SCOPE OF
ACTIVITIES:
CHEMISTRY
INORGANIC
TECHNOLOGY
PRE-DESIGN STUDIES • Location study
• Feasibility study
• Environmental study
PROCESS DESIGNS
EQUIPMENT BIDDING
BASIC ENGINEERING PACKAGES
DETAIL ENGINEERING DESIGNS
• Plant Design & Piping
• Instrumentation & Control
• Checking local engineering
• Assistance at equipment
procurement
FABRICATED EQUIPMENT MECHANICAL DRAWINGS
STAFF TRAINING PROGRAMS
INSTRUCTIONS & MANUALS
• Start-up
• Operation
• Maintenance
SUPERVISION SERVICES • Erection
• Putting into operation
• Conducting guarantee tests
ASSISTANCE AT INDUSTRIAL RUN
PROCESS CONSULTING
TECHNICAL AUDITS
– Confidential –
GENERAL COOPERATION PROPOSAL
on Soda Ash Project preparation & implementation
Contents
1. SODACONSULT IN BRIEF
2. FIELDS OF COOPERATION 2.1 Soda Ash & by-Products production processes 2.1.1 Soda Ash production process 2.1.2 Technology of Soda Ash & by-Products 2.1.3 Scope of Soda Ash Project in B.L. – example
2.2 Unit processes & operations 2.2.1 LSA production 2.2.2 DSA production (monohydrated) 2.2.3 DSA production (compacted) 2.2.4 BIC production 2.2.5 Environmental protection aspects
2.3 Unit operations 2.3.1 Material conveying systems 2.3.2 Dedusting systems 2.3.3 Drying systems 2.3.4 Crushing & screening 2.3.5 Storing & packaging 2.3.6 Silos and shipment
2.4 Mechanical designs of fabricated equipment 2.4.1 Key column apparatuses 2.4.2 Big rotary equipment 2.4.3 Bins & storage silos for bulk materials 2.4.4 Tanks for process solutions 2.4.5 Pressure vessels
3. OFFERED DESIGN ENGINEERING & SERVICES 3.1 Stages of documentation preparation 3.2 Equipment bidding & contracting procedure 3.3 Used software tools 3.4 Scope of documentation & services 3.4.1 PRE-DESIGN STUDIES (P-DS) 3.4.2 BASIC ENGINEERING PACKAGE (BEP) 3.4.3 DETAIL ENGINEERING & DESIGN (DED) 3.4.4 SUPERVISION SERVICES 3.4.5 OPERATIONAL ASSISTANCE
General Cooperation Proposal AS-572.100 2/25
Consulting & Engineering Office
4. COOPERATION WITH LOCAL ENGINEERING COMPANIES 4.1 General assumptions 4.1.1 Introduction 4.1.2 Pre-design Studies 4.1.3 Basic Engineering Package 4.1.4 Detail Engineering 4.1.5 Exemplary list of the Project Units / Sections
4.2 Idea of optional cooperation at detail engineering 4.3 OPTION I 4.4 OPTION II 4.5 OPTION III
5. COOPERATION WITH OWNERS OF INNOVATIVE DESIGNS 5.1 Specific process solutions 5.2 Specific design of critical equipment
5.3 Control systems, visualization and others
6. ADDITIONAL CONSULTANCY SERVICES 6.1 PRE-DESIGN STUDIES (P-DS) 6.2 BASIC ENGINEERING PACKAGE (BEP) 6.3 DETAILED ENGINEERING & DESIGN (DED)
7. ENCLOSURES 7.1 SODACONSULT MAIN REFERENCES 7.2 Historical Folder 1991 – Soda Industry In Poland 7.3 Historical Folder 1996 – Your Partner In Project Development
General Cooperation Proposal AS-572.100 3/25
Consulting & Engineering Office
1. SODACONSULT IN BRIEF 1.1 Origins & roots SODACONSULT has its roots in BIPROKWAS KRAKÓW, managed by A. Bukowski, where the basic
staff of the present SODACONSULT office was employed. In 1991, to face new challenges of transforming Polish economy, two project managers – Andrzej
Auriga (Janikosoda) and Stanisław Smyk (Soda Mątwy) – founded SODACONSULT – a private company for Consulting & Engineering Services.
In 1994 the owners of SODACONSULT and POLIMEX-CEKOP Ltd. founded a new company POLIMEX-SODACONSULT Ltd. – dedicated mainly to execution of the contract for Lime Burning Plant at M.C.I. Alexandria in Egypt.
