOV-ADJUSTECS-CHX DP MEAN-ENA

ECS-HCU1 HTR-C/OCOL-PL C&W-CNFG2

COL-LOG FILE-D/LECS-HCU2 HTR-C/O

DMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFG

DMS-SMALL FILE-UPLDMS-LARGE FILE

DMS-MMU-FILEDMS-MMU-FS

YS

CCS-TLM FORMAT-SWAP

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS DEFIB DLY CMD

MCC

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)

CHECS-DEFIB DLY-CMD

Page 30: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD06

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

A/LREP

EVA 2 (06:30)

ISS EXTERNAL SURVEY

2-18

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/11/07 (345) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR C_LKDPRS

CWC#7

INIT

CWC#9

INIT

CWC#8

INIT

CWC

TERM

CWC

TERM

CWC

TERM

CWCXFER(3)

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREP

HYGBRK/HATCHCLS

IMU

MEAL P/TV07 EVASPPT

P/TV07 EVASPPTPMC

A/G

POSTSLEEP

POST

SLEEP

SLEEP

PLT

P_DPS

INHIB

PAD EVA2 IVA SPPRT

EVA2 IVASPPRTPREP

EXERCISEPOST SLEEPSLEEP

MS1 EXERCISE

ILUM*

POST SLEEPRMS*

LOG

SLEEP SSRMS P1 NTA R&R

XFR

UPDAT

XFEROPS

MS2/EV1 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

NTA STOWIN PLBP1 NTA INSTALLP1 NTA RMVL FROM PLBPOST

SLEEPSLEEP ♣

MS3/EV2 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

NTA STOWIN PLBP1 NTA INSTALLP1 NTA RMVL FROM PLBPOST

SLEEPSLEEP ⊕

MS4/EV3 EXERCISEPOST SLEEPRMS*

LOG

SLEEP SSRMS P1 NTA R&RXFER OPS

FE-2 SLEEP POST SLEEP PREPWORK DPC INSTL

HNDRL

VBA

INSTL

DSTWINSTLFOOTLPS

COLSSCACT

RCNFG

STOW

VOLPCS

PWS

DINST

INSTLPWS

PWSACT EXERCISE RED MIDDAY-MEAL RELOCATE EPM

- A3PCSACT

EMU-T

TVIS

ISS CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

INSTLD3

FLOORPANEL

A3 F1

KBAR

INSTL

EXERCISECEVIS MIDDAY-MEAL

EPMSFRMV

FE-1 SLEEP POST SLEEP PREPWORK DPC

HAM

WINDW

МБИ-21-FE1-EXEСУБАСД1-7REPLC

EXERCISE TVIS СОЖMNT MIDDAY-MEAL ГФИ-1-FE-OBS

VELO

FE-2 EXP16 SLEEP POST SLEEP PREPWORK DPC

ETHER

ANT

ADAPT

VBA

INSTL

RMVD3

FLOORPNL

RMVD2

FLOORPNLS

RCNFG

STOW

VOLRMVPARTCVRS

INSTLD2

FLOORPANEL

INSTL VCA2 PFAT/D

PFAS/U

® MIDDAY-MEAL RELOCATE EPM- A3

RMVD1

FLOORPANEL

UNLKWPAAVM

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT♣SSPTS ROU⊕SSPTS ROU

♦EXERCISE R

®COMMS-VCA2-CNFG

♥UNLK CWSA

*OFF*MNVR-EVA2 VIEWNOTES

2-18

FD06

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

A/LREP

EVA 2 (06:30)

ISS EXTERNAL SURVEY

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/11/07 (345) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR C_LKDPRS

CWC#7

INIT

CWC#9

INIT

CWC#8

INIT

CWC

TERM

CWC

TERM

CWC

TERM

CWCXFER(3)

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREP

HYGBRK/HATCHCLS

IMU

MEAL P/TV07 EVASPPT

P/TV07 EVASPPTPMC

A/G

POSTSLEEP

POST

SLEEP

SLEEP

PLT

P_DPS

INHIB

PAD EVA2 IVA SPPRT

EVA2 IVASPPRTPREP

EXERCISEPOST SLEEPSLEEP

MS1 EXERCISE

ILUM*

POST SLEEPRMS*

LOG

SLEEP SSRMS P1 NTA R&R

XFR

UPDAT

XFEROPS

MS2/EV1 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

NTA STOWIN PLBP1 NTA INSTALLP1 NTA RMVL FROM PLBPOST

SLEEPSLEEP ♣

MS3/EV2 C_LKDPRS

C-LK

EGRS

P_DPS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

NTA STOWIN PLBP1 NTA INSTALLP1 NTA RMVL FROM PLBPOST

SLEEPSLEEP ⊕

MS4/EV3 EXERCISEPOST SLEEPRMS*

LOG

SLEEP SSRMS P1 NTA R&RXFER OPS

FE-2 SLEEP POST SLEEP PREPWORK DPC INSTL

HNDRL

VBA

INSTL

DSTWINSTLFOOTLPS

COLSSCACT

RCNFG

STOW

VOLPCS

PWS

DINST

INSTLPWS

PWSACT EXERCISE RED MIDDAY-MEAL RELOCATE EPM

- A3PCSACT

EMU-T

TVIS

ISS CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

INSTLD3

FLOORPANEL

A3 F1

KBAR

INSTL

EXERCISECEVIS MIDDAY-MEAL

EPMSFRMV

FE-1 SLEEP POST SLEEP PREPWORK DPC

HAM

WINDW

МБИ-21-FE1-EXEСУБАСД1-7REPLC

EXERCISE TVIS СОЖMNT MIDDAY-MEAL ГФИ-1-FE-OBS

VELO

FE-2 EXP16 SLEEP POST SLEEP PREPWORK DPC

ETHER

ANT

ADAPT

VBA

INSTL

RMVD3

FLOORPNL

RMVD2

FLOORPNLS

RCNFG

STOW

VOLRMVPARTCVRS

INSTLD2

FLOORPANEL

INSTL VCA2 PFAT/D

PFAS/U

® MIDDAY-MEAL RELOCATE EPM- A3

RMVD1

FLOORPANEL

UNLKWPAAVM

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79 80

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES♣SSPTS ROU⊕SSPTS ROU

♦EXERCISE R

®COMMS-VCA2-CNFG

♥UNLK CWSA

*OFF*MNVR-EVA2 VIEW

Page 31: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD06

2-19

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/11/07 (345)

12 13 14 15 16 17 18 19 20 21 22 23 005/00MET Day 004 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/11/07 (345)DAY/NIGHTORBIT

DAILY ORBIT 15 16 1 2 3 4 5 6 7TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JKK JJKTLM FORMATSAA

DMS-MMU-FILE DNLK

ACS-AUTO-H/O-RS-INHEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAPMSS-LIGHTS-POWERUPUHF-SSSR-ACTC&T-AUDIO-CNFGVDS-VIDEO-CNFGPPS-PCU FDIR-ENABLEA/L RAPID DPRS-ENADPCETCS-LPB TRRJ-LOCKVDS-WETA-ACTISS-RAP DPRS-INHISS-RAP DPRS-ENAACS-PCA VRIV-OPA/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHGCOMMS-VID LIM-CNFGCDH-INT IMV PPL-LOADETCS-NTA-ACT

S-BD

DMS-MMU-FILE DNLKDMS-MMU-FILE DNLK

DMS-MMU-FILE DNLKACS-AUTO-H/O-RS-INH

EVA-HYGIENE-BREAKEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAPMSS-LIGHTS-POWERUPUHF-SSSR-ACT

C&T-AUDIO-CNFGVDS-VIDEO-CNFG

PPS-PCU FDIR-ENABLEA/L RAPID DPRS-ENA

DPCETCS-LPB TRRJ-LOCK

VDS-WETA-ACTISS-RAP DPRS-INH

ISS-RAP DPRS-ENAACS-PCA VRIV-OP

A/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHG

COMMS-VID LIM-CNFGCDH-INT IMV PPL-LOAD

ETCS-NTA-ACTCHECS-KU-D/LDMS-MMU-FILE DNLK

KU-BD

CHECS-KU-D/LDMS-MMU-FILE DNLK

RS

DMS-MMU-FILE DNLK

ECS-COL EVA MD-RECONTCS-WPA2-C/OTCS-WPA2 ACCUM-S/UDMS-FLAP CDI-UPDATECOMMS-VID LIM-CNFGCOMMS-VDPU-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU SU-CNFGCOMMS-VDPU-CP1-CNFG

COL

DMS-MMU-FILE DNLKDMS-MMU-FILE DNLK

DMS-MMU-FILE DNLKECS-COL EVA MD-RECON

TCS-WPA2-C/OTCS-WPA2 ACCUM-S/U

DMS-FLAP CDI-UPDATECOMMS-VID LIM-CNFG

COMMS-VDPU-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU SU-CNFG

COMMS-VDPSYS

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAPEVA INHIBIT PADMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)

CCS-TLM FORMAT-SWAPEVA INHIBIT PAD

MCC-H FCT H/O (1/2)2-19

FD06 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/11/07 (345)

12 13 14 15 16 17 18 19 20 21 22 23 005/00MET Day 004 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/11/07 (345)DAY/NIGHTORBIT

DAILY ORBIT 15 16 1 2 3 4 5 6 7TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JKK JJKSAA

DMS-MMU-FILE DNLK

ACS-AUTO-H/O-RS-INHEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAPMSS-LIGHTS-POWERUPUHF-SSSR-ACTC&T-AUDIO-CNFGVDS-VIDEO-CNFGPPS-PCU FDIR-ENABLEA/L RAPID DPRS-ENADPCETCS-LPB TRRJ-LOCKVDS-WETA-ACTISS-RAP DPRS-INHISS-RAP DPRS-ENAACS-PCA VRIV-OPA/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHGCOMMS-VID LIM-CNFGCDH-INT IMV PPL-LOADETCS-NTA-ACT

S-BD

DMS-MMU-FILE DNLKDMS-MMU-FILE DNLK

DMS-MMU-FILE DNLKACS-AUTO-H/O-RS-INH

EVA-HYGIENE-BREAKEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAPMSS-LIGHTS-POWERUPUHF-SSSR-ACT

C&T-AUDIO-CNFGVDS-VIDEO-CNFG

PPS-PCU FDIR-ENABLEA/L RAPID DPRS-ENA

DPCETCS-LPB TRRJ-LOCK

VDS-WETA-ACTISS-RAP DPRS-INH

ISS-RAP DPRS-ENAACS-PCA VRIV-OP

A/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHG

COMMS-VID LIM-CNFGCDH-INT IMV PPL-LOAD

ETCS-NTA-ACTCHECS-KU-D/LDMS-MMU-FILE DNLK

KU-BD

CHECS-KU-D/LDMS-MMU-FILE DNLK

RS

DMS-MMU-FILE DNLK

ECS-COL EVA MD-RECONTCS-WPA2-C/OTCS-WPA2 ACCUM-S/UDMS-FLAP CDI-UPDATECOMMS-VID LIM-CNFGCOMMS-VDPU-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU SU-CNFGCOMMS-VDPU-CP1-CNFG

COL

DMS-MMU-FILE DNLKDMS-MMU-FILE DNLK

DMS-MMU-FILE DNLKECS-COL EVA MD-RECON

TCS-WPA2-C/OTCS-WPA2 ACCUM-S/U

DMS-FLAP CDI-UPDATECOMMS-VID LIM-CNFG

COMMS-VDPU-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU SU-CNFG

COMMS-VDPSYS

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAPEVA INHIBIT PADMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)

CCS-TLM FORMAT-SWAPEVA INHIBIT PAD

MCC-H FCT H/O (1/2)

Page 32: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD06

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

2-20

STS-122

DN

ISS

UP

22 23 12/12 01 02 03 04 05 06 07 08 09GMT 12/11/07 (345) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR ♣ EXERCISE POST EVAW/H20,METOX PMC

OCA

PRESLEEP PRE SLEEP SLEEP

PLT

P-RPS

RPRS

CDM-A

EVA 3TOOLCONFIG

EVA2 IVA SPPRT FILTERINSPECT PRE SLEEPPRE

SLEEP SLEEP

MS1 PRE SLEEPRMS*

SLEEPSSRMS P1 NTA R&R

BRIEF

XFER OPSXFER

TAG

MS2/EV1

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEPSSPTS

ROUTING

MS3/EV2

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEPSSPTS

ROUTING

MS4/EV3EVA 3TOOLCONFIG

PRE SLEEP

PRE

SLEEP

RMS*

SLEEPSSRMS P1 NTA R&R XFER OPSXFER

TAG

FE-2 TVISCWC

INIT

H/OCWC

TERM

FIRE

C/O

PREP

WORKDPC PRE SLEEP-ISS SLEEP

ISS CDR EXERCISE REDPREP

WORK

POST EVAW/H20,METOX

BSAINIT

D/L#

PRE SLEEP-ISS SLEEP

FE-1 VELO

GLOVE

PREP WORKPREP

WORK

DWNLD

DPC PRE SLEEP-ISS SLEEP

FE-2 EXP16UNLKCWSAAVM

INSTLD1

FLOORPANEL

H/OPREP

WORK

PREP

WORK

PMC DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT♣CWC XFER (3) *MNVR-COL VIEW #EVA Image Downlink

NOTES

2-20

FD06

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

STS-122

DN

ISS

UP

22 23 12/12 01 02 03 04 05 06 07 08 09GMT 12/11/07 (345) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR ♣ EXERCISE POST EVAW/H20,METOX PMC

OCA

PRESLEEP PRE SLEEP SLEEP

PLT

P-RPS

RPRS

CDM-A

EVA 3TOOLCONFIG

EVA2 IVA SPPRT FILTERINSPECT PRE SLEEPPRE

SLEEP SLEEP

MS1 PRE SLEEPRMS*

SLEEPSSRMS P1 NTA R&R

BRIEF

XFER OPSXFER

TAG

MS2/EV1

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEPSSPTS

ROUTING

MS3/EV2

P-RPS

RPRS

CLNUP&

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEPSSPTS

ROUTING

MS4/EV3EVA 3TOOLCONFIG

PRE SLEEP

PRE

SLEEP

RMS*

SLEEPSSRMS P1 NTA R&R XFER OPSXFER

TAG

FE-2 TVISCWC

INIT

H/OCWC

TERM

FIRE

C/O

PREP

WORKDPC PRE SLEEP-ISS SLEEP

ISS CDR EXERCISE REDPREP

WORK

POST EVAW/H20,METOX

BSAINIT

D/L#

PRE SLEEP-ISS SLEEP

FE-1 VELO

GLOVE

PREP WORKPREP

WORK

DWNLD

DPC PRE SLEEP-ISS SLEEP

FE-2 EXP16UNLKCWSAAVM

INSTLD1

FLOORPANEL

H/OPREP

WORK

PREP

WORK

PMC DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 80 81 82 83 84 85 86 87

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES♣CWC XFER (3) *MNVR-COL VIEW #EVA Image Downlink

Page 33: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD06

2-21

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/12 01 02 03CT 12/11/07 (345)

005/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 005 22 23 12/12 01 02 03 04 05 06 07 08 09

GMT 12/11/07 (345)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JJK JKKTLM FORMATSAA

A/L-CCAA-RECNFGWRM-CWC-FILL-INITWRM-CWC-FILL-TERMETCS-LPB TRRJ-AUTOC&T-AUDIO-CNFGHMS-PMCUHF-SSSR-DEACTVDS-WETA-DEACTPPS-PCU FDIR-INHIBITDPCMSS-POWERDOWNVDS-VIDEO-DCNFGCOL-LOG FILE-D/LCCS-TLM FORMAT-SWAPHK2-TLM-CNFGACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD CHECS-COMMANDING

S-BD

A/L-CCAA-RECNFGWRM-CWC-FILL-INIT

WRM-CWC-FILL-TERMETCS-LPB TRRJ-AUTO

C&T-AUDIO-CNFGHMS-PMCUHF-SSSR-DEACT

VDS-WETA-DEACTPPS-PCU FDIR-INHIBIT

DPCMSS-POWERDOWN

VDS-VIDEO-DCNFGCOL-LOG FILE-D/L

CCS-TLM FORMAT-SWAPHK2-TLM-CNFG

ACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCOL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COMMS-VDPU-CP1-CNFGCOMMS-VCA2-DEACTCOMMS-VMN2-DEACTCOL-LOG FILE-D/LDMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFGECS-D1 ROT-RCNFG

COL

COMMS-VDPU-CP1-CNFGCOMMS-VCA2-DEACTCOMMS-VMN2-DEACT

COL-LOG FILE-D/LDMS-VTC TM PKT-CNFG

DMS-NOM TM PKT-CNFGECS-D1 ROS

YS

CCS-TLM FORMAT-SWAPMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

CCS-TLM FORMAT-SWAPMCC-H FCT H/O (2/3)

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

CHECS-KU-

NOTES:

2-21

FD06 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/12 01 02 03CT 12/11/07 (345)

005/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 005 22 23 12/12 01 02 03 04 05 06 07 08 09

GMT 12/11/07 (345)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JJK JKKSAA

A/L-CCAA-RECNFGWRM-CWC-FILL-INITWRM-CWC-FILL-TERMETCS-LPB TRRJ-AUTOC&T-AUDIO-CNFGHMS-PMCUHF-SSSR-DEACTVDS-WETA-DEACTPPS-PCU FDIR-INHIBITDPCMSS-POWERDOWNVDS-VIDEO-DCNFGCOL-LOG FILE-D/LCCS-TLM FORMAT-SWAPHK2-TLM-CNFGACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD CHECS-COMMANDING

S-BD

A/L-CCAA-RECNFGWRM-CWC-FILL-INIT

WRM-CWC-FILL-TERMETCS-LPB TRRJ-AUTO

C&T-AUDIO-CNFGHMS-PMCUHF-SSSR-DEACT

VDS-WETA-DEACTPPS-PCU FDIR-INHIBIT

DPCMSS-POWERDOWN

VDS-VIDEO-DCNFGCOL-LOG FILE-D/L

CCS-TLM FORMAT-SWAPHK2-TLM-CNFG

ACS-AUTO-H/O-RS-ENACHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCOL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COMMS-VDPU-CP1-CNFGCOMMS-VCA2-DEACTCOMMS-VMN2-DEACTCOL-LOG FILE-D/LDMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFGECS-D1 ROT-RCNFG

COL

COMMS-VDPU-CP1-CNFGCOMMS-VCA2-DEACTCOMMS-VMN2-DEACT

COL-LOG FILE-D/LDMS-VTC TM PKT-CNFG

DMS-NOM TM PKT-CNFGECS-D1 ROS

YS

CCS-TLM FORMAT-SWAPMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

CCS-TLM FORMAT-SWAPMCC-H FCT H/O (2/3)

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

CHECS-KU-

NOTES:

Page 34: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD07

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

2-22

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/12/07 (346) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDRH/O

H/O

ESA

PAO

EVENT

EXERCISEIMU

MEALMNVR

DUMP

MNVR

TEA OFF DUTY OFF DUTYPFC

OCAPOST SLEEP POST SLEEPSLEEP

WASTE

INIT

WASTE

TERM

PLT CONDCWCC/O

CDM*

CDM-D

EXERCISE

MCIU*

MEALN2*

N2*

OFF DUTYOFF

OFFDUTY

P/TV07EVAS/U

PFCOCA

POST SLEEPPWRFILL#5

PWRFILL#6

SLEEP

MS1 EXERCISE MEALOFF DUTY OFF DUTYP/TV05S/U

PFCOCA

RELOCATE EDR- F1POST SLEEP

LOG

SLEEP

MS2/EV1

ASPRN

E-LK PREPEMU

RCNFG/SWAP

EXERCISEMEAL

BATT/

METX

INSTL

OFF DUTY OFFDUTYOFF DUTY PFC

OCAPOST SLEEPSLEEP

MS3/EV2

ASPRN

ESA

PAO

EVENT

EXERCISE MEAL OFF DUTYOFF DUTY OFF DUTYPFCOCA

RELOCATE EDR- F1POST SLEEP

LOG

SLVA

SLEEPELPS

WLES@

MS4/EV3 E-LK PREPEMU

RCNFG/SWAP

EXERCISE MEAL

BATT/

METX

INSTL

OFFDUTY

OFFDUTYOFF DUTY PFC

OCAPOST SLEEP

LOG

SLEEP

FE-2 SLEEPSLVA

POST SLEEPPREP

WORKDPC

INSTL

BNSTR

DCSTRN

DCS

PAOS/U

EXERCISETVIS EXERCISE RED HANDOVER HANDOVER

PREP

PAO

EVENT

MIDDAY-MEAL

ISS CDR SLEEPSLVA

POST SLEEPPREP

WORKDPC

TAPE

TAPE

EPMUMBMATE

D1RT

PPRVREPLC

ROTATE D1RACK

ESA

PAO

EVENT

N2 JUMPERS & PURGE

METX*

S/U

PREP

PAO

EVENT

MIDDAY-MEAL

BSA-T

EMUINIT

EXERCISECEVIS

EXERRED

FE-1 SLEEP POST SLEEP PREPWORK

DPC НЭ-ETD-EXE Ф-СВ ПCMNT

СВО СРВКФГС MNT VELO

ГАНК

MNT

PREP

PAO

EVENT

MIDDAY-MEAL

СВО-ЭЕДВ

PRIM1MNT

СОЖMNT EXERCISE TVIS

FE-2 EXP16 SLEEPSLVA

POST SLEEPPREP

WORKDPC ROTATE

D1 RACKROTATE D1

RACKUNLK

CFA AVM

ESA

PAO

EVENT

ADAPT ADAPTPMC HANDOVER HANDOVERMIDDAY-MEAL

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVV BIAS -XLV +YVV BIAS -XLV -ZVVORB ATT*BATT C/O

*FILTER CHECK*RPRS INIT

*RPRS TERM@DISABLE

*TERMNOTES

2-22

FD07

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/12/07 (346) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDRH/O

H/O

ESA

PAO

EVENT

EXERCISEIMU

MEALMNVR

DUMP

MNVR

TEA OFF DUTY OFF DUTYPFC

OCAPOST SLEEP POST SLEEPSLEEP

WASTE

INIT

WASTE

TERM

PLT CONDCWCC/O

CDM*

CDM-D

EXERCISE

MCIU*

MEALN2*

N2*

OFF DUTYOFF

OFFDUTY

P/TV07EVAS/U

PFCOCA

POST SLEEPPWRFILL#5

PWRFILL#6

SLEEP

MS1 EXERCISE MEALOFF DUTY OFF DUTYP/TV05S/U

PFCOCA

RELOCATE EDR- F1POST SLEEP

LOG

SLEEP

MS2/EV1

ASPRN

E-LK PREPEMU

RCNFG/SWAP

EXERCISEMEAL

BATT/

METX

INSTL

OFF DUTY OFFDUTYOFF DUTY PFC

OCAPOST SLEEPSLEEP

MS3/EV2

ASPRN

ESA

PAO

EVENT

EXERCISE MEAL OFF DUTYOFF DUTY OFF DUTYPFCOCA

RELOCATE EDR- F1POST SLEEP

LOG

SLVA

SLEEPELPS

WLES@

MS4/EV3 E-LK PREPEMU

RCNFG/SWAP

EXERCISE MEAL

BATT/

METX

INSTL

OFFDUTY

OFFDUTYOFF DUTY PFC

OCAPOST SLEEP

LOG

SLEEP

FE-2 SLEEPSLVA

POST SLEEPPREP

WORKDPC

INSTL

BNSTR

DCSTRN

DCS

PAOS/U

EXERCISETVIS EXERCISE RED HANDOVER HANDOVER

PREP

PAO

EVENT

MIDDAY-MEAL

ISS CDR SLEEPSLVA

POST SLEEPPREP

WORKDPC

TAPE

TAPE

EPMUMBMATE

D1RT

PPRVREPLC

ROTATE D1RACK

ESA

PAO

EVENT

N2 JUMPERS & PURGE

METX*

S/U

PREP

PAO

EVENT

MIDDAY-MEAL

BSA-T

EMUINIT

EXERCISECEVIS

EXERRED

FE-1 SLEEP POST SLEEP PREPWORK

DPC НЭ-ETD-EXE Ф-СВ ПCMNT

СВО СРВКФГС MNT VELO

ГАНК

MNT

PREP

PAO

EVENT

MIDDAY-MEAL

СВО-ЭЕДВ

PRIM1MNT

СОЖMNT EXERCISE TVIS

FE-2 EXP16 SLEEPSLVA

POST SLEEPPREP

WORKDPC ROTATE

D1 RACKROTATE D1

RACKUNLK

CFA AVM

ESA

PAO

EVENT

ADAPT ADAPTPMC HANDOVER HANDOVERMIDDAY-MEAL

DAY/NIGHTORBIT 88 89 90 91 92 93 94 95

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV BIAS -XLV +YVV BIAS -XLV -ZVV

NOTES*BATT C/O

*FILTER CHECK*RPRS INIT

*RPRS TERM@DISABLE

*TERM

Page 35: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD07

2-23

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/12/07 (346)

12 13 14 15 16 17 18 19 20 21 22 23 006/00MET Day 005 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/12/07 (346)DAY/NIGHTORBIT

DAILY ORBIT 15 1 2 3 4 5 6 7TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAMNVR TO SIMO DUMP

-XVV +ZLVMNVR TO MATED TEA

-XVV +ZLV TEAISS ATTITUDE

JKKTLM FORMATSAA

SPS-PWR DWN & RCVRYACS-AUTO-H/O-RS-INHPPS-SARJ-FTHRPPS-BGA-FTHRACS-CMG DATA-DUMPACS-CMG/STS ATT-H/ODPCLOCK-OPS-RECORDERACS-CMG GMBL ANG-PSNACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTOPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKHMS-PMCFDS-SD ABIT-SYNCPAO-EVENT

S-BD

SPS-PWR DWN & RCVRY SPS-PWR DWN & RCVRYACS-AUTO-H/O-RS-INH

PPS-SARJ-FTHRPPS-BGA-FTHR

ACS-CMG DATA-DUMPACS-CMG/STS ATT-H/ODPC

LOCK-OPS-RECORDERACS-CMG GMBL ANG-PSNACS-STS/CMG ATT-H/O

ACS-MM-ACTIV W/ USTOPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACK

HMS-PMCFDS-SD ABIT-SYNC

PAO-EVENTCHECS-KU-D/LLOCK-OPS-RECORDERCOMMS-VCR1-PLBKPAO-EVENTCOMMS-VCR2-PLBK

KU-BD

CHECS-KU-D/LLOCK-OPS-RECORDER

COMMS-VCR1-PLBKPAO-EVENT

COMMS-VCR2-PLBKRS

ECS-D1 ROT-RCNFGCOMMS-VMN2-ACTCOMMS-VCA2-ACTTCS-EPM WFSV-CLEPS-EPM PDU OUTL-INHCOMMS-VDPU SU-CNFG1COMMS-VDPU-CP1-CNFG

COMMS-VCR1-ACTCOMMS-VCR1-RCRDCOMMS-VCR1-DEACTECS-D1 ROT-RCVRYDMS-MMU-FILE MGMTDMS-SPC4-C/OECS-SD-SYNCCOMMS-VDPU SU-CNFGCOMMS-VCR1-PLBKCOMMS-VDPU-SWTCHOVERCOMMS-VDPU-CP1-DEACTECS-CTCU2-C/OCOMMS-VDPU SU-CNFG2COMMS-VCR2-ACTCOMMS-VCR2-RCRDCOMMS-VDPU-CP2-ACTCOMMS-VCR2-PLBKCOMMS-VDPU-CP2-CNFGCOMMS-VCR2-DEACTCOMMS-VDPU-CP2-DEACT

COL

ECS-D1 ROT-RCNFGCOMMS-VMN2-ACT

COMMS-VCA2-ACTTCS-EPM WFSV-CLEPS-EPM PDU OUTL-INH

COMMS-VDPU SU-CNFG1COMMS-VDPU-CP1-CNFG

COMMS-VDPU-CP1-CNFGCOMMS-VCR1-ACT COMMS-VCR1-ACT

COMMS-VCR1-RCRDCOMMS-VCR1-DEACT COMMS-VCR1-DEACT

ECS-D1 ROT-RCVRYDMS-MMU-FILE MGMT

DMS-SPC4-C/OECS-SD-SYNC

COMMS-VDPU SU-CNFGCOMMS-VCR1-PLBK

COMMS-VDPU-SWTCHOVERCOMMS-VDPU-CP1-DEACT

ECS-CTCU2-C/OCOMMS-VDPU SU-CNFG2

COMMS-VCR2-ACTCOMMS-VCR2-RCRDCOMMS-VDPU-CP2-ACT

COMMS-VCR2-PLBKCOMMS-VDPU-CP2-CCOMMS-VCR2-DEACCOMMS-VDPU-CP2S

YS

CHECS-KU-D/LMCC-H FCT H/O (3/1)ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTOMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)

ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTO

MCC-H FCT H/O (1/2)

2-23

FD07 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/12/07 (346)

12 13 14 15 16 17 18 19 20 21 22 23 006/00MET Day 005 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/12/07 (346)DAY/NIGHTORBIT

DAILY ORBIT 15 1 2 3 4 5 6 7TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEAMNVR TO SIMO DUMP

-XVV +ZLVMNVR TO MATED TEA

-XVV +ZLV TEA

TLM FORMAT JKKSAA

SPS-PWR DWN & RCVRYACS-AUTO-H/O-RS-INHPPS-SARJ-FTHRPPS-BGA-FTHRACS-CMG DATA-DUMPACS-CMG/STS ATT-H/ODPCLOCK-OPS-RECORDERACS-CMG GMBL ANG-PSNACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTOPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKHMS-PMCFDS-SD ABIT-SYNCPAO-EVENT

S-BD

SPS-PWR DWN & RCVRY SPS-PWR DWN & RCVRYACS-AUTO-H/O-RS-INH

PPS-SARJ-FTHRPPS-BGA-FTHR

ACS-CMG DATA-DUMPACS-CMG/STS ATT-H/ODPC

LOCK-OPS-RECORDERACS-CMG GMBL ANG-PSNACS-STS/CMG ATT-H/O

ACS-MM-ACTIV W/ USTOPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACK

HMS-PMCFDS-SD ABIT-SYNC

PAO-EVENTCHECS-KU-D/LLOCK-OPS-RECORDERCOMMS-VCR1-PLBKPAO-EVENTCOMMS-VCR2-PLBK

KU-BD

CHECS-KU-D/LLOCK-OPS-RECORDER

COMMS-VCR1-PLBKPAO-EVENT

COMMS-VCR2-PLBKRS

ECS-D1 ROT-RCNFGCOMMS-VMN2-ACTCOMMS-VCA2-ACTTCS-EPM WFSV-CLEPS-EPM PDU OUTL-INHCOMMS-VDPU SU-CNFG1COMMS-VDPU-CP1-CNFG

COMMS-VCR1-ACTCOMMS-VCR1-RCRDCOMMS-VCR1-DEACTECS-D1 ROT-RCVRYDMS-MMU-FILE MGMTDMS-SPC4-C/OECS-SD-SYNCCOMMS-VDPU SU-CNFGCOMMS-VCR1-PLBKCOMMS-VDPU-SWTCHOVERCOMMS-VDPU-CP1-DEACTECS-CTCU2-C/OCOMMS-VDPU SU-CNFG2COMMS-VCR2-ACTCOMMS-VCR2-RCRDCOMMS-VDPU-CP2-ACTCOMMS-VCR2-PLBKCOMMS-VDPU-CP2-CNFGCOMMS-VCR2-DEACTCOMMS-VDPU-CP2-DEACT

COL

ECS-D1 ROT-RCNFGCOMMS-VMN2-ACT

COMMS-VCA2-ACTTCS-EPM WFSV-CLEPS-EPM PDU OUTL-INH

COMMS-VDPU SU-CNFG1COMMS-VDPU-CP1-CNFG

COMMS-VDPU-CP1-CNFGCOMMS-VCR1-ACT COMMS-VCR1-ACT

COMMS-VCR1-RCRDCOMMS-VCR1-DEACT COMMS-VCR1-DEACT

ECS-D1 ROT-RCVRYDMS-MMU-FILE MGMT

DMS-SPC4-C/OECS-SD-SYNC

COMMS-VDPU SU-CNFGCOMMS-VCR1-PLBK

COMMS-VDPU-SWTCHOVERCOMMS-VDPU-CP1-DEACT

ECS-CTCU2-C/OCOMMS-VDPU SU-CNFG2

COMMS-VCR2-ACTCOMMS-VCR2-RCRDCOMMS-VDPU-CP2-ACT

COMMS-VCR2-PLBKCOMMS-VDPU-CP2-CCOMMS-VCR2-DEACCOMMS-VDPU-CP2S

YS

CHECS-KU-D/LMCC-H FCT H/O (3/1)ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTOMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)

ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTO

MCC-H FCT H/O (1/2)

Page 36: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD07

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

10.2DPRS

ISS EXTERNAL SURVEY

2-24

STS-122

DN

ISS

UP

22 23 12/13 01 02 03 04 05 06 07 08 09GMT 12/12/07 (346) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDR

EVA3*

EVA3 PROCREVIEWOFF DUTY PMC

A/GPRE SLEEP SLEEP

PLT EVA3 PROCREVIEWOFF DUTY PRE SLEEP SLEEP

MS1 EVA3 PROCREVIEW

ILUM*

OFF DUTY PRE SLEEP SLEEP

MS2/EV1 MASK PB/TOOLCONFIG

EVA3 PROCREVIEWOFF DUTY PRE

SLEEP

PRE

SLEEP

PRE SLEEP SLEEP

MS3/EV2 EVA3 PROCREVIEW

MUS

OFF DUTY PRE SLEEP SLEEP

MS4/EV3 MASK PB/TOOLCONFIG

EVA3 PROCREVIEWOFF DUTY PRE SLEEP

PRE

SLEEP

PRESLEEP SLEEP

WLES*

FE-2 HANDOVER EVA3 PROCREVIEW

PREP

WORKDPC PRE SLEEP-ISS SLEEP

ISS CDR EXER RED EVA3 PROCREVIEW

TAPEPWDPC PRE SLEEP-ISS SLEEP

FE-1 ♣ PREP WORK EVA3 PROCREVIEW

DWNLD

PWDPC PRE SLEEP-ISS SLEEP

FE-2 EXP16 HANDOVERPREP

WORK

PREP

WORK

EVA3 PROCREVIEW DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 95 96 97 98 99 100 101 102 103

