JSC-48000-135 Flight Plan STS-135/ULF-7 (FDO L-35_Jul8 Trajectory) Mission Operations Directorate Operations Division Final June 17, 2011 Launch Date: Fri. July 08, 2011 GMT Launch Time: 189/15:26:46 GMT July 08, 11:26:46 EDT National Aeronautics and Space Administration Lyndon B. Johnson Space Center Houston, Texas Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html For the latest working copy of the Flight Plan, visit http://modspops.jsc.nasa.gov/mod/DO/DO4/Joint/135_ULF7/default.aspx

Upload: vohanh

Post on 01-Aug-2019

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

JSC-48000-135

Flight Plan

STS-135/ULF-7 (FDO L-35_Jul8 Trajectory)

Mission Operations Directorate Operations Division

Final June 17, 2011 Launch Date: Fri. July 08, 2011 GMT Launch Time: 189/15:26:46 GMT July 08, 11:26:46 EDT

National Aeronautics and Space Administration

Lyndon B. Johnson Space Center Houston, Texas

Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html

For the latest working copy of the Flight Plan, visit http://modspops.jsc.nasa.gov/mod/DO/DO4/Joint/135_ULF7/default.aspx

Page 2: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed
Page 3: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed
Page 4: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

ii FLT PLN/135/FIN

Incorporates the following: 482#: FLT PLN-02185

AREAS OF TECHNICAL RESPONSIBILITY

Book Manager/Lead FAO DO4/G. Whitney 281-483-1919

Lead Timeline DO4/C. Hyde 281-483-5734

Lead Pointer DO4/M. Mendoza 281-483-0787

Lead Ops Planner DO4/R. Nimis 281-244-1178

Lead RPE DO4/T. Tucker 281-244-2482

Page 5: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

iii FLT PLN/135/FIN

FLIGHT PLAN STS-135

LIST OF EFFECTIVE PAGES

FINAL 06/17/11 Sign Off ........................... * 135/FIN ii....................................... * 135/FIN iii ...................................... * 135/FIN iv...................................... * 135/FIN v ...................................... * 135/FIN vi...................................... * 135/FIN 1-1 ................................... 135/FIN 1-2 ................................... 135/FIN 1-3 ................................... 135/FIN 1-4 ................................... 135/FIN 2-1 ................................... 135/FIN 2-2 ................................... 135/FIN 2-3 ................................... 135/FIN 2-4 ................................... 135/FIN 2-5 ................................... 135/FIN 2-6 ................................... 135/FIN 2-7 ................................... 135/FIN 2-8 ................................... 135/FIN 2-9 ................................... 135/FIN 2-10 ................................. 135/FIN 2-11 ................................. 135/FIN 2-12 ................................. 135/FIN 2-13 ................................. 135/FIN 2-14 ................................. 135/FIN 2-15 ................................. 135/FIN 2-16 ................................. 135/FIN 2-17 ................................. 135/FIN 2-18 ................................. 135/FIN 2-19 ................................. 135/FIN 2-20 ................................. 135/FIN 2-21 ................................. 135/FIN 2-22 ................................. 135/FIN 2-23 ................................. 135/FIN 2-24 ................................. 135/FIN 2-25 ................................. 135/FIN 2-26 ................................. 135/FIN 2-27 ................................. 135/FIN 2-28 ................................. 135/FIN 2-29 ................................. 135/FIN 2-30 ................................. 135/FIN 2-31 ................................. 135/FIN 2-32 ................................. 135/FIN 2-33 ................................. 135/FIN 2-34 ................................. 135/FIN 2-35 ................................. 135/FIN 2-36 ................................. 135/FIN 2-37 ................................. 135/FIN 2-38 ................................. 135/FIN 2-39 ................................. 135/FIN 2-40 ................................. 135/FIN

2-41 ................................. 135/FIN 2-42 ................................. 135/FIN 2-43 ................................. 135/FIN 2-44 ................................. 135/FIN 3-1 ................................... 135/FIN 3-2 ................................... 135/FIN 3-3 ................................... 135/FIN 3-4 ................................... 135/FIN 3-5 ................................... 135/FIN 3-6 ................................... 135/FIN 3-7 ................................... 135/FIN 3-8 ................................... 135/FIN 3-9 ................................... 135/FIN 3-10 ................................. 135/FIN 3-11 ................................. 135/FIN 3-12 ................................. 135/FIN 3-13 ................................. 135/FIN 3-14 ................................. 135/FIN 3-15 ................................. 135/FIN 3-16 ................................. 135/FIN 3-17 ................................. 135/FIN 3-18 ................................. 135/FIN 3-19 ................................. 135/FIN 3-20 ................................. 135/FIN 3-21 ................................. 135/FIN 3-22 ................................. 135/FIN 3-23 ................................. 135/FIN 3-24 ................................. 135/FIN 3-25 ................................. 135/FIN 3-26 ................................. 135/FIN 3-27 ................................. 135/FIN 3-28 ................................. 135/FIN 3-29 ................................. 135/FIN 3-30 ................................. 135/FIN 3-31 ................................. 135/FIN 3-32 ................................. 135/FIN 3-33 ................................. 135/FIN 3-34 ................................. 135/FIN 3-35 ................................. 135/FIN 3-36 ................................. 135/FIN 3-37 ................................. 135/FIN 3-38 ................................. 135/FIN 3-39 ................................. 135/FIN 3-40 ................................. 135/FIN 3-41 ................................. 135/FIN 3-42 ................................. 135/FIN 3-43 ................................. 135/FIN 3-44 ................................. 135/FIN 3-45 ................................. 135/FIN 3-46 ................................. 135/FIN

* – Omit from flight book

Page 6: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

iv FLT PLN/135/FIN

3-47 ................................. 135/FIN 3-48 ................................. 135/FIN 3-49 ................................. 135/FIN 3-50 ................................. 135/FIN 3-51 ................................. 135/FIN 3-52 ................................. 135/FIN 3-53 ................................. 135/FIN 3-54 ................................. 135/FIN 3-55 ................................. 135/FIN 3-56 ................................. 135/FIN 3-57 ................................. 135/FIN 3-58 ................................. 135/FIN 3-59 ................................. 135/FIN 3-60 ................................. 135/FIN 3-61 ................................. 135/FIN 3-62 ................................. 135/FIN 3-63 ................................. 135/FIN 3-64 ................................. 135/FIN 3-65 ................................. 135/FIN 3-66 ................................. 135/FIN 3-67 ................................. 135/FIN 3-68 ................................. 135/FIN 3-69 ................................. 135/FIN 3-70 ................................. 135/FIN 3-71 ................................. 135/FIN 3-72 ................................. 135/FIN 3-73 ................................. 135/FIN 3-74 ................................. 135/FIN 3-75 ................................. 135/FIN 3-76 ................................. 135/FIN 3-77 ................................. 135/FIN 3-78 ................................. 135/FIN 3-79 ................................. 135/FIN 3-80 ................................. 135/FIN 3-81 ................................. 135/FIN 3-82 ................................. 135/FIN 3-83 ................................. 135/FIN 3-84 ................................. 135/FIN 3-85 ................................. 135/FIN 3-86 ................................. 135/FIN 3-87 ................................. 135/FIN 3-88 ................................. 135/FIN 3-89 ................................. 135/FIN 3-90 ................................. 135/FIN 3-91 ................................. 135/FIN 3-92 ................................. 135/FIN 3-93 ................................. 135/FIN 3-94 ................................. 135/FIN 3-95 ................................. 135/FIN 3-96 ................................. 135/FIN 3-97 ................................. 135/FIN 3-98 ................................. 135/FIN 3-99 ................................. 135/FIN 3-100 ............................... 135/FIN 3-101 ............................... 135/FIN 3-102 ............................... 135/FIN

3-103 ............................... 135/FIN 3-104 ............................... 135/FIN 3-105 ............................... 135/FIN 3-106 ............................... 135/FIN 3-107 ............................... 135/FIN 3-108 ............................... 135/FIN 3-109 ............................... 135/FIN 3-110 ............................... 135/FIN 3-111 ............................... 135/FIN 3-112 ............................... 135/FIN 3-113 ............................... 135/FIN 3-114 ............................... 135/FIN 3-115 ............................... 135/FIN 3-116 ............................... 135/FIN 3-117 ............................... 135/FIN 3-118 ............................... 135/FIN 3-119 ............................... 135/FIN 3-120 ............................... 135/FIN 3-121 ............................... 135/FIN 3-122 ............................... 135/FIN 3-123 ............................... 135/FIN 3-124 ............................... 135/FIN 3-125 ............................... 135/FIN 3-126 ............................... 135/FIN 3-127 ............................... 135/FIN 3-128 ............................... 135/FIN 3-129 ............................... 135/FIN 3-130 ............................... 135/FIN 3-131 ............................... 135/FIN 3-132 ............................... 135/FIN 3-133 ............................... 135/FIN 3-134 ............................... 135/FIN 3-135 ............................... 135/FIN 3-136 ............................... 135/FIN 3-137 ............................... 135/FIN 3-138 ............................... 135/FIN 3-139 ............................... 135/FIN 3-140 ............................... 135/FIN 3-141 ............................... 135/FIN 3-142 ............................... 135/FIN

Page 7: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

v FLT PLN/135/FIN

CONTENTS PAGE

INTRODUCTION ............................................................................................................. vi

OVERVIEW TIMELINE .................................................................................................... 1-1

SUMMARY TIMELINE ..................................................................................................... 2-1

DETAILED TIMELINE ...................................................................................................... 3-1

Page 8: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

vi FLT PLN/135/FIN

INTRODUCTION

The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed timelines that are covered in the Ascent, Post Insertion, Deorbit Prep, and Entry Checklists. The detailed rendezvous and undocking timelines and procedures are contained in the Rendezvous Checklist. The detailed EVA task timelines and procedures are contained in the EVA Checklist. This Flight Plan satisfies the mission requirements specified in the following documents:

NSTS-07700 Vol III, Flight Definition and Requirements Document NSTS-17462-135, STS-135 Flight Requirements Document NSTS-37326, Shuttle Crew Scheduling Constraints NSTS-21558, ISS-ULF7 Mission Integration Plan

The timeline formats used in this Flight Plan are based on JSC-19933, Timeline Format Definitions and Standard Notes, Rev C, May 1990. The STS-135 Flight Plan is based on a launch date of July 08, 2011, at 15:26:46 GMT (11:26:46 EDT). Orbiter inertial attitudes are expressed relative to a mean of 1950 (M50) reference frame. The following SCSC Exceptions have been submitted in order to meet Category 1 objectives:

None The Flight Plan and previously published, non-flown sections listed below are available on the following Space Shuttle Flight Planning web site:

http://modspops.jsc.nasa.gov/mod/DO/DO4/Joint/135_ULF7/default.aspx Non-flown sections that are no longer published:

ISS Commanding Pages Attitude Timeline Ku-Band Antenna Masking Plan Timeline Walkthrough Flight Plan Notes

Page 9: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-1 FLT PLN/135/FIN

OV

ER

VIE

W

TIM

EL

INE

OVERVIEW TIMELINE

Page 10: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-2 FLT PLN/135/FIN

OV

ER

VIE

W

TIM

EL

INE

This Page Intentionally Blank

Page 11: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-3 FLT PLN/135/FIN

Page 12: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

1-4 FLT PLN/135/FIN

This Page Intentionally Blank

Page 13: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

2-1 FLT PLN/135/FIN

SU

MM

AR

Y

TIM

EL

INE

SUMMARY TIMELINE

Page 14: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

2-2 FLT PLN/135/FIN

SU

MM

AR

Y

TIM

EL

INE

This Page Intentionally Blank

Page 15: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

OMS

2

LAUNCH

NC1^

FD01

FERGUSON

HURLEY

MAGNUS

WALHEIM

INRTL MNVR

2-3

STS-135

16 17 18 19 20 21 22 23 07/09 01 02 03GMT 07/08/11 (189) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR ASCENT POST INSERTIONOMSBURN

MNVR -ZLV

SLEEPPGSC SETUP

LOAD DAPS

IMU

PRE SLEEPRMS C/O

RMS PWRUP

ELV PRK

AFT CNTLR

GRP B PWRDN

RMS PWRDN

PMCA/G

PLT ASCENT POST INSERTIONOMSBURN

SLEEPP/TV01 VIDEO SETUP

OCAC SETUP

APU@

PRE SLEEPRMS C/O

RMS PWRUP

RMSINIT

GRP B PWRDN

BLEED*

RMS PWRDN

MS1 ASCENT POST INSERTION SLEEPGIRA INSTALLSEE

SETUP

MDDK

PRE SLEEPOMSPODSRVY

P/TV01 VIDEO SETUP

STL ACT

AEM STATUS

CHECK

PRE SLEEP

MS2 ASCENT POST INSERTION SLEEPPGSC SETUP

OIU ACT

OIU DEACT

WLESACT

ETPHOTO

UMBWELLD/L

PRE SLEEP

TEPC ON

WATCH

MFLR INSTL

W4 MINI CAM

D/L

APCU ACT

APCU DEACT

DAY/NIGHTORBIT 1 2 3 4 5 6 7 8 9

TDRSWEZ

-ZLV -XVV NC1 -ZLV -XVVORB ATT@RECONFIG *ORIFICE

NOTES

2-3

OMS

2

LAUNCH

NC1^

FD01

FERGUSON

HURLEY

MAGNUS

WALHEIM

INRTL MNVR

STS-135

16 17 18 19 20 21 22 23 07/09 01 02 03GMT 07/08/11 (189) 000/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 000

CDR ASCENT POST INSERTIONOMSBURN

MNVR -ZLV

SLEEPPGSC SETUP

LOAD DAPS

IMU

PRE SLEEPRMS C/O

RMS PWRUP

ELV PRK

AFT CNTLR

GRP B PWRDN

RMS PWRDN

PMCA/G

PLT ASCENT POST INSERTIONOMSBURN

SLEEPP/TV01 VIDEO SETUP

OCAC SETUP

APU@

PRE SLEEPRMS C/O

RMS PWRUP

RMSINIT

GRP B PWRDN

BLEED*

RMS PWRDN

MS1 ASCENT POST INSERTION SLEEPGIRA INSTALLSEE

SETUP

MDDK

PRE SLEEPOMSPODSRVY

P/TV01 VIDEO SETUP

STL ACT

AEM STATUS

CHECK

PRE SLEEP

MS2 ASCENT POST INSERTION SLEEPPGSC SETUP

OIU ACT

OIU DEACT

WLESACT

ETPHOTO

UMBWELLD/L

PRE SLEEP

TEPC ON

WATCH

MFLR INSTL

W4 MINI CAM

D/L

APCU ACT

APCU DEACT

DAY/NIGHTORBIT 1 2 3 4 5 6 7 8 9

TDRSWEZ

ORB ATT -ZLV -XVV NC1 -ZLV -XVV

NOTES

@RECONFIG *ORIFICE

Page 16: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

NC2^

FD02

FERGUSON

HURLEY

MAGNUS

WALHEIM

*CRYSTALLIZATION&SHELL HTR ACT %MANUAL#SHELL HTR DEACT

2-4

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/09/11 (190) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDR SLEEP

NOSE CAP

SURVEY

MNVR NOSE

STBD WING SURVEYPOST SLEEP OBSS UNBERTHOMSBURN

MNVR -ZLV

MNVR STBD

MEALPOSTSLEEP

PLT SLEEP

NOSE CAP

SURVEY

STBD WING SURVEYPOST SLEEP OBSS UNBERTHOMSBURN

MEAL

MCIU

POSTSLEEP

MS1 SLEEP

NOSE CAP

SURVEY

STBD WING SURVEYPOST SLEEP

OMS^

FCMSOPS

ERGSETUP

MEALPOSTSLEEP

CUBLAB VID

MS2 SLEEP POST SLEEP

OIU ACT

OIU DEACT

MDDK

ERGSETUP

MEALCRYOO2SNSRCK

FC PRG%

FILTERCLEAN

LOG

POST SLEEP

BRIC UNSTW

CUBLAB ACT

CUBLAB ACT

CUBLAB*

HTR C/O

POST SLEEP

APCU ACT

APCU DEACT

MPLM&

MPLM#

CWCSETUP

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16

TDRSWEZ

-ZLV -XVV NC2 -ZLV -XVV BIAS +YSI BIAS +XSIORB ATT^B POD HTR RCFG

NOTES

2-4

NC2^

FD02

FERGUSON

HURLEY

MAGNUS

WALHEIM

*CRYSTALLIZATION&SHELL HTR ACT %MANUAL#SHELL HTR DEACT

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/09/11 (190) 12 13 14 15 16 17 18 19 20 21 22 23 001/00

MET Day 000

CDR SLEEP

NOSE CAP

SURVEY

MNVR NOSE

STBD WING SURVEYPOST SLEEP OBSS UNBERTHOMSBURN

MNVR -ZLV

MNVR STBD

MEALPOSTSLEEP

PLT SLEEP

NOSE CAP

SURVEY

STBD WING SURVEYPOST SLEEP OBSS UNBERTHOMSBURN

MEAL

MCIU

POSTSLEEP

MS1 SLEEP

NOSE CAP

SURVEY

STBD WING SURVEYPOST SLEEP

OMS^

FCMSOPS

ERGSETUP

MEALPOSTSLEEP

CUBLAB VID

MS2 SLEEP POST SLEEP

OIU ACT

OIU DEACT

MDDK

ERGSETUP

MEALCRYOO2SNSRCK

FC PRG%

FILTERCLEAN

LOG

POST SLEEP

BRIC UNSTW

CUBLAB ACT

CUBLAB ACT

CUBLAB*

HTR C/O

POST SLEEP

APCU ACT

APCU DEACT

MPLM&

MPLM#

CWCSETUP

DAY/NIGHTORBIT 9 10 11 12 13 14 15 16

TDRSWEZ

ORB ATT -ZLV -XVV NC2 -ZLV -XVV BIAS +YSI BIAS +XSI

NOTES

^B POD HTR RCFG

Page 17: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

NC3^

FD02

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-5

STS-135

16 17 18 19 20 21 22 23 07/10 01 02 03GMT 07/09/11 (190) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR SLEEP

PRE SLEEP

MNVR -ZLV

OBSS BERTH

PORT SRVY

MNVR -ZLV

MNVR PORT

NOSECAP

SURVEY

C/LCMR

INSTL

ODSRINGEXT

DOCKING%

PRE SLEEP

FUT LOAD

PMCA/G

PORT WING SURVEY PRE SLEEP+XRCSBURN

PLT SLEEPPRE SLEEPOBSS BERTHPORT WING SURVEYNOSECAP

SURVEY

IMU

RNDZ TOOLSC/O

PRESLEEP

+XRCSBURN

MS1 SLEEPPORT WING SURVEYNOSECAP

SURVEY

ODSRINGEXT

CONDCWCS/U

PRE SLEEPC/LCMR

INSTL

DOCKING%

AEM STATUS

CHECKA/L

PREPLDRI

DOWNLINK

VISION

EXAM

MS2 SLEEP

MDDK

RNDZ TOOLSC/O

WSB*

OCA#

MDDK XFER PREP PRE SLEEP

O2-I

O2-T

A/LPREP

WLES^

EVAPRPXFERTO ISS

HTR C/O

VISION

EXAM

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24

TDRSWEZ

BIAS -YSI -ZLV -XVV NC3 -ZLV -XVVORB ATT%MECH-INIT*CNTLR SWAP #48 Mbps^PREP-RNDZ C/O

NOTES

2-5

NC3^

FD02

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

16 17 18 19 20 21 22 23 07/10 01 02 03GMT 07/09/11 (190) 001/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 001

CDR SLEEP

PRE SLEEP

MNVR -ZLV

OBSS BERTH

PORT SRVY

MNVR -ZLV

MNVR PORT

NOSECAP

SURVEY

C/LCMR

INSTL

ODSRINGEXT

DOCKING%

PRE SLEEP

FUT LOAD

PMCA/G

PORT WING SURVEY PRE SLEEP+XRCSBURN

PLT SLEEPPRE SLEEPOBSS BERTHPORT WING SURVEYNOSECAP

SURVEY

IMU

RNDZ TOOLSC/O

PRESLEEP

+XRCSBURN

MS1 SLEEPPORT WING SURVEYNOSECAP

SURVEY

ODSRINGEXT

CONDCWCS/U

PRE SLEEPC/LCMR

INSTL

DOCKING%

AEM STATUS

CHECKA/L

PREPLDRI

DOWNLINK

VISION

EXAM

MS2 SLEEP

MDDK

RNDZ TOOLSC/O

WSB*

OCA#

MDDK XFER PREP PRE SLEEP

O2-I

O2-T

A/LPREP

WLES^

EVAPRPXFERTO ISS

HTR C/O

VISION

EXAM

DAY/NIGHTORBIT 17 18 19 20 21 22 23 24

TDRSWEZ

ORB ATT BIAS -YSI -ZLV -XVV NC3 -ZLV -XVV

NOTES

%MECH-INIT*CNTLR SWAP #48 Mbps^PREP-RNDZ C/O

Page 18: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

NC4^

FD03

FERGUSON

HURLEY

MAGNUS

WALHEIM

Ti^ ^MNVR

DOCKING*

DOCKING 001/23:43*

NH^

DEACT%

2-6

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/10/11 (191) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDR SLEEP POST SLEEPIMU

ISS RNDZ OPS

GRP B PWRUP

APPROACH T/L

PLT SLEEP POST SLEEP ISS RNDZ OPS

GRP B PWRUP

APPROACH T/L

RCS*

MS1 SLEEP POST SLEEP

PTV02%

PTV02 S/U

P/TV02 DOCK

OIU ACT

MDDK

MCIU

TRANSFERUPDATE

ISS RNDZ OPSPOST SLEEP

POST SLEEP

APCU ACT

APCU DEACT

SSV-3

MS2 SLEEPPOSTSLEEP

POSTSLEEP

RNDZ OPS

APPROACH T/LSIMOINIT

OCA#

LOG

TRIDAR^

POST SLEEPSIMOTERM

ISS RNDZ OPS

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32

TDRSWEZ

-ZLV -XVV -ZLV +YVV RNDZORB ATT*REG RCNFG

#2 Mbps^ACT

NOTES

2-6

NC4^

FD03

FERGUSON

HURLEY

MAGNUS

WALHEIM

Ti^ ^MNVR

DOCKING*

DOCKING 001/23:43*

NH^

DEACT%

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/10/11 (191) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

CDR SLEEP POST SLEEPIMU

ISS RNDZ OPS

GRP B PWRUP

APPROACH T/L

PLT SLEEP POST SLEEP ISS RNDZ OPS

GRP B PWRUP

APPROACH T/L

RCS*

MS1 SLEEP POST SLEEP

PTV02%

PTV02 S/U

P/TV02 DOCK

OIU ACT

MDDK

MCIU

TRANSFERUPDATE

ISS RNDZ OPSPOST SLEEP

POST SLEEP

APCU ACT

APCU DEACT

SSV-3

MS2 SLEEPPOSTSLEEP

POSTSLEEP

RNDZ OPS

APPROACH T/LSIMOINIT

OCA#

LOG

TRIDAR^

POST SLEEPSIMOTERM

ISS RNDZ OPS

DAY/NIGHTORBIT 25 26 27 28 29 30 31 32

TDRSWEZ

ORB ATT -ZLV -XVV -ZLV +YVV RNDZ

NOTES

*REG RCNFG#2 Mbps

^ACT

Page 19: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD03

BORISENKO

SAMOKUTYAEV

GARAN

VOLKOV

FURUKAWA

FOSSUM

DOCKING*

DOCKING 191/15:09*

2-7

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/10/11 (191) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

ISS CDR SLEEP POST SLEEP DPC PW VELO MEAL

FE-1 SLEEP POST SLEEP DPC PW VELO MEAL

FE-3 SLEEP POST SLEEP DPC PW

WNDW CLS

^IMMN SU

T2 ARED

WRMWWTNKSMPL

MEAL

TIMER

TIMER

PMA2

ARVL

FE-4 SLEEP POST SLEEP DPC PW

P/TVRPMVRFYS/U

MEAL

PREP

1000MM

PMA2

ARVL

FE-5 SLEEP POST SLEEP DPC PW

VCA1

RELOC

CEVIS T2

P/TVRPMVRFYS/U

MEAL

PREP

400MM

P/TV

APRCH

PCS P/U

FE-6 SLEEP POST SLEEP DPC PW ARED CEVISWRSWPASMPL

P/TVRPMVRFYS/U

MEAL

PREP

800MM

RPMDL

CAM D

D2XS

DAY/NIGHTDAILY ORBIT 14 15 16 1 2 3 4 5TDRS AVAIL

122 112 122 142ISS TLMORBIT 25 26 27 28 29 30 31 32

^SALIVA

NOTES

2-7

FD03

BORISENKO

SAMOKUTYAEV

GARAN

VOLKOV

FURUKAWA

FOSSUM

DOCKING*

DOCKING 191/15:09*

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/10/11 (191) 12 13 14 15 16 17 18 19 20 21 22 23 002/00

MET Day 001

ISS CDR SLEEP POST SLEEP DPC PW VELO MEAL

FE-1 SLEEP POST SLEEP DPC PW VELO MEAL

FE-3 SLEEP POST SLEEP DPC PW

WNDW CLS

^IMMN SU

T2 ARED

WRMWWTNKSMPL

MEAL

TIMER

TIMER

PMA2

ARVL

FE-4 SLEEP POST SLEEP DPC PW

P/TVRPMVRFYS/U

MEAL

PREP

1000MM

PMA2

ARVL

FE-5 SLEEP POST SLEEP DPC PW

VCA1

RELOC

CEVIS T2

P/TVRPMVRFYS/U

MEAL

PREP

400MM

P/TV

APRCH

PCS P/U

FE-6 SLEEP POST SLEEP DPC PW ARED CEVISWRSWPASMPL

P/TVRPMVRFYS/U

MEAL

PREP

800MM

RPMDL

CAM D

D2XS

DAY/NIGHTDAILY ORBIT 14 15 16 1 2 3 4 5TDRS AVAILISS TLM 122 112 122 142ORBIT 25 26 27 28 29 30 31 32

NOTES

^SALIVA

Page 20: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD03

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO EXERCISEWHILE DOUBLE GRAPPLED

NO UNISOLATED EXERCISEATT RATE SETTLING

HARDMATE

&STS to CMG*DEACT

ACBM SURVEYS

2-8

STS-135

16 17 18 19 20 21 22 23 07/11 01 02 03GMT 07/10/11 (191) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR SLEEPPRE

SLEEP

WELCOME

SAFETYBRIEF

MNVRTEA

GRP B PWRDN

DDC

H/O&

RMS OBSS HANDOFF PRE SLEEPPMCA/G

TRIDAR*

DOCK AUDIO

WLES

VISION

EXAM

PLT SLEEPPRE SLEEP

WELCOME

SAFETYBRIEF

GRP B PWRDN

SSV-2

P/TV04OPS

PTV04

SETUP

RMS OBSS HANDOFF

VISION

EXAM

MS1 SLEEP

HATCHLEAKCK -STS

ODSPREPFORINGR

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

PTV05

SETUP

PTV06

SETUP

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

MDDK

EXERCISE

AEM STATUS

CHECK

HATCH OP

PRE SLEEP

MS2 SLEEP

HATCHLEAKCK -STS

ODSPREPFORINGR

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

EXERCISE PRE SLEEP

CWC TERM

EVAXFER

HATCH OP

SSC-SETUP

CWC#1 INIT

CUBLAB@

CWC XFER

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSWEZ

BIAS -XLV -ZVVORB ATT@DEACT

NOTES

2-8

FD03

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO EXERCISEWHILE DOUBLE GRAPPLED

NO UNISOLATED EXERCISEATT RATE SETTLING

HARDMATE

&STS to CMG*DEACT

ACBM SURVEYS

STS-135

16 17 18 19 20 21 22 23 07/11 01 02 03GMT 07/10/11 (191) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

CDR SLEEPPRE

SLEEP

WELCOME

SAFETYBRIEF

MNVRTEA

GRP B PWRDN

DDC

H/O&

RMS OBSS HANDOFF PRE SLEEPPMCA/G

TRIDAR*

DOCK AUDIO

WLES

VISION

EXAM

PLT SLEEPPRE SLEEP

WELCOME

SAFETYBRIEF

GRP B PWRDN

SSV-2

P/TV04OPS

PTV04

SETUP

RMS OBSS HANDOFF

VISION

EXAM

MS1 SLEEP

HATCHLEAKCK -STS

ODSPREPFORINGR

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

PTV05

SETUP

PTV06

SETUP

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

MDDK

EXERCISE

AEM STATUS

CHECK

HATCH OP

PRE SLEEP

MS2 SLEEP

HATCHLEAKCK -STS

ODSPREPFORINGR

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

EXERCISE PRE SLEEP

CWC TERM

EVAXFER

HATCH OP

SSC-SETUP

CWC#1 INIT

CUBLAB@

CWC XFER

DAY/NIGHTORBIT 33 34 35 36 37 38 39 40

TDRSWEZ

ORB ATT BIAS -XLV -ZVV

NOTES

@DEACT

Page 21: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD03

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

HARDMATE

SAMOKUTYAEV

NO EXERCISEWHILE DOUBLE GRAPPLEDNO UNISOLATED EXERCISE

ATT RATE SETTLING

2-9

ISS

16 17 18 19 20 21 22 23 07/11 01 02 03GMT 07/10/11 (191) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

ISS CDR

WELCOME

SAFETYBRIEF

T2 PW DPC PRE SLEEP-ISS SLEEP

FE-1

WELCOME

SAFETYBRIEF

ARED PW DPC PRE SLEEP-ISS SLEEP

FE-3HATCHLEAKCK ISS

HTCH OP

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

HATCH OP

DOUG S/U

SSRMS OBSS HANDOFF PW PRE SLEEP-ISS SLEEP

FE-4 T2

WELCOME

SAFETYBRIEF

VELO PW DPC PRE SLEEP-ISS SLEEP

FE-5

DK AUDIO

RTR ACT

WELCOME

SAFETYBRIEF

RSNT-I

VSW

VSW

SSRMS OBSS HANDOFF

RSNT-R

PRE SLEEP-ISS SLEEP

FE-6HATCHLEAKCK ISS

HTCH OP

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

HATCH OP

СТТС

D2XS

SODF EMERDEPLOY

EVAXFER

PW PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBIT 6 7 8 9 10 11 12 13TDRS AVAIL

142 112 122 112 122ISS TLMORBIT 33 34 35 36 37 38 39 40

*CAMCORDER CONFIG *CAMCORDER CONFIG

NOTES

2-9

FD03

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

HARDMATE

SAMOKUTYAEV

NO EXERCISEWHILE DOUBLE GRAPPLEDNO UNISOLATED EXERCISE

ATT RATE SETTLING

ISS

16 17 18 19 20 21 22 23 07/11 01 02 03GMT 07/10/11 (191) 002/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 002

ISS CDR

WELCOME

SAFETYBRIEF

T2 PW DPC PRE SLEEP-ISS SLEEP

FE-1

WELCOME

SAFETYBRIEF

ARED PW DPC PRE SLEEP-ISS SLEEP

FE-3HATCHLEAKCK ISS

HTCH OP

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

HATCH OP

DOUG S/U

SSRMS OBSS HANDOFF PW PRE SLEEP-ISS SLEEP

FE-4 T2

WELCOME

SAFETYBRIEF

VELO PW DPC PRE SLEEP-ISS SLEEP

FE-5

DK AUDIO

RTR ACT

WELCOME

SAFETYBRIEF

RSNT-I

VSW

VSW

SSRMS OBSS HANDOFF

RSNT-R

PRE SLEEP-ISS SLEEP

FE-6HATCHLEAKCK ISS

HTCH OP

INGRSHATCHOPEN

WELCOME

SAFETYBRIEF

HATCH OP

СТТС

D2XS

SODF EMERDEPLOY

EVAXFER

PW PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBIT 6 7 8 9 10 11 12 13TDRS AVAILISS TLM 142 112 122 112 122ORBIT 33 34 35 36 37 38 39 40

NOTES

*CAMCORDER CONFIG *CAMCORDER CONFIG

Page 22: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD04

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO T2MPLM INSTL/BOLT LOAD

NO EXERCISE MPLM MNVR FROM BERTH TO PRE-INSTL

2-10

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/11/11 (192) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR SLEEP POST SLEEPMPLM VEST INGRS

