fully sprinklered

4
CONSTRUCT CANCER CENTER 652-318 NO. DESCRIPTION DATE BLDG. 500 16 8 4 0 B A C D E F 6" 1 0 6" 2 0 6" 6" 0 2 4 0 4 0 0 4 8 1 2 3 4 5 6 8 7 9 9 7 8 6 5 4 3 2 1 BID DOCUMENTS FULLY SPRINKLERED MILLER-REMICK LLC PROFESSIONAL ENGINEER Department of Veterans Affairs PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER. Miller-Remick LLC 1010 KINGS HIGHWAY SOUTH CHERRY HILL, NEW JERSEY 08034 PHONE: (856)429-4000 FAX: (856)429-5002 M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business MR PROJECT NO: 0500-0004 B A C D E F COVER SHEET & DRAWING INDEX GI001 DR TH

Upload: others

Post on 23-Mar-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

CONSTRUCT CANCER

CENTER

652-318

NO. DESCRIPTION DATE

BLDG. 500

16

84

0

B

A

C

D

E

F

6"

10

6"

20

6"

6"

02

40

40

04

8

1 2 3 4 5 6 87 9

97 8654321

BID DOCUMENTS

FULLY SPRINKLEREDMILLER-REMICK LLC

PROFESSIONAL ENGINEER

Department ofVeterans Affairs

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTHCHERRY HILL, NEW JERSEY 08034PHONE: (856)429-4000FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran OwnedSmall Business

MR PROJECT NO: 0500-0004

B

A

C

D

E

F

COVER SHEET

& DRAWING INDEX

GI001

DRTH

UP

WALL LEGEND

1 HR. FIRE BARRIER

1 HR. SMOKE BARRIER

2 HR. FIRE BARRIER (PER EXISTING FIRE PLAN)

CORRIDOR SMOKE PARTITION

CORRIDOR SMOKE PARTITION (EXISTING)

XXX SF

X

XXX XXX

OCCUPANT LOAD TAG

ROOM AREA

LOAD FACTOR/OCCUPANT LOAD

USE GROUP

FIRE EXTINGUISHER CABINETFEC

X'-XX"

MAX TRAVEL DISTANCE

REQUIRED EXIT E

LIFE SAFETY LEGEND

HORIZONTAL EXIT HE

BUILDING REGULATION DATA

IBC 2015

USE GROUP

I2: INSTITUTIONAL

CONSTRUCTION TYPE TABLE 601

TYPE 1B FULLY SPRINKLEREDSTRUCTURAL FRAME: 2 HOURSBEARING WALLS: 2 HOURSFLOOR CONSTRUCTION: 2 HOURSROOF CONSTRUCTION: 1 HOURS

BUILDING AREA AND HEIGHTS TABLE 504.3, .4, 506.2

STORIES: 5HEIGHT: 180'AREA: UNLIMITED

HAZARDOUS AREAS TABLE 509

WASTE AND LINEN COLLECTION ROOMS IN USE GROUP I-2 : 1 HOUR

SECTION 407 GROUP I-2

TRAVEL DISTANCE MAX 200'x0" TO BARRIER DOOR.

407.3 CORRIDOR WALL CONSTRUCTION

CORRIDOR WALLS SHALL BE CONSTRUCTED AS SMOKE PARTITIONS

407.5 SMOKE BARRIERS

SMOKE BARRIERS SHALL BE PROVIDED TO SUBDIVIDE EVERY STORY INTO NO FEWER THAN 2 AN AREA OF NO MORE THAN 22,500 SF.

