future fuure ready - d c everest high school

1
Construction: Year 2 APR - AUG 2020 Design Phase Construction: Year 1 Bidding Phase JUL 2018 - JAN 2019 JAN - FEB 2019 MAY - SEP 2019 EXPECTED TIMELINE Goal: Create safe, comfortable and inspiring spaces that equitably support teaching and learning environments Districtwide, and provide high-quality educational opportunities for all our students. Year 1: • Remodel Main Office/Entrance to improve security • Modernize Science Labs and update cabinetry • Remodel IMC (library) entrance, including two unisex bathrooms at the entrance • Replace heating/ventilation systems, add cooling and temperature controls for improved indoor air quality and energy efficiencies • Update roofing, interior doors, ceilings, lighting and cabinetry • Refinish glazed block hallways throughout the building • Update fire alarms and lighting Year 2: • Renovate the Little Theater to include ADA accessible ramp and flexible furniture • Add Special Education and Academic Support rooms on second floor • Relocate Health Room to first floor near the main office • Remodel and update FACE classroom and equipment • Update showers and locker rooms for Physical Education • Complete hallway, door, ceiling, cabinetry, lighting and fire alarm updates • Finish heating and ventilation system replacement, as well as cooling and temperature control additions DECEMBER 2018 JUNIOR HIGH School Update e pr o vi nu di t i n n g o c e d o u t c a e t i r o u n t al u f e xc r e u l o l e n n i c e! g n i t s e v n I D.C. Everest FUTURE FUTURE READY READY FUTURE READY D.C. Everest FUTURE FUTURE READY READY FUTURE READY LEARNING SPACES Renovate and Modernize SAFETY & SECURITY Improve Building Accessibility and Update Fire Alarms BUILDING REMODELS Main Entrance, Little Theater and Phy Ed Locker Rooms INFRASTRUCTURE Overdue Maintenance

Upload: others

Post on 24-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Construction: Year 2

APR - AUG 2020

Design Phase Construction: Year 1Bidding Phase

JUL 2018 - JAN 2019 JAN - FEB 2019 MAY - SEP 2019

E XP ECTED T IME L I N E

Goal: Create safe, comfortable and inspiring spaces that equitably support teaching and learning environments Districtwide, and provide high-quality educational opportunities for all our students.

Year 1:

• Remodel Main Office/Entrance to improve security

• Modernize Science Labs and update cabinetry

• Remodel IMC (library) entrance, including two unisex bathrooms at the entrance

• Replace heating/ventilation systems, add cooling and temperature controls for improved indoor air quality and energy efficiencies

• Update roofing, interior doors, ceilings, lighting and cabinetry

• Refinish glazed block hallways throughout the building

• Update fire alarms and lighting

Year 2:

• Renovate the Little Theater to include ADA accessible ramp and flexible furniture

• Add Special Education and Academic Support rooms on second floor

• Relocate Health Room to first floor near the main office

• Remodel and update FACE classroom and equipment

• Update showers and locker rooms for Physical Education

• Complete hallway, door, ceiling, cabinetry, lighting and fire alarm updates

• Finish heating and ventilation system replacement, as well as cooling and temperature control additions

DECEMBER 2018

JUNIOR HIGH School Update

e provinu diti nn go c e do ut c ae tir ou nt alu f e xcr eu lo l en ni c e!gnitsevnI

D.C. Everest

F U T U R E F U T U R E

R E A D YR E A D Y

F U T U R E

R E A D Y

D.C. Everest

F U T U R E F U T U R E

R E A D YR E A D Y

F U T U R E

R E A D Y

LEARNING SPACESRenovate and Modernize

SAFETY & SECURITYImprove Building Accessibility

and Update Fire Alarms

BUILDING REMODELSMain Entrance, Little Theater

and Phy Ed Locker Rooms

INFRASTRUCTUREOverdue Maintenance