CNFG

MPLM ACT

MEAL

PRLA OPEN

MPLM VEST PRESSP/TV06ROBOTICS

MDDK XFER

PLT SLEEP POST SLEEP MEALSTS O2 P/BCONFIG

SSRMSGRAPL

MPLMUNBERTH/INSTALL

MPLM

INSTALL

LIMP

BRAKE

MPLM

UNGRAPPLE

DOUG SETUP

MDDK XFER

MS1 SLEEP POST SLEEPSSRMSGRAPL

MPLMUNBERTH/INSTALL

MPLM

INSTALL

VERIF

CBM 1 STG

LIMP

CBM 2 STG &

ABOLTS

BRAKE

MPLM

UNGRAPPLE

CPA RMV

MEALMPLM VEST INGRS

CNFG

COND CWC

CHANGEOUT

MS2 SLEEP POST SLEEP MEAL

APCU ACT

APCU DEACT

MDDK

TRANSFER

UPDATE

MCIU

MDDK XFERPLYBKOPS

CWC#2 INIT

CWC TERM

CWC#3 INIT

CWC TERM

TOOLVERIF

PMA3CVRRVW

MDDK XFERMDDKXFER

DAY/NIGHTORBIT 40 41 42 43 44 45 46 47 48

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-10

FD04

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO T2MPLM INSTL/BOLT LOAD

NO EXERCISE MPLM MNVR FROM BERTH TO PRE-INSTL

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/11/11 (192) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDR SLEEP POST SLEEPMPLM VEST INGRS

CNFG

MPLM ACT

MEAL

PRLA OPEN

MPLM VEST PRESSP/TV06ROBOTICS

MDDK XFER

PLT SLEEP POST SLEEP MEALSTS O2 P/BCONFIG

SSRMSGRAPL

MPLMUNBERTH/INSTALL

MPLM

INSTALL

LIMP

BRAKE

MPLM

UNGRAPPLE

DOUG SETUP

MDDK XFER

MS1 SLEEP POST SLEEPSSRMSGRAPL

MPLMUNBERTH/INSTALL

MPLM

INSTALL

VERIF

CBM 1 STG

LIMP

CBM 2 STG &

ABOLTS

BRAKE

MPLM

UNGRAPPLE

CPA RMV

MEALMPLM VEST INGRS

CNFG

COND CWC

CHANGEOUT

MS2 SLEEP POST SLEEP MEAL

APCU ACT

APCU DEACT

MDDK

TRANSFER

UPDATE

MCIU

MDDK XFERPLYBKOPS

CWC#2 INIT

CWC TERM

CWC#3 INIT

CWC TERM

TOOLVERIF

PMA3CVRRVW

MDDK XFERMDDKXFER

DAY/NIGHTORBIT 40 41 42 43 44 45 46 47 48

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 23: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD04

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

NO T2MPLM INSTL/BOLT LOAD

NO EXERCISE MPLM MNVR FROM BERTH TO PRE-INSTL

*CAMCORDER CONFIG

2-11

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/11/11 (192) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

ISS CDR SLEEP POST SLEEP PW PWDPC VELO MEAL

FE-1 SLEEP POST SLEEP PW PWDPC VELO MEAL

FE-3 SLEEP

SALIVA

RXN

POST SLEEP DPC

RSNT-I

VSW

VSW

PW CEVIS MDDK XFER E_LK PREPPMA3CVRRVW

MEAL

RSNT-R

STS O2 P/BCONFIG

FE-4 SLEEP POST SLEEP PW PWDPC T2 MEAL

FE-5 SLEEP

SALIVA

BISP

POST SLEEP DPC

CBCS PWR

PW ARED

VERIF

CBM 1 STG

CBM 2 STG

& ABOLTS

CBCSPOWERDOWN

MPLM VEST PRESS MEAL

AED INS

DMS

MDDK XFR

FE-6 SLEEP

SALIVA

BISP

RXN

POST SLEEP DPC CEVIS PW

D2XS

WHC-UR/IF-R&R E_LK PREPPMA3CVRRVW

MEALTOOLVERIF

MDDKXFER

DAY/NIGHTDAILY ORBIT 13 14 15 1 2 3 4 5 6TDRS AVAIL

122 142 122 112 122ISS TLMORBIT 40 41 42 43 44 45 46 47 48

*CAMCORDER CONFIG

NOTES

2-11

FD04

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

NO T2MPLM INSTL/BOLT LOAD

NO EXERCISE MPLM MNVR FROM BERTH TO PRE-INSTL

*CAMCORDER CONFIG

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/11/11 (192) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

ISS CDR SLEEP POST SLEEP PW PWDPC VELO MEAL

FE-1 SLEEP POST SLEEP PW PWDPC VELO MEAL

FE-3 SLEEP

SALIVA

RXN

POST SLEEP DPC

RSNT-I

VSW

VSW

PW CEVIS MDDK XFER E_LK PREPPMA3CVRRVW

MEAL

RSNT-R

STS O2 P/BCONFIG

FE-4 SLEEP POST SLEEP PW PWDPC T2 MEAL

FE-5 SLEEP

SALIVA

BISP

POST SLEEP DPC

CBCS PWR

PW ARED

VERIF

CBM 1 STG

CBM 2 STG

& ABOLTS

CBCSPOWERDOWN

MPLM VEST PRESS MEAL

AED INS

DMS

MDDK XFR

FE-6 SLEEP

SALIVA

BISP

RXN

POST SLEEP DPC CEVIS PW

D2XS

WHC-UR/IF-R&R E_LK PREPPMA3CVRRVW

MEALTOOLVERIF

MDDKXFER

DAY/NIGHTDAILY ORBIT 13 14 15 1 2 3 4 5 6TDRS AVAILISS TLM 122 142 122 112 122ORBIT 40 41 42 43 44 45 46 47 48

NOTES

*CAMCORDER CONFIG

Page 24: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD04

FERGUSON

HURLEY

MAGNUS

WALHEIM

RRM AND ISS EXTERNAL SURVEYS

PART 1

MPLM VEST

2-12

STS-135

ISS

16 17 18 19 20 21 22 23 07/12 01 02 03GMT 07/11/11 (192) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDR SLEEPPRE

SLEEPMPLM ACT

IMV

INSTALL

MPLMACTII

MPLM

INGRESS

EVA 1 PROCRVW

PRE SLEEPIMU

PMCA/G

EXERCISE

PLT SLEEPPRE SLEEP♣ EXERCISEEVA 1 PROC

RVW

ILL ON

MDDK XFERLIOH XFER

MS1 SLEEPCPA RMV

VESTIBULE

CLOSE OUT

PRE SLEEP

IMV

INSTALL

MPLM

INGRESS

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

EVA 1 PROCRVW

AEM STATUS

CHECK

MS2 SLEEPPRE SLEEPEXERCISE

MDDK

EVA 1 PROCRVW

P/TV01 S/U

CWC#4 INIT

CWC TERM

MICRO XFR

CWC XFER

MDDK XFER

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

♣STS O2 P/B CONFIG

Notes

2-12

FD04

FERGUSON

HURLEY

MAGNUS

WALHEIM

RRM AND ISS EXTERNAL SURVEYS

PART 1

MPLM VEST

STS-135

ISS

16 17 18 19 20 21 22 23 07/12 01 02 03GMT 07/11/11 (192) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDR SLEEPPRE

SLEEPMPLM ACT

IMV

INSTALL

MPLMACTII

MPLM

INGRESS

EVA 1 PROCRVW

PRE SLEEPIMU

PMCA/G

EXERCISE

PLT SLEEPPRE SLEEP♣ EXERCISEEVA 1 PROC

RVW

ILL ON

MDDK XFERLIOH XFER

MS1 SLEEPCPA RMV

VESTIBULE

CLOSE OUT

PRE SLEEP

IMV

INSTALL

MPLM

INGRESS

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

EVA 1 PROCRVW

AEM STATUS

CHECK

MS2 SLEEPPRE SLEEPEXERCISE

MDDK

EVA 1 PROCRVW

P/TV01 S/U

CWC#4 INIT

CWC TERM

MICRO XFR

CWC XFER

MDDK XFER

DAY/NIGHTORBIT 48 49 50 51 52 53 54 55 56

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

♣STS O2 P/B CONFIG

Page 25: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD04

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-13

ISS

16 17 18 19 20 21 22 23 07/12 01 02 03GMT 07/11/11 (192) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

ISS CDR T2 PW PWDPC PRE SLEEP-ISS SLEEP

FE-1

АК-1М

T2 PW PWDPC PRE SLEEP-ISS SLEEP

FE-3 ♣

HMS-PRE

EVA-PMC

AREDEVA 1 PROC

RVWDPCPW PRE SLEEP-ISS

RXN

SLEEP

FE-4 VELO PW PWDPC PRE SLEEP-ISS SLEEP

FE-5 MDDK XFR CEVISSODF

BOOK U/DEVA 1 PROC

RVWDPC

GC/DMS

PW PRE SLEEP-ISS SLEEP

FE-6 MDDKXFER

ARED

HMS-PRE

EVA-PMC

EVA CAMERACNFG

EVA 1 PROCRVW

DPCPW PRE SLEEP-ISSRXN

SLEEP

DAY/NIGHTDAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAIL

122 112 122 142 122ISS TLMORBIT 48 49 50 51 52 53 54 55 56

♣STS O2 P/B CONFIG

NOTES

2-13

FD04

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

16 17 18 19 20 21 22 23 07/12 01 02 03GMT 07/11/11 (192) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

ISS CDR T2 PW PWDPC PRE SLEEP-ISS SLEEP

FE-1

АК-1М

T2 PW PWDPC PRE SLEEP-ISS SLEEP

FE-3 ♣

HMS-PRE

EVA-PMC

AREDEVA 1 PROC

RVWDPCPW PRE SLEEP-ISS

RXN

SLEEP

FE-4 VELO PW PWDPC PRE SLEEP-ISS SLEEP

FE-5 MDDK XFR CEVISSODF

BOOK U/DEVA 1 PROC

RVWDPC

GC/DMS

PW PRE SLEEP-ISS SLEEP

FE-6 MDDKXFER

ARED

HMS-PRE

EVA-PMC

EVA CAMERACNFG

EVA 1 PROCRVW

DPCPW PRE SLEEP-ISSRXN

SLEEP

DAY/NIGHTDAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAILISS TLM 122 112 122 142 122ORBIT 48 49 50 51 52 53 54 55 56

NOTES

♣STS O2 P/B CONFIG

Page 26: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD05

HURLEY

MAGNUS

WALHEIM

EVA 1 (6:30)

NO UNISOLATED EXERCISE EVA on ESP-2

FERGUSON

2-14

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/12/11 (193) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDR SLEEP POST SLEEP

EMU PURGE

C-LKDPRS

MEAL MPLMXFER

MPLM XFERISLE EVA PREP ISLE EMU PREBREATHE

PLT SLEEP POST SLEEP

DOUG SETUP

SSRMS SUPPORTZSRXFER

IMU

ILL OFF

MPLMXFER

CWC#5 INIT

CWC TERM

INHIB PAD

CWC XFER

MPLMXFER

MPLM XFER

MS1 SLEEP POST SLEEP

TRANSFER

UPDATE

SSRMS SUPPORTPOSTSLEEP

MPLM XFER

RSNT-I

MPLM RACK PVT INSTL

MS2 SLEEP POST SLEEP EVA-IVA-SUPPORTIVAPREP

MDDK

ZSRXFER

LOG

MPLM XFER

ORMATE^

IVAPREP

P/TV07S/U

MPLMXFER

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

^ PREP

Notes

2-14

FD05

HURLEY

MAGNUS

WALHEIM

EVA 1 (6:30)

NO UNISOLATED EXERCISE EVA on ESP-2

FERGUSON

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/12/11 (193) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

CDR SLEEP POST SLEEP

EMU PURGE

C-LKDPRS

MEAL MPLMXFER

MPLM XFERISLE EVA PREP ISLE EMU PREBREATHE

PLT SLEEP POST SLEEP

DOUG SETUP

SSRMS SUPPORTZSRXFER

IMU

ILL OFF

MPLMXFER

CWC#5 INIT

CWC TERM

INHIB PAD

CWC XFER

MPLMXFER

MPLM XFER

MS1 SLEEP POST SLEEP

TRANSFER

UPDATE

SSRMS SUPPORTPOSTSLEEP

MPLM XFER

RSNT-I

MPLM RACK PVT INSTL

MS2 SLEEP POST SLEEP EVA-IVA-SUPPORTIVAPREP

MDDK

ZSRXFER

LOG

MPLM XFER

ORMATE^

IVAPREP

P/TV07S/U

MPLMXFER

DAY/NIGHTORBIT 56 57 58 59 60 61 62 63 64

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

^ PREP

Page 27: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD05

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

EVA 1 (6:30)

EVA 1 (6:30)

NO UNISOLATED EXERCISE EVA on ESP-2

*CAMCORDER CONFIG

2-15

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/12/11 (193) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

ISS CDR SLEEP POST SLEEP PW VELO MPLM XFER MEAL

FE-1 SLEEP POST SLEEP PW T2 MPLM XFER ARED MEAL

FE-3 SLEEP POST SLEEP ISLE EVA PREP

EMU

PURGE

ISLE EMU PREBREATHEC-LKDPRS

P-DPS

EGRS

SSRMSSETUP

RMVPM

FRAMESP2

XFERPM

FRAMPLB

INSTLPM

FRAMLMC

RMV RRM

FRAM LMC

FE-4 SLEEP POST SLEEP PW ARED MPLM XFER MEAL

FE-5 SLEEP POST SLEEP

EVA INH

ISLE EVA PREP

EMU

PURGE

ISLE EMU PREBREATHEC-LKDPRS

VSW

T2 MEAL

FE-6 SLEEP POST SLEEP ISLE EVA PREP

EMU

PURGE

ISLE EMU PREBREATHEC-LKDPRS

P-DPS

EGRS

INSTALLCOLTS

RMVPM

FRAMESP2

XFERPM

FRAMPLB

INSTLPM

FRAMLMC

RMV RRM

FRAM LMC

DAY/NIGHTDAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAIL

122 112ISS TLMORBIT 56 57 58 59 60 61 62 63 64

NOTES

2-15

FD05

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

EVA 1 (6:30)

EVA 1 (6:30)

NO UNISOLATED EXERCISE EVA on ESP-2

*CAMCORDER CONFIG

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/12/11 (193) 12 13 14 15 16 17 18 19 20 21 22 23 004/00

MET Day 003

ISS CDR SLEEP POST SLEEP PW VELO MPLM XFER MEAL

FE-1 SLEEP POST SLEEP PW T2 MPLM XFER ARED MEAL

FE-3 SLEEP POST SLEEP ISLE EVA PREP

EMU

PURGE

ISLE EMU PREBREATHEC-LKDPRS

P-DPS

EGRS

SSRMSSETUP

RMVPM

FRAMESP2

XFERPM

FRAMPLB

INSTLPM

FRAMLMC

RMV RRM

FRAM LMC

FE-4 SLEEP POST SLEEP PW ARED MPLM XFER MEAL

FE-5 SLEEP POST SLEEP

EVA INH

ISLE EVA PREP

EMU

PURGE

ISLE EMU PREBREATHEC-LKDPRS

VSW

T2 MEAL

FE-6 SLEEP POST SLEEP ISLE EVA PREP

EMU

PURGE

ISLE EMU PREBREATHEC-LKDPRS

P-DPS

EGRS

INSTALLCOLTS

RMVPM

FRAMESP2

XFERPM

FRAMPLB

INSTLPM

FRAMLMC

RMV RRM

FRAM LMC

DAY/NIGHTDAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAILISS TLM 122 112ORBIT 56 57 58 59 60 61 62 63 64

NOTES

Page 28: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD05

FERGUSON

HURLEY

MAGNUS

WALHEIM

ISS EXTERNAL SURVEYS

NO UNISOLATED EXERCISE EVA on ELC-2

2-16

STS-135

ISS

16 17 18 19 20 21 22 23 07/13 01 02 03GMT 07/12/11 (193) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR SLEEPPRE SLEEP

C-LK RPRS

PRE SLEEPMPLM XFER PMCA/G

POST EVA

PLT SLEEPPRE SLEEPSSRMS SUPPORTFILTERINSP

ILL ON

CWC#6 INIT

CWC TERM

CWC XFER

AEM PHOTO

MS1 SLEEPSSRMS SUPPORT

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

RSNT-R

PRE SLEEP

AEM STATUS

CHECKMPLM XFER

PRE SLEEP

MS2 SLEEPPRE SLEEPEVA-IVA-SUPPORT

MDDK

MICRO ACT

MICRO ACT

ORMATE+

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

+COVER STOWAGE

Notes

2-16

FD05

FERGUSON

HURLEY

MAGNUS

WALHEIM

ISS EXTERNAL SURVEYS

NO UNISOLATED EXERCISE EVA on ELC-2

STS-135

ISS

16 17 18 19 20 21 22 23 07/13 01 02 03GMT 07/12/11 (193) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

CDR SLEEPPRE SLEEP

C-LK RPRS

PRE SLEEPMPLM XFER PMCA/G

POST EVA

PLT SLEEPPRE SLEEPSSRMS SUPPORTFILTERINSP

ILL ON

CWC#6 INIT

CWC TERM

CWC XFER

AEM PHOTO

MS1 SLEEPSSRMS SUPPORT

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

RSNT-R

PRE SLEEP

AEM STATUS

CHECKMPLM XFER

PRE SLEEP

MS2 SLEEPPRE SLEEPEVA-IVA-SUPPORT

MDDK

MICRO ACT

MICRO ACT

ORMATE+

DAY/NIGHTORBIT 64 65 66 67 68 69 70 71

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

+COVER STOWAGE

Page 29: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD05

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

NO UNISOLATED EXERCISE EVA on ELC-2

2-17

ISS

16 17 18 19 20 21 22 23 07/13 01 02 03GMT 07/12/11 (193) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

ISS CDR ARED MPLM XFER PW PRE SLEEP-ISS SLEEP

FE-1 MPLM XFER PW PRE SLEEP-ISS SLEEP

FE-3 ♣

XFERRRMFRAMEOTP

INSEOTP

ORMATE INSTALLELC2

EVA GETAHEAD

EVACLNUP

INGRESS

P-RPS

C-LK

RPRS

POST EVA PS PS

HMS-POST

EVA-PMC

RXN

SLEEP

FE-4 T2 MPLM XFER PW PRE SLEEP-ISS SLEEP

FE-5VSW

GLOVE

ARED

C-LK

RPRS

POST EVA PRE SLEEP-ISS SLEEP

FE-6 ♣

XFERRRMFRAMEOTP

INSEOTP

SSRMSCLEANUP

EVA GET AHEADEVA

CLNUPINGRESS

P-RPS

C-LK

RPRS

POST EVA PS PS

HMS-POST

EVA-PMC

RXN

SLEEP

DAY/NIGHTDAILY ORBIT 7 8 9 10 11 12 13 14TDRS AVAIL

112 122ISS TLMORBIT 64 65 66 67 68 69 70 71

♣RMV RRM FRAM LMC *CAMCORDER CONFIG

NOTES

2-17

FD05

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

NO UNISOLATED EXERCISE EVA on ELC-2

ISS

16 17 18 19 20 21 22 23 07/13 01 02 03GMT 07/12/11 (193) 004/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 004

ISS CDR ARED MPLM XFER PW PRE SLEEP-ISS SLEEP

FE-1 MPLM XFER PW PRE SLEEP-ISS SLEEP

FE-3 ♣

XFERRRMFRAMEOTP

INSEOTP

ORMATE INSTALLELC2

EVA GETAHEAD

EVACLNUP

INGRESS

P-RPS

C-LK

RPRS

POST EVA PS PS

HMS-POST

EVA-PMC

RXN

SLEEP

FE-4 T2 MPLM XFER PW PRE SLEEP-ISS SLEEP

FE-5VSW

GLOVE

ARED

C-LK

RPRS

POST EVA PRE SLEEP-ISS SLEEP

FE-6 ♣

XFERRRMFRAMEOTP

INSEOTP

SSRMSCLEANUP

EVA GET AHEADEVA

CLNUPINGRESS

P-RPS

C-LK

RPRS

POST EVA PS PS

HMS-POST

EVA-PMC

RXN

SLEEP

DAY/NIGHTDAILY ORBIT 7 8 9 10 11 12 13 14TDRS AVAILISS TLM 112 122ORBIT 64 65 66 67 68 69 70 71

NOTES

♣RMV RRM FRAM LMC *CAMCORDER CONFIG

Page 30: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD06

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO EXERCISE IF FI IS REQ (LCS FI)

(IF NO FOCUSED INSPECTION)

(IF NO FI)

(IF NO FOCUSED INSPECTION)

(IF NO FI)

(IF NO FI) (IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

2-18

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/13/11 (194) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR SLEEP POST SLEEP EXERCISE MEAL

ARED H/O

MDDK XFER MPLM XFERCREW

CHOICERECORD

MDDK XFER

CREW

CHOICE D/L

PLT SLEEP POST SLEEP EXERCISE MEAL

MCIU

ILL OFF

FES-T

FES-I

MDDK XFER MDDK XFERMDDKXFER

CREWCHOICERECORD

CWC#7 INIT

CWC TERM

CWC#8 INIT

CWC TERM

CWC XFER

MDDKXFER

MS1 SLEEP POST SLEEP

TRANSFER

UPDATE

EXERCISE MEALMPLM XFERPOST SLEEP MPLM XFERCREW

CHOICERECORD

MPLM XFER

MS2 SLEEP POST SLEEP MEALLOG

MDDK

MICRO ACT

MICRO ACT

MPLM XFER MPLM XFERCREW

CHOICERECORD

MPLM XFER

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-18

FD06

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO EXERCISE IF FI IS REQ (LCS FI)

(IF NO FOCUSED INSPECTION)

(IF NO FI)

(IF NO FOCUSED INSPECTION)

(IF NO FI)

(IF NO FI) (IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

(IF NO FI)

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/13/11 (194) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

CDR SLEEP POST SLEEP EXERCISE MEAL

ARED H/O

MDDK XFER MPLM XFERCREW

CHOICERECORD

MDDK XFER

CREW

CHOICE D/L

PLT SLEEP POST SLEEP EXERCISE MEAL

MCIU

ILL OFF

FES-T

FES-I

MDDK XFER MDDK XFERMDDKXFER

CREWCHOICERECORD

CWC#7 INIT

CWC TERM

CWC#8 INIT

CWC TERM

CWC XFER

MDDKXFER

MS1 SLEEP POST SLEEP

TRANSFER

UPDATE

EXERCISE MEALMPLM XFERPOST SLEEP MPLM XFERCREW

CHOICERECORD

MPLM XFER

MS2 SLEEP POST SLEEP MEALLOG

MDDK

MICRO ACT

MICRO ACT

MPLM XFER MPLM XFERCREW

CHOICERECORD

MPLM XFER

DAY/NIGHTORBIT 72 73 74 75 76 77 78 79

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 31: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD06

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

NO EXERCISE IF FI IS REQ (LCS FI)

SAMOKUTYAEV

2-19

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/13/11 (194) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

ISS CDR SLEEP POST SLEEP PW PWDPC VELO MPLM XFER MEAL

FE-1 SLEEP POST SLEEP PW PWDPC T2 VELO MEAL

FE-3 SLEEP

SALIVA

POST SLEEP PW PWDPC

EVAPHSS/U

EVAPHSCMO

EVAPHSSUB

EVAPHSD/E

POSTEVA

W/H20ARED

CREWCHOICERECORD

T2 MEAL MPLM XFER

FE-4 SLEEP POST SLEEP PW PWDPC T2 MPLM XFER MEAL

FE-5 SLEEP

SALIVA

POST SLEEP PW PWDPC

HAM P/U

CEVIS MPLM XFER MPLM XFER

PL CK

MEAL

FE-6 SLEEP

SALIVA

POST SLEEP PW PWDPC

EVAPHSSUB

EVAPHSCMO

AREDEVACMRA

MPLM XFER MPLM XFER MPLM XFERCREW

CHOICERECORD

MEAL

DAY/NIGHTDAILY ORBIT 15 16 1 2 3 4 5 6TDRS AVAIL

122 112 122 142 122ISS TLMORBIT 72 73 74 75 76 77 78 79

NOTES

2-19

FD06

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

NO EXERCISE IF FI IS REQ (LCS FI)

SAMOKUTYAEV

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/13/11 (194) 12 13 14 15 16 17 18 19 20 21 22 23 005/00

MET Day 004

ISS CDR SLEEP POST SLEEP PW PWDPC VELO MPLM XFER MEAL

FE-1 SLEEP POST SLEEP PW PWDPC T2 VELO MEAL

FE-3 SLEEP

SALIVA

POST SLEEP PW PWDPC

EVAPHSS/U

EVAPHSCMO

EVAPHSSUB

EVAPHSD/E

POSTEVA

W/H20ARED

CREWCHOICERECORD

T2 MEAL MPLM XFER

FE-4 SLEEP POST SLEEP PW PWDPC T2 MPLM XFER MEAL

FE-5 SLEEP

SALIVA

POST SLEEP PW PWDPC

HAM P/U

CEVIS MPLM XFER MPLM XFER

PL CK

MEAL

FE-6 SLEEP

SALIVA

POST SLEEP PW PWDPC

EVAPHSSUB

EVAPHSCMO

AREDEVACMRA

MPLM XFER MPLM XFER MPLM XFERCREW

CHOICERECORD

MEAL

DAY/NIGHTDAILY ORBIT 15 16 1 2 3 4 5 6TDRS AVAILISS TLM 122 112 122 142 122ORBIT 72 73 74 75 76 77 78 79

NOTES

Page 32: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD06

FERGUSON

HURLEY

MAGNUS

WALHEIM

ISS EXTERNAL SURVEYS

2-20

STS-135

ISS

16 17 18 19 20 21 22 23 07/14 01 02 03GMT 07/13/11 (194) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR SLEEPMPLM XFERIMU

PAOHD

PRE SLEEP

ILL ON

MPLM XFER

THANK YOU*

PMCA/G

PLT SLEEPMPLM XFERPRE

SLEEPPAOHD

ARED H/O

N2-I

N2-T

THANK YOU*

PRE SLEEPMDDK XFER

MS1 SLEEPPRE SLEEPMPLM XFER

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

PAOHD

AEM STATUS

CHECK

THANK YOU*

MPLM XFER

MS2 SLEEPPRE SLEEP

MDDK

EXERCISEPAOHD

THANK YOU*

MPLM XFER

DAY/NIGHTORBIT 79 80 81 82 83 84 85 86 87

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

*FACE IN SPACE

Notes

2-20

FD06

FERGUSON

HURLEY

MAGNUS

WALHEIM

ISS EXTERNAL SURVEYS

STS-135

ISS

16 17 18 19 20 21 22 23 07/14 01 02 03GMT 07/13/11 (194) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

CDR SLEEPMPLM XFERIMU

PAOHD

PRE SLEEP

ILL ON

MPLM XFER

THANK YOU*

PMCA/G

PLT SLEEPMPLM XFERPRE

SLEEPPAOHD

ARED H/O

N2-I

N2-T

THANK YOU*

PRE SLEEPMDDK XFER

MS1 SLEEPPRE SLEEPMPLM XFER

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

PAOHD

AEM STATUS

CHECK

THANK YOU*

MPLM XFER

MS2 SLEEPPRE SLEEP

MDDK

EXERCISEPAOHD

THANK YOU*

MPLM XFER

DAY/NIGHTORBIT 79 80 81 82 83 84 85 86 87

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

*FACE IN SPACE

Page 33: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD06

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-21

ISS

16 17 18 19 20 21 22 23 07/14 01 02 03GMT 07/13/11 (194) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

ISS CDR T2 PW DPC PRE SLEEP-ISS SLEEP

FE-1 PWDPC PRE SLEEP-ISS SLEEP

FE-3 MPLM XFER PW DPC PRE SLEEP-ISS SLEEP

FE-4 VELO MPLM XFER PW DPC PRE SLEEP-ISS SLEEP

FE-5 MPLM XFER

PAO S/U

ARED

PAO-D

PW DPC PRE SLEEP-ISS SLEEP

FE-6 MPLM XFER CEVIS PW DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAIL

122 112 122ISS TLMORBIT 79 80 81 82 83 84 85 86 87

NOTES

2-21

FD06

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

16 17 18 19 20 21 22 23 07/14 01 02 03GMT 07/13/11 (194) 005/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 005

ISS CDR T2 PW DPC PRE SLEEP-ISS SLEEP

FE-1 PWDPC PRE SLEEP-ISS SLEEP

FE-3 MPLM XFER PW DPC PRE SLEEP-ISS SLEEP

FE-4 VELO MPLM XFER PW DPC PRE SLEEP-ISS SLEEP

FE-5 MPLM XFER

PAO S/U

ARED

PAO-D

PW DPC PRE SLEEP-ISS SLEEP

FE-6 MPLM XFER CEVIS PW DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBIT 6 7 8 9 10 11 12 13 14TDRS AVAILISS TLM 122 112 122ORBIT 79 80 81 82 83 84 85 86 87

NOTES

Page 34: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD07

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-22

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDR SLEEP POST SLEEPOFFDUTY

MEALEXERCISEIMU

MPLMXFER

MPLM XFERPAOHD

PAOHD

OFF DUTYPFCOCA

MPLM XFER

PLT SLEEP POST SLEEP OFF DUTYMEALEXERCISE

MCIU

PAOHD

OFF DUTY

PFCOCA

ILL OFF

WCS

PWR#1

FILL

PWR#2

FILL

PWR#3

FILL

PWR XFER

CWC#9 INIT

CWC TERM

POSTSLEEP

CWC#10

INIT

CWC TERM

CWC XFER

POSTSLEEP

MS1 SLEEP POST SLEEP OFF DUTY

TRANSFER

UPDATE

MDDK

MEALEXERCISEPOSTSLEEP

PAOHD

MPLM XFER MPLM XFERPAOHD

MS2 SLEEP POST SLEEP OFF DUTYMEALEXERCISELOG

PAOHD

MPLM XFER

DAY/NIGHTORBIT 87 88 89 90 91 92 93 94 95

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-22

FD07

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

CDR SLEEP POST SLEEPOFFDUTY

MEALEXERCISEIMU

MPLMXFER

MPLM XFERPAOHD

PAOHD

OFF DUTYPFCOCA

MPLM XFER

PLT SLEEP POST SLEEP OFF DUTYMEALEXERCISE

MCIU

PAOHD

OFF DUTY

PFCOCA

ILL OFF

WCS

PWR#1

FILL

PWR#2

FILL

PWR#3

FILL

PWR XFER

CWC#9 INIT

CWC TERM

POSTSLEEP

CWC#10

INIT

CWC TERM

CWC XFER

POSTSLEEP

MS1 SLEEP POST SLEEP OFF DUTY

TRANSFER

UPDATE

MDDK

MEALEXERCISEPOSTSLEEP

PAOHD

MPLM XFER MPLM XFERPAOHD

MS2 SLEEP POST SLEEP OFF DUTYMEALEXERCISELOG

PAOHD

MPLM XFER

DAY/NIGHTORBIT 87 88 89 90 91 92 93 94 95

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 35: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD07

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-23

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

ISS CDR SLEEP POST SLEEP DPC PW PMC VELO MEAL OFF DUTY T2

FE-1 SLEEP POST SLEEP DPC PW T2 PMC MEAL OFF DUTY

FE-3 SLEEP POST SLEEP DPC PW RFTA R&R RFTASTOW

MPLM XFER ARED MEAL

PAO-D

OFF DUTY

FE-4 SLEEP POST SLEEP DPC PW ARED VELO PFC PMC MEAL OFF DUTY

FE-5 SLEEP POST SLEEP DPC PW

NLP INS

MPLM XFER MPLM XFERARED

PAO S/U

MEAL OFF DUTY

FE-6 SLEEP POST SLEEP DPC PW T2 MPLM XFER MEAL OFF DUTY

DAY/NIGHTDAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAIL

122 122ISS TLMORBIT 87 88 89 90 91 92 93 94 95

NOTES

2-23

FD07

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00

MET Day 005

ISS CDR SLEEP POST SLEEP DPC PW PMC VELO MEAL OFF DUTY T2

FE-1 SLEEP POST SLEEP DPC PW T2 PMC MEAL OFF DUTY

FE-3 SLEEP POST SLEEP DPC PW RFTA R&R RFTASTOW

MPLM XFER ARED MEAL

PAO-D

OFF DUTY

FE-4 SLEEP POST SLEEP DPC PW ARED VELO PFC PMC MEAL OFF DUTY

FE-5 SLEEP POST SLEEP DPC PW

NLP INS

MPLM XFER MPLM XFERARED

PAO S/U

MEAL OFF DUTY

FE-6 SLEEP POST SLEEP DPC PW T2 MPLM XFER MEAL OFF DUTY

DAY/NIGHTDAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAILISS TLM 122 122ORBIT 87 88 89 90 91 92 93 94 95