1.2 Owners & basic staff Now, the owners of the Office are: Andrzej AURIGA, Stanisław SMYK & Bartosz SMYK
Bartosz Smyk after graduation as civil engineer, has been starting his design coordination activities and engineering management at SODACONSULT.
Chief Engineer of the Office is Mariusz Zastawny. As chemical engineer has been starting his design carrier at SODACONSULT.
Within the range of technological & mechanical aspects the independent advisers are Leszek TARCZYŃSKI (long-term Technical Manager of the Polish Soda Plants and co-author of “Soda Technology”) and Zdzisław TRZECIAK (Experienced Chief Design Engineer of the Soda Installations and mechanical designer of critical apparatuses and machinery).
SODACONSULT staff consists of: – experienced engineers, highly qualified, previously working at BIPROKWAS and CHEMADEX Kraków
– young engineers and economists graduated from the AGH University of Science and Technology, the Cracow University of Technology and the Cracow University of Economics, all located in Kraków.
The above group represents the following specializations: • process technology • utilities • mechanical & piping • instrumental & control • electrical • civil & structural • cost estimation provided for SODA PROCESS KNOW-HOW and MULTIDISCIPLINED ENGINEERING covering offered fields of cooperation.
1.3 Special teams A dynamic team for special tasks can be immediately assembled from the cooperating specialists living in Kraków. For larger projects, SODACONSULT can organize and manage special teams in cooperation with well-known Engineering Companies from Kraków and Warszawa.
General Cooperation Proposal AS-572.100 4/25
Consulting & Engineering Office
1.4 General offer scope – from concept to implementation
General Cooperation Proposal AS-572.100 5/25
Consulting & Engineering Office
2. FIELDS OF COOPERATION
2.1 Soda Ash & by-Products production processes
2.1.1 Soda Ash production process
General Cooperation Proposal AS-572.100 6/25
Consulting & Engineering Office
2.1.2 Technology of Soda Ash & by-Products
General Cooperation Proposal AS-572.100 7/25
Consulting & Engineering Office
2.1.3 Scope of Soda Ash Project in B.L. – example
General Cooperation Proposal AS-572.100 8/25
Consulting & Engineering Office
2.2 Unit process & operations
2.2.1 LSA production
a) Lime and CO2 production
b) CO2 compression
c) Brine purification
d) Absorption & distillation
e) Carbonation & filtration
f) Calcination
2.2.2 DSA production (monohydrated)
a) Crystallization
b) Drying
c) Crushing & screening
2.2.3 DSA production (compacted)
2.2.4 BIC production (compacted)
a) Soda solution preparation
b) Solution filtration
c) Solution carbonation
d) Drying
e) Crushing & screening
f) Storing & shipment
2.2.5 Environmental protection aspects
a) Washing of slurry
b) Decantation & clarification
c) Filtration
d) Fertilizer chalk production
General Cooperation Proposal AS-572.100 9/25
Consulting & Engineering Office
2.3 Unit operation
2.3.1 Material conveying systems
a) dusts
b) liquids
c) pulps
d) solids
2.3.2 Dedusting systems
2.3.3 Drying systems
2.3.4 Crushing & screening
2.3.5 Storing & packing
2.3.6 Silos and shipment
2.4 Mechanical designs of fabricated equipment
2.4.1 Column type apparatuses
a) Carbonating towers
b) Distillation towers
c) Washers
2.4.2 Big rotary equipment
a) Lime slakers
b) Calciners
2.4.3 Bins & storage silos for bulk materials
2.4.4 Tanks and mixers for process solutions
2.4.5 Pressure vessels
General Cooperation Proposal AS-572.100 10/25
Consulting & Engineering Office
3. OFFERED DESIGN ENGINEERING & SERVICES
3.1 Stages of documentation preparation
General Cooperation Proposal AS-572.100 11/25
Consulting & Engineering Office
3.2 Equipment bidding & contracting procedure
General Cooperation Proposal AS-572.100 12/25
Consulting & Engineering Office
3.3. Used software tools
For execution of offered design engineering we are using below updated software systems.
No Documentation Designing Software Notes
1 2 3 4
1. Plant Design & Piping
1. Bentley AutoPLANT V8i 2. ISOGEN 3. Autodesk INVENTOR 2013 4. AutoCAD 2013
Model 3D Pipelines isometric dwgs 3D models of equipment etc.