SMOKE BARRIER DOOR TABLE 716.5

1/3 HOUR

MEANS OF EGRESS

EXIT ACCESS TRAVEL DISTANCE TABLE 1017.2

B: 200 FEET WITH SPRINKLER SYSTEM

SECTION 1007.1.1 : EXIT AND EXIT ACCESS DOORWAYS

TWO EXITS ARE REQUIRED SEPARATION DISTANCE 1/3 THE DIAGONAL WITH SPRINKLER SYSTEM

EGRESS WIDTH

1005.3.1 STAIRWAYS CAPACITY IS OCCUPANT LOAD x .2 INCHES

1005.3.2 CORRIDORS CAPACITY IS OCCUPANT LOAD x .15 INCHES

MINIMUM CORRIDOR WIDTH TABLE 1018.2

44 INCHES96 INCHES GROUP I-2 WHERE REQUIRED FOR BED MOVEMENT

SHAFT ENCLOSURE 713.4

SHAFT SHALL HAVE FIRE-RESISTANT ROOFING OF NOT LESS THAN 1 HOUR WHEN CONNECTING LESS THAN 4 STORIES.

USE GROUP

CHAPTER 18/19 NEW AND EXISTING HEALTHCARE OCCUPANCIES

FIRE RESISTANCE RATINGSNFPA 220 2015 ED TABLE 4.1.1

TYPE 2 (222)

BEARING WALLS 2 HOURS

COLUMNS SUPPORTING MORE THAN ONE FLOOR: 2 HOURS(SUPPORTING ROOF ONLY 1 HOUR)

BEAMS SUPPORTING MORE THAN ONE FLOOR: 2 HOURS(SUPPORTING ROOF ONLY 1 HOUR)

FLOOR - CEILING ASSEMBLIES: 2 HOURS

ROOF CEILING ASSEMBLIES: 1 HOURS

NUMBER OF STORIES TABLE 18.1.6.1

UNLIMITED

NOTE (3) - INTERSTITIAL SPACES USED SOLELY FOR BUILDING OR PROCESS SYSTEMS DIRECTLY RELATED TO THE LEVEL ABOVE OR BELOW ARE NOT CONSIDERED A SEPARATE STORY.

HAZARDOUS AREA PROTECTION TABLE 18.3.2.1

ROOMS WITH SOILED LINEN IN VOLUME GREATER THAN 64 GAL: 1 HOUR

STORAGE ROOMS GREATER THAN 50 SF AND LESS THAN 100 SF STORING COMBUSTIBLE MATERIAL PROVIDE SMOKE PARTITION

STORAGE ROOMS GREATER THAN 100 SF W/ COMBUSTIBLE MATERIAL: 1 HOUR

ROOMS WITH COLLECTING TRASH IN VOLUME EXCEEDING 64 GAL: 1 HOUR

CONSTRUCTION OF CORRIDOR HALLS 18.3.6.2.3

CORRIDOR WALLS SHALL FORM A BARRIER TO BLOCK THE TRANSFER OF SMOKE.

CORRIDOR WALLS PERMITTED TO TERMINATE AT INTERSTITIAL LEVEL. 19.3.6.2.4 & 19.3.6.2.6

SUB DIVISION OF BUILDING SPACE 18.3.7

EVERY STORY OF AMBULATORY HEALTHCARE FACILITY SHALL DIVIDE INTO NOT LESS THAN 2 SMOKE COMPARTMENTS NOT EXCEEDING 22,500SF

TRAVEL DISTANCE FROM ANY POINT TO REACH SMOKE BARRIER DOOR : 200'-0"

SMOKE BARRIER DOOR EXHIBIT 18.3.7.6

DOORS IN SMOKE BARRIERS SHALL BE 1 3/4"SOLID BONDED WOOD DOOR OR 20 MINUTE FIRE RATED DOORS.