NOTES

Page 36: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD07

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-24

STS-135

ISS

16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDR SLEEPPRE

SLEEPOFF DUTY

AEM STATUS

CHECK PMC

A/GPRE SLEEP

PLT SLEEPPRE SLEEPOFF DUTY

MS1 SLEEPPRE SLEEPOFFDUTY

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

OFF DUTYPFCOCA

MS2 SLEEPPRE SLEEPOFF DUTY

MDDK

OFF DUTYPFCOCA

DAY/NIGHTORBIT 95 96 97 98 99 100 101 102 103

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-24

FD07

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

ISS

16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

CDR SLEEPPRE

SLEEPOFF DUTY

AEM STATUS

CHECK PMC

A/GPRE SLEEP

PLT SLEEPPRE SLEEPOFF DUTY

MS1 SLEEPPRE SLEEPOFFDUTY

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

OFF DUTYPFCOCA

MS2 SLEEPPRE SLEEPOFF DUTY

MDDK

OFF DUTYPFCOCA

DAY/NIGHTORBIT 95 96 97 98 99 100 101 102 103

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 37: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD0FD07

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-25

ISS

16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

ISS CDR T2 OFF DUTY PW DPC PRE SLEEP-ISS SLEEP

FE-1 OFF DUTY VELO PW DPC PRE SLEEP-ISS SLEEP

FE-3 OFF DUTY CEVIS PW DPC PRE SLP SLEEP

FE-4 OFF DUTY PW DPC PRE SLEEP-ISS SLEEP

FE-5 OFF DUTY T2 PW DPCPRESLP

PMC PRE SLEEP-ISS SLEEP

FE-6 OFF DUTY ARED DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBIT 7 8 9 10 11 12TDRS AVAIL

122 112 122ISS TLMORBIT 95 96 97 98 99 100 101 102 103

NOTES

2-25

FD0FD07

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 006

ISS CDR T2 OFF DUTY PW DPC PRE SLEEP-ISS SLEEP

FE-1 OFF DUTY VELO PW DPC PRE SLEEP-ISS SLEEP

FE-3 OFF DUTY CEVIS PW DPC PRE SLP SLEEP

FE-4 OFF DUTY PW DPC PRE SLEEP-ISS SLEEP

FE-5 OFF DUTY T2 PW DPCPRESLP

PMC PRE SLEEP-ISS SLEEP

FE-6 OFF DUTY ARED DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBIT 7 8 9 10 11 12TDRS AVAILISS TLM 122 112 122ORBIT 95 96 97 98 99 100 101 102 103

NOTES

Page 38: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD08

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-26

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/15/11 (196) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR SLEEP POST SLEEP MEALEXERCISE MPLM XFERPAOHD

PAOHD

MPLM XFER CREW CONF

CREW PHOTO

MPLM XFER MPLM XFER

PLT SLEEP POST SLEEP MEALEXERCISE CREW CONFIMU

FILTERINSPECT

CREW PHOTO

PAOHD

CWC-IS/U

N2-I

N2-T

MPLM XFERPWR#4

FILL

PWR#5

FILL

PWR#6

FILL

PWR XFER

PAOHD

MS1 SLEEP POST SLEEP MEAL

MDDK

TRANSFER

UPDATE

EXERCISEMPLM XFER CREW CONFPOST SLEEP

CREW PHOTO

MPLM XFERPAOHD

PTV08 S/U

P/TV08 EXT

SRVY

MPLM XFERMPLM XFER

MS2 SLEEP POST SLEEP MEAL

EXERCISE

CREW CONF

CREW PHOTO

LOG

NLP

ACTIVATION

PAOHD

ISSEMUC/OPREP

ISS EMU C/O EMU RESIZEPOSTEVAXFER

NLP TEMP*

DAY/NIGHTORBIT 103 104 105 106 107 108 109 110

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

*CHANGE

Notes

2-26

FD08

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/15/11 (196) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

CDR SLEEP POST SLEEP MEALEXERCISE MPLM XFERPAOHD

PAOHD

MPLM XFER CREW CONF

CREW PHOTO

MPLM XFER MPLM XFER

PLT SLEEP POST SLEEP MEALEXERCISE CREW CONFIMU

FILTERINSPECT

CREW PHOTO

PAOHD

CWC-IS/U

N2-I

N2-T

MPLM XFERPWR#4

FILL

PWR#5

FILL

PWR#6

FILL

PWR XFER

PAOHD

MS1 SLEEP POST SLEEP MEAL

MDDK

TRANSFER

UPDATE

EXERCISEMPLM XFER CREW CONFPOST SLEEP

CREW PHOTO

MPLM XFERPAOHD

PTV08 S/U

P/TV08 EXT

SRVY

MPLM XFERMPLM XFER

MS2 SLEEP POST SLEEP MEAL

EXERCISE

CREW CONF

CREW PHOTO

LOG

NLP

ACTIVATION

PAOHD

ISSEMUC/OPREP

ISS EMU C/O EMU RESIZEPOSTEVAXFER

NLP TEMP*

DAY/NIGHTORBIT 103 104 105 106 107 108 109 110

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

*CHANGE

Page 39: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD08

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-27

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/15/11 (196) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

ISS CDR SLEEP POST SLEEP PW PWDPC VELO MEAL CREW CONF

CREW

PHOTO

T2

FE-1 SLEEP POST SLEEP PW PWDPC ARED MEAL CREW CONF

CREW

PHOTO

VELO

FE-3 SLEEP

SALIVA

POST SLEEP DPC PW PWMPLM XFER MPLM XFERWATERPLC

ARED MEAL CREW CONF

CREW

PHOTO

PAO-D

CL RCNFG

MYCOPREP

MYCO

FE-4 SLEEP POST SLEEP PW PWDPC T2 VELO MEAL CREW CONF

CREW

PHOTO

FE-5 SLEEP

SALIVA

POST SLEEP DPC PW ARED MPLM XFER MPLM XFER

PAO S/U

T2 MEAL CREW CONF

CREW

PHOTO

MPLM XFR

FE-6 SLEEP

SALIVA

POST SLEEP DPC PWWATERPLC

ISSEMUC/OPREP

PGTC/O

CEVISISSEMUC/O

EMU RESIZEPOSTEVAXFER

MEAL CREW CONF

CREW

PHOTO

ARED

DAY/NIGHTDAILY ORBITTDRS AVAIL

122 122ISS TLMORBIT 103 104 105 106 107 108 109 110

NOTES

2-27

FD08

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/15/11 (196) 12 13 14 15 16 17 18 19 20 21 22 23 007/00

MET Day 006

ISS CDR SLEEP POST SLEEP PW PWDPC VELO MEAL CREW CONF

CREW

PHOTO

T2

FE-1 SLEEP POST SLEEP PW PWDPC ARED MEAL CREW CONF

CREW

PHOTO

VELO

FE-3 SLEEP

SALIVA

POST SLEEP DPC PW PWMPLM XFER MPLM XFERWATERPLC

ARED MEAL CREW CONF

CREW

PHOTO

PAO-D

CL RCNFG

MYCOPREP

MYCO

FE-4 SLEEP POST SLEEP PW PWDPC T2 VELO MEAL CREW CONF

CREW

PHOTO

FE-5 SLEEP

SALIVA

POST SLEEP DPC PW ARED MPLM XFER MPLM XFER

PAO S/U

T2 MEAL CREW CONF

CREW

PHOTO

MPLM XFR

FE-6 SLEEP

SALIVA

POST SLEEP DPC PWWATERPLC

ISSEMUC/OPREP

PGTC/O

CEVISISSEMUC/O

EMU RESIZEPOSTEVAXFER

MEAL CREW CONF

CREW

PHOTO

ARED

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 122 122ORBIT 103 104 105 106 107 108 109 110

NOTES

Page 40: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD08

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-28

STS-135

ISS

16 17 18 19 20 21 22 23 07/16 01 02 03GMT 07/15/11 (196) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDR SLEEPMPLM XFER

MYCO RVW

PRE SLEEPPMCA/G

PRESLEEP

PLT SLEEPPRE SLEEP

MYCO RVW

CWC-I XFER

CWC-I

FILL #2

CWC-I

FILL #1

MPLMXFER

MS1 SLEEPPRE SLEEP

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

MDDK

MPLM XFER

AEM STATUS

CHECK

PRE SLEEP

MS2 SLEEP

EXERCISE

PRE SLEEP

MICRO XFR

MPLM GLASCAV

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-28

FD08

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

ISS

16 17 18 19 20 21 22 23 07/16 01 02 03GMT 07/15/11 (196) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

CDR SLEEPMPLM XFER

MYCO RVW

PRE SLEEPPMCA/G

PRESLEEP

PLT SLEEPPRE SLEEP

MYCO RVW

CWC-I XFER

CWC-I

FILL #2

CWC-I

FILL #1

MPLMXFER

MS1 SLEEPPRE SLEEP

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

MDDK

MPLM XFER

AEM STATUS

CHECK

PRE SLEEP

MS2 SLEEP

EXERCISE

PRE SLEEP

MICRO XFR

MPLM GLASCAV

DAY/NIGHTORBIT 111 112 113 114 115 116 117 118

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 41: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD08

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-29

ISS

16 17 18 19 20 21 22 23 07/16 01 02 03GMT 07/15/11 (196) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

ISS CDR PW DPC PRE SLEEP-ISS SLEEP

FE-1 VELO PW DPC PRE SLEEP-ISS SLEEP

FE-3 T2 PW DPC PRE SLEEP-ISS SLEEP

FE-4 PW DPC PRE SLEEP-ISS SLEEP

FE-5 MPLMXFR

MYCO

PW DPC PRE SLEEP-ISS SLEEP

FE-6 ARED

MYCO

PW DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBITTDRS AVAIL

122 122ISS TLMORBIT 111 112 113 114 115 116 117 118

NOTES

2-29

FD08

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

16 17 18 19 20 21 22 23 07/16 01 02 03GMT 07/15/11 (196) 007/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 007

ISS CDR PW DPC PRE SLEEP-ISS SLEEP

FE-1 VELO PW DPC PRE SLEEP-ISS SLEEP

FE-3 T2 PW DPC PRE SLEEP-ISS SLEEP

FE-4 PW DPC PRE SLEEP-ISS SLEEP

FE-5 MPLMXFR

MYCO

PW DPC PRE SLEEP-ISS SLEEP

FE-6 ARED

MYCO

PW DPC PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 122 122ORBIT 111 112 113 114 115 116 117 118

NOTES

Page 42: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD09

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-30

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/16/11 (197) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDR MPLM-VEST CPA-INSTLPOST SLEEP OFF DUTYMEALIMU

EXERCISEMPLM XFER

MYCO SMPL

PAOHD

FES-I

FES-T

MDDKXFER

MDDK XFER

VISION

EXAM

PLT POST SLEEP OFF DUTYMEAL

MCIU

EXERCISEPAOHD

GLACIER STSTRANSFER

MYCO SMPL

MPLM XFER

CWC-I

FILL #3

CWC-I

FILL #4

CWC-I

FILL #5

CWC-I

FILL #6

CWC-I

FILL #7

CWC-I

FILL #8

CWC-I XFER

CWC-I XFER

VISION

EXAM

MS1 MPLM-VEST CPA-INSTLMPLMRACKCONFIG

POST SLEEP OFF DUTYMEAL MDDK XFEREXERCISE

STL P/TV

TRANSFER

UPDATE

POST SLEEP MPLM XFER

VISION

EXAM

RASV ACT

MS2 POST SLEEP OFF DUTYMEALLOG

MDDK

EXERCISE

GLACIER

P/TVMPLM XFER MPLM XFER MDDK XFER

MPLM GLASCAV

VISION

EXAM

DAY/NIGHTORBIT 118 119 120 121 122 123 124 125 126

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-30

FD09

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/16/11 (197) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

CDR MPLM-VEST CPA-INSTLPOST SLEEP OFF DUTYMEALIMU

EXERCISEMPLM XFER

MYCO SMPL

PAOHD

FES-I

FES-T

MDDKXFER

MDDK XFER

VISION

EXAM

PLT POST SLEEP OFF DUTYMEAL

MCIU

EXERCISEPAOHD

GLACIER STSTRANSFER

MYCO SMPL

MPLM XFER

CWC-I

FILL #3

CWC-I

FILL #4

CWC-I

FILL #5

CWC-I

FILL #6

CWC-I

FILL #7

CWC-I

FILL #8

CWC-I XFER

CWC-I XFER

VISION

EXAM

MS1 MPLM-VEST CPA-INSTLMPLMRACKCONFIG

POST SLEEP OFF DUTYMEAL MDDK XFEREXERCISE

STL P/TV

TRANSFER

UPDATE

POST SLEEP MPLM XFER

VISION

EXAM

RASV ACT

MS2 POST SLEEP OFF DUTYMEALLOG

MDDK

EXERCISE

GLACIER

P/TVMPLM XFER MPLM XFER MDDK XFER

MPLM GLASCAV

VISION

EXAM

DAY/NIGHTORBIT 118 119 120 121 122 123 124 125 126

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 43: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD09

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-31

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/16/11 (197) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

ISS CDR POST SLEEP PW PWDPC T2 VELO MEAL

FE-1 POST SLEEP PW PWDPC ARED MEAL VELO

FE-3DRY

MYCO

CLCT

POST SLEEP DPC PW PW

MYCO INS

MPLM XFER ARED MEALBPSMUT/D

CEVIS

FE-4 POST SLEEP PW PWDPC VELO MEAL T2

FE-5DRY

MYCO

CLCT

POST SLEEP DPC PW MPLM XFER MEAL

PAO-D

ARED CEVIS

FE-6DRY

MYCO

CLCT

POST SLEEP DPC

GC/DMS

GC/DMS

PW PWMPLM RACK PVT RMV MPLM XFER T2

T2 SNBR

PAO S/U

MEALGLACIER ISSTRANSFER

ARED

DAY/NIGHTDAILY ORBITTDRS AVAIL

112 122ISS TLMORBIT 118 119 120 121 122 123 124 125 126

NOTES

2-31

FD09

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/16/11 (197) 12 13 14 15 16 17 18 19 20 21 22 23 008/00

MET Day 007

ISS CDR POST SLEEP PW PWDPC T2 VELO MEAL

FE-1 POST SLEEP PW PWDPC ARED MEAL VELO

FE-3DRY

MYCO

CLCT

POST SLEEP DPC PW PW

MYCO INS

MPLM XFER ARED MEALBPSMUT/D

CEVIS

FE-4 POST SLEEP PW PWDPC VELO MEAL T2

FE-5DRY

MYCO

CLCT

POST SLEEP DPC PW MPLM XFER MEAL

PAO-D

ARED CEVIS

FE-6DRY

MYCO

CLCT

POST SLEEP DPC

GC/DMS

GC/DMS

PW PWMPLM RACK PVT RMV MPLM XFER T2

T2 SNBR

PAO S/U

MEALGLACIER ISSTRANSFER

ARED

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 112 122ORBIT 118 119 120 121 122 123 124 125 126

NOTES

Page 44: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD09

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-32

STS-135

ISS

16 17 18 19 20 21 22 23 07/17 01 02 03GMT 07/16/11 (197) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDR SLEEPPOSTSLEEP

OFFDUTY

PRE SLEEPPMCA/G

PLT SLEEPPOSTSLEEP

PRE SLEEPOFFDUTY

MS1 SLEEPPOSTSLEEP

TRANSFER

BRIEF PREP

TRANSFER

BRIEF PRE SLEEP

OFFDUTY

AEM STATUS

CHECK

PRE SLEEP

MS2 SLEEPPOSTSLEEP

PRE SLEEPOFFDUTY

LOG

MDDK

DAY/NIGHTORBIT 126 127 128 129 130 131 132 133 134

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-32

FD09

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

ISS

16 17 18 19 20 21 22 23 07/17 01 02 03GMT 07/16/11 (197) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

CDR SLEEPPOSTSLEEP

OFFDUTY

PRE SLEEPPMCA/G

PLT SLEEPPOSTSLEEP

PRE SLEEPOFFDUTY

MS1 SLEEPPOSTSLEEP

TRANSFER

BRIEF PREP

TRANSFER

BRIEF PRE SLEEP

OFFDUTY

AEM STATUS

CHECK

PRE SLEEP

MS2 SLEEPPOSTSLEEP

PRE SLEEPOFFDUTY

LOG

MDDK

DAY/NIGHTORBIT 126 127 128 129 130 131 132 133 134

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 45: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD09

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-33

ISS

16 17 18 19 20 21 22 23 07/17 01 02 03GMT 07/16/11 (197) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

ISS CDR PW DPC PRE SLEEP-ISS SLEEPPOSTSLEEP

FE-1 PW DPC PRE SLEEP-ISS SLEEPPOSTSLEEP

FE-3 PW DPC PRE SLEEP-ISS SLEEP

SALIVA

POSTSLEEP

FE-4 PW DPC PRE SLEEP-ISS SLEEPPOSTSLEEP

FE-5 CEVIS PW DPC PRE SLEEP-ISS SLEEP

SALIVA

POSTSLEEP

FE-6 ARED DPC PRE SLEEP-ISS SLEEP

SALIVA

POSTSLEEP

DAY/NIGHTDAILY ORBITTDRS AVAIL

122 112 122ISS TLMORBIT 126 127 128 129 130 131 132 133 134

NOTES

2-33

FD09

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

16 17 18 19 20 21 22 23 07/17 01 02 03GMT 07/16/11 (197) 008/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 008

ISS CDR PW DPC PRE SLEEP-ISS SLEEPPOSTSLEEP

FE-1 PW DPC PRE SLEEP-ISS SLEEPPOSTSLEEP

FE-3 PW DPC PRE SLEEP-ISS SLEEP

SALIVA

POSTSLEEP

FE-4 PW DPC PRE SLEEP-ISS SLEEPPOSTSLEEP

FE-5 CEVIS PW DPC PRE SLEEP-ISS SLEEP

SALIVA

POSTSLEEP

FE-6 ARED DPC PRE SLEEP-ISS SLEEP

SALIVA

POSTSLEEP

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 122 112 122ORBIT 126 127 128 129 130 131 132 133 134

NOTES

Page 46: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD10

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO EXERCISEMPLM UNINSTALL/BOLT UNLOADING

NO T2BACK_OFF TO BERTH

NOMINAL CONFIG#MNVR TO UNDOCK*&SHELL

HTR ACT %DEACT

2-34

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/17/11 (198) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDRPRLA

MEAL

FAREWELL

POST SLEEP

MPLM EGRS

MPLM VEST DEMATE

MPLM DEACT

MPLM VEST DEPRESS EXERCISEIMU

H20#

OBSS*

MDDK XFER

AEM STATUS

CHECK

C/LCAMRINST

PLT MEAL

FAREWELL

RNDZ TOOLS

PTV04OPS

PTV04

SETUP

PTV04%

POST SLEEP EXERCISE MDDK XFERSSRMSMPLMGRAPL

SSRMS MPLM UNINSTLMPLM

UNGRPL

PTV05 DACT

OBSS*

N2-I

N2-T

C/LCAMRINST

STS O2 P/BTEARDOWN

MCIU

MS1

MPLM EGRS

MPLM DEACT

MPLM VEST DEMATESSRMSMPLMGRAPL

SSRMS MPLM UNINSTLMPLM

UNGRPL

FAREWELL

HATCHCLOSE

HATCHLEAKCHECK

POST SLEEP MEALEXERCISE

GLCR P/TV

MPLM&

DOUG SETUP

TRANSFER

BRIEF

MS2 MEAL

FAREWELL

HATCHCLOSE

HATCHLEAKCHECK

RNDZ TOOLS

POST SLEEP

TRANSFER

UPDATE

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

SSC-RETURN

MDDK

CWC-I

FILL #9

CWC-I

FILL #10

CWC-I

FILL #11

CWC-I

FILL #12

CWC-I

FILL #14

CWC-I

FILL #13

MDDK XFER

COND CWC

CHANGEOUT

PRLA

EXERCISE

CWC-I XFER

CWC-I XFER

DAY/NIGHTORBIT 134 135 136 137 138 139 140 141 142

TDRSWEZ

BIAS -XLV -ZVVORB ATTTDRS AVAIL

Notes

2-34

FD10

FERGUSON

HURLEY

MAGNUS

WALHEIM

NO EXERCISEMPLM UNINSTALL/BOLT UNLOADING

NO T2BACK_OFF TO BERTH

NOMINAL CONFIG#MNVR TO UNDOCK*&SHELL

HTR ACT %DEACT

STS-135

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/17/11 (198) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

CDRPRLA

MEAL

FAREWELL

POST SLEEP

MPLM EGRS

MPLM VEST DEMATE

MPLM DEACT

MPLM VEST DEPRESS EXERCISEIMU

H20#

OBSS*

MDDK XFER

AEM STATUS

CHECK

C/LCAMRINST

PLT MEAL

FAREWELL

RNDZ TOOLS

PTV04OPS

PTV04

SETUP

PTV04%

POST SLEEP EXERCISE MDDK XFERSSRMSMPLMGRAPL

SSRMS MPLM UNINSTLMPLM

UNGRPL

PTV05 DACT

OBSS*

N2-I

N2-T

C/LCAMRINST

STS O2 P/BTEARDOWN

MCIU

MS1

MPLM EGRS

MPLM DEACT

MPLM VEST DEMATESSRMSMPLMGRAPL

SSRMS MPLM UNINSTLMPLM

UNGRPL

FAREWELL

HATCHCLOSE

HATCHLEAKCHECK

POST SLEEP MEALEXERCISE

GLCR P/TV

MPLM&

DOUG SETUP

TRANSFER

BRIEF

MS2 MEAL

FAREWELL

HATCHCLOSE

HATCHLEAKCHECK

RNDZ TOOLS

POST SLEEP

TRANSFER

UPDATE

TRANSFER

BRIEF

TRANSFER

BRIEF PREP

SSC-RETURN

MDDK

CWC-I

FILL #9

CWC-I

FILL #10

CWC-I

FILL #11

CWC-I

FILL #12

CWC-I

FILL #14

CWC-I

FILL #13

MDDK XFER

COND CWC

CHANGEOUT

PRLA

EXERCISE

CWC-I XFER

CWC-I XFER

DAY/NIGHTORBIT 134 135 136 137 138 139 140 141 142

TDRSWEZ

ORB ATT BIAS -XLV -ZVVTDRS AVAIL

Notes

Page 47: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD10

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

NO EXERCISEMPLM UNINSTALL/BOLT UNLOADING

NO T2BACK_OFF TO BERTH

SAMOKUTYAEV

*CAMCORDER CONFIG

2-35

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/17/11 (198) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

ISS CDR POST SLEEP PW PW PWDPC T2 VELO MEAL

FAREWELL

FE-1 POST SLEEP PW PW PWDPC T2 VELO MEAL

FAREWELL

FE-3 POST SLEEP PW DPC

BLOOD

DRW

BLOOD

OPR ARED

STS O2 P/BTEARDOWN

WATERPLC

MEALCBM

DEMATE

RTR R/D

DCBRVW

DCB PACK DCBXFR

FAREWELL

HATCHCLOSE

CEVIS

FE-4 POST SLEEP PW PW PWDPC VELO MDDK XFER MDDK XFERT2 MEAL

FAREWELL

FE-5 POST SLEEP PW PWDPC

BLOOD

S/U

BLOOD

OPR

BLOOD

OPR

BLOOD

DRW

RSNT-I

CEVIS MPLM VEST DEPRESS MEALVSW

VSW

MDDK XFER ARED

FAREWELL

RSNT-R

BPSMUSTOW

WNDW CLS

FE-6 POST SLEEP PW DPCWATERPLC

BLOOD

DRW

SLV STW

BLD STW

MDDK XFER ARED MEALCBM

DEMATEDCBRVW

DCB PACK

FAREWELL

HATCHCLOSE

T2

DAY/NIGHTDAILY ORBITTDRS AVAIL

112 122 142 122ISS TLMORBIT 134 135 136 137 138 139 140 141 142

♣MSS-RWS CABLE-DSCNCT*CAMCORDER CONFIG

NOTES

2-35

FD10

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

NO EXERCISEMPLM UNINSTALL/BOLT UNLOADING

NO T2BACK_OFF TO BERTH

SAMOKUTYAEV

*CAMCORDER CONFIG

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/17/11 (198) 12 13 14 15 16 17 18 19 20 21 22 23 009/00

MET Day 008

ISS CDR POST SLEEP PW PW PWDPC T2 VELO MEAL

FAREWELL

FE-1 POST SLEEP PW PW PWDPC T2 VELO MEAL

FAREWELL

FE-3 POST SLEEP PW DPC

BLOOD

DRW

BLOOD

OPR ARED

STS O2 P/BTEARDOWN

WATERPLC

MEALCBM

DEMATE

RTR R/D

DCBRVW

DCB PACK DCBXFR

FAREWELL

HATCHCLOSE

CEVIS

FE-4 POST SLEEP PW PW PWDPC VELO MDDK XFER MDDK XFERT2 MEAL

FAREWELL

FE-5 POST SLEEP PW PWDPC

BLOOD

S/U

BLOOD

OPR

BLOOD

OPR

BLOOD

DRW

RSNT-I

CEVIS MPLM VEST DEPRESS MEALVSW

VSW

MDDK XFER ARED

FAREWELL

RSNT-R

BPSMUSTOW

WNDW CLS

FE-6 POST SLEEP PW DPCWATERPLC

BLOOD

DRW

SLV STW

BLD STW

MDDK XFER ARED MEALCBM

DEMATEDCBRVW

DCB PACK

FAREWELL

HATCHCLOSE

T2

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 112 122 142 122ORBIT 134 135 136 137 138 139 140 141 142

NOTES

♣MSS-RWS CABLE-DSCNCT*CAMCORDER CONFIG

Page 48: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD10

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-36

STS-135

16 17 18 19 20 21 22 23 07/18 01 02 03GMT 07/17/11 (198) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDR SLEEPPRE SLEEP POST SLEEPPRE SLEEP

PCS ACT

PMCA/G

PLT SLEEPPRE SLEEP POST SLEEPRNDZ TOOLS

MS1 SLEEPPRE SLEEP POST SLEEP

APCU ACT

APCU DEACT

PRE SLEEP

PRE SLEEP

MDDK

MPLM&

MS2 SLEEPPRE SLEEP POST SLEEPRNDZ TOOLS

DAY/NIGHTORBIT 142 143 144 145 146 147 148 149

TDRSWEZ

BIAS -XLV -ZVVORB ATT&SHELL HTR DEACT

NOTES

2-36

FD10

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

16 17 18 19 20 21 22 23 07/18 01 02 03GMT 07/17/11 (198) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

CDR SLEEPPRE SLEEP POST SLEEPPRE SLEEP

PCS ACT

PMCA/G

PLT SLEEPPRE SLEEP POST SLEEPRNDZ TOOLS

MS1 SLEEPPRE SLEEP POST SLEEP

APCU ACT

APCU DEACT

PRE SLEEP

PRE SLEEP

MDDK

MPLM&

MS2 SLEEPPRE SLEEP POST SLEEPRNDZ TOOLS

DAY/NIGHTORBIT 142 143 144 145 146 147 148 149

TDRSWEZ

ORB ATT BIAS -XLV -ZVV

NOTES

&SHELL HTR DEACT

Page 49: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD10

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-37

ISS

16 17 18 19 20 21 22 23 07/18 01 02 03GMT 07/17/11 (198) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

ISS CDR PW DPC PRE SLEEP-ISS SLEEP POST SLEEP

FE-1 PW DPC PRE SLEEP-ISS SLEEP POST SLEEP

FE-3

CEVIS

PWDPC PRE SLEEP-ISS SLEEP PS

FE-4 PW DPC PRE SLEEP-ISS SLEEP POST SLEEP

FE-5 PW DPC PRE SLEEP-ISS SLEEP

BISP

POST SLEEP

FE-6 T2PWDPC PRE SLEEP-ISS SLEEP

BISP

POST SLEEP

DAY/NIGHTDAILY ORBITTDRS AVAIL

122 112 122ISS TLMORBIT 142 143 144 145 146 147 148 149

NOTES

2-37

FD10

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

16 17 18 19 20 21 22 23 07/18 01 02 03GMT 07/17/11 (198) 009/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 009

ISS CDR PW DPC PRE SLEEP-ISS SLEEP POST SLEEP

FE-1 PW DPC PRE SLEEP-ISS SLEEP POST SLEEP

FE-3

CEVIS

PWDPC PRE SLEEP-ISS SLEEP PS

FE-4 PW DPC PRE SLEEP-ISS SLEEP POST SLEEP

FE-5 PW DPC PRE SLEEP-ISS SLEEP

BISP

POST SLEEP

FE-6 T2PWDPC PRE SLEEP-ISS SLEEP

BISP

POST SLEEP

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 122 112 122ORBIT 142 143 144 145 146 147 148 149

NOTES

Page 50: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD11

UNDOCKING*

*UNDOCKING 009/14:33

FERGUSON

HURLEY

MAGNUS

WALHEIM

SEP1^ SEP2^

*CHANGE

2-38

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/18/11 (199) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR POST SLEEPUNDOCKOPS

MNVRUNDOCK

H/O#

FLYAROUND/SEP MEAL

MNVR STBD

STBD WING SRVY-LATE

MNVR NOSE

NOSE CAPSURVEY

PORT WINGSURVEY

MNVR PORT

MNVR -ZLV

OBSS BERTH

CAB TEMP

PT WNG SVY

MNVR DUMP

GRP B PWRUP

GRP B PWRDN

RMS PWRDN

PLT POST SLEEPUNDOCKOPS

IMU

FLYAROUND/SEP

COMM 1

MEAL

FLAT FIELD

STBD WING SRVY-LATENOSE CAPSURVEY

PORT WING SURVEY OBSS BERTHPOSTSLEEP

HTR B

SSV-4

GRP B PWRUP

GRP B PWRDN

RMS PWRDN

MS1 POST SLEEPP/TV03S/U

P/TV03 UNDOCK

PTV03

DEACT

MEAL STBD WING SRVY-LATENOSE CAPSURVEY

PORT WING SURVEYLDRI

DOWNLINK

COND CWC

TEARDOWN

AEM STATUS

CHECK

SSV-3

FOB P/TV

MDDK

MDDK

MPLM&

RASV TERM

MS2 POST SLEEPUNDOCKOPS

TRIDAR ACT

FLYAROUND/SEP

TRIDAR%

MEALNLPVACTERM

FOB INIT/MIX

FOB SMPLE

XTRCT

NLP TEMP*

SSOR DEACT

FES-I

EMUINSTL

PST ISSEVA ENTPREP

EVA UNPACK & STOWSIMOINIT

SIMOTERM

EXERCISE

DAY/NIGHTORBIT 150 151 152 153 154 155 156 157

TDRSWEZ

BIAS -XLV -ZVV -XLV +ZVV FLYAROUND/SEP BIAS -ZLV +YVV BIAS +YSI BIAS +XSI BIAS -YSI -ZLV -XVVORB ATT#CMG to STS &SHELL HTR ACT

%DEACT

NOTES

2-38

FD11

UNDOCKING*

*UNDOCKING 009/14:33

FERGUSON

HURLEY

MAGNUS

WALHEIM

SEP1^ SEP2^

*CHANGE

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/18/11 (199) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

CDR POST SLEEPUNDOCKOPS

MNVRUNDOCK

H/O#

FLYAROUND/SEP MEAL

MNVR STBD

STBD WING SRVY-LATE

MNVR NOSE

NOSE CAPSURVEY

PORT WINGSURVEY

MNVR PORT

MNVR -ZLV

OBSS BERTH

CAB TEMP

PT WNG SVY

MNVR DUMP

GRP B PWRUP

GRP B PWRDN

RMS PWRDN

PLT POST SLEEPUNDOCKOPS

IMU

FLYAROUND/SEP

COMM 1

MEAL

FLAT FIELD

STBD WING SRVY-LATENOSE CAPSURVEY

PORT WING SURVEY OBSS BERTHPOSTSLEEP

HTR B

SSV-4

GRP B PWRUP

GRP B PWRDN

RMS PWRDN

MS1 POST SLEEPP/TV03S/U

P/TV03 UNDOCK

PTV03

DEACT

MEAL STBD WING SRVY-LATENOSE CAPSURVEY

PORT WING SURVEYLDRI

DOWNLINK

COND CWC

TEARDOWN

AEM STATUS

CHECK

SSV-3

FOB P/TV

MDDK

MDDK

MPLM&

RASV TERM

MS2 POST SLEEPUNDOCKOPS

TRIDAR ACT

FLYAROUND/SEP

TRIDAR%

MEALNLPVACTERM

FOB INIT/MIX

FOB SMPLE

XTRCT

NLP TEMP*

SSOR DEACT

FES-I

EMUINSTL

PST ISSEVA ENTPREP

EVA UNPACK & STOWSIMOINIT

SIMOTERM

EXERCISE

DAY/NIGHTORBIT 150 151 152 153 154 155 156 157

TDRSWEZ

ORB ATT BIAS -XLV -ZVV -XLV +ZVV FLYAROUND/SEP BIAS -ZLV +YVV BIAS +YSI BIAS +XSI BIAS -YSI -ZLV -XVV

NOTES

#CMG to STS &SHELL HTR ACT%DEACT

Page 51: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

*UNDOCKING

*UNDOCKING 199/05:59

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

FD11

SAMOKUTYAEV

2-39

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/18/11 (199) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

