gbt proposed service reductions 6/17/16

21
Initial Proposals for: Proposed Service Changes and Reductions June 2016

Upload: greater-bridgeport-transit

Post on 13-Apr-2017

719 views

Category:

Government & Nonprofit


1 download

TRANSCRIPT

Page 1: GBT Proposed Service Reductions 6/17/16

Initial Proposals for:

Proposed Service Changes and Reductions

June 2016

Page 2: GBT Proposed Service Reductions 6/17/16

Why?• GBT has been operating with

flat funding for the past two years

• There is uncertainty about operating investment in the coming fiscal years

• GBT has been working to make the operation as efficient as possible

• Service changes are part of a larger effort to balance the budget

• Small service reductions now may prevent larger reductions later

Proposals:• Reduce approximately 5,000

(2.5 - 3%) hours annually of service

• Consider temporary service suspensions with low impact on overall service

• Implement other changes/improvements that are neutral in cost

** No proposed change to the current bus fare

Page 3: GBT Proposed Service Reductions 6/17/16

Public Engagement

Page 4: GBT Proposed Service Reductions 6/17/16

PROCESS 1. Temporary suspension 2. Inconvenience not elimination3. Focus on low ridership route segments

Page 5: GBT Proposed Service Reductions 6/17/16

COASTAL LINKSCHEDULE CHANGESTo Fairfield (westbound):• 10:20 PM trip ends

at Bus StationTo the Dock Shopping Center(Eastbound):• 11:04 PM trip cut

PASSENGERS IMPACTED1. 1 Passenger on

the removed segment of the 10:20 PM trip

2. 4 Passengers on the 11:04 PM trip

Page 6: GBT Proposed Service Reductions 6/17/16

ROUTE 1ROUTE CHANGES1. 5:01 AM and 5:31 AM trips

begin at 1475 Barnum Ave (GBT driveway)

SCHEDULE CHANGESTo the Dock Shopping Center (Eastbound):• 10:57 trip PM cut

PASSENGERS IMPACTED1. I Passenger on the 5:01

AM trip segment 2. 3 Passengers on the

5:31AM trip segment3. 3 Passengers on the

10:57PM trip

Page 7: GBT Proposed Service Reductions 6/17/16

ROUTE 3ROUTE CHANGES1. Notre Dame High School/ Sacred

Heart extension removed

SCHEDULE CHANGESTo Westfield (northbound):- 6:20 AM trip cut

PASSENGERS IMPACTED1. 0 Passenger on the 6:20 AM trip

On the Notre Dame HS extension:To downtown (southbound):2. 0 Passenger on the 5:50 AM and

6:20 AM trips3. 3 Passengers on the 6:50 AM trip

To Westfield (northbound):4. 0 Passenger on the 12:42 AM trips 5. 5 Passengers on the 2:13 PM trip6. 1 Passenger on the 3:12 PM trip

Page 8: GBT Proposed Service Reductions 6/17/16

ROUTE 4ROUTE CHANGES1. Deviation to G.E

Headquarters removed.

SCHEDULE CHANGESTo Downtown (southbound):• 5:40 AM trip cut

PASSENGERS IMPACTED1. 0 Passenger on the 5:40 AM

tripOn the GE Headquarters extension:

To Westfield (southbound):2. 0 Passengers on the 6:50

AM and the 7:20 AM trips

To Downtown (northbound):3. 16 Passengers on the 1:54

PM trip4. 0 Passengers on the 4:55

PM trips

Page 9: GBT Proposed Service Reductions 6/17/16

ROUTE 5ROUTE CHANGES1. Extension to

Fairfield Metro area removed

SCHEDULE CHANGESSchedule to be refined based on new routing, existing frequency will be maintained or improved

PASSENGERS IMPACTED2. 80% of the trips in

the Fairfield Metro Extension have less than 5 Passengers

Page 10: GBT Proposed Service Reductions 6/17/16

ROUTE 6ROUTE CHANGES1. No change

SCHEDULE CHANGES

To Westfield (northbound):• 10:35 PM trip cut

To downtown (southbound):• 5:52 AM trip cut• 6:55 AM trip cut

PASSENGERS IMPACTED1. No Passenger use the

three trips

Page 11: GBT Proposed Service Reductions 6/17/16

ROUTE 7ROUTE CHANGES1. Route suspended

or reduced

Page 12: GBT Proposed Service Reductions 6/17/16

ROUTE 8ROUTE CHANGES1. No change

SCHEDULE CHANGESTo Westfield (northbound):• 9:50 PM trip • 10:50 PM trip To downtown (southbound):• 10:20 PM trip

