1 GAS IMPORT JETTY AND PIPELINE PROJECT ENVIRONMENT EFFECTS STATEMENT INQUIRY AND ADVISORY COMMITTEE TECHNICAL NOTE TECHNICAL NOTE NUMBER: TN 039 DATE: 21 October 2020 LOCATION: Crib Point Jetty Works and Pipeline Works EES/MAP BOOK REFERENCE: N/A SUBJECT: Response to Item 1 in Table 4-1 of the Expert Evidence (Groundwater) prepared by Christopher Smitt for Mornington Peninsula Shire Council and Cardinia Shire Council. SUMMARY This document provides written explanation and figures to address the concern raised by Christopher Smitt with respect to the adequacy of the groundwater level baseline data set. REQUEST: N/A NOTE: Item 1 in Table 4-1 of the Expert Evidence (Groundwater) prepared by Christopher Smitt – Concern: No Groundwater baseline has been established (Table 4-1 and Section 4.1.3.11 of Smitt (2020)) Response: 1. As per Section 1.2.6 (Construction) of EES Technical Report D: Groundwater impact assessment (the ‘impact assessment’), pipeline installation is expected to occur primarily during summer. As such, the groundwater levels measured on 30 January 2019 (and included in Section 5.3 and Table B2 Appendix B of the impact assessment) are representative of groundwater levels that might reasonably be expected to be encountered during construction works. 2. Any variability in the actual groundwater levels at the time of construction, as compared to that measured in January 2019, has been accounted for in the assumed groundwater levels encountered in the trench and bellholes. 3. Specifically, the estimated radius of influence (groundwater level drawdown from dewatering) provided in the impact assessment is based on dewatering 2.0m in the trench and 3.5m in the bellhole. 4. As recognised in Section 4.1.3.1.1 of Smitt (2020), the dewatering scenario included a number of conservative estimates including ‘depth to groundwater could be as high as 0.5 mbgl…..; adoption of the upper end of permeability for soils….; and the adoption of a low water specific yield of one percent.’ In fact, in the case of trench dewatering the groundwater was considered to be at surface (that is, 2 metres of drawdown required at the trench). 5. Another key conservative assumption used in the groundwater impact assessment relates to the duration of dewatering. Standard industry practice is to minimise dewatering to reduce the volume of water to be discharged and managed, and to avoid structural issues within the excavations.

Upload: others

Post on 01-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

1

GAS IMPORT JETTY AND PIPELINE PROJECT ENVIRONMENT EFFECTS STATEMENT

INQUIRY AND ADVISORY COMMITTEE

TECHNICAL NOTE

TECHNICAL NOTE NUMBER: TN 039

DATE: 21 October 2020

LOCATION: Crib Point Jetty Works and Pipeline Works

EES/MAP BOOK REFERENCE: N/A

SUBJECT: Response to Item 1 in Table 4-1 of the Expert Evidence

(Groundwater) prepared by Christopher Smitt for Mornington

Peninsula Shire Council and Cardinia Shire Council.

SUMMARY This document provides written explanation and figures to

address the concern raised by Christopher Smitt with respect

to the adequacy of the groundwater level baseline data set.

REQUEST: N/A

NOTE:

Item 1 in Table 4-1 of the Expert Evidence (Groundwater) prepared by Christopher Smitt

– Concern: No Groundwater baseline has been established (Table 4-1 and Section

4.1.3.11 of Smitt (2020))

Response:

1. As per Section 1.2.6 (Construction) of EES Technical Report D: Groundwater impact

assessment (the ‘impact assessment’), pipeline installation is expected to occur primarily

during summer. As such, the groundwater levels measured on 30 January 2019 (and included

in Section 5.3 and Table B2 Appendix B of the impact assessment) are representative of

groundwater levels that might reasonably be expected to be encountered during construction

works.

2. Any variability in the actual groundwater levels at the time of construction, as compared to

that measured in January 2019, has been accounted for in the assumed groundwater levels

encountered in the trench and bellholes.

3. Specifically, the estimated radius of influence (groundwater level drawdown from dewatering)

provided in the impact assessment is based on dewatering 2.0m in the trench and 3.5m in

the bellhole.

4. As recognised in Section 4.1.3.1.1 of Smitt (2020), the dewatering scenario included a number

of conservative estimates including ‘depth to groundwater could be as high as 0.5 mbgl…..;

adoption of the upper end of permeability for soils….; and the adoption of a low water specific

yield of one percent.’ In fact, in the case of trench dewatering the groundwater was considered

to be at surface (that is, 2 metres of drawdown required at the trench).

5. Another key conservative assumption used in the groundwater impact assessment relates to

the duration of dewatering. Standard industry practice is to minimise dewatering to reduce

the volume of water to be discharged and managed, and to avoid structural issues within the

excavations.

Page 2: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

2

6. For trenches, 48 hours of continuous pumping (dewatering) was assumed for the purposes of

the assessment. In reality, the dewatering would likely occur for only hours at a time,

immediately prior to the installation of the pipe, and would not be expected to extend

overnight.

7. At thrust bore bellholes, the impact assessment considered the conservative scenario of 10

days of continuous dewatering but would more typically be expected to be up to five days.

8. The drawdown estimates indicating a limited extent, magnitude and duration of dewatering

effects are therefore considered a conservative, hypothetical worst case scenario given the

multiple conservative assumptions used. Predicted impacts would be even less under a most

likely case scenario that adopted a less conservative set of assumptions.

9. As such, given i) the stated intention to install the pipeline during summer, ii) the shallow

nature of the pipeline construction, iii) temporary nature and short-term duration of

dewatering activities (in the order of hours to days) and iv) the conservative assumptions

used in the impact assessment - the use of one groundwater level data set from summer

2018/2019 is considered adequate to describe existing conditions and commensurate with the

level of risk and potential impacts on groundwater users.

10. In terms of addressing the issue of additional baseline data raised by Smitt (2020), a

groundwater level monitoring event was undertaken in September 2019. This was conducted

outside of the EES scope to inform construction design and was not considered warranted as

part of the impact assessment for the reasons described above. The results are however

considered below in the context of the issue raised. Figures showing depths to groundwater

measured in January 2019 and September 2019 are provided in Attachment A and Attachment

B, and a summary table provided in Attachment C of this Technical Note.

11. Groundwater levels were below ground surface at all locations monitored in September 2019

and therefore within the groundwater level assumption for the trench dewatering scenario

adopted in the impact assessment (which assumed that groundwater levels were at the

surface for trench dewatering assessment purposes).

12. With the exception of monitoring well locations MW06, MW21 and MW22, the groundwater

levels in September 2019 were consistent with assumptions made in the impact assessment

for the thrust bore bellhole dewatering scenario.

13. At MW06 (0.2 mbgs), MW21 (0.3 mbgs) and MW22 (0.12 mbgs) the groundwater levels were

measured to be higher than the impact assessment assumption of 0.5 metres below ground

surface (mbgs). However, at MW06, MW21 and MW22 the geology is described as being

medium to high plasticity clay (as per borelogs included at Appendix D of the impact

assessment), and hydraulic conductivities of 2 x 10-3 m/day (MW21) and 7.1 x 10-3 (MW22)

were estimated from aquifer testing (refer to Section 5.4 of the impact assessment). These

are up to two orders of magnitude lower than the conservative assumption of 0.32 m/day

used in drawdown estimates for the impact assessment, and would result in a smaller

drawdown extent away from the excavation than that predicted in the impact assessment.

14. The groundwater levels measured in September 2019 are consistent with the high watertable

scenario considered as part of the impact assessment when considered together with the other

conservative assumptions adopted, and do not change the findings of the impact assessment.

15. We trust that this document adequately addresses the query raised with respect to a

groundwater level baseline data set.

