for april 2013 the rehabilitation and expansion of central ogbia water project,at bayelsa state site...

Download FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013

If you can't read please download the document

Upload: roy-fitzgerald

Post on 18-Jan-2018

221 views

Category:

Documents


0 download

DESCRIPTION

PROGRES PICTURES Construction of Inspection chamber on water pipeline

TRANSCRIPT

FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013 PROGRES PICTURES UPVC pipe installation PROGRES PICTURES Construction of Inspection chamber on water pipeline PROGRES PICTURES Admin Building 100% completed PROGRES PICTURES Ground Tank 1-4 completed Elevated Tank completed PROGRES PICTURES Ground Tanks completed with Concrete Ground Base PROGRES PICTURES block work for the Gen House and generator platform completed. PROGRES PICTURES 14 no of Filters on site PROGRES PICTURES concrete blinding for aerator tank base, and floor slab of filtration treatment house PROGRES PICTURES Cutting road for pipes and repairing of the surface PROGRESS PICTURES Site General View PROGRESS PICTURES Pipe and bends installation PROGRES PICTURES Pipe, Sluice Valve Installation PROGRESS PICTURES PRESSURE TEST BREAKING OF CONCRETE BEFORE LAYING OF PIPE WITHIN COMMUNITY PROGRESS PICTURES Reinforcement and formwork for Emeyal booster station elevated tank Base