REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS~
4CCESSION NBR:8005200492 DOC ~ DATE: 79 05/02 NOTARIZED: NO DOCKET 0FACIL:50 250 Turkey Point Plant~ Uni P Florida Power and Light C 05000250
50-251 Turkey Point Plant~ Unit 4P Florida Power and Light C +50.50 335 St ~ Lucie Planti Unit 1P Florida Power 8 Light Co. %(8000335
AUTH ~ IVAME AUTHOR AFFILIATIONSCHMIDTPA.D, Florida Power 8 Light Co,
RECIP,NAME RECIPIENT AFFILIATIONOf f i ce of Management and Progr am Anal ysi s
SUBJECT: Forwards monthly ooerating reots fof Apr 1979 'DI sTRI OUT IO u coDE: Aooss cgplEs REGEIYED:LTR Q ERDL g slzE: +
TITLE> Annual, Semi Annual S ttenthlv Omar at i ng Reperts (OL Stag
NOTES:
RECIPIENTID CODE/NAME
ACTION: 05 BC ORB gg>0 . I
INTERhAL: 01 ~~K11 I 8E16 DIR DOR19 RFAC SAFT BR21 EEB23 EFFL TR SYS
EXTERNAL: 03 LPDR24 NATL LAB26 ACRS
COPIESLTTR ENCL
6 6
1 1
2 21 1
1 1
1 1
1 1
1 1
1
15 15
RECIPIENTID CODE/NAME
02 NRC PDR14 MPA18 ENGR BR20 PLANT SYS BR22 CORE PERF BRAEOD
04 NSIC25 BROOKHAVEN
COPIESLTTR ENCL
1 1
2 21 1
1 1
1 1
1 1
1 1
1 1
ENID C/OTOTAL NUtv'BE R OF COPIES REQUIRED: L T TR ~ ENCL
8 OOOO,go 492. BOX 5"91CO, >AIAMI,FL 3" 152t
gX<g/p
':,:. tA~FLORIO* PCVi=R 0, LIGHT CC.'.!RA;iY
May 2, 1979
Office of Management informationand Program Controls
U. S. Nuclear Regulatory CommissionWashington, D. C. 20555
C~ntlemen:
Attached are the April, 1979, Operating Status Reports forTurkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours,
Vice PresidentPower Resouxces
VTC/DDC
cc: Nr. James P. O'ReillyRobert Lowenstein, Esquire
AVERAGE DAILYUNITPOWER LEVEL 8 006/.OD 499
DOCKET NO. 50 250Turkey Point
*CO>XIPLETED DY V. T. Chilson
MONTH APRIL, 19 79
DAY AVERAGE DAILYPOWER LEVEL(MWe-Net)
2
DAY AVERAGE DAILYPOWER LEVEL'>%We Net)
17
18
10
12
13
14
15
19
20
21
22
23
24
25
26
27
28
30
0
400
78
INSTRUCTIONS
NOTE: Average daily power levelgreater than 666 MWe dueto cooler condensercooling water.
On this format, list the average daily unit P»wer level in Mme Net for each day in tl>e rcI>orting >n»nth. C>»nputc tothe nearest whole megawat t.
(<)1771
OPERATING DATAREPORT
OPERATING STATUS
Turkey Point Unit No. 3
760693
00666
1. Unit Name:
2. Reporting Period:3. Licensed Thermal Power (MWt.):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):6. Maximum Dependable Capacity (Gross MWe):7. Maximum Dependable Capacity (Net MWe):
DOCKET NO.DATE 2~~~9.79
COMPLETED DY ~~bilsonTELEPHONE M~~2-3824
Notes- Unit No. 3 operated atapproximately 100% R.P.following completion'f re-
„fueling outage on April 16,1979 except for outages ofApril 16, 17-18, 19-23 and29-30, 1979.