CORRESPONDENCE: N/A

Page 3: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

3

ATTACHMENTS: 3 Attachments:

1. Jan and Sep 2019 Groundwater Level Overview Map

2. Mapsheet Series

3. GWL Table

Page 4: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

4

Attachment 1

Jan and Sep 2019 Groundwater Level Overview Map

Page 5: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!A!A

!A!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A!A!A!A!A!A

5

GW02(3.78)(3.27)GW03

(3.29)(NG)

GW04(2.45)(1.88)

GW05(1.74)(0.80)

MW01(3.80)(2.60)

MW02(1.52)(0.30)

MW03(3.54)(2.34)

MW04(DRY)(4.12)

MW05(1.41)(0.27)

MW06(3.31)(0.20)

MW07(2.60)(1.46)

MW08(3.53)(1.04)

MW09(1.62)(NG)

MW10(1.99)(0.68)

MW11(3.05)(0.83)

MW12(3.23)(0.47)

MW13(2.22)(0.23)

MW14(2.23)(0.45) MW15

(2.24)(2.28)

MW16(4.00)(2.60)

MW17(DRY)(1.32)

MW18(3.92)(1.64)

MW19(DRY)(3.49)

MW21(1.15)(0.38)

MW22(1.09)(0.12)

MW23(DRY)(0.67)

10

15

20

25

30

35

40

45

50

55

MLV 2 -Land area

Crib PointReceivingFacility

MLV 1

PakenhamDeliveryFacility

MLV 2

EOLSS

0 2,000 4,000 6,000metres

´

1:118,884 (when printed at A3)

A3 size

AECO

M does

not w

arrant

the ac

curacy

or co

mplete

ness o

f infor

mation

displa

yed in

this ma

p and

any pe

rson u

sing it

does

so at t

heir o

wn ris

k. A

ECOM

shall

bear n

o resp

onsibil

ity or

liability

for an

y erro

rs, fau

lts, de

fects,

or om

ission

s in the

inform

ation.

www.aecom.com

PROJECT ID

LAST MODIFIEDCREATED BY

60582811 sam.schroder sam.schroder 07 NOV 2019

LEGEND!A Groundwater wells!( Kilometre points

PipelineAlignment OptionsKooWeeRup Water Supply Protection Area

Coordinate System: GDA 1994 MGA Zone 55

Groundwater Impact AssessmentGas Import Jetty and Pipeline ProjectEnvironment Effects Statement

Map Document: (\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\Groundwater Impact Assessment\2019\11\FA1_GW_Geology.mxd)

A1Figu re

AGL/APL

Gro u n dw a ter Ga u gin g – Ja n u a ry a n dSeptember 2019

W e s t e r n P o r t

(3.27)(2.11)

Water level in mbgs Jan 2019Water level in mbgs Sept 2019

!A

!A

!A

!A

!A

!A

MW1(NG)(7.8)

MW5(NG)(6.14)

MW4(NG)(0.81)

MW3(NG)(6.05)

MW2(NG)(6.78)

BH20(NG)(0.63)

NG Not Guaged

End Of Line Scraper StationEOLSSMain Line ValveMLV

mbgs Metres below ground surface

MW17 water level greater than 4.01 mbgsMW19 water level greater than 4.03 mbgsMW23 water level greater than 4.26 mbgsMW04 water level greater than 4.16 mbgs

Dry w ells (Ja n 2019)

Page 6: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

Attachment 2

Mapsheet Series

Page 7: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

V

VVVVVVVVVV

VVVVVVVVVVVVVVVVVVVVVVVVVVVVV

VV

VV

VV

VV

VV

V V

V

V V V V V V V V V VVV

V V V VV V V V

VV V

V

V VVV

V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V V V V V V V V V VV

V V V V V V V V V VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V V V V V V V V V V V VV

V V V V V VV

V

VV

VV

VV

VV

VV

V

V

VVV

VV

V

VV

VV

VVV

VV

VVVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V V VV

VV

V VV

VVVV

VVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVVV

VV

VVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVV

VV

VVV V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

!

!

!

!

! ! !

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!

!

!

!

!

CRIB POINTRECREATION

RESERVE

JACKS BEACHRESERVE

PARK

WOOLLEYSBEACH

RESERVE

CRIB POINTGovernors Rd

Poi

nt R

d

Tobruk Ct

Colin Pde

Bond

Cl

Co

om

a St

Oro

tava

St

Pe

ttit St

Disney St

Lorimer St

Th

e E

spla

na

de

Par

kR

d

Creswell St

Patey St

Ba

y S

t

Lo

ch

St

Os

me

nt

CtA

us

tinC

t

Pe

ters

on

St

Pe

ters

on

St

Me

nti

pla

y S

t

Ka

ra C

t

Glo

ss

op

St

Crib Point Rd

Heather St

Mar

tin S

t

Miln

eS

t

Lincoln St

Ve

rdu

n S

t

Sa

rra

il S

t

Garfield Cr

Fis

he

r S

t

R O

W Y

Woolleys Rd

LNG Carrier

ConstructionLaydown Area

1.3 km 1.2 km

1 km

0.8 km

0.7 km

0.6 km

0.5 km

0.4 km

1.5 km

0.3 km

1.1 km

0.2 km

0.9 km

0.1 km

1.4 km

MW01(3.80)

MORNINGTONPENINSULA

Crib PointJetty

VictorianMaritimeCentre

Berth 1 (United)

Berth 2 (Project)

FSRU

CPT 006

CPT 003

CPT 001

CPT 004

CPT 007

CPT 005

CPT 002

CPT 008

Crib PointReceivingFacility

Gas Import Jetty and

Pipeline Project

Mapsheet 1 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

Open - Cut

Trenchless, Bore

Trenchless, HDD

Crib Point Receiving Facility

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (regional studies)

Moderate potential GDE (regional studies)Terrestrial GDEs

High potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 8: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

V V V VV

VV

VV

V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V V

VV

V

V V V

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V V VV

VV

V

V V

VVV

V

VVVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVVVVVVVVV

VV

VV VVVVVV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVV

VV

VVV V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVVVVVVVV

VV

VV

VV

VV

V V V V V V V V V V V V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV VV

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!

!

!

!

!

JACKS BEACHRESERVE

PARK

Bu

rton

St Mills Av

Tubb St

Woolleys Rd

Kin

g S

t

Go

rrie

Pl

The Esplanade

Buckley St

Ge

org

e S

t

Triton Av

Co

om

a St

Woolleys Rd

Florence Cr

Starb

oardW

alk

Woolleys Rd

Wo

olleysRd

Hall St

Po

rtW

alk

Mid

shipW

alk

Stony Point Rd

3.7 km

3.6 km3.5 km

3.4 km

3.3 km

3.2 km

3 km

2.9 km

2.8 km 2.7 km

2.6 km

2.3 km

2.2 km

1.7 km1.8 km

1.6 km

2.4 km

1.3 km1.2

km 1

km

0.8

km 0.7 km

1.5 km

2.1 km

2 km

1.1 km

2.5 km

0.9

km

1.9 km

1.4 km

3.1 km

MW01(3.80)

MORNINGTONPENINSULA

FRENCH-ELIZABETH-SANDSTONEISLANDS (UNINC)

CPT 012

CPT 006

CPT 003

CPT 010

CPT 013

CPT 004

CPT 007

CPT 011

CPT 005CPT 002

CPT 012-W

CPT 011-W

CPT 014

CPT013-W

CPT 008

CPT 009

Gas Import Jetty and

Pipeline Project

Mapsheet 2 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsModerate potential GDE (regional studies)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 9: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

V V V VV

VV

VV

V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V V

VV

V

V V V

VVV

VV

VV

VV

VV

VV

VV V

V V

VVVVVVV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VVVV

VV

VV

VV

VV

VV

VV

VV

VVV V

VV

VV

VV

VVV

VVVVVVVVVV

V VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V V V V V V V V V V V V VV

VV

V V V V V V V V V V V

V V VV V V V V V V V V

VV V V V V

V

V V V V V V V V

VV

V

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V V V V V V

V

VV

VV

V

VV V

V

VVVV

VVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVVV

VV

VVVVVVVV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVV

VV

VVV V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVVVVVVVV

VV

VV

VV

VV

V V V V V V V V V V V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VVV V

V

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!<

!