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT♣EXERCISE TVIS *PWR INHIBIT*ON

*ENABLENOTES

2-24

FD07

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

10.2DPRS

ISS EXTERNAL SURVEY

STS-122

DN

ISS

UP

22 23 12/13 01 02 03 04 05 06 07 08 09GMT 12/12/07 (346) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDR

EVA3*

EVA3 PROCREVIEWOFF DUTY PMC

A/GPRE SLEEP SLEEP

PLT EVA3 PROCREVIEWOFF DUTY PRE SLEEP SLEEP

MS1 EVA3 PROCREVIEW

ILUM*

OFF DUTY PRE SLEEP SLEEP

MS2/EV1 MASK PB/TOOLCONFIG

EVA3 PROCREVIEWOFF DUTY PRE

SLEEP

PRE

SLEEP

PRE SLEEP SLEEP

MS3/EV2 EVA3 PROCREVIEW

MUS

OFF DUTY PRE SLEEP SLEEP

MS4/EV3 MASK PB/TOOLCONFIG

EVA3 PROCREVIEWOFF DUTY PRE SLEEP

PRE

SLEEP

PRESLEEP SLEEP

WLES*

FE-2 HANDOVER EVA3 PROCREVIEW

PREP

WORKDPC PRE SLEEP-ISS SLEEP

ISS CDR EXER RED EVA3 PROCREVIEW

TAPEPWDPC PRE SLEEP-ISS SLEEP

FE-1 ♣ PREP WORK EVA3 PROCREVIEW

DWNLD

PWDPC PRE SLEEP-ISS SLEEP

FE-2 EXP16 HANDOVERPREP

WORK

PREP

WORK

EVA3 PROCREVIEW DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 95 96 97 98 99 100 101 102 103

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES♣EXERCISE TVIS *PWR INHIBIT*ON

*ENABLE

Page 37: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD07

2-25

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/13 01 02 03CT 12/12/07 (346)

006/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 006 22 23 12/13 01 02 03 04 05 06 07 08 09

GMT 12/12/07 (346)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JKKTLM FORMATSAA

IATCS-A/L LTL-TERMDPCIATCS-A/L LTL-INITA/L-10.2 PSI OP-INIT

A/L-CCAA-SPD-CHGA/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENACOL-LOG FILE-D/LCHECS-DEFIB DLY-CMD CHECS-COMMANDINGHK2-TLM-CNFG

S-BD

IATCS-A/L LTL-TERMDPCIATCS-A/L LTL-INIT

A/L-10.2 PSI OP-INITA/L-10.2 PSI OP-INIT

A/L-CCAA-SPD-CHGA/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENA

COL-LOG FILE-D/LCHECS-DEFIB DLY-CMD

CHECS-COMMANDINGHK2-TLM-CNFG

COL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COMMS-VCR1-ACTCOMMS-VCR1-PLBK2COMMS-VCR1-DEACTCOMMS-VMN2-DEACTCOL-EXT P/L INS-CNFG

COMMS-VCA2-DEACTCOMMS-VDPU SU-CNFG3COL-LOG FILE-D/LDMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFG

COL

COMMS-VCR1-ACTCOMMS-VCR1-PLBK2COMMS-VCR1-DEACT

COMMS-VMN2-DEACTCOL-EXT P/L INS-CNFG

COL-EXT P/L INS-CNFGCOMMS-VCA2-DEACT

COMMS-VDPU SU-CNFG3COL-LOG FILE-D/L

DMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFGS

YS

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCHECS-KU-

*PWR INHIBIT

NOTES:

2-25

FD07 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/13 01 02 03CT 12/12/07 (346)

006/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 006 22 23 12/13 01 02 03 04 05 06 07 08 09

GMT 12/12/07 (346)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JKKSAA

IATCS-A/L LTL-TERMDPCIATCS-A/L LTL-INITA/L-10.2 PSI OP-INIT

A/L-CCAA-SPD-CHGA/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENACOL-LOG FILE-D/LCHECS-DEFIB DLY-CMD CHECS-COMMANDINGHK2-TLM-CNFG

S-BD

IATCS-A/L LTL-TERMDPCIATCS-A/L LTL-INIT

A/L-10.2 PSI OP-INITA/L-10.2 PSI OP-INIT

A/L-CCAA-SPD-CHGA/L-CAMPOUT-CNFGACS-AUTO-H/O-RS-ENA

COL-LOG FILE-D/LCHECS-DEFIB DLY-CMD

CHECS-COMMANDINGHK2-TLM-CNFG

COL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COMMS-VCR1-ACTCOMMS-VCR1-PLBK2COMMS-VCR1-DEACTCOMMS-VMN2-DEACTCOL-EXT P/L INS-CNFG

COMMS-VCA2-DEACTCOMMS-VDPU SU-CNFG3COL-LOG FILE-D/LDMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFG

COL

COMMS-VCR1-ACTCOMMS-VCR1-PLBK2COMMS-VCR1-DEACT

COMMS-VMN2-DEACTCOL-EXT P/L INS-CNFG

COL-EXT P/L INS-CNFGCOMMS-VCA2-DEACT

COMMS-VDPU SU-CNFG3COL-LOG FILE-D/L

DMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFGS

YS

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

A/L-CAMPOUT-CNFGMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCHECS-KU-

NOTES:

*PWR INHIBIT

Page 38: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD08

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

A/LREP

EVA 3 (06:30)

EXT SRVY

2-26

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/13/07 (347) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR C_LKDPRS

CWC10

INIT

CWC11

INIT

CWC

TERM

EMUPREBREATHE

EMU

PURGE

ETF*

CAMPOUT EVA PREP

HYGBRK/HATCHCLS

EXERCISEIMU

MEALP/TV07

PTV07

PTV07

P/TV07 EVASPPTPMC

A/G

POSTSLEEP

POST

SLEEP

PRLA

CLOSE

PWRFILL#7

SLEEP

PPSB*

SOLR*

PLT

P_DPS

INHIB

PAD EVA3 IVA SPPRT

EVA3IVASPPRTPREP

EXERCISEPOST SLEEPSLEEP

MS1

ILUM*

MCIU*

RELOCATEBIOLAB - A2

BLB R

POST SLEEPLOG

SLEEP SSRMS CMGTRANSFER SSRMS EUTEF XFERSSRMS SOLAR TRANSFER

MS2/EV1 C_LKDPRS

C-LK

EGRS

P_DPS

CMG TRANSFEREMUPREBREATHE

EMU

PURGE

EUTEF TRANSFERCAMPOUT EVA PREPHYG BRK/PREBREATHE

CLNUP

INGRS

POSTSLEEPSLEEP SOLAR TRANSFER

MS3/EV2BLBTOOLGATHER

BLB#

INC CIINSTL

BLBINCLFRMV

BLB INC LF RMV

BLB

RPDA%

BLB TCU LFRMV

TCUSI

INSTL

ETC LLRMVL MEALRELOCATE

BIOLAB - A2

BLB R

DCCNVTR

INSTL

POST SLEEPLOG

SLEEP

MS4/EV3 C_LKDPRS

C-LK

EGRS

P_DPS

CMG TRANSFEREMUPREBREATHE

EMU

PURGE

EUTEF TRANSFERCAMPOUT EVA PREPHYG BRK/PREBREATHE

CLNUP

INGRS

POSTSLEEPSLEEP SOLAR TRANSFER

FE-2 SLEEP POST SLEEP PREPWORK DPC ZSR

RLCT DCBFAM

HANDOVER SSRMS SOLARTRANSFER

EXERCISETVIS

EMU-T

MIDDAY-MEALEDR^

EDR^

OGSRECHARGE

RSURESET

EXERCISERED

ISS CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

EXERCISECEVIS EXERCISE RED MIDDAY-MEAL

EDR^

EDR^

EDR REAR S/U

FE-1 SLEEP POST SLEEP PREPWORK DPC

HAM

WINDW

МБИ12

СОГС

MNT

АСУМП-ФВMNT

СГО-АСУ-ЕК-MNT EXERCISE TVIS VELO MIDDAY-MEAL СОЖMNT Ф-ГЖТ MNT

GLOVE

FE-2 EXP16 SLEEP POST SLEEP PREPWORK DPC

INST*

DCBFAM

HANDOVER SSRMS SOLAR TRANSFER SSRMS CMGTRANSFER SSRMS EUTEF XFER

DAY/NIGHTORBIT 103 104 105 106 107 108 109 110 111

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT*PPSB2-ON

*SOL&ETF-ON*PPSB2-ON*OFF

*FILTER CHECK#GN2-INSPCT

%PNL-INSTL

^RACK ROTATE

^RACK ROTATE*A2 KBAR CM

NOTES

2-26

FD08

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

10.2DPRS

A/LREP

EVA 3 (06:30)

EXT SRVY

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/13/07 (347) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR C_LKDPRS

CWC10

INIT

CWC11

INIT

CWC

TERM

EMUPREBREATHE

EMU

PURGE

ETF*

CAMPOUT EVA PREP

HYGBRK/HATCHCLS

EXERCISEIMU

MEALP/TV07

PTV07

PTV07

P/TV07 EVASPPTPMC

A/G

POSTSLEEP

POST

SLEEP

PRLA

CLOSE

PWRFILL#7

SLEEP

PPSB*

SOLR*

PLT

P_DPS

INHIB

PAD EVA3 IVA SPPRT

EVA3IVASPPRTPREP

EXERCISEPOST SLEEPSLEEP

MS1

ILUM*

MCIU*

RELOCATEBIOLAB - A2

BLB R

POST SLEEPLOG

SLEEP SSRMS CMGTRANSFER SSRMS EUTEF XFERSSRMS SOLAR TRANSFER

MS2/EV1 C_LKDPRS

C-LK

EGRS

P_DPS

CMG TRANSFEREMUPREBREATHE

EMU

PURGE

EUTEF TRANSFERCAMPOUT EVA PREPHYG BRK/PREBREATHE

CLNUP

INGRS

POSTSLEEPSLEEP SOLAR TRANSFER

MS3/EV2BLBTOOLGATHER

BLB#

INC CIINSTL

BLBINCLFRMV

BLB INC LF RMV

BLB

RPDA%

BLB TCU LFRMV

TCUSI

INSTL

ETC LLRMVL MEALRELOCATE

BIOLAB - A2

BLB R

DCCNVTR

INSTL

POST SLEEPLOG

SLEEP

MS4/EV3 C_LKDPRS

C-LK

EGRS

P_DPS

CMG TRANSFEREMUPREBREATHE

EMU

PURGE

EUTEF TRANSFERCAMPOUT EVA PREPHYG BRK/PREBREATHE

CLNUP

INGRS

POSTSLEEPSLEEP SOLAR TRANSFER

FE-2 SLEEP POST SLEEP PREPWORK DPC ZSR

RLCT DCBFAM

HANDOVER SSRMS SOLARTRANSFER

EXERCISETVIS

EMU-T

MIDDAY-MEALEDR^

EDR^

OGSRECHARGE

RSURESET

EXERCISERED

ISS CDR SLEEP POST SLEEP

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS

EXERCISECEVIS EXERCISE RED MIDDAY-MEAL

EDR^

EDR^

EDR REAR S/U

FE-1 SLEEP POST SLEEP PREPWORK DPC

HAM

WINDW

МБИ12

СОГС

MNT

АСУМП-ФВMNT

СГО-АСУ-ЕК-MNT EXERCISE TVIS VELO MIDDAY-MEAL СОЖMNT Ф-ГЖТ MNT

GLOVE

FE-2 EXP16 SLEEP POST SLEEP PREPWORK DPC

INST*

DCBFAM

HANDOVER SSRMS SOLAR TRANSFER SSRMS CMGTRANSFER SSRMS EUTEF XFER

DAY/NIGHTORBIT 103 104 105 106 107 108 109 110 111

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES*PPSB2-ON

*SOL&ETF-ON*PPSB2-ON*OFF

*FILTER CHECK#GN2-INSPCT

%PNL-INSTL

^RACK ROTATE

^RACK ROTATE*A2 KBAR CM

Page 39: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD08

2-27

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/13/07 (347)

12 13 14 15 16 17 18 19 20 21 22 23 007/00MET Day 006 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/13/07 (347)DAY/NIGHTORBIT

DAILY ORBIT 15 16 1 2 3 4 5 6 7TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JKK JJKTLM FORMATSAA

ACS-AUTO-H/O-RS-INHEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATEUHF-SSSR-ACTMSS-POWERUPC&T-AUDIO-CNFGVDS-VIDEO-CNFGA/L RAPID DPRS-ENADPCPPS-PCU FDIR-ENABLEISS-RAP DPRS-INHVDS-WETA-ACTISS-RAP DPRS-ENAACS-PCA VRIV-OPA/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHG

S-BD

ACS-AUTO-H/O-RS-INHEVA-HYGIENE-BREAK

EVA-HYGIENE-BREAKCCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATE

UHF-SSSR-ACTMSS-POWERUP

C&T-AUDIO-CNFGVDS-VIDEO-CNFGA/L RAPID DPRS-ENA

DPCPPS-PCU FDIR-ENABLE

ISS-RAP DPRS-INHVDS-WETA-ACT

ISS-RAP DPRS-ENAACS-PCA VRIV-OP

A/L-10.2 PSI OP-TERMACS-PCA VRIV-CL

A/L-CCAA-SPD-CHGCHECS-KU-D/LK

U-BD

CHECS-KU-D/L

RS

COL-PL SERV-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU SU-CNFGCOMMS-VDPU-CP1-CNFGSOL-FEED2-ACTSOL-FEED1 RELAY-OFFSOL-FEED2-DEACTETF-PPSB2-ONSOL&ETF-PPSB1-ONETF-FEED2-ACT

COL

COL-PL SERV-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACT

COMMS-VDPU SU-CNFGCOMMS-VDP

SOL-FEED2-ACT SOL-FEED2SOL-FEED1 RELAY-OFF

SOL-FEED2-DEACTETF-PPSB2-ONSOL&ETF-PPSETF-FEED2S

YS

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATEEVA INHIBIT PADMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATE

EVA INHIBIT PADMCC-H FCT H/O (1/2)

*PPSB2-ON*SOL&ETF-ON

NOTES:

2-27

FD08 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/13/07 (347)

12 13 14 15 16 17 18 19 20 21 22 23 007/00MET Day 006 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/13/07 (347)DAY/NIGHTORBIT

DAILY ORBIT 15 16 1 2 3 4 5 6 7TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JKK JJKSAA

ACS-AUTO-H/O-RS-INHEVA-HYGIENE-BREAK

CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATEUHF-SSSR-ACTMSS-POWERUPC&T-AUDIO-CNFGVDS-VIDEO-CNFGA/L RAPID DPRS-ENADPCPPS-PCU FDIR-ENABLEISS-RAP DPRS-INHVDS-WETA-ACTISS-RAP DPRS-ENAACS-PCA VRIV-OPA/L-10.2 PSI OP-TERMACS-PCA VRIV-CLA/L-CCAA-SPD-CHG

S-BD

ACS-AUTO-H/O-RS-INHEVA-HYGIENE-BREAK

EVA-HYGIENE-BREAKCCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATE

UHF-SSSR-ACTMSS-POWERUP

C&T-AUDIO-CNFGVDS-VIDEO-CNFGA/L RAPID DPRS-ENA

DPCPPS-PCU FDIR-ENABLE

ISS-RAP DPRS-INHVDS-WETA-ACT

ISS-RAP DPRS-ENAACS-PCA VRIV-OP

A/L-10.2 PSI OP-TERMACS-PCA VRIV-CL

A/L-CCAA-SPD-CHGCHECS-KU-D/LK

U-BD

CHECS-KU-D/L

RS

COL-PL SERV-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU SU-CNFGCOMMS-VDPU-CP1-CNFGSOL-FEED2-ACTSOL-FEED1 RELAY-OFFSOL-FEED2-DEACTETF-PPSB2-ONSOL&ETF-PPSB1-ONETF-FEED2-ACT

COL

COL-PL SERV-ACTCOMMS-VDPU-CP1-ACTCOMMS-VMN2-ACTCOMMS-VCA2-ACT

COMMS-VDPU SU-CNFGCOMMS-VDP

SOL-FEED2-ACT SOL-FEED2SOL-FEED1 RELAY-OFF

SOL-FEED2-DEACTETF-PPSB2-ONSOL&ETF-PPSETF-FEED2S

YS

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATEEVA INHIBIT PADMCC-H FCT H/O (1/2)

MCC

CHECS-KU-D/LMCC-H FCT H/O (3/1)CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATE

EVA INHIBIT PADMCC-H FCT H/O (1/2)

NOTES:

*PPSB2-ON*SOL&ETF-ON

Page 40: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD08

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

ISS EXTERNAL SURVEY

2-28

STS-122

DN

ISS

UP

22 23 12/14 01 02 03 04 05 06 07 08 09GMT 12/13/07 (347) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDRCWC

TERM

POST EVAW/H20,METOX

PTV07

PMCA/G

PRE SLEEP SLEEP

PLT

P-RPS

RPRS

CWCXFER(2)

CDM-A

♣ PRE SLEEP* SLEEP

MS1 EXERCISE

ILUM*

PRE SLEEP SLEEP

SSRMS

EUTEF

XFER

MS2/EV1

P-RPS

RPRS

CLNUP

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEP

MS3/EV2 EXERCISE PRE SLEEP SLEEP

MS4/EV3

P-RPS

RPRS

CLNUP

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEP

FE-2EXERCISERED

PREP WORK DPC PRE SLEEP-ISS SLEEP

ISS CDR PREPWORK

POST EVAW/H20,METOX

D/L*

PRE SLEEP-ISS SLEEP

FE-1 PREP WORK DPC

DWNLD

PRE SLEEP-ISS SLEEP

FE-2 EXP16

SSRMS

EUTEF

XFER

EXERCISETVIS DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118 119

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT♣EVA3 IVA SPPRT

*√ HUM SEP*ON

*EVA IMAGENOTES

2-28

FD08

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

ISS EXTERNAL SURVEY

STS-122

DN

ISS

UP

22 23 12/14 01 02 03 04 05 06 07 08 09GMT 12/13/07 (347) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDRCWC

TERM

POST EVAW/H20,METOX

PTV07

PMCA/G

PRE SLEEP SLEEP

PLT

P-RPS

RPRS

CWCXFER(2)

CDM-A

♣ PRE SLEEP* SLEEP

MS1 EXERCISE

ILUM*

PRE SLEEP SLEEP

SSRMS

EUTEF

XFER

MS2/EV1

P-RPS

RPRS

CLNUP

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEP

MS3/EV2 EXERCISE PRE SLEEP SLEEP

MS4/EV3

P-RPS

RPRS

CLNUP

INGRS

POST EVAW/H20,METOX PRE SLEEP SLEEP

FE-2EXERCISERED

PREP WORK DPC PRE SLEEP-ISS SLEEP

ISS CDR PREPWORK

POST EVAW/H20,METOX

D/L*

PRE SLEEP-ISS SLEEP

FE-1 PREP WORK DPC

DWNLD

PRE SLEEP-ISS SLEEP

FE-2 EXP16

SSRMS

EUTEF

XFER

EXERCISETVIS DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118 119

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES♣EVA3 IVA SPPRT

*√ HUM SEP*ON

*EVA IMAGE

Page 41: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD08

2-29

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/14 01 02 03CT 12/13/07 (347)

007/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 007 22 23 12/14 01 02 03 04 05 06 07 08 09

GMT 12/13/07 (347)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JJK JKKTLM FORMATSAA

MSS-POWERDOWNA/L-CCAA-RECNFGCCS-TLM FORMAT-SWAPC&T-AUDIO-CNFGACS-GNC PPL-UPDATEDPCUHF-SSSR-DEACTPPS-PCU FDIR-INHIBITVDS-WETA-DEACTIATCS-MTL FLOW-ADJSTVDS-VIDEO-DCNFGACS-AUTO-H/O-RS-ENACOL-LOG FILE-D/LHK2-TLM-CNFGCHECS-DEFIB DLY-CMD CHECS-COMMANDINGPPS-PCU-DEACT

S-BD

MSS-POWERDOWNA/L-CCAA-RECNFG

CCS-TLM FORMAT-SWAPC&T-AUDIO-CNFGACS-GNC PPL-UPDATEDPC

UHF-SSSR-DEACTPPS-PCU FDIR-INHIBITVDS-WETA-DEACTIATCS-MTL FLOW-ADJST

VDS-VIDEO-DCNFGACS-AUTO-H/O-RS-ENA

COL-LOG FILE-D/LHK2-TLM-CNFG

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

PPS-PCU-DEACTCOL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COMMS-VDPU-CP1-CNFGSOL-FEED2-ACTCOMMS-VCA2-DEACTCOMMS-VMN2-DEACTETF-FEED1 RELAY-OFFSOL-FEED2-DEACTSOL-FEED1-ACTSOL-PWR-ONSOL-SOVIM-C/ODMS-SOLA FILE-UPLKSOL-SOLA FILE-XFERSOL-SOLACES-C/OCOL-LOG FILE-D/LETF-FEED1-ACTSOL-SOLSPEC-C/ODMS-VTC TM PKT-CNFGSOL-CPD XCMU-CMDSOL-CPD-UNLKSOL-CPD-CALIBETF-DHPU TM-C/ODMS-NOM TM PKT-CNFGSOL-CPD-C/ODMS-DHPU FILE-UPLKETF-DHPU FILE-XFERETF-DHPU TC-C/O1ETF-DHPU TC-C/O2DMS-ETF MEDET-UPLKETF-MEDET FILE-XFER

COL

COMMS-VDPU-CP1-CNFGSOL-FEED2-ACTCOMMS-VCA2-DEACTCOMMS-VMN2-DEACT

ETF-FEED1 RELAY-OFFSOL-FEED2-DEACT

SOL-FEED1-ACTSOL-PWR-ON

SOL-SOVIM-C/ODMS-SOLA FILE-UPLKSOL-SOLA FILE-XFER

SOL-SOLACES-C/OCOL-LOG FILE-D/L

ETF-FEED1-ACTSOL-SOLSPEC-C/O

DMS-VTC TM PKT-CNFGSOL-CPD XCMU-CMDSOL-CPD-UNLK

SOL-CPD-CALIBETF-DHPU TM-C/O

DMS-NOM TM PKT-CNFGSOL-CPD-C/O

DMS-DHPU FILE-UPLKETF-DHPU FILE-XFER

ETF-DHPU TC-C/O1ETF-DHPU TC-C/O2DMS-ETF MEDET-UPLETF-MEDET FILE-XS

YS

CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATEMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS KU D/L

MCC

CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATE

MCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCHECS-KU-

2-29

FD08 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/14 01 02 03CT 12/13/07 (347)

007/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 007 22 23 12/14 01 02 03 04 05 06 07 08 09

GMT 12/13/07 (347)DAY/NIGHTORBIT

DAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JJK JKKSAA

MSS-POWERDOWNA/L-CCAA-RECNFGCCS-TLM FORMAT-SWAPC&T-AUDIO-CNFGACS-GNC PPL-UPDATEDPCUHF-SSSR-DEACTPPS-PCU FDIR-INHIBITVDS-WETA-DEACTIATCS-MTL FLOW-ADJSTVDS-VIDEO-DCNFGACS-AUTO-H/O-RS-ENACOL-LOG FILE-D/LHK2-TLM-CNFGCHECS-DEFIB DLY-CMD CHECS-COMMANDINGPPS-PCU-DEACT

S-BD

MSS-POWERDOWNA/L-CCAA-RECNFG

CCS-TLM FORMAT-SWAPC&T-AUDIO-CNFGACS-GNC PPL-UPDATEDPC

UHF-SSSR-DEACTPPS-PCU FDIR-INHIBITVDS-WETA-DEACTIATCS-MTL FLOW-ADJST

VDS-VIDEO-DCNFGACS-AUTO-H/O-RS-ENA

COL-LOG FILE-D/LHK2-TLM-CNFG

CHECS-DEFIB DLY-CMDCHECS-COMMANDING

PPS-PCU-DEACTCOL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COMMS-VDPU-CP1-CNFGSOL-FEED2-ACTCOMMS-VCA2-DEACTCOMMS-VMN2-DEACTETF-FEED1 RELAY-OFFSOL-FEED2-DEACTSOL-FEED1-ACTSOL-PWR-ONSOL-SOVIM-C/ODMS-SOLA FILE-UPLKSOL-SOLA FILE-XFERSOL-SOLACES-C/OCOL-LOG FILE-D/LETF-FEED1-ACTSOL-SOLSPEC-C/ODMS-VTC TM PKT-CNFGSOL-CPD XCMU-CMDSOL-CPD-UNLKSOL-CPD-CALIBETF-DHPU TM-C/ODMS-NOM TM PKT-CNFGSOL-CPD-C/ODMS-DHPU FILE-UPLKETF-DHPU FILE-XFERETF-DHPU TC-C/O1ETF-DHPU TC-C/O2DMS-ETF MEDET-UPLKETF-MEDET FILE-XFER

COL

COMMS-VDPU-CP1-CNFGSOL-FEED2-ACTCOMMS-VCA2-DEACTCOMMS-VMN2-DEACT

ETF-FEED1 RELAY-OFFSOL-FEED2-DEACT

SOL-FEED1-ACTSOL-PWR-ON

SOL-SOVIM-C/ODMS-SOLA FILE-UPLKSOL-SOLA FILE-XFER

SOL-SOLACES-C/OCOL-LOG FILE-D/L

ETF-FEED1-ACTSOL-SOLSPEC-C/O

DMS-VTC TM PKT-CNFGSOL-CPD XCMU-CMDSOL-CPD-UNLK

SOL-CPD-CALIBETF-DHPU TM-C/O

DMS-NOM TM PKT-CNFGSOL-CPD-C/O

DMS-DHPU FILE-UPLKETF-DHPU FILE-XFER

ETF-DHPU TC-C/O1ETF-DHPU TC-C/O2DMS-ETF MEDET-UPLETF-MEDET FILE-XS

YS

CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATEMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS KU D/L

MCC

CCS-TLM FORMAT-SWAPACS-GNC PPL-UPDATE

MCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCHECS-KU-

Page 42: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD09

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

2-30

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/14/07 (348) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDRH/O

H/O

H/O

CREWCONF

CREW

PHOTO

CWC13

INIT

CWC

TERM

CWC

XFER

EXERCISEFARE

WELL

IMU

MEALMNVR

-XLV

MNVR

-XLV

N2*

N2*

O2 XFERT/DPOST SLEEP

PWRFILL#9

REBOOSTCONFIG 3

BSTR

FAN*

XFER OPS

PLT CREWCONF

CREW

PHOTO

CWC12

INIT

CWC

TERM

CWC

XFER

CDM*

CDM-D

FARE

WELL

MEAL

PTVO4

SETUP

PTV05

DEACT

P/TV05S/U

POST SLEEPPWRFILL#8

REBOOSTCONFIG 3

RNDZ TOOLSC/O

XFEROPS XFER OPSXFER OPS

MS1 CREWCONF

CREW

PHOTO

FARE

WELL

ILUM*

BLOOD

COLL

OPR

BLOOD

COLL

OPR

BLOOD

SETUP

STOW

MCIU

MEALPTV08EXTRNLSRVY

P/TV09REBOOST OPSPOST SLEEP RNDZ TOOLS

C/O

LOG

BRIEF

XFR

UPDAT

XFER OPS XFEROPS

XFER

TAG

MS2/EV1

ASPRN

CREWCONF

CREW

PHOTO

EVATOOLDECNFG

FARE

WELL

MEALPOST EVA RCNFG/XFERPOST SLEEPLOG

XFER OPS

MS3/EV2 BLB AI CI INSTL

ATCS*

ATCS@

BGB LF RMVHMCI

BLBHMLFRMV

HM SI

INSTL

BLBUMBMATE

CREWCONF

CREW

PHOTO

EXERCISEFARE

WELL

HATCH

CLOSE

MEALPOST SLEEP

POST

SLEEP

LOG

DRY

DRY

DRY

DRY

SLVA

MS4/EV3

ASPRN

CREWCONF

CREW

PHOTO

EVATOOLDECNFG

EXERCISEFARE

WELL

HATCH

CLOSE

MEALPOST EVA RCNFG/XFERPOST SLEEP

P SLP

LOG

DRY

DRY

DRY

DRY

SLVA

XFER OPSXFER

TAG

WLES

FE-2SLVA

POST SLEEP PREPWORK DPC H/O

INSTL

PART

CVRS

XFER OPS XFEROPSHANDOVER DCB1

PACKDCB2PACK

MTX-T

MTX-I

CREWCONF

CREW

PHOTO

MIDDAY-MEAL EXERCISETVIS EXERCISE RED

FARE

WELL

ISS CDRSLVA

DRY

POST SLEEP

EDR

EQUIP

GTHRDPC EDR

STWG

EDRFRONTS/U

EDRUMBMATE

FIRE

C/O

FIRE

C/O

H20&

DATA

EDR*

SW VF

EXERCISECEVIS EXERCISE RED

EDR%

CREWCONF

CREW

PHOTO

MIDDAY-MEAL S/S

FIBER

BLOOD

COLL

SUBJEUPU

O2 XFERT/D

FARE

WELL

HATCH

CLOSE

FE-1 POST SLEEP PREPWORK DPC

МБИ12

МБИ

DWNLD

РБОMSR

СОГСANLZ

СОЖMNT

ЭЛКТ

MNT EXERCISE TVIS VELO CREW

CONF

CREW

PHOTO

MIDDAY-MEAL XFER OPSFARE

WELL

FE-2 EXP16SLVA

DRY

POST SLEEP PREPWORK

DPC H/OEPMEQUIPGATHER

FIRE

C/O

LAPTP

INSTL

SW VF

HANDOVER DCB1PACK

DCB2PACK

LED

LPTP

C/O

SELF#

CREWCONF

CREW

PHOTO

MIDDAY-MEAL CRCO

UDPC/O

MEEMM

S/U

BLOOD

COLL

SUBJ

STOW*

CDLS/U

FARE

WELL

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVV REBOOST BIAS -XLV -ZVVORB ATT♣EXERCISE R*RPRS INIT *RPRS TERM

*OFF *BATT C/O*OFF

*CI-INSTL@SI INSTL

*LAPTOP-INSTL %LAPTOP-ACT#TEST-C/O

*SLVA CLCTNOTES

2-30

FD09

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/14/07 (348) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDRH/O

H/O

H/O

CREWCONF

CREW

PHOTO

CWC13

INIT

CWC

TERM

CWC

XFER

EXERCISEFARE

WELL

IMU

MEALMNVR

-XLV

MNVR

-XLV

N2*

N2*

O2 XFERT/DPOST SLEEP

PWRFILL#9

REBOOSTCONFIG 3

BSTR

FAN*

XFER OPS

PLT CREWCONF

CREW

PHOTO

CWC12

INIT

CWC

TERM

CWC

XFER

CDM*

CDM-D

FARE

WELL

MEAL

PTVO4

SETUP

PTV05

DEACT

P/TV05S/U

POST SLEEPPWRFILL#8

REBOOSTCONFIG 3

RNDZ TOOLSC/O

XFEROPS XFER OPSXFER OPS

MS1 CREWCONF

CREW

PHOTO

FARE

WELL

ILUM*

BLOOD

COLL

OPR

BLOOD

COLL

OPR

BLOOD

SETUP

STOW

MCIU

MEALPTV08EXTRNLSRVY

P/TV09REBOOST OPSPOST SLEEP RNDZ TOOLS

C/O

LOG

BRIEF

XFR

UPDAT

XFER OPS XFEROPS

XFER

TAG

MS2/EV1

ASPRN

CREWCONF

CREW

PHOTO

EVATOOLDECNFG

FARE

WELL

MEALPOST EVA RCNFG/XFERPOST SLEEPLOG

XFER OPS

MS3/EV2 BLB AI CI INSTL

ATCS*

ATCS@

BGB LF RMVHMCI

BLBHMLFRMV

HM SI

INSTL

BLBUMBMATE

CREWCONF

CREW

PHOTO

EXERCISEFARE

WELL

HATCH

CLOSE

MEALPOST SLEEP

POST

SLEEP

LOG

DRY

DRY

DRY

DRY

SLVA

MS4/EV3

ASPRN

CREWCONF

CREW

PHOTO

EVATOOLDECNFG

EXERCISEFARE

WELL

HATCH

CLOSE

MEALPOST EVA RCNFG/XFERPOST SLEEP

P SLP

LOG

DRY

DRY

DRY

DRY

SLVA

XFER OPSXFER

TAG

WLES

FE-2SLVA

POST SLEEP PREPWORK DPC H/O

INSTL

PART

CVRS

XFER OPS XFEROPSHANDOVER DCB1

PACKDCB2PACK

MTX-T

MTX-I

CREWCONF

CREW

PHOTO

MIDDAY-MEAL EXERCISETVIS EXERCISE RED

FARE

WELL

ISS CDRSLVA

DRY

POST SLEEP

EDR

EQUIP

GTHRDPC EDR

STWG

EDRFRONTS/U

EDRUMBMATE

FIRE

C/O

FIRE

C/O

H20&

DATA

EDR*

SW VF

EXERCISECEVIS EXERCISE RED

EDR%

CREWCONF

CREW

PHOTO

MIDDAY-MEAL S/S

FIBER

BLOOD

COLL

SUBJEUPU

O2 XFERT/D

FARE

WELL

HATCH

CLOSE

FE-1 POST SLEEP PREPWORK DPC

МБИ12

МБИ

DWNLD

РБОMSR

СОГСANLZ

СОЖMNT

ЭЛКТ

MNT EXERCISE TVIS VELO CREW

CONF

CREW

PHOTO

MIDDAY-MEAL XFER OPSFARE

WELL

FE-2 EXP16SLVA

DRY

POST SLEEP PREPWORK

DPC H/OEPMEQUIPGATHER

FIRE

C/O

LAPTP

INSTL

SW VF

HANDOVER DCB1PACK

DCB2PACK

LED

LPTP

C/O

SELF#

CREWCONF

CREW

PHOTO

MIDDAY-MEAL CRCO

UDPC/O

MEEMM

S/U

BLOOD

COLL

SUBJ

STOW*

CDLS/U

FARE

WELL

DAY/NIGHTORBIT 119 120 121 122 123 124 125 126 127

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV REBOOST BIAS -XLV -ZVV

NOTES♣EXERCISE R*RPRS INIT *RPRS TERM

*OFF *BATT C/O*OFF

*CI-INSTL@SI INSTL

*LAPTOP-INSTL %LAPTOP-ACT#TEST-C/O

*SLVA CLCT

Page 43: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD09

2-31

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/14/07 (348)

