FocusPlus SA January 2003
Presentation Presentation of the of the
The ARC SystemThe ARC SystemConstruction Cost ControlConstruction Cost Control
Version 2.2January 2003
“Click” mouse to advance presentation
FocusPlus SA January 2003
What is the ARC System?• Site construction cost control & management software
• Designed for the telecommunications industry
• Based on a comprehensive “shopping list” of construction items (Master Schedule of Works with agreed rates)
• User–friendly means of managing the Schedule of Agreed Construction Rates
• Uses well-defined model sites to set accurate site construction budgets & produce cost control documents
• Used by Designers & Contractors to produce site cost control documentation from Estimate (financial planning) to Final Account
FocusPlus SA January 2003
What are the Benefits?
• Visibility of ‘REAL’ construction costs and excessive costs for sites, early in the rollout process
• Consistent and clear cost information from Contractors
• Simple method of producing / processing cost documentation & contractor payments
• Contractors judged on time and quality not on COST
• Client can use the costs to determine future budgets
• Ensures appropriate ‘paper trail’ for Quality Assurance
FocusPlus SA January 2003
How does the ARC work?
In brief, the ARC System involves two phases of work and different versions:
CLIENT VERSION• Utilised for the set up of the software in accordance with the
Customer requirements including a Master Schedule of Works & Model Sites - Phase 1
• Following set-up the software can be utilised by the Client to import / create / manage cost control documentation – Phase 2
PARTNER VERSIONS• Utilised by Design Consultants and Contractors to create construction
cost control documentation based on an agreed set of rates and model sites – Phase 2
FocusPlus SA January 2003
Phase 1 - Initialisation / Set-upWith the assistance of FocusPlus SA, the ARCSystem is customised to the Client requirements
Setting Client and project parameters
Modifying the Master Schedule of Works to suit the Client’s & project needs
Entering project Designers and Contractor details
Importing & analysing Contractor post tender rates based on the schedule of line items
Setting & fixing the final rates for each Contractor
Defining & importing model sites that are appropriate to the project
Generating Designer & Contractor partner versions for creation of cost control documents based on fixed rates
FocusPlus SA January 2003
Phase 1-Master Schedule of WorksThe FocusPlus Master Schedule of Works isStructured as follows:
• Schedule divided into SECTIONS
• Sections divided into CATEGORIES
• Categories contain SUB CATEGORIES or line items of construction activity
Note: Alternatively a Client may utilise their own schedule of works, however, modifications to the schedule may be necessary to ensure compatability with theARC software.
FocusPlus SA January 2003
Phase 1-Master Schedule of WorksThe FocusPlus SA schedule can be modified or aClient schedule can be imported into the ARC
Sections, Categories & construction line items can be easily located by the tree structure
Support statements provide descriptions of the line items to assist in pricing & schedule management
Line Items can be added to or deleted from the schedule
FocusPlus SA January 2003
The ARC is utilised to analyse Contractor ratesfor different scenarios (e.g. National vs Regional).The ARC will produce a spreadsheet whichcompares the rates submitted by the Contractors.
Phase 1-Rate AgreementThe finalised project Schedule of Works is Priced by the Contractors & the rate for each lineitem is imported into the ARC system.
The ARC can compare the rates of any number of different Contractors
The ARC provides a visual comparison based on percentage variation from the mean value. The percentage variation can be modified to suit.
Rates are negotiated and agreed with the Contractors, then fixed by the ARC
FocusPlus SA January 2003
Phase 1-Project Model Sites
Model sites are defined with the Client that represent thetypical sites to be constructed on the project. Model site schedules are imported into the ARC system.
The function of model sites is as follows:
• Utilised by the Client to establish construction budgets based on negotiated rates
• Selection of an appropriate model site schedule as the basis for the cost control document creation
• As a cost cross comparison budget vs live site construction costs
FocusPlus SA January 2003
Phase 1-Typical Model Sites
Model Site Ref. Model Site Description
GLS – 24 Greenfield – Lattice 24 M – Shelter
GLS – 42 Greenfield – Lattice 42 M – Shelter
GGS – 60 Greenfield – Guyed Mast 60 M – Shelter
GMS – 25 Greenfield – Monopole 25 M – Shelter
GME – 25 Greenfield – Monopole 25 M – External Cabs
RFPE Rooftop – Flat – Poles – External Cabs
RFPS Rooftop – Flat – Poles – Shelter
RFPA Rooftop – Flat – Poles – Attic Internal Room
RFPB Rooftop – Flat – Poles – Basement Internal Room
RPPE Rooftop – Pitched – Poles – External Cabs
RPPA Rooftop – Pitched – Poles – Attic Internal Room
RPPB Rooftop – Pitched – Poles – Basement Internal Room
Model sites are defined that suit the project and territory. Typical models sites currently available are indicated below:
FocusPlus SA January 2003
Phase 1-Partner Version CreationThe CLIENT VERSION is utilised to generate PARTNERVERSIONS of the software for distribution as follows:
The ARC Design Consultant Partner Version incorporatesfixed rate types for the range of Contractors and/or Regions forwhich they will work
The ARC Contractors Partner Version incorporates fixedrates for one of the following rate types:
• National rate basis for all project Contractors • Regional rate basis for each Contractor within a region • Specific Contractor rate basis (Set of fixed rates for each Contractor)
FocusPlus SA January 2003
Entry Screens for Different VersionsAdministrator access only
FocusPlus SA January 2003
Phase 2-Cost Control DocumentsThe ARC System manipulates the Master Schedule of Works to efficiently create various cost documents for eachSite, as indicated below:
The above documents are typically prepared by a Design Consultant
The above documents are typically prepared by a Contractor
Note: The application can be utilised to produce all or a selection ofthe above documents for each site type.