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):10. Reasons For Restrictions, lfAny: ~
NONE
This Month Yr..to-Date Cumulative
2 879.0345.0
-0-236.1
-0-4 0 358142 335122 641
8.28.26.46.1
32.9
11. Hours In Reporting Period 719.012. Number Of Hours Reactor Was Critical 343.213. Reactor Reserve Shutdown Hours14. Hours Generator On. Line 234. 7
15. Unit Reserve Shutdown Hours -0-
l7. Gross Electrical Energy Generated (MWH) 142 16018, Net Electrical Energy Generated (MWH) 127 91619. Unit Service Factor 32.620. Unit Availability Factor 32.621. Unit Capacity Factor (Using MDC Net) .26.722. 'Unit Capacity Factor (Using DER Net) 25. 7
23. Unit Forced Outage Rate 32. 9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):None,
56'20.642 917.4
194.641 413.4
97.382 217 30626 176 76524 769 818
73.874.066.9'63. 7
2.8
25. IfShut Down At End Of Report Period, Estimated Date of Startup:26. Units ln Test Status (Prior to Commercial Operation):
N A
Forecast Achieved
INITIAL CRITICALITYINITIALELECTRICITYCOMhIERCIALOPERATION
UNlTSHUTDO'WNS AND PO)YER REDUCTlONS DOCKET NO
*Iit No.3
'age
1 of 3
Yo. Date
cIoUlrsO
LlccnsccEvent
Rcport 4
Elc tAo ~Q UE p3
V
~ Cause A CorrcctlvcAction to
Prcvcnt Rccurrcnrc
79-01-01 S 368.8 RC FUELXX Unit No'. 3 was removed from servicefor scheduled re fueling, maintenance,and inspections. (Continued fromprevious month) (Nuclear and non-nuclear ystems)
CB PUMPXX
. (B)Outage was extended to repair mechan-ical sealson'eactor coolant pumps.(Nuclear system)
79-04-16 F 1.6 H 3 N/A HA PRPXX(B)
Unit was tripped due to loss of tur-bine system oil pressure. Correctiveactions included returnisrg the turbineoil egectors to service. (Non-nuclearsystem)
F: ForcedS: Scheduled
«)/77)
Reason;A Equipment Failure (Explain)B.Maintenance or TestC'-RefuelingD.Regulatory RcstrlctionE.Operator Training A Uccnsc ExanilnatlonF-hdrninistrativcG Operational Error (Explain)ll.Other (Explain)
3Method:1.Manual '
Manual Scram.3.Autontatic Scram,4.Other (Explain)
Exhibit G ~ instructionsfor Preparation of DataEntry Shccts for LicenseeEvent Rcport (LER) File (NVREC.OI 6 I )
Exhibit l.- Same Source
UNITSHUTDOWNS AND POWER REDUCTIONS it No.3
REPORT MONTH
Page 2 of 3
COMPLETED BY
No. Date
Cl
lA
CJ
ir,
J0
~ ec
~ C/l
LiccnsccEvent
Rcport—
C
o ~Q C$
tJ
Cause A, CorrectiveAction to
Prcvcnt Rccurrcnce
79-04-16 . F 4.8 B N/A GENERA Unit was removed from service tobalance the generator exciter.
(Non-nuclear sys tern)
79-04-16 F 8.0 B 4 N/A GENERA Unit was removed.from service tobalance the generator exciter.
(Non-nuclear system)
79-04-17 F 13.7 B N/A GENERA Unit was removed from service tobalance the generator exciter.