12 13 14 15 16 17 18 19 20 21 22 23 008/00MET Day 007 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/14/07 (348)DAY/NIGHTORBIT

DAILY ORBIT 15 1 2 3 4 5 6 7 8TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAMNVR TO REBOOST

-XLV +ZLVMNVR TO MATED TEA

-XVV +ZLV TEAISS ATTITUDE

JKKTLM FORMATSAA

ACS-AUTO-H/O-RS-INHSDMS-PPL UNDCKNG-U/LDPCSPS-NOD2 DDCU-PWRDNTHC-A/L CCAA-CONFIGACS-CMG/STS ATT-H/OSPS-NOD2 DDCU-PWRUPACS-CCDB-PARAM-UPDTACS-CMG GMBL ANG-PSNACS-STS/CMG ATT-H/OTHC-BOOSTER FAN-DEACACS-MM-ACTIV W/ USTO

S-BD

ACS-AUTO-H/O-RS-INHSDMS-PPL UNDCKNG-U/L

DPCSPS-NOD2 DDCU-PWRDN SPS-NOD2 DDCU-PWRDN

THC-A/L CCAA-CONFIG THC-A/L CACS-CMG/STS ATT-H/O ACS-CMG/ST

SPS-NOD2 DDCU-PWRUP SPS-NOD2 DDCU-PWRUPACS-CCDB-PARAM-UPDT

ACS-CMG GMBL ANG-PSN ACS-CMG GACS-STS/CMG ATT-H/O

THC-BOOSTER FAN-DEACACS-MM-ACTIV W/ USTOK

U-BDRS

ETF-DHPU FILE-XFERDMS-DHPU FILE-DWNLKCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU-CP1-CNFGEPS-EDR PDU OUTL-INHTCS-EDR WFSV-CLEDR-PCDF EU-CNCTEPM-RACK-ACTTCS-BLB-WFSV-CLEPS-BLB PDU OUTL-INHEDR-RACK-ACTECS-EPM SD LMT-UPDTEPM-C&W-CNFGECS-EDR SD LMT-UPDTEDR-S/S-C/OEDR-C&W-CNFGEPM-LAN-I/F-C/OEDR-PCDF EU-CNFG1EDR-PCDF EU-CNFG2EDR-PCDF EU-ACTEPM-MEEMM MU-C/OEDR-PCDF-EU-C/OCOMMS-VCA2-DEACTCOMMS-VMN2-DEACTCOMMS-VDPU-CP1-DEACTEPM-CDL DMCU-C/OEDR-VMU-DCNFG

COL

ETF-DHPU FILE-XFERDMS-DHPU FILE-DWNLK

COMMS-VMN2-ACTCOMMS-VCA2-ACT

COMMS-VDPU-CP1-CNFGEPS-EDR PDU OUTL-INHTCS-EDR WFSV-CL

EDR-PCDF EU-CNCT EDR-PCDF EU-CNCTEPM-RACK-ACT

TCS-BLB-WFSV-CLEPS-BLB PDU OUTL-INH

EDR-RACK-ACTECS-EPM SD LMT-UPDT

EPM-C&W-CNFGECS-EDR SD LMT-UPDT

EDR-S/S-C/OEDR-C&W-CNFG

EPM-LAN-I/F-C/OEDR-PCDF EU-CNFG1

EDR-PCDF EU-CNFG2EDR-PCDF EU-ACT

EPM-MEEMM MU-C/OEDR-PCDF-EU-C/O

COMMS-VCA2-DEACTCOMMS-VMN2-DEACTCOMMS-VDPU-CP1-DEAC

EPM-CDL DEDR-VMU-DCN

IWIS-DATA-TAKESYS

IWIS-DATA-TAKE

MCC-H FCT H/O (3/1)ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTOMCC-H FCT H/O (1/2)

MCC

MCC-H FCT H/O (3/1)ACS-CMG GMBL ANG-PSN ACS-CMG G

ACS-MM-ACTIV W/ USTOMCC-H FCT H/O (1/2)

*OFF

2-31

FD09 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/14/07 (348)

12 13 14 15 16 17 18 19 20 21 22 23 008/00MET Day 007 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/14/07 (348)DAY/NIGHTORBIT

DAILY ORBIT 15 1 2 3 4 5 6 7 8TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEAMNVR TO REBOOST

-XLV +ZLVMNVR TO MATED TEA

-XVV +ZLV TEA

TLM FORMAT JKKSAA

ACS-AUTO-H/O-RS-INHSDMS-PPL UNDCKNG-U/LDPCSPS-NOD2 DDCU-PWRDNTHC-A/L CCAA-CONFIGACS-CMG/STS ATT-H/OSPS-NOD2 DDCU-PWRUPACS-CCDB-PARAM-UPDTACS-CMG GMBL ANG-PSNACS-STS/CMG ATT-H/OTHC-BOOSTER FAN-DEACACS-MM-ACTIV W/ USTO

S-BD

ACS-AUTO-H/O-RS-INHSDMS-PPL UNDCKNG-U/L

DPCSPS-NOD2 DDCU-PWRDN SPS-NOD2 DDCU-PWRDN

THC-A/L CCAA-CONFIG THC-A/L CACS-CMG/STS ATT-H/O ACS-CMG/ST

SPS-NOD2 DDCU-PWRUP SPS-NOD2 DDCU-PWRUPACS-CCDB-PARAM-UPDT

ACS-CMG GMBL ANG-PSN ACS-CMG GACS-STS/CMG ATT-H/O

THC-BOOSTER FAN-DEACACS-MM-ACTIV W/ USTOK

U-BDRS

ETF-DHPU FILE-XFERDMS-DHPU FILE-DWNLKCOMMS-VMN2-ACTCOMMS-VCA2-ACTCOMMS-VDPU-CP1-CNFGEPS-EDR PDU OUTL-INHTCS-EDR WFSV-CLEDR-PCDF EU-CNCTEPM-RACK-ACTTCS-BLB-WFSV-CLEPS-BLB PDU OUTL-INHEDR-RACK-ACTECS-EPM SD LMT-UPDTEPM-C&W-CNFGECS-EDR SD LMT-UPDTEDR-S/S-C/OEDR-C&W-CNFGEPM-LAN-I/F-C/OEDR-PCDF EU-CNFG1EDR-PCDF EU-CNFG2EDR-PCDF EU-ACTEPM-MEEMM MU-C/OEDR-PCDF-EU-C/OCOMMS-VCA2-DEACTCOMMS-VMN2-DEACTCOMMS-VDPU-CP1-DEACTEPM-CDL DMCU-C/OEDR-VMU-DCNFG

COL

ETF-DHPU FILE-XFERDMS-DHPU FILE-DWNLK

COMMS-VMN2-ACTCOMMS-VCA2-ACT

COMMS-VDPU-CP1-CNFGEPS-EDR PDU OUTL-INHTCS-EDR WFSV-CL

EDR-PCDF EU-CNCT EDR-PCDF EU-CNCTEPM-RACK-ACT

TCS-BLB-WFSV-CLEPS-BLB PDU OUTL-INH

EDR-RACK-ACTECS-EPM SD LMT-UPDT

EPM-C&W-CNFGECS-EDR SD LMT-UPDT

EDR-S/S-C/OEDR-C&W-CNFG

EPM-LAN-I/F-C/OEDR-PCDF EU-CNFG1

EDR-PCDF EU-CNFG2EDR-PCDF EU-ACT

EPM-MEEMM MU-C/OEDR-PCDF-EU-C/O

COMMS-VCA2-DEACTCOMMS-VMN2-DEACTCOMMS-VDPU-CP1-DEAC

EPM-CDL DEDR-VMU-DCN

IWIS-DATA-TAKESYS

IWIS-DATA-TAKE

MCC-H FCT H/O (3/1)ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTOMCC-H FCT H/O (1/2)

MCC

MCC-H FCT H/O (3/1)ACS-CMG GMBL ANG-PSN ACS-CMG G

ACS-MM-ACTIV W/ USTOMCC-H FCT H/O (1/2)

*OFF

Page 44: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD09

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

2-32

STS-122

DN

ISS

UP

22 23 12/15 01 02 03 04 05 06 07 08 09GMT 12/14/07 (348) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDRH/O

NOMH2OCNFG

PCS*

PMCA/G

PRE SLEEP SLEEP

PLT EXERCISE PRE SLEEP SLEEP

MS1 EXERCISEP/TV03UNDOCKSETUP

PRE SLEEPPRESLEEP SLEEP

MS2/EV1 EXERCISE PRE SLEEPSETUPC/LCAMR

SLEEP

MS3/EV2

HATCH

CLOSE

MUS

HATCHLEAKCHECK

PRE SLEEPDRY

SLEEP

MS4/EV3

HATCH

CLOSE

HATCHLEAKCHECK

PRE SLEEPDRY

SLEEP

FE-2 PRE SLEEP SLEEP

ISS CDR

HATCH

CLOSE

EUPD

PREP WORK DPC PRE SLEEP-ISS SLEEP

FE-1 PREP WORK

DWNLD

DPC PRE SLEEP-ISS SLEEP

FE-2 EXP16 EXERCISERED

LOGPREPWORK

DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVVORB ATT*ACT

NOTES

2-32

FD09

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

STS-122

DN

ISS

UP

22 23 12/15 01 02 03 04 05 06 07 08 09GMT 12/14/07 (348) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDRH/O

NOMH2OCNFG

PCS*

PMCA/G

PRE SLEEP SLEEP

PLT EXERCISE PRE SLEEP SLEEP

MS1 EXERCISEP/TV03UNDOCKSETUP

PRE SLEEPPRESLEEP SLEEP

MS2/EV1 EXERCISE PRE SLEEPSETUPC/LCAMR

SLEEP

MS3/EV2

HATCH

CLOSE

MUS

HATCHLEAKCHECK

PRE SLEEPDRY

SLEEP

MS4/EV3

HATCH

CLOSE

HATCHLEAKCHECK

PRE SLEEPDRY

SLEEP

FE-2 PRE SLEEP SLEEP

ISS CDR

HATCH

CLOSE

EUPD

PREP WORK DPC PRE SLEEP-ISS SLEEP

FE-1 PREP WORK

DWNLD

DPC PRE SLEEP-ISS SLEEP

FE-2 EXP16 EXERCISERED

LOGPREPWORK

DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTORBIT 127 128 129 130 131 132 133 134 135

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV

NOTES*ACT

Page 45: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD09

2-33

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/15 01 02 03CT 12/14/07 (348)

008/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 008 22 23 12/15 01 02 03 04 05 06 07 08 09

GMT 12/14/07 (348)DAY/NIGHTORBIT

DAILY ORBIT 8 9 10 11 12 13 14 15 16TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAISS ATTITUDE

JKKTLM FORMATSAA

ACS-CMG GMBL ANG-PSNTHC-A/L CCAA-CONFIGACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTODPCACS-AUTO-H/O-RS-ENACOL-LOG FILE-D/LCHECS-DEFIB DLY-CMD CHECS-COMMANDINGHK2-TLM-CNFGCDH-EXT MDM B/U-ONCDH-EXT MDM-PPL LOADSDMS-DATA-TAKECDH-EXT MDM B/U-OFFAR-CDRA-DEACTVDS-ETVCG-ACTVDS-VIDEO-CNFG

S-BD

ACS-CMG GMBL ANG-PSNTHC-A/L CCAA-CONFIG

ACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTO

DPCACS-AUTO-H/O-RS-ENA

COL-LOG FILE-D/LCHECS-DEFIB DLY-CMD

CHECS-COMMANDINGHK2-TLM-CNFG

CDH-EXT MDM B/U-ONCDH-EXT MDM-PPL LOAD

SDMS-DATA-TAKECDH-EXT MDM B/U-OFF

AR-CDRA-DVDS-ETVCG-ACT

VDS-VIDEO-COL-LOG FILE-D/LCHECS-KU-D/LVDS-ETVCG-ACT

KU-BD

COL-LOG FILE-D/LCHECS-KU-

VDS-ETVCG-ACTСЗП-АБ-FULL CHRGR

SСЗП-АБ-FULL CHRG

EPM-CDL DMCU-C/ODMS-DEBIE2-UPLKEDR-PCDF EU-DEACTETF-DEBIE2 FILE-XFEREDR-RACK-DCNFGEDR-RACK-DEACTETF-EUTEMP-C/OEPM-LOG FILE-DNLKCOL-LOG FILE-D/LETF-EXPOSE-C/OETF-MEDET-C/OETF-PLEGP-C/ODMS-VTC TM PKT-CNFGETF-DEBIE2-C/ODMS-NOM TM PKT-CNFGETF-FIPEX-C/OETF-DOSTEL-C/OETF-TRIBO-C/OCOMMS-VDPU SU-CNFGETF-EVC-C/OETF-EXPOSE-ACTCOMMS-VDPU-DEACTETF-MEDET FILE-XFERETF-EXPOSE-COMMETF-MEDET-COMM

COL

EPM-CDL DMCU-C/ODMS-DEBIE2-UPLKEDR-PCDF EU-DEACTETF-DEBIE2 FILE-XFEREDR-RACK-DCNFG

EDR-RACK-DEACTETF-EUTEMP-C/O

EPM-LOG FILE-DNLKCOL-LOG FILE-D/LETF-EXPOSE-C/O

ETF-MEDET-C/OETF-PLEGP-C/O

DMS-VTC TM PKT-CNFGETF-DEBIE2-C/O

DMS-NOM TM PKT-CNFGETF-FIPEX-C/O

ETF-DOSTEL-C/OETF-TRIBO-C/O

COMMS-VDPU SU-CNFGETF-EVC-C/O

ETF-EXPOSE-ACTCOMMS-VDPU-DEACT

ETF-MEDET FILE-ETF-EXPOSETF-MEDETS

YS

ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTOMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTO

MCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCHECS-KU-

2-33

FD09 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/15 01 02 03CT 12/14/07 (348)

008/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 008 22 23 12/15 01 02 03 04 05 06 07 08 09

GMT 12/14/07 (348)DAY/NIGHTORBIT

DAILY ORBIT 8 9 10 11 12 13 14 15 16TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEA

TLM FORMAT JKKSAA

ACS-CMG GMBL ANG-PSNTHC-A/L CCAA-CONFIGACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTODPCACS-AUTO-H/O-RS-ENACOL-LOG FILE-D/LCHECS-DEFIB DLY-CMD CHECS-COMMANDINGHK2-TLM-CNFGCDH-EXT MDM B/U-ONCDH-EXT MDM-PPL LOADSDMS-DATA-TAKECDH-EXT MDM B/U-OFFAR-CDRA-DEACTVDS-ETVCG-ACTVDS-VIDEO-CNFG

S-BD

ACS-CMG GMBL ANG-PSNTHC-A/L CCAA-CONFIG

ACS-STS/CMG ATT-H/OACS-MM-ACTIV W/ USTO

DPCACS-AUTO-H/O-RS-ENA

COL-LOG FILE-D/LCHECS-DEFIB DLY-CMD

CHECS-COMMANDINGHK2-TLM-CNFG

CDH-EXT MDM B/U-ONCDH-EXT MDM-PPL LOAD

SDMS-DATA-TAKECDH-EXT MDM B/U-OFF

AR-CDRA-DVDS-ETVCG-ACT

VDS-VIDEO-COL-LOG FILE-D/LCHECS-KU-D/LVDS-ETVCG-ACT

KU-BD

COL-LOG FILE-D/LCHECS-KU-

VDS-ETVCG-ACTСЗП-АБ-FULL CHRGR

SСЗП-АБ-FULL CHRG

EPM-CDL DMCU-C/ODMS-DEBIE2-UPLKEDR-PCDF EU-DEACTETF-DEBIE2 FILE-XFEREDR-RACK-DCNFGEDR-RACK-DEACTETF-EUTEMP-C/OEPM-LOG FILE-DNLKCOL-LOG FILE-D/LETF-EXPOSE-C/OETF-MEDET-C/OETF-PLEGP-C/ODMS-VTC TM PKT-CNFGETF-DEBIE2-C/ODMS-NOM TM PKT-CNFGETF-FIPEX-C/OETF-DOSTEL-C/OETF-TRIBO-C/OCOMMS-VDPU SU-CNFGETF-EVC-C/OETF-EXPOSE-ACTCOMMS-VDPU-DEACTETF-MEDET FILE-XFERETF-EXPOSE-COMMETF-MEDET-COMM

COL

EPM-CDL DMCU-C/ODMS-DEBIE2-UPLKEDR-PCDF EU-DEACTETF-DEBIE2 FILE-XFEREDR-RACK-DCNFG

EDR-RACK-DEACTETF-EUTEMP-C/O

EPM-LOG FILE-DNLKCOL-LOG FILE-D/LETF-EXPOSE-C/O

ETF-MEDET-C/OETF-PLEGP-C/O

DMS-VTC TM PKT-CNFGETF-DEBIE2-C/O

DMS-NOM TM PKT-CNFGETF-FIPEX-C/O

ETF-DOSTEL-C/OETF-TRIBO-C/O

COMMS-VDPU SU-CNFGETF-EVC-C/O

ETF-EXPOSE-ACTCOMMS-VDPU-DEACT

ETF-MEDET FILE-ETF-EXPOSETF-MEDETS

YS

ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTOMCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD CHECS-COMMANDINGCHECS-KU-D/L

MCC

ACS-CMG GMBL ANG-PSNACS-MM-ACTIV W/ USTO

MCC-H FCT H/O (2/3)CHECS-DEFIB DLY-CMD

CHECS-COMMANDINGCHECS-KU-

Page 46: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD10

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

UNDOCKING*

*8/15:50

S1Δ

S2Δ

2-34

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/15/07 (349) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDRH/O

FLYAROUND

GRP B

PWRUP

MEALMNVR

-ZLV

MNVR

NOSE

MNVR

PORT

MNVRUNDK

PORT WING SURVEYSTBD WING SURVEYPOST SLEEPRMS*

SEP SIMOINIT

SIMOTERM

UNDOCK OPS

PLTCAB T

COMM1

EXERCISEFLYAROUND

GRP B

PWRDN

GRP B

PWRUP

HTR B

IMU

MCIU*

MEALMNVR

STBD

MNVRUNDK

POST SLEEP SEP

SSV-3

UNDOCK OPS

MS1 FLYAROUND MEAL NOSE CAPSURVEY PORT WING SURVEYSTBD WING SURVEY

PTV03

DEACT

POST SLEEPRMS*

RMS*

LOG

SEP

SSOR

DEACT

UNDOCK OPS

MS2/EV1

UNDK

AUDIO

EMUINSTL

EVAUNPACK& STOW

EXERCISEFLYAROUND

GRP B

PWRDN

MEALOIU#

POST SLEEP PST ISS EVAENT PREP

LOG

SEP

SSV-4

UNDOCK OPS

MS3/EV2 EMUINSTL

EVAUNPACK& STOW

EXERCISEFLYAROUND MEAL NOSE CAPSURVEY

PLYBK

OPSPOST SLEEP PST ISS EVA

ENT PREP

LOG

SEPUNDOCK OPS

MS4/EV3COND

T/DFLYAROUND MEAL NOSE CAP

SURVEY PORT WING SURVEYSTBD WING SURVEYPOST SLEEP

POSTUNDKPGSCCNFG

RMS*

RMS*

LOG

SEPUNDOCK OPSWLES

FE-2 POST SLEEP P/TV03 UNDOCK MEAL EXERCISE

ISS CDR POST SLEEP DPC PREPWORK

MTX-T

MTX-I

PMA2DEPARTCONFIG

PMA2-DEPRESS MIDDAY-MEAL

PMA2

LK CK

INITIWISD/L

IWISTEARDOWN

PMA2

LK CK

TERM

EXERCISETVIS EXERCISE RED

FE-1 POST SLEEP DPC PREPWORK

WINDW

PMA2DEPARTCONFIG

VELO MIDDAY-MEAL СОЖMNT EXERCISE TVIS

DWNLD

FE-2 EXP16 POST SLEEP DPC PREPWORK

DCS

DCS

RCNFG

UNDK

VIDEO

EXERCISETVIS MIDDAY-MEAL

MEC

MECS/W

EXERCISE RED BGB SIINSTL

BGBCI

INSTL

EPM

DEACT

EPM

STOWPCSP/D

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSW -171.0E -46.0Z -275.0

BIAS -XLV -ZVV UNDOCK/FLYAROUND/SEP -ZLV +YVV STBD SURVEY NOSE SURVEY PORT SURVEYORB ATT*MNVR-FLAT FIELD*FILTER CHECK*MNVR-UNDOCK

#DEACTNOTES

2-34

FD10

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

UNDOCKING*

*8/15:50

S1Δ

S2Δ

STS-122

DN

ISS

UP

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/15/07 (349) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDRH/O

FLYAROUND

GRP B

PWRUP

MEALMNVR

-ZLV

MNVR

NOSE

MNVR

PORT

MNVRUNDK

PORT WING SURVEYSTBD WING SURVEYPOST SLEEPRMS*

SEP SIMOINIT

SIMOTERM

UNDOCK OPS

PLTCAB T

COMM1

EXERCISEFLYAROUND

GRP B

PWRDN

GRP B

PWRUP

HTR B

IMU

MCIU*

MEALMNVR

STBD

MNVRUNDK

POST SLEEP SEP

SSV-3

UNDOCK OPS

MS1 FLYAROUND MEAL NOSE CAPSURVEY PORT WING SURVEYSTBD WING SURVEY

PTV03

DEACT

POST SLEEPRMS*

RMS*

LOG

SEP

SSOR

DEACT

UNDOCK OPS

MS2/EV1

UNDK

AUDIO

EMUINSTL

EVAUNPACK& STOW

EXERCISEFLYAROUND

GRP B

PWRDN

MEALOIU#

POST SLEEP PST ISS EVAENT PREP

LOG

SEP

SSV-4

UNDOCK OPS

MS3/EV2 EMUINSTL

EVAUNPACK& STOW

EXERCISEFLYAROUND MEAL NOSE CAPSURVEY

PLYBK

OPSPOST SLEEP PST ISS EVA

ENT PREP

LOG

SEPUNDOCK OPS

MS4/EV3COND

T/DFLYAROUND MEAL NOSE CAP

SURVEY PORT WING SURVEYSTBD WING SURVEYPOST SLEEP

POSTUNDKPGSCCNFG

RMS*

RMS*

LOG

SEPUNDOCK OPSWLES

FE-2 POST SLEEP P/TV03 UNDOCK MEAL EXERCISE

ISS CDR POST SLEEP DPC PREPWORK

MTX-T

MTX-I

PMA2DEPARTCONFIG

PMA2-DEPRESS MIDDAY-MEAL

PMA2

LK CK

INITIWISD/L

IWISTEARDOWN

PMA2

LK CK

TERM

EXERCISETVIS EXERCISE RED

FE-1 POST SLEEP DPC PREPWORK

WINDW

PMA2DEPARTCONFIG

VELO MIDDAY-MEAL СОЖMNT EXERCISE TVIS

DWNLD

FE-2 EXP16 POST SLEEP DPC PREPWORK

DCS

DCS

RCNFG

UNDK

VIDEO

EXERCISETVIS MIDDAY-MEAL

MEC

MECS/W

EXERCISE RED BGB SIINSTL

BGBCI

INSTL

EPM

DEACT

EPM

STOWPCSP/D

DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143

TDRSW -171.0E -46.0Z -275.0

ORB ATT BIAS -XLV -ZVV UNDOCK/FLYAROUND/SEP -ZLV +YVV STBD SURVEY NOSE SURVEY PORT SURVEY

NOTES*MNVR-FLAT FIELD*FILTER CHECK*MNVR-UNDOCK

#DEACT

Page 47: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD10

UNDOCKING*

*349/13:17

2-35

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/15/07 (349)

12 13 14 15 16 17 18 19 20 21 22 23 009/00MET Day 008 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/15/07 (349)DAY/NIGHTORBIT

DAILY ORBIT 16 1 2 3 4 5 6 7 8TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

-XVV +ZLV TEAMNVR TO UNDOCK FREE DRIFT +XVV +ZLV TEAISS ATTITUDE

JKK JJK JKKTLM FORMATSAA

ACS-AUTO-H/O-RS-INHSPS-PWR DWN & RCVRYPPS-SARJ-FTHRCDH-PROX VAL CK-INHDPCPPS-BGA-FTHRACS-CMG DATA-DUMPLOCK-OPS-RECORDERVDS-VTR-ACTC&T-H/L AUDIO-BCKOUTACS-CMG/STS ATT-H/OTRRJ-BLIND-OPS-ENAACS-PRE-DPRT-CNFGACS-CCDB-PARAM-UPDTCDH-STND VAL CK-INHC&DH-UNDOCK-CNFGACS-PMA2-DPRT-CNFGKU-BD-ANTENNA-PARKVDS-VTR-RECORDUNDOCKINGACS-POST-DPRT-CNFGPMA2-DEPRESSVDS-VTR-DEACTKU-BD-ORB MASKS-DISVDS-ETVCG-DEACTETCS-PPL-INCORPUHF-SSSR-DEACTACS-H/O-RS-TO-US-MMPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKC&T-AUDIO-CNFGVDS-VIDEO-DCNFGACS-GPS-RECNFGCCS-TLM FORMAT-SWAP

MSS-POWERDOWNIATCS-LTL STPT-CHNGCHECS-DEFIB DLY-CMD

S-BD

ACS-AUTO-H/O-RS-INHSPS-PWR DWN & RCVRY SPS-PWR DWN & RCVRY

PPS-SARJ-FTHRCDH-PROX VAL CK-INH

DPCPPS-BGA-FTHR

ACS-CMG DATA-DUMPLOCK-OPS-RECORDER

VDS-VTR-ACTC&T-H/L AUDIO-BCKOUT

ACS-CMG/STS ATT-H/OTRRJ-BLIND-OPS-ENA TRRJ-BLIND-OPS-ENA

ACS-PRE-DPRT-CNFGACS-CCDB-PARAM-UPDT

CDH-STND VAL CK-INHC&DH-UNDOCK-CNFG

ACS-PMA2-DPRT-CNFGKU-BD-ANTENNA-PARKVDS-VTR-RECORDUNDOCKING

ACS-POST-DPRT-CNFGPMA2-DEPRESS

VDS-VTR-DEACTKU-BD-ORB MASKS-DIS

VDS-ETVCG-DEACTETCS-PPL-INCORPUHF-SSSR-DEACT

ACS-H/O-RS-TO-US-MMPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKC&T-AUDIO-CNFG

VDS-VIDEO-DCNFGACS-GPS-RECNFG

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

MSS-POWERDOWNIATCS-LTL STPT-CHNG

CHECS-DEFIB DLY-CMDCHECS-KU-D/LLOCK-OPS-RECORDER

KU-BD

CHECS-KU-D/LLOCK-OPS-RECORDER

ISS-PROX MODE-XTIONС-СОСБ-FTHRUNDOCKINGСУДН-ОГНИ-ONISS-STAND MODE-XTIONС-СОСБ-MODEСЗП-АБ-PARTIAL CHRG

RS

ISS-PROX MODE-XTIONС-СОСБ-FTHR

UNDOCKINGСУДН-ОГНИ-ON

ISS-STAND MODE-XTIONС-СОСБ-MODE

СЗП-АБ-PARTIAL CHRGETF-EXPOSE-COMMETF-MEDET-COMMEPM-RACK-SHUTDWNEPM-RACK-DEACT

COL

ETF-EXPOSE-COMMETF-MEDET-COMM

EPM-RACK-SHUTDWNEPM-RACK-DEACT

IWIS-DATA-TAKESYS

IWIS-DATA-TAKE

CHECS-KU-D/LMCC-H FCT H/O (3/1)ISS-PROX MODE-XTIONACS-PMA2-DPRT-CNFG

CHECS-KU-D/LMCC-H FCT H/O (3/1)

ISS-PROX MODE-XTIONACS-PMA2-DPRT-CNFG

2-35

FD10

UNDOCKING*

*349/13:17

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

04 05 06 07 08 09 10 11 12 13 14 15CT 12/15/07 (349)

12 13 14 15 16 17 18 19 20 21 22 23 009/00MET Day 008 10 11 12 13 14 15 16 17 18 19 20 21

GMT 12/15/07 (349)DAY/NIGHTORBIT

DAILY ORBIT 16 1 2 3 4 5 6 7 8TDRS AVAIL

VHF

ISS ATTITUDE -XVV +ZLV TEAMNVR TO UNDOCK FREE DRIFT +XVV +ZLV TEA

TLM FORMAT JKK JJK JKKSAA

ACS-AUTO-H/O-RS-INHSPS-PWR DWN & RCVRYPPS-SARJ-FTHRCDH-PROX VAL CK-INHDPCPPS-BGA-FTHRACS-CMG DATA-DUMPLOCK-OPS-RECORDERVDS-VTR-ACTC&T-H/L AUDIO-BCKOUTACS-CMG/STS ATT-H/OTRRJ-BLIND-OPS-ENAACS-PRE-DPRT-CNFGACS-CCDB-PARAM-UPDTCDH-STND VAL CK-INHC&DH-UNDOCK-CNFGACS-PMA2-DPRT-CNFGKU-BD-ANTENNA-PARKVDS-VTR-RECORDUNDOCKINGACS-POST-DPRT-CNFGPMA2-DEPRESSVDS-VTR-DEACTKU-BD-ORB MASKS-DISVDS-ETVCG-DEACTETCS-PPL-INCORPUHF-SSSR-DEACTACS-H/O-RS-TO-US-MMPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKC&T-AUDIO-CNFGVDS-VIDEO-DCNFGACS-GPS-RECNFGCCS-TLM FORMAT-SWAP

MSS-POWERDOWNIATCS-LTL STPT-CHNGCHECS-DEFIB DLY-CMD

S-BD

ACS-AUTO-H/O-RS-INHSPS-PWR DWN & RCVRY SPS-PWR DWN & RCVRY

PPS-SARJ-FTHRCDH-PROX VAL CK-INH

DPCPPS-BGA-FTHR

ACS-CMG DATA-DUMPLOCK-OPS-RECORDER

VDS-VTR-ACTC&T-H/L AUDIO-BCKOUT

ACS-CMG/STS ATT-H/OTRRJ-BLIND-OPS-ENA TRRJ-BLIND-OPS-ENA

ACS-PRE-DPRT-CNFGACS-CCDB-PARAM-UPDT

CDH-STND VAL CK-INHC&DH-UNDOCK-CNFG

ACS-PMA2-DPRT-CNFGKU-BD-ANTENNA-PARKVDS-VTR-RECORDUNDOCKING

ACS-POST-DPRT-CNFGPMA2-DEPRESS

VDS-VTR-DEACTKU-BD-ORB MASKS-DIS

VDS-ETVCG-DEACTETCS-PPL-INCORPUHF-SSSR-DEACT

ACS-H/O-RS-TO-US-MMPPS-BGA-AUTOTRACKPPS-SARJ-AUTOTRACKC&T-AUDIO-CNFG

VDS-VIDEO-DCNFGACS-GPS-RECNFG

CCS-TLM FORMAT-SWAPCCS-TLM FORMAT-SWAP

MSS-POWERDOWNIATCS-LTL STPT-CHNG

CHECS-DEFIB DLY-CMDCHECS-KU-D/LLOCK-OPS-RECORDER

KU-BD

CHECS-KU-D/LLOCK-OPS-RECORDER

ISS-PROX MODE-XTIONС-СОСБ-FTHRUNDOCKINGСУДН-ОГНИ-ONISS-STAND MODE-XTIONС-СОСБ-MODEСЗП-АБ-PARTIAL CHRG

RS

ISS-PROX MODE-XTIONС-СОСБ-FTHR

UNDOCKINGСУДН-ОГНИ-ON

ISS-STAND MODE-XTIONС-СОСБ-MODE

СЗП-АБ-PARTIAL CHRGETF-EXPOSE-COMMETF-MEDET-COMMEPM-RACK-SHUTDWNEPM-RACK-DEACT

COL

ETF-EXPOSE-COMMETF-MEDET-COMM

EPM-RACK-SHUTDWNEPM-RACK-DEACT

IWIS-DATA-TAKESYS

IWIS-DATA-TAKE

CHECS-KU-D/LMCC-H FCT H/O (3/1)ISS-PROX MODE-XTIONACS-PMA2-DPRT-CNFG

CHECS-KU-D/LMCC-H FCT H/O (3/1)

ISS-PROX MODE-XTIONACS-PMA2-DPRT-CNFG

Page 48: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD10

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

2-36

STS-122

DN

ISS

UP

22 23 12/16 01 02 03 04 05 06 07 08 09GMT 12/15/07 (349) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDRMNVR

-ZLV

♣ PMCA/G

POSTSLEEPPRE SLEEPPRE SLEEP SLEEP

PLT

CDM-A

CDM-D

LDRIDNLK

POSTSLEEPPRE SLEEP PRE SLEEP* SLEEP

MS1 OBSSBERTH

⊕ POSTSLEEPPRE SLEEP

RMS

PWRDN

LOG

SLEEP

MS2/EV1 POSTSLEEPPRE SLEEP

LOG

SLEEP

MS3/EV2MUS

POST

SLEEP

PRE SLEEPLOG

DRY

SLVA

SLEEP

MS4/EV3 OBSSBERTH

POST

SLEEP

PRE SLEEP

RMS

PWRDN

LOG

DRY

SLVA

SLEEP

FE-2 PRE SLEEP SLEEPSLVA

DRY

POST

SLEEP

ISS CDR PRE SLEEP-ISS SLEEP POST SLEEP

FE-1 PRE SLEEP-ISS SLEEP POST SLEEP

FE-2 EXP16 PRE SLEEP-ISS SLEEP POST SLEEP

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150

TDRSW -171.0E -46.0Z -275.0

-ZLV -XVVORB ATT♣PORT WING SURVEY⊕PORT WING SURVEY♦PORT WING SURVEY

*√ HUM SEPNOTES

2-36

FD10

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

WHITSON

TANI

MALENCHENKO

STS-122

DN

ISS

UP

22 23 12/16 01 02 03 04 05 06 07 08 09GMT 12/15/07 (349) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDRMNVR

-ZLV

♣ PMCA/G

POSTSLEEPPRE SLEEPPRE SLEEP SLEEP

PLT

CDM-A

CDM-D

LDRIDNLK

POSTSLEEPPRE SLEEP PRE SLEEP* SLEEP

MS1 OBSSBERTH

⊕ POSTSLEEPPRE SLEEP

RMS

PWRDN

LOG

SLEEP

MS2/EV1 POSTSLEEPPRE SLEEP

LOG

SLEEP

MS3/EV2MUS

POST

SLEEP

PRE SLEEPLOG

DRY

SLVA

SLEEP

MS4/EV3 OBSSBERTH

POST

SLEEP

PRE SLEEP

RMS

PWRDN

LOG

DRY

SLVA

SLEEP

FE-2 PRE SLEEP SLEEPSLVA

DRY

POST

SLEEP

ISS CDR PRE SLEEP-ISS SLEEP POST SLEEP

FE-1 PRE SLEEP-ISS SLEEP POST SLEEP

FE-2 EXP16 PRE SLEEP-ISS SLEEP POST SLEEP

DAY/NIGHTORBIT 143 144 145 146 147 148 149 150

TDRSW -171.0E -46.0Z -275.0

ORB ATT -ZLV -XVV

NOTES♣PORT WING SURVEY⊕PORT WING SURVEY♦PORT WING SURVEY

*√ HUM SEP

Page 49: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD10

2-37

STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/16 01 02 03CT 12/15/07 (349)

009/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 009 22 23 12/16 01 02 03 04 05 06 07 08 09

GMT 12/15/07 (349)DAY/NIGHTORBIT

DAILY ORBIT 8 9 10 11 12 13 14 15 1TDRS AVAIL

VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF ALL VHF

+XVV +ZLV TEAISS ATTITUDE

JKKTLM FORMATSAA

COL-LOG FILE-D/LSDMS-DATA-DUMPHK2-TLM-CNFGCHECS-COMMANDING

S-BD

COL-LOG FILE-D/LSDMS-DATA-DUMP

HK2-TLM-CNFGCHECS-COMMANDING

COL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COL-LOG FILE-D/LDMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFG

COL

COL-LOG FILE-D/LDMS-VTC TM PKT-CNFG

DMS-NOM TM PKT-CNFGSYS

CHECS-COMMANDINGCHECS-KU-D/LM

CC

CHECS-COMMANDINGCHECS-KU-

NOTES:

2-37

FD10 STS-122/1E JOINT MSN SHORT TERM PLAN

ISS

16 17 18 19 20 21 22 23 12/16 01 02 03CT 12/15/07 (349)

009/00 01 02 03 04 05 06 07 08 09 10 11 12MET Day 009 22 23 12/16 01 02 03 04 05 06 07 08 09

GMT 12/15/07 (349)DAY/NIGHTORBIT

DAILY ORBIT 8 9 10 11 12 13 14 15 1TDRS AVAIL

VHF

ISS ATTITUDE +XVV +ZLV TEA

TLM FORMAT JKKSAA

COL-LOG FILE-D/LSDMS-DATA-DUMPHK2-TLM-CNFGCHECS-COMMANDING

S-BD

COL-LOG FILE-D/LSDMS-DATA-DUMP

HK2-TLM-CNFGCHECS-COMMANDING

COL-LOG FILE-D/LCHECS-KU-D/L

KU-BD

COL-LOG FILE-D/LCHECS-KU-

RS

COL-LOG FILE-D/LDMS-VTC TM PKT-CNFGDMS-NOM TM PKT-CNFG

COL

COL-LOG FILE-D/LDMS-VTC TM PKT-CNFG

DMS-NOM TM PKT-CNFGSYS

CHECS-COMMANDINGCHECS-KU-D/LM

CC

CHECS-COMMANDINGCHECS-KU-

NOTES:

Page 50: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD11

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

TANI

OAΔ

2-38

STS-122

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/16/07 (350) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR CABINSTOW

CABIN STOW

CABIN

STOW

COND

INIT

COND

INIT

COND

TERM

COND

TERM

D/OBRIEF EXERCISEFCS C/O

IMU

MADS*

MEALMNVR

-XLV

MNVR

DUMP

OFFDUTY

OAOMSBURN

PAO

EVENT

PILOT OPSPOST SLEEP

RCS HOT

FIRE

PLT CABIN STOW CABIN STOWD/OBRIEF

CDM*

ENTRY

VIDEO

SETUP

EXERCISEFCS C/O

FES-I

FES-T

MEAL OFFDUTY

OAOMSBURN

PAO

EVENT

PILOT OPSPOST SLEEP PWRDUMP

RCS HOT

FIRE

W/B*

MS1 CABIN STOWCABINSTOW CABIN

STOW

CABINSTOW

CABIN

STOW

COMM 1

D/OBRIEFEXERCISE

BLOOD

DRAW

OPR

KU STOW

L-1COMMCHK

L-1COMMCHK

MEAL OFFDUTY

PAO

EVENT

PAO

SETUP

POST SLEEP

BLOOD

SETUP

STOW

BLOOD

DRAW

OPR

BLOOD

DRAW

OPR

SSV

DEACT

MS2 CABIN STOWD/OBRIEFEXERCISE FCS C/O

LAUNCHENTRY SUIT

CKMEAL OFF

DUTY

PAO

EVENT

PILOT OPSPOST SLEEP

RCS HOT

FIRE

RCMBNTSEATS/U

MS3 CABIN STOW CABIN STOW CABINSTOWCABIN STOWCABIN STOW D/O

BRIEFERGSTOWEXERCISE MEAL

MUS

OFFDUTY

PAO

EVENT

POST SLEEP

BLOOD

DRAW

SUBJ

DRY

DRY

DRY

MS4 CABIN STOW CABIN STOWCABIN STOWD/OBRIEF

ERGSTOWEXERCISEFILTER

CLEANING MEAL OFFDUTY

PAO

EVENT

PGSCSTOWPARTI

POST SLEEP

BLOOD

DRAW

SUBJ

DRY

DRY

DRY

WLES

DEACT

WLES

DEACT*

FE-2 EXP15 CABIN STOW CABIN STOWCABINSTOW

D/OBRIEFEXERCISE

BLOOD

DRAW

SUBJ

LAUNCHENTRY SUIT

CKMEAL OFF

DUTY

PAO

EVENT

POST SLEEP RCMBNTSEATS/U

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSW -171.0E -46.0Z -275.0

-ZLV -XVV -ZLV -XVV -ZLV -XVV -ZLV -YVV OAORB ATTGND DFRMLA MLA

*PWR ON*TERM*HEATER ACT

*B/U PGSCNOTES

2-38

FD11

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

TANI

OAΔ

STS-122

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/16/07 (350) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR CABINSTOW

CABIN STOW

CABIN

STOW

COND

INIT

COND

INIT

COND

TERM

COND

TERM

D/OBRIEF EXERCISEFCS C/O

IMU

MADS*

MEALMNVR

-XLV

MNVR

DUMP

OFFDUTY

OAOMSBURN

PAO

EVENT

PILOT OPSPOST SLEEP

RCS HOT

FIRE

PLT CABIN STOW CABIN STOWD/OBRIEF

CDM*

ENTRY

VIDEO

SETUP

EXERCISEFCS C/O

FES-I

FES-T

MEAL OFFDUTY

OAOMSBURN

PAO

EVENT

PILOT OPSPOST SLEEP PWRDUMP

RCS HOT

FIRE

W/B*

MS1 CABIN STOWCABINSTOW CABIN

STOW

CABINSTOW

CABIN

STOW

COMM 1

D/OBRIEFEXERCISE

BLOOD

DRAW

OPR

KU STOW

L-1COMMCHK

L-1COMMCHK

MEAL OFFDUTY

PAO

EVENT

PAO

SETUP

POST SLEEP

BLOOD

SETUP

STOW

BLOOD

DRAW

OPR

BLOOD

DRAW

OPR

SSV

DEACT

MS2 CABIN STOWD/OBRIEFEXERCISE FCS C/O

LAUNCHENTRY SUIT

CKMEAL OFF

DUTY

PAO

EVENT

PILOT OPSPOST SLEEP

RCS HOT

FIRE

RCMBNTSEATS/U

MS3 CABIN STOW CABIN STOW CABINSTOWCABIN STOWCABIN STOW D/O

BRIEFERGSTOWEXERCISE MEAL

MUS

OFFDUTY

PAO

EVENT

POST SLEEP

BLOOD

DRAW

SUBJ

DRY

DRY

DRY

MS4 CABIN STOW CABIN STOWCABIN STOWD/OBRIEF

ERGSTOWEXERCISEFILTER

CLEANING MEAL OFFDUTY

PAO

EVENT

PGSCSTOWPARTI

POST SLEEP

BLOOD

DRAW

SUBJ

DRY

DRY

DRY

WLES

DEACT

WLES

DEACT*

FE-2 EXP15 CABIN STOW CABIN STOWCABINSTOW

D/OBRIEFEXERCISE

BLOOD

DRAW

SUBJ

LAUNCHENTRY SUIT

CKMEAL OFF

DUTY

PAO

EVENT

POST SLEEP RCMBNTSEATS/U

DAY/NIGHTORBIT 151 152 153 154 155 156 157 158

TDRSW -171.0E -46.0Z -275.0

ORB ATT -ZLV -XVV -ZLV -XVV -ZLV -XVV -ZLV -YVV OAGND

NOTES*PWR ON*TERM

*HEATER ACT*B/U PGSC

Page 51: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD11

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

TANI

2-39

STS-122

22 23 12/17 01 02 03 04 05 06 07 08 09GMT 12/16/07 (350) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDR OFF DUTY PMCA/G

POSTSLEEPPRE SLEEP SLEEP

PLT

ENTRY*

OFFDUTY

POSTSLEEPPRE SLEEP SLEEP

MS1 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

SLEEP

MS2 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

SLEEP

MS3 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

DRY

SLEEP

MS4 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

DRY

SLEEP

FE-2 EXP15 OFFDUTY

POSTSLEEPPRE SLEEP SLEEP

DAY/NIGHTORBIT 159 160 161 162 163 164 165 166

TDRSW -171.0E -46.0Z -275.0

-ZLV -XVVORB ATTGND DFR DFR DFR DFR DFR DFR

MLA MLA*COOLING CNFGNOTES

2-39

FD11

EYHARTS

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

TANI

STS-122

22 23 12/17 01 02 03 04 05 06 07 08 09GMT 12/16/07 (350) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDR OFF DUTY PMCA/G

POSTSLEEPPRE SLEEP SLEEP

PLT

ENTRY*

OFFDUTY

POSTSLEEPPRE SLEEP SLEEP

MS1 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

SLEEP

MS2 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

SLEEP

MS3 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

DRY

SLEEP

MS4 OFFDUTY

POSTSLEEPPRE SLEEP

LOG

DRY

SLEEP

FE-2 EXP15 OFFDUTY

POSTSLEEPPRE SLEEP SLEEP

DAY/NIGHTORBIT 159 160 161 162 163 164 165 166

TDRSW -171.0E -46.0Z -275.0

ORB ATT -ZLV -XVVGND

NOTES*COOLING CNFG

Page 52: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FD12

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

TANI

KSC

LANDING*

KSC

DEORBIT

TIG*

*KSC LANDING 10/19:58*KSC TIG 10/18:562-40

STS-122

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/17/07 (351) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR DEORBIT PREP

GRP B

PWRUP

IMUALIGN &VERIF

MADS*

PMCA/G

POST SLEEPTRK

-XSI

PLT DEORBIT PREP

GRP B

PWRUP

POST SLEEPPOST SLEEP

MS1 DEORBIT PREPOCAC

STOW

POST SLEEP

WATCH

MS2AIR*

DEORBIT PREP

GIRA

DEACT

POST SLEEP

WATCH

MS3 DEORBIT PREPMUS

POST SLEEP

WATCH

STOW*

MS4 DEORBIT PREPPGSCSTOWPARTII

POST SLEEP

WATCH

FE-2 EXP15 DEORBIT PREPPOST SLEEP

WATCH

DAY/NIGHTORBIT 167 168 169 170 171 172 173 174

TDRSW -171.0E -46.0Z -275.0

-ZLV -XVV -XSI COMM LANDINGORB ATTGND DFR DFRMLA

*ENABLE *SAMPLE*SALIVA KITNOTES

2-40

FD12

FRICK

POINDEXTER

LOVE

MELVIN

WALHEIM

SCHLEGEL

TANI

KSC

LANDING*

KSC

DEORBIT

TIG*

*KSC LANDING 10/19:58*KSC TIG 10/18:56

STS-122

10 11 12 13 14 15 16 17 18 19 20 21GMT 12/17/07 (351) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR DEORBIT PREP

GRP B

PWRUP

IMUALIGN &VERIF

MADS*

PMCA/G

POST SLEEPTRK

-XSI

PLT DEORBIT PREP

GRP B

PWRUP

POST SLEEPPOST SLEEP

MS1 DEORBIT PREPOCAC

STOW

POST SLEEP

WATCH

MS2AIR*

DEORBIT PREP

GIRA

DEACT

POST SLEEP

WATCH

MS3 DEORBIT PREPMUS

POST SLEEP

WATCH

STOW*

MS4 DEORBIT PREPPGSCSTOWPARTII

POST SLEEP

WATCH

FE-2 EXP15 DEORBIT PREPPOST SLEEP

WATCH

DAY/NIGHTORBIT 167 168 169 170 171 172 173 174

TDRSW -171.0E -46.0Z -275.0

ORB ATT -ZLV -XVV -XSI COMM LANDINGGND

NOTES*ENABLE *SAMPLE

*SALIVA KIT

Page 53: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

3-1 FLT PLN/122/FIN

DET

AIL

ED

TIM

ELIN

E

DETAILED TIMELINE

Page 54: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FRICK POINDEXTER MELVIN

01

ACTIVITIES PRIOR TO 0/2:30 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS.THE ORBITER SHOULD BE IN A BIAS -ZLV -YVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

FD01 EZ ACTIVITIES:PCS 1(2) CONFIG (ORB OPS, ECLS) Config PCS 1 with 14.7 CAB REG INLET SYS 1,2 VLV - CLLAMP TEST (ORB OPS, EPS)SMK DETN CKT TEST (ORB OPS, ECLS)CSA-CP BATTERY CHANGEOUT (ORB OPS, CSA-CP)CSA-CP CHECKOUT AND ZERO CALIBRATION OPS (ORB OPS, CSA-CP)VTR CLOCK SET (PHOTO/TV, DTV) if not performed for PLBD recMS2&MS3: If PMZ Req'd, perform PMZ PROTOCOL (ORB OPS, SDBI)

3-2

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/06(340)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

~ ~

DORB

7

8

ORB

2

3

ASCENT

OMS2

BIAS -ZLV +YVV

NC1

~

-ZLV -XVV

STS ATT

CDR

AFT CONTROLLER C/O (ORB OPS, GNC)ELEVON PARK, GNC 201 (ORB OPS, GNC)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Omit Steps 3,7 & 10 (Single G2)IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (0/02:55:28)

PLT

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Omit Steps 3,7 & 10 (Single G2)

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (0/02:55:28)

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

~

MS1

DATE/TIME SET (PHOTO/TV, DCS 760)

OCAC SETUP (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

DON ACTIWATCH (ORB OPS, SDBI)

SSV NOMINAL SETUP (PHOTO/TV, SSV) SSV OUTRATE - 4

UPDATEORBITALMNVR PAD

UPLINKβ21 + Mask

UPDATEORBITALMNVR PAD

NOTES

3-2

FRICK POINDEXTER MELVIN

01

ACTIVITIES PRIOR TO 0/2:30 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS.THE ORBITER SHOULD BE IN A BIAS -ZLV -YVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

FD01 EZ ACTIVITIES:PCS 1(2) CONFIG (ORB OPS, ECLS) Config PCS 1 with 14.7 CAB REG INLET SYS 1,2 VLV - CLLAMP TEST (ORB OPS, EPS)SMK DETN CKT TEST (ORB OPS, ECLS)CSA-CP BATTERY CHANGEOUT (ORB OPS, CSA-CP)CSA-CP CHECKOUT AND ZERO CALIBRATION OPS (ORB OPS, CSA-CP)VTR CLOCK SET (PHOTO/TV, DTV) if not performed for PLBD recMS2&MS3: If PMZ Req'd, perform PMZ PROTOCOL (ORB OPS, SDBI)

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/06(340)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

DORB

7

8

ORB

2

3

STS ATT

ASCENT

OMS2

BIAS -ZLV +YVV

NC1

~

-ZLV -XVV

CDR

AFT CONTROLLER C/O (ORB OPS, GNC)ELEVON PARK, GNC 201 (ORB OPS, GNC)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Omit Steps 3,7 & 10 (Single G2)IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRK

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (0/02:55:28)

PLT

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Omit Steps 3,7 & 10 (Single G2)

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (0/02:55:28)

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

~

MS1

DATE/TIME SET (PHOTO/TV, DCS 760)

OCAC SETUP (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

DON ACTIWATCH (ORB OPS, SDBI)

SSV NOMINAL SETUP (PHOTO/TV, SSV) SSV OUTRATE - 4

NOTES

UPDATEORBITALMNVR PAD

UPLINKβ21 + Mask

UPDATEORBITALMNVR PAD

Page 55: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

01

WALHEIM SCHLEGEL LOVE EYHARTS

L12(SSP1) APCU 1(2) OUTPUT RLY(two)-CL CONV(two)-ON (tb-gray)

A

3-3

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/06(340)

00:00

01:00

02:00

03:00

04:00

MET

Day 000Z W E

TDRS

~~

DORB

7

8

ORB

2

3

ASCENT

OMS2

BIAS -ZLV +YVV

NC1

~

-ZLV -XVV

STS ATT

MS2

APCU ACTIVATION A

GIRA INSTALLATION (ORB OPS, ECLS)

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (0/02:55:28)

MS3

PGSC SETUP (PART I) Setup the minimum config: PGSC NETWORK (ORB OPS, PGSC) Setup KFX, OCA Router, WLES & WORLDMAP COLOR PRNTR UNSTOW & ASSMBLE (ORB OPS, PGSC) PGSC HARD DISK LATE UPDATE Update all Network PGSCs with late update disk carried onboard except for OCA Router

~

MS4

L17 Check MCIU filter screenPGSC SETUP (PART I) Setup the minimum config: PGSC NETWORK (ORB OPS, PGSC) Setup KFX, OCA Router, WLES & WORLDMAP COLOR PRNTR UNSTOW & ASSMBLE (ORB OPS, PGSC) PGSC HARD DISK LATE UPDATE Update all Network PGSCs with late update disk carried onboard except for OCA Router

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

DON ACTIWATCH (ORB OPS, SDBI)

FE-2 (UP)

MOTION PERCEPTION QUESTIONNAIRE (ASSY PAYLOADS, QUESTIONNAIRES)

MUS(LBP-MUS) QSTION(ASSY PL, QSTION)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DON ACTIWATCH (ORB OPS, SDBI)

UPDATEORBITALMNVR PAD

NOTES

3-3

01

WALHEIM SCHLEGEL LOVE EYHARTS

L12(SSP1) APCU 1(2) OUTPUT RLY(two)-CL CONV(two)-ON (tb-gray)

A

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/06(340)

00:00

01:00

02:00

03:00

04:00

MET

Day 000Z W E

TDRS

DORB

7

8

ORB

2

3

STS ATT

ASCENT

OMS2

BIAS -ZLV +YVV

NC1

~

-ZLV -XVV

MS2

APCU ACTIVATION A

GIRA INSTALLATION (ORB OPS, ECLS)

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (0/02:55:28)

MS3

PGSC SETUP (PART I) Setup the minimum config: PGSC NETWORK (ORB OPS, PGSC) Setup KFX, OCA Router, WLES & WORLDMAP COLOR PRNTR UNSTOW & ASSMBLE (ORB OPS, PGSC) PGSC HARD DISK LATE UPDATE Update all Network PGSCs with late update disk carried onboard except for OCA Router

~

MS4

L17 Check MCIU filter screenPGSC SETUP (PART I) Setup the minimum config: PGSC NETWORK (ORB OPS, PGSC) Setup KFX, OCA Router, WLES & WORLDMAP COLOR PRNTR UNSTOW & ASSMBLE (ORB OPS, PGSC) PGSC HARD DISK LATE UPDATE Update all Network PGSCs with late update disk carried onboard except for OCA Router

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INIT)

DON ACTIWATCH (ORB OPS, SDBI)

FE-2 (UP)

MOTION PERCEPTION QUESTIONNAIRE (ASSY PAYLOADS, QUESTIONNAIRES)

MUS(LBP-MUS) QSTION(ASSY PL, QSTION)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DON ACTIWATCH (ORB OPS, SDBI)

NOTES

UPDATEORBITALMNVR PAD

Page 56: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

01

FRICK POINDEXTER MELVIN

A MO69M Insert Bleed Orifice Assembly into LEH O2 8 QDLEH O2 8 vlv-OP

3-4

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/07(341)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

~

~ ~

~

DORB

8

9

10

11

ORB

3

4

5

6

~

-ZLV -XVV

MNVR

~

STS ATT

CDR

APU FD1 RECONFIGSR2 BLR PWR(three)-OFFA12 APU HTR GG/FU PMP(three)-A AUTO

INSTALL BLEED ORIFICE A

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Perform Post GIRA INSTALL:SHUTTLE EMERGENCY EYEWASH (SEE) Unstow, attach on or near galley Fill one drink container and label it "FOR EYE RINSE ONLY" and attach on or near galley

SLEEP

~

PLT

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)√HUM SEP for H2O Accumulation

SLEEP

~

UMBILICAL WELL TPS CAMR IMGRY D/L (ORB OPS, PGSC)

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-4

01

FRICK POINDEXTER MELVIN

A MO69M Insert Bleed Orifice Assembly into LEH O2 8 QDLEH O2 8 vlv-OP

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/07(341)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

DORB

8

9

10

11

ORB

3

4

5

6

STS ATT~

-ZLV -XVV

MNVR

~

CDR

APU FD1 RECONFIGSR2 BLR PWR(three)-OFFA12 APU HTR GG/FU PMP(three)-A AUTO

INSTALL BLEED ORIFICE A

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Perform Post GIRA INSTALL:SHUTTLE EMERGENCY EYEWASH (SEE) Unstow, attach on or near galley Fill one drink container and label it "FOR EYE RINSE ONLY" and attach on or near galley

SLEEP

~

PLT

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)√HUM SEP for H2O Accumulation

SLEEP

~

UMBILICAL WELL TPS CAMR IMGRY D/L (ORB OPS, PGSC)

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 57: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

01

WALHEIM SCHLEGEL LOVE EYHARTS

3-5

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/07(341)

04:00

05:00

06:00

07:00

08:00

MET

Day 000Z W E

TDRS

~

~ ~

~

DORB

8

9

10

11

ORB

3

4

5

6

~

-ZLV -XVV

MNVR

~

STS ATT

MS2

DCS FILE XFER (PHOTO/TV,DCS 760) ET HANDHELD PHOTO

GIRA INSTALLATION (ORB OPS, ECLS)

~

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) ET HANDHELD VIDEO D/L KU TDRW (01:55-02:23)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DON ACTIWATCH (ORB OPS, SDBI)

SLEEP

~

MS3

PGSC SETUP (PART I) Setup the minimum config: PGSC NETWORK (ORB OPS, PGSC) Setup KFX, OCA Router, WLES & WORLDMAP COLOR PRNTR UNSTOW & ASSMBLE (ORB OPS, PGSC) PGSC HARD DISK LATE UPDATE Update all Network PGSCs with late update disk carried onboard except for OCA Router

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DON ACTIWATCH (ORB OPS, SDBI)

SLEEP

~

ACTIVATION & CHECK OUT (ORB OPS, WLE SENSORS) Prior to start, √ Late Update complete on WLES & WORLDMAP PGSCs

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-5

01

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/07(341)

04:00

05:00

06:00

07:00

08:00

MET

Day 000Z W E

TDRS

DORB

8

9

10

11

ORB

3

4

5

6

STS ATT~

-ZLV -XVV

MNVR

~

MS2

DCS FILE XFER (PHOTO/TV,DCS 760) ET HANDHELD PHOTO

GIRA INSTALLATION (ORB OPS, ECLS)

~

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) ET HANDHELD VIDEO D/L KU TDRW (01:55-02:23)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DON ACTIWATCH (ORB OPS, SDBI)

SLEEP

~

MS3

PGSC SETUP (PART I) Setup the minimum config: PGSC NETWORK (ORB OPS, PGSC) Setup KFX, OCA Router, WLES & WORLDMAP COLOR PRNTR UNSTOW & ASSMBLE (ORB OPS, PGSC) PGSC HARD DISK LATE UPDATE Update all Network PGSCs with late update disk carried onboard except for OCA Router

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DON ACTIWATCH (ORB OPS, SDBI)

SLEEP

~

ACTIVATION & CHECK OUT (ORB OPS, WLE SENSORS) Prior to start, √ Late Update complete on WLES & WORLDMAP PGSCs

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 58: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

01

FRICK POINDEXTER MELVIN

3-6

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/07(341)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

~ ~

~

DORB

11

12

13

ORB

6

7

8

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-6

01

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/07(341)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

DORB

11

12

13

ORB

6

7

8

STS ATT~

~

-ZLV -XVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 59: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

01

WALHEIM SCHLEGEL LOVE EYHARTS

3-7

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/07(341)

08:00

09:00

10:00

11:00

12:00

MET

Day 000Z W E

TDRS

~ ~

~

DORB

11

12

13

ORB

6

7

8

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (UP)

SLEEP

~

~

NOTES

3-7

01

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/07(341)

08:00

09:00

10:00

11:00

12:00

MET

Day 000Z W E

TDRS

DORB

11

12

13

ORB

6

7

8

STS ATT~

~

-ZLV -XVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (UP)

SLEEP

~

~

NOTES

Page 60: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

FRICK POINDEXTER MELVIN

FD02 EZ ACTIVITIES: OCAC FILTER INSPECTION Hard Reboot all PGSCs Except: WLES and WORLDMAP EXTERNAL A/L HEATER RECONFIG: ML86B:C cb MNA EXT AIRLK HTR LN ZN 1,2 - op cb MNB EXT AIRLK HTR LN ZN 1,2 - cl

3-8

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/07(341)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

~ ~

~

DORB

14

15

16

ORB

9

10

11

~

~

-ZLV -XVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRUP (PDRS, RMS PWRUP)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-8

02

FRICK POINDEXTER MELVIN

FD02 EZ ACTIVITIES: OCAC FILTER INSPECTION Hard Reboot all PGSCs Except: WLES and WORLDMAP EXTERNAL A/L HEATER RECONFIG: ML86B:C cb MNA EXT AIRLK HTR LN ZN 1,2 - op cb MNB EXT AIRLK HTR LN ZN 1,2 - cl

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/07(341)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

DORB

14

15

16

ORB

9

10

11

STS ATT~

~

-ZLV -XVV

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRUP (PDRS, RMS PWRUP)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 61: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

WALHEIM SCHLEGEL LOVE EYHARTS

3-9

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/07(341)

12:00

13:00

14:00

15:00

16:00

MET

Day 000Z W E

TDRS

~ ~

~

DORB

14

15

16

ORB

9

10

11

~

~

-ZLV -XVV

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRUP (PDRS, RMS PWRUP)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

FE-2 (UP)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-9

02

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/07(341)

12:00

13:00

14:00

15:00

16:00

MET

Day 000Z W E

TDRS

DORB

14

15

16

ORB

9

10

11

STS ATT~

~

-ZLV -XVV

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRUP (PDRS, RMS PWRUP)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

FE-2 (UP)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 62: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

FRICK POINDEXTER MELVIN

A A14 RCS/OMS HTR L POD A - OFF B - AUTO R POD A - OFF B - AUTO

B L12(SSP1) APCU 2 CONV - OFF(tb-bp) OUTPUT RLY - OP(tb-bp)

3-10

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/07(341)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

~ ~

~

DORB

16

1

2

3

ORB

11

12

13

14

~

-ZLV -XVV

NC2

~

STBD SURVEY

STS ATT

CDR

IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) BIAS -ZLV +XVV (Flat Field) TG=2 BV=3 OM=160 A1/AUTO/VERN Init TRK

MNVR (TRK) BIAS +YSI (Stbd Survey)TG=4 BV=5 P=0 Y=40 OM=345A14/AUTO/VERN Init TRKOBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

ON-ORBIT OMS BURN (ORB OPS, OMS) Do not load DAPs A1 and B1 until maneuver is complete

< NC2 TIG (0/17:09:36)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RCS/OMS HEATER RECONFIG A

PLT

APCU CONFIG FOR OBSS UNBERTH BExpect 'S200 APCU2 VOLT LMT' Msg

CRYO 02 TK HTR SNSR CK (ORB OPS, EPS)

FILTER CLEANING (IFM,SCHEDULED MAINTENANCE)

O2 REPRESS INITC5 DIRECT O2 vlv - OP

O2 REPRESS TERM on MCC GOC5 DIRECT O2 vlv - CL

ON-ORBIT OMS BURN (ORB OPS, OMS) Do not load DAPs A1 and B1 until maneuver is complete

< NC2 TIG (0/17:09:36)

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS UNBERTH (PDRS, OBSS OPERATIONS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS CHECKOUT (PDRS, RMS C/O)

UPDATEORBITALMNVR PAD

UPDATEORBITALMNVR PAD

NOTES

3-10

02

FRICK POINDEXTER MELVIN

A A14 RCS/OMS HTR L POD A - OFF B - AUTO R POD A - OFF B - AUTO

B L12(SSP1) APCU 2 CONV - OFF(tb-bp) OUTPUT RLY - OP(tb-bp)

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/07(341)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

DORB

16

1

2

3

ORB

11

12

13

14

STS ATT~

-ZLV -XVV

NC2

~

STBD SURVEY

CDR

IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) BIAS -ZLV +XVV (Flat Field) TG=2 BV=3 OM=160 A1/AUTO/VERN Init TRK

MNVR (TRK) BIAS +YSI (Stbd Survey)TG=4 BV=5 P=0 Y=40 OM=345A14/AUTO/VERN Init TRKOBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

ON-ORBIT OMS BURN (ORB OPS, OMS) Do not load DAPs A1 and B1 until maneuver is complete

< NC2 TIG (0/17:09:36)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RCS/OMS HEATER RECONFIG A

PLT

APCU CONFIG FOR OBSS UNBERTH BExpect 'S200 APCU2 VOLT LMT' Msg

CRYO 02 TK HTR SNSR CK (ORB OPS, EPS)

FILTER CLEANING (IFM,SCHEDULED MAINTENANCE)

O2 REPRESS INITC5 DIRECT O2 vlv - OP

O2 REPRESS TERM on MCC GOC5 DIRECT O2 vlv - CL

ON-ORBIT OMS BURN (ORB OPS, OMS) Do not load DAPs A1 and B1 until maneuver is complete

< NC2 TIG (0/17:09:36)

P/TV01 VIDEO SETUP (PHOTO/TV, SCENES)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS UNBERTH (PDRS, OBSS OPERATIONS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS CHECKOUT (PDRS, RMS C/O)

NOTES

UPDATEORBITALMNVR PAD

UPDATEORBITALMNVR PAD

Page 63: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

WALHEIM SCHLEGEL LOVE EYHARTS

3-11

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/07(341)

16:00

17:00

18:00

19:00

20:00

MET

Day 000Z W E

TDRS

~ ~

~

DORB

16

1

2

3

ORB

11

12

13

14

~

-ZLV -XVV

NC2

~

STBD SURVEY

STS ATT

MS2

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

ON-ORBIT OMS BURN (ORB OPS, OMS) Do not load DAPs A1 and B1 until maneuver is complete

< NC2 TIG (0/17:09:36)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

PGSC SETUP (PART II) Setup the remaining PGSCs PGSC NETWORK (ORB OPS, PGSC) LOCKER STOWAGE UPDATE Update remaining PGSC locker stow with disk carried onboard except for OCA Router

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS UNBERTH (PDRS, OBSS OPERATIONS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS CHECKOUT (PDRS, RMS C/O)

FE-2 (UP)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

EXERCISE

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPS Ref. Transfer List & MSG XXX

UPDATEORBITALMNVR PAD

NOTES

3-11

02

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/07(341)

16:00

17:00

18:00

19:00

20:00

MET

Day 000Z W E

TDRS

DORB

16

1

2

3

ORB

11

12

13

14

STS ATT~

-ZLV -XVV

NC2

~

STBD SURVEY

MS2

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

ON-ORBIT OMS BURN (ORB OPS, OMS) Do not load DAPs A1 and B1 until maneuver is complete

< NC2 TIG (0/17:09:36)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

PGSC SETUP (PART II) Setup the remaining PGSCs PGSC NETWORK (ORB OPS, PGSC) LOCKER STOWAGE UPDATE Update remaining PGSC locker stow with disk carried onboard except for OCA Router

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS UNBERTH (PDRS, OBSS OPERATIONS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS CHECKOUT (PDRS, RMS C/O)

FE-2 (UP)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform ERGOMETER SETUP

EXERCISE

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPS Ref. Transfer List & MSG XXX

NOTES

UPDATEORBITALMNVR PAD

Page 64: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

FRICK POINDEXTER MELVIN

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

3-12

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/07(341)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

~ ~

~

DORB

3

4

5

ORB

14

15

16

~

NOSE SURVEY

~

PORT SURVEY

STS ATT

CDR

MEAL

In step 3 of OBSS/LDRI RCC SURVEY-PORTMNVR TRK BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=323 OM=189 A14/AUTO/VERN Init TRK

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

PLT

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

FC PURGE - MANUAL (ORB OPS, EPS)

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

MEAL

MNVR (TRK) BIAS +XSI (Nose Cap) TG=4 BV=5 P=330 Y=0 OM=185 A14/AUTO/VERN Init TRK

R2 BLR CNTLR/HTR (three) - B

MS1

MEAL

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

NOTES

3-12

02

FRICK POINDEXTER MELVIN

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/07(341)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

DORB

3

4

5

ORB

14

15

16

STS ATT~

NOSE SURVEY

~

PORT SURVEY

CDR

MEAL

In step 3 of OBSS/LDRI RCC SURVEY-PORTMNVR TRK BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=323 OM=189 A14/AUTO/VERN Init TRK

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

PLT

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

FC PURGE - MANUAL (ORB OPS, EPS)