LATCHING HARDWARE NOT REQUIRED 18.3.7.8

NFPA 101 2015

INTERNATIONAL BUILDING CODE (IBC 2015)NFPA-101 LIFE SAFETY CODE (2015) NFPA-220 STANDARD TYPE OF BUILDING CONSTRUCTION (2015)NFPA-10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS (2013)NFPA-70 NATIONAL ELECTRIC CODE (2014)NFPA-101 LIFE SAFETY CODE (2015) CHAPTER 43.6 RECONSTRUCTION

APPLICABLE CODES AND STANDARDS:MEANS OF EGRESS

TRAVEL DISTANCE TO EXIT 18.2.6.2.1

TRAVEL DISTANCE SHALL NOT EXCEED 200 FEET WITH SPRINKLER SYSTEM

NUMBER OF MEANS OF EGRESS 18.2.4.2

NOT LESS THAN 2

SEPARATION DISTANCE NOT LESS THAN 1/3 THE DIAGONAL 7.5.1.3.3

EGRESS WIDTH TABLE 7.3.3.1

STAIRWAYS : OCCUPANCY LOAD x .3 INCHESCORRIDORS : OCCUPANCY LOAD x .2 INCHES

CAPACITY OF MEANS OF EGRESS 18.2.3.4

SHALL NOT BE LESS THAN 8' CLEAR

18.2.3.4 (1) MINIMUM WIDTH OF 44 INCHES IN NON PATIENT AREAS

SHAFT 8.6.5 ITEM 2

SHAFTS LESS THAN 4 STORIES SHALL HAVE 1-HOUR FIRE BARRIER.

FINISH REQUIREMENTS (NFPA 101 10.2.2):

EXIT ENCLOSURES/EXIT PASSAGEWAYS: CLASS A OR B

EXIT ACCESS CORRIDORS & OTHER EXIT WAYS: CLASS A OR B

ROOMS & ENCLOSED SPACES: CLASS A, B, OR C

FLOORS IN EXIT ENCLOSURES, EXIT PASSAGEWAYS AND CORRIDORS (OTHER THAN WOOD, VINYL, LINOLEUM, AND RESILIENT FLOORS W/O FIBER MATERIALS): CLASS I OR II

FIRE PROTECTION:

AUTOMATIC SPRINKLER SYSTEMS: FULLY SPRINKLERED

PORTABLE FIRE EXTINGUISHERS (NFPA 10):

CLASS ABC TYPE, MIN RATING 2-A WHERE INDICATED ON LIFE SAFETY PLAN

MAXIMUM TRAVEL DISTANCE TO FEC: 75'

STRUCTURAL STEEL FIRE PROOFING: UL N706

IBC 2015

USE GROUP

I2: INSTITUTIONAL

CONSTRUCTION TYPE TABLE 601

TYPE 1B FULLY SPRINKLEREDSTRUCTURAL FRAME: 2 HOURSBEARING WALLS: 2 HOURSFLOOR CONSTRUCTION: 2 HOURSROOF CONSTRUCTION: 1 HOURS

BUILDING AREA AND HEIGHTS TABLE 504.3, .4, 506.2

STORIES: 5HEIGHT: 180'AREA: UNLIMITED

USE GROUP

CHAPTER 18/19 NEW AND EXISTING HEALTHCARE OCCUPANCIES

FIRE RESISTANCE RATINGSNFPA 220 2015 ED TABLE 4.1.1

TYPE 2 (222)

BEARING WALLS 2 HOURS

COLUMNS SUPPORTING MORE THAN ONE FLOOR: 2 HOURS(SUPPORTING ROOF ONLY 1 HOUR)

BEAMS SUPPORTING MORE THAN ONE FLOOR: 2 HOURS(SUPPORTING ROOF ONLY 1 HOUR)

FLOOR - CEILING ASSEMBLIES: 2 HOURS

ROOF CEILING ASSEMBLIES: 1 HOURS

NUMBER OF STORIES TABLE 18.1.6.1

UNLIMITED

NFPA 101 2015

EXISTING BUILDING DATA:

878 SF

59A

15

1Z-200

203 SF

3I

100

1Z-202

303 SF

4B

100

1Z-209

155 SF

2B

100

1Z-212

100 SF

2

B

100

1Z-237

252 SF

1

M

300

1Z-217

109

SF

2I

100

1Z-2

20

111

SF

2I

100

1Z-2

22

109

SF

2I

100

1Z-2

23

109

SF

2I

100

1Z-2

24

169

SF

2I

100

1Z-2

25

115

SF

2I

100

1Z-2

27

110

SF

2I

100

1Z-2

26

118

SF

2I

100

1Z-2

28

256

SF

3B

100

1Z-2

30

117

SF

2I

100

1Z-2

29

116

SF

2I

100

1Z-2

32

102 SF

2

B

100

1Z-206

68 SF

1B

100

1Z-207

1620 SF

17I

100

1Z-208

TRAVEL DISTANCE = 76' - 0"

E

DIAGONAL DISTANCE = 190' -0"

TRAVEL DISTANCE = 70' -

0"

E

328 SF

4B

100

1Z-201

180 SF

2

B

100

1Z-211

440 SF

2

M

300

1Z-218136 SF

1

M

300

1Z-216

136

SF

2B

100

1Z-2

36

70 S

F

1B

100

1Z-2

35

147

SF

2B

100

1Z-2

19

HE

48 SF

1

M

300

1Z-215

71 SF

1B

100

1Z-210

56 SF

1

I

100

1Z-221

NOTE:ALL CORRIDOR WALLS TO BE CONSTRUCTED PER NFPA 101, 2015 SECTION 18.3.6.2.3

ASe

rvic

eD

i sa

bl e

dVet e r an Owned

Sm

al

lB

us

iness

SDVOSB

CVE

www.pfa-architect.com - Project No: ####

ARCHITECTURE, PLANNING, INTERIORSWorld Trade Center101 West Main Street, Suite 7000Norfolk, VA 23510Phone: 757-471-0537Fax: 757-471-4205

PF&A DESIGN

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: Office ofConstructionand FacilitiesManagement

one

eig

hth

in

ch

= o

ne

foo

t

16

84

0

B

A

C

D

E

F

thre

e in

ch

es =

on

e f

oo

t 6"

10

6"

on

e a

nd

on

e h

alf in

ch

es =

on

e f

oo

to

ne in

ch

= o

ne

fo

ot

20

6"

6"

02

thre

e q

uart

ers

in

ch

= o

ne

foo

to

ne h

alf in

ch

= o

ne

foo

t

40

thre

e e

igh

ths in

ch

= o

ne

foo

t

40

04

8

on

e q

uart

er

inch

= o

ne

foo

t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTHCHERRY HILL, NEW JERSEY 08034PHONE: (856)429-4000FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran OwnedSmall Business

MR PROJECT NO: 0500-0004

B

A

C

D

E

F

NO. DESCRIPTION DATE

KEYPLAN

BID DOCUMENTS

FULLY SPRINKLERED

ACTUAL & PLANNORTH

NTS

CONSTRUCT CANCERCENTER

VAMC RICHMOND, VA

652-318

11-08-2018

BLDG. 500

Department of

Veterans Affairs

MILLER-REMICK LLCPROFESSIONAL

ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

GI002

LIFE SAFETY PLAN - LEVEL 1

JCHDJP11/08/18

OCCUPANT LOAD - LEVEL 1 - PER TYPE

USEGROUP

OCCUPANCYFACTOR AREA

OCCUPANCYLOAD

A 15 878 SF 59

B 100 1915 SF 26

I 100 3061 SF 41

M 300 876 SF 5

6730 SF 131

NOTE - ROOMS OF SIMILAR OCCUPANCY HAVE BEEN COMBINED

• SEE SHEET GI003 FOR SMOKE ZONE AREAS

3/32" = 1'-0"LIFE SAFETY PLAN - LEVEL 1 - PHASE 2

ROOM LEGEND - LEVEL 1 - PHASE 2NUMBER NAME

1Z-200 WAITING

1Z-201 RECEPTION

1Z-202 BLOOD DRAW / VITALS

1Z-203 TOILET

1Z-204 TOILET

1Z-205 STORAGE

1Z-206 CLEAN LINEN

1Z-207 SOILED LINEN

1Z-208 CHEMOTHERAPY TREATMENT ROOM

1Z-209 NURSE STATION

1Z-210 PHARMACIST

1Z-211 ANTE

1Z-212 HD BUFFER

1Z-213 TOILET

1Z-214 TOILET

1Z-215 ELEV. EQUIP.

