ITS South Africa AGM Gautrain Rapid Rail Link –
From Dreams to Reality Jack van der Merwe (Pr. Eng)
CEO : Gautrain Management Agency 25 August 2010
![Page 2: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/2.jpg)
Scope
Currently one of the largest Green fields rail infrastructure project in the world (USA $ 4,0 b) Emphasising the integration of Gautrain with
existing public transport in Gauteng Was voted “Best Global Deal to Sign” by the International Public Finance Association in 2007
![Page 3: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/3.jpg)
Objectives of the Gautrain Project
![Page 4: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/4.jpg)
More than Just Another Transport Project
![Page 5: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/5.jpg)
Transportation Goals • Alleviate severe traffic congestion (traffic volumes in corridor
growing at 7% pa.. for more than a decade) • Show Government’s commitment to the promotion of
public transport (National Land Transport Act,) – Catalyst public transport project
• Improve the image of public transport with this project and attract more car users to public transport
• To link to the Tshwane Ring Rail Project, linking Mamelodi, Atteridgeville and Soshanguve / Mabopane
• Part of holistic transport plan and network for Gauteng • Catalyst public transport project of national importance
![Page 6: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/6.jpg)
Flagship Public Transport Project of National Significance
• Gautrain is a flagship public transport project of national importance. It can be the catalyst to free existing resources or to generate new resources to promote public transport in a holistic fashion
• Need to ensure Gautrain is integrated into the public transport system of Gauteng: – Promotion of public transport – Strategic integration – Operational integration – Funding strategy / process – Gautrain governance structure – TDM strategy
![Page 7: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/7.jpg)
![Page 8: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/8.jpg)
The Deal
![Page 9: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/9.jpg)
PPP - Project partners: Equity PUBLIC PRIVATE
25%
25% 17%
17% 8%
8%
![Page 10: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/10.jpg)
Concessionaire Bombela
Turnkey Contractor
Civil Contractor
E&M Contractor
E&M Maintainer
Operator
Contractual Structure
Lenders
Province
Shareholders Agreement
Loan Agreement
Concession Agreement
E&M Maintenance Sub Contract
Bombardier 90% SPG 10%
RATP Dev 51% SPG 25.1% M&R 23.9%
Bombardier 25% Bouygues 25% M&R 25% SPG 25%
Private Sector Finance
Bombela “Family”
Onshore Sub-
supplier
Offshore Sub-supplier
Bombardier 25% Bouygues 25% M&R 25% SPG 25%
Shareholders
Bouygues 45% M&R 45% SPG 10%
Bombardier SPG
Onshore Sub-
supplier
Offshore Sub-supplier
Onshore procure
Offshore procure
Feeder & Distribution
Co-operation Agreement
Onshore Sub-
supplier
Offshore procure
Offshore procure
Offshore Sub-supplier
Offshore Sub-supplier
Onshore procure
Onshore procure
Onshore Procure
Onshore Sub-
supplier
Offshore procure
![Page 11: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/11.jpg)
Complex problems have simple, easy to understand, wrong answers.
No. 4 Grossman’s Misquote
![Page 12: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/12.jpg)
The hidden flaw never remains hidden.
No. 7 Law of Revelation
![Page 13: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/13.jpg)
Funding
![Page 14: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/14.jpg)
Funding
• Gautrain has 5 sources of funding – DoRA (Division of Revenue Act) money from central
government via the Department of Transport – MTEF (Medium Term Expenditure Framework) from
Gauteng Provincial Government – Private Sector Equity – Private Sector Borrowing – Provincial Borrowing
![Page 15: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/15.jpg)
Project Financing
MTEF 26.1%
DoRA 44.2%
Equity 1.8%
Private Debt 9.5%
Provincial borrowing
18.4%
![Page 16: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/16.jpg)
Signaling System adopted for the Gautrain
![Page 17: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/17.jpg)
Signalling
• In-cab signalling is being used • The recommended speed and distance to go
displayed in cab. • Speed monitored. • Brake intervention if over speeding • This system is called ATP (Automatic Train
Protection)
![Page 18: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/18.jpg)
Signalling
• The signalling system conforms to ERTMS(European Rail Traffic Management System) level 1.
• Track to train communication via balise (transponder).
• Track occupancy by means of Track Circuits • Swing nose points are being used • Allows for higher speeds over turnouts.
![Page 19: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/19.jpg)
19
Driver Supported by ATP
Brakes!
Travel direction!Controlled Balise
ATP!
Interlocking!
CAU
![Page 20: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/20.jpg)
20
What Can ATP Do?