!

!

!

!

PARK

RECREATIONRESERVE

WARR INGINE CREEK

Martin St

Jam

es

Hir

dD

r

Sa

lmo

nS

t

Reid Pde

Po

un

d R

d

Bray St

Will

iam

St

Seaglades Lane

Jam

es Hird Dr

Ro

ss

St

Warrenda Pl

James St

Warranq

iteC

r

Kinfauns Lane

Gaskin Av

Ra

ilwa

yC

r

Ca

rinya

Ct

Ku

rra

jon

g S

t

WindrestPl

Ash CtP

ep

pe

rmin

t P

l Cedar Rose Tce

Pepp er mint Pl

Sk

inn

er

St

War

ring

ine

Cre

ekLa

ne

Heritage Way

Sandstone Island Cir

Lady Nelson Pwy

Douglas St

Bayvie

wC

ountry

Lan

e

Warrenda Pl

Stony Point Rd

Frank

ston -

Flind

ers R

d

Stony

Poin

t Line

4.9 km 4.8 km

4.7 km

4.3 km

3.9 km

4.2 km

3.8 km

3.7 km

3.6 km

3.5 km

3.4 km

3.3 km

4.4 km

3.2 km

3 km

2.9 km

4.1 km

2.8 km

4.5 km

4.6 km

4 km

5.2 km

5.3 km

5.1 km

5 km

3.1 km

MW02(1.52)

MW03(3.54)

MW04(DRY)

MORNINGTONPENINSULA

1

2 Warringine Creek

CPT 012

CPT 012

CPT 013

CPT 011

CPT 012-W

CPT 011-W

CPT 014

CPT 014-W

CPT 015

CPT 012-W-1

CPT 013-W

CPT 016

CPT 015-A

CPT 016-W

Gas Import Jetty and

Pipeline Project

Mapsheet 3 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsModerate potential GDE (regional studies)

High potential GDE (national assessment)Terrestrial GDEs

High potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 10: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

V V V VV

VV

VV

V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V V

VV

V

V V V

VVV

VV

VV

VV

VV

VV

VV V

V V

VVVVVVV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VVVV

VV

VV

VV

VV

VV

VV

VV

VVV V

VV

VV

VV

VVV

VVVVVVVVVV

VV

VV

VV

VVV

V

V VV

V

V

V V VV V V V V

VV

VV

VV

VV

VV V V V V V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VV V V

VV

V

VVV

VVVVV

V V VV

V V V V VV

VV

VV

V V V V V V V V V VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V V V V V V V V V V V V V V V V V V VVV

VV

V V V V V V VV V V

V V V V

V V V V V V V V VV V V V V

V V

V V V V V V V

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V V V V VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VVVVVVVVVVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVVVVVVVV

VV

VV

VV

VV

V V V V V V V V V V V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VVV V

V

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!<

!<

!

!

!

!

!

HASTINGS OVAL

PARK

RECREATIONRESERVE

HASTINGS

K INGS CREEK

WARRINGINE CREE K

Martin St

Jam

es

Hir

dD

r

Helen Dr

Lomica

Dr

Bianca Dr

Reid Pde

Curacoa D

r

MatthewCc

t

Kristy Dr

Autumn Ct

Su

ns

et

Rise

Bray St

Pound Rd

Phillip Ct

Cool Store Rd

High St

Sail Dr

Ta

ve

n S

t

Vill

aw

oo

d D

r Ma

rineP

de

La

ch

lan

Ct

Pe

ns

hu

rst

Av

Tambar Pl

Sta

lwa

rt A

v

Elizabeth St

Will

iam

St

Ha

rbo

ur D

r

Dolphin St

C

i nd y

Dr

Portside

Dr

Ro

ss

St

Hodgins Rd

Brydon Ct

Georgia Way

Ro

se

ma

ry D

r

Isis

Pl

Bilgola St

Hodgins Rd

Sa

lmo

n S

t

Church St

Warren Cr

Spring St

Wa

llaroo

Pl

Ce

da

r D

r

Greythorn Rd

Melaleuca

Dr

Sp

ruc

e D

r

Chloe Dr

Seahaven St

High St

OakCt

Hill

top

Ris

e

Sk

inn

er

St

James St

J

ames Hird Dr

Gascoyne

Ct

Ta

ra D

r

Em

an

Tc

e

Mic

he

lle D

r

Constantine

Wa

y

Lea Ct

Ro

ma Ct

Me

na

i

Ct

Lewis St

Emily Pl

Vic

tor

Dr

Wa

r ran

qi t e

Cr

Qu

ee

n S

t

Te

al

Ct

Vic

tori

a S

t

Jarrod Dr

Gaskin Av

Jenola CtW

ing

alaCt

Ra

ilwa

yC

r

Fo

rb

es Pl

Mullet St

De

llwo

od

Ct

Sa

mu

elC

t

Ba

bin

gto

n C

l

Carin

ya

Ct

Jacaranda Ct

N icho las

Ct

Ash Ct

Otway Ct

Laurel Ct

Isis Pl

Quality Ct

Sta

tio

nS

t

Alexander Dr

Me

rle

ba

h C

t

Sh

elly

Pl

Kin

g S

t

Sim

on

St

Lintel Ct

Art

hu

r S

t

Ply

mo

uth

St

Alf

red

St

Natalie Ct

High St

Albert St

Mary Gr

Stephen St

Herring St

Fra

nk

sto

n-

Flin

de

rsR

d

Mc

ca

llum

St

Ra

nk

in R

dK

urr

ajo

ng

St

Wa

llis

Dr

Pin

ew

oo

dD

r

Edward St

Douglas St

Gle

nd

ale

Av

Oliv

ia W

ay

Frank

ston -

Flind

ers R

d

Stony

Poin

t Line

6.9 km6.8 km

6.5 km

6.4 km

6.2 km

5.8

km

5.5 km

4.9 km

6.7 km

7 km

5.7 km

5.4 km

5.6 km

6.1 km

6 km5.9 km

5.2 km

6.6 km

6.3 km

5.3 km

5.1 km

5 km

7.1 km

GW02(3.78)

GW03(3.29)

MW04(DRY)

MORNINGTONPENINSULA

3 Kings Creek

CPT 012

CPT 021-D

CPT021

CPT 019

CPT014

CPT 014

CPT 018

CPT018

CPT 014-W

CPT 015CPT 016

CPT020

CPT 015-A

CPT021-C

CPT 016-W

CPT 021-B

CPT 021-A

CPT021-W

Gas Import Jetty and

Pipeline Project

Mapsheet 4 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (regional studies)

Moderate potential GDE (regional studies)

High potential GDE (national assessment)Terrestrial GDEs

High potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 11: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V

VV

V

V V V

VVV

VV

VV

VV

VV

VV

VV V

V V

VVVVVVV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VVVV

VV

VV

VV

VV

VV

VV

VV

VVV V

VV

VV

VV

VVV

VVVVVVVVVV

VV

VV

VV

VVV

VV V

VV

V

V V VV V V V V

VV

VVV

VV

VV V V V V V V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VV V V

VV

V

VVV

VVVVV

V V VV

V V V V V VV

VV

VV V V V V V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V V V V V V V V V V V V V V V V V V VVV

VV

V V V V V V VV V V

V V V V

V V V V V V V V VV V V V V

V V

V V V V V V V

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V V V V VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

V V

VV

VV

VV

VV

VVVVVVVVVVVVVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

V

V

VV

VV

VV

VV

VV

VV

V

V

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!<

!<

!