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

MEAL

MNVR (TRK) BIAS +XSI (Nose Cap) TG=4 BV=5 P=330 Y=0 OM=185 A14/AUTO/VERN Init TRK

R2 BLR CNTLR/HTR (three) - B

MS1

MEAL

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

NOTES

Page 65: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

WALHEIM SCHLEGEL LOVE EYHARTS

3-13

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/07(341)

20:00

21:00

22:00

23:00

00:00

MET

Day 000Z W E

TDRS

~ ~

~

DORB

3

4

5

ORB

14

15

16

~

NOSE SURVEY

~

PORT SURVEY

STS ATT

MS2

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

EXERCISE

MEAL

MS3

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

MEAL

OBSS LDRI/IDC RCC SURVEY - NOSECAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

MS4

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

EXERCISE

~

MEAL

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

FE-2 (UP)

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #1 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

EXERCISE

~

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

MEAL

NOTES

3-13

02

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/07(341)

20:00

21:00

22:00

23:00

00:00

MET

Day 000Z W E

TDRS

DORB

3

4

5

ORB

14

15

16

STS ATT~

NOSE SURVEY

~

PORT SURVEY

MS2

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

EXERCISE

MEAL

MS3

EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

MEAL

OBSS LDRI/IDC RCC SURVEY - NOSECAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

MS4

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

EXERCISE

~

MEAL

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

FE-2 (UP)

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #1 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

EXERCISE

~

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE

MEAL

NOTES

Page 66: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

FRICK POINDEXTER MELVIN

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

A8U PARAM - PORT TEMP JOINT - CRIT TEMP

A

3-14

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/07(341)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

~ ~

~ ~

DORB

6

7

8

ORB

17

18

19

~

BIAS -ZLV +YVV

NC3

~

-ZLV -XVV

STS ATT

CDR

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC3 TIG (01/02:16:02)

L12(SSP1) APCU 2 OUTPUT RLY - CL CONV - ON (tb-gray)

EXERCISE

MNVR (TRK) BIAS -ZLV +YVV TG=2 BV=3 OM=150 A14/AUTO/VERN Init TRK

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRKFUTURE LOADED MNVR (-ZLV +YVV,Water Dump) TG=2 BV=3 OM=270 A6/AUTO/ALT (1/13:50) Init TRK

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC3 TIG (01/02:16:02)

CDM SETUP & BATT C/O (ORB OPS, CDM DT0) Loc 1

EXERCISE

FCMS OPS (ORB OPS, EPS)

P/TV08 EXTERNAL SURVEY (S/U) (P/TV, SCENES) Step 1P/TV08 EXTERNAL SURVEY (OPS) (P/TV, SCENES) Item 1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

MS1

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS PWRDN (PDRS, RMS PWRDN) A Step 1 only

TFL 192

TFL 188

NOTES

3-14

02

FRICK POINDEXTER MELVIN

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

A8U PARAM - PORT TEMP JOINT - CRIT TEMP

A

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/07(341)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

DORB

6

7

8

ORB

17

18

19

STS ATT~

BIAS -ZLV +YVV

NC3

~

-ZLV -XVV

CDR

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC3 TIG (01/02:16:02)

L12(SSP1) APCU 2 OUTPUT RLY - CL CONV - ON (tb-gray)

EXERCISE

MNVR (TRK) BIAS -ZLV +YVV TG=2 BV=3 OM=150 A14/AUTO/VERN Init TRK

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A6/AUTO/ALT Init TRKFUTURE LOADED MNVR (-ZLV +YVV,Water Dump) TG=2 BV=3 OM=270 A6/AUTO/ALT (1/13:50) Init TRK

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC3 TIG (01/02:16:02)

CDM SETUP & BATT C/O (ORB OPS, CDM DT0) Loc 1

EXERCISE

FCMS OPS (ORB OPS, EPS)

P/TV08 EXTERNAL SURVEY (S/U) (P/TV, SCENES) Step 1P/TV08 EXTERNAL SURVEY (OPS) (P/TV, SCENES) Item 1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

MS1

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS PWRDN (PDRS, RMS PWRDN) A Step 1 only

NOTES

TFL 192

TFL 188

Page 67: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

WALHEIM SCHLEGEL LOVE EYHARTS

3-15

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/07(341)

00:00

01:00

02:00

03:00

04:00

MET

Day 001Z W E

TDRS

~ ~

~~

DORB

6

7

8

ORB

17

18

19

~

BIAS -ZLV +YVV

NC3

~

-ZLV -XVV

STS ATT

MS2

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC3 TIG (01/02:16:02)

HANDHELD LIDAR C/O (RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

DISABLE WLES FILE BACKUP(ORB OPS, WLES)

MS3

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

EXERCISE

LBP-MUSCLE QSTION(ASSY PL, QSTION)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

MS4

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

EXERCISE

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS PWRDN (PDRS, RMS PWRDN) A Step 1 only A8U PARAM - PORT TEMP JOINT - CRIT TEMP

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

FE-2 (UP)

MOTION PERCEPTION QUESTIONNAIRE (ASSY PAYLOADS, QUESTIONNAIRES)

MUS(LBP-MUS) QSTION(ASSY PL, QSTION)

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

3-15

02

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/07(341)

00:00

01:00

02:00

03:00

04:00

MET

Day 001Z W E

TDRS

DORB

6

7

8

ORB

17

18

19

STS ATT~

BIAS -ZLV +YVV

NC3

~

-ZLV -XVV

MS2

ON-ORBIT +X RCS BURN (ORB OPS, RCS)

< NC3 TIG (01/02:16:02)

HANDHELD LIDAR C/O (RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

DISABLE WLES FILE BACKUP(ORB OPS, WLES)

MS3

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

EXERCISE

LBP-MUSCLE QSTION(ASSY PL, QSTION)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR)

MS4

DOCKING MECH INITIALIZATIONDOCKING MECH POWERUPDOCKING RING EXTENSIONDOCKING MECH POWERDOWN (RNDZ, APDS)

EXERCISE

~

OBSS BERTH (PDRS, OBSS OPERATIONS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RMS PWRDN (PDRS, RMS PWRDN) A Step 1 only A8U PARAM - PORT TEMP JOINT - CRIT TEMP

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

FE-2 (UP)

MOTION PERCEPTION QUESTIONNAIRE (ASSY PAYLOADS, QUESTIONNAIRES)

MUS(LBP-MUS) QSTION(ASSY PL, QSTION)

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

Page 68: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

FRICK POINDEXTER MELVIN

3-16

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/08(342)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

~

~ ~

DORB

8

9

10

11

ORB

19

20

21

22

~

~

-ZLV -XVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-16

02

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/08(342)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

DORB

8

9

10

11

ORB

19

20

21

22

STS ATT~

~

-ZLV -XVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 69: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

WALHEIM SCHLEGEL LOVE EYHARTS

3-17

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/08(342)

04:00

05:00

06:00

07:00

08:00

MET

Day 001Z W E

TDRS

~

~~

DORB

8

9

10

11

ORB

19

20

21

22

~

~

-ZLV -XVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-17

02

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/08(342)

04:00

05:00

06:00

07:00

08:00

MET

Day 001Z W E

TDRS

DORB

8

9

10

11

ORB

19

20

21

22

STS ATT~

~

-ZLV -XVV

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 70: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

FRICK POINDEXTER MELVIN

3-18

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/08(342)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

~

~ ~

DORB

11

12

13

ORB

22

23

24

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-18

02

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/08(342)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

DORB

11

12

13

ORB

22

23

24

STS ATT~

~

-ZLV -XVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 71: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

02

WALHEIM SCHLEGEL LOVE EYHARTS

3-19

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/08(342)

08:00

09:00

10:00

11:00

12:00

MET

Day 001Z W E

TDRS

~

~~

DORB

11

12

13

ORB

22

23

24

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (UP)

SLEEP

~

NOTES

3-19

02

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/08(342)

08:00

09:00

10:00

11:00

12:00

MET

Day 001Z W E

TDRS

DORB

11

12

13

ORB

22

23

24

STS ATT~

~

-ZLV -XVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (UP)

SLEEP

~

NOTES

Page 72: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

FRICK POINDEXTER MELVIN

FD03 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP

< MNVR WATER DUMP ATT

3-20

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/08(342)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

~

~ ~

DORB

13

14

15

1

ORB

24

25

26

27

~

-ZLV -XVV

~

-ZLV +YVV

STS ATT

CDR

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

SLEEP

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,6(Triple G2),5

IMU ALIGN - S TRK (ORB OPS, GNC)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS REGULATOR RCNFG (ORB OPS, RCS)

SLEEP

~

MS1

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,6(Triple G2),5POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-20

03

FRICK POINDEXTER MELVIN

FD03 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP

< MNVR WATER DUMP ATT

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/08(342)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

DORB

13

14

15

1

ORB

24

25

26

27

STS ATT~

-ZLV -XVV

~

-ZLV +YVV

CDR

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

SLEEP

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,6(Triple G2),5

IMU ALIGN - S TRK (ORB OPS, GNC)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RCS REGULATOR RCNFG (ORB OPS, RCS)

SLEEP

~

MS1

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,6(Triple G2),5POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 73: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

WALHEIM SCHLEGEL LOVE EYHARTS

3-21

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/08(342)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

~

~ ~

DORB

13

14

15

1

ORB

24

25

26

27

~

-ZLV -XVV

~

-ZLV +YVV

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

FE-2 (UP)

SLEEP

LIQUID SLVA SAMPLE(ORB OPS,SDBI)

LIQUID SALIVA SAMPLE(ORB OPS,SDBI)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

3-21

03

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/08(342)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

DORB

13

14

15

1

ORB

24

25

26

27

STS ATT~

-ZLV -XVV

~

-ZLV +YVV

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

FE-2 (UP)

SLEEP

LIQUID SLVA SAMPLE(ORB OPS,SDBI)

LIQUID SALIVA SAMPLE(ORB OPS,SDBI)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

Page 74: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

FRICK POINDEXTER MELVIN

< NC4 1/16:24:54

< Ti 1/17:56:13

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

TRANSITION TO RNDZ C/Lat MET 01/15:39:54

RNDZ PET 00:00 (Ti)at MET 01/17:56:13

UPLINKβ21 OnlyBox 90

3-22

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/08(342)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

~

~

DORB

1

2

3

4

ORB

27

28

29

30

~

~

RNDZ

STS ATT

CDR

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

PLT

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

MS1

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

EXERCISE

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

N2 REPRESS USING PAYLOAD N2 VLVS A

N2 REPRESS USING PAYLOAD N2 VLVS B

P/TV02 DOCK (PHOTO/TV, SCENES) Setup

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

3-22

03

FRICK POINDEXTER MELVIN

< NC4 1/16:24:54

< Ti 1/17:56:13

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

TRANSITION TO RNDZ C/Lat MET 01/15:39:54

RNDZ PET 00:00 (Ti)at MET 01/17:56:13

UPLINKβ21 OnlyBox 90

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/08(342)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

DORB

1

2

3

4

ORB

27

28

29

30

STS ATT~

~

RNDZ

CDR

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

PLT

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

MS1

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

EXERCISE

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

N2 REPRESS USING PAYLOAD N2 VLVS A

N2 REPRESS USING PAYLOAD N2 VLVS B

P/TV02 DOCK (PHOTO/TV, SCENES) Setup

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

Page 75: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

WALHEIM SCHLEGEL LOVE EYHARTS

3-23

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/08(342)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

~

~

DORB

1

2

3

4

ORB

27

28

29

30

~

~

RNDZ

STS ATT

MS2

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

SSP1 OIU PWR - OIU 1 ON (tb-UP)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSV OUTRATE - 3

MS3

EMU REMOVAL (EVA, AIRLOCK CONFIG)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

MIDDECK PREP (EVA, EVA PREP) Steps 9-12

P/TV02 DOCK (PHOTO/TV, SCENES) Ops

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP

EMU REMOVAL (EVA, AIRLOCK CONFIG)

EXERCISE

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

MIDDECK PREP (EVA, EVA PREP) Steps 9-12

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FE-2 (UP)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

P/TV02 DOCK (PHOTO/TV, SCENES) Ops

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

TFL 192

NOTES

3-23

03

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/08(342)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

DORB

1

2

3

4

ORB

27

28

29

30

STS ATT~

~

RNDZ

MS2

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

SSP1 OIU PWR - OIU 1 ON (tb-UP)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSV OUTRATE - 3

MS3

EMU REMOVAL (EVA, AIRLOCK CONFIG)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

MIDDECK PREP (EVA, EVA PREP) Steps 9-12

P/TV02 DOCK (PHOTO/TV, SCENES) Ops

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP

EMU REMOVAL (EVA, AIRLOCK CONFIG)

EXERCISE

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

MIDDECK PREP (EVA, EVA PREP) Steps 9-12

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FE-2 (UP)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

P/TV02 DOCK (PHOTO/TV, SCENES) Ops

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

NOTES

TFL 192

Page 76: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

FRICK POINDEXTER MELVIN

< DOCKING (20:43:43) RETURN TO FLIGHT PLAN

UPLINKβ21 OnlyBox 20,21

3-24

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/08(342)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

~

~

~

DORB

4

5

6

ORB

30

31

32

~

RNDZ

DOCK

~

BIAS -XLV -ZVV

STS ATT

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Configure BPSMU & RWS Cables

PRIORITY PWRDN GRP B (ORB PKT) Steps 6(Single G2) and 12 O6 S TRK PWR -Z - OFF

JOINT OPS: 2.104 HATCH OPENINGAND STS/ISS DUCT INSTALLATION

NODE 2 O2 SYSTEM PURGE AND SETUPFOR PREBREATHE USING SHUTTLE O2 (ASSY OPS, ACT&C/O) Steps 4-12

~

OBSS HANDOFF FROM SSRMS (NODE 2) TO SRMS (PDRS, OBSS NOMINAL) Pre-Grapple MNVR, Steps 1-2

SAFETY BRIEFING

PLT

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

PRIORITY PWRDN GRP B (ORB PKT) Steps 6(Single G2) and 12 O6 S TRK PWR -Z - OFF

√DAP A/LVLH/VERN MNVR (TRK) BIAS -XLV, -ZVV TG=2 BV=5 P=159.68 Y=353.90 OM=184.25 Init TRK, DAP:FREE >2 secThen: DAP:A12/AUTO/VERN

POST-DOCKING EVA TRANSFER/RECONFIG (EVA, AIRLOCK CONFIG) Steps 1-48

SAFETY BRIEFING

SSV OUTRATE - 2

MS1

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

TRANSFER OPSRef. Transfer List & MSG XXX

P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) Setup

P/TV05 ISS INTERNAL OPS (HC) (PHOTO/TV, SCENES) Setup

OBSS HANDOFF FROM SSRMS (NODE 2) TO SRMS (PDRS, OBSS NOMINAL) Pre-Grapple MNVR, Steps 1-2

SAFETY BRIEFING

ROBOTICS: 1.110 OBSS GRAPPLE

~

TFL 184

UPLINKβ21 OnlyBox 22,23

NOTES

3-24

03

FRICK POINDEXTER MELVIN

< DOCKING (20:43:43) RETURN TO FLIGHT PLAN

UPLINKβ21 OnlyBox 20,21

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/08(342)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

DORB

4

5

6

ORB

30

31

32

STS ATT~

RNDZ

DOCK

~

BIAS -XLV -ZVV

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Configure BPSMU & RWS Cables

PRIORITY PWRDN GRP B (ORB PKT) Steps 6(Single G2) and 12 O6 S TRK PWR -Z - OFF

JOINT OPS: 2.104 HATCH OPENINGAND STS/ISS DUCT INSTALLATION

NODE 2 O2 SYSTEM PURGE AND SETUPFOR PREBREATHE USING SHUTTLE O2 (ASSY OPS, ACT&C/O) Steps 4-12

~

OBSS HANDOFF FROM SSRMS (NODE 2) TO SRMS (PDRS, OBSS NOMINAL) Pre-Grapple MNVR, Steps 1-2

SAFETY BRIEFING

PLT

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

PRIORITY PWRDN GRP B (ORB PKT) Steps 6(Single G2) and 12 O6 S TRK PWR -Z - OFF

√DAP A/LVLH/VERN MNVR (TRK) BIAS -XLV, -ZVV TG=2 BV=5 P=159.68 Y=353.90 OM=184.25 Init TRK, DAP:FREE >2 secThen: DAP:A12/AUTO/VERN

POST-DOCKING EVA TRANSFER/RECONFIG (EVA, AIRLOCK CONFIG) Steps 1-48

SAFETY BRIEFING

SSV OUTRATE - 2

MS1

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

TRANSFER OPSRef. Transfer List & MSG XXX

P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) Setup

P/TV05 ISS INTERNAL OPS (HC) (PHOTO/TV, SCENES) Setup

OBSS HANDOFF FROM SSRMS (NODE 2) TO SRMS (PDRS, OBSS NOMINAL) Pre-Grapple MNVR, Steps 1-2

SAFETY BRIEFING

ROBOTICS: 1.110 OBSS GRAPPLE

~

NOTES

TFL 184

UPLINKβ21 OnlyBox 22,23

Page 77: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

WALHEIM SCHLEGEL LOVE EYHARTS

3-25

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/08(342)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

~

~

~

DORB

4

5

6

ORB

30

31

32

~

RNDZ

DOCK

~

BIAS -XLV -ZVV

STS ATT

MS2

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

JOINT OPS: 6.103 HARDLINE AUDIOCONFIG (ISS) Steps 1,2,6,7

EXERCISE

POST-DOCKING EVA TRANSFER/RECONFIG (EVA, AIRLOCK CONFIG) Steps 1-48

EVA SYSTEMS: 1.307 REBA INSTALL/REMOVAL Perform INSTALLATION Steps 1-11

SAFETY BRIEFING

MS3

JOINT OPS: 2.104 HATCH OPENINGAND STS/ISS DUCT INSTALLATION

A/L PREP FOR INGRESS - BOOSTERFAN ACTIVE (RNDZ, APDS)

P/TV02 DOCK (PHOTO/TV, SCENES) Ops

~

POST-DOCKING EVA TRANSFER/RECONFIG (EVA, AIRLOCK CONFIG) Steps 1-48

EVA SYSTEMS: 1.307 REBA INSTALL/REMOVAL Perform INSTALLATION Steps 1-11

SAFETY BRIEFING

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

MS4

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

A/L PREP FOR INGRESS - BOOSTERFAN ACTIVE (RNDZ, APDS)

POST RNDZ PGSC CONFIG Configure PGSCs per Usage Chart

SAFETY BRIEFING

ROBOTICS: 1.110 OBSS GRAPPLE

~

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

ENABLE WLES FILE BACKUP(ORB OPS, WLES)

FE-2 (UP)

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

SAFETY BRIEFING

ROBOTICS: 1.110 OBSS GRAPPLE

~

NOTES

3-25

03

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/08(342)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

DORB

4

5

6

ORB

30

31

32

STS ATT~

RNDZ

DOCK

~

BIAS -XLV -ZVV

MS2

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

JOINT OPS: 6.103 HARDLINE AUDIOCONFIG (ISS) Steps 1,2,6,7

EXERCISE

POST-DOCKING EVA TRANSFER/RECONFIG (EVA, AIRLOCK CONFIG) Steps 1-48

EVA SYSTEMS: 1.307 REBA INSTALL/REMOVAL Perform INSTALLATION Steps 1-11

SAFETY BRIEFING

MS3

JOINT OPS: 2.104 HATCH OPENINGAND STS/ISS DUCT INSTALLATION

A/L PREP FOR INGRESS - BOOSTERFAN ACTIVE (RNDZ, APDS)

P/TV02 DOCK (PHOTO/TV, SCENES) Ops

~

POST-DOCKING EVA TRANSFER/RECONFIG (EVA, AIRLOCK CONFIG) Steps 1-48

EVA SYSTEMS: 1.307 REBA INSTALL/REMOVAL Perform INSTALLATION Steps 1-11

SAFETY BRIEFING

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

MS4

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

A/L PREP FOR INGRESS - BOOSTERFAN ACTIVE (RNDZ, APDS)

POST RNDZ PGSC CONFIG Configure PGSCs per Usage Chart

SAFETY BRIEFING

ROBOTICS: 1.110 OBSS GRAPPLE

~

POST DOCKING HATCH LEAK CHECK (RNDZ, APDS)

ENABLE WLES FILE BACKUP(ORB OPS, WLES)

FE-2 (UP)

APPROACH TIMELINE(RNDZ, CUE CARD CONFIG)

~

SAFETY BRIEFING

ROBOTICS: 1.110 OBSS GRAPPLE

~

NOTES

Page 78: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

FRICK POINDEXTER MELVIN

3-26

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/08(342)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

~

~

~

DORB

6

7

8

9

ORB

32

33

34

35

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

NODE 2 O2 SYSTEM PURGE AND SETUPFOR PREBREATHE USING SHUTTLE O2 (ASSY OPS, ACT&C/O) Steps 4-12

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS HANDOFF FROM SSRMS (NODE 2)TO SRMS (PDRS, OBSS NOMINAL) Grapple, Steps 6-7

OBSS MANEUVER TO COLUMBUS VIEWINGPOSITION (PDRS, OBSS NOMINAL)

PLT

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Steps 1-3 & 10-11 not req'd Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) DOCKING VIDEO KU TDRW (01:33-02:05)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

~

MS1

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBOTICS: 1.112 OBSS UNGRAPPLE Steps 1-2

ROBOTICS: 1.110 OBSS GRAPPLE~

ROBOTICS: 1.111 OBSS MANEUVERTO HANDOFF

NO EXERCISEWHILE BOTHARMSGRAPPLEDTO OBSS

NOTES

3-26

03

FRICK POINDEXTER MELVIN

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/08(342)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

DORB

6

7

8

9

ORB

32

33

34

35

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

NODE 2 O2 SYSTEM PURGE AND SETUPFOR PREBREATHE USING SHUTTLE O2 (ASSY OPS, ACT&C/O) Steps 4-12

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS HANDOFF FROM SSRMS (NODE 2)TO SRMS (PDRS, OBSS NOMINAL) Grapple, Steps 6-7

OBSS MANEUVER TO COLUMBUS VIEWINGPOSITION (PDRS, OBSS NOMINAL)

PLT

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Steps 1-3 & 10-11 not req'd Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) DOCKING VIDEO KU TDRW (01:33-02:05)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

~

MS1

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBOTICS: 1.112 OBSS UNGRAPPLE Steps 1-2

ROBOTICS: 1.110 OBSS GRAPPLE~

ROBOTICS: 1.111 OBSS MANEUVERTO HANDOFF

NOTES

NO EXERCISEWHILE BOTHARMSGRAPPLEDTO OBSS

Page 79: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

WALHEIM SCHLEGEL LOVE EYHARTS

EVA SYSTEMS: 1.403 REBAPOWERED HARDWARE C/O

EVA SYSTEMS: 1.403 REBAPOWERED HARDWARE C/O

ROBOTICS: 1.111 OBSS MANEUVERTO HANDOFF

3-27

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/08(342)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

~

~

~

DORB

6

7

8

9

ORB

32

33

34

35

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Steps 1-3 & 10-11 not req'd Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Steps 1-3 & 10-11 not req'd Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

OBSS HANDOFF FROM SSRMS (NODE 2)TO SRMS (PDRS, OBSS NOMINAL) MRL Release, Steps 3-5

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS HANDOFF FROM SSRMS (NODE 2)TO SRMS (PDRS, OBSS NOMINAL) Grapple, Steps 6-7

OBSS MANEUVER TO COLUMBUS VIEWINGPOSITION (PDRS, OBSS NOMINAL)

SETUP RMS WORKSTATION

ROBOTICS: 1.110 OBSS GRAPPLE~

FE-2 (UP)

ROBOTICS: 1.110 OBSS GRAPPLE~

ROBOTICS: 1.111 OBSS MANEUVERTO HANDOFF

PREP WORK

ROBOTICS: 1.112 OBSS UNGRAPPLE Steps 1-2

ROBOTICS: 1.112 OBSS UNGRAPPLE Maneuver to Overnight Park Step 3

DAILY PLANNING CONFERENCE (DPC)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE SLEEP-ISS

~

NOEXERCISEWHILEBOTH ARMSGRAPPLEDTO OBSS

NOTES

3-27

03

WALHEIM SCHLEGEL LOVE EYHARTS

EVA SYSTEMS: 1.403 REBAPOWERED HARDWARE C/O

EVA SYSTEMS: 1.403 REBAPOWERED HARDWARE C/O

ROBOTICS: 1.111 OBSS MANEUVERTO HANDOFF

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/08(342)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

DORB

6

7

8

9

ORB

32

33

34

35

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Steps 1-3 & 10-11 not req'd Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Steps 1-3 & 10-11 not req'd Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

OBSS HANDOFF FROM SSRMS (NODE 2)TO SRMS (PDRS, OBSS NOMINAL) MRL Release, Steps 3-5

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS HANDOFF FROM SSRMS (NODE 2)TO SRMS (PDRS, OBSS NOMINAL) Grapple, Steps 6-7

OBSS MANEUVER TO COLUMBUS VIEWINGPOSITION (PDRS, OBSS NOMINAL)

SETUP RMS WORKSTATION

ROBOTICS: 1.110 OBSS GRAPPLE~

FE-2 (UP)

ROBOTICS: 1.110 OBSS GRAPPLE~

ROBOTICS: 1.111 OBSS MANEUVERTO HANDOFF

PREP WORK

ROBOTICS: 1.112 OBSS UNGRAPPLE Steps 1-2

ROBOTICS: 1.112 OBSS UNGRAPPLE Maneuver to Overnight Park Step 3

DAILY PLANNING CONFERENCE (DPC)

EVA1 PROCEDURE REVIEW Ref: EVA1 BRIEFING CARD (EVA, TIMELINES)

PRE SLEEP-ISS

~

NOTES

NOEXERCISEWHILEBOTH ARMSGRAPPLEDTO OBSS

Page 80: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

FRICK POINDEXTER MELVIN

3-28

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/09(343)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

~

~

~

DORB

9

10

11

ORB

35

36

37

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-28

03

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/09(343)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

DORB

9

10

11

ORB

35

36

37

STS ATT~

~

BIAS -XLV -ZVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 81: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

WALHEIM SCHLEGEL LOVE EYHARTS

3-29

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/09(343)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

~

~

~

DORB

9

10

11

ORB

35

36

37

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYS: 2.305 10.2 PSIACAMPOUT MASK PREBREATHE

Ref: PRE EVA 1 TOOL CONFIG (EVA, TIMELINES)

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

EVA SYS: 2.305 10.2 PSIACAMPOUT MASK PREBREATHE

Ref: PRE EVA 1 TOOL CONFIG (EVA, TIMELINES)

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE SLEEP-ISS

~

SLEEP

~

NOTES

3-29

03

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/09(343)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

DORB

9

10

11

ORB

35

36

37

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYS: 2.305 10.2 PSIACAMPOUT MASK PREBREATHE

Ref: PRE EVA 1 TOOL CONFIG (EVA, TIMELINES)

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

EVA SYS: 2.305 10.2 PSIACAMPOUT MASK PREBREATHE

Ref: PRE EVA 1 TOOL CONFIG (EVA, TIMELINES)

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE SLEEP-ISS

~

SLEEP

~

NOTES

Page 82: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

FRICK POINDEXTER MELVIN

3-30

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/09(343)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

~

~ ~

~

DORB

12

13

14

ORB

38

39

40

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-30

03

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/09(343)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

DORB

12

13

14

ORB

38

39

40

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 83: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

03

WALHEIM SCHLEGEL LOVE EYHARTS

3-31

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/09(343)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

~

~ ~

~

DORB

12

13

14

ORB

38

39

40

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (UP)

SLEEP

~

~

NOTES

3-31

03

WALHEIM SCHLEGEL LOVE EYHARTS

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/09(343)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

DORB

12

13

14

ORB

38

39

40

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (UP)

SLEEP

~

~

NOTES

Page 84: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

FRICK POINDEXTER MELVIN

FD04 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP

3-32

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/09(343)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~

~

~

DORB

14

15

16

1

ORB

40

41

42

43

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-32

04

FRICK POINDEXTER MELVIN

FD04 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/09(343)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

DORB

14

15

16

1

ORB

40

41

42

43

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 85: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

WALHEIM SCHLEGEL LOVE

3-33

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/09(343)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~

~

~

DORB

14

15

16

1

ORB

40

41

42

43

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-33

04

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/09(343)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

DORB

14

15

16

1

ORB

40

41

42

43

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 86: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

3-34

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/09(343)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~

~ ~

~

DORB

1

2

3

ORB

43

44

45

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EXERCISE

IMU ALIGN - S TRK (ORB OPS, GNC)N2 REPRESS USING PAYLOAD N2 VLVS A

PLT

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA INHIBIT PAD (EVA, TIMELINES)

IVA SUPPORT EVA1

~

IVA SUPPORT PREP

L17 Check MCIU filter screen

P/TV07 EVA (PHOTO/TV, SCENES) Setup

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

KU-BD ANT STOW (ORB OPS, COMM/INST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE

~

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

NOTES

3-34

04

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/09(343)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

DORB

1

2

3

ORB

43

44

45

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EXERCISE

IMU ALIGN - S TRK (ORB OPS, GNC)N2 REPRESS USING PAYLOAD N2 VLVS A

PLT

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA INHIBIT PAD (EVA, TIMELINES)

IVA SUPPORT EVA1

~

IVA SUPPORT PREP

L17 Check MCIU filter screen

P/TV07 EVA (PHOTO/TV, SCENES) Setup

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

KU-BD ANT STOW (ORB OPS, COMM/INST)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE

~

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

NOTES

Page 87: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

WALHEIM SCHLEGEL LOVE

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE

3-35

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/09(343)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~

~ ~

~

DORB

1

2

3

ORB

43

44

45

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

PDGF SETUP

~

MS3

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

PDGF SETUP

~

MS4

S&M: 1.403 CBCS INSTALLATION/REMOVAL (SSRMS) - GENERIC Perform CBCS POWERUP, Step 13

EXERCISE

KU-BD ANT STOW (ORB OPS, COMM/INST)PGSC POWERDOWN Powerdown all unnecessary PGSCs. At a minimum, leave KFX, RPOP, and Color Printer on

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

~

FILE SNEAKERNET BETWEEN ISS SSC & SHUTTLEPGSC (ORB OPS, PGSC) Part A, Steps 1-3

NOTES

3-35

04

WALHEIM SCHLEGEL LOVE

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/09(343)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

DORB

1

2

3

ORB

43

44

45

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

PDGF SETUP

~

MS3

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

PDGF SETUP

~

MS4

S&M: 1.403 CBCS INSTALLATION/REMOVAL (SSRMS) - GENERIC Perform CBCS POWERUP, Step 13

EXERCISE

KU-BD ANT STOW (ORB OPS, COMM/INST)PGSC POWERDOWN Powerdown all unnecessary PGSCs. At a minimum, leave KFX, RPOP, and Color Printer on

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

~

FILE SNEAKERNET BETWEEN ISS SSC & SHUTTLEPGSC (ORB OPS, PGSC) Part A, Steps 1-3

NOTES

Page 88: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

~3-36

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/09(343)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~ ~

~

DORB

3

4

5

6

ORB

46

47

48

~

BIAS -XLV -ZVV

~

STS ATT

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #3 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #2 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 2 CWCs to ISS

MEAL

MNVR (TRK) UPDATE (Post Columbus Install) TG=2 BV=5 P=161 Y=354 OM=184 A12/FREE/VERN Init TRK

N2 REPRESS USING PAYLOAD N2 VLVS B

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES) Ops

ROBOTICS: 1.311 COLUMBUS INSTALL PRLA Release, Step 5

PWR FILL (ORB OPS, ECLS) Perform Water Fill #1 Ref. MSG XXX

PLT

IVA SUPPORT EVA1

~

~

MS1

ROBOTICS: 1.310 COLUMBUS GRAPPLE

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

ROBOTICS: 1.211 PDGF INSTALL

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE~

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

NOTES

3-36

04

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

~

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/09(343)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

DORB

3

4

5

6

ORB

46

47

48

STS ATT~

BIAS -XLV -ZVV

~

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #3 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #2 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 2 CWCs to ISS

MEAL

MNVR (TRK) UPDATE (Post Columbus Install) TG=2 BV=5 P=161 Y=354 OM=184 A12/FREE/VERN Init TRK

N2 REPRESS USING PAYLOAD N2 VLVS B

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES) Ops

ROBOTICS: 1.311 COLUMBUS INSTALL PRLA Release, Step 5

PWR FILL (ORB OPS, ECLS) Perform Water Fill #1 Ref. MSG XXX

PLT

IVA SUPPORT EVA1

~

~

MS1

ROBOTICS: 1.310 COLUMBUS GRAPPLE

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

ROBOTICS: 1.211 PDGF INSTALL

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE~

NOTES

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

Page 89: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

WALHEIM SCHLEGEL LOVE

~3-37

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/09(343)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~ ~

~

DORB

3

4

5

6

ORB

46

47

48

~

BIAS -XLV -ZVV

~

STS ATT

MS2

P1 NTA REMOVAL PREP

~

PDGF INSTALL

PDGF SETUP

~

MS3

P1 NTA REMOVAL PREP

~

PDGF INSTALL

PDGF SETUP

~

MS4

ROBOTICS: 1.310 COLUMBUS GRAPPLE

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

ROBOTICS: 1.211 PDGF INSTALL

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE~

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

NOTES

3-37

04

WALHEIM SCHLEGEL LOVE

~

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/09(343)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

DORB

3

4

5

6

ORB

46

47

48

STS ATT~

BIAS -XLV -ZVV

~

MS2

P1 NTA REMOVAL PREP

~

PDGF INSTALL

PDGF SETUP

~

MS3

P1 NTA REMOVAL PREP

~

PDGF INSTALL

PDGF SETUP

~

MS4

ROBOTICS: 1.310 COLUMBUS GRAPPLE

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

ROBOTICS: 1.211 PDGF INSTALL

ROBOTICS: 1.210 EVA1-PDGF RETRIEVE~

NOTES

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

Page 90: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

FRICK POINDEXTER MELVIN

~

3-38

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/09(343)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~ ~

~

DORB

6

7

8

9

ORB

48

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 1 CWC to ISS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd In step 61, stow batts in BSA per Battery Recharge CC

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

P/TV07 EVA (PHOTO/TV, SCENES) Ops

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 2

IVA SUPPORT EVA1

~

EXERCISE

LCC ACTIVATION (PHOTO/TV, CUE CARDS)Steps 1-3LCC DEACTIVATION (PHOTO/TV, CUE CARDS)Step 1PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT First Stage Capture, Steps 1-4

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT Second Stage Capture, Step 5

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.311 COLUMBUS INSTALL Limp,St 13

ROBOTICS: 1.311 COLUMBUS INSTALL Safe,St 14-15

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

TRANSFER BRIEF Call down status to MCC

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER TAGUP Coordinate with xfer counterpart

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

NOTES

3-38

04

FRICK POINDEXTER MELVIN

~

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/09(343)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

DORB

6

7

8

9

ORB

48

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 1 CWC to ISS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd In step 61, stow batts in BSA per Battery Recharge CC

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

P/TV07 EVA (PHOTO/TV, SCENES) Ops

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 2

IVA SUPPORT EVA1

~

EXERCISE

LCC ACTIVATION (PHOTO/TV, CUE CARDS)Steps 1-3LCC DEACTIVATION (PHOTO/TV, CUE CARDS)Step 1PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT First Stage Capture, Steps 1-4

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT Second Stage Capture, Step 5

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.311 COLUMBUS INSTALL Limp,St 13

ROBOTICS: 1.311 COLUMBUS INSTALL Safe,St 14-15

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

TRANSFER BRIEF Call down status to MCC

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

Page 91: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

WALHEIM SCHLEGEL LOVE

~

3-39

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/09(343)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~ ~

~

DORB

6

7

8

9

ORB

48

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd In step 61, stow batts in BSA per Battery Recharge CC

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

P1 NTA REMOVAL PREP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd In step 61, stow batts in BSA per Battery Recharge CC

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

LBP-MUSCLE QSTION(ASSY PL, QSTION)

P1 NTA REMOVAL PREP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

S&M: 1.403 CBCS INSTALLATION/REMOVAL (SSRMS) - GENERIC Perform REMOVING CBCS, Steps 14-15

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT First Stage Capture, Steps 1-4

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT Second Stage Capture, Step 5

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT Bolts Acquisition, Steps 6-7

EVA SYSTEMS: 1.605 BSA BATTERYRECHARGE Perform INITIATE Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.311 COLUMBUS INSTALL Limp,St 13

ROBOTICS: 1.311 COLUMBUS INSTALL Safe,St 14-15

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER TAGUP Coordinate with xfer counterpart

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

NOTES

3-39

04

WALHEIM SCHLEGEL LOVE

~

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/09(343)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

DORB

6

7

8

9

ORB

48

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd In step 61, stow batts in BSA per Battery Recharge CC

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

P1 NTA REMOVAL PREP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd In step 61, stow batts in BSA per Battery Recharge CC

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

LBP-MUSCLE QSTION(ASSY PL, QSTION)

P1 NTA REMOVAL PREP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

S&M: 1.403 CBCS INSTALLATION/REMOVAL (SSRMS) - GENERIC Perform REMOVING CBCS, Steps 14-15

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT First Stage Capture, Steps 1-4

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT Second Stage Capture, Step 5

S&M: 1.512 NODE 2 CBM CAPTURE/ABOLT Bolts Acquisition, Steps 6-7

EVA SYSTEMS: 1.605 BSA BATTERYRECHARGE Perform INITIATE Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.311 COLUMBUS INSTALL Limp,St 13

ROBOTICS: 1.311 COLUMBUS INSTALL Safe,St 14-15

ROBOTICS: 1.311 COLUMBUS INSTALL Columbus Unberth, Steps 1-12

~

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

NO EXERCISEDURINGCOL UNBERTH& CBMOPERATIONS

Page 92: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

FRICK POINDEXTER MELVIN

3-40

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/10(344)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

~ ~

~ ~

DORB

9

10

11

ORB

51

52

53

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-40

04

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/10(344)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

DORB

9

10

11

ORB

51

52

53

STS ATT~

~

BIAS -XLV -ZVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 93: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

WALHEIM SCHLEGEL LOVE

3-41

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/10(344)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

~ ~

~ ~

DORB

9

10

11

ORB

51

52

53

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-41

04

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/10(344)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

DORB

9

10

11

ORB

51

52

53

STS ATT~

~

BIAS -XLV -ZVV

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 94: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

FRICK POINDEXTER MELVIN

3-42

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/10(344)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

~

~

~

~

DORB

11

12

13

14

ORB

53

54

55

56

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-42

04

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/10(344)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

DORB

11

12

13

14

ORB

53

54

55

56

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 95: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

04

WALHEIM SCHLEGEL LOVE

3-43

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/10(344)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

~

~

~

~

DORB

11

12

13

14

ORB

53

54

55

56

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

3-43

04

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/10(344)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

DORB

11

12

13

14

ORB

53

54

55

56

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

Page 96: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

FRICK POINDEXTER MELVIN

FD05 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP After Ku Deploy, Verify late Update Cards from SSC have been returned to Shuttle.