1Z-216 TELE. / DATA

1Z-217 ELEC.

1Z-218 MECH.

1Z-219 CONFERENCE / CONSULT

1Z-220 EXAM ROOM 8

1Z-221 TOILET

1Z-222 EXAM ROOM 7

1Z-223 EXAM ROOM 6

1Z-224 EXAM ROOM 5

1Z-225 EXAM / PROCEDURE

1Z-226 EXAM ROOM 9

1Z-227 EXAM ROOM 4

1Z-228 EXAM ROOM 3

1Z-229 EXAM ROOM 2

1Z-230 TEAM ROOM

1Z-231 TOILET

1Z-232 EXAM ROOM 1

1Z-234 STORAGE

1Z-235 MEDICINE

1Z-236 LOUNGE

1Z-237 KITCHEN

1Z-C1 CORRIDOR

1Z-C2 CORRIDOR

1Z-C3 CORRIDOR

1Z-C4 CORRIDOR

1Z-E1 ELEV.

1Z-S1 STAIR 1

7843

NO.

AI

NI

GRI

VFOHTLA

EW

NO

MM

OC JOSEPH H. TROST

ARCHITECT

UP

E.J.

COVER

PLATE

PLATE

E.J. COVER

E.J.

COVER

PLATE

STATION

TUG DOCK

BLK

FC

FC

UP

UP

DN

9518 SF

CARE SUITE & SMOKEZONE 1

10500 SF

CARE SUITE & SMOKEZONE 2

SM

OK

E Z

ON

ES

PE

R E

XIS

TIN

G C

ON

DIT

ION

S

SMOKE ZONES PER EXISTING CONDITIONS

SM

OK

E Z

ON

ES

PE

R E

XIS

TIN

G C

ON

DIT

ION

S

HE

TRAVEL DISTANCE =

163'

TRAVEL DISTANCE =

189'

HE

XXX SF

X

XXX XXX

OCCUPANT LOAD TAG

ROOM AREA

LOAD FACTOR/OCCUPANT LOAD

USE GROUP

FIRE EXTINGUISHER CABINETFEC

X'-XX"

MAX TRAVEL DISTANCE

REQUIRED EXIT E

LIFE SAFETY LEGEND

HORIZONTAL EXIT HE

WALL LEGEND

1 HR. FIRE BARRIER

1 HR. SMOKE BARRIER

2 HR. FIRE BARRIER (PER EXISTING FIRE PLAN)

CORRIDOR SMOKE PARTITION

CORRIDOR SMOKE PARTITION (EXISTING)

400 SF

27

A

15

2Z-243

289 SF

20

A

15

2Z-242

79 SF

1

B

100

2Z-255

82 SF

1

B

100

2Z-257

82 SF

1

B

100

2Z-259

170 SF

2

B

100

2Z-261

84 SF

1

B

100

2Z-258

82 SF

1

B

100

2Z-256

97 SF

1

M

300

2Z-240

83 SF

1

M

300

2Z-241

88 SF

1B

100

2Z-251

203 SF

3

B

100

2Z-250

110 SF

2

B

100

2Z-247

172 SF

2

B

100

2Z-249

82 SF

1

B

100

2Z-248

DIA

GONAL D

ISTANCE = 9

1' -7"

E

81 SF

1

B

100

2Z-246

81 SF

1

B

100

2Z-245

HE

104 SF

2B

100

2Z-253

199 SF

2

B

100

2Z-260

TRAVEL DISTANCE = 112' - 0"

