flood situation multan division (10 sep 2014 / wed)

Download FLOOD SITUATION MULTAN DIVISION (10 SEP 2014 / WED)

If you can't read please download the document

Upload: dulcie-garrett

Post on 16-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

  • Slide 1
  • FLOOD SITUATION MULTAN DIVISION (10 SEP 2014 / WED)
  • Slide 2
  • SEQ ThreatResponseArrangements
  • Slide 3
  • THREAT Two flood waves of 5 lacs cusecs and 8.5 lacs cusecs are mov in succession in R Chenab A flood wave of 4 lacs cusecs is mov in R Jehlum At Present Confluence of flood wave in R Chenab and R Jehlum, at Trimmu - a magnified threat for Mtn and Mzg
  • Slide 4
  • Flood ETA at TrimmuFlood ETA at Mtn Discharge (Lac Cusecs) 1First wave of R. Chenab- 1800 hrs 9 Sep14 1800 hrs 10 Sep14 onward 5.5 6 2First wave of R. Jhelum- 1200 hrs 9 Sep14 1800 hrs 10 Sep14 onward 3Second wave of R. Chenab-1500 hrs 12 Sep14 1500 hrs 13 Sep14 onward 6 7 TENTATIVE FLOOD FORECAST TIMMING FOR MTN AND MZG (REF FFD EX PMD) Cumulative eff of all three waves likely to generate a serious threat to Mtn and Mzg 7 8 lac cusecs. Attenuation and dissipation due to Trimmu Breaches is likely to reduce the inflow at Multan / Mzg by 25 %
  • Slide 5
  • Sensitive time 1800 hrs 10 Sep to 1800 hrs 13 Sep 14. Critical time 0400 hrs 11 Sep to 2200 hrs 13 Sep 14. Imperatives Decision by Dist: Admn /breaching committee to activate all breaching sections around Mtn and Mzg vital by LL 9 Sep 2014 Protection and diversion of breaching sites by Dist: Admn Safe sites of relief camps Maint of MSR NHA and C&W CRITICAL TIME TEMPLATES
  • Slide 6
  • RESPONSE
  • Slide 7
  • KAURA HT VEHOVA HT SANGHAR HT SORI LUND HT VIDORE HT SAKHI SARWAR HT MITHWAN HT KAHA HT CHACHA R HT PITOK HT SORI SHUMALI HT ZANGI HT HIGH EDGE OF R INDUS FAKHAR FB RLY EMBANKMENT ROJHAN FB 6 NO BUND LAYYAH TOWN BUND KASTORI FB MZG FB SS FB RMB DOABA FB K GARH FB ROHARI FB DHUNDA FB BALOCH WAH FB GARDEZPUR FB JALALPUR KHAKI FB AHMADPUR FB PANJNAD CANAL CHANADAR BHAN FB COLONY FB MINCHAN FB CHACHARAN FB SHAKRANI FB NAGANI FB GUJJU HATTA BR FB RAILWAY FB SHUJABAD BR SHER SHAH FB AKBAR FB CHENAB FB NAWABPUR FB FAKHAR MINOR NURPUR DY BUKHA RI DY FORES T DY DG KHAN CANAL LINK - 1 LINK - III KATCHI CANAL ROJHA N DY FLOOD EMBANKMENT LINK III LALA CREEK ESC APE U HAZAR A DY KOT SULTA N DY KOT SULTAN BUND DHOLLE WALA BUND SHAH WALI BUND F NORTH - LAYYAH ABBASS WALA BUND TPLC MZG CANAL MZG BR JATOI BR MAGAS ON BR U/S GHUTTU FB KHAN WAH FB D/S GHUTTU FB MZG BR FB JATOI BR FB RANGPUR CANAL TILE BUND FLOOD PROTECTION BUNDS FAZAL FB JAMPUR FB
  • Slide 8
  • KAURA HT VEHOVA HT SANGHAR HT SORI LUND HT VIDORE HT SAKHI SARWAR HT MITHWAN HT KAHA HT CHACHAR HT PITOK HT SORI SHUMALI HT ZANGI HT SHUJABAD BR BREACHING SITES Sidhnai HWs Resp : ARMY Sher Shah Lt & Rt Resp : ARMY Punjnad HWs Resp : ARMY HMW Resp : ARMY Shershah Lt Shershah Rt HMW Sidhani HWs
  • Slide 9
  • BREACHING SECTION HEAD MUHAMMAD WALA (HMW)
  • Slide 10