2. Instrumentation & Control
1. CADprofi Electrical
2. Schneider Electric Library AutoCAD
3. AutoCAD 2013
3. Electrical Installation
1. CADprofi Electrical
2. Schneider Electric Library AutoCAD
3. AutoCAD 2013
4. Civil & Structural
1. Autodesk ROBOT Structural System 2012 2. ZwCAD+ 2014
Calculation + model 3D
5. Architecture 1. Autodesk Revid Structure 2. Autodesk INVENTOR 2013 3. AutoCAD 2013
6 Others 1. Microprotol V32.8.8.2 – EuReserch (www.microprotol.com) 2. MathCAD 14.0 3. MS Excel 2013 4. MS Word 2013 5. MS Project 2003
UDT (TÜV) calculation Technological calculation
NOTE:
1. Application of above designing tools depends on stage of design engineering to be worked out.
2. Technical documentation will be e-mailed and in papers copies.
General Cooperation Proposal AS-572.100 13/25
Consulting & Engineering Office
3.4 Scope of documentation & services 3.4.1 PRE-DESIGN STUDIES (P-DS)
Conceptual design studies Site selections/evaluations Technology evaluation Technical and economic feasibility studies Optimization studies Environmental impact assessments
3.4.2 BASIC ENGINEERING PACKAGE (BEP)
Process design - general
- material and heat balances
- process and utilities flow diagrams
- control & visualization philosophy
- main equipment selection
- executive summary
Basic engineering - basic design data
- P + ID’s for process and utilities (preliminary)
- equipment arrangements
- general plot plan
- instrumentation philosophy, data sheets and schemes
- electrical general specifications, single line diagrams and load/power user summary
- civil and structural general specification, architectural concept and general arrangement drawings
- data/guide lines for local engineering and activities
Manuals and instructions For the whole Plant/Unit
- start-up instruction
- operating and maintenance manual
- chemist’s manual
- safety manual
For mechanical, electrical equipment and instrumentation
- vendor’s manuals
BEP executive summary
3.4.3 DETAIL ENGINEERING & DESIGN (DED)
Civil and structural - concrete/foundation drawings
- structural detail drawings
- steelwork pipe supports
- building drawings
- road lay-outs
- paving and drainage drawings
- U/G coordinated drawings
- material requisitions
General Cooperation Proposal AS-572.100 14/25
Consulting & Engineering Office
Plant design & piping - overall site plans
- unit plot plans
- P + ID’s for process and utilities (final)
- design area matchlines
- piping arrangement drawings
- isometrics
- material requisitions
Instrumentation/Control & visualization systems - instrument installation schedules
- instrument lay-out drawings
- logic diagrams
- instrumentation/material requisitions
Electrical - tray/racking lay-outs
- cable routing drawings
- communications
- lighting lay-outs
- U/G cable trench drawings
- cable schedules
- interconnecting diagrams
- substation lay-outs
- material requisitions
Detail mechanical drawings For fabricated critical equipment
- technical specifications
- assembly drawings
- drawings of subassemblies
- drawings of main details
- operating and maintenance manuals
3.4.4 SUPERVISION SERVICES
Local detailed engineering - assistance / supervision and checking the multidiscipline detailed engineering - assistance/supervision and checking detailed mechanical drawings of fabricated eq-nt - assistance in obtaining approvals from local authorities
Technical procurement - imported critical equipment and machinery - local equipment and materials - spare parts for proprietary equipment and others
Inspection of equipment fabrication - supervising during fabrication - inspection before shipment - assistance at packing and storing
General Cooperation Proposal AS-572.100 15/25
Consulting & Engineering Office
Civil works & structural - supervising in compliance with Plant Design & Piping requirements
Equipment assembly/erection - supervision of field – assembled big equipment, locally fabricated or imported - erection supervising of the equipment and installation - supervision of mechanical completion operations - supervision of pre-commissioning operations