NOTE:ALL CORRIDOR WALLS TO BE CONSTRUCTED PER NFPA 101, 2015 SECTION 18.3.6.2.3

ASe

rvic

eD

i sa

bl e

dVet e r an Owned

Sm

al

lB

us

iness

SDVOSB

CVE

www.pfa-architect.com - Project No: ####

ARCHITECTURE, PLANNING, INTERIORSWorld Trade Center101 West Main Street, Suite 7000Norfolk, VA 23510Phone: 757-471-0537Fax: 757-471-4205

PF&A DESIGN

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: Office ofConstructionand FacilitiesManagement

one

eig

hth

in

ch

= o

ne

foo

t

16

84

0

B

A

C

D

E

F

thre

e in

ch

es =

on

e f

oo

t 6"

10

6"

on

e a

nd

on

e h

alf in

ch

es =

on

e f

oo

to

ne in

ch

= o

ne

fo

ot

20

6"

6"

02

thre

e q

uart

ers

in

ch

= o

ne

foo

to

ne h

alf in

ch

= o

ne

foo

t

40

thre

e e

igh

ths in

ch

= o

ne

foo

t

40

04

8

on

e q

uart

er

inch

= o

ne

foo

t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTHCHERRY HILL, NEW JERSEY 08034PHONE: (856)429-4000FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran OwnedSmall Business

MR PROJECT NO: 0500-0004

B

A

C

D

E

F

NO. DESCRIPTION DATE

KEYPLAN

BID DOCUMENTS

FULLY SPRINKLERED

ACTUAL & PLANNORTH

NTS

CONSTRUCT CANCERCENTER

VAMC RICHMOND, VA

652-318

11-08-2018

BLDG. 500

Department of

Veterans Affairs

MILLER-REMICK LLCPROFESSIONAL

ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

GI003

LIFE SAFETY PLAN - LEVEL 2, SUITEPLANS AND EXISTING TRAVELDISTANCE

JCHDJP11/08/18

1/16" = 1'-0"SMOKE ZONE PLAN - LEVEL 1

1" = 30'-0"TRAVEL DISTANCE - EXISTING BUILDING

3/32" = 1'-0"LIFE SAFETY PLAN - LEVEL 2

NOTE - ROOMS OF SIMILAR OCCUPANCY HAVE BEEN COMBINED

OCCUPANT LOAD - LEVEL 2 - PER TYPE

USEGROUP

OCCUPANCYFACTOR AREA

OCCUPANCYLOAD

M 300 180 SF 2

B 100 1700 SF 22

A 15 690 SF 47

2569 SF 71

ROOM LEGEND - LEVEL 2 - PHASE 2

NUMBER NAME

ROOM LEGEND - LEVEL 2 - PHASE 2

NUMBER NAME2Z-253 N.P. OFFICE

2Z-254 CORRIDOR

2Z-255 F.T. ATTEND

2Z-256 F.T. ATTEND

2Z-257 F.T. ATTEND

2Z-258 F.T. ATTEND

2Z-259 F.T. ATTEND

2Z-260 MICROSCOPE

2Z-261 RECEPTION / ADMIN.

2Z-262 STORAGE

2Z-C1 CORRIDOR

2Z-C2 CORRIDOR

2Z-C3 CORRIDOR

2Z-E1 ELEV.

2Z-S1 STAIR 1

ROOM LEGEND - LEVEL 2 - PHASE 2

NUMBER NAME2Z-238 TOILET

2Z-239 TOILET

2Z-240 TELE. / DATA

2Z-241 ELEC.

2Z-242 TELE. MED / SMALL CONF.

2Z-243 FLEX CONF. SPACE

2Z-244 COPY ROOM

2Z-245 F.T. ATTEND.

2Z-246 F.T. ATTEND.

2Z-247 CHIEF RADIATION ONCOLOGY

2Z-248 F.T. ATTEND.

2Z-249 N.P. OFFICE

2Z-250 PHYSICS W.S.

2Z-251 CHIEF PHYSICS

2Z-252 CORRIDOR

7843

NO.