3-44

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/10(344)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

~ ~

~ ~

DORB

14

15

1

2

ORB

56

57

58

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-44

05

FRICK POINDEXTER MELVIN

FD05 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP After Ku Deploy, Verify late Update Cards from SSC have been returned to Shuttle.

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/10(344)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

DORB

14

15

1

2

ORB

56

57

58

STS ATT~

~

BIAS -XLV -ZVV

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 97: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

WALHEIM SCHLEGEL LOVE

3-45

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/10(344)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

~ ~

~ ~

DORB

14

15

1

2

ORB

56

57

58

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA CREW: TAKE 1 ASPIRIN (325mg) POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

NOTES

3-45

05

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/10(344)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

DORB

14

15

1

2

ORB

56

57

58

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA CREW: TAKE 1 ASPIRIN (325mg) POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

NOTES

Page 98: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

FRICK POINDEXTER MELVIN

WCS CRADLE - AUTO INHIBITInspect hose block filter, change if req'dWCS CRADLE - AUTO

A

3-46

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/10(344)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

~

~ ~

~

DORB

2

3

4

ORB

59

60

61

~

~

BIAS -XLV -ZVV

STS ATT

CDR

DOUG REVIEW Ref. MSG XXX

IMU ALIGN - S TRK (ORB OPS, GNC)

MEAL

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

PLT

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #5 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #4 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERM~

EXERCISE

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

WCS FILTER CHECK A

MS1

DOUG REVIEW Ref. MSG XXX

KU-BD ACTIVATION Ref. MSG XXX

KU-BD ANT DEPLOY (ORB OPS, COMM/INST)

MEAL

~

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.312 COLUMBUS UNGRAPPLE

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Steps 1-4.2

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

UPLINKβ21 OnlyBox 22,23, 30

NOTES

3-46

05

FRICK POINDEXTER MELVIN

WCS CRADLE - AUTO INHIBITInspect hose block filter, change if req'dWCS CRADLE - AUTO

A

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/10(344)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

DORB

2

3

4

ORB

59

60

61

STS ATT~

~

BIAS -XLV -ZVV

CDR

DOUG REVIEW Ref. MSG XXX

IMU ALIGN - S TRK (ORB OPS, GNC)

MEAL

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

PLT

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #5 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #4 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERM~

EXERCISE

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

WCS FILTER CHECK A

MS1

DOUG REVIEW Ref. MSG XXX

KU-BD ACTIVATION Ref. MSG XXX

KU-BD ANT DEPLOY (ORB OPS, COMM/INST)

MEAL

~

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.312 COLUMBUS UNGRAPPLE

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Steps 1-4.2

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

NOTES

UPLINKβ21 OnlyBox 22,23, 30

Page 99: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

WALHEIM SCHLEGEL LOVE

05

3-47

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/10(344)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

~

~ ~

~

DORB

2

3

4

ORB

59

60

61

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EXERCISE

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

~

MS3

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Steps 1-4 Remove Disk and Thermal Covers, Install Ground Straps

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 7, Install 1553 Jumpers

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 6, Install Hardwired Jumpers

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 5, Install Power Jumpers

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 8, Remove Fwd & Aft CPAs

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

DOUG REVIEW Ref. MSG XXX

KU-BD ACTIVATION Ref. MSG XXX

KU-BD ANT DEPLOY (ORB OPS, COMM/INST)

MEAL

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

PGSC CHECK Verify all PGSCs are powered onand KFX application running on KFX machine.

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.312 COLUMBUS UNGRAPPLE

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Steps 1-4.2

NOTES

3-47

WALHEIM SCHLEGEL LOVE

05STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/10(344)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

DORB

2

3

4

ORB

59

60

61

STS ATT~

~

BIAS -XLV -ZVV

MS2

EXERCISE

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

~

MS3

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Steps 1-4 Remove Disk and Thermal Covers, Install Ground Straps

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 7, Install 1553 Jumpers

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 6, Install Hardwired Jumpers

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 5, Install Power Jumpers

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 8, Remove Fwd & Aft CPAs

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

DOUG REVIEW Ref. MSG XXX

KU-BD ACTIVATION Ref. MSG XXX

KU-BD ANT DEPLOY (ORB OPS, COMM/INST)

MEAL

~

PUBLIC AFFAIRS EVENTISS KU AVAIL: XX:XX-XX:XX

PGSC CHECK Verify all PGSCs are powered onand KFX application running on KFX machine.

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.312 COLUMBUS UNGRAPPLE

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Steps 1-4.2

NOTES

Page 100: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

FRICK POINDEXTER MELVIN

3-48

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/10(344)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

~

~

~

~

DORB

4

5

6

7

ORB

61

62

63

64

~

~

BIAS -XLV -ZVV

STS ATT

CDR

FOCUSED INSPECTION Ref. MSG XXX

~

MEAL

~

PLT

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #X Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERM

~

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 3 CWCs to ISS

MEAL

PWR FILL (ORB OPS, ECLS) Perform Water Fill #2 Ref. MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

MS1

FOCUSED INSPECTION Ref. MSG XXX

~

MEAL

~

NOTES

3-48

05

FRICK POINDEXTER MELVIN

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/10(344)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

DORB

4

5

6

7

ORB

61

62

63

64

STS ATT~

~

BIAS -XLV -ZVV

CDR

FOCUSED INSPECTION Ref. MSG XXX

~

MEAL

~

PLT

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #X Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERM

~

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 3 CWCs to ISS

MEAL

PWR FILL (ORB OPS, ECLS) Perform Water Fill #2 Ref. MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

MS1

FOCUSED INSPECTION Ref. MSG XXX

~

MEAL

~

NOTES

Page 101: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

WALHEIM SCHLEGEL LOVE

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 8, Remove Fwd & Aft CPAs

3-49

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/10(344)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

~

~

~

~

DORB

4

5

6

7

ORB

61

62

63

64

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA) Note: Observe 32oz cold H2O max bag capacity during DIDB fills.

EVA SYSTEMS: 1.605 BSA BATTERYRECHARGE Perform INITIATE Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA SYSTEMS: 1.605 BSA BATTERY RCHRG (TERM) Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

~

MEAL

TRANSFER OPSRef. Transfer List & MSG XXX

~

MS3

EVA CREW: TAKE 1 ASPIRIN (325mg)

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 9, Install ITCS Jumpers

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA) Note: Observe 32oz cold H2O max bag capacity during DIDB fills.

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

~

MEAL

EVA SYSTEMS: 1.515 EMU METOX/LIOH/BATTERYREPLACEMENT Install METOX Canisters Ref: STS-122 CONSUMABLES TRACKING CC (EVA) Stow used LiOH in EMU Systems Transfer Bag

EVA SYSTEMS: 1.510 METOXREGENERATION (Terminate)

~

MS4

FOCUSED INSPECTION Ref. MSG XXX

~

MEAL

~

NOTES

3-49

05

WALHEIM SCHLEGEL LOVE

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 8, Remove Fwd & Aft CPAs

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/10(344)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

DORB

4

5

6

7

ORB

61

62

63

64

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA) Note: Observe 32oz cold H2O max bag capacity during DIDB fills.

EVA SYSTEMS: 1.605 BSA BATTERYRECHARGE Perform INITIATE Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA SYSTEMS: 1.605 BSA BATTERY RCHRG (TERM) Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

~

MEAL

TRANSFER OPSRef. Transfer List & MSG XXX

~

MS3

EVA CREW: TAKE 1 ASPIRIN (325mg)

COLUMBUS VESTIBULE OUTFITTING (ASSY OPS, ACT&C/O) Step 9, Install ITCS Jumpers

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA) Note: Observe 32oz cold H2O max bag capacity during DIDB fills.

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

~

MEAL

EVA SYSTEMS: 1.515 EMU METOX/LIOH/BATTERYREPLACEMENT Install METOX Canisters Ref: STS-122 CONSUMABLES TRACKING CC (EVA) Stow used LiOH in EMU Systems Transfer Bag

EVA SYSTEMS: 1.510 METOXREGENERATION (Terminate)

~

MS4

FOCUSED INSPECTION Ref. MSG XXX

~

MEAL

~

NOTES

Page 102: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

FRICK POINDEXTER MELVIN

3-50

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/10(344)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

~

~ ~

~

DORB

7

8

9

ORB

64

65

66

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

FOCUSED INSPECTION Ref. MSG XXX

~

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 3

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

P/TV07 EVA (PHOTO/TV, SCENES) Setup

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS) Perform Water Fill #3 Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform Water Fill #4 Ref. MSG XXX

MS1

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

FOCUSED INSPECTION Ref. MSG XXX

~

ILLUMINATOR OPS (CUE CARD)ILLUM ON - A,D

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Maneuver to Overnight Park Steps 4.3-6

TRANSFER BRIEF Call down status to MCC

TRANSFER TAGUP Coordinate with xfer counterpart

UPLINKβ21 OnlyBox 22,23

NOTES

3-50

05

FRICK POINDEXTER MELVIN

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/10(344)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

DORB

7

8

9

ORB

64

65

66

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

FOCUSED INSPECTION Ref. MSG XXX

~

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 3

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

P/TV07 EVA (PHOTO/TV, SCENES) Setup

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS) Perform Water Fill #3 Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform Water Fill #4 Ref. MSG XXX

MS1

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

FOCUSED INSPECTION Ref. MSG XXX

~

ILLUMINATOR OPS (CUE CARD)ILLUM ON - A,D

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Maneuver to Overnight Park Steps 4.3-6

TRANSFER BRIEF Call down status to MCC

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

UPLINKβ21 OnlyBox 22,23

Page 103: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

WALHEIM SCHLEGEL LOVE

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

3-51

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/10(344)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

~

~ ~

~

DORB

7

8

9

ORB

64

65

66

~

~

BIAS -XLV -ZVV

STS ATT

MS2

~

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

MS3

~

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

LBP-MUSCLE QSTION(ASSY PL, QSTION)

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

FOCUSED INSPECTION Ref. MSG XXX

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Maneuver to Overnight Park Steps 4.3-6

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

3-51

05

WALHEIM SCHLEGEL LOVE

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/10(344)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

DORB

7

8

9

ORB

64

65

66

STS ATT~

~

BIAS -XLV -ZVV

MS2

~

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

TRANSFER OPSRef. Transfer List & MSG XXX

MS3

~

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

EXERCISE

LBP-MUSCLE QSTION(ASSY PL, QSTION)

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

EVA2 PROCEDURE REVIEW Ref: EVA2 BRIEFING CARD (EVA, TIMELINES)

FOCUSED INSPECTION Ref. MSG XXX

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 2.210 MANEUVER TO FOCUSEDINSPECTION VIEWING Maneuver to Overnight Park Steps 4.3-6

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

Page 104: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

FRICK POINDEXTER MELVIN

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

3-52

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/11(345)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

10

11

12

ORB

67

68

69

~

~

BIAS -XLV -ZVV

STS ATT

CDR

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-52

05

FRICK POINDEXTER MELVIN

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/11(345)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

DORB

10

11

12

ORB

67

68

69

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 105: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

WALHEIM SCHLEGEL LOVE

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

3-53

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/11(345)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

10

11

12

ORB

67

68

69

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE

Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE

Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-53

05

WALHEIM SCHLEGEL LOVE

PUBLIC AFFAIRS EVENTKU AVAIL: 03:42-04:11

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/11(345)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

DORB

10

11

12

ORB

67

68

69

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE

Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE

Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD5 Steps

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 106: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

FRICK POINDEXTER MELVIN

3-54

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/11(345)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

12

13

14

15

ORB

69

70

71

72

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-54

05

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/11(345)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

DORB

12

13

14

15

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 107: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

05

WALHEIM SCHLEGEL LOVE

3-55

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/11(345)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

12

13

14

15

ORB

69

70

71

72

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

3-55

05

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/11(345)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

DORB

12

13

14

15

ORB

69

70

71

72

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

Page 108: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

FRICK POINDEXTER MELVIN

FD06 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP

3-56

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/11(345)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

15

16

1

ORB

72

73

74

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-56

06

FRICK POINDEXTER MELVIN

FD06 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES AND WORLDMAP

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/11(345)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

DORB

15

16

1

ORB

72

73

74

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 109: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

WALHEIM SCHLEGEL LOVE

3-57

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/11(345)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

15

16

1

ORB

72

73

74

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-57

06

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/11(345)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

DORB

15

16

1

ORB

72

73

74

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 110: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

FRICK POINDEXTER MELVIN

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Steps 1-3

TRANSFER OPSRef. Transfer List & MSG XXX

3-58

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/11(345)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

1

2

3

4

ORB

74

75

76

77

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #7 Ref. MSG XXX

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

IMU ALIGN - S TRK (ORB OPS, GNC)

P/TV07 EVA (PHOTO/TV, SCENES) Ops

~

PLT

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA INHIBIT PAD (EVA, TIMELINES)

IVA SUPPORT EVA2

~

IVA SUPPORT PREP

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

EXERCISE

ILLUMINATOR OPS (CUE CARD)ILLUM OFF - ALL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.410 EVA 2-P1 NTA R&R

~

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

UPLINKβ0 OnlyBox 22,23

NOTES

3-58

06

FRICK POINDEXTER MELVIN

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Steps 1-3

TRANSFER OPSRef. Transfer List & MSG XXX

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/11(345)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

DORB

1

2

3

4

ORB

74

75

76

77

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #7 Ref. MSG XXX

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

IMU ALIGN - S TRK (ORB OPS, GNC)

P/TV07 EVA (PHOTO/TV, SCENES) Ops

~

PLT

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA INHIBIT PAD (EVA, TIMELINES)

IVA SUPPORT EVA2

~

IVA SUPPORT PREP

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

EXERCISE

ILLUMINATOR OPS (CUE CARD)ILLUM OFF - ALL

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

ROBOTICS: 1.410 EVA 2-P1 NTA R&R

~

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

NOTES

UPLINKβ0 OnlyBox 22,23

Page 111: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

WALHEIM SCHLEGEL LOVE

TRANSFER OPSRef. Transfer List & MSG XXX

3-59

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/11(345)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

~

~

~

DORB

1

2

3

4

ORB

74

75

76

77

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

P1 NTA REMOVAL FROM PLB

~

MS3

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

P1 NTA REMOVAL FROM PLB

~

MS4

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Steps 1-3

ROBOTICS: 1.410 EVA 2-P1 NTA R&R

~

NOTES

3-59

06

WALHEIM SCHLEGEL LOVE

TRANSFER OPSRef. Transfer List & MSG XXX

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/11(345)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

DORB

1

2

3

4

ORB

74

75

76

77

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

P1 NTA REMOVAL FROM PLB

~

MS3

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

P1 NTA REMOVAL FROM PLB

~

MS4

EXERCISE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Steps 1-3

ROBOTICS: 1.410 EVA 2-P1 NTA R&R

~

NOTES

Page 112: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

FRICK POINDEXTER MELVIN

3-60

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/11(345)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

~

~ ~

~

DORB

4

5

6

7

ORB

77

78

79

80

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #9 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #8 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 3 CWCs to ISS

~

MEAL

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES) Ops

~

PLT

IVA SUPPORT EVA2

~

~

MS1

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

~

NOTES

3-60

06

FRICK POINDEXTER MELVIN

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/11(345)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

DORB

4

5

6

7

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV -ZVV

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #9 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #8 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 3 CWCs to ISS

~

MEAL

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES) Ops

~

PLT

IVA SUPPORT EVA2

~

~

MS1

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

~

NOTES

Page 113: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

WALHEIM SCHLEGEL LOVE

3-61

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/11(345)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

~

~ ~

~

DORB

4

5

6

7

ORB

77

78

79

80

~

~

BIAS -XLV -ZVV

STS ATT

MS2

NTA STOW IN PLB

P1 NTA INSTALL

P1 NTA REMOVAL FROM PLB

~

SSPTS ROUTING~

MS3

NTA STOW IN PLB

P1 NTA INSTALL

P1 NTA REMOVAL FROM PLB

~

SSPTS ROUTING~

MS4

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

~

NOTES

3-61

06

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/11(345)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

DORB

4

5

6

7

ORB

77

78

79

80

STS ATT~

~

BIAS -XLV -ZVV

MS2

NTA STOW IN PLB

P1 NTA INSTALL

P1 NTA REMOVAL FROM PLB

~

SSPTS ROUTING~

MS3

NTA STOW IN PLB

P1 NTA INSTALL

P1 NTA REMOVAL FROM PLB

~

SSPTS ROUTING~

MS4

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

~

NOTES

Page 114: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

FRICK POINDEXTER MELVIN

TRANSFER OPSRef. Transfer List & MSG XXX

3-62

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/11(345)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

~ ~

~

DORB

7

8

9

ORB

80

81

82

~

~

BIAS -XLV -ZVV

STS ATT

CDR

CWC TRANSFER Transfer 3 CWCs to ISS

~

EXERCISE

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Medical Conference

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps

IVA SUPPORT EVA2

~

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Step 4

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

TRANSFER BRIEF Call down status to MCC

TRANSFER TAGUP Coordinate with xfer counterpart

OCA-PMC

UPLINKβ21 OnlyBox 22,23

NOTES

3-62

06

FRICK POINDEXTER MELVIN

TRANSFER OPSRef. Transfer List & MSG XXX

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/11(345)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

DORB

7

8

9

ORB

80

81

82

STS ATT~

~

BIAS -XLV -ZVV

CDR

CWC TRANSFER Transfer 3 CWCs to ISS

~

EXERCISE

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC) Private Medical Conference

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps

IVA SUPPORT EVA2

~

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Step 4

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

TRANSFER BRIEF Call down status to MCC

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

OCA-PMC

UPLINKβ21 OnlyBox 22,23

Page 115: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

WALHEIM SCHLEGEL LOVE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER OPSRef. Transfer List & MSG XXX

3-63

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/11(345)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

~ ~

~

DORB

7

8

9

ORB

80

81

82

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSPTS ROUTING

~

MS3

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSPTS ROUTING

~

MS4

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Step 4

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

3-63

06

WALHEIM SCHLEGEL LOVE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

TRANSFER OPSRef. Transfer List & MSG XXX

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/11(345)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

DORB

7

8

9

ORB

80

81

82

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSPTS ROUTING

~

MS3

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSPTS ROUTING

~

MS4

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION (PDRS, OBSS NOMINAL)Step 4

ROBOTICS: 1.410 EVA 2-P1 NTA R&R~

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

Page 116: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

FRICK POINDEXTER MELVIN

3-64

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/12(346)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

~ ~

~

DORB

9

10

11

12

ORB

82

83

84

85

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-64

06

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/12(346)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

DORB

9

10

11

12

ORB

82

83

84

85

STS ATT~

~

BIAS -XLV -ZVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 117: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

WALHEIM SCHLEGEL LOVE

3-65

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/12(346)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

~ ~

~

DORB

9

10

11

12

ORB

82

83

84

85

~

~

BIAS -XLV -ZVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-65

06

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/12(346)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

DORB

9

10

11

12

ORB

82

83

84

85

STS ATT~

~

BIAS -XLV -ZVV

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 118: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

FRICK POINDEXTER MELVIN

3-66

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/12(346)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

~ ~

~ ~

DORB

12

13

14

ORB

85

86

87

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-66

06

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/12(346)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

DORB

12

13

14

ORB

85

86

87

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 119: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

06

WALHEIM SCHLEGEL LOVE

3-67

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/12(346)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

~ ~

~ ~

DORB

12

13

14

ORB

85

86

87

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

3-67

06

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/12(346)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

DORB

12

13

14

ORB

85

86

87

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

Page 120: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

FRICK POINDEXTER MELVIN

FD07 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES and WORLDMAP

3-68

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/12(346)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

~

~ ~

DORB

15

1

2

ORB

88

89

90

~

BIAS -XLV -ZVV

~

BIAS -XLV +YVV

STS ATT

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITERMNVR (TRK) BIAS -XLV +YVV (Water Dump)TG=2 BV=5 P=161 Y=354 OM=197A12/AUTO/VERN Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Waste Dump

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)

EXERCISE

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

UPDATEH2O WASTEDUMP QTY

NOTES

3-68

07

FRICK POINDEXTER MELVIN

FD07 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES and WORLDMAP

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/12(346)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

DORB

15

1

2

ORB

88

89

90

STS ATT~

BIAS -XLV -ZVV

~

BIAS -XLV +YVV

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITERMNVR (TRK) BIAS -XLV +YVV (Water Dump)TG=2 BV=5 P=161 Y=354 OM=197A12/AUTO/VERN Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Waste Dump

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)

EXERCISE

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

UPDATEH2O WASTEDUMP QTY

Page 121: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

WALHEIM SCHLEGEL LOVE

3-69

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/12(346)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

~

~ ~

DORB

15

1

2

ORB

88

89

90

~

BIAS -XLV -ZVV

~

BIAS -XLV +YVV

STS ATT

MS2

EVA CREW: TAKE 1 ASPIRIN (325mg) POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

EVA CREW: TAKE 1 ASPIRIN (325mg) POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-69

07

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/12(346)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

DORB

15

1

2

ORB

88

89

90

STS ATT~

BIAS -XLV -ZVV

~

BIAS -XLV +YVV

MS2

EVA CREW: TAKE 1 ASPIRIN (325mg) POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS3

EVA CREW: TAKE 1 ASPIRIN (325mg) POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 122: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-70

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/12(346)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

~

~ ~

DORB

2

3

4

5

ORB

90

91

92

93

~

~

BIAS -XLV -ZVV

STS ATT

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

ESA PUBLIC AFFAIRS EVENTKU AVAIL: 17:17-17:44

EXERCISE

IMU ALIGN - S TRK (ORB OPS, GNC)

MEAL

~

MNVR (TRK) BIAS -XLV -ZVVTG=2 BV=5 P=161 Y=354 OM=184A12/AUTO/VERN Init TRK

OFF DUTY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Waste Dump

PLT

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform CHANGEOUT Use CWC S/N XXX

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 4

EXERCISE

~

L17 Check MCIU filter screen

N2 REPRESS USING PAYLOAD N2 VLVS A

N2 REPRESS USING PAYLOAD N2 VLVS B

OFF DUTY

OFF DUTY

P/TV07 EVA (PHOTO/TV, SCENES) Setup

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

PWR FILL (ORB OPS, ECLS) Perform Water Fill #5 Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform Water Fill #6 Ref. MSG XXX

MS1

EXERCISE

OFF DUTY

~

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate EDR to F1

~

OCA-PFC

NOTES

3-70

07

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/12(346)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

DORB

2

3

4

5

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV -ZVV

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

ESA PUBLIC AFFAIRS EVENTKU AVAIL: 17:17-17:44

EXERCISE

IMU ALIGN - S TRK (ORB OPS, GNC)

MEAL

~

MNVR (TRK) BIAS -XLV -ZVVTG=2 BV=5 P=161 Y=354 OM=184A12/AUTO/VERN Init TRK

OFF DUTY

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Waste Dump

PLT

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform CHANGEOUT Use CWC S/N XXX

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 4

EXERCISE

~

L17 Check MCIU filter screen

N2 REPRESS USING PAYLOAD N2 VLVS A

N2 REPRESS USING PAYLOAD N2 VLVS B

OFF DUTY

OFF DUTY

P/TV07 EVA (PHOTO/TV, SCENES) Setup

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

PWR FILL (ORB OPS, ECLS) Perform Water Fill #5 Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform Water Fill #6 Ref. MSG XXX

MS1

EXERCISE

OFF DUTY

~

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate EDR to F1

~

NOTES

OCA-PFC

Page 123: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

WALHEIM SCHLEGEL LOVEPOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-71

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/12(346)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

~

~ ~

DORB

2

3

4

5

ORB

90

91

92

93

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Note: Observe 32oz Cold H2O max bag capacity during DIDB fills.

LV EMU RECONFIGURATION AND SWAP (EVA, AIRLOCK CONFIG)

MEAL

~

EVA SYSTEMS: 1.515 EMU METOX/LIOH/BATTERYREPLACEMENT Install METOX Canisters Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

OFF DUTY

~

MS3

ESA PUBLIC AFFAIRS EVENTKU AVAIL: 17:17-17:44

EXERCISE

OFF DUTY

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate EDR to F1

COL EMERGENCY LIGHT POWER SUPPLY-ENABLE (ASSY OPS, ACT&C/O)

DISABLE WLES FILE B/U (ORB OPS, WLES)

MS4

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Note: Observe 32oz Cold H2O max bag capacity during DIDB fills.

LV EMU RECONFIGURATION AND SWAP (EVA, AIRLOCK CONFIG)

EXERCISE

MEAL

~

EVA SYSTEMS: 1.515 EMU METOX/LIOH/BATTERYREPLACEMENT Install METOX Canisters Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

OFF DUTY

~

NOTES

3-71

07

WALHEIM SCHLEGEL LOVEPOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/12(346)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

DORB

2

3

4

5

ORB

90

91

92

93

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Note: Observe 32oz Cold H2O max bag capacity during DIDB fills.

LV EMU RECONFIGURATION AND SWAP (EVA, AIRLOCK CONFIG)

MEAL

~

EVA SYSTEMS: 1.515 EMU METOX/LIOH/BATTERYREPLACEMENT Install METOX Canisters Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

OFF DUTY

~

MS3

ESA PUBLIC AFFAIRS EVENTKU AVAIL: 17:17-17:44

EXERCISE

OFF DUTY

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate EDR to F1

COL EMERGENCY LIGHT POWER SUPPLY-ENABLE (ASSY OPS, ACT&C/O)

DISABLE WLES FILE B/U (ORB OPS, WLES)

MS4

EVA SYSTEMS: 1.305 EQUIPMENTLOCK PREP Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Note: Observe 32oz Cold H2O max bag capacity during DIDB fills.

