rockton downtown streetscape master plan · 3/27/2018 · riverfront pathway – 8’w. cottage...

54
ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN Steering Committee Meeting #3 | March 27, 2018 Teska Associates | Christopher Burke Engineering

Upload: vancong

Post on 12-Mar-2019

212 views

Category:

Documents


0 download

TRANSCRIPT

ROCKTON DOWNTOWN

STREETSCAPEMASTER PLAN

Steering Committee Meeting #3 | March 27, 2018Teska Associates | Christopher Burke Engineering

AGENDA

1. Schedule

2. Gateway & Wayfinding Signage

3. Streetscape Materials & Products

4. Streetscape Typologies & Concepts

5. Streetscape Costs & Phasing

6. Next Steps

7. Adjourn

SCOPE & SCHEDULE

PHASE 1 | DATA COLLECTION

PHASE 4 | FINAL PLAN

PHASE 5 | IMPLEMENTATION PLAN

PHASE 2 | OUTREACH

PHASE 3 | PRELIM PLAN

c

cc

p p

vbc p vb

committee public Village Board

Aug

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Apr

STREETSCAPE STRATEGIES

#1: REINFORCE DOWNTOWN STREETS AS THE HISTORIC AND CULTURAL CENTER OF ROCKTON.Evaluate opportunities to balance existing roadway/on-street parking functions with widened sidewalks and active seating/dining areas.

#2: PROMOTE ROCKTON’S IMAGE AND FUNCTION THROUGH SIGNAGECreate a comprehensive signage program that addresses gateway, wayfinding, parking and business directory signage

#3: REINFORCE FESTIVAL SPACESAccommodate a variety of fest types, including large format events at Settlers Park, and smaller format events on Main and/or Hawick Streets.

#4: ENHANCE OFF STREET PARKING AND ALLEYWAY CONNECTIONSImprove off street parking functions and alleyway connectivity through design treatments.

#5: IMPROVE CONNECTIVITY BETWEEN DOWNTOWN AND RIVERFRONTProvide interconnected experiences that draw users between Downtown and Riverfront. Experiential elements may include interconnected pathways, crosswalks, sidewalks, seating/ gathering areas, river overlooks, passive open space, active play and interpretive landscaping.

Preferred Sign Concept

GATEWAY & WAYFINDING SIGNAGE

Gateway Sign Directional Sign Parking Identifier

Parking Directional

Business Directory Kiosk

Bicycle/Pedestrian Directional Sign

6

LIGHTING

Ashberry LED post topLandscape Forms

Option 1 Option 2

Square Lantern Series LED post topLumec

Existing light pole

BENCHES / RECEPTACLES

Victor Stanley, Backless CR-296 (6’ bench, 30” chair) / Landscape Forms, Concord Trash and Recycling Receptacles

Existing donor bench

BIKE RACKS / REPAIR

Maglin, bike bollard Dero, bike repair

PAVING

Maglin, bike bollardUnilock, Umbriano Pavers

Random Ashlar Paving Pattern

PLANTING

Ironsmith, Tree Grate Planter

PLANTERS

Landscape Forms, Fence Post Series, precast concrete planter

14

STREETSCAPE TYPOLOGIES

SHOPPING / DINING STREETSCURB & GUTTER • Opportunities to redistribute / expand

downtown parking• Expanded corner bump outs at intersection

cornersLIGHTING • Decorative LED pedestrian light

PLANTINGS • Planter pits at intersection corners / bump outs• Trees in grates at narrow sidewalk sections

PAVING • Unit pavers at accent corners• Concrete sidewalks with regular joint pattern• Unit pavers at crosswalks

SITE FURNISHINGS • Clustered benches, trash receptacles and planter pots at intersection corners