Commissioning & start-up - supervision of start-up activities - management of performance tests and commissioning
3.4.5 OPERATIONAL ASSISTANCE
Technical management - assistance at plant operation
Training & technology transfer - training program - theoretical and practical training conducting
Revamp & debottlenecking services - yield improvement studies - expertizes on bottlenecks and trouble shooting
“As-built” documentation - machinery and equipment lay-outs - P+ID’s and piping isometrics - instrument details and lay-outs - electrical lay-out and cable details - complete list of plants and equipment
General Cooperation Proposal AS-572.100 16/25
Consulting & Engineering Office
4. COOPERATION WITH LOCAL ENGINEERING COMPANIES 4.1 General assumptions 4.1.1 Introduction
SODA WORKS to be designed by SDC including optional participation of INV OFF-SITE INSTALLATIONS to be designed by INV including coordination,
guidelines, consultations & checking of SDC 4.1.2 Pre-design Studies
BASIC REPORT / Feasibility Study to be elaborated by SDC PRELIMINARY BUSINESS PLAN to be elaborated by INV including participation of SDC
4.1.3 Basic Engineering Package
SODA WORK as a whole to be elaborated by SDC OFF-SITE INSTALLATIONS – all necessary guidelines & consultation to be rendered by SDC
4.1.4 Detail Engineering
See Optional Cooperation Proposal it. 4.3, 4.4, & 4.5 4.1.5 Exemplary list of the Project Units / Sections
100 – DENSE SODA ASH PLANT (DSA) 200 to 400 – SODA BY-PRODUCTS (Reserved for future) 500 – UTILITY FACILITIES 600 – MATERIALS & UTILITIES STORAGES 700 – GENERAL & MAINTENANCE SERVICES 800 – WASTE SLURRY TREATMENT 900 – TRANSPORT INFRASTRUCTURE 1000 – OFF – SITE INSTALLATIONS
General Cooperation Proposal AS-572.100 17/25
Consulting & Engineering Office
4.2 Idea of optional cooperation at detail engineering
General Cooperation Proposal AS-572.100 18/25
Consulting & Engineering Office
4.3 OPTION I
OPTION I
SODA PROJECT UNITS
100 – DENSE SODA ASH PLANT (DSA)
200 to 400 – SODA BY-PRODUCTS (Reserved for the future)
500 – UTILITY FACILITIES
600 – MATERIALS & UTILITIES STORAGES
700 – GENERAL & MAINTENANCE SERVICES
800 – WASTE SLURRY TREATMENT
900 –TRANSPORT INFRASTRUCTURE
1000 – OFF- SITE INSTALLATIONS to be agreed later on
SODACONSULT / Polish Engineering: o Complete Documentation for the whole SODA PROJECT covering the following
Units: 100, 200, 500, 600, 700, 800, 900 (Column 3 as below)
INVESTOR / Local engineering: o Adaptation to the local standards selected
parts /disciplines (Column 6) of INVESTOR documentation, as below:
electricals
civil & structural
interconnections
roads & railways
general lay-out
No Multidiscipline Detail Engineering
Polish En-ng Local En-ng
EXECUTION Guidelines consulting checking
EXECUTION Adaptation
to local standards
1 2 3 4 5 6
1. PLANT DESIGN & PIPING X – – –
2. INSTRUMENTATION & CONTROL X – – –
3. ELECTRICAL INSTALLATIONS X – – X
4. CIVIL & STRUCTURAL X – – X
5. INTERCONNECTIONS X – – X
6. ROADS & RAILWAYS X – – X
7. GENERAL LAY-OUT X – – X
General Cooperation Proposal AS-572.100 19/25
Consulting & Engineering Office
4.4 OPTION II
OPTION II
SODA PROJECT UNITS
100 – DENSE SODA ASH PLANT (DSA)
200 to 400 – SODA BY-PRODUCTS (Reserved for the future)
500 – UTILITY FACILITIES
600 – MATERIALS & UTILITIES STORAGES
700 – GENERAL & MAINTENANCE SERVICES
800 – WASTE SLURRY TREATMENT
900 –TRANSPORT INFRASTRUCTURE
1000 – OFF- SITE INSTALLATIONS to be agreed later on
SODACONSULT / Polish Engineering: o Documentation for the whole SODA PROJECT covering the following Units: 100, 200, 500,
600, 700, 800 & 900 (Column 3) excluding the below parts/ disciplines (Column 5):
electricals
civil & structural
interconnections
roads & railways
general lay-out o Guidelines, consulting & checking of INVESTOR
below documentation
INVESTOR / Local Engineering: o Documentation for the whole SODA
PROJECT as above, covering selected parts/ disciplines as below (Column 5):
electricals
civil & structural
interconnections
roads & railways
general lay-out
No Multidiscipline Detail Engineering
Polish En-ng Local En-ng
