Fundamentals of
Retro-Commissioning
Tom MeyerCSME, GGP, CBCP, QCP, EBCP
The ESCO Group
Fundamentals of Retro-Commissioning
Fundamentals of Commissioning Existing Buildings
Fundamentals of Optimizing Existing Buildings
Purpose of Retro-Commissioning
Optimization of Existing Buildings
Why Existing Buildings?• Lots of existing buildings• All have opportunities • Benefits range from less
than a month to a year economic payback
• Helps identify capital and rehab projects with economic payback from one to 20 years.
Not ALL Buildings are Candidates
If there is no functional use and you want to save energy – close the building down.
Flavors of Commissioning
• New Construction Commissioning• Re-Commissioning• Continuous
Commissioning• Retro-
Commissioning
Defining Retro-Commissioning
Q: What does “retro-commissioning” mean?1. Returning out of spec equipment back to original
design.2. Commissioning a building again after several
years since it was commissioned as new construction.
3. Commissioning a building never before commissioned to the owner’s current requirements.
Limited in Scope
Most retro-commissioning programs are limited in scope. – System– Equipment– Problem
Motivation
The Building Owner’s motivation is the determining factor of scale and depth of the commissioning process.
Nuts and Bolts of Cx
• Benefits of Retro-Commissioning• Process of Retro-Commissioning• Commissioning Methods• Types of Commissioning
Top 10 Retro-Cx Measures
10. Improve boiler efficiency/controls 9. Reset supply static pressure setpoint 8. Review terminal unit operation 7. Return VFD to variable speed operation 6. Lower condenser water temperature
Courtesy of San Diego Energy Office
Top 10 Retro-Cx Measures
5. Calibrate sensors and instrumentation 4. System level and balance 3. Optimize economizer operation 2. Eliminate simultaneous heating & cooling 1. Turn off equipment when not needed
Courtesy of San Diego Energy Office
Confused?
Get Professional Help!
Any successful commissioning plan starts with the right people led by a person with the proper training and experience.
QUESTIONS?