AI

NI

GRI

VFOHTLA

EW

NO

MM

OC JOSEPH H. TROST

ARCHITECT

UP

FC

T

Q

P

20 23 25 28

MIN.

6' - 0"

1

1

R.3 R.3

W

25 28

MIN

.

6' -

0"

1

11

GENERAL PHASING NOTES

-SEE SHEET GI004 FOR ICRA MATRIX AND REQUIREMENTS.

-THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT UNDER CONSTRUCTION.

-THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION WITH THE COR. NOTE THAT WORK MAY NEED TO BE PERFORMED AT NIGHT.

-THE CONTRACTOR SHALL COORDINATE WITH THE COR THE SCHEDULING OF ALL INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.

-THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION OPERATIONS.

-THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE COR.

-TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO FACILITATE THE HOSPITAL’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE COR.

-ALL WORK INDICATED OR NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE COR PRIOR TO COMMENCEMENT OF THE WORK.

-THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING CONSTRUCTION.

-THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.

-ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD OF DUST.

-EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE COR PRIOR TO BEGINNING THE NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE COR TO MOVE.

-ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.

-ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF THE MAJOR WORK AREAS. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.

-ICRA WALLS SHOWN ARE AT A MINIMUM. ADDITIONAL LOCATIONS MAY BE REQUIRED AS DIRECTED BY COR.

KEY NOTES

1. DENOTES TEMPORARY FIRE RATED DOOR AND ICRA HARDWALL BARRIER - 1 HR SMOKE BARRIER. WALL TO BE: 5/8" TYPE X GWB BOTH SIDES OF 3 5/8" MTL STUDS AT 16" OC, EXTEND TO DECK / SLAB ABOVE WITH FIRE RATED SEALANT AT TOP AND BOTTOM CONNECTIONS ON BOTH SIDES

2. PROVIDE TEMPORARY 1/3 HOUR RATED DOOR, FRAME AND HARDWARE. PROVIDE 1-1/2 PAIRS OF HINGES, CLOSER AND CLASSROOM (F84) LOCKSET, AUTOMATIC DOOR BOTTOMS AND RUBBER SEALS

LEGEND

1 HR. RATED TEMPORARY PARTITION

AREA NOT IN SCOPE

T

20 23

1

MIN.

6' - 0"

PATIENT RISK GROUP TABLE

GROUP 1LOW RISK

GROUP 2MEDIUM RISK

GROUP 3HIGH RISK

GROUP 4HIGHEST RISK

- ADMINISTRATIVE OFFICES- PUBLIC CORRIDORS- ELEVATORS- DAY ROOMS- CANTEEN RETAIL STORE- VACANT WARDS OR VACANT ICU'S ETC.

- OUTPATIENT, URGENT CARE & PRIMARY CARE CLINICS- LABORATORY- CARDIOLOGY- ECHOCARDIOGRAPHY- ENDOSCOPY- FOOD SERVICES- INTERIM CARE & MEDICAL UNITS- NUCLEAR MEDICINE- PHARMACY- PHYSICAL THERAPY- RADIOLOGY & NUCLEAR MEDICINE- RESPIRATORY THERAPY

- CCU- EMERGENCY ROOM- LABORATORY- OUTPATIENT SURGERY- PHARMACY- POST ANESTHESIA CARE UNIT- SURGICAL UNITS

- ANY AREA CARING FOR IMMUNICOMPROMISED PATIENTS- SPD STORAGE / STERILIZATION- INTENSIVE CARE UNITS- TB NEGATIVE PRESSURE ISOLATION ROOMS-OPERATING ROOM

INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

PATIENT RISK GROUP

LOW RISK GROUP 1

MEDIUM RISK GROUP 2

HIGH RISK GROUP 3

HIGHEST RISK GROUP 4

TYPE A TYPE B TYPE C TYPE D

I

I

I

II

II

II

II

III/IV

II

II

III/IV

III/IV

III/IV

IV

IV

IV

CONSTRUCTION PROJECT TYPE

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTIONS.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