!

!

!

!

HASTINGS OVALPARK

RECREATIONRESERVE

WESTPARK

OLD TYABB

KINGSCREE K

KINGS CREEK

OLIVERSCREEK

Helen Dr

Cu

rac

oa

Dr

Su

ns

et

Rise

Wills St

Ma

rin

e P

de

Pe

ns

hu

rst

Av

Robertson St

Ellery St

Haddock St

Tambar Pl

Sta

lwar

tA

v

Kristy Dr

Hodgins Rd

Georgia Way

Barclay Cr

Hodgins Rd

Wa

ll aroo

Pl

Hill

top

Ris

e

Spruce Dr

OakCt

Bu

rke S

t

Lya

ll St

John Coleman Cl

GascoyneC

t

Em

an

Tc

e

Ce

da

r D

r

Mic

he

lle D

r

Constanti ne

Wa

y

Bayview Rd

Vic

tor

Dr

Bu

rke S

t

Wright St

Te

al Ct

Wright St

Du

ch

ess

Ct

Ca

llan

an S

t

Quad

ran

tC

t

Vam

pir

eC

t

Curlew Ct

Fo

rbes Pl

Ons

low

Ct

Vic

toria

St

Ma

rine

Pd

e

Thornhill St

Ellery St

Drake

Ct

Fra

nk

sto

n -

Flin

de

rs R

d

Otway Ct

Kip

pe

sL

an

e

Mo

rra

h S

t

Junee Ct

Madang Ct

Ardent Ct

Mo

rra

h S

t

Mo

rrah

St

Je

rem

iah

s R

d

Natalie Ct

Ca

llan

an S

t

Lya

ll St

Ma

yne

Av

Sovereign Dr

Stephen St

Ka

no

wn

a S

t

Wa

llis

Dr

Pin

ew

oo

dD

r

Graydens Rd

Frank

ston -

Flind

ers R

d

Stony

Point

Line

8.8 km

8.6 km

7.8 km

7.4 km

6.9 km6.8 km

6.7

km

7 km

8.4 km

8.7

km

8.3 km

7.3 km

8.5 km

8.1 km

8.2 km

7.5 km

6.6 km

7.2 km

8 km

7.7 km

7.9 km

7.1 km

7.6 km

GW03(3.29)

MW05(1.41)

MW06(3.31)

MORNINGTONPENINSULA

4

5

3 Kings Creek

CPT021-D

CPT 027 CPT 028

CPT 026CPT 025

CPT021-C

CPT 024-A

CPT021-B

CPT 021-A

CPT021-W

Gas Import Jetty and

Pipeline Project

Mapsheet 5 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (regional studies)

High potential GDE (national assessment)Terrestrial GDEs

High potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 12: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V VV

VVV V

VVVV

VV

VV

VV

VV

VV

V

V V V

VVVVVVVV

VV

V

VV

VV

VVV

VV

VV

VV

VV

VVVV

VV

VV

VV

VV

VV

VV

VV

VV

V V VV

VV

VV

VV

VV

VVVVVVVVV

VV

VV

VV

V

VV

VV V

V

V V

V V VV V

V V V

VV

VV

VVV

VV

V V V V V V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VVV V V

VV

VVV

VVVVV

V V V

V

V V V V VV

V VV

VV

V V V V V V V V VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V V V V V V V V V V V V V VV

VV

V V V V V V V V V VV

V V V

V V V V V V V V VV V V V V

V VV V V V V V V V

VV

V

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V V V V V V

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V V

VV

VV

VV

VV

VVVVVVVVVVVVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V

V

VV

VV

VV

V

VV V

VV

VV

VV

VV V

V VV

V

VV

V

VV

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!

!

!

!

!

RECREATIONRESERVE

OL IVERS CREEK

Ce

me

tery

Rd

Bayview Rd

Beach Dr

Warramunga Dr

Ce

me

tery

Rd

Be

ac

h D

r

Vo

ya

ge

r S

t

Pic

nic

Av

Outlook Av

Stu

art

Ct

Ba

rbe

cu

e C

t

Highland Av

Arunta Av

Quickmatch St

Kippes Lane

Je

rem

iah

s R

d

Fo

res

ho

re A

v

Lo

ng

Isla

nd

Dr

ConstructionLaydown Area

ConstructionLaydown AreaMORNINGTON

PENINSULA

IndustrialSteel Wharf

CPT PipeLaydown 01

Gas Import Jetty and

Pipeline Project

Mapsheet 6 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsKnown GDE (regional studies)

High potential GDE (regional studies)

High potential GDE (national assessment)Terrestrial GDEs

High potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 13: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

VV

VV

VV

VV

VV

V V VV

VV

VV

VV V

V

VVVVVVVVV

VV

VV

VV

V VVV

V V

V

V

VV V V

V VV V V

VV

VV

VVV

VV

V V V V V V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VVV V V

VV

VVV

VVVVV

V V VV

V V V V VV

V VV

VV

V V V V V V V V VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V V

VV

VV

VV

VV

VVVVVVVVVVVVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V

V

VV

VV

VV

V

VV V

V

VV

VV

VV

V VV

!!!

!! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!

!

!

!

!

OLIVE

RS C

REEK

OLIV

ERS

CREE

K

FRAN

KSTO

N-FL

INDE

RS R

OAD

DANDENONG-HASTINGS ROAD

Ra

ilwa

yR

dR

ailw

ay

Rd

Ma

rine

Pd

e

Kip

pe

sL

ane

Stu

art

Rd

Bayview Rd

Mo

rra

h S

t

Ka

no

wn

aS

t

Denham Rd

Graydens Rd

Frank

ston -

Flind

ers R

d

Frank

ston-

Flind

ersRd

Stony

Poin

t Line

11.1 km10.8 km10.5 km10.2 km

10.3 km10.1 km

9.8 km

9.7 km

9.5 km

9.4 km

9.1 km

8.9 km

8.8 km

8.6 km

10.6 km

9 km

8.4 km

11 km

9.3 km

8.7

km

8.3 km

9.2 km

10.7

km

8.5 km

10.4

km

10.9

km10 km

9.9 km

MW06(3.31)

MORNINGTONPENINSULA

5

6 Olivers CreekCPT 032

CPT 035

CPT 027

CPT 029

CPT 031CPT 033

CPT 028

CPT 034

CPT 030

CPT 026CPT 025

CPT 024-A

Gas Import Jetty and

Pipeline Project

Mapsheet 7 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 14: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

V V V V V V V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VVV V

VV

V

VVV

VVVVV

V V VV

V V V V VV

VV

VV V V V V V V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VV

V VV V

VV

VV

VV

VV

VVVVVVVVVVVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

V

V

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

V

VV

VV

V

VV

V

VV

VV

VV

V

VV V

VV

VV

V VV

V V

VVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

!

!

!

!

!!!!!

!

!

!

!!

!!!

!!

! !

!

!!

!

!

!

!

!

!

!

!

!

!

!!

!!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!<

!

!

!

!

!