ISS CDR POSTSLEEP

PW PWDPC ♣T2 MEAL ARED

FE-1 POSTSLEEP

PW PWDPC ♣VELO MEAL T2

FE-3 PS PS

PMA2

SETUP

DPC ♣PW PW

CREW

SRVY

PMA2

DEPART

CONFIG

PMA2 DPRSPT1

PMA2PT2

PMA2PT3

MEAL T2 ARED

FE-4 POSTSLEEP

PW PWDPC ♣MEAL VELO T2

FE-5 POSTSLEEP

PW PWDPC ♣ARED

CREW

SRVY

DUCT-RMV

GC/DMS

GC/DMS

RWS PR

T2 MEAL

TOCA

CSAO2CAL

VCA1 CAM

RTN T

OCA

FE-6 POSTSLEEP

PW PWDPC ♣

CRW SRVY

PMA2

DEPART

CONFIG

UNDK

VIDEO

AUD CFG

BPSMU

STOW

ARED MEALWHCMANFILL

WHC MAINTENANCE PLC CEVIS

DAY/NIGHTDAILY ORBITTDRS AVAIL

142 112 122ISS TLMORBIT 150 151 152 153 154 155 156 157

♣DPC⊕ SODF-EVA-UPDATE♦ AR-CDRA LTL-DSCNCT

NOTES

2-39

*UNDOCKING

*UNDOCKING 199/05:59

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

FD11

SAMOKUTYAEV

ISS

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/18/11 (199) 12 13 14 15 16 17 18 19 20 21 22 23 010/00

MET Day 009

ISS CDR POSTSLEEP

PW PWDPC ♣T2 MEAL ARED

FE-1 POSTSLEEP

PW PWDPC ♣VELO MEAL T2

FE-3 PS PS

PMA2

SETUP

DPC ♣PW PW

CREW

SRVY

PMA2

DEPART

CONFIG

PMA2 DPRSPT1

PMA2PT2

PMA2PT3

MEAL T2 ARED

FE-4 POSTSLEEP

PW PWDPC ♣MEAL VELO T2

FE-5 POSTSLEEP

PW PWDPC ♣ARED

CREW

SRVY

DUCT-RMV

GC/DMS

GC/DMS

RWS PR

T2 MEAL

TOCA

CSAO2CAL

VCA1 CAM

RTN T

OCA

FE-6 POSTSLEEP

PW PWDPC ♣

CRW SRVY

PMA2

DEPART

CONFIG

UNDK

VIDEO

AUD CFG

BPSMU

STOW

ARED MEALWHCMANFILL

WHC MAINTENANCE PLC CEVIS

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 142 112 122ORBIT 150 151 152 153 154 155 156 157

NOTES

♣DPC⊕ SODF-EVA-UPDATE♦ AR-CDRA LTL-DSCNCT

Page 52: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD11

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-40

STS-135

ISS

16 17 18 19 20 21 22 23 07/19 01 02 03GMT 07/18/11 (199) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDR SLEEP POST SLEEPPRE SLEEPPMCA/G

RMS PWRDN

PRE SLEEP

PLT SLEEPPRE SLEEP POST SLEEP

RMS PWRDN

MS1 SLEEPPRE SLEEPPRE

SLEEPPOST SLEEP

OIU DEACT

APCU ACT

APCU DEACT

MPLM&

PRE SLEEP

RASV TERM

MS2 SLEEP

OCA#

POST SLEEPLOG

PRE SLEEP

FOB SMPLE

XTRCT

PLYBK OPS

FES-T

PRESLEEP

DAY/NIGHTORBIT 157 158 159 160 161 162 163 164 165

TDRSWEZ

-ZLV -XVVORB ATTTDRS AVAIL

&SHELL HTR DEACT#48 Mbps

Notes

2-40

FD11

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

ISS

16 17 18 19 20 21 22 23 07/19 01 02 03GMT 07/18/11 (199) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

CDR SLEEP POST SLEEPPRE SLEEPPMCA/G

RMS PWRDN

PRE SLEEP

PLT SLEEPPRE SLEEP POST SLEEP

RMS PWRDN

MS1 SLEEPPRE SLEEPPRE

SLEEPPOST SLEEP

OIU DEACT

APCU ACT

APCU DEACT

MPLM&

PRE SLEEP

RASV TERM

MS2 SLEEP

OCA#

POST SLEEPLOG

PRE SLEEP

FOB SMPLE

XTRCT

PLYBK OPS

FES-T

PRESLEEP

DAY/NIGHTORBIT 157 158 159 160 161 162 163 164 165

TDRSWEZ

ORB ATT -ZLV -XVVTDRS AVAIL

Notes

&SHELL HTR DEACT#48 Mbps

Page 53: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD11

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

2-41

ISS

16 17 18 19 20 21 22 23 07/19 01 02 03GMT 07/18/11 (199) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

ISS CDRDPC

PRE SLEEP-ISS SLEEP

FE-1DPC

PRE SLEEP-ISS SLEEP

FE-3DPC

PRE SLEEP-ISS SLEEP

FE-4DPC

PRE SLEEP-ISS SLEEP

FE-5DPC

PRE SLEEP-ISS SLEEP

FE-6DPC

PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBITTDRS AVAIL

122ISS TLMORBIT 157 158 159 160 161 162 163 164 165

NOTES

2-41

FD11

BORISENKO

GARAN

VOLKOV

FURUKAWA

FOSSUM

SAMOKUTYAEV

ISS

16 17 18 19 20 21 22 23 07/19 01 02 03GMT 07/18/11 (199) 010/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 010

ISS CDRDPC

PRE SLEEP-ISS SLEEP

FE-1DPC

PRE SLEEP-ISS SLEEP

FE-3DPC

PRE SLEEP-ISS SLEEP

FE-4DPC

PRE SLEEP-ISS SLEEP

FE-5DPC

PRE SLEEP-ISS SLEEP

FE-6DPC

PRE SLEEP-ISS SLEEP

DAY/NIGHTDAILY ORBITTDRS AVAILISS TLM 122ORBIT 157 158 159 160 161 162 163 164 165

NOTES

Page 54: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

POWER ON#

^DPLYSEP3^

FERGUSON

HURLEY

MAGNUS

WALHEIM

FD12

SHELL HTR DEACT&

2-42

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/19/11 (200) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR FCS C/O

RCS HOT

FIRE PILOT OPS

D/OBRIEF

PAOEVENT

MEAL

MADS#

POSTSLEEP

PICOSATDEPLOY

AEM STATUS

CHECK

+XRCSBURN

FES&

CABIN STOW

FES-I

MNVR -ZLV

MNVR -ZLV

MNVR DUMP

POSTSLEEP

EXERCISE

PLT FCS C/O

RCS HOT

FIRE

D/OBRIEF

PAOEVENT

MEAL

MLAL-1COMMCHK

DFRL-1COMMCHK

EXERCISEPOSTSLEEP

COMM2

PILOT OPSIMU

+XRCSBURN

MNVR DPLY

PICOSATDEPLOY

CABIN STOW

MPM STOW

POSTSLEEP

CABINSTOW

FES*

MS1FCSC/OP/TV

D/OBRIEF

PAOEVENT

MEALPAOS/U

ENTRY

VIDEO

SETUP

ERGSTOW

POST SLEEP

PTV10 S/U

PTV10 OPS

BRIC ACT

BRIC P/TV

CABIN STOW

MDDK

COND INIT

COND TERM

CABINSTOW

EXERCISE CABIN STOW

CREW

CHOICE D/L

MS2 FCS C/O

RCS HOT

FIRE

D/OBRIEF

PAOEVENT

MEALEXERCISE

W/B*

POSTSLEEP

FILTERCLEAN

OCA%

PICOSATDEPLOY

CABIN STOW

WLES^

BRIC ACTPOSTSLEEP

MPLM@

CABIN STOW

WLES DEACT

MDDK

MPLM&

OIU ACT

APCU ACT

PGSCSTOWPARTI

APCU DEACT

OIU DEACT

DAY/NIGHTORBIT 165 166 167 168 169 170 171 172 173

TDRSWEZ

GND DFR DFRMLA MLAMLA

SEP3 -ZLV -XVV -YLV +ZVV -ZLV +YVV -ZLV -XVVORB ATT&OFF *ON*HEATER ACT

%2 Mbps^PREP-RNDZ C/O

@SHELL HTR ACT

NOTES

2-42

POWER ON#

^DPLYSEP3^

FERGUSON

HURLEY

MAGNUS

WALHEIM

FD12

SHELL HTR DEACT&

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/19/11 (200) 12 13 14 15 16 17 18 19 20 21 22 23 011/00

MET Day 010

CDR FCS C/O

RCS HOT

FIRE PILOT OPS

D/OBRIEF

PAOEVENT

MEAL

MADS#

POSTSLEEP

PICOSATDEPLOY

AEM STATUS

CHECK

+XRCSBURN

FES&

CABIN STOW

FES-I

MNVR -ZLV

MNVR -ZLV

MNVR DUMP

POSTSLEEP

EXERCISE

PLT FCS C/O

RCS HOT

FIRE

D/OBRIEF

PAOEVENT

MEAL

MLAL-1COMMCHK

DFRL-1COMMCHK

EXERCISEPOSTSLEEP

COMM2

PILOT OPSIMU

+XRCSBURN

MNVR DPLY

PICOSATDEPLOY

CABIN STOW

MPM STOW

POSTSLEEP

CABINSTOW

FES*

MS1FCSC/OP/TV

D/OBRIEF

PAOEVENT

MEALPAOS/U

ENTRY

VIDEO

SETUP

ERGSTOW

POST SLEEP

PTV10 S/U

PTV10 OPS

BRIC ACT

BRIC P/TV

CABIN STOW

MDDK

COND INIT

COND TERM

CABINSTOW

EXERCISE CABIN STOW

CREW

CHOICE D/L

MS2 FCS C/O

RCS HOT

FIRE

D/OBRIEF

PAOEVENT

MEALEXERCISE

W/B*

POSTSLEEP

FILTERCLEAN

OCA%

PICOSATDEPLOY

CABIN STOW

WLES^

BRIC ACTPOSTSLEEP

MPLM@

CABIN STOW

WLES DEACT

MDDK

MPLM&

OIU ACT

APCU ACT

PGSCSTOWPARTI

APCU DEACT

OIU DEACT

DAY/NIGHTORBIT 165 166 167 168 169 170 171 172 173

TDRSWEZ

GND

ORB ATT SEP3 -ZLV -XVV -YLV +ZVV -ZLV +YVV -ZLV -XVV

NOTES

&OFF *ON*HEATER ACT%2 Mbps

^PREP-RNDZ C/O@SHELL HTR ACT

Page 55: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

FD12

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-43

STS-135

16 17 18 19 20 21 22 23 07/20 01 02 03GMT 07/19/11 (200) 011/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 011

CDR

ENTRY@

SLEEP POST SLEEPPRE SLEEPPMCA/G

FES-T

PLT SLEEPPRE SLEEP POST SLEEP

CABIN STOW

MS1

KU STOW

SLEEPPRE SLEEP POST SLEEP

SSV DEACT

CABIN STOW

MS2 SLEEP POST SLEEPLOG

PRE SLEEP

DAY/NIGHTORBIT 173 174 175 176 177 178 179 180 181

TDRSWEZ

-ZLV -XVVORB ATT@COOLING CNFG

NOTES

2-43

FD12

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

16 17 18 19 20 21 22 23 07/20 01 02 03GMT 07/19/11 (200) 011/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 011

CDR

ENTRY@

SLEEP POST SLEEPPRE SLEEPPMCA/G

FES-T

PLT SLEEPPRE SLEEP POST SLEEP

CABIN STOW

MS1

KU STOW

SLEEPPRE SLEEP POST SLEEP

SSV DEACT

CABIN STOW

MS2 SLEEP POST SLEEPLOG

PRE SLEEP

DAY/NIGHTORBIT 173 174 175 176 177 178 179 180 181

TDRSWEZ

ORB ATT -ZLV -XVV

NOTES

@COOLING CNFG

Page 56: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

*DEORBIT TIG ~011/18:36

*LANDING ~011/19:40

FD13

FERGUSON

HURLEY

MAGNUS

WALHEIM

2-44

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/20/11 (201) 12 13 14 15 16 17 18 19 20 21 22 23 012/00

MET Day 011

CDR POSTSLEEP

DEORBIT PREP

TRK -XSI

IMUALIGN&

VERIF

PMCA/G

GRP B PWRUP

POST SLEEP

PLT POST SLEEP DEORBIT PREP

OCAC STOW

POSTSLEEP

GRP B PWRUP

MS1 POST SLEEP DEORBIT PREP

MADS^

GIRA STOW

STL*

MFLR RMVL

AEM STATUS

CHECK

MS2 POST SLEEP DEORBIT PREPPGSCSTOWPARTII

TEPC PWRDN

SAMPL

WATCH

CUBLAB@

MDDK

DAY/NIGHTORBIT 181 182 183 184 185 186 187 188

TDRSWEZ

-ZLV -XVV -XSI IMU COMM D0 ENTRYORB ATT^STRAIN GAGE ENABLE

*ENTRY PREP@DEACT

NOTES

2-44

*DEORBIT TIG ~011/18:36

*LANDING ~011/19:40

FD13

FERGUSON

HURLEY

MAGNUS

WALHEIM

STS-135

04 05 06 07 08 09 10 11 12 13 14 15GMT 07/20/11 (201) 12 13 14 15 16 17 18 19 20 21 22 23 012/00

MET Day 011

CDR POSTSLEEP

DEORBIT PREP

TRK -XSI

IMUALIGN&

VERIF

PMCA/G

GRP B PWRUP

POST SLEEP

PLT POST SLEEP DEORBIT PREP

OCAC STOW

POSTSLEEP

GRP B PWRUP

MS1 POST SLEEP DEORBIT PREP

MADS^

GIRA STOW

STL*

MFLR RMVL

AEM STATUS

CHECK

MS2 POST SLEEP DEORBIT PREPPGSCSTOWPARTII

TEPC PWRDN

SAMPL

WATCH

CUBLAB@

MDDK

DAY/NIGHTORBIT 181 182 183 184 185 186 187 188

TDRSWEZ

ORB ATT -ZLV -XVV -XSI IMU COMM D0 ENTRY

NOTES

^STRAIN GAGE ENABLE*ENTRY PREP

@DEACT

Page 57: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

3-1 FLT PLN/135/FIN

DE

TA

ILE

D

TIM

EL

INE

DETAILED TIMELINE

Page 58: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

ACTIVITIES PRIOR TO 00/02:50 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS.THE ORBITER SHOULD BE IN A -ZLV -XVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

FD01 EZ ACTIVITIES:PCS 1(2) CONFIG (ORB OPS, ECLS) Config to PCS 2 with 14.7 CAB REG INLET SYS1,2 vlvs (two)- CLLAMP TEST (ORB OPS, EPS)SMOKE DETN CKT TEST (ORB OPS, ECLS)CSA-CP BATTERY CHANGEOUT (ORB OPS, CSA-CP)CSA-CP CHECKOUT AND ZERO CALIBRATION OPS (ORB OPS, CSA-CP)VTR CLOCK SET (PHOTO/TV, DTV) if not performed for PLBD recD3s (PHOTO/TV, REF PROC) Perform DATE/TIME SET

RETURN TO FLIGHT PLAN AT 00/02:50

01

Ferguson Hurley

UPLINKβ21+MASK

UPDATEORBITAL MNVR PAD

3-2

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/08(189)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

~ ~

D/N

ORB

1

2

3

-ZLV -XVV

NC1

~

STS ATT

CDR

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (03:40)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

LOAD DAPS Ref.STS-135 DAP A(B) CONFIGURATIONS (ORB OPS, DAP TABLE)

AFT CONTROLLER C/O (ORB OPS, GNC)

PLT

ON-ORBIT OMS BURN (ORB OPS, OMS)

OCAC SETUP (ORB OPS, CREW SYSTEMS)

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INITIALIZATION)

NOTES

3-2

ACTIVITIES PRIOR TO 00/02:50 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS.THE ORBITER SHOULD BE IN A -ZLV -XVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

FD01 EZ ACTIVITIES:PCS 1(2) CONFIG (ORB OPS, ECLS) Config to PCS 2 with 14.7 CAB REG INLET SYS1,2 vlvs (two)- CLLAMP TEST (ORB OPS, EPS)SMOKE DETN CKT TEST (ORB OPS, ECLS)CSA-CP BATTERY CHANGEOUT (ORB OPS, CSA-CP)CSA-CP CHECKOUT AND ZERO CALIBRATION OPS (ORB OPS, CSA-CP)VTR CLOCK SET (PHOTO/TV, DTV) if not performed for PLBD recD3s (PHOTO/TV, REF PROC) Perform DATE/TIME SET

RETURN TO FLIGHT PLAN AT 00/02:50

01

Ferguson Hurley

UPLINKβ21+MASK

UPDATEORBITAL MNVR PAD

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/08(189)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

D/N

ORB

1

2

3

STS ATT

-ZLV -XVV

NC1

~

CDR

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC1 TIG (03:40)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

LOAD DAPS Ref.STS-135 DAP A(B) CONFIGURATIONS (ORB OPS, DAP TABLE)

AFT CONTROLLER C/O (ORB OPS, GNC)

PLT

ON-ORBIT OMS BURN (ORB OPS, OMS)

OCAC SETUP (ORB OPS, CREW SYSTEMS)

ON-ORBIT INITIALIZATION (PDRS, ON-ORBIT INITIALIZATION)

NOTES

sstaffor
Text Box
DETAILED TIMELINE
Page 59: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

01

Magnus Walheim

ACTIVITIES PRIOR TO 00/02:50 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS.THE ORBITER SHOULD BE IN A -ZLV -XVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

RETURN TO FLIGHT PLAN AT 00/02:50

A On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

UPLINKTFL 199

MPLM ENVIRONMENTCHECK

On MCC Go: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

PGSC ACT (Details on pg 3-5)

AEM MUFFLER INSL- Retrieve muffler from Seat Bag 5, attach to faceplate at Velcro tabs, and repeat for other two AEM units.

3-3

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/08(189)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

~ ~

D/N

ORB

1

2

3

-ZLV -XVV

NC1

~

STS ATT

MS1

GIRA INSTALLATION (ORB OPS, ECLS)

P/TV01 VIDEO SETUP (P/TV, SCENES) ~

STL INITIALIZATION (ASSY OPS, PAYLOADS)

MS2

~

SSP1 OIU PWR - OIU 1 ON (tb-UP)

OIU PWR - OFF (tb-bp)

TISSUE EQUIVALENT PRORP COUNTER (TEPC) (A. PWR ON) (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION A

UPLINKTFL 188

NOTES

3-3

01

Magnus Walheim

ACTIVITIES PRIOR TO 00/02:50 ARE IN THE ASCENT AND POST INSERTION CHECKLISTS.THE ORBITER SHOULD BE IN A -ZLV -XVV ATTITUDE UPON ENTERING THE FLIGHT PLAN.

RETURN TO FLIGHT PLAN AT 00/02:50

A On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

UPLINKTFL 199

MPLM ENVIRONMENTCHECK

On MCC Go: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

PGSC ACT (Details on pg 3-5)

AEM MUFFLER INSL- Retrieve muffler from Seat Bag 5, attach to faceplate at Velcro tabs, and repeat for other two AEM units.

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/08(189)

00:00

01:00

02:00

03:00

04:00

MET

Day 000W E Z

TDRS

D/N

ORB

1

2

3

STS ATT

-ZLV -XVV

NC1

~

MS1

GIRA INSTALLATION (ORB OPS, ECLS)

~P/TV01 VIDEO SETUP (P/TV, SCENES)

STL INITIALIZATION (ASSY OPS, PAYLOADS)

MS2

~

SSP1 OIU PWR - OIU 1 ON (tb-UP)

OIU PWR - OFF (tb-bp)

TISSUE EQUIVALENT PRORP COUNTER (TEPC) (A. PWR ON) (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION A

NOTES

UPLINKTFL 188

Page 60: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

01

Ferguson Hurley

B MO69M Insert Bleed Orifice Assembly into LEH O2 8 QD LEH O2 8 vlv-OP

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 2,5,6(Single G2), & 12(IMU 2)

PRIORITY PWRDN GRP B (ORB PKT, PRIORITY PWRDN) Steps 2,5,6(Single G2), & 12(IMU 2)

A12 APU HTR GG/FU (three) - A AUTOR2 BLR POWER (three) - OFF

3-4

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/08(189)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

~ ~

~

D/N

ORB

3

4

5

6

~

~

-ZLV -XVV

STS ATT

CDR

PGSC ACT PGSC NETWORK (A. SETUP) OCA SETUP PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRNTR UNSTOW & ASSMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

RMS CHECKOUT (PDRS, RMS CHECKOUT)

RMS PWRUP (PDRS, RMS PWRUP)

ELEVON PARK, GNC 201 (ORB OPS, GNC)

RMS PWRDN (PDRS, RMS PWRDN) Step 1O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

P/TV01 VIDEO SETUP (P/TV, SCENES)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

RMS CHECKOUT (PDRS, RMS CHECKOUT)

RMS PWRUP (PDRS, RMS PWRUP)

INSTALL BLEED ORIFICE BRMS PWRDN (PDRS, RMS PWRDN) Step 1

NOTES

3-4

01

Ferguson Hurley

B MO69M Insert Bleed Orifice Assembly into LEH O2 8 QD LEH O2 8 vlv-OP

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 2,5,6(Single G2), & 12(IMU 2)

PRIORITY PWRDN GRP B (ORB PKT, PRIORITY PWRDN) Steps 2,5,6(Single G2), & 12(IMU 2)

A12 APU HTR GG/FU (three) - A AUTOR2 BLR POWER (three) - OFF

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/08(189)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

D/N

ORB

3

4

5

6

STS ATT~

~

-ZLV -XVV

CDR

PGSC ACT PGSC NETWORK (A. SETUP) OCA SETUP PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRNTR UNSTOW & ASSMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RMS CHECKOUT (PDRS, RMS CHECKOUT)

RMS PWRUP (PDRS, RMS PWRUP)

ELEVON PARK, GNC 201 (ORB OPS, GNC)

RMS PWRDN (PDRS, RMS PWRDN) Step 1O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

P/TV01 VIDEO SETUP (P/TV, SCENES)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RMS CHECKOUT (PDRS, RMS CHECKOUT)

RMS PWRUP (PDRS, RMS PWRUP)

INSTALL BLEED ORIFICE BRMS PWRDN (PDRS, RMS PWRDN) Step 1

NOTES

Page 61: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

01

Magnus Walheim

3-5

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/08(189)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

~ ~

~

D/N

ORB

3

4

5

6

~

~

-ZLV -XVV

STS ATT

MS1

SHUTTLE EMER EYEWASH SETUP After GIRA INSTALL, unstow and fill one drink container; label "FOR EYE RINSE ONLY". Attach on or near galley.

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

P/TV08 EXTERNAL SRVY (SETUP) Step 1P/TV08 EXTERNAL SRVY (OPS) (P/TV, SCENES) Item 1, OMS Pod Srvy Best Lighting (07:15-07:58)

P/TV01 VIDEO SETUP (P/TV, SCENES)

~

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

PGSC ACT PGSC NETWORK (A. SETUP) OCA SETUP PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRNTR UNSTOW & ASSMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

~

WLES ACTIVATION & CHECKOUT (ORB OPS, WLE SENSORS)

IMAGE FILE XFER (PHOTO/TV, D2Xs) Perform DCS FILE TO HARD DRIVE for ET HH PhotoUMBILICAL WELL TPS CAMERA IMAGERY DOWNLOADING (ORB OPS, PGSC)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) W4 Mini-Cam KU TDRW (07:05-07:58) Gimbal flip @ 7:29

NOTES

3-5

01

Magnus Walheim

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/08(189)

04:00

05:00

06:00

07:00

08:00

MET

Day 000W E Z

TDRS

D/N

ORB

3

4

5

6

STS ATT~

~

-ZLV -XVV

MS1

SHUTTLE EMER EYEWASH SETUP After GIRA INSTALL, unstow and fill one drink container; label "FOR EYE RINSE ONLY". Attach on or near galley.

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

P/TV08 EXTERNAL SRVY (SETUP) Step 1P/TV08 EXTERNAL SRVY (OPS) (P/TV, SCENES) Item 1, OMS Pod Srvy Best Lighting (07:15-07:58)

~P/TV01 VIDEO SETUP (P/TV, SCENES)

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~PGSC ACT PGSC NETWORK (A. SETUP) OCA SETUP PGSC HARD DISK LATE UPDATEWINDECOM OPS (A. ACT)WORLDMAP INITIALIZATIONCOLOR PRNTR UNSTOW & ASSMBLECOLOR PRINTER WARMUP & SELF-TEST (ORB OPS, PGSC)

WLES ACTIVATION & CHECKOUT (ORB OPS, WLE SENSORS)

IMAGE FILE XFER (PHOTO/TV, D2Xs) Perform DCS FILE TO HARD DRIVE for ET HH PhotoUMBILICAL WELL TPS CAMERA IMAGERY DOWNLOADING (ORB OPS, PGSC)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) W4 Mini-Cam KU TDRW (07:05-07:58) Gimbal flip @ 7:29

NOTES

Page 62: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

01

Ferguson Hurley

CREW WAKE @ 00/16:30

3-6

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/08(189)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

~ ~

~

D/N

ORB

6

7

8

9

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-6

01

Ferguson Hurley

CREW WAKE @ 00/16:30

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/08(189)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

D/N

ORB

6

7

8

9

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 63: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

01

Magnus Walheim

SDBI 1634 SLEEP-WAKE ACTIGRAPHY (ORB OPS, SDBI) A. DON ACTIWATCH

CREW WAKE @ 00/16:30

3-7

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/08(189)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

~ ~

~

D/N

ORB

6

7

8

9

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-7

01

Magnus Walheim

SDBI 1634 SLEEP-WAKE ACTIGRAPHY (ORB OPS, SDBI) A. DON ACTIWATCH

CREW WAKE @ 00/16:30

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/08(189)

08:00

09:00

10:00

11:00

12:00

MET

Day 000W E Z

TDRS

D/N

ORB

6

7

8

9

STS ATT~

~

-ZLV -XVV

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 64: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

01

Ferguson Hurley

3-8

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/09(190)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

~

~

~

~

D/N

ORB

9

10

11

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-8

01

Ferguson Hurley

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/09(190)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

D/N

ORB

9

10

11

STS ATT~

~

-ZLV -XVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 65: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

01

Magnus Walheim

3-9

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/09(190)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

~

~

~

~

D/N

ORB

9

10

11

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-9

01

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/09(190)

12:00

13:00

14:00

15:00

16:00

MET

Day 000W E Z

TDRS

D/N

ORB

9

10

11

STS ATT~

~

-ZLV -XVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 66: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Ferguson Hurley

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

FD02 EZ ACTIVITIES: TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3 (KFX)

3-10

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/09(190)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

~

~ ~

~

D/N

ORB

11

12

13

14

~

-ZLV -XVV

NC2

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC2 TIG (18:42)MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

~

ON-ORBIT OMS BURN (ORB OPS, OMS)

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UPDATEORBITAL MNVR PAD

NOTES

3-10

02

Ferguson Hurley

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

FD02 EZ ACTIVITIES: TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3 (KFX)

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/09(190)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

D/N

ORB

11

12

13

14

STS ATT~

-ZLV -XVV

NC2

~

-ZLV -XVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

~

OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

ON-ORBIT OMS BURN (ORB OPS, OMS)

< NC2 TIG (18:42)MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

ON-ORBIT OMS BURN (ORB OPS, OMS)

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

UPDATEORBITAL MNVR PAD

Page 67: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Magnus Walheim

B A14 RCS/OMS HTR L POD - A OFF - B AUTO R POD - A OFF - B AUTO

A On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

MPLM PRESSURECHECK

UPLINKTFL 199

OIU PWR - OFF (tb-bp)

On MCC GO: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

3-11

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/09(190)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

~

~ ~

~

D/N

ORB

11

12

13

14

~

-ZLV -XVV

NC2

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RCS/OMS POD HEATER RECONFIG B

FC MONITORING SYS (FCMS) OPS (ORB OPS, EPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSP1 OIU PWR - OIU 1 ON (tb-UP)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION A

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

UPLINKTFL 188

NOTES

3-11

02

Magnus Walheim

B A14 RCS/OMS HTR L POD - A OFF - B AUTO R POD - A OFF - B AUTO

A On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

MPLM PRESSURECHECK

UPLINKTFL 199

OIU PWR - OFF (tb-bp)

On MCC GO: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/09(190)

16:00

17:00

18:00

19:00

20:00

MET

Day 000W E Z

TDRS

D/N

ORB

11

12

13

14

STS ATT~

-ZLV -XVV

NC2

~

-ZLV -XVV

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RCS/OMS POD HEATER RECONFIG B

FC MONITORING SYS (FCMS) OPS (ORB OPS, EPS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSP1 OIU PWR - OIU 1 ON (tb-UP)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION A

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

NOTES

UPLINKTFL 188

Page 68: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Ferguson Hurley

MNVR (TRK) BIAS +XSI (Nose Cap) TG=4 BV=5 P=330 Y=0 OM=305 A14/AUTO/VERN, RCC SURVEY-STBD cmplt, Init TRK

3-12

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/09(190)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

~

~

~

~

D/N

ORB

14

15

16

~

BIAS +YSI

~

BIAS +XSI

STS ATT

CDR

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

~

MNVR (TRK) BIAS +YSI (Stbd Survey) TG=4 BV=5 P=0 Y=40 OM=270 A14/AUTO/VERN, OBSS UNBERTH cmplt, Init TRK

MEAL

PLT

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

~

MEAL

NOTES

3-12

02

Ferguson Hurley

MNVR (TRK) BIAS +XSI (Nose Cap) TG=4 BV=5 P=330 Y=0 OM=305 A14/AUTO/VERN, RCC SURVEY-STBD cmplt, Init TRK

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/09(190)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

D/N

ORB

14

15

16

STS ATT~

BIAS +YSI

~

BIAS +XSI

CDR

~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

MNVR (TRK) BIAS +YSI (Stbd Survey) TG=4 BV=5 P=0 Y=40 OM=270 A14/AUTO/VERN, OBSS UNBERTH cmplt, Init TRK

MEAL

PLT

~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~OBSS UNBERTH (PDRS, OBSS OPERATIONS) Prior to Step 3: SSP1 √APCU 2 OUTPUT RLY CLOSE tb-bp

MEAL

NOTES

Page 69: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Magnus Walheim

BRICK SYNRGE UNSTOW (ASSY OPS, PAYLOADS)CUBE LAB MODULE-8 ACTIVATION (ASSY OPS, PAYLOADS)

CUBE LAB MODULE-7 ACTIVATION (ASSY OPS, PAYLOADS) All Trays in LMA Packs 1 and 2; ONLY activate Syringes with "FD2" labeled arrows on back of trays.

3-13

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/09(190)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

~

~

~

~

D/N

ORB

14

15

16

~

BIAS +YSI

~

BIAS +XSI

STS ATT

MS1

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

MEAL

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) Item 5 Video

MS2

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

MEAL

CRYO 02 TK HTR SNSR CK (ORB OPS, EPS)

FUEL CELL PURGE - MANUAL (ORB OPS, EPS)

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

CUBE LAB MODULE-8 CRYSTALLIZATION (ASSY OPS, PAYLOADS)

ML86B:C cb MNC EXT ARLK HTR LN ZN 1,2 (two) - cl

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

SHUTTLE/ISS H2O CONTAINER FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE Ref. MSG XXX

NOTES

3-13

02

Magnus Walheim

BRICK SYNRGE UNSTOW (ASSY OPS, PAYLOADS)CUBE LAB MODULE-8 ACTIVATION (ASSY OPS, PAYLOADS)

CUBE LAB MODULE-7 ACTIVATION (ASSY OPS, PAYLOADS) All Trays in LMA Packs 1 and 2; ONLY activate Syringes with "FD2" labeled arrows on back of trays.