(Non-nuclear system)
79-04-19 F 84.9 N/A GENERA Unit was removed from service due tohigh temper'ature in generator stator.Corrective actions included changes.to hydrogen orifices to provide properhydrogen flow distribution.(Non-nuclear s stem)
F: ForcedS: Scheduled
P)/77)
Reason:A.Equipment Failure (Explain)D.Maintenance or TestC.RefuelingD.Regulatory RestrictionE Operator Training c% Liccnsc Exan:inationF-AdministrativeG.Operational Error (Explain)H-Other (Explain)
3Method:I.Manual2.Manual Scram,3.Automatic Scram.4-Other (Explain)
4Exhibit G - Instructionsfor Preparation of DataEntry Sheets for LieensccEvent Rcport (LEIO File (NUREG-OI6l )
$Exhibit I - Satne Source
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 0 - 250
COMPLETED BY
Page 3 of 3
No. DateLiccnscc
EventReport «..
c~V
E~PJ
Cause Er. CorrectiveAction to
Prevent Recurrcncc
79-04-29 ' 2.6 N/A HH VALVEX(c)
Unit was tripped by steam generatorlevel protection system. Correctiveactions included isolating and re-pairing condensate pump No. 3Cdischarge check valve. (Non-nuclearsys tern)
IF: ForcedS: Scheduled
Reason:A-Equipmcnt Failure (Explain)B Maintenance or TestC-RefuelingD.Rc ulatory RestrictionE.Operator Training i% Liccnsc ExaminationF-AdministrativeG.Operational Error (Explain)H Other (Explain)
3Method:I-Manual2-Manual Scram.3 Automatic Scram.,4-Other (Explain)
Exhibit G - Instructionsfor Preparation of DataEntry Shccts ior L!ccnsceEvent Rcport (LER) File (NUREG-OI6I)
5Exhibit I - Sante Suttrcc
AVERAGE DAILYUi IITPOWER LEVEL
DOCKET NO.Turkey Pox'<
UNIT ~~oDAN@ Bay >
MONTH AP RIL, l9 79
DAY AVERAGE DAILYPOWER LEVEL(MWe-Net)
612
DAY AVERAGE DAII.YPOWER LEVEL(MWe Net)
17
18
19
20
21
22
10
12
13
14
15
16
24
25
26
27
2S
29
30
31.
INSTRUCTIONS
On this format, list the average daily onit power level in Mme Net for each day in the rcportiilg llloiltll.Ctillli)U(ctothc nearest wliole megawat t.
19/77)
OPERATING STATUS
OPERATING DATAREPORT
DOCKET NO ~50 — 2 2DATE Z~~L979
COMPLETED BY 3L L bolsonTELEPHONE ~0~552-3824
Notes- Unit No. 4 oPerated atpproximately 95% R.P. until.nit was removed from service
for scheduled refueling, maintenance, and inspections ex-ept for outage of April 4-5.979.
Turke Point Unit No. 4I. Unit Name.
2. Reporting Period:3. Licensed Thermal Power (MWt):4. Nameplate Rating (Gross M'iVe):
5. Design Electrical Rating (Net MWe):6. Maximum Dependable Capacity (Gross MWe):7. Maximum De endable Ca acit Net MWe:
2200
693700666p y( )
8. IfChanges Qccur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To which Restricted. IfAny (Net MWe):10. Reasons For Restrictions, IfAny:
This Month Yr.-to-Date Cumulative
2 879.0I l. Hours In Reporting Period12. Number Of Hours Reactor Was Critical13. Reactor Reserve Shutdown Hours14. Hours Generator On-Line15. Unit Reserve Shutdown Hours16. Gross Thermal Energy Generated (hDVH)I 7. Gross Electrical Energy Generated (MWH)18. Net Electrical Energy Generated (MWH)19. Unit Service Factor20. Unit Availability Factor