DANDENONG-HASTINGS ROAD

Whitneys Rd

Thornells Rd

Mc

kir

dy

s R

d

Denham Rd

14.2 km

14.1 km

14 km

13.8 km13.6 km

13.5

km

13.2 km

12.9 km

12.8 km

13.1 km

11.9 km11.5 km11.4

km

11.3 km

11.1 km10.8 km

10.5 km

11.8 km11.2 km

10.6 km

12.3 km

11

km

12.6 km

10.7 km

13 km

11.6 km

12.2 km

12.1 km

11.7 km

12.7 km

13.7 km

10.4 km

10.9 km

12 km

12.5 km

12.4 km

13.9 km

GW04(2.45)

GW05(1.74)

MW07(2.60)

MORNINGTONPENINSULA

8

7

CPT 036CPT 036-A CPT 036-C CPT 036-E

CPT 032

CPT 036-B

CPT 035

CPT 036-F

CPT 038

CPT 040-A

CPT 045

CPT 040-B

CPT 039

CPT 036-H

CPT 036-D

CPT 033

CPT 036-I

CPT028

CPT 034

CPT030

CPT 040

CPT 036-G

CPT PipeLaydown 01

MLV 1

Gas Import Jetty and

Pipeline Project

Mapsheet 8 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

MLV 1

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsKnown GDE (regional studies)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 15: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

V

V

V

VV

VV

VV

V

VV

V

VV

VV

VV

V

VV

V VV

V

VV

V

VV

VV

VV

VV V V

VV

VV V

VV V

VVVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

V V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVV

VV

VV

VVVVVVVVVVVVVVVVVV

VV

VVVVVVVVVVV V V V V

V V V V V V VV V V V V V V V V V V

VV

V

VV

VV

VVVV V V V V

VV

VV

VV

VV

VV

VV

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!!!!!

!

!

!

!

!

!

!

! !!

!!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!>

!>

!<

!<

!<

!<

!

!

!

!

!

DAND

ENON

G-HA

STIN

GS R

OAD

Yaringa Rd

Wh

itn

ey

s R

d

Lumeah Rd

Mc

kir

dy

s R

d

Iluka Rd

Pikes Rd

Ka

tan

dra

Rd

Oneills Rd

Tyabb

- Toora

din Rd

16.9 km

16.5 km

16.4 km

16 km

15.8 km

15.7 km15.3 km15 km14.9 km

14.6 km

14.5 km

16.3 km

14.3 km

14.2 km

15.6 km

14.1 km

14 km13.8 km

13.6 km

13.5

km13.4 km

13.2 km

15.9 km

16.6 km

14.8 km

16.8 km

15.4 km15.5 km

15.1 km

13.7

km

13.3 km

16.2 km

14.7 km

16.1 km

15.2

km

17 km

14.4 km

16.7 km

13.9 km

142356

121049

GW04(2.45)

GW05(1.74)

MW07(2.60)

MW08(3.53)

Option BG-11

Option B

B-10

MORNINGTONPENINSULA

8

9

7

CPT 049

CPT 045

CPT 040-B

CPT048

CPT 047

CPT 046

Gas Import Jetty and

Pipeline Project

Mapsheet 9 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!> Consumptive use bores within 30 m of pipeline

!( Waterway crossing locations

Open - Cut

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsKnown GDE (regional studies)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 16: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVVVVVV

VV

VVVVVVVVVVVVVVVVVV

VV

VVVVVVVVVV

V V V V V V V V V V VV V V

V V V V V V V V V

VV

V

VV

VV

VVVV V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

V V V V V V V V V V V V V V V V V V V VVV

V

V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VV

VV

VV

V

!

!

!

!

!

!

!

!

!

!

!

!

!

!!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!>

!<

!<

!<

!

!

!

!

!

WATSON CREEK

PEARCEDALESOUTH

CREEK

WATSON CREEK

Bembridge Rd

Wh

itn

ey

s R

d

Bungower RdBungower Rd

Tyab

b - To

oradin

Rd

19.6 km

19.5 km

19.3 km

19.7 km

19.2 km

19.1 km

19 km

18.6 km

18.5 km

18.4 km

18.3 km18.1 km

18 km17.9 km

17.7 km

17.6 km

17.4 km

17.3 km

17.2 km

16.9 km

18.2 km

19.4 km

17.5 km

17.1 km

18.7 km

18.8 km

16.8 km

18.9 km

17.8 km

17 km

16.7 km

121049

MW08(3.53)

MW09(1.62)

MW10(1.99)

Option

BB-10

MORNINGTONPENINSULA

10 Watson Creek

11 Pearcedale South Creek

CPT 051-A

CPT 049-A

CPT 056

CPT 049

CPT049-B

CPT 051-C

CPT 053

CPT 055

CPT 051-B

CPT 052

CPT 048

CPT 054

CPT 050

CPT 047

Gas Import Jetty and

Pipeline Project

Mapsheet 10 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!> Consumptive use bores within 30 m of pipeline

!( Waterway crossing locations

Open - Cut

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsKnown GDE (regional studies)

Unclassified potential GDE (regional studies)

High potential GDE (national assessment)Terrestrial GDEs

High potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 17: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

VV

VV

VV

VV

VV

VV

VV

VV

VVV V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVVVVVV

VV

VV

VVVVVVVVVVVVVVVVV

V

VVVVVVVVVV

VV V V V V V V V V V VV V V V V V V V V V V V

VV

VV

VV

VVV

V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V V V V V V V V V V V V V V V V V V VV

V

V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!

!

!

!

!

PEARCEDALE SOUTH CREEK

LANGWARRIN CREEK

Vo

we

ll D

r

Ca

llan

an

s L

an

e

Shekleton St

Ea

st

Rd

South Boundary Rd East

Tyabb

- Toora

din Rd

22.7

km

22.6 km

22.2 km21.9 km

21.8 km

21.7 km

21.3 km

21.2 km

20.6 km

20.4 km

20.2 km20 km

19.8 km

19.6 km

22.4 km

19.5 km

19.7 km

21.4 km

20.3 km

20.9 km

21.5 km

22.3 km

21.6 km

20.8 km

20.1 km

22.1 km

19.9 km

22.8 km

21.1

km

22 km

21 km

20.7 km

20.5 km

22.5 km

MW11(3.05)

MORNINGTONPENINSULA

CASEY12 Langwarrin Creek

13 14

CPT 056

CPT 062-W

CPT 057

CPT 057-ACPT 057-A

CPT 059

CPT 055

CPT062

CPT 060

CPT 060

CPT 061

CPT 061-W Gas Import Jetty and

Pipeline Project

Mapsheet 11 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsKnown GDE (regional studies)

High potential GDE (national assessment)Terrestrial GDEs

High potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 18: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

V V V V V V V V V V V V V V V V V V V VVV

V

V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVV

VV

VV

VV

VV

VV

VV

VVV V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V VV

VV

VV

VV

VV

V

V V V V V V V V V V V V V V V V V VV

VV

VV V V V V V VV

VV

VV

VV

VV

VVV

VV

VV

VV

VV

V V

V

VV

VV V V V V V

VV

VV

V V V V V V

VVVV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VVVV

VVV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

V V V V V V V V V V V V V V V V

VV

V

VV

VV

VVV

VV

V V V

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!

!

!

!

!