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/09(190)

20:00

21:00

22:00

23:00

00:00

MET

Day 000W E Z

TDRS

D/N

ORB

14

15

16

STS ATT~

BIAS +YSI

~

BIAS +XSI

MS1

~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

MEAL

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) Item 5 Video

MS2

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) ERGOMETER SETUP

MEAL

CRYO 02 TK HTR SNSR CK (ORB OPS, EPS)

FUEL CELL PURGE - MANUAL (ORB OPS, EPS)

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

CUBE LAB MODULE-8 CRYSTALLIZATION (ASSY OPS, PAYLOADS)

ML86B:C cb MNC EXT ARLK HTR LN ZN 1,2 (two) - cl

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

SHUTTLE/ISS H2O CONTAINER FILL (ORB OPS, ECLS) Perform EQUIP PREP and WATER TRANSFER HOSE PURGE Ref. MSG XXX

NOTES

Page 70: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Ferguson Hurley

UPLINKTFL 192

3-14

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/09(190)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

~

~ ~

~

D/N

ORB

17

18

19

~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

STS ATT

CDR

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A14/AUTO/VERN, RCC-SURVEY-PORT Step 14 cmplt, Init TRK

When RCC SURVEY-PORT step 3 complete: MNVR (TRK) BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=323 OM=10, A14/AUTO/VERN, Init TRK

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

DOCKING MECHANISM INITIALIZATION (RNDZ, APDS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

PLT

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) ~

NOTES

3-14

02

Ferguson Hurley

UPLINKTFL 192

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/09(190)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

D/N

ORB

17

18

19

STS ATT~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

CDR

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A14/AUTO/VERN, RCC-SURVEY-PORT Step 14 cmplt, Init TRK

When RCC SURVEY-PORT step 3 complete: MNVR (TRK) BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=323 OM=10, A14/AUTO/VERN, Init TRK

~OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

DOCKING MECHANISM INITIALIZATION (RNDZ, APDS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

PLT

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

~RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

NOTES

Page 71: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Magnus Walheim

C OCAC PWR - OFFC5 DIRECT O2 vlv - OP

D C5 DIRECT O2 vlv - CLOCAC PWR - ON

3-15

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/09(190)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

~

~ ~

~

D/N

ORB

17

18

19

~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

STS ATT

MS1

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

~

DOCKING MECHANISM INITIALIZATION (RNDZ, APDS)

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) LDRI Surveys KU TDRE (03:06-03:51) Gimbal flip @ 03:25

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

MS2

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS) ~

R2 BLR CNTLR/HTR (three) - B

MIDDECK TRANSFER PREP

O2 REPRESS INIT C

O2 REPRESS TERM (On MCC GO) D

WLES RNDZ TOOLS C/O PREP (ORB OPS, WLE SENSORS)

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

3-15

02

Magnus Walheim

C OCAC PWR - OFFC5 DIRECT O2 vlv - OP

D C5 DIRECT O2 vlv - CLOCAC PWR - ON

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/09(190)

00:00

01:00

02:00

03:00

04:00

MET

Day 001W E Z

TDRS

D/N

ORB

17

18

19

STS ATT~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

MS1

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

DOCKING MECHANISM INITIALIZATION (RNDZ, APDS)

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) LDRI Surveys KU TDRE (03:06-03:51) Gimbal flip @ 03:25

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

MS2

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

R2 BLR CNTLR/HTR (three) - B

MIDDECK TRANSFER PREP

O2 REPRESS INIT C

O2 REPRESS TERM (On MCC GO) D

WLES RNDZ TOOLS C/O PREP (ORB OPS, WLE SENSORS)

EVA PREP FOR TRANSFER TO ISS (EVA, AIRLOCK CONFIG)

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

Page 72: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Ferguson Hurley

TFL 188

CREW WAKE @ 01/16:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UPLINK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

3-16

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/09(190)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

~

~

~

~

D/N

ORB

19

20

21

22

~

-ZLV -XVV

NC3

~

-ZLV -XVV

STS ATT

CDR

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

C/L CAMR INSTALL (P/TV, CENTERLINE CAMR) Setup & Align C/L Camera

DOCKING MECHANISM POWERUPDOCKING RING EXTENSIONDOCKING MECHANISM POWERDOWN (RNDZ, APDS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

FUTURE LOAD MNVR (TRK) -ZLV +YVV (Dump) TG=2 BV=3 OM=270 A1/AUTO/VERN (1/16:20), Init TRK

O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

<NC3 TIG (05:58)

PLT

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

UPDATEORBITALMNVR PAD

NOTES

3-16

02

Ferguson Hurley

TFL 188

CREW WAKE @ 01/16:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UPLINK

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/09(190)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

D/N

ORB

19

20

21

22

STS ATT~

-ZLV -XVV

NC3

~

-ZLV -XVV

CDR

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

C/L CAMR INSTALL (P/TV, CENTERLINE CAMR) Setup & Align C/L Camera

DOCKING MECHANISM POWERUPDOCKING RING EXTENSIONDOCKING MECHANISM POWERDOWN (RNDZ, APDS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

FUTURE LOAD MNVR (TRK) -ZLV +YVV (Dump) TG=2 BV=3 OM=270 A1/AUTO/VERN (1/16:20), Init TRK

O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

<NC3 TIG (05:58)

PLT

~RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

NOTES

UPDATEORBITALMNVR PAD

Page 73: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Magnus Walheim

E After LDRI Playback Complete: RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit Step 4)

CREW WAKE @ 01/16:00

3-17

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/09(190)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

~

~

~

~

D/N

ORB

19

20

21

22

~

-ZLV -XVV

NC3

~

-ZLV -XVV

STS ATT

MS1

DOCKING MECHANISM POWERUPDOCKING RING EXTENSIONDOCKING MECHANISM POWERDOWN (RNDZ, APDS)

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP using hardware in TBD

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

C/L CAMR INSTALL (P/TV, CENTERLINE CAMR) Setup & Align C/L Camera

AEM UNIT #1,2,3 CHECK (Cue Card)

A/L PREP FOR DOCKING (EVA, AIRLOCK CONFIG)

MS2

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~

RECNFG OCA DOWNLINK RATE (PL MAX) E

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

A/L PREP FOR DOCKING (EVA, AIRLOCK CONFIG)

On MCC Go: ML86B:C cb MNC EXT ARLK HTR LN ZN 1,2 (two) - op

NOTES

3-17

02

Magnus Walheim

E After LDRI Playback Complete: RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit Step 4)

CREW WAKE @ 01/16:00

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/09(190)

04:00

05:00

06:00

07:00

08:00

MET

Day 001W E Z

TDRS

D/N

ORB

19

20

21

22

STS ATT~

-ZLV -XVV

NC3

~

-ZLV -XVV

MS1

DOCKING MECHANISM POWERUPDOCKING RING EXTENSIONDOCKING MECHANISM POWERDOWN (RNDZ, APDS)

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform SETUP using hardware in TBD

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

C/L CAMR INSTALL (P/TV, CENTERLINE CAMR) Setup & Align C/L Camera

AEM UNIT #1,2,3 CHECK (Cue Card)

A/L PREP FOR DOCKING (EVA, AIRLOCK CONFIG)

MS2

~RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

RECNFG OCA DOWNLINK RATE (PL MAX) E

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

A/L PREP FOR DOCKING (EVA, AIRLOCK CONFIG)

On MCC Go: ML86B:C cb MNC EXT ARLK HTR LN ZN 1,2 (two) - op

NOTES

Page 74: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Ferguson Hurley

3-18

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/09(190)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

22

23

24

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

NOTES

3-18

02

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/09(190)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

D/N

ORB

22

23

24

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

PLT

~

SLEEP

NOTES

Page 75: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Magnus Walheim

3-19

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/09(190)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

22

23

24

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

MS2

SLEEP

~

NOTES

3-19

02

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/09(190)

08:00

09:00

10:00

11:00

12:00

MET

Day 001W E Z

TDRS

D/N

ORB

22

23

24

STS ATT~

~

-ZLV -XVV

MS1

~

SLEEP

MS2

~

SLEEP

NOTES

Page 76: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Ferguson Hurley

3-20

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/10(191)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

25

26

27

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

NOTES

3-20

02

Ferguson Hurley

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/10(191)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

D/N

ORB

25

26

27

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

PLT

~

SLEEP

NOTES

Page 77: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

02

Magnus Walheim

3-21

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/10(191)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

~

~

~

D/N

ORB

25

26

27

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

MS2

SLEEP

~

NOTES

3-21

02

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/10(191)

12:00

13:00

14:00

15:00

16:00

MET

Day 001W E Z

TDRS

D/N

ORB

25

26

27

STS ATT~

~

-ZLV -XVV

MS1

~

SLEEP

MS2

~

SLEEP

NOTES

Page 78: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

< NC4 TIG 19:32

FD03 EZ ACTIVITIES: √OCAC FILTER TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

Ferguson Hurley

< NH TIG 18:44

3-22

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/10(191)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

~

~ ~

~

D/N

ORB

27

28

29

30

~

-ZLV +YVV

~

RNDZ

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

PRIORITY PWRUP GRP B (ORB PKT, PRIORITY PWRDN) Steps 12 (IMU 2),6 (Triple G2), 5

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

PRIORITY PWRUP GRP B (ORB PKT, PRIORITY PWRDN) Steps 12 (IMU 2),6 (Triple G2), 5

RCS REGULATOR RECONFIG (ORB OPS, RCS)

NOTES

3-22

03

< NC4 TIG 19:32

FD03 EZ ACTIVITIES: √OCAC FILTER TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

Ferguson Hurley

< NH TIG 18:44

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/10(191)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

D/N

ORB

27

28

29

30

STS ATT~

-ZLV +YVV

~

RNDZ

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

PRIORITY PWRUP GRP B (ORB PKT, PRIORITY PWRDN) Steps 12 (IMU 2),6 (Triple G2), 5

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

PRIORITY PWRUP GRP B (ORB PKT, PRIORITY PWRDN) Steps 12 (IMU 2),6 (Triple G2), 5

RCS REGULATOR RECONFIG (ORB OPS, RCS)

NOTES

Page 79: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS,PGSC) Part D then A (Omit step 4)

Magnus Walheim

MPLM PRESSURECHECK

A On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

UPLINKTFL 199

On MCC GO: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

3-23

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/10(191)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

~

~ ~

~

D/N

ORB

27

28

29

30

~

-ZLV +YVV

~

RNDZ

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSP1 OIU PWR - OIU 1 ON (tb-UP)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

L17 Check MCIU filter screen

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION A

SSV OUTRATE - 3

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

SUPPLY/WASTE WATER DUMP (Init) (ORB OPS, ECLS) Ref. MSG XXX

SLEEP LOGBOOK (SDBI 1634)

On MCC GO: TRIDAR ACTIVATION (Cue Card)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SUPPLY/WASTE WATER DUMP (Term) (ORB OPS, ECLS) Ref. MSG XXX

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

UPLINKTFL 192

NOTES

3-23

03

RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS,PGSC) Part D then A (Omit step 4)

Magnus Walheim

MPLM PRESSURECHECK

A On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

UPLINKTFL 199

On MCC GO: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/10(191)

16:00

17:00

18:00

19:00

20:00

MET

Day 001W E Z

TDRS

D/N

ORB

27

28

29

30

STS ATT~

-ZLV +YVV

~

RNDZ

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSP1 OIU PWR - OIU 1 ON (tb-UP)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

L17 Check MCIU filter screen

~

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION A

SSV OUTRATE - 3

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

SUPPLY/WASTE WATER DUMP (Init) (ORB OPS, ECLS) Ref. MSG XXX

SLEEP LOGBOOK (SDBI 1634)

On MCC GO: TRIDAR ACTIVATION (Cue Card)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SUPPLY/WASTE WATER DUMP (Term) (ORB OPS, ECLS) Ref. MSG XXX

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

NOTES

UPLINKTFL 192

Page 80: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

< Ti TIG 21:05

Ferguson Hurley

UPLINKβ21+MASKBOX 30,40

DOCKING 01/23:43

3-24

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/10(191)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

~

~

~

~

D/N

ORB

30

31

32

~

RNDZ

~

DK

STS ATT

CDR

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

APPROACH (Cue Card)

PLT

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

APPROACH (Cue Card)

NOTES

3-24

03

< Ti TIG 21:05

Ferguson Hurley

UPLINKβ21+MASKBOX 30,40

DOCKING 01/23:43

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/10(191)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

D/N

ORB

30

31

32

STS ATT~

RNDZ

~

DK

CDR

~RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

APPROACH (Cue Card)

PLT

~RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

APPROACH (Cue Card)

NOTES

Page 81: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

Magnus Walheim

DOCKING 01/23:43

3-25

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/10(191)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

~

~

~

~

D/N

ORB

30

31

32

~

RNDZ

~

DK

STS ATT

MS1

P/TV02 DOCK (P/TV, SCENES) DEACTIVATION

P/TV02 DOCK (P/TV, SCENES) SETUP

P/TV02 DOCK (P/TV, SCENES) OPS, Items 1-3

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

~

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

MS2

APPROACH (Cue Card)

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

~

NOTES

3-25

03

Magnus Walheim

DOCKING 01/23:43

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/10(191)

20:00

21:00

22:00

23:00

00:00

MET

Day 001W E Z

TDRS

D/N

ORB

30

31

32

STS ATT~

RNDZ

~

DK

MS1

P/TV02 DOCK (P/TV, SCENES) DEACTIVATION

P/TV02 DOCK (P/TV, SCENES) SETUP

P/TV02 DOCK (P/TV, SCENES) OPS, Items 1-3

~

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

MS2

APPROACH (Cue Card)

~RENDEZVOUS TIMELINE (RNDZ, RENDEZVOUS T/L)

NOTES

Page 82: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

NO UNISOLATEDEXERCISE INDAP: B13

TFL 184

Ferguson Hurley

UPLINKβ21+MASKBOX 40,50

When ISS is GO for attitude cntrl,DAP: FREEDAP: A12/FREE/VERNReload DAP: B12

B In Step 3 of G2 SET CONTRACTION √MCC or pause ~4 min (DAP Settling) DAP: as req'd

UPLINK

When MNVR complete and rates damped:PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Step 6 (Single G2) B, Step 12 (IMU 2)O6 S TRK PWR -Z - OFF

When MNVR complete and rates damped:PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Step 6 (Single G2) B, Step 12 (IMU 2)O6 S TRK PWR -Z - OFF

3-26

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/10(191)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

~

~

~

~

D/N

ORB

33

34

35

~

~

BIAS -XLV -ZVV

STS ATT

CDR

WELCOME

SAFETY BRIEFING

MNVR (TRK) BIAS -XLV -ZVV (Mated TEA)TG=2 BV=5 P=161.91 Y=359.93 OM=174.12Init TRK, DAP: FREE > 2 sec, thenDAP: A12/AUTO/VERN

When ISS is GO for deadband collapse, DAP: B13

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

~

TRIDAR DEACTIVATION (Cue Card)JOINT OPS: 6.109 HARDLINE ICOM AUDIO Steps 1,5,6

WLES DOCK/UNDOCK RECOVERY (ORB OPS, WLE SENSORS)

PLT

WELCOME

SAFETY BRIEFING

SSV OUTRATE - 2

P/TV04 INGRESS/EGRESS (P/TV, SCENES) OPS Ingress, Item 1

P/TV04 ISS INTERNAL OPS (HC) (P/TV, SCENES) SETUP

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

~

NOTES

3-26

03

NO UNISOLATEDEXERCISE INDAP: B13

TFL 184

Ferguson Hurley

UPLINKβ21+MASKBOX 40,50

When ISS is GO for attitude cntrl,DAP: FREEDAP: A12/FREE/VERNReload DAP: B12

B In Step 3 of G2 SET CONTRACTION √MCC or pause ~4 min (DAP Settling) DAP: as req'd

UPLINK

When MNVR complete and rates damped:PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Step 6 (Single G2) B, Step 12 (IMU 2)O6 S TRK PWR -Z - OFF

When MNVR complete and rates damped:PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Step 6 (Single G2) B, Step 12 (IMU 2)O6 S TRK PWR -Z - OFF

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/10(191)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

D/N

ORB

33

34

35

STS ATT~

~

BIAS -XLV -ZVV

CDR

WELCOME

SAFETY BRIEFING

MNVR (TRK) BIAS -XLV -ZVV (Mated TEA)TG=2 BV=5 P=161.91 Y=359.93 OM=174.12Init TRK, DAP: FREE > 2 sec, thenDAP: A12/AUTO/VERN

When ISS is GO for deadband collapse, DAP: B13

~

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

TRIDAR DEACTIVATION (Cue Card)JOINT OPS: 6.109 HARDLINE ICOM AUDIO Steps 1,5,6

WLES DOCK/UNDOCK RECOVERY (ORB OPS, WLE SENSORS)

PLT

WELCOME

SAFETY BRIEFING

SSV OUTRATE - 2

P/TV04 INGRESS/EGRESS (P/TV, SCENES) OPS Ingress, Item 1

P/TV04 ISS INTERNAL OPS (HC) (P/TV, SCENES) SETUP

~

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

NOTES

Page 83: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

Magnus Walheim

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Perform steps 10-15; MCC-H will perform Steps 10.1, 12-13, and 16-18

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Perform steps 10-15; MCC-H will perform Steps 10.1, 12-13, and 16-18

NO UNISOLATEDEXERCISE INDAP: B13

3-27

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/10(191)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

~

~

~

~

D/N

ORB

33

34

35

~

~

BIAS -XLV -ZVV

STS ATT

MS1

POST DOCKING HATCH LEAK CHECK (RDNZ, APDS)

AIRLOCK PREP FOR INGRESS - AIRLOCK FAN ACTIVE (RNDZ, APDS)

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Verify ISS complete through step 2.4 Perform steps 3-9

WELCOME

SAFETY BRIEFING

P/TV05 ISS INTERNAL OPS (HC) (P/TV, SCENES) SETUP

P/TV06 ROBOTICS (P/TV, SCENES) SETUP

EXERCISE

~

MS2

POST DOCKING HATCH LEAK CHECK (RDNZ, APDS)

AIRLOCK PREP FOR INGRESS - AIRLOCK FAN ACTIVE (RNDZ, APDS)

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Verify ISS complete through step 2.4 Perform steps 3-9

WELCOME

SAFETY BRIEFING

EXERCISE

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION ~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #1, Ref. MSG XXX

NOTES

3-27

03

Magnus Walheim

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Perform steps 10-15; MCC-H will perform Steps 10.1, 12-13, and 16-18

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Perform steps 10-15; MCC-H will perform Steps 10.1, 12-13, and 16-18

NO UNISOLATEDEXERCISE INDAP: B13

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/10(191)

00:00

01:00

02:00

03:00

04:00

MET

Day 002W E Z

TDRS

D/N

ORB

33

34

35

STS ATT~

~

BIAS -XLV -ZVV

MS1

POST DOCKING HATCH LEAK CHECK (RDNZ, APDS)

AIRLOCK PREP FOR INGRESS - AIRLOCK FAN ACTIVE (RNDZ, APDS)

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Verify ISS complete through step 2.4 Perform steps 3-9

WELCOME

SAFETY BRIEFING

P/TV05 ISS INTERNAL OPS (HC) (P/TV, SCENES) SETUP

P/TV06 ROBOTICS (P/TV, SCENES) SETUP

~

EXERCISE

MS2

POST DOCKING HATCH LEAK CHECK (RDNZ, APDS)

AIRLOCK PREP FOR INGRESS - AIRLOCK FAN ACTIVE (RNDZ, APDS)

JOINT OPS: 2.104 HATCH OPENING & STS/ISS DUCT INSTL Verify ISS complete through step 2.4 Perform steps 3-9

WELCOME

SAFETY BRIEFING

EXERCISE

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #1, Ref. MSG XXX

NOTES

Page 84: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

Ferguson Hurley

NO EXERCISEWHILE DOUBLE GRAPPLED

CREW WAKEUP @ 02/15:30

NODE 2 NADIR CBM SURVEY (Camera C)

~

3-28

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/10(191)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

~

~

~

~

D/N

ORB

35

36

37

38

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

~

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

3-28

03

Ferguson Hurley

NO EXERCISEWHILE DOUBLE GRAPPLED

CREW WAKEUP @ 02/15:30

NODE 2 NADIR CBM SURVEY (Camera C)

~

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/10(191)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

D/N

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

PLT

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~OBSS HANDOFF FROM SSRMS TO SRMS (PDRS, OBSS NOMINAL)

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

Page 85: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

Magnus Walheim

CREW WAKEUP @ 02/15:30

SHUTTLE/ISS H2O CONTAINER FILL (HC) see pg 3-27

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CUBE LAB MODULE-7 DEACTIVATION (ASSY OPS, PAYLOADS) All Trays in LMA Packs 1 and 2; ONLY deactivate Syringes with "FD3" labeled arrows on back of trays.

NO EXERCISEWHILE DOUBLE GRAPPLED

3-29

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/10(191)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

~

~

~

~

D/N

ORB

35

36

37

38

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

EXERCISE

~

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

SLEEP

~

~

POST DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

ORBITER SSC SETUP Ref. Transfer List Item XXX

CWC TRANSFER Transfer 1 CWC to ISS

NOTES

3-29

03

Magnus Walheim

CREW WAKEUP @ 02/15:30

SHUTTLE/ISS H2O CONTAINER FILL (HC) see pg 3-27

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CUBE LAB MODULE-7 DEACTIVATION (ASSY OPS, PAYLOADS) All Trays in LMA Packs 1 and 2; ONLY deactivate Syringes with "FD3" labeled arrows on back of trays.

NO EXERCISEWHILE DOUBLE GRAPPLED

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/10(191)

04:00

05:00

06:00

07:00

08:00

MET

Day 002W E Z

TDRS

D/N

ORB

35

36

37

38

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~

EXERCISE

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST DOCKING EVA TRANSFER & RECONFIG (EVA, AIRLOCK CONFIG)

ORBITER SSC SETUP Ref. Transfer List Item XXX

CWC TRANSFER Transfer 1 CWC to ISS

NOTES

Page 86: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

Ferguson Hurley

MPLM CBM SURVEY (Camera A and D)

~

~

3-30

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/10(191)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

~ ~

~~

D/N

ORB

38

39

40

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-30

03

Ferguson Hurley

MPLM CBM SURVEY (Camera A and D)

~

~

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/10(191)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

D/N

ORB

38

39

40

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 87: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

03

Magnus Walheim

3-31

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/10(191)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

~ ~

~~

D/N

ORB

38

39

40

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-31

03

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/10(191)

08:00

09:00

10:00

11:00

12:00

MET

Day 002W E Z

TDRS

D/N

ORB

38

39

40

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 88: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Ferguson Hurley

3-32

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/11(192)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~

~

~

D/N

ORB

40

41

42

43

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-32

04

Ferguson Hurley

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/11(192)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

D/N

ORB

40

41

42

43

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 89: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Magnus Walheim

3-33

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/11(192)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~

~

~

D/N

ORB

40

41

42

43

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-33

04

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/11(192)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

D/N

ORB

40

41

42

43

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 90: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

FD04 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

Ferguson Hurley

NO T2MPLM MNVR FROM BERTH TOPRE-INSTALL

NO EXERCISEMPLM INSTALL/BOLT LOAD

~3-34

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/11(192)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~ ~

~

D/N

ORB

43

44

45

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 6-10

P/TV06 ROBOTICS OPERATIONS (P/TV, SCENES) SETUP & OPS Items 1,2 for MPLM Unberth & Install

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 1-3

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 4-16

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 17

POC: 2.7.501 DOUG STARTUP PROCEDURE Step 1

NOTES

3-34

04

FD04 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

Ferguson Hurley

NO T2MPLM MNVR FROM BERTH TOPRE-INSTALL

NO EXERCISEMPLM INSTALL/BOLT LOAD

~

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/11(192)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

D/N

ORB

43

44

45

STS ATT~

~

BIAS -XLV -ZVV

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 6-10

P/TV06 ROBOTICS OPERATIONS (P/TV, SCENES) SETUP & OPS Items 1,2 for MPLM Unberth & Install

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 1-3

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 4-16

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 17

POC: 2.7.501 DOUG STARTUP PROCEDURE Step 1

NOTES

Page 91: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Magnus Walheim

~

UPLINKTFL 184

NO T2MPLM MNVR FROM BERTH TOPRE-INSTALL

NO EXERCISEMPLM INSTALL/BOLT LOAD

~3-35

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/11(192)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~ ~

~

D/N

ORB

43

44

45

~

~

BIAS -XLV -ZVV

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 1-3

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 4-16

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 17

S&M: 1.511 N2 CBM VERIFY PRE-MATE STATUS

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

On MCC Go: SSP1 APCU 1 OUTPUT RLY - CL (tb-gray)

On MCC Go: SSP1 APCU 1 OUTPUT RLY - OP (tb-bp)CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

L17 Check MCIU filter screen

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) Docking KU TDRW (17:33-18:07)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #2, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #3, Ref. MSG XXX

~

UPLINKTFL 199

MPLM PRESSURECHECK

NOTES

3-35

04

Magnus Walheim

~

UPLINKTFL 184

NO T2MPLM MNVR FROM BERTH TOPRE-INSTALL

NO EXERCISEMPLM INSTALL/BOLT LOAD

~

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/11(192)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

D/N

ORB

43

44

45

STS ATT~

~

BIAS -XLV -ZVV

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 1-3

ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 4-16

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 17

S&M: 1.511 N2 CBM VERIFY PRE-MATE STATUS

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

On MCC Go: SSP1 APCU 1 OUTPUT RLY - CL (tb-gray)

On MCC Go: SSP1 APCU 1 OUTPUT RLY - OP (tb-bp)CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

L17 Check MCIU filter screen

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) Docking KU TDRW (17:33-18:07)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #2, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #3, Ref. MSG XXX

NOTES

UPLINKTFL 199

MPLM PRESSURECHECK

Page 92: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Ferguson Hurley

NO EXERCISEMPLM INSTALL/BOLT LOAD

3-36

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/11(192)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~

~

D/N

ORB

46

47

48

~

~

BIAS -XLV -ZVV

STS ATT

CDR

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 1-7S&M: A.14 MPLM VESTIBULE AND ACTIVATION PROCEDURES (Cue Card)

MPLM: 1.103 MPLM ACTIVATION (PART 1) Perform Steps 1,4-8 ~

MEAL

MPLM: 1.113 N2 TO MPLM VESTIBULE PRESSURIZATIONAND LEAK CHECK Verify CBM bolt load complete prior to Step 5. Leave ISA/VAJ connected in Step 9.

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

PLT

MEAL

On MCC Go: JOINT OPS: 3.120 PREBREATHE USING SHUTTLE O2 SETUP Steps 2-6.12. MCC-H will perform steps 2.4-2.5

~

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 18

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 19ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 20-end

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

3-36

04

Ferguson Hurley

NO EXERCISEMPLM INSTALL/BOLT LOAD

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/11(192)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

D/N

ORB

46

47

48

STS ATT~

~

BIAS -XLV -ZVV

CDR

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 1-7S&M: A.14 MPLM VESTIBULE AND ACTIVATION PROCEDURES (Cue Card)

~MPLM: 1.103 MPLM ACTIVATION (PART 1) Perform Steps 1,4-8

MEAL

MPLM: 1.113 N2 TO MPLM VESTIBULE PRESSURIZATIONAND LEAK CHECK Verify CBM bolt load complete prior to Step 5. Leave ISA/VAJ connected in Step 9.

~TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

MEAL

~

On MCC Go: JOINT OPS: 3.120 PREBREATHE USING SHUTTLE O2 SETUP Steps 2-6.12. MCC-H will perform steps 2.4-2.5

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 18

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 19ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 20-end

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

Page 93: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Magnus Walheim

NO EXERCISEMPLM INSTALL/BOLT LOAD

3-37

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/11(192)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~

~

D/N

ORB

46

47

48

~

~

BIAS -XLV -ZVV

STS ATT

MS1

ASSY OPS: 1.105 NODE 2 NADIR CBM INCREMENTALCAPTURE/ABOLT Steps 1-4ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 18ASSY OPS: 1.105 NODE 2 NADIR CBM INCREMENTALCAPTURE/ABOLT Steps 5-end

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 19ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 20-end

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Step 8 ~

MEAL

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 1-7S&M: A.14 MPLM VESTIBULE AND ACTIVATION PROCEDURES (Cue Card)

SHUTTLE CONDENSATE COLLECT(ORB OPS, ECLS) Perform CHANGEOUT. Gather ISS CWC S/N TBD from TBD and take Shuttle CWC S/N TBD to TBD for processing.

MS2

MEAL

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #3, Ref. MSG XXX

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

135 EVA 1 TOOL CONFIG (EVA, TIMELINES) Audit

PMA3 COVER INSTALL (EVA, TIMELINES) Review Procedure

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

NOTES

3-37

04

Magnus Walheim

NO EXERCISEMPLM INSTALL/BOLT LOAD

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/11(192)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

D/N

ORB

46

47

48

STS ATT~

~

BIAS -XLV -ZVV

MS1

ASSY OPS: 1.105 NODE 2 NADIR CBM INCREMENTALCAPTURE/ABOLT Steps 1-4ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 18ASSY OPS: 1.105 NODE 2 NADIR CBM INCREMENTALCAPTURE/ABOLT Steps 5-end

ROBO: 1.200 MPLM UNBERTH AND INSTALL Step 19ROBO: 1.200 MPLM UNBERTH AND INSTALL Steps 20-end

~S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Step 8

MEAL

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 1-7S&M: A.14 MPLM VESTIBULE AND ACTIVATION PROCEDURES (Cue Card)

SHUTTLE CONDENSATE COLLECT(ORB OPS, ECLS) Perform CHANGEOUT. Gather ISS CWC S/N TBD from TBD and take Shuttle CWC S/N TBD to TBD for processing.