• Bike racks and repair stations at intersection corners

Diagonal parking

Diagonal parking

Parallel parking

{A}Main Street

15

10

17

{B}Main Street

15

19

18

{A}

{B}

M.1 – MAIN STREET

MAIN ST

BLA

CK

HA

WK

GR

EEN

ST

PRA

IRIE

ST

VillageHall

LibraryDairyhaus

Rockton Food & Sprirts

LocalDoughCafe

Pedestrian Lighting- with Decorative Planter Pots

6” Landscape Planter Curbs- with Outcropping Stone,

Limestone Benches,

Parallel Parking (both sides)- 17 spaces

M.2 – MAIN STREETMAIN ST

HAWICK

PRA

IRIE

ST

LocalDoughCafe

Post Office

Greater RocktonCentre

Trees in Expanded Grates

Corner Bump-outs-Decorative Pavers, Benches, Planter Pots,Bike Racks, and 6” Landscape Planter Curbs

Landscape Bump-outs- Modified for Snow Operations

M.3 – MAIN STREET

MAIN ST

HAWICK

PRA

IRIE

ST

LocalDoughCafe

Post OfficeGreater RocktonCentre

AmericanLegion B

LAC

KH

AW

K

CEN

TER

ST

CO

TTA

GE

Hawick Riverfront Plaza-Limestone Seatwall, Decorative Pavers, Limestone Boulders

Riverfront Pathway – 8’w

Cottage Riverfront Plaza-Decorative Pavers, Benches, Limestone Boulders

New Parking Area- 10 spaces

New Parking Area- 7 spaces

Pedestrian Lighting- with Decorative Planter Pots

New Parallel Parking- 28 spaces

TRANSITION STREETS

CURB & GUTTER

• New curb and gutter as required• Expanded corner bump outs at intersection

cornersLIGHTING • Decorative LED pedestrian light

• Decorative LED bollard light at park areas

PLANTINGS • Parkway trees in lawn areas• Dwarf shrub / groundcover plantings at curb

bump out areas

PAVING • Unit pavers at accent areas• Concrete sidewalks with regular joint pattern• Painted crosswalks

SITE FURNISHINGS

• Clustered benches, trash receptacles and bike racks at key areas such as Village Green Park

C.1 – CHAPEL STREET

C.1 – CHAPEL STREET

CHAPEL ST

Village Green Park

BLA

CK

HA

WK

GR

EEN

ST

Village Green Park Entry Plaza & Sidewalk- benches, bike racks, trash receptacles, plantings

Curb & GutterLandscaped Bump Outs

Painted Crosswalks

FESTIVAL / GATHERING STREETS

CURB & GUTTER • Existing alignment to remain• Expanded corner bump outs at intersection

cornersLIGHTING • Decorative LED pedestrian light

• Decorative LED bollard light at Settlers Park

PLANTINGS • Planter pits at intersection corners / bump outs• Trees at Settlers Park

PAVING • Unit pavers at accent areas• Concrete sidewalks with regular joint pattern• Unit pavers at crosswalks

SITE FURNISHINGS

• Clustered benches, trash receptacles and planter pots at intersection corners

• Bike racks and repair stations at intersection corners

27

H.1 – HAWICK STREET

29

H.1 – HAWICK STREET

HAWICK ST

BLA

CK

HA

WK

Rockton Sanctuary

Spa

The Mix Cafe

Landscape Bump-outs- Modified for Snow Operations

SETTLER’S PARK IMPROVEMENTS

Naturalized Area w/paths and seating

areas

Athletic Fields/

Ice Skating

Existing Soccer Field

Existing Basketball

CourtsSettler’s

Park

BLA

CK

HA

WK

HAWICK

Splash PadArea

Playground/Large Games New Park Shelter

- 40’ x 60’

New Riverfront Access Pathway

Riverfront Overlook- Decorative Pavers, Benches, Limestone Boulders or Decking Overlook