Craigs Lane Drain

Vo

we

ll D

r

Cra

ig R

d

Cra

igs

La

ne

Noaki St

Baxter - Tooradin Rd

24.6

km

24.4 km

23.7 km

23.2 km

23 km

23.3 km

22.9 km

22.7 km

22.6 km

22.2 km

21.9 km

21.8 km

21.7 km

24.2 km

24.5 km

22.4 km

23.4 km

23.8 km

23.9 km24.3 km

24 km

22.3 km

23.1 km

21.6 km

23.5 km

23.6 km

22.1 km

22.8 km

22 km

22.5 km

MW12(3.23)

CASEY

17

18

1516 CPT 063

CPT 064

CPT 062-W

CPT 065

CPT 062

CPT 060

CPT 060

CPT 061

CPT 061-W

Gas Import Jetty and

Pipeline Project

Mapsheet 12 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsKnown GDE (regional studies)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 19: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

V V V VVV

V

V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V

VV

VV

VV

VV

VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

V

VVVVVVVVVV

VV

VV

VV

VV

VV

VV

VVV V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V VV

VV

VV

VV

VV

V

V V V V V V V V V V V V V V V V V VV

VV

VV V V V V V VV

VV

VV

VV

VV

VVV

VV

VV

VV

VV

V V

V

VV

VV V V V V V

VV

VV

V V V V V V V V V VV

VV

VV

VV

VV

VV

V

V V V V V V V V V V VV

VV

VV

VV

V

VV

VV

VV

VV

VV

VV V V V V V V V VV

VV

VV

VV

VV

VV

V V V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VVV V V V V V V

VV V V V V V V V V

V

VV V V V V V V

VV

VV

VV

VV

VV

VV

VV

VV

VVV V

VV

VV

VV

VV

VV

V

VVV

VV

VV

VV

VVVVVVVVVVVVVVVVVVVV

VV

VV

VV

VV

VV

V V V V V V V VVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVVVVVVVVVVVVVVVVVVV

VV

VV

VV

VVVVVVVV

VV

VV

VVVV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VVVV

VV

VVVV

VV

VV

V VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

VV

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!

!

!

!

!

Le

mn

os

Rd

Cannons C

reek Rd

Daly Dr

Currawong Gr

Fis

he

rie

s R

d

Bronze Wing Ct

Pivato Ct

Ibis

Way

Baxter - Tooradin Rd

27.5 km

27.2 km

27.1 km

26.5 km

26.4 km26.1 km

26 km

25.7 km25.6 km

25.4 km

24.9 km24.6 km

24.4 km

26.9 km

27.4 km

27.3 km

24.5

km

26.2 km

26.3 km

24.3

km

26.6 km

26.8 km

25.2 km

25.9

km25.5

km

24.8

km

25 km

25.3 km

25.1 km

27 km

24.7 km

25.8

km

MW12(3.23)

MW13(2.22)

CASEY

1820

19

21

2322 Quail Inlet Drain

24

CPT064

CPT 065 CPT 066

CPT 068

CPT 067

CPT 069

Gas Import Jetty and

Pipeline Project

Mapsheet 13 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsKnown GDE (regional studies)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 20: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!<

!

!

!

!

!

RUTH

ERFO

RDCR

EEK

SOUTH GIPPSLAND HIGHWAY

North Rd

Ad

en

ey

s R

d

Fis

he

rie

s R

d

Ad

en

ey

s R

d

Baxter - Tooradin Rd

29.9 km

29.6 km

29.5 km

29.3 km

29.8 km

29.2 km28.9 km

28.7 km

28.6 km28.1 km

27.9 km27.6 km

29.1

km

27.5 km

27.2 km27.1

km

27.4 km

27.3 km

28.4 km

29.7 km

30.1 km

28.8 km

28.2 km

29

km

30

km

29.4 km

27.8 km

28.3 km 28.5 km

27.7 km

28 km

MW14(2.23)

Option AN-9

CASEY

25 Christies Drain26

27

28 Rutherford Creek

CPT 070

CPT 074

CPT 072

CPT 074-A

CPT 073-B

CPT 073

CPT 075-W

CPT 071

CPT 076

CPT 073-A

CPT 069

Gas Import Jetty and

Pipeline Project

Mapsheet 14 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 21: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!>

!<

!

!

!

!

!

WESTE

RNOUTF

ALL D

RAIN

RUTH

ERFO

RD C

REEK

MUDDY GATES DRAIN

MUDDY GATES DRAIN

WESTERN OUTFALL DRAIN

SOUTH GIPPSLAND HIGHWAY

North Rd

Lynes Rd

Lynes Rd

Mu

dd

y G

ate

s L

an

e

Baxter - Tooradin Rd

32 km

31.9 km

31.5

km31.4

km

31.3 km

31.2 km31.1 km

30.9 km

30.7 km

30.5 km

30.4 km30.3 km

29.9 km

29.6 km

29.5

km

29.8 km

30.8 km

29.7

km

30.1 km

31.8 km

30.6 km

31.6 km

30.2 km

32.1 km

32.2 km

31.7 km

30 km

31 km

91465

MW15(2.24)

Option

AN-9

Option AM-9

Option AE-8_0.1

CASEY

28 Rutherford Creek

29 Western Outfall Drain

CPT074

CPT 080

CPT 082

CPT074-A

CPT 077

CPT 073-B

CPT 084

CPT 075-W

CPT 076

CPT 083

CPT 081CPT 077-A

Gas Import Jetty and

Pipeline Project

Mapsheet 15 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!> Consumptive use bores within 30 m of pipeline

!( Waterway crossing locations

Open - Cut

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 22: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!

!

!

!

!

MANKS ROAD DRAIN

MUDD

Y GAT

ES D

RAIN

WES

TERN

OUTF

ALL D

RAIN

MUDDY GATES DRAIN

Manks Rd

Langtree Rd

Mu

dd

y G

ate

s L

an

eM

calpine Rd

Mu

dd

y G

ate

s L

an

e

La

nd

ale

Rd

Ya

llam

be

e R

d

Wandook Rd

Dandenong-Leongatha34.3 km

34.2 km

33.8 km33.7 km

33.6 km33.4 km33.2 km

33 km

32.9 km32.8 km

32.7 km

32.5 km

32 km

31.9 km

31.5 km

31.4 km

34.4 km

32.3 km

32.4 km

34 km

33.1 km

33.5

km

31.8 km

33.9

km

32.6 km

32.1 km

32.2 km

31.7 km

34.5

km

MW16(4.00)

Optio

n Z-8

Option AE-8_0.1

CASEY31 Manks Rd Drain

32

30 Muddy Gates Drain

29 Western Outfall Drain

CPT087

CPT 080

CPT 090

CPT 082

CPT 084

CPT 083

CPT 081

CPT 088

CPT 077-A

Gas Import Jetty and

Pipeline Project

Mapsheet 16 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 23: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!

!

!

!

!

TOORADIN RD DRAIN

RUTTERS RD DRAIN

TOOR

ADIN

RD

DRAIN

MANKS ROAD DRAIN

MANKS ROAD DRAIN

To

ora

din

Sta

tio

n R

d

Manks Rd

Dandenong-Leongatha

37.1 km

36.9 km

36.7 km

36.2 km

36.1 km36 km

36.6 km

35.9 km35.7 km

35.6 km35.5 km

35.3 km

35.1 km

34.3 km34.2 km

34.6 km

35.8 km

34.9 km

34.4 km

34.7 km

34 km

36.4 km

35.2 km

37 km

36.5 km

34.8 km

33.9 km

36.8 km

36.3 km

35.4 km

35 km

34.5 km

Option D-8

Option D-8

Option AU-9

Option Z-8 CARDINIA

CASEY

31 Manks Rd Drain32

33

36

34

37

35 Tooradin Road Drain

CPT 093

CPT 092

CPT 098

CPT 087

CPT 090

CPT 091

CPT 094

CPT 096

CPT097

CPT 097

CPT 095

CPT 088

Gas Import Jetty and

Pipeline Project

Mapsheet 17 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 24: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!!

!!

!!

!

!

!

!!

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!>

!<

!

!

!

!

!

