ganttchart for clearquest 1.4 and 1.3.1

33
GanttChart for ClearQuest. GanttChart for ClearQuest. A A d d hoc planning and operational management of hoc planning and operational management of projects projects www.rational-tools .info www.cmcons.com

Upload: alex-novichkov

Post on 11-Jun-2015

1.005 views

Category:

Technology


0 download

DESCRIPTION

http://rational-tools.info Ad hoc planning and operational management. The module of the visualization of the ClearQuest tasks hierarchy as Gantt diagram. The module is made in the form of Plug-in for IBM Rational ClearQuest 7.0 and upper. This module is intended for every person who uses IBM Rational ClearQuest and is short of project management capabilities. The module does not substitute for existing project management tools but adds the operational sections into IBM Rational. For the most experienced users the functions of this module will be absolutely enough for ad hoc planning and operational management of their projects. The module has no analogues in the world! CM-Consult GanttChart is featured in the IBM Global Solutions Directory ID 41151 The new version 1.3 of GanttChart for ClearQuest is available!

TRANSCRIPT

Page 1: GanttChart for ClearQuest 1.4 and 1.3.1

GanttChart for ClearQuest. GanttChart for ClearQuest.

AAdd hoc planning and operational management of projectshoc planning and operational management of projects

www.rational-tools.info

www.cmcons.com

Page 2: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

GanttChart for IBM Rational ClearQuest

Testimonials

Page 3: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

This solution was developed as a result of an effort of both our specialists and our clients. The idea to create such solution has emerged as a result of close cooperation with our customers and deep understanding of their business problems. In most companies we have cooperated with the planning horizon for tasks and works is measured in months and quarters, but not years. Project managers have often to modify work schedule, update it, establish priorities, and set responsible persons. ClearQuest is a powerful tool that simplifies this process, but it has its limits. In ClearQuest, planning and representation of tasks is performed in flat view, but all managers are used to using the Gantt chart for planning. Unfortunately, the standard ClearQuest package does not provide users with such opportunity. GanttChart for ClearQuest allows managers to save a lot of time while preparing plans of work/tasks and exercising operational control over the project. In absolute terms, a manager spends about 12-16 minutes on rescheduling the average group of connected tasks without using GanttChart. Using GanttChart for ClearQuest, the same operation takes 10-15 seconds. So, using GanttChart for ClearQuest results in increasing the manager’s efficiency and manageability of the whole project. We are greatly pleased to have gained recognition of our contribution from IBM Corporation"

Alexander Novichkov, CEO, CM-Consult, IBM Rational ClearQuest certify specialist.

Page 4: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

CM-Consult’s GanttChart is a product that was wanted by many project managers using IBM Rational ClearQuest. It allows executing almost every PM’s task within IBM Rational ClearQuest in a new and agile way.

Vasily Razuvaykin, Former Rational sales specialist, IBM (2005-2007)

Page 5: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

With GanttChart module my team achieved possibility to plan tasks for  change requests resolving right after acceptance, in the same tool, without any intermediate steps. I recommend this tool as a rapid-planning extension to all teams, which use ClearQuest.

Rustam Zaydullin, Lead analyst, SCM Specialist, TatNeft (Oil company).

Page 6: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

This is a usefull and successful solution allowing to simplify a life to ClearQuest users who got used to work with Gantt charts. Visualisation of hierarchy and relationships of change requests of different types allows to accelerate the analysis of a current tasks' status and to make a decision faster.

Dmitry Lapygine, Rational Technical Specialist, IBM EE/A, SWG Department.

Page 7: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

The major advantage of the GanttChart tool is the ability to graphically represent states of activities. When you have a large number of activities it is difficult to visually represent and estimate them using the grid view only. In such case, a chart is very useful.Another advantage is the possibility to modify dates of activities in graphic view (i.e. in a chart itself) that simplifies data updating in ClearQuest.

Jesuino Jose de Freitas Neto, IT Executive Manager, Banco do Nordeste do Brazil, Federal  Bank of Brazil

Page 8: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

GanttChart

Page 9: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

The module is made in the form of Plug-in for IBM Rational ClearQuest 7.0 and upperThis module is intended for every person who uses IBM Rational ClearQuest and is short of project management capabilitiesThe module does not substitute for existing project management tools but adds the operational sections into IBM Rational

The module has no analogues in the world!