. 21. Unit Capacity Factor (Using MDC Net)22. Unit Capacity Factor (Using DER Net)23. Unit Forced Outa e Rate24. Shutdowns Scheduled Over Next 6 Months
96.0 2 188.3-0-
2 182.0-0-
.96.0-0- -0-
210 15862 14556 989
4 077 1011 267 1001 192 739
75.813.375.813.362..211.959.811.41.44.4
(Type, Dhte. and Duration of Each):
49'48.036 535.9
138.835 001.0
-0-72 216 96823 102 82521 877 444
70.270.266.3'63. 3
2.7
25. IfShut Down At End Of Report Period, Estimated Date of Startup:26. Units In Test Status (prior to Commercial Operation): Forecast Achieved
INITIALCRITICALITYINITIALELECTRICITYCOMMERCIALOPERATION
('t/77)
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50
*COMPLETED DY
it No.4
No. Date
rl
Cl
grI
A Jtl
Q~ C/7
LicensccEvent
Report ~
C
VQE~
Cause Ec CorrcctivcAction to
Prevent Rccurrcnce
79-04-04 . F 4.4 N/A ZZ ZZZZZZ Unit was tripped by turbine-generatorpro tee tion sys tera due to sys tern loadconditions. (Non-nuclear system)
79-04-05 S 618.6 N/A RC FUELXX Unit No. 4 out of service forscheduled refueling, maintenance,and inspections. (Nuclear and non-nuclear systems)
F: ForcedS: Scheduled
Reason:A Equipment Failure (Explain)8-Maintenance or TestC-RefuelingD.Regulatory RestrictionE.Operator Training A Liccnsc ExaminationF-AdministrativeG.Operational Error (Explain)H Other (Explain)
Method:I.Manual2.Manual Scram.3-Autontatic Scram.4 Other (Explain)
Exhibit G - Instructionsfor Preparation of DataEntry Shccts for LiccnsccEvent Rcport (LER) File (NUREG-016l)
5Exhibit I - Satnc Source
AVERAGE DAILYUNITPOWER LEVEL
S t. Lucia~9COMPLETED IIY V- T. ChilSOn
TELEPHONE
MONTH APRIL, 1979
DAY AVERAGE DAILYPOWER LEVEL(MWe Net)
DAY AVERAGE DAILYPOWER LEVEL(MWe.Net)
l7
IS
I9
20
2l
23
IO
l3
l4
IS
I6
25
26
27
1S
29
30
INSTRUCTIONS
On this format, list the averaSe daily unit I)ower level in MWe.Net for each day in the rcportinI; month. Compute tothe nearest whole megawatt.
(t>/77 I
OPERATING DATAREPORT
OPERATING STATUS
850
]. Unit Name St. Lucie Unit No. 1
2. Reporting Period:3. Licensed Thermal Power (hlWt):4. Namcplatc Rating (Gross MWe):5. Design Electrical Rating (Net MWe):6. hIaximum Dependable Ca'pacity (Gross MWe):7. hiaximum Dependable Capacity (Net MWe):
822'77
DOCKET NO.DATE Za~~79
COMPLETED BY Z '~~sonTELEPHONE ~i52-3824
Notes - Unit was removed from'ervice on April 1, 1979,for scheduled refueling,maintenance, and inspec-tions.
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To IVhich Restricted. IfAny (Net MWe):10. Reasons For Restrictions, lf'Any:
NONE
This Month
719 .0
Yr.~ to-Date
2 879.02 009.50.1
-0-1 991.7
-0-
-0-0.1-0-
08841 635 5001 543 302— 889
69.20.069.20.070.00.066.80.0
7.80.0Date. and Duration of Each):
11. Hours In Reporting Period12. Number Of Hours Reactor Was Critical13. Reactor Reserve Shutdown Hours14. Hours Generator On. Line15. Unit Reserve Shutdown Hours
17. Gross Electrical Energy Generated (MWH)18. Net Electrical Energy Generated (MWH)19. Unit Service Factor20. Unit Availability Factor21. Unit Capacity Factor (Using hIDC Net)22. Unit Capacity Factor (Using DER Net)23. Unit Forced Outage Rate24. Shutdowns Scheduled Over Next 6 Months (Type.
