future fuure ready - d c everest high school
TRANSCRIPT
Construction: Year 2
APR - AUG 2020
Design Phase Construction: Year 1Bidding Phase
JUL 2018 - JAN 2019 JAN - FEB 2019 MAY - SEP 2019
E XP ECTED T IME L I N E
Goal: Create safe, comfortable and inspiring spaces that equitably support teaching and learning environments Districtwide, and provide high-quality educational opportunities for all our students.
Year 1:
• Remodel Main Office/Entrance to improve security
• Modernize Science Labs and update cabinetry
• Remodel IMC (library) entrance, including two unisex bathrooms at the entrance
• Replace heating/ventilation systems, add cooling and temperature controls for improved indoor air quality and energy efficiencies
• Update roofing, interior doors, ceilings, lighting and cabinetry
• Refinish glazed block hallways throughout the building
• Update fire alarms and lighting
Year 2:
• Renovate the Little Theater to include ADA accessible ramp and flexible furniture
• Add Special Education and Academic Support rooms on second floor
• Relocate Health Room to first floor near the main office
• Remodel and update FACE classroom and equipment
• Update showers and locker rooms for Physical Education
• Complete hallway, door, ceiling, cabinetry, lighting and fire alarm updates
• Finish heating and ventilation system replacement, as well as cooling and temperature control additions
DECEMBER 2018
JUNIOR HIGH School Update
e provinu diti nn go c e do ut c ae tir ou nt alu f e xcr eu lo l en ni c e!gnitsevnI
D.C. Everest
F U T U R E F U T U R E
R E A D YR E A D Y
F U T U R E
R E A D Y
D.C. Everest
F U T U R E F U T U R E
R E A D YR E A D Y
F U T U R E
R E A D Y
LEARNING SPACESRenovate and Modernize
SAFETY & SECURITYImprove Building Accessibility
and Update Fire Alarms
BUILDING REMODELSMain Entrance, Little Theater
and Phy Ed Locker Rooms
INFRASTRUCTUREOverdue Maintenance