Page 10: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

GanttChart for ClearQuest – is the new generation module that is intended for concerted operations with IBM Rational ClearQuest Eclipse. All project management functions of the module are available immediately after its installation in the standard menu of IBM ClearQuestGanttChart for ClearQuest is the very flexible solution which allows setting up any change requests with any relations and any nesting level, granting meanwhile the fine tuning of additional fields

Page 11: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Why GanttChart?Why GanttChart?

GanttChart for ClearQuest allows project managers and executives:

To analyze the project progress in real-time modeTo promptly modify the work scheduleWhen service-oriented approach is used and every day a lot of requests require project manager’s attention, GanttChart allows managers to save time spent on rescheduling groups of requests (change requests and enhancement requests)To efficiently allocate resourcesTo promptly convert requests from one state into anotherTo modify planned dates of groups of tasks and requests by dragging tasks and requests on a chart by the mouse

 GanttChart for ClearQuest allows project participants:

To view their load relative to the whole pool of requests (tasks, defects, requests, etc.)To comfortably work with the work schedule

Page 12: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

GanttChart for ClearQuest is added to the IBM Global Solutions Directory with the ID# 41151.

Page 13: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

FFundamental capabilities of undamental capabilities of

GanttChartGanttChart

Here are the fundamental capabilities of GanttChart for ClearQuest:

Multiplatform. Our module is being incorporated into the Eclipse client of IBM Rational ClearQuest and works on different platforms of Widows and UnixThere is no necessity of additional software. Everything works in one tool - IBM Rational ClearQuest. The exceptions are the functions of budgeting, resource distribution and portfolio managementThe only one data source and the synchronization in real time. The module allows showing the real state of projecting activities basing on the last changes in IBM Rational ClearQuest. There is no necessity to make additional synchronization or data duplication for it. All visualization functions are real timeAll functions of IBM Rational ClearQuest are still accessible. Because of module embedding into IBM Rational ClearQuest the user has an access to the planning capabilities by Gantt diagram and to all the functions of IBM Rational ClearQuest (building requests, reports, graphs etc) at the same time

Page 14: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Main features. DisplayingMain features. Displaying

Displaying a calendar grid and a plan in a separate view of the ClearQuest client for Eclipse

Displaying a hierarchy and relationships between change requests in form of summary tasks and an execution sequence

Displaying a completion rate (in percent) of every change request

Displaying an owner of every change request on a Gantt chart

Displaying planned shifts when editing a plan

Displaying shifts between actual and planned dates

Displaying brief information about a task in form of tooltips

Displaying an UML state diagram for every task (upon a command from the right-click menu)

Displaying change requests on basis of executed queries.

Project manager can generate a query that displays controllable change requests.

Visualization of change requests using different colour schemes depending on a completion rate and ratio of planned to actual dates.

Displaying a workload of an owner

Custom displaying of fields in a chart (ID, Record Type, Headline and any other custom fields)

Visualization of change history for a selected change request

Page 15: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Main features. ManagementMain features. Management

Available Operations for Change Requests:

Modifying planned start and finish dates from within a Gantt chart

Dragging tasks within the calendar grid on a Gantt chart

Modifying task owners from within a Gantt chart considering possible owners for a selected change request

Grouped operations:

Selecting groups of tasks and performing aggregate modifications of planned dates (prolongation, changing execution dates)

Selecting related tasks and performing aggregate modifications of planned dates

Modifying planned dates for child tasks owing to shifting of an summary task within a Gantt chart

Assigning owners for change requests from within a Gantt chart

Ability to cancel the last operation (Undo functionality)

Preview mode (developing a plan without saving changes to the ClearQuest database) allows saving drafts of a plan Creating new change requests from within a Gantt chart

Creating new change requests from within a Gantt chart

Creating links between an execution sequence and a change request hierarchy from within a Gantt chart

Page 16: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Main features. Navigation and Main features. Navigation and

additional featuresadditional features

Navigating to the beginning of a plan to the first task

Navigating to the end of a plan to the last task

Navigating to the current date in a plan

Selecting any date in a calendar plan and highlighting the aggregate of tasks to be executed on this date

Flexible configuration of functions

Export and import configuration for replication

Access restriction to configuration for general users

Automatic building of a Gantt chart on the basis of selected queries

Printing a plan to a printer

Export and import a plan to MS Project format

Export and import a plan to MS Excel format

Specifying a working calendar for a project

Support of ALM schema

Support of any custom ClearQuest schema in case this schema’s change requests contain fields necessary for planning

Multiplatform (executable on all platforms that support IBM Rational ClearQuest Client for Eclipse)

Page 17: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Tasks hierarchy visualizationTasks hierarchy visualization as Gantt Chart as Gantt Chart   