  • Chenab River HMW Br Multan TPLC Shujabad Canal Khushab Rd AFPB NPFB Breaching Sec Being eval by NHA for mech breaching BREACHING SECTION HMW BR Breaching sec notified by NHA Auths Breaching sec notified by NHA Auths 65 liners have been placed 65 liners have been placed Expl for breaching sec has not been purchased so far Expl for breaching sec has not been purchased so far SAFEGD AGAINST MULTAN SAFEGD AGAINST MULTAN Breaching sec notified by NHA Auths Breaching sec notified by NHA Auths 65 liners have been placed 65 liners have been placed Expl for breaching sec has not been purchased so far Expl for breaching sec has not been purchased so far SAFEGD AGAINST MULTAN SAFEGD AGAINST MULTAN
  • Slide 11
  • LAYOUT OF FPBs BREACHING SECS HMW LT HMW RT 1 2 TPLC to be closed. Part of Plan B SUBJECT TO APPROVAL BY Zonal Breaching Committee and civil adm
  • Slide 12
  • LAYOUT OF FPBs BREACHING SECS SHERSHAH LT SHERSHAH RT 1 2 3 4 5 6 9 8 7 Akbar FPB Doaba FPB Rohari FPB CULVERT
  • Slide 13
  • EXEC OF BREACHING PLAN SHER SHAH SEC SHERSHAH LT SHERSHAH RT 1 2 3 4 5 6 9 8 7 Akbar FPB Doaba FPB Rohari FPB Ph 1 (12 Hrs) Collection of expl Mov to Mtn Prep of charges Ph 2 ( 10 Hrs) Depl of 3 x army breaching teams Charging of breaching secs Depl of Guard Ph 3 ( 1 x Hr) Final Breach Committee meeting Firing of on written orders
  • Slide 14
  • EXEC OF BREACHING PLAN SHER SHAH SEC SHERSHAH LT SHERSHAH RT 1 2 3 4 5 6 9 8 7 Akbar FPB Doaba FPB Rohari FPB Seq of Breaching 1 and 2 wdr to Mtn or 6 and 5 wdr to Mzg 7 and 8 simultaneously 3 and 4 wdr to Mzg
  • Slide 15
  • ARRANGEMENTS
  • Slide 16
  • LIKELY AFFECTED POPULATION District Affected Villages No of Affected Population Area House Holds Death Livestock No of relief Camp Dist Multan 12526862913928971240NIL38338024
  • Slide 17
  • LIKELY AFFECTED POPULATION District Affected Villages No of Affected Population Area House Holds Death Livestock No of relief Camp Dist KHANEWAL 95850605342415185NIL11964813
  • Slide 18
  • Rescue-1122 + Police + Army + Revenue Teams employed Announcement made in Mosques / Media Imposition of Section 144 of Cr Pc Forceful Evacuation
  • Slide 19
  • Establishment of Camps (37) Provision of Food Hampers Setting up of tent villages Medicine/treatment for Flood Affectees Fodder/medicine/vaccination of Livestock Rescue through ARMY, NAVY, 1122, Police
  • Slide 20
  • EQUIPMENT / MACHINERY / SUPPLIES BOATS33 DEWATERING SETS127 SUCKER MACHINES14 TENTS5000 FOOD HAMPERS to be purchased WATER FILTRATION PLANT01 HELICOPTER01 MULTAN DISTRICT
  • Slide 21
  • EQUIPMENT / MACHINERY / SUPPLIES BOATS17 DEWATERING SETS26 SUCKER MACHINES5 TENTS585 FOOD HAMPERS to be purchased WATER FILTRATION PLANTNIL HELICOPTERNIL KHANEWAL DISTRICT
  • Slide 22
  • Advance Gardawri has been done Probable Affected Area Crops Acres Survey regarding House Holds complete Post Flood compensation will be based on Advance Girdawri
  • Slide 23
  • 23 SHER SHAH BREACHING SECS To Multan Sher Shah Br To MZG Railway Resp Rly Dept Resp Irrigation Dept Resp (DG Kkan) Irrigation Dept Resp (DG Khan) 401.36 ft 400.13 ft 395.08 ft 396.07 ft 392.02 ft 393.36 ft
  • Slide 24
  • THANKS