• Is fail safe • Supports and supervises the driver • Warns the driver and applies the brakes in all
dangerous situations • Never intervenes unless the driver fails to
respond to given warnings • Makes it possible to increase traffic capacity
![Page 21: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/21.jpg)
Distance-to-go Signalling
S1 S2
![Page 22: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/22.jpg)
22
Speed (Ceiling) Supervision
80!
90!
V max!V max + 3!V max + 6!
V!
V max + 9!Service Brake!
Emergency Brake!
Audible!
FSB���Applied FSB���
Released FSB���
Applied
EB���Applied
EB Not Released ���until stationary
![Page 23: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/23.jpg)
![Page 24: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/24.jpg)
24
Target Supervision
40 80 80 80 80 - 00
00 00 00
Allowed speed
Target speed
80
60
20
First���warning
Application of the service brakes by
Second ���warning
Full service brake curve Emergency brake curve
![Page 25: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/25.jpg)
25
Typical Example (Park to Rosebank)
Dynamic Data Fixed Data
Gradient
Train Speed
Speed Profile
![Page 26: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/26.jpg)
Telecommunication Systems
![Page 27: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/27.jpg)
Telecommunications
• Monitoring of any ground settlement that might take place in the dolomitic areas around Centurion.
• Surveillance of the total rail system using CCTV cameras
• Cameras monitored and controlled from stations and the OCC.
• The Operations Control Centre situated in Midrand
•
![Page 28: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/28.jpg)
Main Subsystems
• Fibre Optic Communications System (FOCS) • Supervisory Control and Data Acquisition (SCADA) • Telephone System • Closed Circuit Television (CCTV) • Public Address (PA) and Passenger Information (PI) • Control Room Consoles
![Page 29: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/29.jpg)
Locations of Communications Subsystems
• Train Depot • Stations • MPS and APSs • Tunnels, Tunnel Rooms, Evac Shafts &
Portal • Guideway • Bus Depots (subject to VO)
![Page 30: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/30.jpg)
Fibre Optic Communications Subsystem
• Transports voice, video and data over fibre optic media
• Major Components: – Fibre Optic Add Drop Multiplexer (ADM) – Network Manager – Fibre Cable – LAN Switches and Routers – Fibre Optic Transceivers – GPS Network Time Server (NTS) – LAN and Fibre patch panel
![Page 31: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/31.jpg)
Fibre Optic Communications Subsystem
• Interfaces: – 1Gb/s Ethernet with VLANs supporting
SCADA, CCTV, PA/PI, AFC, Telephone, Radio and CJV systems (STMS, BMS & SAMS)
– Dedicated independent LANs for Signalling and O&M (Train & Bus VLANs)
– Voice Interface (4-Wire) supporting Radio – Fibre connections supporting ACSA, PS&D,
Signalling and CJV systems
![Page 32: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/32.jpg)
Fibre Optic Communications Subsystem
• Two FOCS rings with a total bandwidth of 2.5Gb/s each
• Cable loop via two separate conduits • OTN Multiplexer with 1G Ethernet Uplinks • Main FOCS backbone fibre single-mode cable 24
cores • FOCS fault tolerant for cable breaks, main
processor, power supplies and Signalling interfaces
• Secondary multi-mode and single-mode fibre cables for point to point signal distribution
![Page 33: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/33.jpg)
Fibre Optic Communications Subsystem
• Dual Ring Structure
![Page 34: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/34.jpg)
FOCS • Fast Reconfiguration of SDH Multiplexer < 50ms
![Page 35: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/35.jpg)
FOCS - Cabinet
![Page 36: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/36.jpg)
SCADA
• SCADA provides a user interface to monitor and/or control various subsystems;
• SCADA Remote Terminal Units (RTU) located in the Depot, station EERs, traction power disconnects, tunnel EERs, the MPS and in each APS;
• Interface with NTS for time stamping of events • Interfaces with CJV’s BMS, SAMS, and STMS
![Page 37: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/37.jpg)
SCADA – Monitoring & Control • The SCADA System will allow the Central Control
Operators (CCO) to control and monitor: – MPS and APSs; – Motorised Traction Power Disconnects; – Predefined CJV Tunnel Ventilation Scenarios
[auxiliary control]; – CJV 11kV Tunnel Power System [auxiliary
control], and – CJV tunnel drainage and pumps [auxiliary
control].