EXECUTION Guidelines consulting checking
EXECUTION Adaptation
to local standards
1 2 3 4 5 6
1. PLANT DESIGN & PIPING X – – –
2. INSTRUMENTATION & CONTROL
X – – –
3. ELECTRICAL INSTALLATIONS – X X –
4. CIVIL & STRUCTURAL – X X –
5. INTERCONNECTIONS – X X –
6. ROADS & RAILWAYS – X X –
7. GENERAL LAY-OUT – X X –
General Cooperation Proposal AS-572.100 20/25
Consulting & Engineering Office
4.5 OPTION III
OPTION III
SODA PROJECT UNITS
100 – DENSE SODA ASH PLANT (DSA)
200 to 400 – SODA BY-PRODUCTS (Reserved for the future)
500 – UTILITY FACILITIES
600 – MATERIALS & UTILITIES STORAGES
700 – GENERAL & MAINTENANCE SERVICES
800 – WASTE SLURRY TREATMENT
900 –TRANSPORT INFRASTRUCTURE
1000 – OFF – SITE INSTALLATIONS to be agreed later on
SODACONSULT / Local Engineering: o Complete Documentation for production
& storing of the SODA PROJECT covering the following Units: 100, 200, 600 & 800 (Column 3)
o Guidelines, consulting & checking of INVESTOR below documentation (Column 4)
INVESTOR / Local Engineering: o Complete Documentation for utilities, general
& maintenance services, roads & railways covering the following Units: 500, 700 & 900 (Column 5)
o Adaptation of SODACONSULT documentation to the local standards (Column 6)
No Multidiscipline Detail Engineering
Polish En-ng Local En-ng
EXECUTION
100+200+ 600 +800
Guidelines consulting checking
500+700+ 900
EXECUTION
500+700+ 900
Adaptation to local
standards
100+200+ 600+800
1 2 3 4 5 6
1. PLANT DESIGN & PIPING X X X –
2. INSTRUMENTATION & CONTROL X – X –
3. ELECTRICAL INSTALLATIONS X – X X
4. CIVIL & STRUCTURAL X – X X
5. INTERCONNECTIONS X X X X
6. ROADS & RAILWAYS X X X X
7. GENERAL LAY-OUT X X X X
General Cooperation Proposal AS-572.100 21/25
Consulting & Engineering Office
5. COOPERATION WITH OWNERS OF INNOVATIVE DESIGNS 5.1 Specific process solutions 5.2 Specific design in critical equipment 5.3 Control systems, visualization and others
General Cooperation Proposal AS-572.100 22/25
Consulting & Engineering Office
6. ADDITIONAL CONSULTANCY SERVICES AT DESIGN DEVELOPMENT
6.1 PRE-DESIGN STUDIES (P-DS)
ENGINEERING STAGES LOCAL SUPPLIER
INVESTOR ORDERING
SODACONSULT CONSULTING SERVICES
Conceptual design studies
Site selections/evaluations
Technology evaluation
Technical and economic feasibility studies
Optimization studies
Environmental impact assessments
Equipment bidding
P-DS BIDDING & SUPPLIER SELECTION
< Draft of Invitation to bid (ITB)
< Offers/quotations collecting & comparison
< Recommendations for contracting
P-DS CONTRACTING < Participation in negotiation (option)
< Advising at contract signing
MONITORING P-DS PROGRESS & DESIGN MEETINGS
< Checking Telecon Records
< Checking Design Reports
< Participation in key design meetings
< Documents transmission way proposal
< E-mail communication system proposal
< Elaboration Design Progress Reports
P-DS APPROVAL
< Checking recommendations fulfilment by the Supplier
< Draft of Final Approval Report
< Participation in the Final Approval meeting (option)
General Cooperation Proposal AS-572.100 23/25
Consulting & Engineering Office
6.2 BASIC ENGINEERING PACKAGE (BEP)
ENGINEERING STAGES LOCAL SUPPLIER
INVESTOR ORDERING
SODACONSULT CONSULTING SERVICES
Process design - general
- material and heat balances
- process and utilities flow diagrams
- control & visualization philosophy
- main equipment selection
- executive summary
Basic engineering - basic design data
- P + ID’s for process and utilities
- equipment arrangements
- general plot plan
- instrumentation philosophy, data sheets and schemes
- electrical general specifications, single line diagrams and load/power user summary
- civil and structural general specification, architectural concept and general arrangement drawings
- data/guide lines for local engineering and activities
Manuals and instructions For the whole Plant/Unit
- start-up instruction
- operating and maintenance manual
- chemist’s manual
- safety manual
For mechanical, electrical equipment and instrumentation
- vendor’s manuals
BEP executive summary
BEP BIDDING & SUPPLIER SELECTION
< Draft of Invitation to bid (ITB)
