general arrangments - site plan
TRANSCRIPT
St. Dymphna Hospital
North
500mm Earth ducts
AP
56000
56000
55536
56000
56000
55165
56000
H
23510
3139
686749
2349
1
Ground Floor Level55750
First Floor Level59350
Basement Level51600
Second Floor Level62950
Roof Level 266550
3600
3600
3600
4150
www.autodesk.com/revit
Scale
LECTURER
Drawn by
Date
Project number
Institute of Technology CarlowBSc. in Architectural Technology
Year 3 2015-2016
As indicated
25/0
4/20
16 2
0:41
:02
General Arrangments - Site Plan
Project Number 3
Carlow Primary Health Care Centre
22/04/2016
Author
Checker
A103
1 : 500Proposal Site Plan1
1 : 1000Site location2 1 : 250
Section A-A3
APFire assembly point
Water Hydrant for fire fighters
Disabled carparking spaces
Carparking spaces 2.4x4.8m
Surrounding Building
SITE:
The location of the site is in Carlow Ireland. Siteorientationis set out at due South, and perfectly achieving maximumsun orientation. The building is to be located on a site shared with a number of existingHSE facilities in Carlow town, including St Dympna’shospital.The intention is to centralise primary care facilities forCarlow town and its environs, while complementing thein-patient and hospital facilities provided by St. Luke’s in Kilkenny.
43D Site Renders
NTS
Vehicle and bycicle entrance
Pedestrian entrance
Site Notice