WEST

DAL

MORE

RD D

RAIN

ADAMS DRAIN

TOORADIN INLET DRAIN

CARDINIA CREEK

WEST

DAL

MORE

RD

DRAIN

RIDG

EWAY

S DRA

IN

BOWDENS DRAIN

Da

lmo

re R

d

Be

azl

ey

Rd

Ad

am

s R

d

Ric

es

Rd

Bloomfield Lane

39.8

km

39.5 km

39.3 km39.1 km

39 km

38.8 km

38.7 km

38.6 km

38.5 km

38.3 km

38.2 km

38.1 km38 km37.9 km

37.8 km

37.7 km

37.5 km

37.1 km

36.9 km

36.7 km

39.4 km

37.3 km

38.4 km

37.6

km

36.8 km

39.7 km

WRK070589

MW17(DRY)

Optio

n D-8

Option BE-10Op

tion D

-8

Option AT-9

CARDINIA

43 44

39 Ridgeways Drain

40

41

42 West Dalmore Rd Drain

38 Tooradin Inlet Drain

CPT 092

CPT 098

CPT094

CPT 096

CPT 097

CPT 097

CPT 106

CPT 104

CPT 102-WCPT 099

CPT 095

CPT 100-A

CPT 107

CPT 105

CPT 100

Gas Import Jetty and

Pipeline Project

Mapsheet 18 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!> Consumptive use bores within 30 m of pipeline

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 25: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!

!

!

!

!

BALLARTO ROADWEST DRAIN

LOWE

R GU

M SC

RUB C

REEK

LOWER GUM SCRUB CREEK

HAGELTHORNES D RAIN

CARDINIA CREEK

DEEP

CRE

EK

TOOM

UC C

REEK

We

nn

Rd

Ho

bs

on

Rd

Bloomfield Lane

Ballarto Rd

42.5 km

42.2 km

41.8 km

41.7 km

41.5 km

41.4 km

41.3 km

41.2 km

41.1 km

40.8 km

40.7 km

39.8

km

39.5 km

39.3 km

39.2 km

41.6 km

41 km

39.4 km

41.9 km

42.3 km

40.5 km

42.1 km

40.3 km

39.7 km

40.4 km

40.9 km

40.2 km

42.4 km

40.6 km

42 km

MW18(3.92)

Option AO-9

CARDINIA

43 44

48

45

47

49 Lower Gum Scrub Ck

50 Toomuc Creek

5251 Deep Creek

46 Cardinia Creek

CPT105-A

CPT 108

CPT 110

CPT 109

CPT 106

CPT 106

CPT 104

CPT102-W

CPT 107

CPT 105

CPT 105

MLV 2 -Land area MLV 2

Gas Import Jetty and

Pipeline Project

Mapsheet 19 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, HDD

MLV 2

MLV 2 - Land area

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Page 26: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!<

!

!

!

!

!

RYTHDALE

RYTH

DALE

DRA

IN

HAGE

LTHO

RNES

DRAI

N

BALLARTO ROAD WEST DRAIN

SOLDIERS RD WEST DR

SOLDIERS RD WEST DR

HAGELTHORNES DRAIN

TOOM

UC C

REEK

DEEP

CRE

EK

Soldiers Rd

Rythdale Rd

Fowler Rd

We

nn

Rd

Mc

gre

go

r R

d

Ho

bso

n R

d

Ballarto Rd

44.1 km

44 km

43.5 km43.2 km

42.8 km42.6 km

42.5 km42.2 km

41.8 km

41.7 km

41.5 km

41.4 km

41.1 km

41.6 km

43 km

44.5 km

41.9 km

43.7 km

42.3 km

42.1 km

43.8 km

42.7

km

44.2 km

44.3 km

43.6 km

44.4 km

43.1 km

43.9 km

43.3 km

43.4 km42.9 km

42.4 km

42 km

44.6 km

MW19(DRY)

Option AG-8

Option AO-9

CARDINIA

52

53

51 Deep Creek

54 Soldiers Rd West Dr

CPT105-A

CPT 111

CPT 112

CPT 108

CPT 110

CPT116

CPT 114

CPT 109

CPT 113

CPT105

Gas Import Jetty and

Pipeline Project

Mapsheet 20 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 27: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!<

!

!

!

!

!

DEEP C

REEK

FOGARTYS ROAD DRAIN

SOLDIERSRD WEST DR

FOGA

RTYS DRAIN

MC GREGORS DRAIN

MC G

REGO

RS D

RAIN

DEEP CREEKHAGELTHORNES DRAIN

Hall Rd

Soldiers Rd

Ho

bs

on

Rd

Watson Rd

Koo W

eeRu

p Rd

47.2 km

47 km

46.9 km

46.6 km46.5 km

46.4 km46.3 km

46.2 km45.9 km

45.7 km

45.6 km

45.5 km

45.4 km

45.3 km45.2 km

45 km

44.9 km

44.1

km

44.8 km

46.1 km

46 km

45.1 km

47.3

km

44.5 km

46.8 km

44.2 km

44.3 km

47.1 km

44.4 km

44.7 km

45.8 km

46.7 km

44.6 km

MW19(DRY)

CARDINIA

56 McGregors Drain58

55 Hagelthornes Drain

57

54 Soldiers Rd West DrCPT 112

CPT 117

CPT116

CPT 114

CPT 115

CPT 115

CPT 118

CPT 113

CPT 120CPT 119

CPT 121

CPT 120-A

Gas Import Jetty and

Pipeline Project

Mapsheet 21 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 28: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!

!

!

!

!

FOGA

RTYS

DRAIN

MCGREGORS DRAIN

NORTHERN BOUNDARY DRAIN

PAKENHAM CREEKDEEP CREEK

Mc

do

na

lds

Dra

in R

d

Mc

do

na

lds

Dra

in R

d E

as

t

Mc

do

na

lds

Dra

in R

d W

es

t

Watson Rd

Bourke Rd

Koo Wee Rup Rd

49.9 km

49.7 km

49.6 km

49.5 km

49.1 km

48.8 km48.4 km

48.1 km

47.9 km

47.7 km

47.6 km

47.4 km

47.2 km

47 km46.9 km

46.6 km

46.5 km

46.4 km

46.3

km

48.2 km

49.3 km

49.2 km

48.9 km

47.3 km

48.6 km

48.7 km

48 km

48.3 km 48.5 km

49 km

49.4 km

47.5 km

47.1 km

47.8 km

49.8 km

46.7

km

CARDINIA

56 McGregors Drain

5857

59 Deep Creek (lower)

CPT 117

CPT 116

CPT 118

CPT 126

CPT 126

Option AQ9

CPT 123

CPT 120

CPT 126-A

CPT 119

CPT 122

CPT 125CPT 125

CPT 124

CPT 121

CPT 120-A

CPT 120-B

Gas Import Jetty and

Pipeline Project

Mapsheet 22 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!( Waterway crossing locations

Open - Cut

Trenchless, HDD

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 29: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!

!!

!!

!!

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!

!

!

!

!

DEEP CREEK

Bald Hill Rd

Mc

do

na

lds

Dra

in R

d

Bourke Rd

Ry

an

Rd

Co

op

Rd

52.8 km

52.7 km

52.6 km

52.5 km

52.4 km52.3 km

52.2 km

52.1 km

51.9 km

51.8 km

51.7 km

51.6 km

51.5 km

51.3 km

51.2 km

50.5 km

49.9 km

49.7 km

49.6 km

50.6 km

50.4 km

50.8 km

50.3 km

50.7 km

51 km

50.2 km

52.9 km

51.4 km

50.1 km

49.8 km

53 km

50 km

50.9 km

51.1 km

MW21(1.15)

CARDINIA

60

6261

CPT 130

CPT 126-B

CPT 131

CPT 129

CPT 126CPT 126

CPT 126-C

CPT 126-A

CPT 132

Gas Import Jetty and

Pipeline Project

Mapsheet 23 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Aquatic GDEsHigh potential GDE (national assessment)

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Page 30: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!<

!