New Park Lighting

Potential Pathway Extension

New Riverfront Dock

Potential Pathway Extension

Concrete Walkway

31

SPLASH PAD CONSIDERATIONS

32

ON STREET PARKING ASSESSMENT

ON-STREET PARKINGASSESSMENT

H.1

M.1M.2

M.2

M.3

C.1

EXISTING PARKING

PROPOSED CONCEPT PARKING

H.1HAWICK ST

49 44 {-5}

M.1MAIN ST

59 40 {-19}

M.2MAIN ST

56 57 {+1}

M.3MAIN ST

39 53 {+14}

C.1CHAPEL ST

34 34 {0}

TOTAL 237 228 {-9}

34

OFF-STREET PARKING OPPORTUNITIES

STREETSCAPE PHASING H.1 Hawick StreetBlackhawk Blvd. to Bridge St.

+/- 550 LF

M.1 Main Street Prairie St. to Green St. (Prairie St Intersection Included)

+/- 1,000 LF

M.2 Main Street Center St. to Prairie St. & Prairie Street Main St. to Hawick St.

+/- 650 LF

M.3 Main Street Cottage St. to Center St. & Hawick Street Center St. to Blackhawk Blvd.

+/- 1,700 LF

C.1 Chapel Street Blackhawk Blvd. to Green St.

+/- 550 LF

H.1

M.1M.2

M.2

M.3

C.1

STREETSCAPE BUDGET COSTS:PROJECT CATEGORIES & ELEMENTSRoadway & Drainage Site mobilization; curb & gutter remove and replace; pavement

resurfacing; tree removals; pavement marking; detectable warning plates; alternate utility improvements, signal modifications.

Lighting & Support Infrastructure

Decorative light poles.

Hardscape & Furnishings Decorative pavers, stone outcropping, outcropping seating, stone lighting pier bases, 6” concrete planter curb, sidewalk, benches, planter pots, litter & recycling.

Signage Gateway signs, directional signs, business directory kiosks, bike/ped directional signs, parking identifier, parking directional

Plantings Trees, shrubs, perennials/groundcover, soils, mulches.

Streetscape budget costs are provided for Village planning purposes. Costs are derived based on past planning efforts, aerial photography and site reviews. Final design and engineering is required to produce final cost estimates.

STREETSCAPE COSTS H.1 - Hawick Street - Blackhawk Blvd. to Bridge St

Roadway $366,500

Lighting $86,500

Hardscape & Furnishings $89,000

Utility Upgrades (sewer) $75,000

Plantings $61,500

Design and Engineering (15%) $112,300

Maintenance of Traffic / Admin $71,000

TOTAL $861,800

H.1

STREETSCAPE COSTS M.1 - Main Street - Prairie St. to Green St

Roadway $948,000

Lighting $270,000

Hardscape & Furnishings $590,500

Utility Upgrades (sewer) $271,000

Traffic Signal Modifications $120,000

Plantings $102,500

Design and Engineering (15%) $386,500

Maintenance of Traffic / Admin $275,000

TOTAL $2,963,500

M.1

IDOT COORDINATION

IDOT requires a formal Phase 1 study for any upgrades that involve Blackhawk Rd (IL-75). Typical timeframe:

▫ Phase 1 review – 1 year▫ Phase 2 construction docs – 1 year▫ Phase 3 – Construction – 1 year

Design team is meeting with IDOT April 10 to discuss intersection upgrades.

STREETSCAPE COSTS M.2 - Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St.

Roadway $606,000

Lighting $130,000

Hardscape & Furnishings $162,000

Utility Upgrades (sewer, structure adjustments)

$204,000

Plantings $45,000

Design and Engineering (15%) $198,000

Maintenance of Traffic / Admin $173,000

TOTAL $1,518,000M.2

M.2

STREETSCAPE COSTS M.3 - Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd.