MS2

MEAL

~SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #3, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

135 EVA 1 TOOL CONFIG (EVA, TIMELINES) Audit

PMA3 COVER INSTALL (EVA, TIMELINES) Review Procedure

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

Page 94: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Ferguson HurleyOn MCC Go: JOINT OPS: 3.120 PREBREATHE USING SHUTTLE O2 SETUP Steps 2-6.12. MCC-H will perform steps 2.4-2.5

3-38

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/11(192)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~

~

~

D/N

ORB

48

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MPLM: 1.103 MPLM ACTIVATION (PART 1) Perform Steps 1,4-8

~

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 9-10

MPLM: 1.103 MPLM ACTIVATION (PART 2) Step 9

MPLM: 1.104 MPLM INGRESS Steps 1-5

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

EXERCISE

PLT

~

EXERCISE

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

LiOH Transfer Ref. Middeck Transfer List and MSG XXX

NOTES

3-38

04

Ferguson HurleyOn MCC Go: JOINT OPS: 3.120 PREBREATHE USING SHUTTLE O2 SETUP Steps 2-6.12. MCC-H will perform steps 2.4-2.5

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/11(192)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

D/N

ORB

48

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

CDR

~MPLM: 1.103 MPLM ACTIVATION (PART 1) Perform Steps 1,4-8

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 9-10

MPLM: 1.103 MPLM ACTIVATION (PART 2) Step 9

MPLM: 1.104 MPLM INGRESS Steps 1-5

~

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

EXERCISE

PLT

~

EXERCISE

~

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

LiOH Transfer Ref. Middeck Transfer List and MSG XXX

NOTES

Page 95: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Magnus Walheim

3-39

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/11(192)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~

~

~

D/N

ORB

48

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

MS1

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Step 8

~

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 12-end

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 9-10

MPLM: 1.104 MPLM INGRESS Steps 1-5

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

AEM UNIT #1,2,3 CHECK (Cue Card)

MS2

EXERCISE

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

P/TV01 VIDEO SETUP (P/TV, SCENES) Setup Step 8

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #4, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

MICRO-4 TRANSFER TO ISS (ASSY OPS, PAYLOADS)

CWC TRANSFER Transfer 3 CWCs to ISS

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

NOTES

3-39

04

Magnus Walheim

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/11(192)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

D/N

ORB

48

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

MS1

~S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Step 8

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 12-end

S&M: 1.108 MPLM VESTIBULE - CONFIGURE FOR INGRESS Steps 9-10

MPLM: 1.104 MPLM INGRESS Steps 1-5

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

~

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

AEM UNIT #1,2,3 CHECK (Cue Card)

MS2

EXERCISE

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

P/TV01 VIDEO SETUP (P/TV, SCENES) Setup Step 8

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #4, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

MICRO-4 TRANSFER TO ISS (ASSY OPS, PAYLOADS)

CWC TRANSFER Transfer 3 CWCs to ISS

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

Page 96: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Ferguson Hurley

CREW WAKE @ 03/15:30

3-40

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/11(192)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

51

52

53

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

NOTES

3-40

04

Ferguson Hurley

CREW WAKE @ 03/15:30

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/11(192)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

D/N

ORB

51

52

53

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

NOTES

Page 97: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Magnus Walheim

CREW WAKE @ 03/15:30

3-41

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/11(192)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

51

52

53

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

~

NOTES

3-41

04

Magnus Walheim

CREW WAKE @ 03/15:30

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/11(192)

04:00

05:00

06:00

07:00

08:00

MET

Day 003W E Z

TDRS

D/N

ORB

51

52

53

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

MS2

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~EVA 1 BRIEFING CARD (EVA, TIMELINES) EVA 1 Procedure Review Ref. MSG XXX

NOTES

Page 98: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Ferguson Hurley

3-42

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/11(192)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

~

~~

D/N

ORB

53

54

55

56

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-42

04

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/11(192)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

D/N

ORB

53

54

55

56

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 99: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

04

Magnus Walheim

3-43

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/11(192)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

~

~~

D/N

ORB

53

54

55

56

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-43

04

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/11(192)

08:00

09:00

10:00

11:00

12:00

MET

Day 003W E Z

TDRS

D/N

ORB

53

54

55

56

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 100: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Ferguson Hurley

FD05 EZ ACTIVITIES: √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3 (KFX)

3-44

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/12(193)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

~

~~

D/N

ORB

56

57

58

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-44

05

Ferguson Hurley

FD05 EZ ACTIVITIES: √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3 (KFX)

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/12(193)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

D/N

ORB

56

57

58

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 101: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Magnus Walheim

3-45

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/12(193)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

~

~~

D/N

ORB

56

57

58

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-45

05

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/12(193)

12:00

13:00

14:00

15:00

16:00

MET

Day 003W E Z

TDRS

D/N

ORB

56

57

58

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

NOTES

Page 102: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Ferguson Hurley

3-46

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/12(193)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

59

60

61

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

~

EVA SYSTEMS: 1.220 EMU PURGE MCC-H performs steps 6 and 12

ISS EVA SYSTEMS: 2.325 ISLE EVA PREP MCC-H Performs Steps 1, 22.8.4 - 22.8.6

ISS EVA SYSTEMS: 2.330 ISLE EMU PREBREATHE(WITH DATA COLLECTION) Skip Steps 8, 11 and 15 MCC-H Performs Step 53

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

2.105 ZSR TRANSFER MPLM TO ISS AND DEPLOY (ASSY OPS, TRANSFER) Steps 1-3, 5-end

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALL

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #5, Ref. MSG XXX

EVA 1 INHIBIT PAD (EVA, TIMELINES)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

NOTES

3-46

05

Ferguson Hurley

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/12(193)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

D/N

ORB

59

60

61

STS ATT~

~

BIAS -XLV -ZVV

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS) √Hum Seps for H20 Accumulation

EVA SYSTEMS: 1.220 EMU PURGE MCC-H performs steps 6 and 12

ISS EVA SYSTEMS: 2.325 ISLE EVA PREP MCC-H Performs Steps 1, 22.8.4 - 22.8.6

~

ISS EVA SYSTEMS: 2.330 ISLE EMU PREBREATHE(WITH DATA COLLECTION) Skip Steps 8, 11 and 15 MCC-H Performs Step 53

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

2.105 ZSR TRANSFER MPLM TO ISS AND DEPLOY (ASSY OPS, TRANSFER) Steps 1-3, 5-end

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALL

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #5, Ref. MSG XXX

EVA 1 INHIBIT PAD (EVA, TIMELINES)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 103: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Magnus Walheim

P/TV07 EVA (P/TV, SCENES) SETUP, step 4

3-47

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/12(193)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

59

60

61

~

~

BIAS -XLV -ZVV

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

S&M: 1.261 RSP/RSR ROTATE DOWN Steps 1-3 for Pivot Fitting Installation on MPL2A2, F2, A4, F4

For Rack Rotations Ref:S&M: 1.262 RSP/RSR ROTATE UP Step 3 to Rotate an RSP Up

S&M: 1.261 RSP/RSR ROTATE DOWN Steps 4-end to Rotate an RSP Down

~

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

2.105 ZSR TRANSFER MPLM TO ISS AND DEPLOY (ASSY OPS, TRANSFER) Steps 1-3, 5-end

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

3-47

05

Magnus Walheim

P/TV07 EVA (P/TV, SCENES) SETUP, step 4

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/12(193)

16:00

17:00

18:00

19:00

20:00

MET

Day 003W E Z

TDRS

D/N

ORB

59

60

61

STS ATT~

~

BIAS -XLV -ZVV

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

S&M: 1.261 RSP/RSR ROTATE DOWN Steps 1-3 for Pivot Fitting Installation on MPL2A2, F2, A4, F4

For Rack Rotations Ref:S&M: 1.262 RSP/RSR ROTATE UP Step 3 to Rotate an RSP Up

S&M: 1.261 RSP/RSR ROTATE DOWN Steps 4-end to Rotate an RSP Down

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

2.105 ZSR TRANSFER MPLM TO ISS AND DEPLOY (ASSY OPS, TRANSFER) Steps 1-3, 5-end

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 104: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Ferguson Hurley

NO UNISOLATEDEXERCISEEV CREW ON ESP-2

3-48

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/12(193)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

61

62

63

64

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS CUE CARD Perform CREWLOCK DEPRESS

MEAL

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

ISS EVA SYSTEMS: 2.330 ISLE EMU PREBREATHE(WITH DATA COLLECTION) Skip Steps 8, 11 and 15 MCC-H Performs Step 53

~

PLT

POC: 2.7.501 DOUG STARTUP PROCEDURE Step 1ROBO: 1.300 EVA1 SUPPORT

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 1 CWC to ISS

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

NOTES

3-48

05

Ferguson Hurley

NO UNISOLATEDEXERCISEEV CREW ON ESP-2

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/12(193)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

D/N

ORB

61

62

63

64

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS CUE CARD Perform CREWLOCK DEPRESS

MEAL

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~ISS EVA SYSTEMS: 2.330 ISLE EMU PREBREATHE(WITH DATA COLLECTION) Skip Steps 8, 11 and 15 MCC-H Performs Step 53

PLT

POC: 2.7.501 DOUG STARTUP PROCEDURE Step 1

~

ROBO: 1.300 EVA1 SUPPORT

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 1 CWC to ISS

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 105: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Magnus Walheim

MPLM Pivot Fitting Installation (see pg 3-47 for details)

NO UNISOLATEDEXERCISEEV CREW ON ESP-2

3-49

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/12(193)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

~

~

~

~

D/N

ORB

61

62

63

64

~

~

BIAS -XLV -ZVV

STS ATT

MS1

ROBO: 1.300 EVA1 SUPPORT

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CSS: 1.111 CUP CREW RESTRAINT OPS Install, Step 5

~

MS2

IVA SUPPORT EVA 1

~

IVA SUPPORT PREP

On MCC Go:MISSE 8 ORMATE III R/W PREP FOR EVA (EVA, TOOLS AND STOWAGE)

IVA SUPPORT PREP

P/TV07 EVA (P/TV, SCENES) SETUP, step 4

~

NOTES

3-49

05

Magnus Walheim

MPLM Pivot Fitting Installation (see pg 3-47 for details)

NO UNISOLATEDEXERCISEEV CREW ON ESP-2

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/12(193)

20:00

21:00

22:00

23:00

00:00

MET

Day 003W E Z

TDRS

D/N

ORB

61

62

63

64

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

ROBO: 1.300 EVA1 SUPPORT

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CSS: 1.111 CUP CREW RESTRAINT OPS Install, Step 5

~

MS2

~

IVA SUPPORT EVA 1

IVA SUPPORT PREP

On MCC Go:MISSE 8 ORMATE III R/W PREP FOR EVA (EVA, TOOLS AND STOWAGE)

IVA SUPPORT PREP

~P/TV07 EVA (P/TV, SCENES) SETUP, step 4

NOTES

Page 106: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Ferguson Hurley

NO UNISOLATEDEXERCISEEV CREW ON ELC-2

P/TV09 MIDDECK PAYLOADS (ASSY OPS, PAYLOADS) Item 4 Photos

3-50

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/12(193)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

~

~ ~

~

D/N

ORB

64

65

66

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA SYSTEMS: CREWLOCK DPRS/RPRS CUE CARD Perform CREWLOCK REPRESS

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

PLT

ROBO: 1.300 EVA1 SUPPORT~

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #6, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 1 CWC to ISS

NOTES

3-50

05

Ferguson Hurley

NO UNISOLATEDEXERCISEEV CREW ON ELC-2

P/TV09 MIDDECK PAYLOADS (ASSY OPS, PAYLOADS) Item 4 Photos

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/12(193)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

D/N

ORB

64

65

66

STS ATT~

~

BIAS -XLV -ZVV

CDR

EVA SYSTEMS: CREWLOCK DPRS/RPRS CUE CARD Perform CREWLOCK REPRESS

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PLT

~ROBO: 1.300 EVA1 SUPPORT

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #6, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 1 CWC to ISS

NOTES

Page 107: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Magnus Walheim

NO UNISOLATEDEXERCISEEV CREW ON ELC-2

3-51

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/12(193)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

~

~ ~

~

D/N

ORB

64

65

66

~

~

BIAS -XLV -ZVV

STS ATT

MS1

ROBO: 1.300 EVA1 SUPPORT~

TRANSFER BRIEF PREP~

CSS: 1.111 CUP CREW RESTRAINT OPS Removal, Step 6

AEM UNIT #1,2,3 CHECK (Cue Card)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

IVA SUPPORT EVA 1

~

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

NOTES

3-51

05

Magnus Walheim

NO UNISOLATEDEXERCISEEV CREW ON ELC-2

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/12(193)

00:00

01:00

02:00

03:00

04:00

MET

Day 004W E Z

TDRS

D/N

ORB

64

65

66

STS ATT~

~

BIAS -XLV -ZVV

MS1

~ROBO: 1.300 EVA1 SUPPORT

~TRANSFER BRIEF PREP

CSS: 1.111 CUP CREW RESTRAINT OPS Removal, Step 6

AEM UNIT #1,2,3 CHECK (Cue Card)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

IVA SUPPORT EVA 1

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

NOTES

Page 108: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Ferguson Hurley

CREW WAKE @ 04/15:00

3-52

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/12(193)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

~

~

~

~

D/N

ORB

66

67

68

69

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

ISS EVA SYSTEMS: 1.240 POST EVA Without H2O RECHARGE Steps 37-39, 51, 66 not required MCC-H will perform Steps 43, 67-68

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

3-52

05

Ferguson Hurley

CREW WAKE @ 04/15:00

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/12(193)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

D/N

ORB

66

67

68

69

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

ISS EVA SYSTEMS: 1.240 POST EVA Without H2O RECHARGE Steps 37-39, 51, 66 not required MCC-H will perform Steps 43, 67-68

PLT

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 109: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Magnus Walheim

CREW WAKE @ 04/15:00

A On MCC Go: MISSE 8 ORMATE III R/W POST EVA COVER STOWAGE (EVA, TOOLS AND STOWAGE)

3-53

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/12(193)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

~

~

~

~

D/N

ORB

66

67

68

69

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MICRO-4 MIXING-ISS (MIX A) (ASSY OPS, PAYLOADS)

MICRO-4 MIXING - SHUTTLE (MIX A) (ASSY OPS, PAYLOADS)

MISSE 8 ORMATE III R/W POST EVA COVER STOWAGE A

NOTES

3-53

05

Magnus Walheim

CREW WAKE @ 04/15:00

A On MCC Go: MISSE 8 ORMATE III R/W POST EVA COVER STOWAGE (EVA, TOOLS AND STOWAGE)

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/12(193)

04:00

05:00

06:00

07:00

08:00

MET

Day 004W E Z

TDRS

D/N

ORB

66

67

68

69

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

TRANSFER BRIEFCall down status to MCC

~

TRANSFER BRIEF PREP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MICRO-4 MIXING-ISS (MIX A) (ASSY OPS, PAYLOADS)

MICRO-4 MIXING - SHUTTLE (MIX A) (ASSY OPS, PAYLOADS)

MISSE 8 ORMATE III R/W POST EVA COVER STOWAGE A

NOTES

Page 110: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Ferguson Hurley

3-54

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/12(193)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

~

~

~

~

D/N

ORB

69

70

71

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-54

05

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/12(193)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

D/N

ORB

69

70

71

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 111: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

05

Magnus Walheim

3-55

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/12(193)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

~

~

~

~

D/N

ORB

69

70

71

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-55

05

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/12(193)

08:00

09:00

10:00

11:00

12:00

MET

Day 004W E Z

TDRS

D/N

ORB

69

70

71

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 112: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Ferguson Hurley

FD06 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

3-56

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/13(194)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

~

~~

D/N

ORB

72

73

74

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-56

06

Ferguson Hurley

FD06 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/13(194)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

D/N

ORB

72

73

74

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 113: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Magnus Walheim

3-57

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/13(194)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

~

~~

D/N

ORB

72

73

74

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-57

06

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/13(194)

12:00

13:00

14:00

15:00

16:00

MET

Day 004W E Z

TDRS

D/N

ORB

72

73

74

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

NOTES

Page 114: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALL

Ferguson Hurley

SHUTTLE/ISS H2O CONTAINER FILL (HC)(ORB OPS, ECLS) Perform CWC FILL #7, Ref. MSG XXX

3-58

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/13(194)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

~

~~

D/N

ORB

74

75

76

77

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

L17 Check MCIU filter screen

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONSHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #8, Ref. MSG XXX

NOTES

3-58

06

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALL

Ferguson Hurley

SHUTTLE/ISS H2O CONTAINER FILL (HC)(ORB OPS, ECLS) Perform CWC FILL #7, Ref. MSG XXX

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/13(194)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

D/N

ORB

74

75

76

77

STS ATT~

~

BIAS -XLV -ZVV

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EXERCISE

L17 Check MCIU filter screen

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATIONSHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #8, Ref. MSG XXX

NOTES

Page 115: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Magnus Walheim

3-59

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/13(194)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

~

~~

D/N

ORB

74

75

76

77

~

~

BIAS -XLV -ZVV

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

EXERCISE

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

NOTES

3-59

06

Magnus Walheim

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/13(194)

16:00

17:00

18:00

19:00

20:00

MET

Day 004W E Z

TDRS

D/N

ORB

74

75

76

77

STS ATT~

~

BIAS -XLV -ZVV

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

EXERCISE

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 116: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Ferguson HurleyTRANSFER OPS Ref. Middeck Transfer List and MSG XXX

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Step 2 w/FES Pri B req'd

CREW CHOICE DOWNLINKKU AVAIL TDRW: 22:23-23:04 Gimbal flip @ 22:55 Ref. MSG XXX

3-60

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/13(194)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

~

~

~

~

D/N

ORB

77

78

79

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EXERCISE

~

MEAL

ARED FAMILIARIZATION Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CREW CHOICE PAO RECORDING Ref. MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

MEAL

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri B

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

CREW CHOICE PAO RECORDING Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 2 CWCs to ISS

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

NOTES

3-60

06

Ferguson HurleyTRANSFER OPS Ref. Middeck Transfer List and MSG XXX

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Step 2 w/FES Pri B req'd

CREW CHOICE DOWNLINKKU AVAIL TDRW: 22:23-23:04 Gimbal flip @ 22:55 Ref. MSG XXX

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/13(194)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

D/N

ORB

77

78

79

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

EXERCISE

MEAL

ARED FAMILIARIZATION Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CREW CHOICE PAO RECORDING Ref. MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

MEAL

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri B

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

CREW CHOICE PAO RECORDING Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 2 CWCs to ISS

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

Page 117: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Magnus Walheim

3-61

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/13(194)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

~

~

~

~

D/N

ORB

77

78

79

~

~

BIAS -XLV -ZVV

STS ATT

MS1

MEAL

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

CREW CHOICE PAO RECORDING Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

MEAL

MICRO-4 MIXING - SHUTTLE (MIX B) (ASSY OPS, PAYLOADS)

MICRO-4 MIXING - ISS (MIX B) (ASSY OPS, PAYLOADS)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

CREW CHOICE PAO RECORDING Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

3-61

06

Magnus Walheim

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/13(194)

20:00

21:00

22:00

23:00

00:00

MET

Day 004W E Z

TDRS

D/N

ORB

77

78

79

STS ATT~

~

BIAS -XLV -ZVV

MS1

MEAL

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CREW CHOICE PAO RECORDING Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

MEAL

MICRO-4 MIXING - SHUTTLE (MIX B) (ASSY OPS, PAYLOADS)

MICRO-4 MIXING - ISS (MIX B) (ASSY OPS, PAYLOADS)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CREW CHOICE PAO RECORDING Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 118: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Ferguson Hurley

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 2-7 MCC will TMBU S/W FDA, H/W FDA already INH.

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) On MCC go, perform steps 8-12 MCC will TMBU S/W FDA. Do not ENA H/W.

3-62

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/13(194)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

79

80

81

82

~

~

BIAS -XLV -ZVV

STS ATT

CDR

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

ARED FAMILIARIZATION Ref. MSG XXX

N2 REPRESS INIT A

N2 REPRESS TERM (On MCC GO) B

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

NOTES

3-62

06

Ferguson Hurley

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 2-7 MCC will TMBU S/W FDA, H/W FDA already INH.

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) On MCC go, perform steps 8-12 MCC will TMBU S/W FDA. Do not ENA H/W.

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/13(194)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

D/N

ORB

79

80

81

82

STS ATT~

~

BIAS -XLV -ZVV

CDR

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

ARED FAMILIARIZATION Ref. MSG XXX

N2 REPRESS INIT A

N2 REPRESS TERM (On MCC GO) B

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

Page 119: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Magnus Walheim

3-63

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/13(194)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

79

80

81

82

~

~

BIAS -XLV -ZVV

STS ATT

MS1

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

AEM UNIT #1,2,3 CHECK (Cue Card)

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

EXERCISE

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

NOTES

3-63

06

Magnus Walheim

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/13(194)

00:00

01:00

02:00

03:00

04:00

MET

Day 005W E Z

TDRS

D/N

ORB

79

80

81

82

STS ATT~

~

BIAS -XLV -ZVV

MS1

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

AEM UNIT #1,2,3 CHECK (Cue Card)

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

EXERCISE

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (01:27 - 01:55)

FACE IN SPACE Ref. MSG XXXISS KU AVAIL (01:55 - 02:02)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 120: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Ferguson Hurley

CREW WAKE @ 05/14:00

3-64

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/13(194)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

82

83

84

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-64

06

Ferguson Hurley

CREW WAKE @ 05/14:00

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/13(194)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

D/N

ORB

82

83

84

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 121: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Magnus Walheim

CREW WAKE @ 05/14:00

3-65

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/13(194)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

~ ~

~

D/N

ORB

82

83

84

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-65

06

Magnus Walheim

CREW WAKE @ 05/14:00

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/13(194)

04:00

05:00

06:00

07:00

08:00

MET

Day 005W E Z

TDRS

D/N

ORB

82

83

84

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 122: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Ferguson Hurley

3-66

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/13(194)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

~

~

~

~

D/N

ORB

85

86

87

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-66

06

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/13(194)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

D/N

ORB

85

86

87

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 123: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

06

Magnus Walheim

3-67

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/13(194)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

~

~

~

~

D/N

ORB

85

86

87

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-67

06

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/13(194)

08:00

09:00

10:00

11:00

12:00

MET

Day 005W E Z

TDRS

D/N

ORB

85

86

87

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 124: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Ferguson Hurley

FD07 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

3-68

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/14(195)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

~

~

~

~

D/N

ORB

87

88

89

90

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #9, Ref. MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-68

07

Ferguson Hurley

FD07 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/14(195)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

D/N

ORB

87

88

89

90

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #9, Ref. MSG XXX

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 125: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Magnus Walheim

3-69

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/14(195)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

~

~

~

~

D/N

ORB

87

88

89

90

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-69

07

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/14(195)

12:00

13:00

14:00

15:00

16:00

MET

Day 005W E Z

TDRS

D/N

ORB

87

88

89

90

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

NOTES

Page 126: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Ferguson Hurley

A WCS CRADLE - AUTO INIBIT Inspect hose block filter, change if req'd WCS CRADLE - AUTO

3-70

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/14(195)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

~

~~

~

D/N

ORB

90

91

92

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:26 - 20:10)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

PLT

EXERCISE

L17 Check MCIU filter screen

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALLWCS FILTER CHECK A

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #1 Fill S/N TBD, Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #2 Fill S/N TBD, Ref. MSG XXX

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #10, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 2 CWCs to ISS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

3-70

07

Ferguson Hurley

A WCS CRADLE - AUTO INIBIT Inspect hose block filter, change if req'd WCS CRADLE - AUTO

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/14(195)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

D/N

ORB

90

91

92

STS ATT~

~

BIAS -XLV -ZVV

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EXERCISE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:26 - 20:10)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PLT

EXERCISE

L17 Check MCIU filter screen

ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALLWCS FILTER CHECK A

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #1 Fill S/N TBD, Ref. MSG XXX

~

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #2 Fill S/N TBD, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #10, Ref. MSG XXX

SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION

CWC TRANSFER Transfer 2 CWCs to ISS

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 127: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Magnus Walheim

3-71

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/14(195)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

~

~~

~

D/N

ORB

90

91

92

~

~

BIAS -XLV -ZVV

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

EXERCISE

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:26 - 20:10)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

NOTES

3-71

07

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Magnus Walheim

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/14(195)

16:00

17:00

18:00

19:00

20:00

MET

Day 005W E Z

TDRS

D/N

ORB

90

91

92

STS ATT~

~

BIAS -XLV -ZVV

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~

EXERCISE

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:26 - 20:10)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EXERCISE

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 128: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Ferguson HurleyPWR FILL (ORB OPS, ECLS) Perform WATER FILL #2 Fill S/N TBD, Ref. MSG XXX

B PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.

3-72

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/14(195)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

~

~

~

~

D/N

ORB

92

93

94

95

~

~

BIAS -XLV -ZVV

STS ATT

CDR

OFF DUTY

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

OFF DUTY

~

Private Family Conference B ISS KU AVAIL (22:49 - 23:32)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

PLT

OFF DUTY

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

OFF DUTY

~

Private Family Conference B ISS KU AVAIL (23:34 - 00:04)

~

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #3 Fill S/N TBD, Ref. MSG XXX

PWR TRANSFER Transfer 3 PWRs to ISS

NOTES

3-72

07

Ferguson HurleyPWR FILL (ORB OPS, ECLS) Perform WATER FILL #2 Fill S/N TBD, Ref. MSG XXX

B PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/14(195)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

D/N

ORB

92

93

94

95

STS ATT~

~

BIAS -XLV -ZVV

CDR

OFF DUTY

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

~

OFF DUTY

Private Family Conference B ISS KU AVAIL (22:49 - 23:32)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PLT

OFF DUTY

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

~

OFF DUTY

Private Family Conference B ISS KU AVAIL (23:34 - 00:04)

~

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #3 Fill S/N TBD, Ref. MSG XXX

PWR TRANSFER Transfer 3 PWRs to ISS

NOTES

Page 129: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Magnus Walheim

3-73

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/14(195)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

~

~

~

~

D/N

ORB

92

93

94

95

~

~

BIAS -XLV -ZVV

STS ATT

MS1

OFF DUTY

~

MEAL

EXERCISE

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

MS2

OFF DUTY

~

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

NOTES

3-73

07

Magnus Walheim

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/14(195)

20:00

21:00

22:00

23:00

00:00

MET

Day 005W E Z

TDRS

D/N

ORB

92

93

94

95

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

OFF DUTY

MEAL

~

EXERCISE

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

MS2

~

OFF DUTY

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (21:54 - 22:21)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 130: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Ferguson Hurley

3-74

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/14(195)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

~

~

~

~

D/N

ORB

95

96

97

~

~

BIAS -XLV -ZVV

STS ATT

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OFF DUTY

~

AEM UNIT #1,2,3 CHECK (Cue Card)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

~

NOTES

3-74

07

Ferguson Hurley

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/14(195)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

D/N

ORB

95

96

97

STS ATT~

~

BIAS -XLV -ZVV

CDR

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

AEM UNIT #1,2,3 CHECK (Cue Card)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

NOTES

Page 131: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Magnus Walheim

B PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.

3-75

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/14(195)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

~

~

~

~

D/N

ORB

95

96

97

~

~

BIAS -XLV -ZVV

STS ATT

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

~

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

OFF DUTY

Private Family Conference B ISS KU AVAIL (00:31 - 01:04)

MS2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

~

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

OFF DUTY

Private Family Conference B ISS KU AVAIL (01:06 - 01:48)

NOTES

3-75

07

Magnus Walheim

B PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/14(195)

00:00

01:00

02:00

03:00

04:00

MET

Day 006W E Z

TDRS

D/N

ORB

95

96

97

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

OFF DUTY

Private Family Conference B ISS KU AVAIL (00:31 - 01:04)

MS2

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

OFF DUTY

Private Family Conference B ISS KU AVAIL (01:06 - 01:48)

NOTES

Page 132: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Ferguson Hurley

CREW WAKE @ 06/13:00

3-76

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/14(195)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

~ ~

~

D/N

ORB

98

99

100

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-76

07

Ferguson Hurley

CREW WAKE @ 06/13:00

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/14(195)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

D/N

ORB

98

99

100

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 133: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Magnus Walheim

CREW WAKE @ 06/13:00

3-77

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/14(195)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

~ ~

~

D/N

ORB

98

99

100

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-77

07

Magnus Walheim

CREW WAKE @ 06/13:00

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/14(195)

04:00

05:00

06:00

07:00

08:00

MET

Day 006W E Z

TDRS

D/N

ORB

98

99

100

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 134: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Ferguson Hurley

3-78

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/14(195)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

~ ~

~

D/N

ORB

100

101

102

103

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-78

07

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/14(195)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

D/N

ORB

100

101

102

103

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 135: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

07

Magnus Walheim

3-79

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/14(195)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

~ ~

~

D/N

ORB

100

101

102

103

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-79

07

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/14(195)

08:00

09:00

10:00

11:00

12:00

MET

Day 006W E Z

TDRS

D/N

ORB

100

101

102

103

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 136: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Ferguson Hurley

FD08 EZ ACTIVITIES: √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

3-80

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/15(196)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

~

~

~

~

D/N

ORB

103

104

105

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EXERCISE

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

NOTES

3-80

08

Ferguson Hurley

FD08 EZ ACTIVITIES: √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/15(196)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

D/N

ORB

103

104

105

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

PLT

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

NOTES

Page 137: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Magnus Walheim

3-81

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/15(196)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

~

~

~

~

D/N

ORB

103

104

105

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

ISS EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

~

NOTES

3-81

08

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/15(196)

12:00

13:00

14:00

15:00

16:00

MET

Day 006W E Z

TDRS

D/N

ORB

103

104

105

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

~

ISS EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

NOTES

Page 138: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Ferguson Hurley

3-82

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/15(196)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

~

~

~

D/N

ORB

105

106

107

108

~

~

BIAS -XLV -ZVV

STS ATT

CDR

EXERCISE

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:14 - 19:49)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

PLT

EXERCISE

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:14 - 19:49)

CWC-I FILL (ORB OPS, ECLS) Parts A-C Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #4 Fill S/N TBD, Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #5 Fill S/N TBD, Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #6 Fill S/N TBD, Ref. MSG XXX

PWR TRANSFER Transfer 3 PWRs to ISS

NOTES

3-82

08

Ferguson Hurley

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/15(196)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

D/N

ORB

105

106

107

108

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

EXERCISE

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:14 - 19:49)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PLT

EXERCISE

~

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:14 - 19:49)

CWC-I FILL (ORB OPS, ECLS) Parts A-C Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #4 Fill S/N TBD, Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #5 Fill S/N TBD, Ref. MSG XXX

PWR FILL (ORB OPS, ECLS) Perform WATER FILL #6 Fill S/N TBD, Ref. MSG XXX

PWR TRANSFER Transfer 3 PWRs to ISS

NOTES

Page 139: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Magnus Walheim

3-83

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/15(196)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

~

~

~

D/N

ORB

105

106

107

108

~

~

BIAS -XLV -ZVV

STS ATT

MS1

EXERCISE

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

P/TV08 EXTERNAL SURVEY (P/TV, SCENES) SETUP

P/TV08 EXTERNAL SURVEY (P/TV, SCENES) OPS, Item 2 for ISS Survey

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

ISS EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

~

ISS EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

POST EVA EMU RESIZE (EVA, AIRLOCK CONFIG)

~

NOTES

3-83

08

Magnus Walheim

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/15(196)

16:00

17:00

18:00

19:00

20:00

MET

Day 006W E Z

TDRS

D/N

ORB

105

106

107

108

STS ATT~

~

BIAS -XLV -ZVV

MS1

EXERCISE

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

P/TV08 EXTERNAL SURVEY (P/TV, SCENES) SETUP

P/TV08 EXTERNAL SURVEY (P/TV, SCENES) OPS, Item 2 for ISS Survey

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

~ISS EMU CHECKOUT PREP (EVA, AIRLOCK CONFIG)

ISS EMU CHECKOUT (EVA, CHECKOUTS) Perform for 2 EMUs

~

POST EVA EMU RESIZE (EVA, AIRLOCK CONFIG)

NOTES

Page 140: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Ferguson Hurley

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 3-7 MCC will TMBU S/W FDA, H/W FDA already INH.

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) On MCC go, perform steps 8-12 MCC will TMBU S/W FDA. Do not ENA H/W.

3-84

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/15(196)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

~

~

D/N

ORB

108

109

110

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

CREW PHOTO

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

PLT

MEAL

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

~

CREW PHOTO

N2 REPRESS INIT A

N2 REPRESS TERM (On MCC GO) B

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

NOTES

3-84

08

Ferguson Hurley

A N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 3-7 MCC will TMBU S/W FDA, H/W FDA already INH.

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS) On MCC go, perform steps 8-12 MCC will TMBU S/W FDA. Do not ENA H/W.