Page 18: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Tasks hierarchy visualization and plan Tasks hierarchy visualization and plan

decomposition at high-level tasks: requests and bugs decomposition at high-level tasks: requests and bugs

reports grouped by tasks and activities reports grouped by tasks and activities

Page 19: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Color highlights allow decomposing the tasks by their Color highlights allow decomposing the tasks by their

status: e.g. green - done, yellow – in progress, red – is status: e.g. green - done, yellow – in progress, red – is

behind time, blue - plannedbehind time, blue - planned    

Page 20: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Workload by ownerWorkload by owner

Page 21: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

WorkloadWorkload

Page 22: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Export to the MS ProjectExport to the MS Project

Page 23: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Displaying an UML state diagram for every task Displaying an UML state diagram for every task

(upon a command from the right-click menu)(upon a command from the right-click menu)

Page 24: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

GanttChart for ClearQuest on Linux.

Configure

Page 25: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

GanttChart for ClearQuest on Linux.

Tasks hierarchy visualization

Page 26: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Main capabilitiesMain capabilities

Support for multiple platforms

Real time synchronization of Gantt diagram and ClearQuest requests

Visualization of the request’s hierarchy and their relations as Gantt diagram

Tasks visualization basing on the completed queries

Visualization of the task fulfillment percentage

Visualization of the ratio for planned terms and fact terms

Page 27: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Main capabilitiesMain capabilities

Visualization the change requests with the different color schemes depending on their fulfillment stage and realization on time. The color highlighting will help to separate tasks by their status, e.g. green – complete, yellow – in progress, red – is behind time, blue – only planned

Decomposition of the Gantt diagram for complex Requests

Changing and saving the results of such changing of the planned terms for requests

Opening the change request forms from the Gantt diagram directly

Page 28: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

DetailsDetails

Solution type: Plug-in for IBM Rational ClearQuest Eclipse.Prerequisites: Requires IBM Rational ClearQuest installed in the system.Delivery type: Multiplatform package. Compatibility: Compatible with ClearQuest 7.0 and upper. Multilanguage support: Yes (MUI)License scheme 1: unlimited corporate license * (only for 1. IBM business partners or CM-Consult customers)License scheme 2:  node-locked (can only be used on one machine)

Page 29: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Multilanguage interface and documentationMultilanguage interface and documentation

Page 30: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

About «CM-Consult» companycompany

It was founded in 2004. The main business is consulting in project management area, implementation and support IBM Rational tools and technologies as well as methodic (RUP). Distribution, setup and customization, support of IBM Rational software and Microsoft tools.  «CM-Consult» is in TOP-5 of the Russian consulting companies implementing IBM Rational.  Our team conducted over 25 successful projects of  IBM Rational technologies implementation, we trained over 700 specialists.  «CM-Consult»  is a business partner of  IBM for all these years and has a status Premier IBM Partner as well as Value Advantage Plus (V.A.P.).The base of the team is the certified professionals and experts whose experience and deep knowledge are beyond doubts.  The clients of «CM-Consult»  are the biggest international companies: HUK-COBURG (Germany), Banco do Nordeste (Brazil), United Aviation Group (Russia), Tatneft (Tatarstan oil, Russia), VTB bank (state external trade bank, Russia), Irkut avia plant (Russia), Russian Aluminum and many others. 

Page 31: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

About Rational Tools projectAbout Rational Tools project

The project starts at 2008 for international promoting the solutions and services of CM-Consult which are worked through the real projects of the company. Rational-Tools is the set of the unique solutions and software which extends and complements the capabilities of IBM Rational tools and it has no analogues in the world. Some of these products are registered in IBM as Value Advantage Plus (V.A.P.) solutions (Project Tracker and UML2ClearQuest), that confirms their high quality and relevance for the broad spectrum of customers.

Page 32: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

Our solutions in Our solutions in

IBM Global Solutions Directory

'ProjectTracker' for MSP Server 2003 & 2007 -  (ID# 38167)

GanttChart for ClearQuest - (ID# 41151) 

UML2ClearQuest 3.0 - (ID#: 41240)

CQSD ClearQuest & HP Service Desk integration   (ID#: 41241)

Page 33: GanttChart for ClearQuest 1.4 and 1.3.1

www.rational-tools.info

More Info (worlwide):www.rational-tools.info

Exclusive Partner in Europe

IBTS (International Business & Technology Solutions), GermanyScheelestr. 108, D-12209 BerlinTel.: +49 (0)30 755 14 304Fax: +49 (0)30 755 14 348E-mail: [email protected]: http://www.ibts-online.com