Roadway $778,500

Lighting $270,000

Hardscape & Furnishings $371,500

Utility Upgrades (sewer, water main west of Blackhawk, structure adjustments)

$942,500

Plantings $60,000

Design and Engineering (15%) $390,000

Maintenance of Traffic / Admin $180,000

TOTAL $2,992,500M.3

M.3

STREETSCAPE COSTS C.1 - Chapel Street - Blackhawk Blvd. to Green St

Roadway $232,500

Lighting $0

Hardscape & Furnishings $26,500

Utility Upgrades (sewer laterals, structure adjustments)

$89,500

Plantings $18,000

Design and Engineering $65,000

Maintenance of Traffic / Admin $68,000

TOTAL $499,500

C.1

PARK COSTS Settlers Park Base Infrastructure Improvements

Site Preparations $84,000

Hardscape & Furnishings $212,500

Lighting $432,000

Plantings $104,500

Design and Engineering (15%) $131,500

Maintenance of Traffic / Admin $42,000

TOTAL $1,006,500

Settlers Park

Settlers Park Specialty Park Amenities

Specialty Amenities $1,260,000 to $2,340,000

Design and Engineering (15%) $165,000 to $300,000

Maintenance of Traffic / Admin $60,000

TOTAL $1,485,000 to $2,700,000

STREETSCAPE COSTSSUMMARY

H.1 - Hawick Street - Blackhawk Blvd. to Bridge St. (approx. 550 LF)TOTAL: $861,800

M.1 - Main Street - Prairie St. to Green St. (Prairie St Intersection Included) (approx. 1,000 LF)

TOTAL: $2,963,500M.2 - Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. (approx. 650 LF)

TOTAL: $1,518,000M.3 - Main Street - Cottage St. to Center St. & Hawick Street -Center St. to Blackhawk Blvd. (approx. 1,700 LF)

TOTAL: $2,992,500C.1 - Chapel Street - Blackhawk Blvd. to Green St. (approx. 550 LF)

TOTAL: $499,500Settlers Park Base Infrastructure Improvements

TOTAL: $1,006,500Settlers Park Specialty Park Amenities **Not included in total costs

TOTAL: $1,485,000 to $2,700,000

Streetscape Project Total: $9,841,800

UTILITY POLE UPGRADESCosts to relocate utilities underground

H.1 - Hawick Street - Blackhawk Blvd. to Bridge St. (approx. 550 LF)TOTAL: $208,800

M.1 - Main Street - Prairie St. to Green St. (Prairie St Intersection Included) (approx. 1,000 LF)

TOTAL: $295,200M.2 - Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. (approx. 650 LF)

TOTAL: $146,400M.3 - Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd. (approx. 1,700 LF)

TOTAL: $590,400C.1 - Chapel Street - Blackhawk Blvd. to Green St. (approx. 550 LF)

TOTAL: $244,800Settlers Park Base Infrastructure Improvements

TOTAL: $2,505,510

Utility Pole Upgrades Project Total: $3,991,110

COMMUNITY IDENTITYWAYFINDING SIGNAGE

WAYFINDING SIGNAGE

Gateway Sign (Option A) – (2 signs) $100,000

Gateway Sign (Option B) – (2 signs) $40,000

Directional Sign – 4” Letters – (7 signs) $70,000

Directional Sign – 3” Letters – (2 signs) $16,000

Business Directory Kiosk – (4 signs) $60,000

Bicycle/Ped Directional Sign – (3 signs) $7,500

Parking Identifier – (5 signs) $37,500

Parking Directional – (5 signs) $25,000

SUBTOTAL $379,200

Design & Engineering (10%) $ 37,920

TOTAL $417,120

NEXT STEPS

Committee discussion:

1. Streetscape concepts & treatments2. Implementation & priority projects

Open House / Plan Commission – April 10Village Board - TBD

49

50

51

52

GATEWAY & WAYFINDING SIGNAGE

53

GATEWAY & WAYFINDING SIGNAGE

54

GATEWAY & WAYFINDING SIGNAGE