flow diagram for pmp
TRANSCRIPT
![Page 1: Flow Diagram for PMP](https://reader036.vdocument.in/reader036/viewer/2022081909/577cb10c1a28aba7118b7b10/html5/thumbnails/1.jpg)
8/20/2019 Flow Diagram for PMP
http://slidepdf.com/reader/full/flow-diagram-for-pmp 1/1
INTEGRATION
4.2 Develop ProjectManagement Plan
INTEGRATION
4.3 Direct and ManageProject Work
INTEGRATION
4.1 Develop Project Charter
INTEGRATION
4.4 Monitor and ControlProject Work
INTEGRATION
4.5 Perform IntegratedChange Control
INTEGRATION
4 .6 C lo se P ro je ct or P ha se
STAKEHOLDER
13.2 Plan StakeholderManagement
STAKEHOLDER
13.3 Manage S takeholderEngagement
STAKEHOLDER
13.1 I dentif y Stak eholders
STAKEHOLDER
13.4 Control StakeholderEngagement
HUMAN RESOURCE
9.1 Plan Human ResourceManagement
HUMAN RESOURCE
9 .2 A cq ui re P ro je ct Te am
HUMAN RESOURCE
9 .3 D eve lo p P ro je ct Te am
HUMAN RESOURCE
9 .4 M an ag e P ro je ct Te am
COST
7.1 Plan C os t Management
COST
7.2 Estimate Costs
COST
7.3 Determine Budget
COST
7.4 Control Costs
QUALITY
8.1 Plan Quality Management
QUALITY
8.2 Perform Quality Assurance
QUALITY
8.3 Control Quality
RISK
11.1 Plan Risk Management
RISK
11.2 Identify Risks
RISK
11.3 Perform QualitativeRisk Analysis
RISK
11.4 Perform QuantitativeRisk Analysis
RISK
1 1. 5 P la n R is k R es po ns es
RISK
11.6 Control Risks
TIME
6.1 Plan ScheduleManagement
SCOPE
5.6 Control Scope
PROCUREMENT
12.1 Plan ProcurementManagement
PROCUREMENT
12.2 C ondu ct Pro cu rements
PROCUREMENT
1 2. 4 C lo se P ro cu re me nt s
PROCUREMENT
12.3 C ontrol Pro cu rements
SCOPE
5.5 Validate Scope
TIME
6.2 Define Activities
TIME
6 .3 S eq ue nc e Ac ti vi ti es
TIME
6.4 Estimate ActivityResources
TIME
6.5 Estimate ActivityDurations
TIME
6.6 Develop Schedule
COMMUNICATIONS
10.1 Plan CommunicationsManagement
COMMUNICATIONS
10.2 Manage Communications
COMMUNICATIONS
10.3 Control Communications
SCOPE
5.3 Define Scope
SCOPE
5.1 Plan Scope Management
SCOPE
5 .2 C ol le ct R eq ui re me nt s
SCOPE
5.4 Create WBS
TIME
6.7 Control Schedule
INSTRUCTIONS
1. Print this sheet in the same
paper size of your printed“canvas” file.
For instance, if you print the
“canvas” file using the A3 format,
print this file also in A3, otherwise
you will get different sizes and
these processes will not fit on thecanvas, they will be either smaller
or bigger.
2. Cut the processes using the
dashed lines as guidance.
3. Use, if you can, a double-sidedtape to fix the processes on the
canvas.
Based on the PMBOK® Guide 5th Edition
(English Version)
Copyright: Project Management Institute,
A Guide to the Project Management Body
of Knowledge - Fifth Edition (PMBOK®
Guide), Project Management Institute, Inc.,
(2013). Copyright and all rights reserved.
The material from this publication has been
reproduced with the permission of PMI.
Adaptation: Ricardo Viana Vargas, MSc,
CSM, PRINCE2® Practitioner, PMI-RMP, PMI-SP,
PMP
Review: Wagner Maxsen, Kaplan-Norton
BSC Certified Graduate, PMP, PRINCE2
Practitioner, PMI-RMP
Graphic Design: Sérgio Jardim, PMP