!

!

!

!

Oa

kv

iew

La

ne

Canty Lane

Bairnsdale Line

55.9 km

55.8 km

55.7 km55.6 km

55 km

54.8 km

54.7 km

54.6

km54.5 km

54.4

km54.3 km

54.2 km54.1 km

54 km

53.7 km

53.6 km53.5 km

53.3 km

53.1 km

52.8 km

52.7 km

53.4 km

53.8 km

55.3 km

55.5 km

54.9 km

53.2 km

55.1 km

55.2 km

55.4 km

53.9 km

52.9 km

53 km

MW22(1.09)

CARDINIA

63

64

CPT 130

CPT 135

CPT 131

CPT 136

CPT 133

CPT 134

CPT 137

CPT 138

CPT 131-A

CPT 132

CPT 139 Pakenham East Delivery Facility

Gas Import Jetty and

Pipeline Project

Mapsheet 24 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

!< Groundwater wells (water level in mbgs, 30 January 2019)

!( Waterway crossing locations

Open - Cut

Trenchless, Bore

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 31: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!

!

!

!

!

SEVEN MILE DRAIN

PRINCES HIGHWAYM

ou

nt

Ara

rat

No

rth

Rd

Oa

kv

iew

La

ne

Mo

un

tA

rara

tS

ou

thR

d

56.7 km

56.6 km

56.5 km

56.4 km

56.3 km

55.9 km

55.8 km

55.7 km

55.6 km

56 km

56.1 km

56.75 km

55.5 km

56.2 km

CARDINIA

CPT 142

CPT 136CPT 137

CPT 138

CPT 139

CPT 141

PakenhamEast Delivery

Facility

EOLSS

Gas Import Jetty and

Pipeline Project

Mapsheet 25 (of 25)

0 100 200

Metres

\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).

!

!

!

CRIB POINT

PAKENHAM

KOO WEE RUP

123

45

252423

222021

181916 17

1512 13 14

1110987 6

AE

CO

M d

oe

s n

ot

wa

rra

nt

the

ac

cu

rac

y o

r c

om

ple

ten

es

s o

f in

form

ati

on

dis

pla

yed

in t

his

ma

p a

nd

an

y p

ers

on

us

ing

it d

oe

s s

o a

t th

eir

ow

n r

isk.

AE

CO

M s

ha

ll b

ea

r n

o r

es

po

ns

ibili

ty o

r lia

bili

ty f

or

an

y e

rro

rs, f

au

lts

, de

fec

ts, o

r o

mis

sio

ns

in t

he

info

rma

tio

n.

! Kilometre point

Open - Cut

Trenchless, Bore

Gas Import Jetty Works area

Pipeline Works Area

Construction Footprint

Local Government Area

VV VVV Western Port Ramsar site boundary

Terrestrial GDEsHigh potential GDE (national assessment)

Moderate potential GDE (national assessment)

Low potential GDE (national assessment)

Page 32: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

Attachment 3

GWL Table

Page 33: GAS IMPORT JETTY AND PIPELINE PROJECT ......September 2019 W e s t e r n P o r t (3.27) (2.11) Water level in mbgs Jan 2019 Water level in mbgs Sept 2019 A! A! A! A! A! A! MW1 (NG)

Gas Import Jetty and Pipeline Project EESInquiry and Advisroy CommitteeGroundwater Level Gauging: January and Septmber 2019

Top of Casing Elevation

Ground Surface Elevation

mAHD mAHD 30/01/2019 23/09/2019 30/01/2019 23/09/2019 30/01/2019 23/09/2019

CPT006_MW01 MW01 7.375 6.594 4.58 3.38 3.80 2.60 2.80 4.00CPT012_MW02 MW02 5.231 5.348 1.41 0.18 1.52 0.30 3.83 5.05CPT012_MW03 MW03 3.408 3.522 3.43 2.23 3.54 2.34 -0.02 1.18CPT015_MW04 MW04 7.992 8.135 >4.09 3.98 >4.23 4.12 NK 4.01CPT000_GW02 GW02 13.574 13.674 3.68 3.17 3.78 3.27 9.89 10.40CPT000_GW03 GW03 7.636 7.753 3.17 Decom. 3.29 - 4.46 -CPT022_MW05 MW05 6.791 6.899 1.30 0.16 1.41 0.27 5.49 6.63CPT027_MW06 MW06 6.772 6.016 4.06 0.96 3.31 0.20 2.71 5.81CPT036_C_MW23 MW23 15.463 14.860 >4.86 1.27 >4.26 0.67 NK 14.19CPT040_B_MW07 MW07 11.575 10.974 3.20 2.06 2.60 1.46 8.38 9.52CPT040_B_GW04 GW04 10.812 10.122 3.14 2.57 2.45 1.88 7.68 8.24CPT045_GW05 GW05 8.601 7.867 2.48 1.53 1.74 0.80 6.12 7.07CPT000_MW08 MW08 8.382 8.509 3.40 0.91 3.53 1.04 4.98 7.47CPT051_MW09 MW09 3.203 3.341 1.48 NG 1.62 - 1.72 -CPT055_MW10 MW10 2.708 2.809 1.89 0.58 1.99 0.68 0.82 2.13CPT000_MW11 MW11* 3.530 3.645 2.94 0.71 3.05 0.83 0.59 2.82CPT064_MW12 MW12 4.367 3.607 3.99 1.23 3.23 0.47 0.38 3.14CPT068_MW13 MW13 5.323 4.622 2.92 0.93 2.22 0.23 2.40 4.39CPT037_B_MW14 MW14* 4.876 4.116 2.99 1.21 2.23 0.44 1.89 3.67CPT000_MW15 MW15* 3.578 3.675 2.14 2.18 2.24 2.28 1.44 1.40CPT000_MW16 MW16* 3.805 3.948 3.85 2.46 4.00 2.60 -0.05 1.35CPT099_MW17 MW17 2.895 2.941 >3.96 1.28 >4.01 1.32 NK 1.62CPT107_MW18 MW18 3.925 3.009 4.83 2.56 3.92 1.64 -0.91 1.37CPT114_MW19 MW19 4.911 4.162 >4.78 4.24 >4.03 3.49 NK 0.67CPT129_MW21 MW21 17.626 17.716 1.06 0.29 1.15 0.38 16.57 17.34CPT134_MW22 MW22 23.902 24.001 1.00 0.02 1.09 0.12 22.91 23.88

Top of Casing

Elevation# Ground Surface Elevation

Depth to Water (mbTOC)

Total depth of well

(mBTOC)mAHD mAHD 23/09/2019 23/09/2019 30/01/2019 23/09/2019 30/01/2019 23/09/2019

MW1 8.40 8.10 8.10 8.75 - 7.80 - 0.30MW2 8.45 7.95 7.28 8.11 - 6.78 - 1.17MW3 7.68 7.28 6.45 9.00 - 6.05 - 1.23MW4 2.86 2.96 0.72 5.00 - 0.82 - 2.15MW5 6.96 7.06 6.04 8.40 - 6.14 - 0.92BH20 2.77 2.87 0.53 3.23 - 0.63 - 2.24

Note:* - MW11, MW14, MW15 & MW16 gauged on 24 Sep 2019NK - not known (well dry or not gauged in Jan 2019 and/or Sep 2019)Dry to base of well

# Top of casing elevation and height of casing above ground level not known, elevation and heights estimated

Crib Point Receiving Facility Monitoring Wells

Groundwater Elevation (mAHD)

Depth to Water (mbgs)

Depth to Water (mbTOC)

Depth to Water (mbgs)

Groundwater Elevation (mAHD)

GIJPP EES Monitoring Wells