Cumulative
"20'63.016 797.1
118. 516 350.9
21.09 256 995
12 742 45011'86 140
79.179.274. 7'72. 3
6.6
5. IfShut Down At End Of Report Period, Estimated Date ofStartup.'6.
Units In Test Status (Prior to Commercial Operation):
June 4, 1979
Forecast Achieved
INITIAL CRIT ICALITYINITIALELECTRICITYCOMhIERCIALOPERATION
('>/77)
UNITSHUTDOWNS AND POKER REDUCTIONS DOCKET NO. 50UNIT NAME S t. Lucie Unit No.1
COMPLETED BY
No. DateLicenscc
EventReport -.
CJ CP'nV'wg QQIE (J
to
Cause Ec CorrcctivcAction to
Prcvcnt Recurrence
5 79-04-01 S 718.9 C N/A RC HJELXX Unit was removed from service forscheduled refueling, maintenance,and inspections. (nuclear andnon-nuclear systems)
I
F: ForcedS: Schcdulcd
(')/77)
Reason:A.Equipment Failure (Explain)B-Maintenance or TestC.Rcfue1ingD.Regulatory RestrictionE.Operator Trainingh License ExaminationF-AdministrativeG-Operational Error (Explain)ii Other (Explain)
3Method:14Ianual2-Manual Scram,3-Automat tc Scram.4-Other (Explain)
Exhibit G - Instructionsfor Preparation of DataEntry Shccts for LiccnsceEvent Rcport (LER) File (NUREG-0161)
Exhibit I ~ Sante Source
. BOX 529100, ~111AIWII. rL ~3IS2
FLGAIOA PC'eVER h LIGI1T GG,'IPAi4Y
May 2, 1979
Office of Management Xnformationand Program Controls
U. S. Nuclear Regulatory CommissionWashington, D. C. 20555,
Gentlemen:
Attached are the April, 1979, Operating Summary Reports forTurkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours,
A. D. Schmidt-Vice PresidentPower Resources
VTC/DDC
cc: Mr. James P. 0'eillyRobert Lowenstein, Esquire
SUHl1APY OF OPERATING EXPERIENCE
DOCKET NO.
UNIT
50 — 250
Turkey PointUnit No. 3
DATE Ma 2, 1979
COMPLETED BY V. T. Chilson
REPORT MONTH APRIL, 19 79
TELEPHONE (305) 552-3824
Unit operated at approximately 100% R.P. after the unit was returned toservice following completion of scheduled refueling, maintenance,inspections, and tests, except for the outages of April 16, 17-18,19-23 and 29-30, 1979. Refer to "Unit Shutdowns and Power Reductions"section of the April, 1979, Operating Status Report for additionalinformation.
Major Safety-related maintenance activities performed duringthe'onthincluded:
Completed repairs to mechanical seals on reactorcoolant pumps.
SUllMARX OF OPERATING EXPERIENCE
DOCKET NO. 50 — 251
Turkey PointUnit No. 4
DATE Ma 2 1979
COMPLETED BY V. T. Chilson
REPORT MONTH APRIL, 1979
TELEPHONE (305) 552-3824
Unit operated at.Approximately 100% R.P. until unit was removed fromservice for scheduled refueling, maintenance, and inspections exceptfor outage of April 4-5, 1979. Refer to "Unit Shutdowns and PowerReductions" section of the April, 1979, Operating Status Report foradditional information.
Major Safety-related maintenance activities performed during themonth
included:'ompletedthe Steam Generator Tube Inspection Program.
SUMMARY OF OPERATING EXPERIENCE
POCKET NO. 50 — 335
St. LucieN
DATE 2 1979
'COMPLETED BY V. T. Chilson
TELEPHONE 305 552-3824
REPORT MONTH ~ APRIL 1979
Unit was removed from service 'on April 1, 1979, for scheduled refueling,maintenance, .and inspection. Refer to "Unit Shutdowns and Power Re-ductions" section of the April, 1979, Operating Status Report foradditional information.
Major Safety-related maintenance activities performed during the monthincluded:
Installed 68 new fuel assemblies.
Completed modifications to steam generator tube supportplates.
Started modification of charging pump suction piping.