PASSENGERS IMPACTEDTo Westfield (northbound):1. 0 Passenger on the

9:50 PM trip2. 5 Passengers on the

10:50 PM tripTo downtown (southbound):3. 8 Passenger on the

10:20 PM trip

Page 13: GBT Proposed Service Reductions 6/17/16

ROUTE 9ROUTE CHANGES1. No change

SCHEDULE CHANGESTo Downtown (southbound):• 9:23 PM trip ends at the Bus

Station

To Hawley Lane Mall (northbound):• 10:04 PM trip cut• 10:50 PM trip cut

PASSENGERS IMPACTEDTo Downtown:1. 14 Passengers on the 9:23 PM

trip, between the Bus Station and the Seaside Park

To Hawley Lane Mall:2. 5 Passengers on the 10:04 PM trip3. 7 Passengers on the 10:50 PM trip

Page 14: GBT Proposed Service Reductions 6/17/16

ROUTE 13ROUTE CHANGES1. Serve Palisade Ave

only before the Pearl Harbor loop

SCHEDULE CHANGESNo change

PASSENGERS IMPACTEDNo Passengers impacted

Page 15: GBT Proposed Service Reductions 6/17/16

ROUTE 15ROUTE CHANGES1. No change

SCHEDULE CHANGESTo Boston Ave at Bruce (northbound):• 10:50 PM trip cut• 11:20 PM trip cut

PASSENGERS IMPACTED1. 2 Passengers on the

10:50 PM trip2. 0 Passenger on the

11:20 PM trip

Page 16: GBT Proposed Service Reductions 6/17/16

ROUTE 16ROUTE CHANGES1. Straighten the route with a focus on Main

Street and ends at Hawley Lane Mall2. End service to Trumbull Corporate Park3. Reduce service span from 9am to 5 pm

SCHEDULE CHANGES

PASSENGERS IMPACTED4. Less than 10 Passengers use daily the East

Main diversion 5. Only trips with Passengers on board, North

of Hawley Lane Mall:1. 6:30 AM (northbound): 3 Passengers2. 8:00 AM (northbound): 3 Passengers3. 3:30 PM (northbound): 2 Passenger

6. 22 Passengers between 6-9am and 6 Passengers between 5-6pm

SedgewickHawley lane

9:00 AM 9:26 AM10:00 AM 10:26 AM11:00 AM 11:26 AM12:00 PM 12:26 PM 1:00 PM 1:26 PM 2:00 PM 2:26 PM 3:00 PM 3:26 PM 4:00 PM 4:26 PM

Hawley lane Sedgewick 9:30 AM 9:56 AM10:30 AM 10:56 AM11:30 AM 11:56 AM12:30 PM 12:56 PM 1:30 PM 1:56 PM 2:30 PM 2:56 PM 3:30 PM 3:56 PM 4:30 PM 4:56 PM

Page 17: GBT Proposed Service Reductions 6/17/16

ROUTE 17ROUTE CHANGES1. Serve Palisade Ave

only before the Pearl Harbor loop

2. Move route from Park Ave. to Madison Ave.

SCHEDULE CHANGESTo Pearl Harbor:• 6:30 AM trip cut

PASSENGERS IMPACTED1. No Passenger use the

6:30 AM trip

Page 18: GBT Proposed Service Reductions 6/17/16

ROUTE 20ROUTE CHANGES1. Service on Spring

Hill Road and Trefoil Drive removed

SCHEDULE CHANGESNo change

PASSENGERS IMPACTED2. 5 Passengers use

daily the removed extension.

Page 19: GBT Proposed Service Reductions 6/17/16

ROUTE 22XROUTE CHANGES1. The route will run

clockwise in the Shelton Corporate Park AM & PM

SCHEDULE CHANGESNo change

PASSENGERS IMPACTED2. No impact

Page 20: GBT Proposed Service Reductions 6/17/16

ROUTE 23ROUTE CHANGES1. No change

SCHEDULE CHANGESTo downtown (southbound):• 4:59 AM trip cut• 5:29 AM trip cut• 7:00 PM trip cutTo Derby (northbound):• 9:20 AM trip cut• 7:33 PM trip cut

PASSENGERS IMPACTED1. 5 Passengers or less on

those 5 trips

Page 21: GBT Proposed Service Reductions 6/17/16

PROPOSED SERVICE CHANGES AND REDUCTIONSQuestions?

Steven DeMichele, ManagerPlanning and Service Development

Greater Bridgeport Transit

(203) 366-7070 X100

[email protected]