for everett riverfront plan

55
EVERETT RIVERFRONT PLAN Virtual Public Meeting for Thursday, May 13, 2021 7:00pm

Upload: others

Post on 27-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

EVERETT RIVERFRONT PLAN

Virtual Public Meetingfor

Thursday, May 13, 20217:00pm

Questions during the presentation?Use the “Q&A” button at the bottom of the screen and type your question.

The Hosts will answer questions at the end of the presentation.

There will also be breakout rooms for smaller group discussion.

MEETING AGENDA

7:00pm Welcome by MyRWA and Mayor Carlo DeMaria

7:15 Presentation7:45 Full Meeting Clarification Questions7:55 Breakout Rooms8:15 Groups Report Back8:25 Next Steps8:30 Adjourn

“Our vision is a vibrant, healthy and

resilient Mystic River watershed for the

benefit of all our community members.”

Transforming Parks & Paths Water Quality Habitat Restoration Climate Resilience

NORTH

ENCORE BOSTON HARBOR

GATEWAY CENTER

NGRID

RIVERGREEN

MALDEN RIVER

MYSTIC RIVER

ROU

TE 1

6MEDFO

RD ST.

BROADWAY

Welcome by Mayor Carlo DeMaria• Everett’s riverfront was invisible, inaccessible and polluted.

• Goals are improved access, recreation, transportation and economic development.

• Ongoing work on many sites includes public improvements and environmental cleanup.

• Thank you to John Preotle for River’s Edge, and to Encore Boston Harbor, for starting the riverfront restoration!

RIVER’S EDGE

MEDFORD

EVERETT2.5 MILES OF RIVERFRONT WALKWAY

PRESENTATION OVERVIEWConsultant Team

City’s Recent Riverfront Improvements & Planning WorkRiverfront Plan Overview & Details

Discussion & Breakout RoomsNext Steps

CONSULTANT DESIGN TEAMPRIME CONSULTANT &LANDSCAPE ARCHITECT

Shadley Associates, P.C.

GEI Consultants

The Vertex Companies

MARINE ENGINEER

LICENSED SITE PROFESSIONAL

CITY OF EVERETT PARTNERS

Context Map and Project Site

PROJ

ECT S

ITE

SOMERVILLE

EVERETT

MEDFORD

MALDEN

GATEWAYCENTER

ENCOREBOSTONHARBOR

RIVERGREEN

MALDEN

RIVER

MAL

DEN R

IVER

MYSTIC RIVER

MYSTIC RIVER

ROUTE 16

ROUTE 16

BROADW

AY –RO

UTE 99

ROU

TE 2

8MBTA

WELLINGTON STATION

NORTHERN STRAND COMMUNITY TRAIL

CONNECTOR TRAIL

NORTH

Project Site

MALDEN

RIVER

NORTH

Summary of the City’s Recent Riverfront Improvements & Planning Work

Recent Riverfront Improvements & Planning Work

• City’s Open Space and Recreation Plan

• Northern Strand Community Trail Extension

• Rivergreen Riverwalk and Park

• Rivergreen Temporary Boathouse and Boat Access

• Rivergreen Shoreline Restoration Projects

• Everett Riverfront District Master Plan

• Gateway Park Improvements & Invasive Vegetation Removal

• Encore Boston Harbor & Connector Trail

Everett - DRAFTOpen Space and Recreation Plan (2019):

“The Waterfront is critical open space in this Environmental Justice and Equity community”

Recent Riverfront Improvements & Planning Work

Northern Strand Community TrailEverett extension to be completed by end of 2022

EXTENSION UNDER CONSTRUCTION

Recent Riverfront Improvements & Planning Work

Rivergreen Riverwalk and ParkRiverwalk (.75-mile) completed in two phases from 2017-2019Park completed in 2019 (turf field, playground, splash pad, basketball, hockey)

NORTH

MALDEN RIVER

Sout

h Cr

eek

North Creek

Recent Riverfront Improvements & Planning Work

NORTH

Rivergreen Temporary Boathouse & Boat AccessTemporary Boathouse:

- Temporary tent structure- Floating dock with gangway- Currently in permitting- Tentative opening in Fall 2021

Boat Access completed in 2020

ApproximateTent Location

(50’x100’)

Recent Riverfront Improvements & Planning Work

Rivergreen Restoration Projects:South Creek, North Creek and Malden River ShorelineTo reduce flood risk, provide additional wildlife habitat, open river views, and enhance public access.

Invasive vegetation removal at the Malden River

North Creek Restoration – dredged channel and new native planting

Recent Riverfront Improvements & Planning Work

Rivergreen Restoration Projects:Malden River Shoreline

Recent Riverfront Improvements & Planning Work

Everett Riverfront DistrictMaster PlanDeveloped by another consultant team in 2020

Master Plan goals include:

• Create a transportation network for better access and development potential

• Reconnect the public with the Malden River

• Encourage economic development

• Create a vibrant mixed-use neighborhood

• Phased implementation

NORTH

Recent Riverfront Improvements & Planning Work

Mystic River Reservation at Gateway Park (20± acres)- Removal of invasive plants along shoreline- New signage- Cleanup and repair

Recent Riverfront Improvements & Planning Work

Encore Boston Harbor & Connector TrailEncore Boston Harbor (completed in 2019)

- Public waterfront walkway with connection to Lower Broadway

Connector Trail (completed in 2019)- Connection between Gateway Park and Encore Boston Harbor - Access to Northern Strand extension (to be completed in 2022)

Recent Riverfront Improvements & Planning Work

The Riverfront Plan Overview

Top Answers

Walk

Boat (canoe, kayak, row)

Bicycle

Run

Also…

Fishing

Using a wheelchair

Watching Rowing

Parkour

Doing cleanups

Walking dogs

Painting

Spending time with family

What’s your favorite thing to do on the riverfront?