![Page 38: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/38.jpg)
SCADA – Monitoring & Control • SCADA will monitor the status of:
– AFC, CCTV, Radio, PA/PI, PBX, ETELs; – Fire Alarm Detection and Suppression System
[auxiliary monitoring]; – CJV Building Management System (Lifts,
Escalators, HVAC, Lighting); – CJV Security Access Management System
(Building Access Control); – Workshop Equipment (if applicable).
![Page 39: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/39.jpg)
SCADA – Depot Equipment
• SunFire V445 Server
![Page 40: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/40.jpg)
SCADA – System Diagram
![Page 41: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/41.jpg)
SCADA – RTU
![Page 42: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/42.jpg)
Closed Circuit Television System (CCTV)
• Major Components – Fixed and Pan Tilt Zoom (PTZ) Cameras – Networked Server Based Recorders – Operator Workstations provide live and pre-
recorded video of assigned cameras – Fibre Transceivers – Camera Power Supply
![Page 43: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/43.jpg)
CCTV - Guideway Cameras
• Cameras: mostly PTZ with some fixed • Pole mounted • Provides surveillance of open guideway space • Excludes tunnel sections due to lack of
permanent lighting • Spacing between 500 to 1000m • Low lux cameras but limited to ambient lighting
only
![Page 44: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/44.jpg)
Guideway Camera View
• PTZ Cameras are installed every 500 to 1000 metres along the alignment. • Each camera can only monitor a portion of its coverage at any given time. • There will most likely exist blind spots in this coverage. • This coverage will not work in low to no ambient lighting.
![Page 45: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/45.jpg)
CCTV - Server Based Video Recorder
• Provides means for live and stored video playback
• Video transmitted over Ethernet VLAN • Storage of all camera images for a minimum 7
days at 4CIF (704x576), 4 frames/sec. • Screen pops on designated CCTV
workstations of alarmed station ETEL locations • Interface with NTS for time stamping
![Page 46: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/46.jpg)
Passenger Announcement and Information System (PA/PI)
• Major Components: – Redundant servers – Station Controllers – Amplifiers – Speakers – Ambient noise sensors – LED Signs and LED Clocks – OCC Workstations
![Page 47: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/47.jpg)
Public Address
• Broadcasting of operational messages in stations; 1 zone for the platforms and 1 for the concourse
• OCC will be capable of making live or pre-recorded announcements to any combination of stations including the Depot
• Combination of suspended, flush and recess mounted speakers
• Ambient noise compensation to adjust speaker volume under varying noise levels
• Station Control Panel for live or selected pre-recorded messages
![Page 48: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/48.jpg)
Passenger Information Signs
• Two-double sided signs per platform edge • Displays:
• Time of next service departing from the platform; • Destination of next train; • Details of its stopping pattern - 4 or 8 car; • Time of second train calling at the platform, when the first train is
at the station;
• Display in 4 languages as needed – 2 Lines scrolling • Manual pre-recorded or adhoc messages via OCC
consoles can be sent to any combination of stations (one time or timed messages). Messages can be coordinated with PA message.
• Separate digital clock at both ends of platform
![Page 49: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/49.jpg)
Passenger Information Signs
![Page 50: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/50.jpg)
Platform Time Clock
![Page 51: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/51.jpg)
Telephone System – ETEL (typical)
![Page 52: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/52.jpg)
Operations control centre
![Page 53: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/53.jpg)
Bus Depots (VO to be issued)
• CCTV, PA, Telephone • Cameras for the yard and entrances • DVRs to record images • Main Bus Depot telephones connected to Train Depot
PBX via fibre optics • Radios for buses • Bus Tracking computer in Main Bus Depot • Fibre from Train Depot to Main Bus Depot for O&M
LAN
![Page 54: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/54.jpg)
Automatic Fare Collection
![Page 55: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/55.jpg)
All Electronic Automatic Fare Collection
• Use of modern Contactless Smart Card (CSC) as ticket medium
• CSC used complies with International contactless ticket standards (ISO 14443) and other standards
• Ability to integrate Gautrain rail travel, Feeder bus travel and Gautrain parking using same CSC
•
![Page 56: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/56.jpg)
All Electronic Automatic Fare Collection
• Use of world class Ticket Vending Machines for self service
• Ability for ticket interoperability with other operators based on agreement and compatible technology
![Page 57: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/57.jpg)
Level 2
Comms
Level 1
Fron
t Office
Level 0
Fare M
edia
Level 3
Ope
rator
Integrated
FMS Operator Back Office
Transit Ticket
Database
Kiosk
On/Off-‐Board Card Readers
On Board Equipment
Buy Transit Ticket
Check In
Check Out
Update TransacMon InformaMon
Revenue Management
ReporMng
Travel
Fare Data
TVM
AFC Process
ApplicaMon
Revenue Management
Fare Rules
ReporMng
Gautrain AFC structure
![Page 58: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/58.jpg)
SYSTEM CONFIGURATION – Sta;on
WAN
![Page 59: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/59.jpg)
SYSTEM CONFIGURATION – Central System
WAN
![Page 60: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/60.jpg)
Ticket vending machines
![Page 61: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/61.jpg)
Fare gates
![Page 62: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/62.jpg)
Electrification
![Page 63: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/63.jpg)
Electrification
• The traction voltage is 25KV. • Balanced feed from the Main Propulsion
Substation (MPS) at +25KV and -25KV to the Auto Paralleling Substations (APS) along the line.
