forum on university street - university of hong kong forum … · forum on university street. 17th...

40
The University of Hong Kong University Street and Associated Works Forum on University Street 17th September 2009

Upload: trinhtu

Post on 24-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

The University of Hong Kong

University Street and Associated Works

Forum on University Street

17th September 2009

Student’sUnion

Centennial Campus Main Campus

University Street

3 Courtyards

Reservoir Roof

Library Plaza

Lily Pond

Master Layout Plan

West Gate

Central Gate

TIIB

Entry Plaza

ENTRY PLAZA

AMENITIES

UNIVERSITY STREET

AMENITIES

AMENITIES

LEARNING COMMONS

West Courtyard

CLASSROOM SUITESOCIAL

SCIENCES

ARTS

LAW

TO CHOW YEI CHING

TO WEST GATE

Senior Staff QuartersWorkmen’s Quarters

Centre Courtyard

East Courtyard

Courtyards at Level +91 – 2,500sm

Courtyards at Level +91 – 2,500sm

Entry Plaza – 1,000sm

ENTRY PLAZA

Landscaped Reservoir Roof – 4,500sm

Donor’s Walk

Philosopher’s Walk Amphitheatre

Sculpture Garden

Landscaped Reservoir Roof – 4,500sm

Lecture Centre2x 900+ seats hall

Learning Commons6000sm

3 Courtyards

ReservoirRoof

4000sm

Diagrammatic Section

+91

EntryPlaza

Learning Commons – 6,000sm

Quiet Area

Atrium

Central Classrooms

Central ClassroomsLavs.

Law Faculty Lobby

Lavs.

Courtyard BelowCourtyard BelowCourtyard Below

Learning Commons – 6,000sm

Lecture Hall 1: 900+ Seats

Lecture Hall 2: 900+ Seats

Pre-function

Lecture Centre – 2,500sm

Artist Impression of Lecture Hall 1

Proposed Amenities in Centennial Campus

Plan at Level +91

F&B180sm

Bookstore 130+450sm

Bank100sm

F&B230sm

Convenience Store 110sm

F&B140sm

F&B: 1,010 smConvenience Store: 110 smPrayer Room: 120 smBookstore: 130smFitness Centre: 320smBank: 100smOthers: 90smTotal: 1,780sm

Plan at Level +85 (Haking Wong Podium Deck)

North, Sea View

U N I V E R S I T Y S T R E E T

Chow Yei Ching Building Composite Building Haking Wong Building

Central GateMTR

Proposed Students’ Union

Proposed New Outdoor Plaza

Proposed Canteen

Centennial Campus

Main CampusUniversity Drive

Plan at Level +91 (Level UG1 of SU)

North, Sea ViewCentral Gate

MTR

U N I V E R S I T Y S T R E E TProposed Students’ Union

Centennial Campus

Main Campus

University Drive

Chow Yei Ching Building Composite Building Haking Wong Building

Elevations

Haking Wong Building

SKY Lee Hall / Composite

Building

Chow Yei Ching Building

University StreetCentral Gate

Centennial Campus

West Gate

Aerial View of University Street

MTR Entrance A / Central Gate

Haking Wong Building Composite

Building

CYC Building

SKY Lee Hall

University Street at Haking Wong looking towards Central Gate (Level UG1 of SU)

Proposed Renovation works at Composite Building

Section Across Composite Building

Students’ Union G

Students’ Union UG1

Students’ Union UG2

Roof Garden

University Street

Composite Building

University Street

Students’ Union +85 – G – Haking Wong Podium Deck

Proposed Students’ Union

(790 sm)

University Street

Sky Lee Hall

Students’ Union +91 – UG1

Students’ Union (850 sm)

University Street

Students’ Union +93 – UG2

Students’ Union (720 sm)

SKY Lee Hall

SKY Lee Hall Podium Deck Level

1m tall Lift

Overrun

University Street outside Students’ Union at +90 (Level UG1 of SU)

Proposed Canteen / Food Court at Haking Wong Podium

Existing Union Restaurant at Composite Building

Seating Area 630sm (72%)

Kitchen and Servery 240sm (28%)

Total 870sm

386 Seats

Kitchen

Existing Union Restaurant at Composite Building

Haking Wong Building - Plan at Podium Deck +85 (Haking Wong Podium Deck)

Kitchen/Services 240sm

320 seats Dining Area

320sm

New Outdoor Plaza 560sm

180sm 150sm

Section of New University Street at Haking Wong Building

Haking Wong Building

Landscape Garden New Outdoor Plaza New Canteen

University Street at Haking Wong on Podium Deck (Haking Wong Podium Deck)

Options for Location of SU Canteen

Plan at Level +85 (Haking Wong Podium Deck)

North, Sea View

Canteen

Students’ Union

Location of Canteen Plan at Level +85

Canteen

Original Plaza Retained

Canteen

Students’ Union New Outdoor

Plaza

Option 1: Canteen Retained

Option 2: Canteen Relocated to Haking Wong

Option 1: Canteen Retained

Existing Canteen: 870sm

Proposed Canteen: 780sm

Existing SU: 1,765sm

Proposed SU: 1,570 sm

Option 2: Canteen Relocated

Existing Canteen: 870sm

Proposed Canteen: 560sm

Existing SU: 1,765sm

Proposed SU: 2,360 sm

SU’s Temporary Accommodation in TIIB

Technology Innovation and Incubation Building - Ground Floor

Technology Innovation and Incubation Building - First FloorTotal Area of G/ & 1/F - 1069.62 sq. m

Technology Innovation and Incubation Building

Technology Innovation and Incubation Building

Tentative Programme

JUN 2010: Temporarily relocation of SU to TIIB

MAR to OCT 2010: Construction of new Canteen at Haking Wong Covered Podium

NOV 2010: Demolition of Union Canteen; Commencement of U-street and associated renovation works at Composite Building

JUN 2011: SU move from TIIB to Composite Building (New SU)