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/15(196)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

D/N

ORB

108

109

110

STS ATT~

~

BIAS -XLV -ZVV

CDR

MEAL

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

CREW PHOTO

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PLT

MEAL

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

~FILTER CLEANING (IFM, SCHEDULED MAINTENANCE) Inspect filters and clean as necessary

CREW PHOTO

N2 REPRESS INIT A

N2 REPRESS TERM (On MCC GO) B

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

NOTES

Page 141: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Magnus Walheim

3-85

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/15(196)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

~

~

D/N

ORB

108

109

110

~

~

BIAS -XLV -ZVV

STS ATT

MS1

MEAL

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

CREW PHOTO

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

MS2

MEAL

EXERCISE

~

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

CREW PHOTO

NLP ACTIVATION (ASSY OPS, PAYLOADS) Activate GAPs A-P

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

POST EVA EMU RESIZE (EVA, AIRLOCK CONFIG)~

POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

CGBA ADJUST SET TEMP (ASSY OPS, PAYLOADS) Set temperature to +37C

NOTES

3-85

08

Magnus Walheim

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/15(196)

20:00

21:00

22:00

23:00

00:00

MET

Day 006W E Z

TDRS

D/N

ORB

108

109

110

STS ATT~

~

BIAS -XLV -ZVV

MS1

MEAL

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

CREW PHOTO

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

MEAL

~

EXERCISE

CREW CONFERENCE ISS KU AVAIL (21:51 - 22:32) (22:34 - 23:06)

CREW PHOTO

NLP ACTIVATION (ASSY OPS, PAYLOADS) Activate GAPs A-P

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (20:09 - 20:54)

~POST EVA EMU RESIZE (EVA, AIRLOCK CONFIG)POST EVA RECONFIG AND TRANSFER TO SHUTTLE (EVA, AIRLOCK CONFIG)

CGBA ADJUST SET TEMP (ASSY OPS, PAYLOADS) Set temperature to +37C

NOTES

Page 142: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Ferguson Hurley

CREW WAKE @ 07/12:00

3-86

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/15(196)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

~

~~

D/N

ORB

111

112

113

~

~

BIAS -XLV -ZVV

STS ATT

CDR

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) Review Only

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) Review Only

CWC-I TRANSFER Transfer 2 CWC-Is to ISS

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #2 Perform Parts D-F Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #1 Perform Parts D & E Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

3-86

08

Ferguson Hurley

CREW WAKE @ 07/12:00

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/15(196)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

D/N

ORB

111

112

113

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) Review Only

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) Review Only

CWC-I TRANSFER Transfer 2 CWC-Is to ISS

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #2 Perform Parts D-F Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #1 Perform Parts D & E Ref. MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

NOTES

Page 143: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Magnus Walheim

CREW WAKE @ 07/12:00

3-87

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/15(196)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

~

~~

D/N

ORB

111

112

113

~

~

BIAS -XLV -ZVV

STS ATT

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

EXERCISE

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MICRO-4 TRANSFER TO SHUTTLE (ASSY OPS, PAYLOADS)

On MCC-H Go:IFM: 1.2.406 MPLM GLA SCAVENGE Steps 1-3, for MPL2PA1, MPL2PF1, MPL2PA4, MPL2PF4

NOTES

3-87

08

Magnus Walheim

CREW WAKE @ 07/12:00

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/15(196)

00:00

01:00

02:00

03:00

04:00

MET

Day 007W E Z

TDRS

D/N

ORB

111

112

113

STS ATT~

~

BIAS -XLV -ZVV

MS1

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

EXERCISE

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MICRO-4 TRANSFER TO SHUTTLE (ASSY OPS, PAYLOADS)

On MCC-H Go:IFM: 1.2.406 MPLM GLA SCAVENGE Steps 1-3, for MPL2PA1, MPL2PF1, MPL2PA4, MPL2PF4

NOTES

Page 144: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Ferguson Hurley

3-88

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/15(196)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

113

114

115

116

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

NOTES

3-88

08

Ferguson Hurley

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/15(196)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

D/N

ORB

113

114

115

116

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PLT

~

SLEEP

NOTES

Page 145: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Magnus Walheim

3-89

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/15(196)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

113

114

115

116

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

MS2

SLEEP

~

NOTES

3-89

08

Magnus Walheim

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/15(196)

04:00

05:00

06:00

07:00

08:00

MET

Day 007W E Z

TDRS

D/N

ORB

113

114

115

116

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

MS2

~

SLEEP

NOTES

Page 146: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Ferguson Hurley

3-90

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/15(196)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

~ ~

~

D/N

ORB

116

117

118

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PLT

SLEEP

~

NOTES

3-90

08

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/15(196)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

D/N

ORB

116

117

118

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PLT

~

SLEEP

NOTES

Page 147: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

08

Magnus Walheim

3-91

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/15(196)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

~ ~

~

D/N

ORB

116

117

118

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

MS2

SLEEP

~

NOTES

3-91

08

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/15(196)

08:00

09:00

10:00

11:00

12:00

MET

Day 007W E Z

TDRS

D/N

ORB

116

117

118

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

MS2

~

SLEEP

NOTES

Page 148: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

FD09 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC (ORB OPS, CREW SYSTEMS) CHECK STATUS HARD REBOOT STS-3(KFX)

Ferguson Hurley

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) At step 6.1, hand Myco Kit to FE-3, FE-5 or FE-6 for MELFI insertion

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) At step 6.1, hand Myco Kit to FE-3, FE-5 or FE-6 for MELFI insertion

3-92

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/16(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

~ ~

~

D/N

ORB

118

119

120

121

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

L17 Check MCIU filter screen

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #3 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #4 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #5 Perform Parts D & E Ref. MSG XXX

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

3-92

09

FD09 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC (ORB OPS, CREW SYSTEMS) CHECK STATUS HARD REBOOT STS-3(KFX)

Ferguson Hurley

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) At step 6.1, hand Myco Kit to FE-3, FE-5 or FE-6 for MELFI insertion

MYCO BODY SAMPLE COLLECTION (ASSY OPS, PAYLOADS) At step 6.1, hand Myco Kit to FE-3, FE-5 or FE-6 for MELFI insertion

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/16(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

D/N

ORB

118

119

120

121

STS ATT~

~

BIAS -XLV -ZVV

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

L17 Check MCIU filter screen

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #3 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #4 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #5 Perform Parts D & E Ref. MSG XXX

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

Page 149: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Magnus Walheim

3-93

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/16(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

~ ~

~

D/N

ORB

118

119

120

121

~

~

BIAS -XLV -ZVV

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EXERCISE

~

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) OPS Item 6 for STL

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

TRANSFER OPS- Ref. MPLM Transfer Lists and MSG XXX

~

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

3-93

09

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/16(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 007W E Z

TDRS

D/N

ORB

118

119

120

121

STS ATT~

~

BIAS -XLV -ZVV

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) OPS Item 6 for STL

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)

~

TRANSFER OPS- Ref. MPLM Transfer Lists and MSG XXX

VISION EXAM- Retrieve Visual Acuity Charts from MAK, TBD. Complete Exam and Questionnaire with uncorrected vision and corrected vision, if perscribed.

NOTES

Page 150: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Ferguson HurleySUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri B

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES Pri B req'd

3-94

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/16(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

121

122

123

~

~

BIAS -XLV -ZVV

STS ATT

CDR

S&M: 1.100 CBM CONTROLLER PANEL ASSEMBLYINSTALLATION - GENERIC Steps 1.2-end for Node 2 Nadir

MEAL

~

EXERCISE

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

MEAL

~

EXERCISE

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

~

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #6 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #7 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #8 Perform Parts D-F Ref. MSG XXX

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

NOTES

3-94

09

Ferguson HurleySUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri B

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES Pri B req'd

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/16(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

D/N

ORB

121

122

123

STS ATT~

~

BIAS -XLV -ZVV

CDR

S&M: 1.100 CBM CONTROLLER PANEL ASSEMBLYINSTALLATION - GENERIC Steps 1.2-end for Node 2 Nadir

~

MEAL

EXERCISE

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

~

MEAL

EXERCISE

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #6 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #7 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #8 Perform Parts D-F Ref. MSG XXX

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

NOTES

Page 151: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Magnus Walheim

3-95

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/16(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

121

122

123

~

~

BIAS -XLV -ZVV

STS ATT

MS1

S&M: 1.100 CBM CONTROLLER PANEL ASSEMBLYINSTALLATION - GENERIC Steps 1.2-end for Node 2 Nadir

2.110 CONFIGURE MPLM RACKS FOR ENTRY - ULF7 (ASSY OPS, TRANSFER)

MEAL

~

EXERCISE

~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

MEAL

~

EXERCISE

TRANSFER OPS- Ref. MPLM Transfer Lists and MSG XXX~

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

3-95

09

Magnus Walheim

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/16(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 007W E Z

TDRS

D/N

ORB

121

122

123

STS ATT~

~

BIAS -XLV -ZVV

MS1

S&M: 1.100 CBM CONTROLLER PANEL ASSEMBLYINSTALLATION - GENERIC Steps 1.2-end for Node 2 Nadir

2.110 CONFIGURE MPLM RACKS FOR ENTRY - ULF7 (ASSY OPS, TRANSFER)

~

MEAL

~

EXERCISE

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

MS2

~

MEAL

EXERCISE

~TRANSFER OPS- Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. MPLM Transfer Lists and MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NOTES

Page 152: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Ferguson Hurley

3-96

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/16(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

124

125

126

~

~

BIAS -XLV -ZVV

STS ATT

CDR

OFF DUTY

~

MEAL

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:55 - 20:32)

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

OFF DUTY

~

MEAL

~

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:55 - 20:32)

GLACIER SWAP - SHUTTLE (ASSY OPS, PAYLOADS)

NOTES

3-96

09

Ferguson Hurley

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/16(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

D/N

ORB

124

125

126

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

OFF DUTY

~

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:55 - 20:32)

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

~

OFF DUTY

~

MEAL

PUBLIC AFFAIRS EVENT ISS KU AVAIL: (19:55 - 20:32)

GLACIER SWAP - SHUTTLE (ASSY OPS, PAYLOADS)

NOTES

Page 153: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Magnus Walheim

3-97

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/16(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

~

~

~

~

D/N

ORB

124

125

126

~

~

BIAS -XLV -ZVV

STS ATT

MS1

OFF DUTY

~

MEAL

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NLP ACTIVATION (ASSY OPS, PAYLOADS)

MS2

OFF DUTY

~

MEAL

~

P/TV 09 MIDDECK PAYLOADS (P/TV, SCENES) OPS for item 1 video, photo

IFM: 1.2.406 MPLM GLA SCAVENGE Steps 1-3, for MPL2PA2, MPL2PF2, MPL2PA3, MPL2PF3

NOTES

3-97

09

Magnus Walheim

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/16(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 007W E Z

TDRS

D/N

ORB

124

125

126

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

OFF DUTY

~

MEAL

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

NLP ACTIVATION (ASSY OPS, PAYLOADS)

MS2

~

OFF DUTY

~

MEAL

P/TV 09 MIDDECK PAYLOADS (P/TV, SCENES) OPS for item 1 video, photo

IFM: 1.2.406 MPLM GLA SCAVENGE Steps 1-3, for MPL2PA2, MPL2PF2, MPL2PA3, MPL2PF3

NOTES

Page 154: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Ferguson Hurley

CREW WAKE @ 08/11:30

3-98

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/16(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

~

~~

~

D/N

ORB

126

127

128

129

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

OFF DUTY

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OFF DUTY

~

NOTES

3-98

09

Ferguson Hurley

CREW WAKE @ 08/11:30

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/16(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

D/N

ORB

126

127

128

129

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

OFF DUTY

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

NOTES

Page 155: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Magnus Walheim

CREW WAKE @ 08/11:30

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

3-99

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/16(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

~

~~

~

D/N

ORB

126

127

128

129

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

TRANSFER BRIEF PREP

TRANSFER BRIEFCall down status to MCC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OFF DUTY

~

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OFF DUTY

~

NOTES

3-99

09

Magnus Walheim

CREW WAKE @ 08/11:30

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/16(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 008W E Z

TDRS

D/N

ORB

126

127

128

129

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

TRANSFER BRIEF PREP

TRANSFER BRIEFCall down status to MCC

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

AEM UNIT #1,2,3 CHECK (Cue Card)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OFF DUTY

NOTES

Page 156: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Ferguson Hurley

3-100

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/16(197)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

129

130

131

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-100

09

Ferguson Hurley

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/16(197)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

D/N

ORB

129

130

131

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 157: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

09

Magnus Walheim

3-101

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/16(197)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

129

130

131

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-101

09

Magnus Walheim

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/16(197)

04:00

05:00

06:00

07:00

08:00

MET

Day 008W E Z

TDRS

D/N

ORB

129

130

131

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 158: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Ferguson Hurley

FD10 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

3-102

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/16(197)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

131

132

133

134

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-102

10

Ferguson Hurley

FD10 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/16(197)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

D/N

ORB

131

132

133

134

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 159: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Magnus Walheim

3-103

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/16(197)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

131

132

133

134

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-103

10

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/16(197)

08:00

09:00

10:00

11:00

12:00

MET

Day 008W E Z

TDRS

D/N

ORB

131

132

133

134

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

NOTES

Page 160: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

A Steps 1-6 (Ground can perform steps 4-5 on request). Remove PFE and PBA from MPLM and stow in the following locations: PFE: NOD1P2-12 PEPS Locker and PBA: NOD2P2 PEPS Locker.

Ferguson Hurley

MPLM: 1.110 NODE 2 TO MPLM VESTIBULE DEPRESSAND LEAK CHECK Ground will perform Steps 5.1 and 10.2

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 3-7 MCC will TMBU S/W FDA, H/W FDA already INH.

3-104

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/17(198)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

~ ~

~

D/N

ORB

134

135

136

~

~

BIAS -XLV -ZVV

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MPLM: 1.105 MPLM EGRESS A

S&M: 1.109 MPLM VESTIBULE CONFIGURE FOR DEMATE Steps 3-end

MPLM: 1.106 MPLM DEACTIVATION Steps 1-2,4-6

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

EXERCISE

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

N2 REPRESS INIT BL17 Check MCIU filter screen

NOTES

3-104

10

A Steps 1-6 (Ground can perform steps 4-5 on request). Remove PFE and PBA from MPLM and stow in the following locations: PFE: NOD1P2-12 PEPS Locker and PBA: NOD2P2 PEPS Locker.

Ferguson Hurley

MPLM: 1.110 NODE 2 TO MPLM VESTIBULE DEPRESSAND LEAK CHECK Ground will perform Steps 5.1 and 10.2

B N2 REPRESS USING P/L N2 VLVS (ORB OPS, ECLS)Steps 3-7 MCC will TMBU S/W FDA, H/W FDA already INH.

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/17(198)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

D/N

ORB

134

135

136

STS ATT~

~

BIAS -XLV -ZVV

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MPLM: 1.105 MPLM EGRESS A

S&M: 1.109 MPLM VESTIBULE CONFIGURE FOR DEMATE Steps 3-end

MPLM: 1.106 MPLM DEACTIVATION Steps 1-2,4-6

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

EXERCISE

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

N2 REPRESS INIT BL17 Check MCIU filter screen

NOTES

Page 161: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

A Steps 1-6 (Ground can perform steps 4-5 on request). Remove PFE and PBA from MPLM and stow in the following locations: PFE: NOD1P2-12 PEPS Locker and PBA: NOD2P2 PEPS Locker.

Magnus Walheim

3-105

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/17(198)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

~ ~

~

D/N

ORB

134

135

136

~

~

BIAS -XLV -ZVV

STS ATT

MS1

MPLM: 1.105 MPLM EGRESS A

MPLM: 1.106 MPLM DEACTIVATION Steps 1-2,4-6

S&M: 1.109 MPLM VESTIBULE CONFIGURE FOR DEMATE Steps 3-end

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

ORBITER SSC RETURN Ref. Transfer List Item XXX~

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #9 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #10 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #11 Perform Parts D & E Ref. MSG XXX

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

NOTES

3-105

10

A Steps 1-6 (Ground can perform steps 4-5 on request). Remove PFE and PBA from MPLM and stow in the following locations: PFE: NOD1P2-12 PEPS Locker and PBA: NOD2P2 PEPS Locker.

Magnus Walheim

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/17(198)

12:00

13:00

14:00

15:00

16:00

MET

Day 008W E Z

TDRS

D/N

ORB

134

135

136

STS ATT~

~

BIAS -XLV -ZVV

MS1

MPLM: 1.105 MPLM EGRESS A

MPLM: 1.106 MPLM DEACTIVATION Steps 1-2,4-6

S&M: 1.109 MPLM VESTIBULE CONFIGURE FOR DEMATE Steps 3-end

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

DAILY TRANSFER LIST UPDATERef. Transfer List & MSG XXX

~ORBITER SSC RETURN Ref. Transfer List Item XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #9 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #10 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #11 Perform Parts D & E Ref. MSG XXX

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

NOTES

Page 162: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Ferguson Hurley

NO EXERCISEMPLM UNINSTALL/BOLT UNLOAD

C N2 REPRESS USINGP/L N2 VLVS (ORB OPS, ECLS) On MCC go: Perform steps 8-12 MCC will TMBU S/W FDA. Do not ENA H/W.

3-106

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/17(198)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

~ ~

~

D/N

ORB

137

138

139

~

~

BIAS -XLV -ZVV

STS ATT

CDR

MEAL

MPLM: 1.110 NODE 2 TO MPLM VESTIBULE DEPRESSAND LEAK CHECK Ground will perform Steps 5.1 and 10.2

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

PLT

MEAL

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 1-5

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

~

N2 REPRESS TERM (On MCC GO) COn MCC Go:JOINT OPS: 3.122 PREBREATHE USING SHUTTLE O2 TEARDOWN Steps 2-7; MCC-H will perform steps 2.4 and 5.5

NOTES

3-106

10

Ferguson Hurley

NO EXERCISEMPLM UNINSTALL/BOLT UNLOAD

C N2 REPRESS USINGP/L N2 VLVS (ORB OPS, ECLS) On MCC go: Perform steps 8-12 MCC will TMBU S/W FDA. Do not ENA H/W.

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/17(198)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

D/N

ORB

137

138

139

STS ATT~

~

BIAS -XLV -ZVV

CDR

MEAL

~MPLM: 1.110 NODE 2 TO MPLM VESTIBULE DEPRESSAND LEAK CHECK Ground will perform Steps 5.1 and 10.2

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

PLT

MEAL

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 1-5

~

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

N2 REPRESS TERM (On MCC GO) COn MCC Go:JOINT OPS: 3.122 PREBREATHE USING SHUTTLE O2 TEARDOWN Steps 2-7; MCC-H will perform steps 2.4 and 5.5

NOTES

Page 163: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Magnus Walheim

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) Ops for Item 1 Video, Photo CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),

GLACIER STATUS CHECK (CC)

NO EXERCISEMPLM UNINSTALL/BOLT UNLOAD

3-107

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/17(198)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

~ ~

~

D/N

ORB

137

138

139

~

~

BIAS -XLV -ZVV

STS ATT

MS1

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 1-5

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

~

MEAL

EXERCISE

POC: 2.7.501 DOUG STARTUP PROCEDURE Step 1

MS2

MEAL

ORBITER SSC RETURN Ref. Transfer List Item XXX

~

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #12 Perform Parts D & E Ref. MSG XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #13 Perform Parts D & E Ref. MSG XXX

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

EXERCISE

NOTES

3-107

10

Magnus Walheim

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) Ops for Item 1 Video, Photo CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),

GLACIER STATUS CHECK (CC)

NO EXERCISEMPLM UNINSTALL/BOLT UNLOAD

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/17(198)

16:00

17:00

18:00

19:00

20:00

MET

Day 008W E Z

TDRS

D/N

ORB

137

138

139

STS ATT~

~

BIAS -XLV -ZVV

MS1

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 1-5

~

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

MEAL

EXERCISE

POC: 2.7.501 DOUG STARTUP PROCEDURE Step 1

MS2

MEAL

~

ORBITER SSC RETURN Ref. Transfer List Item XXX

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #12 Perform Parts D & E Ref. MSG XXX

~

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #13 Perform Parts D & E Ref. MSG XXX

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

EXERCISE

NOTES

Page 164: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Ferguson Hurley

NO T2MPLM MNVRBACKOFF TOBERTH

UPLINKTFL 192

3-108

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/17(198)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

139

140

141

142

~

~

BIAS -XLV -ZVV

STS ATT

CDR

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 10-17

FAREWELL

EXERCISE

NOMINAL H20 CNFG (ORB OPS, ECLS) √MCC for FES Pri A

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

~

AEM UNIT #1,2,3 CHECK (Cue Card)

C/L CAMR INSTALL (P/TV, C/L CAMR) Steps 1 and 4

PLT

FAREWELL

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~

P/TV04 INGRESS/EGRESS (P/TV, SCENES) SETUP

P/TV04 ISS INTERNAL OPS (HC) (P/TV, SCENES) SETUP

P/TV04 INGRESS/EGRESS (DEACTIVATION) (P/TV, SCENES)

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

~

ROBO: 1.210 MPLM DEMATEAND BERTH Steps 18-end

P/TV05 ISS INTERNAL OPS (P/TV, SCENES) Perform DEACTIVATION

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

C/L CAMR INSTALL (P/TV, C/L CAMR) Steps 1 and 4

NOTES

3-108

10

Ferguson Hurley

NO T2MPLM MNVRBACKOFF TOBERTH

UPLINKTFL 192

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/17(198)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

D/N

ORB

139

140

141

142

STS ATT~

~

BIAS -XLV -ZVV

CDR

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 10-17

FAREWELL

EXERCISE

NOMINAL H20 CNFG (ORB OPS, ECLS) √MCC for FES Pri A

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

~

TRANSFER OPS Ref. Middeck Transfer List and MSG XXX

AEM UNIT #1,2,3 CHECK (Cue Card)

C/L CAMR INSTALL (P/TV, C/L CAMR) Steps 1 and 4

PLT

FAREWELL

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

P/TV04 INGRESS/EGRESS (P/TV, SCENES) SETUP

P/TV04 ISS INTERNAL OPS (HC) (P/TV, SCENES) SETUP

P/TV04 INGRESS/EGRESS (DEACTIVATION) (P/TV, SCENES)

~ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

ROBO: 1.210 MPLM DEMATEAND BERTH Steps 18-end

P/TV05 ISS INTERNAL OPS (P/TV, SCENES) Perform DEACTIVATION

OBSS MNVR TO UNDOCK POSITION (PDRS, OBSS NOMINAL)

C/L CAMR INSTALL (P/TV, C/L CAMR) Steps 1 and 4

NOTES

Page 165: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Magnus Walheim

CWC-I FILL (ORB OPS, ECLS) (See Details on Pg 3-107)

NO T2MPLM MNVRBACKOFF TOBERTH

3-109

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/17(198)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

~

~

~

~

D/N

ORB

139

140

141

142

~

~

BIAS -XLV -ZVV

STS ATT

MS1

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

~

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 18-end

FAREWELL

JOINT OPS: 4.102 STS/ISS DUCT RMVL & HATCH CLOSING MCC-H can perform steps 2 & 3 on crew request

JOINT OPS: 4.104 ODS VEST/PMA DPRS & HATCH LEAK CHECK

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

TRANSFER BRIEFCall down status to MCC

MS2

FAREWELL

JOINT OPS: 4.102 STS/ISS DUCT RMVL & HATCH CLOSING MCC-H can perform steps 2 & 3 on crew request

JOINT OPS: 4.104 ODS VEST/PMA DPRS & HATCH LEAK CHECK

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #14 Perform Parts D-F Ref. MSG XXX

~

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform CHANGEOUT. Gather empty Shuttle CWC S/N TBD from TBD and take ISS CWC S/N TBD to TBD for processing.ROBO: 1.210 MPLM DEMATE AND BERTH Steps 10-17

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

NOTES

3-109

10

Magnus Walheim

CWC-I FILL (ORB OPS, ECLS) (See Details on Pg 3-107)

NO T2MPLM MNVRBACKOFF TOBERTH

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/17(198)

20:00

21:00

22:00

23:00

00:00

MET

Day 008W E Z

TDRS

D/N

ORB

139

140

141

142

STS ATT~

~

BIAS -XLV -ZVV

MS1

~ROBO: 1.210 MPLM DEMATE AND BERTH Steps 6-17

ROBO: 1.210 MPLM DEMATE AND BERTH Steps 18-end

FAREWELL

JOINT OPS: 4.102 STS/ISS DUCT RMVL & HATCH CLOSING MCC-H can perform steps 2 & 3 on crew request

JOINT OPS: 4.104 ODS VEST/PMA DPRS & HATCH LEAK CHECK

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

TRANSFER BRIEFCall down status to MCC

MS2

FAREWELL

JOINT OPS: 4.102 STS/ISS DUCT RMVL & HATCH CLOSING MCC-H can perform steps 2 & 3 on crew request

JOINT OPS: 4.104 ODS VEST/PMA DPRS & HATCH LEAK CHECK

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

TRANSFER BRIEFCall down status to MCC

TRANSFER BRIEF PREP

CWC-I FILL (ORB OPS, ECLS) Fill CWC-I #14 Perform Parts D-F Ref. MSG XXX

~

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform CHANGEOUT. Gather empty Shuttle CWC S/N TBD from TBD and take ISS CWC S/N TBD to TBD for processing.ROBO: 1.210 MPLM DEMATE AND BERTH Steps 10-17

CWC-I TRANSFER Transfer 3 CWC-Is to ISS

NOTES

Page 166: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Ferguson Hurley

CREW WAKE @ 09/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

3-110

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/17(198)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

~

~

~

D/N

ORB

142

143

144

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

PCS ACTIVATION ON MCC GO: MO10W 14.7 CAB REG INLET SYS 2 VLV - OP Avoid WCS use during high N2 flow Expect possible "S66 CAB O2 FLO 2" msgs

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

SLEEP

~

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~

NOTES

3-110

10

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

Ferguson Hurley

CREW WAKE @ 09/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/17(198)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

D/N

ORB

142

143

144

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

PCS ACTIVATION ON MCC GO: MO10W 14.7 CAB REG INLET SYS 2 VLV - OP Avoid WCS use during high N2 flow Expect possible "S66 CAB O2 FLO 2" msgs

CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

~

SLEEP

~RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

NOTES

Page 167: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Magnus Walheim

CREW WAKE @ 09/11:00

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

3-111

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/17(198)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

~

~

~

D/N

ORB

142

143

144

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

On MCC Go: SSP1 APCU 1 OUTPUT RLY - CL (tb-gray)

On MCC Go: SSP1 APCU 1 OUTPUT RLY - OP (tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

MS2

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

~

UPLINKTFL 199

MPLM PRESSURECHECK

UPLINKTFL 184

NOTES

3-111

10

Magnus Walheim

CREW WAKE @ 09/11:00

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/17(198)

00:00

01:00

02:00

03:00

04:00

MET

Day 009W E Z

TDRS

D/N

ORB

142

143

144

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

On MCC Go: SSP1 APCU 1 OUTPUT RLY - CL (tb-gray)

On MCC Go: SSP1 APCU 1 OUTPUT RLY - OP (tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

MS2

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~RNDZ TOOLS CHECKOUT (RNDZ, RNDZ TOOLS)

NOTES

UPLINKTFL 199

MPLM PRESSURECHECK

UPLINKTFL 184

Page 168: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Ferguson Hurley

3-112

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/17(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

~

~

~

D/N

ORB

144

145

146

147

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-112

10

Ferguson Hurley

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/17(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

D/N

ORB

144

145

146

147

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 169: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

10

Magnus Walheim

3-113

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/17(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

~

~

~

D/N

ORB

144

145

146

147

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-113

10

Magnus Walheim

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/17(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 009W E Z

TDRS

D/N

ORB

144

145

146

147

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 170: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Ferguson Hurley

FD11 EZ ACTIVITIES: √OCAC FILTER TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

3-114

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/17(198)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

147

148

149

~

~

BIAS -XLV -ZVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) √Hum Seps for H20 Accumulation

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-114

11

Ferguson Hurley

FD11 EZ ACTIVITIES: √OCAC FILTER TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/17(198)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

D/N

ORB

147

148

149

STS ATT~

~

BIAS -XLV -ZVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) √Hum Seps for H20 Accumulation

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 171: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Magnus Walheim

3-115

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/17(198)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

147

148

149

~

~

BIAS -XLV -ZVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-115

11

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/17(198)

08:00

09:00

10:00

11:00

12:00

MET

Day 009W E Z

TDRS

D/N

ORB

147

148

149

STS ATT~

~

BIAS -XLV -ZVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 172: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

H/O ATT CNTRL CMG TA TO ORB A

TFL 192

Ferguson Hurley

UPLINKβ21+MASKBOX 30,40

UPLINKO6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),6 (Triple G2, Remain FREE DRIFT),5

O6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),6 (Triple G2, Remain FREE DRIFT),5

A √A12/FREE/VERN When ISS in Free Drift, DAP: LVLH, When jet activity stopped for > 5 sec, DAP: FREE > 2 sec, Then DAP: AUTO

UNDOCKING 009/14:33

3-116

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/18(199)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

150

151

152

~

BIAS -XLV -ZVV

-XLV +ZVV

~

FLYAROUND/SEP

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) √Hum Seps for H20 Accumulation

~

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCKING/SEP TIMELINE)

MNVR (TRK) -XLV +ZVV (Undock)TG=2 BV=5 P=180 Y=0 OM=0A12/AUTO/VERN, Init TRK

SEP/FLYAROUNDFLYAROUNDSEP BURNSTERMINATE SEP OPS (RNDZ, UNDOCKING/SEP TIMELINE)

~

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCKING/SEP TIMELINE)

SEP/FLYAROUNDFLYAROUNDSEP BURNSTERMINATE SEP OPS (RNDZ, UNDOCKING/SEP TIMELINE)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

3-116

11

H/O ATT CNTRL CMG TA TO ORB A

TFL 192

Ferguson Hurley

UPLINKβ21+MASKBOX 30,40

UPLINKO6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),6 (Triple G2, Remain FREE DRIFT),5

O6 S TRK PWR -Z - ONPRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),6 (Triple G2, Remain FREE DRIFT),5

A √A12/FREE/VERN When ISS in Free Drift, DAP: LVLH, When jet activity stopped for > 5 sec, DAP: FREE > 2 sec, Then DAP: AUTO

UNDOCKING 009/14:33

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/18(199)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

D/N

ORB

150

151

152

STS ATT~

BIAS -XLV -ZVV

-XLV +ZVV

~

FLYAROUND/SEP

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) √Hum Seps for H20 Accumulation

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCKING/SEP TIMELINE)

MNVR (TRK) -XLV +ZVV (Undock)TG=2 BV=5 P=180 Y=0 OM=0A12/AUTO/VERN, Init TRK

~

SEP/FLYAROUNDFLYAROUNDSEP BURNSTERMINATE SEP OPS (RNDZ, UNDOCKING/SEP TIMELINE)

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCKING/SEP TIMELINE)

~

SEP/FLYAROUNDFLYAROUNDSEP BURNSTERMINATE SEP OPS (RNDZ, UNDOCKING/SEP TIMELINE)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 173: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Magnus Walheim

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

UNDOCKING 009/14:33

3-117

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/18(199)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

~

~

~

~

D/N

ORB

150

151

152

~

BIAS -XLV -ZVV

-XLV +ZVV

~

FLYAROUND/SEP

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

P/TV03 UNDOCK (P/TV, SCENES) SETUP

P/TV03 UNDOCK (P/TV, SCENES) OPS

~

SSV OUTRATE - 3

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCKING/SEP TIMELINE)

On MCC GO: TRIDAR ACTIVATION (Cue Card)

SEP/FLYAROUNDFLYAROUNDSEP BURNSTERMINATE SEP OPS (RNDZ, UNDOCKING/SEP TIMELINE)

~

NOTES

3-117

11

Magnus Walheim

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

UNDOCKING 009/14:33

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/18(199)

12:00

13:00

14:00

15:00

16:00

MET

Day 009W E Z

TDRS

D/N

ORB

150

151

152

STS ATT~

BIAS -XLV -ZVV

-XLV +ZVV

~

FLYAROUND/SEP

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

P/TV03 UNDOCK (P/TV, SCENES) SETUP

~

P/TV03 UNDOCK (P/TV, SCENES) OPS

SSV OUTRATE - 3

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UNDOCKING/SEPARATION TIMELINE (RNDZ, UNDOCKING/SEP TIMELINE)

On MCC GO: TRIDAR ACTIVATION (Cue Card)

~

SEP/FLYAROUNDFLYAROUNDSEP BURNSTERMINATE SEP OPS (RNDZ, UNDOCKING/SEP TIMELINE)

NOTES

Page 174: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

SEP/FLYAROUND (Details on Pg 3-115) SEP/FLYAROUND (Details on Pg 3-115)

Ferguson Hurley

UPLINKβ21+MASK

3-118

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/18(199)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

~ ~

~

D/N

ORB

152

153

154

155

~

BIAS -ZLV +YVV

~

BIAS +YSI

STS ATT

CDR

~

MEAL

MNVR (TRK) BIAS +YSI (Stbd Survey) TG=4 BV=5 P=0 Y=40 OM=275 A14/AUTO/VERN Init TRK

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

CABIN TEMP CONTROLLER RECNFG 2(1) (ORB OPS, ECLS)

MNVR (TRK) BIAS -ZLV +YVV (Dump) TG=2 BV=5 P=90 Y=0 OM=290 A1/AUTO/VERN, Init TRK

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6 (Single G2),9,12 (IMU 2)

PLT

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

~

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

MEAL

OBSS MNVR TO FLAT FIELD (PDRS, OBSS NOMINAL)

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

HEATER RECONFIG-CONFIG B (ORB OPS, EPS)SSV OUTRATE - 4

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6 (Single G2),9,12 (IMU 2)

UPLINKTFL 188

NOTES

3-118

11

SEP/FLYAROUND (Details on Pg 3-115) SEP/FLYAROUND (Details on Pg 3-115)

Ferguson Hurley

UPLINKβ21+MASK

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/18(199)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

D/N

ORB

152

153

154

155

STS ATT~

BIAS -ZLV +YVV

~

BIAS +YSI

CDR

~

MEAL

MNVR (TRK) BIAS +YSI (Stbd Survey) TG=4 BV=5 P=0 Y=40 OM=275 A14/AUTO/VERN Init TRK

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

CABIN TEMP CONTROLLER RECNFG 2(1) (ORB OPS, ECLS)

MNVR (TRK) BIAS -ZLV +YVV (Dump) TG=2 BV=5 P=90 Y=0 OM=290 A1/AUTO/VERN, Init TRK

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6 (Single G2),9,12 (IMU 2)

PLT

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

~

COMM STRING 1 C/O (PART A) (ORB OPS, COMM/INST)

MEAL

OBSS MNVR TO FLAT FIELD (PDRS, OBSS NOMINAL)

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

HEATER RECONFIG-CONFIG B (ORB OPS, EPS)SSV OUTRATE - 4

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN) Steps 5,6 (Single G2),9,12 (IMU 2)

NOTES

UPLINKTFL 188

Page 175: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

SEP/FLYAROUND (Details on Pg 3-115)

Magnus Walheim

3-119

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/18(199)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

~ ~

~

D/N

ORB

152

153

154

155

~

BIAS -ZLV +YVV

~

BIAS +YSI

STS ATT

MS1

P/TV03 UNDOCK (P/TV, SCENES) OPS

~

P/TV03 UNDOCK (P/TV, SCENES) DEACTIVATION

MEAL

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) OPS Item 3

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

MS2

~

TRIDAR DEACTIVATION (Cue Card)

MEAL

FOB MIXING (ASSY OPS, PAYLOADS)

JOINT OPS: 6.106 SSOR DEACTIVATION

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

~

SUPPLY/WASTE WATER DUMP (Init) (ORB OPS, ECLS) Ref. MSG XXX

SUPPLY/WASTE WATER DUMP (Term) (ORB OPS, ECLS) Ref. MSG XXX

NOTES

3-119

11

SEP/FLYAROUND (Details on Pg 3-115)