Overall Design Goals

• Connect destinations, parks, and bike paths

• 10-foot wide walkway for two-way travel for pedestrians and bicyclists

• Overlooks with seating and shade structures at important views

• Location for accessible canoe/kayak launch

• Abundant seating and bicycle parking along the riverfront

• Educational and interpretive elements and identity/wayfinding signage

• Lighting along main walkways for security and extended use

• Remove invasive vegetation to open views

• New native planting for erosion control, shade and wildlife habitat

The Riverfront Plan Overview

The Riverfront Plan Overview

Site Opportunities & Constraints

NORTH

The Riverfront Plan Overview

Overall Concept Plan

Overall Concept PlanProject Site divided into six areas for further detail

The Riverfront Plan Overview

NORTH

Gateway Park South

NORTH

Riverfront Plan Details

Gateway Park South – Existing ConditionsRiverfront Plan Details

Plan 1

Gateway Park South – Enlarged PlanRiverfront Plan Details

Riverfront Walkway Details

Plan 1

Riverfront Plan Details Gateway Park South – Overlook Pier

Gateway Park CentralRiverfront Plan Details

NORTH

Gateway Park Central – Existing ConditionsRiverfront Plan Details

Plan 2

Gateway Park Central – Enlarged PlanRiverfront Plan Details

Riverfront Walkway Details

Plan 2

Riverfront Plan Details Gateway Park Central – Canoe / Kayak Launch

RECENTLY COMPLETED CANOE/KAYAK LAUNCH AT MACDONALD PARK IN MEDFORD

Planning for Possible Boat Moorings- Intended to serve Everett Residents, maximum 25’ boat length- Quantity will be based on demand and other river uses- Maintain federal navigation channel

Riverfront Plan Details

Riverfront Plan Details Water Quality“The sediments do not pose a health risk that should prevent people from boating on the Malden River.”

– Malden River Human Health Risk Study for Boating 2018

Boating Advisory – Be Safe!www.mysticriver.org/boatingadvisoryTwitter: @safemystic

Recent Waterfront Improvements

Gateway Park North

NORTH

Riverfront Plan Details

Gateway Park North – Existing ConditionsRiverfront Plan Details

Plan 3

Gateway Park North - BoardwalkRiverfront Plan Details

Village Landing ParkRiverfront Plan Details

NORTH

Village Landing Park – Existing ConditionsRiverfront Plan Details

Plan 4

Village Landing ParkRiverfront Plan Details

Berberian PropertyRiverfront Plan Details

NORTH

Berberian Property – Existing ConditionsRiverfront Plan Details

Plan 5

Berberian PropertyRiverfront Plan Details

RivergreenRiverfront Plan Details

NORTH

Rivergreen – Existing ConditionsRiverfront Plan Details

Enlarged Plans

Plan 6

Rivergreen – Permanent BoathouseRiverfront Plan Details

Site FurnishingsRiverfront Plan Details

Full Meeting Clarification Questions• How does the Riverfront Plan connect with other bike/walking trails?

It will connect to other trails wherever possible! There is already a ped/bike underpass at Route 16, the Northern Strand Community Trail is under construction behind Gateway Plaza, and planning and funding are underway for a ped/bike bridge over the Mystic River just south of the dam.

• Will the Riverfront be open and free to the public?Yes, the Riverfront will be fully open and free to the public.

• What is the width of the Riverfront Walkway and what will it accommodate?The Riverfront Plan calls for a 10’ width clear on the main route and boardwalks. This can be re-evaluated in final design phases as the project moves forward.

• Can you please explain the proposed mooring plan in more detail, and describe the City’s and MyRWA’s position on it?

The plan for the moorings in the river is a CONCEPT, a VISION. The plan will evolve with discussions with groups, abutters, and boaters, as the river is a shared resource.

Discussion & Breakout Rooms• Do you have questions about the plan?

• What do you like most about the plan? What do you like the least?• Boardwalk through wetland at Gateway Park• Canoe/kayak launch at Gateway Park• Boathouse at Rivergreen• Pavilion and picnic area at Village Landing Park• Overlook pier at Gateway Park• Multi-use path• Plaza with public art• Environmental restoration• Boat moorings

• What do you think is missing from the plan?

• What are the biggest issues/challenges you see?

• Continue to develop individual projects that improve the riverfront and the environment (Rivergreen boathouse, environmental work, public involvement).

• Identify and obtain funding for phased construction.

• For the funded areas: prepare field survey, perform final design, obtain all permits, bid and construct.

THE CREATION OF THE RIVERFRONT IS A MULTI-YEAR PROJECT THAT WILL HAVE SIGNIFICANT COMMUNITY INVOLVMENT.

Next Steps

Thank you for participating!The City and MyRWA want to hear more from you about the Riverfront

Please participate in the survey below:

https://forms.gle/fdNJuCvwrhnqzWRFA

Or submit your additional comments to:

Tom Philbin, City of [email protected]

Project information can be found at:www.ci.everett.ma.us

Comments will be received until June 4, 2021