Build Cost Estimate
Bill of Quantities
Fixed Price Quotation
Certificate of Payment
Final Account
Variation Orders
FocusPlus SA January 2003
Phase 2-Cost Control DocumentsCost Control Document output is dependant on the ARC Version utilised, as indicated below:
Cost Control Document TypeClient
VersionDesigner Version
Contractor Version
Build Cost Estimate Yes YesBill of Quantities Yes Yes
Contractors Fixed Price Quotation Yes Yes
Contractors Certificate for Payment Yes Yes
Contractors Variation Order Yes YesContractors Final Account Yes Yes
FocusPlus SA January 2003
Phase 2-Cost Control Documents
Cost Control Document Type When Issued
Build Cost Estimate Concept Design Phase
Bill of Quantities (without costs) Detailed Design Phase
Contractors Fixed Price Quotation
Pre Construction Phase
Contractors Certificate for Payment
During and Post Construction Phase
Contractors Variation Order During Construction Phase
Contractors Final Account Post Construction Phase
Each document type is issued during the following phases:
FocusPlus SA January 2003
Phase 2-Cost Document Creation
Enter the site details e.g Site ID, site name, address site type etc.
The above screens are used to access site details and documentsalready in the database and for entering new site details
Enter the site reference and candidate
List of sites in the database
Create a document
Accessing site cost information or entering new site details:
FocusPlus SA January 2003
Phase 2-Cost Document Creation
Export a created document
Site details
Choose a document type:
Build Cost EstimateBill of QuantitiesContractors Fixed Price QuotationContractors Certificate for PaymentContractors Variation OrderContractors Final Account
Creation of document based on:
A Model SitePreviously created document (same type)Document version from another SiteManually from the Master ScheduleImported document prepared by another user
Choose the rate basis:NationalRegionalContractor(OR Zero rate)
Create a document
Saved Documents
Document version control
Import quantities from a document previously created by another ARC user
Print a report
View the contents of a document
Select the document type and other parameters:
FocusPlus SA January 2003
Creating a cost control document (e.g. Build Cost Estimate)
Phase 2-Cost Document Creation
Site details
Itemsof work which areNot Included in theMaster Schedule of Workscan be entered manually
Add new line items From the MasterSchedule ofWorks library
Documents based on model sites are substantially complete with only minor modifications necessary
Delete line items as necessary
Group statement
Select the name of the user pereparing the document
Unit rates CANNOT be altered by the end user
Alter quantities as necessary
FocusPlus SA January 2003
Phase 2-Cost Document Creation
Site details
Contractors namemust be selected
Save modifications priorleaving the screen
Total of variation orders issued to date entered automatically
The report can be previewed and printedfrom this screen
Select the name of the user pereparing the document
Less amount paid out in the previous payment certificate entered automaticallyNet amount due in
the current certificate
Creating a Contractor’s Certificate for Payment
Manually enter the gross amount figure
Purchase order value
Enter retention precentage if applicable
FocusPlus SA January 2003
Phase 2-Cost Document Creation
Site details
Contractors namemust be selected
Contractors final account is based on the fixed pricequotation plus anyvariation orders issuedduring the construction phase
The report can be previewed andprinted from this screen
Select the name of the user pereparing the document
Total final account
Creating a Contractor’s Final Account
Total of variation orders
Save modifocationsprior to leaving thescreen
FocusPlus SA January 2003
Phase 2-Cost Document Creation
Select Sub Categories from the Master Schedule of Works to be included in the Variation Order
Entering a negative quantity will change the item to a negative amount and turn the line RED
Enter manually items of work which are Not Included in theMaster Schedule ofWorks
Creating a Contractor’s Variation Order
FocusPlus SA January 2003
The ARC SystemThe ARC System
by by
FocusPlus SAFocusPlus SA
FocusPlus SA January 2003
Contacting FocusPlus SA
FocusPlus SA6e étageImmeuble BCB – Route de Renens 1Case postale 184CH-1030 Bussigny-près-LausanneSWITZERLAND
Telephone: +41 21 706 6000
Facsimile: +41 21 706 6009
E-mail: [email protected]
WWW: www.focusplus.ch