• There are seven APSs. • Only one feed point from ESKOM comprising
two independent transmission lines. •
![Page 64: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/64.jpg)
Electrification
• In order to balance the voltage between the two rails a number of impedance bonds have been used.
• Regenerative braking • Regenerated Power can be used by other trains
or fed back into the system •
![Page 65: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/65.jpg)
Construction update & stations
![Page 66: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/66.jpg)
On the test track in Midrand ....
![Page 67: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/67.jpg)
![Page 68: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/68.jpg)
![Page 69: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/69.jpg)
Inside the train depot
![Page 70: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/70.jpg)
![Page 71: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/71.jpg)
Sandton Station
![Page 72: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/72.jpg)
Sandton Station
![Page 73: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/73.jpg)
Sandton Station
![Page 74: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/74.jpg)
Sandton Station platform
![Page 75: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/75.jpg)
Gautrain at Sandton Station
![Page 76: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/76.jpg)
![Page 77: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/77.jpg)
![Page 78: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/78.jpg)
![Page 79: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/79.jpg)
Centurion Station
![Page 80: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/80.jpg)
Supersport Park
Centurion Station
Viaduct 5 towards Centurion Station
John Vorster interchange
![Page 81: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/81.jpg)
Supersport Park
Centurion Station
Centurion Station John Vorster interchange
![Page 82: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/82.jpg)
Viaduct 5, John Vorster Ave
![Page 83: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/83.jpg)
Pier 76 27 January 2009
Jean Avenue Viaduct 5d - Balanced Cantilever
![Page 84: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/84.jpg)
Viaduct 5, Jean Ave
![Page 85: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/85.jpg)
Dolomite Area: U-shaped ground bridge
North of OvP24 (K103) U-shape (U10) Elements
23 January 2009
![Page 86: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/86.jpg)
Launching Girder
![Page 87: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/87.jpg)
Viaduct 5 launching crane
![Page 88: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/88.jpg)
P 6
P 7
P 8
Piers 6, 7 & 8 20 January 2009
John Vorster Viaduct 5b – Balanced Cantilever
![Page 89: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/89.jpg)
Airport Link
![Page 90: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/90.jpg)
OR Tambo station platform & concourse
![Page 91: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/91.jpg)
OR Tambo station platforms
![Page 92: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/92.jpg)
OR Tambo station
![Page 93: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/93.jpg)
Viaduct 5, Jean Ave
![Page 94: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/94.jpg)
Viaduct 5, Jean Ave
![Page 95: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/95.jpg)
![Page 96: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/96.jpg)
The Seven Stages of a PPP Project • Enthusiasm • Promises & Programmes • Disillusionment • Panic • Hunt for the guilty • Punishment of the innocent • Reward for those who had nothing to do with
it
![Page 97: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/97.jpg)
Whatever it is that hits the fan will not be evenly distributed.
No. 2 Law of Probable Dispersal
![Page 98: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/98.jpg)
Thank You www.gautrain.co.za
“The Future is not for the faint hearted.”
R Reagan
“The philosophers have only interpreted the world, the point
however is to change it” Karl Marx
![Page 99: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/99.jpg)
Rhodesfield Station
![Page 100: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/100.jpg)
Viaduct 15 towards airport
Rhodesfield Station parking area
![Page 101: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/101.jpg)
OR Tambo station
![Page 102: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/102.jpg)
OR Tambo station
![Page 103: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/103.jpg)
Opportunity always knocks at the least opportune moment.
No. 11 Ducharme’s Precept
![Page 104: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/104.jpg)
There’s always one more bug. No. 2 Lubarsky’s Law of Cybernetic Entomology
![Page 105: Gautrain ITSSA 2010](https://reader036.vdocument.in/reader036/viewer/2022062418/5565b343d8b42a4c6f8b4f0a/html5/thumbnails/105.jpg)
Park Station