CLA

SS

I

CL

AS

S

II

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.2.WATER MIST WORK SURFACES TO

CONTROL DUST WHILE CUTTING.3.SEAL UNUSED DOORS WITH DUCT TAPE.4.BLOCK OFF AND SEAL AIR VENTS.5.PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.6.REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

1.WIPE WORK SURFACES WITH DISINFECTANT.2.CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3.WIPE WORK SURFACES WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA

VACUUM BEFORE LEAVING WORK AREA.4.REMOVE ISOLATION OF HVAC.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA CLASS DESIGNATION

CLA

SS

III

CLA

SS

IV

1.REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.2.COMPLETE ALL CRITICAL BARRIERS, I.E.,

SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.3.MAINTAIN NEGATIVE AIR PRESSURE WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.4.CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5.COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

1.DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE ENVIRONMENTAL HEALTH

AND SAFETY AND INFECTION CONTROL AND THOROUGHLY CLEANED BY ENVIRONMENTAL SANITATION SECTION.2.REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.3.VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS. 4.WET MOP AREA WITH DISINFECTANT.5.REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1.OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.3.COMPLETE ALL CRITICAL BARRIERS OR

IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.4.MAINTAIN NEGATIVE AIR PRESSURE WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

5.SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.

6.CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM

SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. 7.ALL PERSONNEL ENTERING WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS.

1.DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT.2.VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. 3.WET MOP AREA WITH DISINFECTANT.4.REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.5.CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.6.COVER TRANSPORT RECEPTACLES OR

CARTS. TAPE COVERING.7.REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

ASe

rvic

eD

i sa

bl e

dVet e r an Owned

Sm

al

lB

us

iness

SDVOSB

CVE

www.pfa-architect.com - Project No: ####

ARCHITECTURE, PLANNING, INTERIORSWorld Trade Center101 West Main Street, Suite 7000Norfolk, VA 23510Phone: 757-471-0537Fax: 757-471-4205

PF&A DESIGN

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: Office ofConstructionand FacilitiesManagement

one

eig

hth

in

ch

= o

ne

foo

t

16

84

0

B

A

C

D

E

F

thre

e in

ch

es =

on

e f

oo

t 6"

10

6"

on

e a

nd

on

e h

alf in

ch

es =

on

e f

oo

to

ne in

ch

= o

ne

fo

ot

20

6"

6"

02

thre

e q

uart

ers

in

ch

= o

ne

foo

to

ne h

alf in

ch

= o

ne

foo

t

40

thre

e e

igh

ths in

ch

= o

ne

foo

t

40

04

8

on

e q

uart

er

inch

= o

ne

foo

t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTHCHERRY HILL, NEW JERSEY 08034PHONE: (856)429-4000FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran OwnedSmall Business

MR PROJECT NO: 0500-0004

B

A

C

D

E

F

NO. DESCRIPTION DATE

KEYPLAN

BID DOCUMENTS

FULLY SPRINKLERED

ACTUAL & PLANNORTH

NTS

CONSTRUCT CANCERCENTER

VAMC RICHMOND, VA

652-318

11-08-2018

BLDG. 500

Department of

Veterans Affairs

MILLER-REMICK LLCPROFESSIONAL

ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

GI004

ICRA ASSESSMENT PLAN

JCHDJP11/08/18

3/32" = 1'-0"ICRA PLAN - LEVEL 1 - PHASE 2

3/32" = 1'-0"ICRA PARTIAL PLAN - LEVEL 2 - PHASE 2

3/32" = 1'-0"ICRA PLAN - LEVEL 1 - PHASE 1

CONSTRUCTION TYPE: CPATIENT RISK GROUP: MEDIUM RISK, GROUP 3INFECTIION CONTROL PRECAUTIONS: CLASS IV

FOR ALL WORK:

7843

NO.

AI

NI

GRI

VFOHTLA

EW

NO

MM

OC JOSEPH H. TROST

ARCHITECT