< Offers/quotations collecting & comparison
< Recommendations for contracting of BEP Supplier
BEP SUPPLIER CONTRACTING
< Participation in negotiation (option)
< Advising at contract signing (option)
DETAILED TIME SCHEDULE OF THE BEP DEVELOPMENT
< Comment to Supplier execution time schedule
< Comment to detailed list of documentation (contents)
< Participation in discussion & agreements
SITE VISITING APPROVAL
< Draft of visiting program
< Participation in the site visit (option)
< Draft of visiting Report
KEY EQUIPMENT BIDDING & DESIGN DATA TRANSMISSION
< Checking Supplier enquiries & recommendations
< Copies of offers/quotation collecting & comparison
< Recommendation for selection of 3. potential deliverers
< Checking design data to be transmitted to BEP Supplier
MONITORING BEP PROGRESS & DESIGN MEETINGS
< Checking Telecon Records
< Checking Design Reports
< Participation in key design meetings (option)
< Documents transmission way proposal
< E-mail communication system proposal
< Elaboration Design Progress Reports
BEP PRELIMINARY APPROVAL – working version
< Checking key items of BEP & recommendations
< Draft of Preliminary Approval Report
< Participation in the Approval meeting (option)
BEP FINAL APPROVAL – final version
< Recommendations fulfilment by the Supplier
< Draft of Final Approval Report
< Participation in the Final Approval meeting (option)
General Cooperation Proposal AS-572.100 24/25
Consulting & Engineering Office
6.3 DETAIL ENGINEERING & DESIGN (DED)
ENGINEERING STAGES LOCAL SUPPLIER
INVESTOR ORDERING
SODACONSULT CONSULTING SERVICES
Civil and structural - concrete/foundation drawings
- structural detail drawings
- steelwork pipe supports
- building drawings
- road lay-outs
- paving and drainage drawings
- U/G coordinated drawings
- material requisitions
Plant design & piping - overall site plans
- unit plot plans
- design area match-lines
- piping arrangement drawings
- isometrics
- material requisitions
Instrumentation/Control & visualization systems
- instrument installation schedules
- instrument lay-out drawings
- logic diagrams
- instrumentation/material requisitions
Electrical - tray/racking lay-outs
- cable routing drawings
- communications
- lighting lay-outs
- U/G cable trench drawings
- cable schedules
- interconnecting diagrams
- substation lay-outs
- material requisitions
Detail mechanical drawings For fabricated critical equipment
- technical specifications
- assembly drawings
- drawings of subassemblies
- drawings of main details
- operating and maintenance manuals
DED BIDDING & SUPPLIER SELECTION (Option)
< Draft of Invitation to bid (ITB)
< Offers/quotations collecting & comparison
< Recommendations for contracting
DED SUPPLIER CONTRACTING (Option)
< Comment to the draft of DED Supplier contract
< Participation in negotiation
< Advising at contract signing
DETAILED TIME SCHEDULE & LIST OF DOCUMENTATION
< Comment to Supplier schedule of documentation execution
< Comment to detailed list of documentation
< Comment to schedule of telecons & design meetings
< Participation in discussion & agreements
SITE VISITING APPROVAL
< Draft of visiting program
< Participation in the site visit (options)
< Draft of visiting Report
KEY EQUIPMENT CONTRACTING & CONTRACTUAL DATA TRANSMISSION TO DED SUPPLIER
< Checking Supplier contractual specifications & recommendations
< Participation in the contract negotiation
< Advising at guarantee test procedure
< Checking the time schedule of contractual data transmission
MONITORING DED PROGRESS & DESIGN MEETINGS
< Checking Telecon Records
< Checking Design Reports
< Participation in key design meetings
< Documents transmission way proposal
< E-mail communication system proposal
< Elaboration Design Progress Reports
DED PRELIMINARY APPROVAL – working version
< Checking key items of DED & recommendations
< Draft of Preliminary Approval Report
< Participation in the Approval meeting
DED FINAL APPROVAL
– final version
< Recommendations fulfilment by the Supplier
< Draft of Final Approval Report
< Participation in the Final Approval meeting (option)