LV EMU RECONFIGURATION AND SWAP (EVA, AIRLOCK CONFIG)

EXERCISE

MEAL

~

EVA SYSTEMS: 1.515 EMU METOX/LIOH/BATTERYREPLACEMENT Install METOX Canisters Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

OFF DUTY

~

NOTES

Page 124: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

FRICK POINDEXTER MELVIN

3-72

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/12(346)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

~

~ ~

DORB

5

6

7

ORB

93

94

95

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

~

OFF DUTY

~

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

PLT

MEAL

OFF DUTY

~

MS1

MEAL

OFF DUTY~

OFF DUTY

~

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

OCA-PFC

OCA-PFC

NOTES

3-72

07

FRICK POINDEXTER MELVIN

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/12(346)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

DORB

5

6

7

ORB

93

94

95

STS ATT~

~

BIAS -XLV -ZVV

CDR

MEAL

~

OFF DUTY

~

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

PLT

MEAL

OFF DUTY

~

MS1

MEAL

OFF DUTY~

OFF DUTY

~

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

NOTES

OCA-PFC

OCA-PFC

Page 125: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

WALHEIM SCHLEGEL LOVE

3-73

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/12(346)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

~

~ ~

DORB

5

6

7

ORB

93

94

95

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EXERCISE

MEAL

~

OFF DUTY

OFF DUTY

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

MS3

MEAL

OFF DUTY

OFF DUTY

~

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

MS4

MEAL

~

OFF DUTY

~

OFF DUTY

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

OCA-PFC

OCA-PFC

OCA-PFC

NOTES

3-73

07

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/12(346)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

DORB

5

6

7

ORB

93

94

95

STS ATT~

~

BIAS -XLV -ZVV

MS2

EXERCISE

MEAL

~

OFF DUTY

OFF DUTY

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

MS3

MEAL

OFF DUTY

OFF DUTY

~

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

MS4

MEAL

~

OFF DUTY

~

OFF DUTY

VIDEO TELECONFERENCE (ORB OPS, OCA) Private Family Conference

NOTES

OCA-PFC

OCA-PFC

OCA-PFC

Page 126: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

FRICK POINDEXTER MELVIN

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-74

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/12(346)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

~

~

DORB

7

8

9

10

ORB

95

96

97

98

~

~

BIAS -XLV -ZVV

STS ATT

CDR

COLUMBUS CONFIG FOR EUTEF & SOLAR INSTALL (ASSY PAYLOADS, COL EXT PAYLOADS) On COL-CC Go, Steps 1.3 - 1.5

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

PRIVATE MEDICAL CONFERENCE

~

PLT

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

ILLUMINATOR OPS (CUE CARD)ILLUM ON - A,D

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

3-74

07

FRICK POINDEXTER MELVIN

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/12(346)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

DORB

7

8

9

10

ORB

95

96

97

98

STS ATT~

~

BIAS -XLV -ZVV

CDR

COLUMBUS CONFIG FOR EUTEF & SOLAR INSTALL (ASSY PAYLOADS, COL EXT PAYLOADS) On COL-CC Go, Steps 1.3 - 1.5

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

PRIVATE MEDICAL CONFERENCE

~

PLT

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

ILLUMINATOR OPS (CUE CARD)ILLUM ON - A,D

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

Page 127: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

WALHEIM SCHLEGEL LOVE

3-75

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/12(346)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

~

~

DORB

7

8

9

10

ORB

95

96

97

98

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

LBP-MUSCLE QSTION(ASSY PL, QSTION)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ENABLE WLES FILE B/U (ORB OPS, WLES)

NOTES

3-75

07

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/12(346)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

DORB

7

8

9

10

ORB

95

96

97

98

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

LBP-MUSCLE QSTION(ASSY PL, QSTION)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

EVA3 PROCEDURE REVIEW Ref: EVA 3 BRIEFING CARD (EVA, TIMELINES)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ENABLE WLES FILE B/U (ORB OPS, WLES)

NOTES

Page 128: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

FRICK POINDEXTER MELVIN

3-76

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/13(347)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

~

~

~

DORB

10

11

12

13

ORB

98

99

100

101

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-76

07

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/13(347)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

DORB

10

11

12

13

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV -ZVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 129: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

WALHEIM SCHLEGEL LOVE

3-77

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/13(347)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

~

~

~

DORB

10

11

12

13

ORB

98

99

100

101

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

3-77

07

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/13(347)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

DORB

10

11

12

13

ORB

98

99

100

101

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS4

EVA SYSTEMS: 2.305 10.2 PSIA CAMPOUTMASK PREBREATHE Ref: EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD7 Steps Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

Page 130: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

FRICK POINDEXTER MELVIN

3-78

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/13(347)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

~

~

~

DORB

13

14

15

ORB

101

102

103

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-78

07

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/13(347)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

DORB

13

14

15

ORB

101

102

103

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 131: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

07

WALHEIM SCHLEGEL LOVE

3-79

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/13(347)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

~

~

~

DORB

13

14

15

ORB

101

102

103

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

3-79

07

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/13(347)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

DORB

13

14

15

ORB

101

102

103

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

NOTES

Page 132: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

FRICK POINDEXTER MELVIN

FD08 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES and WORLDMAP

3-80

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/13(347)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

~

~

~

DORB

15

16

1

2

ORB

103

104

105

106

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-80

08

FRICK POINDEXTER MELVIN

FD08 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES and WORLDMAP

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/13(347)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

DORB

15

16

1

2

ORB

103

104

105

106

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 133: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

WALHEIM SCHLEGEL LOVE

3-81

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/13(347)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

~

~

~

DORB

15

16

1

2

ORB

103

104

105

106

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

1.901 BIOLAB RPDA STOWAGE ITEMSINSTALLATION (ASSY PAYLOADS, BIOLAB)~

1.219 REMOVE ETC LOCKER LAUNCH SCREWS (ASSY PAYLOADS, EDR)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS4

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

3-81

08

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/13(347)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

DORB

15

16

1

2

ORB

103

104

105

106

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

1.901 BIOLAB RPDA STOWAGE ITEMSINSTALLATION (ASSY PAYLOADS, BIOLAB)~

1.219 REMOVE ETC LOCKER LAUNCH SCREWS (ASSY PAYLOADS, EDR)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS4

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

Page 134: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

FRICK POINDEXTER MELVINPOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-82

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/13(347)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

~

~ ~

~

DORB

2

3

4

ORB

106

107

108

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EXERCISE

IMU ALIGN - S TRK (ORB OPS, GNC)PRLA CLOSE (ORB OPS, PRLA)

PWR FILL (ORB OPS, ECLS) Perform Water Fill #7 Ref. MSG XXX

COLUMBUS CONFIG FOR EUTEF AND SOLAR INSTALLATION (ASSY PAYLOADS, COL EXT PAYLOADS) Steps 2.1 & 2.2~

PLT

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA INHIBIT PAD (EVA, TIMELINES)

IVA SUPPORT EVA3

~

IVA SUPPORT PREP

EXERCISE

MS1

ILLUMINATOR OPS (CUE CARD)ILLUM OFF - ALLL17 Check MCIU filter screen

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate BIOLAB to A2, Steps 1-5.9

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate BIOLAB to A2, Steps 5.10-end

~

ROBOTICS: 1.510 EVA3-SOLAR TRANSFER

~

UPLINKβ0 OnlyBox 22,23

NOTES

3-82

08

FRICK POINDEXTER MELVINPOST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/13(347)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

DORB

2

3

4

ORB

106

107

108

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

EXERCISE

IMU ALIGN - S TRK (ORB OPS, GNC)PRLA CLOSE (ORB OPS, PRLA)

PWR FILL (ORB OPS, ECLS) Perform Water Fill #7 Ref. MSG XXX

COLUMBUS CONFIG FOR EUTEF AND SOLAR INSTALLATION (ASSY PAYLOADS, COL EXT PAYLOADS) Steps 2.1 & 2.2~

PLT

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA INHIBIT PAD (EVA, TIMELINES)

IVA SUPPORT EVA3

~

IVA SUPPORT PREP

EXERCISE

MS1

ILLUMINATOR OPS (CUE CARD)ILLUM OFF - ALLL17 Check MCIU filter screen

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate BIOLAB to A2, Steps 1-5.9

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate BIOLAB to A2, Steps 5.10-end

~

ROBOTICS: 1.510 EVA3-SOLAR TRANSFER

~

NOTES

UPLINKβ0 OnlyBox 22,23

Page 135: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

WALHEIM SCHLEGEL LOVE

3-83

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/13(347)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

~

~ ~

~

DORB

2

3

4

ORB

106

107

108

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

SOLAR TRANSFER

~

MS3

GATHER BIOLAB EQUIPMENT

1.001 BIOLAB INSPECTION AFTER RACKRELOCATION (ASSY PAYLOADS, BIOLAB)

1.901 BIOLAB RPDA STOWAGE ITEMSINSTALLATION (ASSY PAYLOADS, BIOLAB)

~

1.103 BIOLAB TCUS LAUNCH FIXATIONSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB) Steps 1-4

1.104 BIOLAB TCU STOWAGEITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate BIOLAB to A2, Steps 1-5.9

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS) Relocate BIOLAB to A2, Steps 5.10-end

1.701 BIOLAB LAPTOP STOWAGE ITEMSINSTALLATION (ASSY PAYLOADS, BIOLAB)

MS4

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

SOLAR TRANSFER

~

NOTES

3-83

08

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/13(347)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

DORB

2

3

4

ORB

106

107

108

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

SOLAR TRANSFER

~

MS3

GATHER BIOLAB EQUIPMENT

1.001 BIOLAB INSPECTION AFTER RACKRELOCATION (ASSY PAYLOADS, BIOLAB)

1.901 BIOLAB RPDA STOWAGE ITEMSINSTALLATION (ASSY PAYLOADS, BIOLAB)

~

1.103 BIOLAB TCUS LAUNCH FIXATIONSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB) Steps 1-4

1.104 BIOLAB TCU STOWAGEITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS, ACT&C/O) Relocate BIOLAB to A2, Steps 1-5.9

1.207 COLUMBUS ISPR RACK RELOCATION (ASSY OPS) Relocate BIOLAB to A2, Steps 5.10-end

1.701 BIOLAB LAPTOP STOWAGE ITEMSINSTALLATION (ASSY PAYLOADS, BIOLAB)

MS4

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: CREWLOCK EGRESS (CC)EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

~

SOLAR TRANSFER

~

NOTES

Page 136: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

FRICK POINDEXTER MELVINCOLUMBUS CONFIG FOR EUTEF AND SOLAR INSTALLATION (ASSY PAYLOADS, COL EXT PAYLOADS) Steps 2.1 & 2.2

3-84

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/13(347)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

~ ~

~

DORB

5

6

7

ORB

109

110

111

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #10 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #11 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

COLUMBUS CONFIG FOR EUTEF AND SOLAR INSTALLATION (ASSY PAYLOADS, COL EXT PAYLOADS) Steps 4.1 and 4.2

MEAL

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES)Ops

~

P/TV07 EVA (PHOTO/TV, SCENES) Ops

ESA_SODF: EPDS: 2.310 PPSB MANUAL POWER SWITCHING Step 1.3 for PPSB Bus 1 (X=1), Outlets PL OZ 1 AND PL OX 1

~

PLT

IVA SUPPORT EVA3

~

~

MS1

ROBOTICS: 1.511 EVA3-CMG RETURN

ROBOTICS: 1.512 EVA3-EuTEF TRANSFER

~

ROBOTICS: 1.510 EVA3-SOLAR TRANSFER~

NOTES

3-84

08

FRICK POINDEXTER MELVINCOLUMBUS CONFIG FOR EUTEF AND SOLAR INSTALLATION (ASSY PAYLOADS, COL EXT PAYLOADS) Steps 2.1 & 2.2

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/13(347)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

DORB

5

6

7

ORB

109

110

111

STS ATT~

~

BIAS -XLV -ZVV

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #10 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #11 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

COLUMBUS CONFIG FOR EUTEF AND SOLAR INSTALLATION (ASSY PAYLOADS, COL EXT PAYLOADS) Steps 4.1 and 4.2

MEAL

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES) Ops

P/TV07 EVA (PHOTO/TV, SCENES)Ops

~

P/TV07 EVA (PHOTO/TV, SCENES) Ops

ESA_SODF: EPDS: 2.310 PPSB MANUAL POWER SWITCHING Step 1.3 for PPSB Bus 1 (X=1), Outlets PL OZ 1 AND PL OX 1

~

PLT

IVA SUPPORT EVA3

~

~

MS1

ROBOTICS: 1.511 EVA3-CMG RETURN

ROBOTICS: 1.512 EVA3-EuTEF TRANSFER

~

ROBOTICS: 1.510 EVA3-SOLAR TRANSFER~

NOTES

Page 137: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

WALHEIM SCHLEGEL LOVE

3-85

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/13(347)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

~ ~

~

DORB

5

6

7

ORB

109

110

111

~

~

BIAS -XLV -ZVV

STS ATT

MS2

CMG TRANSFER

EUTEF TRANSFER

CLEANUP AND INGRESS

~

SOLAR TRANSFER

~

MS3

1.502 BIOLAB INCUBATOR COMMISSIONINGITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.501 BIOLAB INCUBATOR LAUNCH FIXATIONSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB) Steps 1-3

1.501 BIOLAB INCUBATOR LAUNCH FIXATIONSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB) Steps 4-13

MEAL

MS4

CMG TRANSFER

EUTEF TRANSFER

CLEANUP AND INGRESS

~

SOLAR TRANSFER

~

NOTES

3-85

08

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/13(347)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

DORB

5

6

7

ORB

109

110

111

STS ATT~

~

BIAS -XLV -ZVV

MS2

CMG TRANSFER

EUTEF TRANSFER

CLEANUP AND INGRESS

~

SOLAR TRANSFER

~

MS3

1.502 BIOLAB INCUBATOR COMMISSIONINGITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.501 BIOLAB INCUBATOR LAUNCH FIXATIONSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB) Steps 1-3

1.501 BIOLAB INCUBATOR LAUNCH FIXATIONSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB) Steps 4-13

MEAL

MS4

CMG TRANSFER

EUTEF TRANSFER

CLEANUP AND INGRESS

~

SOLAR TRANSFER

~

NOTES

Page 138: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

FRICK POINDEXTER MELVIN

3-86

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/13(347)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

~ ~

~

DORB

7

8

9

10

ORB

111

112

113

114

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

P/TV07 EVA (PHOTO/TV, SCENES)Ops

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CWC TRANSFER Transfer 2 CWCs to ISS

CDM ACTIVATION (ORB OPS, CDM DT0)

IVA SUPPORT EVA3

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√ HUM SEP for H2O Accumulation

MS1

EXERCISE

ILLUMINATOR OPS (CUE CARD)ILLUM ON - A,DPRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBOTICS: 1.512 EVA3-EuTEF TRANSFER~

UPLINKβ21 OnlyBox 22,23

NOTES

3-86

08

FRICK POINDEXTER MELVIN

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/13(347)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

DORB

7

8

9

10

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV -ZVV

CDR

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

P/TV07 EVA (PHOTO/TV, SCENES)Ops

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CWC TRANSFER Transfer 2 CWCs to ISS

CDM ACTIVATION (ORB OPS, CDM DT0)

IVA SUPPORT EVA3

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√ HUM SEP for H2O Accumulation

MS1

EXERCISE

ILLUMINATOR OPS (CUE CARD)ILLUM ON - A,DPRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

ROBOTICS: 1.512 EVA3-EuTEF TRANSFER~

NOTES

UPLINKβ21 OnlyBox 22,23

Page 139: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

WALHEIM SCHLEGEL LOVE

3-87

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/13(347)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

~ ~

~

DORB

7

8

9

10

ORB

111

112

113

114

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

~

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

~

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOTES

3-87

08

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/13(347)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

DORB

7

8

9

10

ORB

111

112

113

114

STS ATT~

~

BIAS -XLV -ZVV

MS2

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

~

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS3

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS4

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

CLEANUP AND INGRESS

~

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX Steps 37 & 67 not req'd

Ref: STS-122 CONSUMABLES TRACKING CC (EVA)

Ref: POST EVA GLOVE PHOTOS (EVA, MAINT/RCHRG)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOTES

Page 140: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

FRICK POINDEXTER MELVIN

3-88

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/14(348)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

~ ~

~

DORB

10

11

12

ORB

114

115

116

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

3-88

08

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/14(348)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

DORB

10

11

12

ORB

114

115

116

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

Page 141: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

WALHEIM SCHLEGEL LOVE

3-89

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/14(348)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

~ ~

~

DORB

10

11

12

ORB

114

115

116

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

3-89

08

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/14(348)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

DORB

10

11

12

ORB

114

115

116

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

Page 142: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

FRICK POINDEXTER MELVIN

3-90

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/14(348)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

~ ~

~

DORB

13

14

15

ORB

117

118

119

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

3-90

08

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/14(348)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

DORB

13

14

15

ORB

117

118

119

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

Page 143: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

08

WALHEIM SCHLEGEL LOVE

3-91

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/14(348)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

~ ~

~

DORB

13

14

15

ORB

117

118

119

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

3-91

08

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/14(348)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

DORB

13

14

15

ORB

117

118

119

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

Page 144: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

FRICK POINDEXTER MELVIN

FD09 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES & WORLDMAP

3-92

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/14(348)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

DORB

15

1

2

3

ORB

119

120

121

122

~

BIAS -XLV -ZVV

~

REBOOST

STS ATT

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITERMNVR (TRK) REBOOST ATTITUDETG=2 BV=5 P=175 Y=0 OM=172A12/AUTO/VERN Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS) Perform Water Fill #8 Ref. MSG XXX

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

MS1

ILLUMINATOR OPS (CUE CARD)ILLUM OFF - ALLL17 Check MCIU filter screen

P/TV09 STRUCTURAL DYNAMICS (PHOTO/TV, SCENES) Reboost Ops

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

NOTES

3-92

09

FRICK POINDEXTER MELVIN

FD09 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES & WORLDMAP

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/14(348)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

DORB

15

1

2

3

ORB

119

120

121

122

STS ATT~

BIAS -XLV -ZVV

~

REBOOST

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITERMNVR (TRK) REBOOST ATTITUDETG=2 BV=5 P=175 Y=0 OM=172A12/AUTO/VERN Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PWR FILL (ORB OPS, ECLS) Perform Water Fill #8 Ref. MSG XXX

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

MS1

ILLUMINATOR OPS (CUE CARD)ILLUM OFF - ALLL17 Check MCIU filter screen

P/TV09 STRUCTURAL DYNAMICS (PHOTO/TV, SCENES) Reboost Ops

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DAILY TRANSFER LIST UPDATE Ref. MSG XXX

NOTES

Page 145: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

WALHEIM SCHLEGEL LOVE

3-93

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/14(348)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

DORB

15

1

2

3

ORB

119

120

121

122

~

BIAS -XLV -ZVV

~

REBOOST

STS ATT

MS2

EVA CREW: TAKE 1 ASPIRIN (325mg)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD9 - EVA 3 Deconfig Steps

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

MS3

1.401 BIOLAB HANDLING MECHANISM LAUNCH FIXATIONS DISENGAGEMENT (ASSY PAYLOADS, BIOLAB)

1.402 BIOLAB HANDLING MECHANISM STOWAGE ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB) ~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

MS4

EVA CREW: TAKE 1 ASPIRIN (325mg)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD9 - EVA 3 Deconfig Steps

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)

LIQUID SLVA SAMPLE(ORB OPS,SDBI)

NOTES

3-93

09

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/14(348)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

DORB

15

1

2

3

ORB

119

120

121

122

STS ATT~

BIAS -XLV -ZVV

~

REBOOST

MS2

EVA CREW: TAKE 1 ASPIRIN (325mg)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD9 - EVA 3 Deconfig Steps

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

MS3

1.401 BIOLAB HANDLING MECHANISM LAUNCH FIXATIONS DISENGAGEMENT (ASSY PAYLOADS, BIOLAB)

1.402 BIOLAB HANDLING MECHANISM STOWAGE ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB) ~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

MS4

EVA CREW: TAKE 1 ASPIRIN (325mg)

EVA TOOLS MANAGEMENT (EVA, TOOLS AND STOWAGE) Perform FD9 - EVA 3 Deconfig Steps

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)

LIQUID SLVA SAMPLE(ORB OPS,SDBI)

NOTES

Page 146: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

3-94

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/14(348)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

~

~

~

~

DORB

3

4

5

ORB

122

123

124

~

~

BIAS -XLV -ZVV

STS ATT

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

CREW CONFERENCE

CREW PHOTO

IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) BIAS -XLV -ZVVTG=2 BV=5 P=161 Y=355 OM=184A12/AUTO/VERN Init TRK

N2 REPRESS USING PAYLOAD N2 VLVS A

N2 REPRESS USING PAYLOAD N2 VLVS B

PWR FILL (ORB OPS, ECLS) Perform Water Fill #9 Ref. MSG XXX

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

JOINT OPS: 2.108 SHUTTLE AIRLOCK/TUNNELFAN DEACTIVATION (BYPASS DUCT INSTALLED) Steps 3-9, Inform MCC when completeTRANSFER OPSRef. Transfer List & MSG XXX

PLT

CREW CONFERENCE

CREW PHOTO

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #12 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 1 CWCs to ISS

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

MS1

CREW CONFERENCE

CREW PHOTO

P/TV08 EXTERNAL SURVEY (PHOTO/TV, SCENES) Ops

P/TV09 STRUCTURAL DYNAMICS (PHOTO/TV, SCENES) Reboost Ops

~

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

NOTES

3-94

09

FRICK POINDEXTER MELVIN

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) Steps 1-5, On MCC Go, perform step 6 MCC will TMBU all S/W limits

A

N2 REPRESS USING PAYLOAD N2 VLVS (ORB OPS, ECLS) On MCC Go, perform steps 7-12 MCC will TMBU all S/W limits

B

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/14(348)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

DORB

3

4

5

ORB

122

123

124

STS ATT~

~

BIAS -XLV -ZVV

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

CREW CONFERENCE

CREW PHOTO

IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) BIAS -XLV -ZVVTG=2 BV=5 P=161 Y=355 OM=184A12/AUTO/VERN Init TRK

N2 REPRESS USING PAYLOAD N2 VLVS A

N2 REPRESS USING PAYLOAD N2 VLVS B

PWR FILL (ORB OPS, ECLS) Perform Water Fill #9 Ref. MSG XXX

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

JOINT OPS: 2.108 SHUTTLE AIRLOCK/TUNNELFAN DEACTIVATION (BYPASS DUCT INSTALLED) Steps 3-9, Inform MCC when completeTRANSFER OPSRef. Transfer List & MSG XXX

PLT

CREW CONFERENCE

CREW PHOTO

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #12 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 1 CWCs to ISS

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Setup

AUTO REBOOST (ORB OPS, REBOOST/DAP) CONFIG 3

~

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

MS1

CREW CONFERENCE

CREW PHOTO

P/TV08 EXTERNAL SURVEY (PHOTO/TV, SCENES) Ops

P/TV09 STRUCTURAL DYNAMICS (PHOTO/TV, SCENES) Reboost Ops

~

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER OPSRef. Transfer List & MSG XXX

NOTES

Page 147: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

WALHEIM SCHLEGEL LOVE1.402 BIOLAB HANDLING MECHANISM STOWAGE ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.216 BIOLAB UMBILICAL MATE (ASSY PAYLOADS, BIOLAB)

3-95

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/14(348)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

~

~

~

~

DORB

3

4

5

ORB

122

123

124

~

~

BIAS -XLV -ZVV

STS ATT

MS2

CREW CONFERENCE

CREW PHOTO

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

MS3

1.601 BIOLAB ANALYSIS INSTRUMENTS CMSSNITEMS INSTALL (ASSY PAYLOADS, BIOLAB)

1.202 BIOLAB AUTOMATIC TEMPERATURE CONTROLLEDSTOWAGE COMMISSIONING ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.201 BIOLAB AUTOMATIC TEMPERATURE CONTROLLED STOWAGE ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.403 BIOLAB HANDLING MECHANISM CMSSNINGITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

~

CREW CONFERENCE

CREW PHOTO

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CREW CONFERENCE

CREW PHOTO

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

DRY SALIVA CLCT(ORB OPS,SDBI)

NOTES

3-95

09

WALHEIM SCHLEGEL LOVE1.402 BIOLAB HANDLING MECHANISM STOWAGE ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.216 BIOLAB UMBILICAL MATE (ASSY PAYLOADS, BIOLAB)

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/14(348)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

DORB

3

4

5

ORB

122

123

124

STS ATT~

~

BIAS -XLV -ZVV

MS2

CREW CONFERENCE

CREW PHOTO

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

MS3

1.601 BIOLAB ANALYSIS INSTRUMENTS CMSSNITEMS INSTALL (ASSY PAYLOADS, BIOLAB)

1.202 BIOLAB AUTOMATIC TEMPERATURE CONTROLLEDSTOWAGE COMMISSIONING ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.201 BIOLAB AUTOMATIC TEMPERATURE CONTROLLED STOWAGE ITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

1.403 BIOLAB HANDLING MECHANISM CMSSNINGITEMS INSTALLATION (ASSY PAYLOADS, BIOLAB)

~

CREW CONFERENCE

CREW PHOTO

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CREW CONFERENCE

CREW PHOTO

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Do not perform EVA UNPACK AND STOW steps

~

DRY SALIVA CLCT(ORB OPS,SDBI)

NOTES

Page 148: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

FRICK POINDEXTER MELVIN

3-96

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/14(348)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

DORB

5

6

7

8

ORB

124

125

126

127

~

~

BIAS -XLV -ZVV

STS ATT

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITER

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #13 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 1 CWC to ISS

EXERCISE

FAREWELL

MEAL

JOINT OPS: 3.118 OXYGEN TRANSFER TEARDOWN Steps 1-6

PLT

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 5

FAREWELL

MEAL

P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) Setup

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Perform DEACTIVATION,Step 2

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

TRANSFER OPSRef. Transfer List & MSG XXX

MS1

FAREWELL

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 2, BLOOD DRAW

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 2, BLOOD DRAW

US_PODF: HRF INT IMM: 2.011 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 1, BLOOD SETUP

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTION Perform Step 3,STOW

MEAL

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

TRANSFER BRIEF Call down status to MCC

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

3-96

09

FRICK POINDEXTER MELVIN

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/14(348)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

DORB

5

6

7

8

ORB

124

125

126

127

STS ATT~

~

BIAS -XLV -ZVV

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITER

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)INIT FILL #13 Ref. MSG XXX

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATIONCWC TRANSFER Transfer 1 CWC to ISS

EXERCISE

FAREWELL

MEAL

JOINT OPS: 3.118 OXYGEN TRANSFER TEARDOWN Steps 1-6

PLT

CDM SETUP AND BATTERY CHANGEOUT (ORB OPS, CDM DT0) Location 5

FAREWELL

MEAL

P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) Setup

P/TV05 ISS INTERNAL OPS (PHOTO/TV, SCENES) Perform DEACTIVATION,Step 2

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

TRANSFER OPSRef. Transfer List & MSG XXX

MS1

FAREWELL

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 2, BLOOD DRAW

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 2, BLOOD DRAW

US_PODF: HRF INT IMM: 2.011 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 1, BLOOD SETUP

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTION Perform Step 3,STOW

MEAL

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

TRANSFER BRIEF Call down status to MCC

TRANSFER TAGUP Coordinate with xfer counterpart

NOTES

Page 149: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

WALHEIM SCHLEGEL LOVE

3-97

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/14(348)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

~ ~

~ ~

DORB

5

6

7

8

ORB

124

125

126

127

~

~

BIAS -XLV -ZVV

STS ATT

MS2

FAREWELL

MEAL

TRANSFER OPSRef. Transfer List & MSG XXX

MS3

1.301 BIOLAB GLOVEBOX LAUNCH BRACKETSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB)

EXERCISE

FAREWELL

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

MEAL

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

EXERCISE

FAREWELL

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

MEAL

DRY SALIVA CLCT(ORB OPS,SDBI)

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER TAGUP Coordinate with xfer counterpart

DISABLE WLES FILE BACKUP(ORB OPS, WLES)

NOTES

3-97

09

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/14(348)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

DORB

5

6

7

8

ORB

124

125

126

127

STS ATT~

~

BIAS -XLV -ZVV

MS2

FAREWELL

MEAL

TRANSFER OPSRef. Transfer List & MSG XXX

MS3

1.301 BIOLAB GLOVEBOX LAUNCH BRACKETSDISENGAGEMENT (ASSY PAYLOADS, BIOLAB)

EXERCISE

FAREWELL

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

MEAL

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

EXERCISE

FAREWELL

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

MEAL

DRY SALIVA CLCT(ORB OPS,SDBI)

TRANSFER OPSRef. Transfer List & MSG XXX

TRANSFER TAGUP Coordinate with xfer counterpart

DISABLE WLES FILE BACKUP(ORB OPS, WLES)

NOTES

Page 150: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

FRICK POINDEXTER MELVIN

PCS ACTIVATIONMO10W 14.7 CAB REG INLET SYS 1 VLV - OPAvoid WCS use during high N2 flowExpect possible "S66 CAB N2(O2) FLO 1" msgs

A

3-98

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/14(348)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

~

~ ~

~

DORB

8

9

10

ORB

127

128

129

~

~

BIAS -XLV -ZVV

STS ATT

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

NOMINAL H2O CONFIG (ORB OPS, ECLS) FES PRI A Req'd

PCS ACTIVATION A

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

EXERCISE

P/TV03 UNDOCK (PHOTO/TV, SCENES) Setup

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOTES

3-98

09

FRICK POINDEXTER MELVIN

PCS ACTIVATIONMO10W 14.7 CAB REG INLET SYS 1 VLV - OPAvoid WCS use during high N2 flowExpect possible "S66 CAB N2(O2) FLO 1" msgs

A

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/14(348)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

DORB

8

9

10

ORB

127

128

129

STS ATT~

~

BIAS -XLV -ZVV

CDR

JOINT OPS: 3.111 HANDOVER ATTITUDECONTROL ORBITER to CMGTA

NOMINAL H2O CONFIG (ORB OPS, ECLS) FES PRI A Req'd

PCS ACTIVATION A

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PLT

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

MS1

EXERCISE

P/TV03 UNDOCK (PHOTO/TV, SCENES) Setup

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

NOTES

Page 151: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

WALHEIM SCHLEGEL LOVE

3-99

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/14(348)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

~

~ ~

~

DORB

8

9

10

ORB

127

128

129

~

~

BIAS -XLV -ZVV

STS ATT

MS2

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR) Perform step 1 only

MS3

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

LBP-MUSCLE QSTION(ASSY PL, QSTION)

JOINT OPS: 4.104 ODS VEST/PMADPRS & HATCH LEAK CHECK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

JOINT OPS: 4.104 ODS VEST/PMADPRS & HATCH LEAK CHECK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

NOTES

3-99

09

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/14(348)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

DORB

8

9

10

ORB

127

128

129

STS ATT~

~

BIAS -XLV -ZVV

MS2

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

C/L CAMR INSTALL (PHOTO/TV, C/L CAMR) Perform step 1 only

MS3

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

LBP-MUSCLE QSTION(ASSY PL, QSTION)

JOINT OPS: 4.104 ODS VEST/PMADPRS & HATCH LEAK CHECK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

JOINT OPS: 4.103 DUCT REMOVAL &HATCH CLOSE (BYPASS CONFIG)

~

JOINT OPS: 4.104 ODS VEST/PMADPRS & HATCH LEAK CHECK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

NOTES

Page 152: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

FRICK POINDEXTER MELVIN

3-100

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/15(349)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

11

12

13

ORB

130

131

132

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

3-100

09

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/15(349)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

DORB

11

12

13

ORB

130

131

132

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

Page 153: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

WALHEIM SCHLEGEL LOVE

3-101

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/15(349)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

11

12

13

ORB

130

131

132

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

3-101

09

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/15(349)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

DORB

11

12

13

ORB

130

131

132

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

Page 154: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

FRICK POINDEXTER MELVIN

3-102

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/15(349)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

13

14

15

16

ORB

132

133

134

135

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

3-102

09

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/15(349)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

DORB

13

14

15

16

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV -ZVV

CDR

SLEEP

~

PLT

SLEEP

~

MS1

SLEEP

~

NOTES

Page 155: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

09

WALHEIM SCHLEGEL LOVE

3-103

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/15(349)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

13

14

15

16

ORB

132

133

134

135

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

3-103

09

WALHEIM SCHLEGEL LOVE

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/15(349)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

DORB

13

14

15

16

ORB

132

133

134

135

STS ATT~

~

BIAS -XLV -ZVV

MS2

SLEEP

~

MS3

SLEEP

~

MS4

SLEEP

~

NOTES

Page 156: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

FRICK POINDEXTER MELVIN

FD10 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES & WORLDMAP

< UNDOCK 08/15:50

O6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 & 6(Triple G2)

O6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 & 6(Triple G2)

3-104

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/15(349)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

16

1

2

ORB

135

136

137

~

BIAS -XLV -ZVV

~

STS ATT

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITERMNVR (TRK) UNDOCK ATTITUDE TG=2 BV=5 P=180 Y=0 OM=0 A12/AUTO/VERN (8/14:41) Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

PLT

IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) UNDOCK ATTITUDE TG=2 BV=5 P=180 Y=0 OM=0 A12/AUTO/VERN (8/14:41) Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SSV OUTRATE - 3

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

TFL 192

NOTES

3-104

10

FRICK POINDEXTER MELVIN

FD10 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES & WORLDMAP

< UNDOCK 08/15:50

O6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 & 6(Triple G2)

O6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 & 6(Triple G2)

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/15(349)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

DORB

16

1

2

ORB

135

136

137

STS ATT~

BIAS -XLV -ZVV

~

CDR

JOINT OPS: 3.110 HANDOVER ATTITUDECONTROL CMG TA to ORBITERMNVR (TRK) UNDOCK ATTITUDE TG=2 BV=5 P=180 Y=0 OM=0 A12/AUTO/VERN (8/14:41) Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

PLT

IMU ALIGN - S TRK (ORB OPS, GNC)

MNVR (TRK) UNDOCK ATTITUDE TG=2 BV=5 P=180 Y=0 OM=0 A12/AUTO/VERN (8/14:41) Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SSV OUTRATE - 3

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

NOTES

TFL 192

Page 157: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

WALHEIM SCHLEGEL LOVE TANI

3-105

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/15(349)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

16

1

2

ORB

135

136

137

~

BIAS -XLV -ZVV

~

STS ATT

MS2

JOINT OPS: 6.104 HARDLINEAUDIO CONFIG (ISS) BACKOUT Steps 1,3,4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

FE-2 (DN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

P/TV03 UNDOCK (PHOTO/TV, SCENES) OPS

~

NOTES

3-105

10

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/15(349)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

DORB

16

1

2

ORB

135

136

137

STS ATT~

BIAS -XLV -ZVV

~

MS2

JOINT OPS: 6.104 HARDLINEAUDIO CONFIG (ISS) BACKOUT Steps 1,3,4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

FE-2 (DN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

P/TV03 UNDOCK (PHOTO/TV, SCENES) OPS

~

NOTES

Page 158: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

FRICK POINDEXTER MELVIN

HEATER RECONFIG-CONFIG B (ORB OPS, EPS)CABIN TEMP CONTROLLER RECONFIG 2(1) (ORB OPS, ECLS)

3-106

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/15(349)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

3

4

5

ORB

138

139

140

~

UNDOCK/FLYAROUND/SEP

-ZLV +YVV

~

STS ATT

CDR

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

MNVR (TRK) BIAS -ZLV +YVV TG=2 BV=3 OM=270 A6/AUTO/ALT Init TRK

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS MNVR TO FLAT FIELD POSITION (PDRS, OBSS NOMINAL)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

PLT

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12

L17 Check MCIU filter screen

MEAL

MNVR (TRK) BIAS +YSI (STBD Survey) TG=4 BV=5 P=0 Y=40 OM=333 A14/AUTO/VERN Init TRK

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS1

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

P/TV03 UNDOCK (PHOTO/TV, SCENES) Deactivation

OBSS MNVR TO FLAT FIELD POSITION (PDRS, OBSS NOMINAL)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

JOINT OPS: 6.106 SSOR DEACTIVATION

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

UPLINKβ21 OnlyBox 90

UPLINKβ21 + Mask

NOTES

3-106

10

FRICK POINDEXTER MELVIN

HEATER RECONFIG-CONFIG B (ORB OPS, EPS)CABIN TEMP CONTROLLER RECONFIG 2(1) (ORB OPS, ECLS)

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/15(349)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

DORB

3

4

5

ORB

138

139

140

STS ATT~

UNDOCK/FLYAROUND/SEP

-ZLV +YVV

~

CDR

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

MNVR (TRK) BIAS -ZLV +YVV TG=2 BV=3 OM=270 A6/AUTO/ALT Init TRK

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS MNVR TO FLAT FIELD POSITION (PDRS, OBSS NOMINAL)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Initiate Supply/Waste Dump

SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) Terminate Supply/Waste Dump

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

PLT

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12

L17 Check MCIU filter screen

MEAL

MNVR (TRK) BIAS +YSI (STBD Survey) TG=4 BV=5 P=0 Y=40 OM=333 A14/AUTO/VERN Init TRK

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS1

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

P/TV03 UNDOCK (PHOTO/TV, SCENES) Deactivation

OBSS MNVR TO FLAT FIELD POSITION (PDRS, OBSS NOMINAL)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

JOINT OPS: 6.106 SSOR DEACTIVATION

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

NOTES

UPLINKβ21 OnlyBox 90

UPLINKβ21 + Mask

Page 159: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

WALHEIM SCHLEGEL LOVE TANI

SSP1 OIU PWR - OFF (tb-bp) Expect S62 BCE BYP PSP 1

3-107

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/15(349)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

~

~

~

DORB

3

4

5

ORB

138

139

140

~

UNDOCK/FLYAROUND/SEP

-ZLV +YVV

~

STS ATT

MS2

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12

MEAL

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

SSV OUTRATE - 4

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS3

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) Undocking Video KU TDRE (17:47-18:02)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS4

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

POST UNDOCK PGSC CONFIG Configure PGSCs per Usage Chart

OBSS MNVR TO FLAT FIELD POSITION (PDRS, OBSS NOMINAL)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

ENABLE WLES FILE BACKUP(ORB OPS, WLES)