Magnus Walheim

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/18(199)

16:00

17:00

18:00

19:00

20:00

MET

Day 009W E Z

TDRS

D/N

ORB

152

153

154

155

STS ATT~

BIAS -ZLV +YVV

~

BIAS +YSI

MS1

~P/TV03 UNDOCK (P/TV, SCENES) OPS

P/TV03 UNDOCK (P/TV, SCENES) DEACTIVATION

MEAL

~

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

SHUTTLE CONDENSATE COLLECTION (ORB OPS, ECLS) Perform TEARDOWN

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) OPS Item 3

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

MS2

~

TRIDAR DEACTIVATION (Cue Card)

MEAL

FOB MIXING (ASSY OPS, PAYLOADS)

JOINT OPS: 6.106 SSOR DEACTIVATION

~

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

SUPPLY/WASTE WATER DUMP (Init) (ORB OPS, ECLS) Ref. MSG XXX

SUPPLY/WASTE WATER DUMP (Term) (ORB OPS, ECLS) Ref. MSG XXX

NOTES

Page 176: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Ferguson Hurley

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)MNVR (TRK) BIAS +XSI (Nose Cap) TG=4 BV=5 P=330 Y=0 OM=335 A14/AUTO/VERN, RCC SURVEY-STBD cmplt, Init TRK

3-120

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/18(199)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

~ ~

~

D/N

ORB

155

156

157

~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

STS ATT

CDR

~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

When RCC SURVEY-PORT Step 3 complete: MNVR (TRK) BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=323 OM=350, A14/AUTO/VERN, Init TRK

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A14/AUTO/VERN, RCC-SURVEY-PORT Step 12 cmplt, Init TRK

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6 ~

PLT

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS BERTH (PDRS, OBSS OPERATIONS)

RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6 ~

NOTES

3-120

11

Ferguson Hurley

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)MNVR (TRK) BIAS +XSI (Nose Cap) TG=4 BV=5 P=330 Y=0 OM=335 A14/AUTO/VERN, RCC SURVEY-STBD cmplt, Init TRK

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/18(199)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

D/N

ORB

155

156

157

STS ATT~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

CDR

~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

When RCC SURVEY-PORT Step 3 complete: MNVR (TRK) BIAS -YSI (Port Survey) TG=4 BV=5 P=0 Y=323 OM=350, A14/AUTO/VERN, Init TRK

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A14/AUTO/VERN, RCC-SURVEY-PORT Step 12 cmplt, Init TRK

OBSS BERTH (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

~RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6

PLT

~OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

OBSS BERTH (PDRS, OBSS OPERATIONS)

~RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6

NOTES

Page 177: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Magnus Walheim

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri A

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC) FOB SAMPLE EXTRACTION

(ASSY OPS, PAYLOADS)

CGBA ADJUST SET TEMP (ASSY OPS, PAYLOADS) Set temperature to +8C

3-121

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/18(199)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

~ ~

~

D/N

ORB

155

156

157

~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

STS ATT

MS1

OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) LDRI Surveys KU TDRE (22:46-23:45) Gimbal flip @ 23:16

AEM UNIT #1,2,3 CHECK (Cue Card)

NLP TERMINATION (ASSY OPS, PAYLOADS) ~

MS2

NLP TERMINATION (ASSY OPS, PAYLOADS) Terminate GAPs A-P

~

~

POST ISS EVA ENT PREP (EVA, POST EVA ENT PREP)

EVA UNPACK AND STOW (EVA, AIRLOCK CONFIG)

EXERCISE

NOTES

3-121

11

Magnus Walheim

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri A

EMU INSTALLATION (EVA, AIRLOCK CONFIG)

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC) FOB SAMPLE EXTRACTION

(ASSY OPS, PAYLOADS)

CGBA ADJUST SET TEMP (ASSY OPS, PAYLOADS) Set temperature to +8C

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/18(199)

20:00

21:00

22:00

23:00

00:00

MET

Day 009W E Z

TDRS

D/N

ORB

155

156

157

STS ATT~

BIAS +XSI

BIAS -YSI

~

-ZLV -XVV

MS1

~OBSS LDRI/IDC RCC SURVEY - STBD (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - NOSE CAP (PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT (PDRS, OBSS OPERATIONS)

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) LDRI Surveys KU TDRE (22:46-23:45) Gimbal flip @ 23:16

AEM UNIT #1,2,3 CHECK (Cue Card)

~NLP TERMINATION (ASSY OPS, PAYLOADS)

MS2

NLP TERMINATION (ASSY OPS, PAYLOADS) Terminate GAPs A-P

~

~

POST ISS EVA ENT PREP (EVA, POST EVA ENT PREP)

EVA UNPACK AND STOW (EVA, AIRLOCK CONFIG)

EXERCISE

NOTES

Page 178: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Ferguson Hurley

CREW WAKE @ 10/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

3-122

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/18(199)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

~

~

~

~

D/N

ORB

157

158

159

160

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6

~

PLT

SLEEP

~

RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6

~

NOTES

3-122

11

Ferguson Hurley

CREW WAKE @ 10/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/18(199)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

D/N

ORB

157

158

159

160

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

~RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6

PLT

~

SLEEP

~RMS PWRDWN (PDRS, RMS PWRDN) Skip Steps 5 and 6

NOTES

Page 179: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Magnus Walheim

C After LDRI Playback Complete: RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit Step 4)

CREW WAKE @ 10/11:00

OIU PWR - OFF (tb-bp)

B On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

On MCC Go: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UPLINKTFL 199

MPLM PRESSURECHECK

3-123

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/18(199)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

~

~

~

~

D/N

ORB

157

158

159

160

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION B

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NLP TERMINATION (ASSY OPS, PAYLOADS)

~

MS2

SLEEP

~

RECNFG OCA DOWNLINK RATE (PL MAX) C

FOB SAMPLE EXTRACTION (ASSY OPS, PAYLOADS)

~

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) Undocking KU TDRW (00:17 - 00:44)

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES Pri A req'd

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UPLINKTFL 188

NOTES

3-123

11

Magnus Walheim

C After LDRI Playback Complete: RECONFIGURE OCA DOWNLINK RATE (PL MAX) (ORB OPS, PGSC) Part C (Omit Step 4)

CREW WAKE @ 10/11:00

OIU PWR - OFF (tb-bp)

B On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

On MCC Go: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UPLINKTFL 199

MPLM PRESSURECHECK

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/18(199)

00:00

01:00

02:00

03:00

04:00

MET

Day 010W E Z

TDRS

D/N

ORB

157

158

159

160

STS ATT~

~

-ZLV -XVV

MS1

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

APCU ACTIVATION B

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~NLP TERMINATION (ASSY OPS, PAYLOADS)

MS2

~

SLEEP

RECNFG OCA DOWNLINK RATE (PL MAX) C

~FOB SAMPLE EXTRACTION (ASSY OPS, PAYLOADS)

DIGITAL VIA VTR (Cue Card, DIGITAL PLAYBACK) Undocking KU TDRW (00:17 - 00:44)

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES Pri A req'd

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

UPLINKTFL 188

Page 180: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Ferguson Hurley

3-124

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/18(199)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

160

161

162

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-124

11

Ferguson Hurley

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/18(199)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

D/N

ORB

160

161

162

STS ATT~

~

-ZLV -XVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 181: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

11

Magnus Walheim

3-125

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/18(199)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

160

161

162

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-125

11

Magnus Walheim

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/18(199)

04:00

05:00

06:00

07:00

08:00

MET

Day 010W E Z

TDRS

D/N

ORB

160

161

162

STS ATT~

~

-ZLV -XVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 182: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

FD12 EZ ACTIVITIES: FLUID LOADING PREP Fill drink containers Ref. MSG XXX TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

FD12 CABIN STOW ACTIVITIES: Remove loose items stored in A/L Perform MS Seat Installation

Ferguson Hurley

3-126

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/18(199)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

163

164

165

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-126

12

FD12 EZ ACTIVITIES: FLUID LOADING PREP Fill drink containers Ref. MSG XXX TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)

FD12 CABIN STOW ACTIVITIES: Remove loose items stored in A/L Perform MS Seat Installation

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/18(199)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

D/N

ORB

163

164

165

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 183: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Magnus Walheim

3-127

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/18(199)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

~

~

~

D/N

ORB

163

164

165

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-127

12

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/18(199)

08:00

09:00

10:00

11:00

12:00

MET

Day 010W E Z

TDRS

D/N

ORB

163

164

165

STS ATT~

~

-ZLV -XVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

NOTES

Page 184: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Ferguson Hurley

MNVR (TRK) -YLV +ZVV (PSSC DEPLOY) TG=2 BV=5 P=0 Y=270 OM=90 A1/AUTO/VERN, Init TRK

3-128

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/19(200)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

~

~

~

~

D/N

ORB

165

166

167

168

~

-ZLV -XVV

SEP3

-ZLV -XVV

~

-YLV +ZVV

STS ATT

CDR

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS) ~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PSSC DEPLOY (ASSY OPS, PAYLOADS)

ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

< SEP3 TIG (13:08)

L1 FLASH EVAP CNTLR PRI A(B)-OFF

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS) ~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

PSSC DEPLOY (ASSY OPS, PAYLOADS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

UPLINKTFL 161

UPLINKTFL 188

UPDATEORBITALMNVR PAD

NOTES

3-128

12

Ferguson Hurley

MNVR (TRK) -YLV +ZVV (PSSC DEPLOY) TG=2 BV=5 P=0 Y=270 OM=90 A1/AUTO/VERN, Init TRK

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/19(200)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

D/N

ORB

165

166

167

168

STS ATT~

-ZLV -XVV

SEP3

-ZLV -XVV

~

-YLV +ZVV

CDR

FCS CHECKOUT (ORB OPS, GNC)

~RCS HOT FIRE TEST (ORB OPS, RCS)

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PSSC DEPLOY (ASSY OPS, PAYLOADS)

ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

< SEP3 TIG (13:08)

L1 FLASH EVAP CNTLR PRI A(B)-OFF

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

FCS CHECKOUT (ORB OPS, GNC)

~RCS HOT FIRE TEST (ORB OPS, RCS)

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)ON-ORBIT +X RCS BURN, MM 202 (ORB OPS, RCS)

PSSC DEPLOY (ASSY OPS, PAYLOADS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

UPLINKTFL 161

UPLINKTFL 188

UPDATEORBITALMNVR PAD

Page 185: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

A R2 √BLR CNTLR/HTR(three) -B PWR (three) -ON

Magnus Walheim

B RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS, PGSC) Part D then A (Omit Step 4)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

FCS C/O CAMR SETUP (P/TV, REF PROC)

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

3-129

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/19(200)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

~

~

~

~

D/N

ORB

165

166

167

168

~

-ZLV -XVV

SEP3

-ZLV -XVV

~

-YLV +ZVV

STS ATT

MS1

CANON G1 (P/TV, REF PROC) HD CC DNLK, PAO Event Setup ~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

P/TV10 PSSC DEPLOY (P/TV, SCENES) Perform SETUP, OPS Items 1,2

P/TV10 PSSC DEPLOY (P/TV, SCENES) Perform OPS, Items 3-5

EXERCISE

MS2

FCS CHECKOUT (ORB OPS, GNC)

RCS HOT FIRE TEST (ORB OPS, RCS) ~

W/B STEAM VENT HTR ACT A

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

RECONFIGURE OCA DOWNLINK RATE B

PSSC DEPLOY (ASSY OPS, PAYLOADS)

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

NOTES

3-129

12

A R2 √BLR CNTLR/HTR(three) -B PWR (three) -ON

Magnus Walheim

B RECONFIGURE OCA DOWNLINK RATE (Ch. 2) (ORB OPS, PGSC) Part D then A (Omit Step 4)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

FCS C/O CAMR SETUP (P/TV, REF PROC)

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

FILTER CLEANING (IFM, SCHEDULED MAINTENANCE)

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/19(200)

12:00

13:00

14:00

15:00

16:00

MET

Day 010W E Z

TDRS

D/N

ORB

165

166

167

168

STS ATT~

-ZLV -XVV

SEP3

-ZLV -XVV

~

-YLV +ZVV

MS1

~CANON G1 (P/TV, REF PROC) HD CC DNLK, PAO Event Setup

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

P/TV10 PSSC DEPLOY (P/TV, SCENES) Perform SETUP, OPS Items 1,2

P/TV10 PSSC DEPLOY (P/TV, SCENES) Perform OPS, Items 3-5

EXERCISE

MS2

FCS CHECKOUT (ORB OPS, GNC)

~RCS HOT FIRE TEST (ORB OPS, RCS)

W/B STEAM VENT HTR ACT A

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

RECONFIGURE OCA DOWNLINK RATE B

PSSC DEPLOY (ASSY OPS, PAYLOADS)

SSP1 MPLM CHAN 1,2 HTR PWR (two) - ON (tb-gray)

NOTES

Page 186: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Ferguson Hurley

RCS HOT FIRE TEST (ORB OPS, RCS) RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (FOR A31p PGSC) (ORB OPS, PGSC)

MNVR (TRK) -ZLV +YVV (Dump) TG=2 BV=3 OM=270 A1/AUTO/VERN, Init TRK

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

3-130

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/19(200)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

~

~~

D/N

ORB

168

169

170

~

-ZLV +YVV

~

-ZLV -XVV

STS ATT

CDR

~

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

EXERCISE

~

PLT

~

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)

PILOT WITH RHC (FOR A31p PGSC) (ORB OPS, PGSC)

RMS PWRDN (PDRS, RMS PWRDN)Steps 3,5-7

CABIN CONFIG/STOW

~

On MCC Go: L1 FES PRI A - ON

NOTES

3-130

12

Ferguson Hurley

RCS HOT FIRE TEST (ORB OPS, RCS) RCS HOT FIRE TEST (ORB OPS, RCS)

PILOT WITH RHC (FOR A31p PGSC) (ORB OPS, PGSC)

MNVR (TRK) -ZLV +YVV (Dump) TG=2 BV=3 OM=270 A1/AUTO/VERN, Init TRK

MNVR (TRK) -ZLV -XVV TG=2 BV=3 OM=0 A1/AUTO/VERN, Init TRK

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/19(200)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

D/N

ORB

168

169

170

STS ATT~

-ZLV +YVV

~

-ZLV -XVV

CDR

~

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

~

EXERCISE

PLT

~

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

COMM STRING 1 C/O (PART B) (ORB OPS, COMM/INST)

PILOT WITH RHC (FOR A31p PGSC) (ORB OPS, PGSC)

RMS PWRDN (PDRS, RMS PWRDN)Steps 3,5-7

~

CABIN CONFIG/STOW

On MCC Go: L1 FES PRI A - ON

NOTES

Page 187: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Magnus Walheim

RCS HOT FIRE TEST (ORB OPS, RCS)

3-131

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/19(200)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

~

~~

D/N

ORB

168

169

170

~

-ZLV +YVV

~

-ZLV -XVV

STS ATT

MS1

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

CANON G1 (P/TV, REF PROC) HD CC DNLK, PAO Event Setup

~

MINI-CAM (P/TV, REF PROC) ENTRY VIDEO SETUP

CWC OVERBOARD DUMP (Init) (ORB OPS, ECLS) Ref. MSG XXX

CWC OVERBOARD DUMP (Term) (ORB OPS, ECLS) Ref. MSG XXX

CABIN CONFIG/STOW

CABIN CONFIG/STOW~

MS2

~

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

EXERCISE

CABIN CONFIG/STOW

~

WLES RNDZ TOOLS C/O PREP (ORB OPS, WLE SENSORS)

NOTES

3-131

12

Magnus Walheim

RCS HOT FIRE TEST (ORB OPS, RCS)

STS-135/ULF7 FD

08:00

09:00

10:00

11:00

GMT

Date07/19(200)

16:00

17:00

18:00

19:00

20:00

MET

Day 010W E Z

TDRS

D/N

ORB

168

169

170

STS ATT~

-ZLV +YVV

~

-ZLV -XVV

MS1

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

~CANON G1 (P/TV, REF PROC) HD CC DNLK, PAO Event Setup

MINI-CAM (P/TV, REF PROC) ENTRY VIDEO SETUP

CWC OVERBOARD DUMP (Init) (ORB OPS, ECLS) Ref. MSG XXX

CWC OVERBOARD DUMP (Term) (ORB OPS, ECLS) Ref. MSG XXX

CABIN CONFIG/STOW

~CABIN CONFIG/STOW

MS2

~

DEORBIT PREP BRIEFING

PUBLIC AFFAIRS EVENT KU AVAIL TDRE (18:25 - 18:46) (18:52 - 19:21)

MEAL

EXERCISE

~

CABIN CONFIG/STOW

WLES RNDZ TOOLS C/O PREP (ORB OPS, WLE SENSORS)

NOTES

Page 188: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Ferguson Hurley

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri B

3-132

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/19(200)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

~

~~

D/N

ORB

170

171

172

173

~

~

-ZLV -XVV

STS ATT

CDR

A6L MADS STRAIN GAGE - ON

AEM UNIT #1,2,3 CHECK (Cue Card)

CABIN CONFIG/STOW

EXERCISE

~

PLT

LANDING-1 COMM C/O (ORB OPS, COMM/INST) MLA (20:24-20:32)

LANDING-1 COMM C/O (ORB OPS, COMM/INST) DFR (21:54-22:03)

EXERCISE

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

~

NOTES

3-132

12

Ferguson Hurley

SUPPLY H2O DUMP USING FES (ORB OPS, ECLS) Step 1 using FES Pri B

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/19(200)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

D/N

ORB

170

171

172

173

STS ATT~

~

-ZLV -XVV

CDR

A6L MADS STRAIN GAGE - ON

AEM UNIT #1,2,3 CHECK (Cue Card)

CABIN CONFIG/STOW

~

EXERCISE

PLT

LANDING-1 COMM C/O (ORB OPS, COMM/INST) MLA (20:24-20:32)

LANDING-1 COMM C/O (ORB OPS, COMM/INST) DFR (21:54-22:03)

EXERCISE

~

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

NOTES

Page 189: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Magnus Walheim

C On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

On MCC Go: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

3-133

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/19(200)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

~

~~

D/N

ORB

170

171

172

173

~

~

-ZLV -XVV

STS ATT

MS1

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) RECONFIG/STOW

BRICK SYNRGE ACTUATION (ASSY OPS, PAYLOADS)

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) OPS, Item 2 for BRIC Photo

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

~

CREW CHOICE DOWNLINK (RECORDED SHUTTLE TRIBUTE) KU AVAIL TDRE: 21:45-22:44 Gimbal flip @ 22:16

MS2

CABIN CONFIG/STOW

~

BRICK SYNRGE ACTUATION (ASSY OPS, PAYLOADS)

CABIN CONFIG/STOW

WLES DEACTIVATION & TEARDOWN (ORB OPS, WLE SENSORS)

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

SSP1 OIU PWR - OIU 1 ON (tb-UP)APCU ACTIVATION CPGSC NETWORK B.TEARDOWNCOLOR PRINTER STOW (ORB OPS, PGSC) Stow color printer and all STS PGSCs except STS-2 (WinDecom)

OIU PWR - OFF (tb-bp)

UPLINKTFL 199

MPLM PRESSURECHECK

UPLINKTFL 161

NOTES

3-133

12

Magnus Walheim

C On MCC Go: SSP1 √APCU 1,2 CONV (two) - OFF (tb-bp) APCU 1 OUTPUT RLY - CL CONV - ON (tb-gray) √OUTPUT RLY CLOSE tb-gray

On MCC Go: SSP1 APCU 1 CONV - OFF (tb-bp) OUTPUT RLY - OP (tb-bp)

STS-135/ULF7 FD

12:00

13:00

14:00

15:00

GMT

Date07/19(200)

20:00

21:00

22:00

23:00

00:00

MET

Day 010W E Z

TDRS

D/N

ORB

170

171

172

173

STS ATT~

~

-ZLV -XVV

MS1

CYCLE ERGOMETER OPS (ORB OPS, CREW SYS) RECONFIG/STOW

BRICK SYNRGE ACTUATION (ASSY OPS, PAYLOADS)

P/TV09 MIDDECK PAYLOADS (P/TV, SCENES) OPS, Item 2 for BRIC Photo

~

CABIN CONFIG/STOW

~

CABIN CONFIG/STOW

CREW CHOICE DOWNLINK (RECORDED SHUTTLE TRIBUTE) KU AVAIL TDRE: 21:45-22:44 Gimbal flip @ 22:16

MS2

~

CABIN CONFIG/STOW

BRICK SYNRGE ACTUATION (ASSY OPS, PAYLOADS)

CABIN CONFIG/STOW

WLES DEACTIVATION & TEARDOWN (ORB OPS, WLE SENSORS)

CGBA UNIT #1,2 STATUS CK (CC),STL STATUS CK (CC),GLACIER STATUS CHECK (CC)

SSP1 MPLM CHAN 1,2 HTR PWR (two) - OFF (tb-bp)

SSP1 OIU PWR - OIU 1 ON (tb-UP)APCU ACTIVATION CPGSC NETWORK B.TEARDOWNCOLOR PRINTER STOW (ORB OPS, PGSC) Stow color printer and all STS PGSCs except STS-2 (WinDecom)

OIU PWR - OFF (tb-bp)

NOTES

UPLINKTFL 199

MPLM PRESSURECHECK

UPLINKTFL 161

Page 190: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Ferguson Hurley

CREW WAKE @ 11/11:00

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES Pri A req'd

D R12 √VPU PWR - OFF (LED-off) Minimize use of P/TV equipment Dim cabin lighting to 25%

3-134

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/19(200)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

~

~

~

~

D/N

ORB

173

174

175

~

~

-ZLV -XVV

STS ATT

CDR

ENTRY COOLING CONFIG D

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

CABIN CONFIG/STOW

~

NOTES

3-134

12

Ferguson Hurley

CREW WAKE @ 11/11:00

SUPPLY WATER DUMP USING FES (ORB OPS, ECLS) Perform Step 2 w/FES Pri A req'd

D R12 √VPU PWR - OFF (LED-off) Minimize use of P/TV equipment Dim cabin lighting to 25%

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/19(200)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

D/N

ORB

173

174

175

STS ATT~

~

-ZLV -XVV

CDR

ENTRY COOLING CONFIG D

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

O6 √UHF MODE - OFFL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PLT

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

CABIN CONFIG/STOW

NOTES

Page 191: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Magnus Walheim

CREW WAKE @ 11/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

3-135

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/19(200)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

~

~

~

~

D/N

ORB

173

174

175

~

~

-ZLV -XVV

STS ATT

MS1

KU-BD ANT STOW (ORB OPS, COMM/INST)

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSV DEACTIVATION (P/TV, SSV)

CABIN CONFIG/STOW

~

MS2

SLEEP

~

NOTES

3-135

12

Magnus Walheim

CREW WAKE @ 11/11:00

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

STS-135/ULF7 FD

16:00

17:00

18:00

19:00

GMT

Date07/19(200)

00:00

01:00

02:00

03:00

04:00

MET

Day 011W E Z

TDRS

D/N

ORB

173

174

175

STS ATT~

~

-ZLV -XVV

MS1

KU-BD ANT STOW (ORB OPS, COMM/INST)

~

SLEEP

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SSV DEACTIVATION (P/TV, SSV)

~

CABIN CONFIG/STOW

MS2

~

SLEEP

NOTES

Page 192: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Ferguson Hurley

3-136

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/19(200)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

~

~

~

~

D/N

ORB

176

177

178

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

~

PLT

SLEEP

~

~

NOTES

3-136

12

Ferguson Hurley

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/19(200)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

D/N

ORB

176

177

178

STS ATT~

~

-ZLV -XVV

CDR

~

~

SLEEP

PLT

~

~

SLEEP

NOTES

Page 193: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

12

Magnus Walheim

3-137

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/19(200)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

~

~

~

~

D/N

ORB

176

177

178

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

~

MS2

SLEEP

~

~

NOTES

3-137

12

Magnus Walheim

STS-135/ULF7 FD

20:00

21:00

22:00

23:00

GMT

Date07/19(200)

04:00

05:00

06:00

07:00

08:00

MET

Day 011W E Z

TDRS

D/N

ORB

176

177

178

STS ATT~

~

-ZLV -XVV

MS1

~

~

SLEEP

MS2

~

~

SLEEP

NOTES

Page 194: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

13

FD13 EZ ACTIVITIES: √OCAC FILTER TEPC STATUS CHECK Verify display is backlit Stow CSA-CP

Ferguson Hurley

3-138

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/19(200)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

~

~ ~

~

D/N

ORB

178

179

180

181

~

~

-ZLV -XVV

STS ATT

CDR

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

NOTES

3-138

13

FD13 EZ ACTIVITIES: √OCAC FILTER TEPC STATUS CHECK Verify display is backlit Stow CSA-CP

Ferguson Hurley

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/19(200)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

D/N

ORB

178

179

180

181

STS ATT~

~

-ZLV -XVV

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

NOTES

Page 195: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

13

Magnus Walheim

3-139

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/19(200)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

~

~ ~

~

D/N

ORB

178

179

180

181

~

~

-ZLV -XVV

STS ATT

MS1

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-139

13

Magnus Walheim

STS-135/ULF7 FD

00:00

01:00

02:00

03:00

GMT

Date07/19(200)

08:00

09:00

10:00

11:00

12:00

MET

Day 011W E Z

TDRS

D/N

ORB

178

179

180

181

STS ATT~

~

-ZLV -XVV

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

SLEEP LOGBOOK (SDBI 1634)

NOTES

Page 196: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

13

GO TO DEORBIT PREP AT 11/14:36

Ferguson Hurley

3-140

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/20(201)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

~

~

~

~

D/N

ORB

181

182

183

~

-ZLV -XVV

-XSI

IMU

~

COMM

STS ATT

CDR

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

MNVR (TRK) BIAS -XSI TG=4 BV=5 P=184 Y=0 OM=90 A1/AUTO/VERN, Init TRK

MNVR IMU STAR ALIGN ATT A (pg 3-142) A1/AUTO/VERN, (11/13:58), Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-142) A1/AUTO/VERN, Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)

O6 √UHF MODE - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),10,9,7,6 (Dual G2),2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

OCAC STOWAGE (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),10,9,7,6 (Dual G2),2

NOTES

3-140

13

GO TO DEORBIT PREP AT 11/14:36

Ferguson Hurley

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/20(201)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

D/N

ORB

181

182

183

STS ATT~

-ZLV -XVV

-XSI

IMU

~

COMM

CDR

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

MNVR (TRK) BIAS -XSI TG=4 BV=5 P=184 Y=0 OM=90 A1/AUTO/VERN, Init TRK

MNVR IMU STAR ALIGN ATT A (pg 3-142) A1/AUTO/VERN, (11/13:58), Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)MNVR IMU VERIF ATT B (pg 3-142) A1/AUTO/VERN, Init MNVRIMU ALIGN - S TRK (ORB OPS, GNC)

O6 √UHF MODE - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),10,9,7,6 (Dual G2),2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PLT

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

OCAC STOWAGE (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PRIORITY PWRUP GRP B (ORB PKT, PRIOR PWRDN) Steps 12 (IMU 2),10,9,7,6 (Dual G2),2

NOTES

Page 197: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

13

Magnus Walheim

GO TO DEORBIT PREP AT 11/14:36

CUBE LAB MODULE-7 DEACTIVATION (ASSY OPS, PAYLOADS) All Trays in all LMA Packs; ONLY deactivate Syringes with "EOM" or "ULF7" for labeled arrows on back of tray.TISSUE EQUIVALENT PROPORTIONAL COUNTER (TEPC) (ORB OPS, CREW SYSTEMS) B. POWERDOWN

AEM MUFFLER STOWRemove muffler from each AEM and stow in Seat Bag 5.

3-141

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/20(201)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

~

~

~

~

D/N

ORB

181

182

183

~

-ZLV -XVV

-XSI

IMU

~

COMM

STS ATT

MS1

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

A6L MADS STRAIN GAGE - PCM ENA

GIRA STOWAGE (ORB OPS, ECLS)

STL ENTRY PREP (ASSY OPS, PAYLOADS)AEM UNIT #1,2,3 CHECK (Cue Card)

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

~

PGSC NETWORK (ORB OPS, PGSC) B.TEARDOWN Stow remaining PGSCs

AIR SAMPLE - Rcd MET and location on bottle

SDBI 1634, SLEEP-WAKE ACTIGRAPHY (ORB OPS, SDBI) B. DOFF ACTIWATCH

CGBA UNIT #1,2 STATUS CK (CC),GLACIER STATUS CHECK (CC)

NOTES

3-141

13

Magnus Walheim

GO TO DEORBIT PREP AT 11/14:36

CUBE LAB MODULE-7 DEACTIVATION (ASSY OPS, PAYLOADS) All Trays in all LMA Packs; ONLY deactivate Syringes with "EOM" or "ULF7" for labeled arrows on back of tray.TISSUE EQUIVALENT PROPORTIONAL COUNTER (TEPC) (ORB OPS, CREW SYSTEMS) B. POWERDOWN

AEM MUFFLER STOWRemove muffler from each AEM and stow in Seat Bag 5.

STS-135/ULF7 FD

04:00

05:00

06:00

07:00

GMT

Date07/20(201)

12:00

13:00

14:00

15:00

16:00

MET

Day 011W E Z

TDRS

D/N

ORB

181

182

183

STS ATT~

-ZLV -XVV

-XSI

IMU

~

COMM

MS1

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

A6L MADS STRAIN GAGE - PCM ENA

GIRA STOWAGE (ORB OPS, ECLS)

STL ENTRY PREP (ASSY OPS, PAYLOADS)AEM UNIT #1,2,3 CHECK (Cue Card)

MS2

~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)

PGSC NETWORK (ORB OPS, PGSC) B.TEARDOWN Stow remaining PGSCs

AIR SAMPLE - Rcd MET and location on bottle

SDBI 1634, SLEEP-WAKE ACTIGRAPHY (ORB OPS, SDBI) B. DOFF ACTIWATCH

CGBA UNIT #1,2 STATUS CK (CC),GLACIER STATUS CHECK (CC)

NOTES

Page 198: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

FLT PLN/135/FIN

A IMU STAR ALIGN PAD

ID: -Y: 30 ANTARES MET (11/13:52 TO 11/14:42)

ID: -Z: 16 ACHERNAR MET (11/14:07 TO 11/14:52)

ANG DIFF: 88.9

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 30 -Y: 16 R 20 R 282 114 P 344 P 326 352 Y 319 Y 324 325

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

∆X ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Y ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Z ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

EXECUTION TIME: ____/___:___:___MET

B IMU VERIFICATION STAR ALIGN PAD

ID: -Y: 27 DENEB MET (11/14:18 TO 11/15:11)

-Z: 54 DIPHDA MET (11/14:13 TO 11/15:03)

ANG DIFF: 83.7

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 27 -Y: 54

R 15 R 305 92 P 283 P 262 293 Y 44 Y 47 58

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

∆X ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Y ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Z ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

If any ∆X, ∆Y, OR ∆Z > 0.1 Check MCC

EXECUTION TIME: ____/___:___:___MET

3-1423-142

A IMU STAR ALIGN PAD

ID: -Y: 30 ANTARES MET (11/13:52 TO 11/14:42)

ID: -Z: 16 ACHERNAR MET (11/14:07 TO 11/14:52)

ANG DIFF: 88.9

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 30 -Y: 16 R 20 R 282 114 P 344 P 326 352 Y 319 Y 324 325

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

∆X ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Y ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Z ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

EXECUTION TIME: ____/___:___:___MET

B IMU VERIFICATION STAR ALIGN PAD

ID: -Y: 27 DENEB MET (11/14:18 TO 11/15:11)

-Z: 54 DIPHDA MET (11/14:13 TO 11/15:03)

ANG DIFF: 83.7

DUAL S TRKR 2nd ATTITUDE ALIGNMENT (SINGLE S TRKR) -Z: 27 -Y: 54

R 15 R 305 92 P 283 P 262 293 Y 44 Y 47 58

REQD ID:

-Y: _____, -Z: _____, ANG ERR____,____ ____

ANG: 1 2 3

∆X ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Y ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

∆Z ( )___,___ ___ ( )___,___ ___ ( )___,___ ___

If any ∆X, ∆Y, OR ∆Z > 0.1 Check MCC

EXECUTION TIME: ____/___:___:___MET

Page 199: Flight Plan - NASA · vi FLT PLN/135/FIN INTRODUCTION The STS-135 Flight Plan is the Flight Data File article that contains the on-orbit timeline. It does not contain the detailed

Flight Cover (trim bottom to expose tabs)

JSC-48000-135 FINAL

FLIGHT PLAN STS

135