FE-2 (DN)

P/TV03 UNDOCK (PHOTO/TV, SCENES) OPS

~

MEAL

TFL 188

NOTES

3-107

10

WALHEIM SCHLEGEL LOVE TANI

SSP1 OIU PWR - OFF (tb-bp) Expect S62 BCE BYP PSP 1

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/15(349)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

DORB

3

4

5

ORB

138

139

140

STS ATT~

UNDOCK/FLYAROUND/SEP

-ZLV +YVV

~

MS2

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6(Single G2),9,10 & 12

MEAL

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

SSV OUTRATE - 4

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS3

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) Undocking Video KU TDRE (17:47-18:02)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

MS4

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN

FLYAROUND (RNDZ, UNDOCK/SEP T/L)

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

POST UNDOCK PGSC CONFIG Configure PGSCs per Usage Chart

OBSS MNVR TO FLAT FIELD POSITION (PDRS, OBSS NOMINAL)

SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L)

UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L)

~

ENABLE WLES FILE BACKUP(ORB OPS, WLES)

FE-2 (DN)

P/TV03 UNDOCK (PHOTO/TV, SCENES) OPS

~

MEAL

NOTES

TFL 188

Page 160: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

FRICK POINDEXTER MELVIN

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

3-108

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/15(349)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

~

~ ~

~

DORB

5

6

7

8

ORB

140

141

142

143

~

STBD SURVEY

NOSE SURVEY

~

PORT SURVEY

STS ATT

CDR

MNVR (TRK) BIAS +XSI (Nose Cap Survey) TG=4 BV=5 P=330 Y=0 OM=166 A14/AUTO/VERN Init TRK

In step 3 of OBSS/LDRI RCC SURVEY-POSTMNVR (TRK) BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=334 OM=165 A14/AUTO/VERN Init TRK

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

PLT

EXERCISE

MS1

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

NOTES

3-108

10

FRICK POINDEXTER MELVIN

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/15(349)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

DORB

5

6

7

8

ORB

140

141

142

143

STS ATT~

STBD SURVEY

NOSE SURVEY

~

PORT SURVEY

CDR

MNVR (TRK) BIAS +XSI (Nose Cap Survey) TG=4 BV=5 P=330 Y=0 OM=166 A14/AUTO/VERN Init TRK

In step 3 of OBSS/LDRI RCC SURVEY-POSTMNVR (TRK) BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=334 OM=165 A14/AUTO/VERN Init TRK

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

PLT

EXERCISE

MS1

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

NOTES

Page 161: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

WALHEIM SCHLEGEL LOVE TANI

POST ISS EVA ENT PREP (EVA, POST EVA ENT PREP)

POST ISS EVA ENT PREP (EVA, POST EVA ENT PREP)

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

3-109

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/15(349)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

~

~ ~

~

DORB

5

6

7

8

ORB

140

141

142

143

~

STBD SURVEY

NOSE SURVEY

~

PORT SURVEY

STS ATT

MS2

EXERCISE

MS3

EXERCISE

OBSS LDRI/IDC RCC SURVEY - NOSECAP (PDRS, OBSS OPERATIONS)

MS4

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

FE-2 (DN)

EXERCISE

NOTES

3-109

10

WALHEIM SCHLEGEL LOVE TANI

POST ISS EVA ENT PREP (EVA, POST EVA ENT PREP)

POST ISS EVA ENT PREP (EVA, POST EVA ENT PREP)

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

POST EVA EMU RECONFIGURATIONAND TRANSFER (EVA, AIRLOCK CONFIG) Perform EVA UNPACK AND STOW

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/15(349)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

DORB

5

6

7

8

ORB

140

141

142

143

STS ATT~

STBD SURVEY

NOSE SURVEY

~

PORT SURVEY

MS2

EXERCISE

MS3

EXERCISE

OBSS LDRI/IDC RCC SURVEY - NOSECAP (PDRS, OBSS OPERATIONS)

MS4

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

FE-2 (DN)

EXERCISE

NOTES

Page 162: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

FRICK POINDEXTER MELVIN

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-110

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/15(349)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

~

~

~

~

DORB

8

9

10

ORB

143

144

145

~

~

-ZLV -XVV

STS ATT

CDR

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A14/AUTO/ALT Init TRK

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

SLEEP

~

MS1

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN)

SLEEP

~

NOTES

3-110

10

FRICK POINDEXTER MELVIN

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/15(349)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

DORB

8

9

10

ORB

143

144

145

STS ATT~

~

-ZLV -XVV

CDR

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A14/AUTO/ALT Init TRK

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

CDM ACTIVATION (ORB OPS, CDM DT0)

PLAYBACK (DIGITAL) (PHOTO/TV, CUE CARD) LDRI SURVEYS

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

SLEEP

~

MS1

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN)

SLEEP

~

NOTES

Page 163: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

WALHEIM SCHLEGEL LOVE TANIOBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

3-111

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/15(349)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

~

~

~

~

DORB

8

9

10

ORB

143

144

145

~

~

-ZLV -XVV

STS ATT

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

LBP-MUSCLE QSTION(ASSY PL, QSTION)PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN)

SLEEP

~

FE-2 (DN)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

3-111

10

WALHEIM SCHLEGEL LOVE TANIOBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/15(349)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

DORB

8

9

10

ORB

143

144

145

STS ATT~

~

-ZLV -XVV

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

LBP-MUSCLE QSTION(ASSY PL, QSTION)PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS4

OBSS BERTH (PDRS, OBSS OPERATIONS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

RMS PWRDN (PDRS, RMS PWRDN)

SLEEP

~

FE-2 (DN)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

Page 164: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

FRICK POINDEXTER MELVIN

3-112

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/16(350)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

~

~ ~

~

DORB

10

11

12

13

ORB

146

147

148

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-112

10

FRICK POINDEXTER MELVIN

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/16(350)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

DORB

10

11

12

13

ORB

146

147

148

STS ATT~

~

-ZLV -XVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 165: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

WALHEIM SCHLEGEL LOVE TANI

3-113

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/16(350)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

~

~ ~

~

DORB

10

11

12

13

ORB

146

147

148

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (DN)

SLEEP

~

~

NOTES

3-113

10

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/16(350)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

DORB

10

11

12

13

ORB

146

147

148

STS ATT~

~

-ZLV -XVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (DN)

SLEEP

~

~

NOTES

Page 166: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

FRICK POINDEXTER MELVIN

3-114

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/16(350)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

DORB

13

14

15

1

ORB

148

149

150

~

~

-ZLV -XVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-114

10

FRICK POINDEXTER MELVIN

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/16(350)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

DORB

13

14

15

1

ORB

148

149

150

STS ATT~

~

-ZLV -XVV

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

CDM DEACTIVATION (ORB OPS, CDM DT0)POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 167: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

10

WALHEIM SCHLEGEL LOVE TANI

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

3-115

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/16(350)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

DORB

13

14

15

1

ORB

148

149

150

~

~

-ZLV -XVV

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

FE-2 (DN)

SLEEP

~

LIQUID SLVA SAMPLE(ORB OPS,SDBI)US_PODF: HRF INT IMM: 2.002 SALIVACLCT FOR INTEGRATED IMMUNE Step 3

~

NOTES

3-115

10

WALHEIM SCHLEGEL LOVE TANI

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/16(350)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

DORB

13

14

15

1

ORB

148

149

150

STS ATT~

~

-ZLV -XVV

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

FLIGHT SLEEP LOG (ORB OPS, SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)LIQUID SLVA SAMPLE(ORB OPS,SDBI)

SLEEP

~

FE-2 (DN)

SLEEP

~

LIQUID SLVA SAMPLE(ORB OPS,SDBI)US_PODF: HRF INT IMM: 2.002 SALIVACLCT FOR INTEGRATED IMMUNE Step 3

~

NOTES

Page 168: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

FRICK POINDEXTER MELVIN

FD11 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES & WORLDMAP

FD11 CABIN STOW ACTIVITIES: Remove loose items stored in A/L Perform SEAT INSTALLATION Perform FLIGHTS WITH RETENTION NET (REF DATA, ENTRY STOW)

W/B STEAM VENT HTR ACTR2 √BLR CNTLR/HTR(three) -B PWR (three) -ON

3-116

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/16(350)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

~

~

~

~

DORB

1

2

3

ORB

151

152

153

~

-ZLV -XVV

~

STS ATT

CDR

CABIN CONFIG/STOW

FCS CHECKOUT (ORB OPS, GNC)

~

IMU ALIGN - S TRK (ORB OPS, GNC)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

CABIN CONFIG/STOW

CDM COMPLETION (ORB OPS, CDM DTO)

FCS CHECKOUT (ORB OPS, GNC)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 2, BLOOD DRAW (OPR)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI) Perform SETUP FOR BLOOD SAMPLE CLCT

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI)Perform STOW HARDWARE

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE COLLECTION (OPR)

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE COLLECTION (OPR)

TFL 161

NOTES

3-116

11

FRICK POINDEXTER MELVIN

FD11 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES & WORLDMAP

FD11 CABIN STOW ACTIVITIES: Remove loose items stored in A/L Perform SEAT INSTALLATION Perform FLIGHTS WITH RETENTION NET (REF DATA, ENTRY STOW)

W/B STEAM VENT HTR ACTR2 √BLR CNTLR/HTR(three) -B PWR (three) -ON

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/16(350)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

DORB

1

2

3

ORB

151

152

153

STS ATT~

-ZLV -XVV

~

CDR

CABIN CONFIG/STOW

FCS CHECKOUT (ORB OPS, GNC)

~

IMU ALIGN - S TRK (ORB OPS, GNC)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PLT

CABIN CONFIG/STOW

CDM COMPLETION (ORB OPS, CDM DTO)

FCS CHECKOUT (ORB OPS, GNC)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

US_PODF: HRF INT IMM: 2.001 INTEGRATEDIMMUNE BLOOD COLLECTIONPerform Step 2, BLOOD DRAW (OPR)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI) Perform SETUP FOR BLOOD SAMPLE CLCT

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI)Perform STOW HARDWARE

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE COLLECTION (OPR)

SDBI 1900, INTEGRATED IMMUNE BLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE COLLECTION (OPR)

NOTES

TFL 161

Page 169: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

WALHEIM SCHLEGEL LOVE TANI

3-117

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/16(350)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

~

~

~

~

DORB

1

2

3

ORB

151

152

153

~

-ZLV -XVV

~

STS ATT

MS2

EXERCISE

FCS CHECKOUT (ORB OPS, GNC)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

CABIN CONFIG/STOW

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SDBI 1900, INTEGRATED IMMUNEBLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE CLCT (SUBJ)

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CABIN CONFIG/STOW

~

FILTER CLEANING (IFM,SCHEDULED MAINTENANCE)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SDBI 1900, INTEGRATED IMMUNEBLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE CLCT (SUBJ)

DRY SALIVA CLCT(ORB OPS,SDBI)

FE-2 (DN)

CABIN CONFIG/STOW

EXERCISE

~

US_PODF: HRF INT IMM: 2.001INTEGRATED IMMUNE BLOODCOLLECTIONPerform Step 2, BLOOD DRAW (SUBJ)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

3-117

11

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/16(350)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

DORB

1

2

3

ORB

151

152

153

STS ATT~

-ZLV -XVV

~

MS2

EXERCISE

FCS CHECKOUT (ORB OPS, GNC)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS3

CABIN CONFIG/STOW

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SDBI 1900, INTEGRATED IMMUNEBLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE CLCT (SUBJ)

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CABIN CONFIG/STOW

~

FILTER CLEANING (IFM,SCHEDULED MAINTENANCE)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SDBI 1900, INTEGRATED IMMUNEBLOOD CLCT (ORB OPS, SDBI) Perform BLOOD SAMPLE CLCT (SUBJ)

DRY SALIVA CLCT(ORB OPS,SDBI)

FE-2 (DN)

CABIN CONFIG/STOW

EXERCISE

~

US_PODF: HRF INT IMM: 2.001INTEGRATED IMMUNE BLOODCOLLECTIONPerform Step 2, BLOOD DRAW (SUBJ)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

Page 170: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

FRICK POINDEXTER MELVIN

3-118

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/16(350)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

DORB

3

4

5

6

ORB

153

154

155

156

~

-ZLV -XVV

-ZLV -XVV

~

STS ATT

CDR

CABIN CONFIG/STOW

CWC OVERBOARD DUMP (ORB OPS, ECLS) Initiate Dump

DEORBIT BRIEFING

FCS CHECKOUT (ORB OPS, GNC)

~

MEAL

~

MNVR (TRK) -ZLV -YVV (Water Dump)TG=2 BV=3 OM=70A6/AUTO/ALT Init TRK

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

PILOT WITH RHC (ORB OPS, PGSC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PLT

DEORBIT BRIEFING

ENTRY VIDEO SETUP (PHOTO/TV, MINI-CAM)

EXERCISE

~

FCS CHECKOUT (ORB OPS, GNC)

~

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

PILOT WITH RHC (ORB OPS, PGSC)

RCS HOT FIRE TEST (ORB OPS, RCS)

MS1

CABIN CONFIG/STOW

CABIN CONFIG/STOW

CABIN CONFIG/STOW

DEORBIT BRIEFING

EXERCISE

LANDING-1 COMM C/O (ORB OPS, COMM/INST) MLA AOS: 19:31:23 LOS: 19:37:25

MEAL

~

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

ANALOG PAO CC (PHOTO/TV, SONY PD100)

TFL 188

NOTES

3-118

11

FRICK POINDEXTER MELVIN

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/16(350)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

DORB

3

4

5

6

ORB

153

154

155

156

STS ATT~

-ZLV -XVV

-ZLV -XVV

~

CDR

CABIN CONFIG/STOW

CWC OVERBOARD DUMP (ORB OPS, ECLS) Initiate Dump

DEORBIT BRIEFING

FCS CHECKOUT (ORB OPS, GNC)

~

MEAL

~

MNVR (TRK) -ZLV -YVV (Water Dump)TG=2 BV=3 OM=70A6/AUTO/ALT Init TRK

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

PILOT WITH RHC (ORB OPS, PGSC)

RCS HOT FIRE TEST (ORB OPS, RCS)

PLT

DEORBIT BRIEFING

ENTRY VIDEO SETUP (PHOTO/TV, MINI-CAM)

EXERCISE

~

FCS CHECKOUT (ORB OPS, GNC)

~

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

PILOT WITH RHC (ORB OPS, PGSC)

RCS HOT FIRE TEST (ORB OPS, RCS)

MS1

CABIN CONFIG/STOW

CABIN CONFIG/STOW

CABIN CONFIG/STOW

DEORBIT BRIEFING

EXERCISE

LANDING-1 COMM C/O (ORB OPS, COMM/INST) MLA AOS: 19:31:23 LOS: 19:37:25

MEAL

~

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

ANALOG PAO CC (PHOTO/TV, SONY PD100)

NOTES

TFL 188

Page 171: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

WALHEIM SCHLEGEL LOVE TANI

3-119

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/16(350)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

~ ~

~ ~

DORB

3

4

5

6

ORB

153

154

155

156

~

-ZLV -XVV

-ZLV -XVV

~

STS ATT

MS2

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

FCS CHECKOUT (ORB OPS, GNC)

~

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

PILOT WITH RHC (ORB OPS, PGSC)

RCS HOT FIRE TEST (ORB OPS, RCS)

MS3

CABIN CONFIG/STOW

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

EXERCISE

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

EXERCISE

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

DRY SALIVA CLCT(ORB OPS,SDBI)

DEACTIVATION & TEARDOWN (ORB OPS, WLE SENSORS) Deactivate Backup WLES PGSC

FE-2 (DN)

CABIN CONFIG/STOW

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

EXERCISE

~

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

NOTES

3-119

11

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/16(350)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

DORB

3

4

5

6

ORB

153

154

155

156

STS ATT~

-ZLV -XVV

-ZLV -XVV

~

MS2

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

FCS CHECKOUT (ORB OPS, GNC)

~

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

PILOT WITH RHC (ORB OPS, PGSC)

RCS HOT FIRE TEST (ORB OPS, RCS)

MS3

CABIN CONFIG/STOW

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

EXERCISE

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

EXERCISE

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

DRY SALIVA CLCT(ORB OPS,SDBI)

DEACTIVATION & TEARDOWN (ORB OPS, WLE SENSORS) Deactivate Backup WLES PGSC

FE-2 (DN)

CABIN CONFIG/STOW

CABIN CONFIG/STOW ~

DEORBIT BRIEFING

EXERCISE

~

MEAL

PUBLIC AFFAIRS EVENTKU AVAIL: 17:57-18:25

NOTES

Page 172: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FRICK POINDEXTER MELVIN

11

C3 MASTER MADS POWER - ONA6L MADS STRAIN GAGE - ON

3-120

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/16(350)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

~

~ ~

DORB

6

7

8

ORB

156

157

158

~

-ZLV -YVV

OA

~

STS ATT

CDR

CABIN CONFIG/STOW

CWC OVERBOARD DUMP (ORB OPS, ECLS) Initiate Dump

CWC OVERBOARD DUMP (ORB OPS, ECLS) Perform DUMP TERMINATION

CWC OVERBOARD DUMP (ORB OPS, ECLS) Perform DUMP TERMINATION

EXERCISE

MEAL

~

MNVR (TRK) -ZLV -XVVTG=2 BV=3 OM=0A6/AUTO/ALT Init TRK

OFF DUTY

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

< OA TIG (09/23:17)

PLT

CABIN CONFIG/STOW

EXERCISE

~

SUPPLY H2O DUMP USING FES (ORB OPS)Step 1 using FES Pri A

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS)On MCC GO: Step 2, FES Pri A Req'd

MEAL

OFF DUTY

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

< OA TIG (09/23:17)

PWR DUMP - SUPPLY LINE (ORB OPS, ECLS) Dump SN TBS (Barcode #TBS) Dump dur. ~xx min

MS1

CABIN CONFIG/STOW

CABIN CONFIG/STOW

COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)

KU-BD ANT STOW (ORB OPS, COMM/INST)

LANDING-1 COMM C/O (ORB OPS, COMM/INST) DFR AOS: 22:33:11 LOS: 22:42:40

MEAL

~

OFF DUTY

~

SSV DEACTIVATION (PHOTO/TV, SSV)

UPDATEORBITALMNVR PAD

UPDATEORBITALMNVR PAD

NOTES

3-120

FRICK POINDEXTER MELVIN

11

C3 MASTER MADS POWER - ONA6L MADS STRAIN GAGE - ON

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/16(350)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

DORB

6

7

8

ORB

156

157

158

STS ATT~

-ZLV -YVV

OA

~

CDR

CABIN CONFIG/STOW

CWC OVERBOARD DUMP (ORB OPS, ECLS) Initiate Dump

CWC OVERBOARD DUMP (ORB OPS, ECLS) Perform DUMP TERMINATION

CWC OVERBOARD DUMP (ORB OPS, ECLS) Perform DUMP TERMINATION

EXERCISE

MEAL

~

MNVR (TRK) -ZLV -XVVTG=2 BV=3 OM=0A6/AUTO/ALT Init TRK

OFF DUTY

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

< OA TIG (09/23:17)

PLT

CABIN CONFIG/STOW

EXERCISE

~

SUPPLY H2O DUMP USING FES (ORB OPS)Step 1 using FES Pri A

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS)On MCC GO: Step 2, FES Pri A Req'd

MEAL

OFF DUTY

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

< OA TIG (09/23:17)

PWR DUMP - SUPPLY LINE (ORB OPS, ECLS) Dump SN TBS (Barcode #TBS) Dump dur. ~xx min

MS1

CABIN CONFIG/STOW

CABIN CONFIG/STOW

COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)

KU-BD ANT STOW (ORB OPS, COMM/INST)

LANDING-1 COMM C/O (ORB OPS, COMM/INST) DFR AOS: 22:33:11 LOS: 22:42:40

MEAL

~

OFF DUTY

~

SSV DEACTIVATION (PHOTO/TV, SSV)

NOTES

UPDATEORBITALMNVR PAD

UPDATEORBITALMNVR PAD

Page 173: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

WALHEIM SCHLEGEL LOVE TANI

3-121

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/16(350)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

~

~ ~

DORB

6

7

8

ORB

156

157

158

~

-ZLV -YVV

OA

~

STS ATT

MS2

CABIN CONFIG/STOW

~

LAUNCH ENTRY SUIT CHECK Verify Fit

OFF DUTY

~

RECUMBENT SEAT KIT (RSK)INSTALLATION (ORB OPS, CUE CARD)

MS3

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

CABIN CONFIG/STOW

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

LBP-MUSCLE QSTION(ASSY PL, QSTION)

OFF DUTY

~

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CABIN CONFIG/STOW

CABIN CONFIG/STOW

~

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

OFF DUTY

~

PGSC DEACT (ORB OPS, PGSC) Stow all STS PGSCs except Worldmap

DRY SALIVA CLCT(ORB OPS,SDBI)

DEACTIVATION & TEARDOWN (ORB OPS, WLE SENSORS)

FE-2 (DN)

CABIN CONFIG/STOW

~

LAUNCH ENTRY SUIT CHECK Verify Fit

OFF DUTY

~

RECUMBENT SEAT KIT (RSK)INSTALLATION (ORB OPS, CUE CARD)

NOTES

3-121

11

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

18:00

19:00

20:00

21:00

GMT

Date12/16(350)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

DORB

6

7

8

ORB

156

157

158

STS ATT~

-ZLV -YVV

OA

~

MS2

CABIN CONFIG/STOW

~

LAUNCH ENTRY SUIT CHECK Verify Fit

OFF DUTY

~

RECUMBENT SEAT KIT (RSK)INSTALLATION (ORB OPS, CUE CARD)

MS3

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

CABIN CONFIG/STOW

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

LBP-MUSCLE QSTION(ASSY PL, QSTION)

OFF DUTY

~

DRY SALIVA CLCT(ORB OPS,SDBI)

MS4

CABIN CONFIG/STOW

CABIN CONFIG/STOW

~

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) Perform RECONFIG/STOW

OFF DUTY

~

PGSC DEACT (ORB OPS, PGSC) Stow all STS PGSCs except Worldmap

DRY SALIVA CLCT(ORB OPS,SDBI)

DEACTIVATION & TEARDOWN (ORB OPS, WLE SENSORS)

FE-2 (DN)

CABIN CONFIG/STOW

~

LAUNCH ENTRY SUIT CHECK Verify Fit

OFF DUTY

~

RECUMBENT SEAT KIT (RSK)INSTALLATION (ORB OPS, CUE CARD)

NOTES

Page 174: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FRICK POINDEXTER MELVIN

11

R12 √VPU PWR - OFF(LED-off)Minimize use of P/TV EquipmentDim cabin lighting to 25%

A

3-122

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/16(350)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

~

~ ~

DORB

9

10

11

ORB

159

160

161

~

~

-ZLV -XVV

STS ATT

CDR

OFF DUTY

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

ENTRY COOLING CONFIG A

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

3-122

FRICK POINDEXTER MELVIN

11

R12 √VPU PWR - OFF(LED-off)Minimize use of P/TV EquipmentDim cabin lighting to 25%

A

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/16(350)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

DORB

9

10

11

ORB

159

160

161

STS ATT~

~

-ZLV -XVV

CDR

OFF DUTY

~

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

PLT

ENTRY COOLING CONFIG A

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS1

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

Page 175: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

WALHEIM SCHLEGEL LOVE TANI

3-123

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/16(350)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

~

~ ~

DORB

9

10

11

ORB

159

160

161

~

~

-ZLV -XVV

STS ATT

MS2

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

SLEEP

~

MS4

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

SLEEP

~

FE-2 (DN)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

3-123

11

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

22:00

23:00

00:00

01:00

GMT

Date12/16(350)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

DORB

9

10

11

ORB

159

160

161

STS ATT~

~

-ZLV -XVV

MS2

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

MS3

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

SLEEP

~

MS4

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

SLEEP

~

FE-2 (DN)

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

Page 176: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FRICK POINDEXTER MELVIN

11

3-124

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/17(351)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

~

~ ~

DORB

11

12

13

14

ORB

161

162

163

164

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

3-124

FRICK POINDEXTER MELVIN

11STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/17(351)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

DORB

11

12

13

14

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

CDR

SLEEP

~

~

PLT

SLEEP

~

~

MS1

SLEEP

~

~

NOTES

Page 177: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

WALHEIM SCHLEGEL LOVE TANI

3-125

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/17(351)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

~

~ ~

DORB

11

12

13

14

ORB

161

162

163

164

~

~

-ZLV -XVV

STS ATT

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (DN)

SLEEP

~

~

NOTES

3-125

11

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

02:00

03:00

04:00

05:00

GMT

Date12/17(351)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

DORB

11

12

13

14

ORB

161

162

163

164

STS ATT~

~

-ZLV -XVV

MS2

SLEEP

~

~

MS3

SLEEP

~

~

MS4

SLEEP

~

~

FE-2 (DN)

SLEEP

~

~

NOTES

Page 178: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FRICK POINDEXTER MELVIN

11

FD12 EZ ACTIVITIES BEFORE LEAVING FLIGHT PLAN:OCAC FILTER INSPECTIONFLUID LOADING PREP Fill drink containers per MSG XXXStow CSA-CP

3-126

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/17(351)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

~

~ ~

DORB

14

15

16

ORB

164

165

166

~

~

-ZLV -XVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

3-126

FRICK POINDEXTER MELVIN

11

FD12 EZ ACTIVITIES BEFORE LEAVING FLIGHT PLAN:OCAC FILTER INSPECTIONFLUID LOADING PREP Fill drink containers per MSG XXXStow CSA-CP

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/17(351)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

DORB

14

15

16

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

NOTES

Page 179: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

11

WALHEIM SCHLEGEL LOVE TANI

3-127

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/17(351)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

~

~ ~

DORB

14

15

16

ORB

164

165

166

~

~

-ZLV -XVV

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

FE-2 (DN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

3-127

11

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

06:00

07:00

08:00

09:00

GMT

Date12/17(351)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

DORB

14

15

16

ORB

164

165

166

STS ATT~

~

-ZLV -XVV

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

MS4

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG (ORB OPS, SDBI)

SLEEP

~

FE-2 (DN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SLEEP

~

NOTES

Page 180: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FRICK POINDEXTER MELVIN

12

GO TO DEORBIT PREP @ 10/14:56

3-128

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/17(351)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

~

~ ~

~

DORB

1

2

3

ORB

167

168

169

~

-ZLV -XVV

~

-XSI

STS ATT

CDR

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,7,6(Dual G2),5MNVR IMU STAR ALIGN ATT A (pg 3-130) A1/AUTO/VERN Init MNVR (10/14:14)IMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-130) A1/AUTO/VERN Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)

A6L MADS STRAIN GAGE - PCM ENA

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MNVR (TRK) -XSI ATT TG=4 BV=5 P=184 Y=0 OM=90 A1/AUTO/VERN Init TRK

PLT

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,7,6(Dual G2),5POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

OCAC STOWAGE (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

NOTES

3-128

FRICK POINDEXTER MELVIN

12

GO TO DEORBIT PREP @ 10/14:56

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/17(351)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

DORB

1

2

3

ORB

167

168

169

STS ATT~

-ZLV -XVV

~

-XSI

CDR

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,7,6(Dual G2),5MNVR IMU STAR ALIGN ATT A (pg 3-130) A1/AUTO/VERN Init MNVR (10/14:14)IMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-130) A1/AUTO/VERN Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)

A6L MADS STRAIN GAGE - PCM ENA

PRIVATE MEDICAL CONFERENCE

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MNVR (TRK) -XSI ATT TG=4 BV=5 P=184 Y=0 OM=90 A1/AUTO/VERN Init TRK

PLT

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12,9,7,6(Dual G2),5POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS1

OCAC STOWAGE (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

NOTES

Page 181: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

12

WALHEIM SCHLEGEL LOVE TANI

GO TO DEORBIT PREP @ 10/14:56

3-129

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/17(351)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

~

~ ~

~

DORB

1

2

3

ORB

167

168

169

~

-ZLV -XVV

~

-XSI

STS ATT

MS2

AIR SAMPLE Rcd MET and location on bottle

GIRA STOWAGE (ORB OPS, ECLS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

MS3

LBP-MUSCLE QSTION(ASSY PL, QSTION)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)SALIVA STOW (ORB OPS, SDBI)

MS4

PGSC DEACT COLOR PRINTER STOW (ORB OPS, PGSC) Stow remaining PGSCs and color printer

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

FE-2 (DN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

NOTES

3-129

12

WALHEIM SCHLEGEL LOVE TANI

GO TO DEORBIT PREP @ 10/14:56

STS-122 FD ( )

10:00

11:00

12:00

13:00

GMT

Date12/17(351)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

DORB

1

2

3

ORB

167

168

169

STS ATT~

-ZLV -XVV

~

-XSI

MS2

AIR SAMPLE Rcd MET and location on bottle

GIRA STOWAGE (ORB OPS, ECLS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

MS3

LBP-MUSCLE QSTION(ASSY PL, QSTION)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)SALIVA STOW (ORB OPS, SDBI)

MS4

PGSC DEACT COLOR PRINTER STOW (ORB OPS, PGSC) Stow remaining PGSCs and color printer

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

FE-2 (DN)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

DOFFING ACTIWATCH (ORB OPS, SDBI)

NOTES

Page 182: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

FRICK POINDEXTER MELVIN

12

A IMU STAR ALIGN PAD

ID: -Y: 47, GIENAH MET (10/14:24 TO 10/15:12)

ID: -Z: 81, PHACT MET (10/14:03 TO 10/14:51)

ANG DIFF: 87.4

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 47 -Y: 81

R 93 R 0 173 P 83 P 73 70 Y 328 Y 315 337

REQD ID:

-Y: ____, -Z: ____, ANG ERR ____,____ ____

ANG: 1 2 3

ΔX ( )__,__ __ ( )__,__ __ ( )__,__ __ΔY ( )__,__ __ ( )__,__ __ ( )__,__ __ΔZ ( )__,__ __ ( )__,__ __ ( )__,__ __

EXECUTION TIME: ___/___:___:___ MET

B IMU VERIFICATION STAR ALIGN PAD

ID: -Y: 78, GAMMA LUPI MET (10/14:28 TO 10/15:16)

ID: -Z: 87, ZOZCA MET (10/14:22 TO 10/15:14)

ANG DIFF: 86.3

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 78 -Y: 87

R 15 R 302 95 P 105 P 85 114 Y 40 Y 43 54

REQD ID:

-Y: ____, -Z: ____, ANG ERR ____,____ ____

ANG: 1 2 3

ΔX ( )__,__ __ ( )__,__ __ ( )__,__ __ΔY ( )__,__ __ ( )__,__ __ ( )__,__ __ΔZ ( )__,__ __ ( )__,__ __ ( )__,__ __

EXECUTION TIME: ___/___:___:___ MET

3-130

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/17(351)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

~

~

~

~

DORB

3

4

5

6

ORB

169

170

171

172

~

-XSI

COMM

LANDING

STS ATT

CDR

PLT

MS1

NOTES

3-130

FRICK POINDEXTER MELVIN

12

A IMU STAR ALIGN PAD

ID: -Y: 47, GIENAH MET (10/14:24 TO 10/15:12)

ID: -Z: 81, PHACT MET (10/14:03 TO 10/14:51)

ANG DIFF: 87.4

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 47 -Y: 81

R 93 R 0 173 P 83 P 73 70 Y 328 Y 315 337

REQD ID:

-Y: ____, -Z: ____, ANG ERR ____,____ ____

ANG: 1 2 3

ΔX ( )__,__ __ ( )__,__ __ ( )__,__ __ΔY ( )__,__ __ ( )__,__ __ ( )__,__ __ΔZ ( )__,__ __ ( )__,__ __ ( )__,__ __

EXECUTION TIME: ___/___:___:___ MET

B IMU VERIFICATION STAR ALIGN PAD

ID: -Y: 78, GAMMA LUPI MET (10/14:28 TO 10/15:16)

ID: -Z: 87, ZOZCA MET (10/14:22 TO 10/15:14)

ANG DIFF: 86.3

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 78 -Y: 87

R 15 R 302 95 P 105 P 85 114 Y 40 Y 43 54

REQD ID:

-Y: ____, -Z: ____, ANG ERR ____,____ ____

ANG: 1 2 3

ΔX ( )__,__ __ ( )__,__ __ ( )__,__ __ΔY ( )__,__ __ ( )__,__ __ ( )__,__ __ΔZ ( )__,__ __ ( )__,__ __ ( )__,__ __

EXECUTION TIME: ___/___:___:___ MET

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/17(351)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

DORB

3

4

5

6

ORB

169

170

171

172

STS ATT~

-XSI

COMM

LANDING

CDR

PLT

MS1

NOTES

Page 183: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

FLT PLN/122/FIN

12

WALHEIM SCHLEGEL LOVE TANI

3-131

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/17(351)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

~

~

~

~

DORB

3

4

5

6

ORB

169

170

171

172

~

-XSI

COMM

LANDING

STS ATT

MS2

MS3

MS4

FE-2 (DN)

NOTES

3-131

12

WALHEIM SCHLEGEL LOVE TANI

STS-122 FD ( )

14:00

15:00

16:00

17:00

GMT

Date12/17(351)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

DORB

3

4

5

6

ORB

169

170

171

172

STS ATT~

-XSI

COMM

LANDING

MS2

MS3

MS4

FE-2 (DN)

NOTES

Page 184: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

3-132 FLT PLN/122/FIN

This Page Intentionally Blank

Page 185: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

4-i FLT PLN/122/FIN

The sections following this divider page will not be included in flight copies.

Page 186: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

4-ii FLT PLN/122/FIN

This Page Intentionally Blank

Page 187: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

4-iii FLT PLN/122/FIN

For the latest version of the non-flown sections:

Attitude Timeline Ku-Band Antenna Masking Plan Flight Plan Notes Flight Plan Walkthrough

Go to:

http://mod.jsc.nasa.gov/do4/flightplan/main/fp.cfm?id=122

Page 188: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

4-iv FLT PLN/122/FIN

This Page Intentionally Blank

Page 189: Flight Plan - NASAvi FLT PLN/122/FIN INTRODUCTION The STS-122 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines

Flight Cover (trim bottom to expose tabs)

JSC-48000-122 FINAL

FLIGHT PLAN STS

122